Page 1: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

www.ofwat.gov.uk

December 2019

Anglian Water ‒ Outcomes performance commitment appendix

Page 2: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

1

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

This appendix sets out in detail the performance commitments and outcome delivery incentives we are putting in place for Anglian Water for the period 2020-2025. 

This is a technical document to specify clearly the company’s performance commitments and outcome delivery incentives. This document is not intended to substitute the information that Anglian Water should provide to its customers on its outcomes and performance commitments.

The appendix sets out each of the company’s performance commitments and

associated outcome delivery incentives, firstly for common and then for bespoke

performance commitments.  

The appendix provides the following information on each performance commitment:

the name and unique identifier of the performance commitment; 

a summary of the purpose and benefits of the performance commitment. The

definitions and other terms set out in the performance commitment should be

considered to be authoritative in determining the company’s commitments and

incentives under the performance commitment; 

the detailed definition of the performance commitment. Where these refer to, and

incorporate, referenced or linked materials as part of the description of any

aspect of these definitions (for example documents on the Ofwat or another

organisation’s website, or an attachment to the performance commitment), the

referenced or linked materials should be considered to be authoritative in

interpreting the definitions of the performance commitment, unless otherwise

stated. It is the company’s responsibility to report accurate and complete

information and it must have adequate processes in place to do this. Any

direction on reporting and assurance is specific to the commitment and in

addition to the company meeting other obligations;  

the form and type of the outcome delivery incentive; 

the performance commitment levels and targets; 

the limits on outperformance and underperformance payments (caps and collars)

and neutral zones (deadbands), if applicable; 

the incentive rates, if applicable;  

the allocation of the performance commitment to the company’s applicable price

controls; and 

any other additional details on the measure, as required. 

In the PR19 Final Methodology (p56) we state that:

Page 3: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

2

Companies should commit to keeping the definitions of their performance

commitments unchanged during 2020-25 and, if any unavoidable changes are

required, to follow our procedures for changes. 

Companies should commit that their outcome delivery incentive payments will

only relate to real performance changes and not definitional, methodological or

data changes in the performance commitment. 

We will be mindful of these points when we are assessing companies’ performance against their commitments and outcome delivery incentives during the 2020-25 period. 

The procedures for making any changes to performance commitments during the 2020-25 period are specified in Annex 2 of this document.

The outcomes framework sits in the broader context of the company’s statutory and licence requirements for service delivery. Independently of the outcomes framework, each company also has to ensure that it complies with its legal obligations, or risk enforcement action. If a company’s performance falls below the level set for a performance commitment (irrespective of the existence of any deadband or collar), we will consider whether this is indicative of wider compliance issues to the detriment of consumers and whether enforcement action, with the potential for remedial and fining measures, is warranted. 

Accompanying documents set out our decisions that relate to performance commitments and outcome delivery incentives and the reasons for them. Please see ‘Delivering outcomes for customers policy appendix’ for sector wide issues and company specific issues in the company’s “Delivering for customers outcomes final decisions” document. The detail of the performance commitments and outcome delivery incentives set out in this appendix reflect these decisions.  These documents are intended to be fully consistent. In the event of any inconsistency, then this Outcomes performance commitment appendix takes precedence in all instances.

1.1 Common performance commitments

This section sets out the detail of each of the common performance commitments and outcome delivery incentives we are putting in place for the company for the

period 2020-2025.

A number of companies receive enhanced outcome delivery incentives for certain common PCs. In the PR19 methodology (Appendix 2, p.85) we state: “Companies proposing enhanced outperformance and underperformance payments should explain in their business plans how they will share the knowledge behind their success with companies across the sector by the end of the 2020-25 price review period or soon after. Receiving the enhanced outperformance payments will depend on whether the company has a credible plan for sharing its approach with the sector.”  This is an important aspect of the framework for enhanced outcome delivery

Page 4: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

3

incentives and we expect companies earning them to share learning on what has worked and what has not, consistent with the knowledge-sharing plans set out in their business plan. We also expect companies to assess the success of their knowledge-sharing and be able to provide evidence of this to Ofwat, and we will take account of this when we make in-period and end-of-period outcome delivery incentive determinations. 

Page 5: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

4

1.1.1 Water quality compliance (CRI)

Purpose: The performance commitment incentivises the company to fully comply

with statutory obligations and to mitigate any issues affecting performance.

Benefits: This performance commitment incentives companies to fully comply with

statutory obligations which promotes customer confidence that water is clean and

safe to drink.

Performance commitment definition and parameters

Unique Reference PR19ANH_3

Detailed definition

of performance

measure:

The definition for this performance commitment is set by the Drinking Water Inspectorate (DWI) in collaboration with the industry. This is published as DWI Compliance Risk Index (CRI), August 2018 at:

https://www.ofwat.gov.uk/publication/dwi-compliance-risk-index-cri-definition/

Additional detail on

measurement units: A CRI score is calculated for every individual compliance failure at water supply zones, supply points and treatment works, and service reservoirs. The annual CRI for a company, for any given calendar year, is the sum of the individual CRI scores for every compliance failure reported during the year (see the DWI Compliance Risk Index for further detail on the full calculations).

Specific exclusions: There are no specific exclusions, however, for some special rules on calculation of risk score refer to the definition.

Reporting and

assurance: No specific requirements.

Measurement unit

and decimal places Numerical CRI score, reported to two decimal places.

Measurement

timing Calendar year

Incentive form Revenue

Incentive type Underperformance payments

Timing of

underperformance

and outperformance

payments

In-period

Price control

allocation 100% water network plus

Page 6: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

5

Unique Reference PR19ANH_3

Frequency of

reporting Annual, on a calendar year basis. For example, performance assessment for 2020-21 will be based on the calendar year 2020, whereas 2024-25 assessment will be based on the calendar year 2024.

Any other relevant

information NA

Links to relevant

external documents NA

Performance commitment levels

Company

forecast

Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment level number NA 0.00 0.00 0.00 0.00 0.00

Standard

underperformance

collar number 9.50 9.50 9.50 9.50 9.50

Enhanced

underperformance

threshold number NA NA NA NA NA

Underperformance

deadband number 2.00 2.00 2.00 2.00 2.00

Outperformance

deadband number NA NA NA NA NA

Enhanced

outperformance

threshold number NA NA NA NA NA

Standard

outperformance

cap number NA NA NA NA NA

Page 7: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

6

Incentive rates

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard -0.788

Underperformance payment - enhanced NA

Outperformance payment - standard NA

Outperformance payment - enhanced NA

1.1.2 Water supply interruptions

Purpose: This performance commitment is designed to incentivise companies to

minimise the number and duration of supply interruptions.

Benefits: Reducing the number and duration of interruption events improves the

reliability of supply and reduces negative social and public health impacts on customers.

Performance commitment definition and parameters

Unique Reference PR19ANH_4

Detailed definition of

performance measure

Reducing interruptions to water supply is defined in the reporting guidance for PR19 – Supply Interruptions, published on 27 March 2018:

https://www.ofwat.gov.uk/publication/reporting-guidance-supply-interruptions/

It is calculated as the average number of minutes lost per customer for the whole customer base for interruptions that lasted three hours or more

Additional detail on

measurement units

Output should be presented as average minutes lost. Calculation of performance is carried out using the following equation:

((𝑃𝑟𝑜𝑝𝑒𝑟𝑡𝑖𝑒𝑠 𝑤𝑖𝑡ℎ 𝑖𝑛𝑡𝑒𝑟𝑟𝑢𝑝𝑡𝑒𝑑 𝑠𝑢𝑝𝑝𝑙𝑦 ≥ 180 𝑚𝑖𝑛𝑠) × 𝐹𝑢𝑙𝑙 𝑑𝑢𝑟𝑎𝑡𝑖𝑜𝑛 𝑜𝑓 𝑖𝑛𝑡𝑒𝑟𝑟𝑢𝑝𝑡𝑖𝑜𝑛) ÷

𝑇𝑜𝑡𝑎𝑙 𝑛𝑢𝑚𝑏𝑒𝑟 𝑜𝑓 𝑝𝑟𝑜𝑝𝑒𝑟𝑡𝑖𝑒𝑠 𝑠𝑢𝑝𝑝𝑙𝑖𝑒𝑑 (𝑦𝑒𝑎𝑟 𝑒𝑛𝑑) = average number of minutes lost per customer

Properties supplied: properties shall include billed mains pressure fed household and non-household properties connected to the company’s water supply network.

Supply interruption: is defined as when the supply of water to a property is at a pressure of three metres or less (adjusted for any difference in ground or property level).

Page 8: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

7

Unique Reference PR19ANH_4

Duration of interruption: is defined as the length of time for which properties are without a continuous supply of water at a pressure over three metres. The duration shall only be considered in the calculation of the metric where the duration is three hours or greater.

Specific exclusions: NA

Reporting and

assurance: No specific requirements.

Measurement unit

and decimal places Hours:minutes:seconds (HH:MM:SS) per property per year, reported to zero decimal places.

Measurement timing Reporting year

Incentive form Revenue

Incentive type Outperformance and underperformance payments

Timing of

underperformance

and outperformance

payments

In-period

Price control

allocation 100% water network plus

Frequency of

reporting Annual

Any other relevant

information Outcome delivery incentive rate applies on a per minute basis.

Links to relevant

external documents NA

Page 9: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

8

Performance commitment levels

Company

forecast

Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023

-24

2024-

25

Performance

commitment level HH:MM

:SS NA

00:06:30

00:06:08

00:05:45

00:05:23

00:05:00

Enhanced

underperformance

collar

HH:MM:SS

NA NA NA NA NA

Standard

underperformance

collar

HH:MM:SS

00:22:

45 00:22:

45 00:22:

45 00:22:

45 00:22:

45

Underperformance

deadband HH:MM

:SS NA NA NA NA NA

Outperformance

deadband HH:MM

:SS NA NA NA NA NA

Standard

outperformance

cap

HH:MM:SS

00:05:

37 00:04:

53 00:04:

05 00:03:

17 00:02:

26

Enhanced

outperformance

cap

HH:MM:SS

NA NA NA NA NA

Incentive rates

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard -1.146

Underperformance payment - enhanced NA

Outperformance payment - standard 1.146

Outperformance payment - enhanced NA

Page 10: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

9

1.1.3 Leakage

Purpose: This performance commitment is designed to incentivise companies to

reduce leakage.

Benefits: The benefits of reduced leakage are improved water resources

supply/demand balance, reduced need for water abstraction and increased water supply network resilience.

Performance commitment definition and parameters

Unique Reference PR19ANH_5

Detailed definition of

performance measure

The percentage reduction of three year average leakage in megalitres per day (Ml/d) from the 2019-20 baseline.

The total level of leakage is defined in the Final reporting guidance for PR19 – Leakage, published on 27 March 2018: https://www.ofwat.gov.uk/publication/reporting-guidance-leakage/

Three-year average values are calculated from annual average values for the reporting year and two preceding years and expressed in megalitres per day (Ml/d).

Additional detail on

measurement units

Total leakage is defined as the sum of distribution system leakage, including service reservoir losses and trunk main leakage plus customer supply pipe leakage.

Baseline total leakage is calculated as a three-year average of annual values for 2017-18, 2018-19 and 2019-20 and expressed in megalitres per day (Ml/d).

The company should provide a commentary in its 2019-20 Annual Performance Report submission describing any differences in its baseline total leakage level expressed in megalitres per day (Ml/d) in comparison with its business plan forecast. Reasons for any differences should be clearly explained and their volumetric impacts on the baseline quantified.

We reserve the right to intervene if the company does not clearly explain the reasons for differences or if the forecast 2019-20 service level is not met due to reasons which we consider to be within the company’s control.

As a minimum, if, using the PR14 calculation of leakage set out in the PR14 performance commitment, a company does not meet its 2019-20 leakage performance commitment level (specified in our PR14 final determinations), the company’s actual level for 2019-20 will, for the purposes of setting the baseline for the 2020-25 period, be adjusted downwards by one third of the difference between the value derived from the PR14 2019-20 performance commitment level and the actual level for

Page 11: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

10

Unique Reference PR19ANH_5

2019-20. For PR14 performance commitments set on a three or five year average basis, we assume the 2019-20 annual performance commitment level is equal to the average level specified in the PR14 performance commitment.

Outcome delivery incentives will be applied on a megalitres per day basis. The performance commitment levels expressed as percentage reduction will be applied to 2019-20 baseline. The difference between this value to one decimal place and actual three year average leakage will be used to calculate outcome delivery incentives.

Specific exclusions: As defined in the reporting guidance.

Reporting and

assurance: The company will also report leakage as a three year average in Ml/d to one decimal place, corresponding to the percentage reduction reported.

Measurement unit and

decimal places Percentage reduction from 2019-20 baseline, reported to one decimal place.

The volumetric levels resulting from the application of the percentage reduction in megalitres per day (Ml/d) reported to one decimal place.

Measurement timing Reporting year

Incentive form Revenue

Incentive type Outperformance and underperformance payments

Timing of

underperformance and

outperformance

payments

In-period

Price control allocation 100% water network plus

Frequency of reporting Annual

Any other relevant

information Performance commitment levels are set as percentage reduction from 2019-20 baseline.

Incentive payments relate to performance changes expressed in megalitres per day (Ml/d).

Links to relevant

external documents NA

Page 12: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

11

Performance commitment levels

Company

forecast

Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment level

– percentage

reduction

% NA 1.4 5.6 8.5 12.4 16.4

Enhanced

underperformance

collar –

percentage

reduction

%

-109.5 -109.5 -109.5 -109.5 -109.5

Standard

underperformance

collar –

percentage

reduction

%

-80.8 -80.8 -80.8 -80.8 -80.8

Standard

underperformance

collar for tier 1

standard

underperformance

rate – percentage

reduction

%

0.0 0.0 0.0 0.0 0.0

Underperformanc

e deadband –

percentage

reduction

%

NA NA NA NA NA

Outperformance

deadband –

percentage

reduction

%

NA NA NA NA NA

Standard

outperformance

cap – percentage

reduction

%

6.6 8.2 11.1 14.9 18.7

Enhanced

outperformance

cap £

* * * * *

Page 13: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

12

* For each performance commitment with an enhanced ODI, we will apply a cap (in

£) in each year on enhanced outperformance payments (ie payments for

performance above the enhanced threshold) equal to 1% of either water or

wastewater regulated equity (as relevant) in that year. Water regulated equity refers

to the subset of appointee regulated equity which is linked to either the water

network plus or water resources price controls, whilst wastewater regulated equity

refers to the subset of appointee equity which is linked to either the wastewater

network plus or bioresources price controls.

Incentive rates

Incentive type Incentive rate (£m/Ml/d/year)

Underperformance payment tier 1 –

standard -0.280

Underperformance payment tier 2 –

standard -0.365

Underperformance payment - enhanced -0.782

Outperformance payment - standard 0.219

Outperformance payment - enhanced 0.782

Page 14: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

13

1.1.4 Per capita consumption

Purpose: This performance commitment is designed to incentivise companies to

help customers reduce their consumption.

Benefits: The benefit of reduced per capita consumption (PCC) is to improve long

term water resources supply/demand balance and reduce need for water abstraction.

Performance commitment definition and parameters

Unique Reference PR19ANH_6

Detailed definition

of performance

measure

Per capita consumption is defined in the Final reporting guidance for PR19 – Per Capita Consumption, published on 27 March 2018: https://www.ofwat.gov.uk/publication/reporting-guidance-per-capita-consumption/

Three-year average values are calculated from annual average values for the reporting year and two preceding years and expressed in litres/person/day (l/p/d).

Additional detail on

measurement units

Per capita consumption is defined as the sum of measured household consumption and unmeasured household consumption divided by the total household population.

The company should provide a commentary in its 2019-20 Annual Performance Report submission describing any differences in its baseline PCC expressed in litres per person per day (l/p/d) in comparison with its business plan forecast. Reasons for any differences should be clearly explained and their volumetric impacts on the baseline quantified.

We reserve the right to intervene if the company does not clearly explain the reasons for differences or if the forecast 2019-20 service level is not met due to reasons which we consider to be within the company’s control.

Outcome delivery incentives will be applied on a litres per person per day basis. The performance commitment levels expressed as percentage reduction will be applied to 2019-20 baseline. The difference between this value to one decimal place and actual three year average per capita consumption will be used to calculate outcome delivery incentives.

Specific exclusions: As defined in the reporting guidance.

Reporting and

assurance: The company will also report per capita consumption as a three year average in litres per person per day to one decimal place, corresponding to the percentage reduction reported.

Measurement unit

and decimal places Percentage reduction from 2019-20 baseline, reported to one decimal place.

Page 15: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

14

Unique Reference PR19ANH_6

The volumetric levels resulting from the application of the percentage reduction in litres/person/day (l/p/d) reported to one decimal place.

Measurement

timing Reporting year

Incentive form Revenue

Incentive type Outperformance and underperformance payments

Timing of

underperformance

and outperformance

payments

In-period

Price control

allocation 100% water network plus

Frequency of

reporting Annual

Any other relevant

information Performance commitment levels are set as percentage reduction from 2019-20 baseline.

Incentive payments relate to performance changes expressed in litres/person/day (l/p/d).

Links to relevant

external documents NA

Page 16: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

15

Performance commitment levels

Company

forecast

Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment level

– percentage

reduction

% NA 0.8 2.0 3.2 4.5 5.6

Enhanced

underperformance

collar –

percentage

reduction

%

NA NA NA NA NA

Standard

underperformance

collar –

percentage

reduction

%

NA NA NA NA NA

Underperformance

deadband –

percentage

reduction

%

NA NA NA NA NA

Outperformance

deadband –

percentage

reduction

%

NA NA NA NA NA

Standard

outperformance

cap – percentage

reduction

%

NA NA NA NA NA

Enhanced

outperformance

cap – percentage

reduction

%

NA NA NA NA NA

Page 17: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

16

Incentive rates

Incentive type Incentive rate (£m/litres/person/day)

Underperformance payment - standard -0.374

Underperformance payment - enhanced NA

Outperformance payment - standard 0.312

Outperformance payment - enhanced NA

1.1.5 Mains repairs

Purpose: This performance commitment is designed to incentivise the company to

appropriately maintain and improve the asset health of the infrastructure and below-ground water mains network and demonstrate its commitment to its asset stewardship responsibility.

Benefits: This performance commitment helps to ensure that the overall asset

health of the water mains network is maintained and improved for the benefit of current and future generations.

Performance commitment definition and parameters

Unique Reference PR19ANH_11

Detailed definition

of performance

measure

Mains repairs is defined in the reporting guidance for PR19 – Mains Repairs per 1000km, published on 27 March 2018. https://www.ofwat.gov.uk/publication/reporting-guidance-mains-repairs-per-1000km/

It is reported as the number of mains repairs per thousand kilometres of the entire water main network (excluding communication and supply pipes).

Additional detail on

measurement units

Mains repairs – This includes all physical repair work to mains from which water is lost.

Mains length – This is the length of all pipes conveying treated water around the distribution point but not including communication pipes or supply pipes.

Specific exclusions As defined in the reporting guidance.

Reporting and

assurance The company should report mains repaired pro-actively and reactively separately. Pro-active repairs are those completed by the company as a result of the company’s active leakage control (ALC) or its own leak detection activity. Reactive repairs are those that are completed as a result of a customer

Page 18: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

17

Unique Reference PR19ANH_11

contact (made using any communication channel) informing the company of a leak.

Measurement unit

and decimal places Number of repairs per 1000km of mains, reported to one decimal place.

Measurement

timing Reporting year

Incentive form Revenue

Incentive type Underperformance payments

Timing of

underperformance

and outperformance

payments

In-period

Price control

allocation 100% water network plus

Frequency of

reporting Annual

Any other relevant

information NA

Links to relevant

external documents NA

Page 19: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

18

Performance commitment levels

Company

forecast

Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment level number NA 140.1 138.1 136.2 134.2 132.3

Enhanced

underperformance

collar number NA NA NA NA NA

Standard

underperformance

collar number NA NA NA NA NA

Underperformance

deadband number NA NA NA NA NA

Outperformance

deadband number NA NA NA NA NA

Standard

outperformance

cap number NA NA NA NA NA

Enhanced

outperformance

cap number NA NA NA NA NA

Incentive rates

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard -0.165

Underperformance payment - enhanced NA

Outperformance payment - standard NA

Outperformance payment - enhanced NA

Page 20: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

19

1.1.6 Unplanned outage

Purpose: This performance commitment is designed to incentivise the company to

appropriately maintain and improve the asset health of the non-infrastructure or above-ground water assets and demonstrate its commitment to its asset stewardship responsibility.

Benefits: This performance commitment helps to ensure that the overall asset

health of the above-ground water assets is maintained and improved for the benefit of current and future generations.

Performance commitment definition and parameters

Unique Reference PR19ANH_12

Detailed definition

of performance

measure

Unplanned outage is defined in the reporting guidance for PR19 – Unplanned Outage, published on 4 April 2019.

https://www.ofwat.gov.uk/publication/reporting-guidance-unplanned-outage/

This measure is reported as the temporary loss of peak week production capacity (PWPC) in the reporting year weighted by the duration of the loss (in days). Unplanned outage for each water production site is calculated separately and then summed over the reporting year to give a total actual unplanned outage for the water resource zone.

The company water resource zone weighted outage should then be summed (Ml/d) and normalised based on overall company peak week production capacity to be reported as a percentage.

Additional detail on

measurement units See reporting guidance for additional detail.

Specific exclusions: As defined in the reporting guidance.

Reporting and

assurance The company should report its current company level peak week production capacity (PWPC) (Ml/d), the unplanned outage (Ml/d) and planned outage (Ml/d) in its commentary. The company should also provide a summary of data quality and compliance in accordance with the reporting requirements.

Measurement unit

and decimal places Percentage of peak week production capacity, reported to two decimal places.

Measurement

timing Reporting year

Incentive form Revenue

Incentive type Underperformance payment

Page 21: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

20

Unique Reference PR19ANH_12

Timing of

underperformance

and outperformance

payments

In-period

Price control

allocation 100% water network plus

Frequency of

reporting Annual

Any other relevant

information NA

Links to relevant

external documents NA

Performance commitment levels

Company

forecast

Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023-

24

2024-25

Performance

commitment level % NA 2.34 2.34 2.34 2.34 2.34

Enhanced

underperformance

collar % NA NA NA NA NA

Standard

underperformance

collar % 5.22 5.22 5.22 5.22 5.22

Underperformance

deadband % NA NA NA NA NA

Outperformance

deadband % NA NA NA NA NA

Standard

outperformance

cap % NA NA NA NA NA

Enhanced

outperformance

cap % NA NA NA NA NA

Page 22: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

21

Incentive rates

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard -1.324

Underperformance payment - enhanced NA

Outperformance payment - standard NA

Outperformance payment - enhanced NA

1.1.7 Risk of severe restrictions in a drought

Purpose: To measure the resilience of each company to severe restrictions in a 1-in-

200 drought and incentivise the improvement of this level of resilience in the short and longer term.

Benefits: A reduction in the risk of severe drought restrictions will reduce the

associated risk of substantial costs and detrimental effects on customers’ wellbeing.

Performance commitment definition and parameters

Unique Reference PR19ANH_9

Detailed definition

of performance

measure

The performance commitment drought risk is defined in the reporting guidance – Drought resilience metric, published on 13 March 2018:

https://www.ofwat.gov.uk/publication/drought-resilience-metric-risk-of-severe-restrictions-in-a-drought/

The overall metric will be, on a company basis, the percentage of the customer population at risk of experiencing severe restrictions in a 1-in-200 year drought, on average, over 25 years.

Additional detail on

measurement units

The metric will be calculated using the following formula:

𝐴𝑡 𝑟𝑖𝑠𝑘 𝑖𝑓, 𝐷𝑂−𝑂𝐴 <𝐷𝐷+𝑇𝐻

Where:

Deployable output (supply) = DO

Outage allowance (unavailable supply) = OA

Dry year demand = DD

Target headroom (uncertainty) = TH

The annual percentage of customers at risk is then calculated by dividing total numbers of customers at risk (ie population of a water resource zone) by the total number of customers served by the company.

Specific exclusions: As defined in the reporting guidance.

Page 23: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

22

Unique Reference PR19ANH_9

Reporting and

assurance As defined in the reporting guidance.

Measurement unit

and decimal places Percentage of population at risk reported to one decimal place

Measurement

timing Reporting year

Incentive form Reputational

Incentive type NA

Timing of

underperformance

and outperformance

payments

NA

Price control

allocation NA

Frequency of

reporting Annual

Any other relevant

information NA

Links to relevant

external documents NA

Page 24: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

23

Performance commitment levels

Company

forecast Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment level % NA 20.5 20.5 22.0 21.8 0.0

Enhanced

underperformance

collar % NA NA NA NA NA

Standard

underperformance

collar % NA NA NA NA NA

Underperformance

deadband % NA NA NA NA NA

Outperformance

deadband % NA NA NA NA NA

Standard

outperformance

cap % NA NA NA NA NA

Enhanced

outperformance

cap % NA NA NA NA NA

Incentive rates

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard NA

Underperformance payment - enhanced NA

Outperformance payment - standard NA

Outperformance payment - enhanced NA

Page 25: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

24

1.1.8 Priority services for customers in vulnerable circumstances

Purpose: To ensure a minimum standard across all companies for the number of

households registered on the Priority Service Register (PSR) and for PSR data checking.

Benefits: This performance commitment will help to increase the number of

customers in vulnerable circumstances that receive the most appropriate service to their needs. It will also ensure the PSR is kept up to date.

Performance commitment definition and parameters

Unique Reference PR19ANH_22

Detailed definition

of performance

measure

This common performance commitment is defined in the reporting guidance: ‘Reporting guidance – Common performance commitment for the Priority Service Register’.

This performance commitment consists of the following criteria:

The PSR reach: percentage of households that the company supplies with water and/or wastewater services that are registered on the company’s PSR;

Attempted contact: percentage of distinct households on the PSR that the company has attempted to contact over a two-year period;

Actual contact: percentage of distinct households on the PSR that the company has actually contacted over a two-year period.

To achieve compliance with this performance commitment the reach, attempted contact and actual contact targets should be achieved.

Additional detail on

measurement units

The performance commitment is calculated using the following formulas:

𝑃𝑆𝑅 𝑅𝑒𝑎𝑐ℎ = (𝑃𝑆𝑅 [ℎ𝑜𝑢𝑠𝑒ℎ𝑜𝑙𝑑𝑠]

𝑇𝑜𝑡𝑎𝑙 ℎ𝑜𝑢𝑠𝑒ℎ𝑜𝑙𝑑𝑠) × 100

𝐴𝑡𝑡𝑒𝑚𝑝𝑡𝑒𝑑 𝑐𝑜𝑛𝑡𝑎𝑐𝑡𝑠 = (𝑁𝑢𝑚𝑏𝑒𝑟 𝑜𝑓 𝑎𝑡𝑡𝑒𝑚𝑝𝑡𝑒𝑑 𝑐𝑜𝑛𝑡𝑎𝑐𝑡𝑠

𝑃𝑆𝑅 [ℎ𝑜𝑢𝑠𝑒ℎ𝑜𝑙𝑑𝑠]) × 100

𝐴𝑐𝑡𝑢𝑎𝑙 𝑐𝑜𝑛𝑡𝑎𝑐𝑡𝑠 = (𝑁𝑢𝑚𝑏𝑒𝑟 𝑜𝑓 𝑎𝑐𝑡𝑢𝑎𝑙 𝑐𝑜𝑛𝑡𝑎𝑐𝑡𝑠

𝑃𝑆𝑅 [ℎ𝑜𝑢𝑠𝑒ℎ𝑜𝑙𝑑𝑠]) × 100

PSR [households] – Number of households on the PSR (recorded on 31 March)

Total households – Total number of households served (recorded on 31 March)

Page 26: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

25

Unique Reference PR19ANH_22

Attempted contact – Distinct households which the company has attempted to contact over a two-year period (recorded on 31 March)

Actual contact – Distinct households where the company had actual contact over a two-year period (recorded on 31 March)

Specific exclusions NA

Reporting and

assurance Companies should also report the following information:

PSR reach: companies should present PSR membership by separately reporting forecast annual figures for individuals registered receiving support through PSR services for a) communication, b) support with mobility and access restrictions c) support with supply interruption, d) support with security and e) support with other needs.

PSR data-checking: Companies should report the number of households added and removed from the PSR if the data is not available to report numbers of individuals. Where possible, the company should report the corresponding figure for individuals alongside this.

Regardless of whether an ‘attempted’ contact is undertaken through the company or a third party, we require all performance to be reported as part of the single ‘attempted contact’ measure in the company’s overall performance reporting to Ofwat.

Measurement unit

and decimal places PSR reach: percentage of applicable households, reported to one decimal place.

Actual contacts: percentage of applicable households, reported to one decimal place.

Attempted contacts: percentage of applicable households, reported to one decimal place

Measurement

timing Reporting year

Incentive form Reputational

Incentive type NA

Timing of

underperformance

and outperformance

payments

NA

Price control

allocation NA

Frequency of

reporting Annual

Any other relevant

information NA

Page 27: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

26

Unique Reference PR19ANH_22

Links to relevant

external documents

NA

Performance commitment levels

Company

forecast Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment level:

Reach % NA 1.8 3.6 6.1 9.5 12.8

Performance

commitment level:

Actual contact % 17.5 35.0 35.0 35.0 35.0

Performance

commitment level:

Attempted contact % 45.0 90.0 90.0 90.0 90.0

Enhanced

underperformance

collar % NA NA NA NA NA

Standard

underperformance

collar % NA NA NA NA NA

Underperformance

deadband % NA NA NA NA NA

Outperformance

deadband % NA NA NA NA NA

Standard

outperformance

cap % NA NA NA NA NA

Enhanced

outperformance

cap % NA NA NA NA NA

Page 28: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

27

Incentive rates

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard NA

Underperformance payment - enhanced NA

Outperformance payment - standard NA

Outperformance payment - enhanced NA

1.1.9 Internal sewer flooding

Purpose: This performance commitment is designed to incentivise companies to

reduce the number of internal sewer flooding incidents.

Benefits: A reduction in internal sewer flooding reduces disruption and other

negative social impacts for customers.

Performance commitment definition and parameters

Unique Reference PR19ANH_7

Detailed definition

of performance

measure

The internal sewer flooding measure is defined in the reporting guidance for PR19 – Sewer Flooding, updated on 28 April 2018:

https://www.ofwat.gov.uk/publication/reporting-guidance-sewer-flooding/

The measure is calculated as the number of internal sewer flooding incidents normalised per 10,000 sewer connections including sewer flooding due to severe weather events.

Companies might also want to present their performance commitments in absolute numbers to make it easier for customers and stakeholders to understand.

The definitive service levels are those expressed as the values normalised per 10,000 sewer connections.

Additional detail on

measurement units

Internal flooding: is defined as flooding which enters a building or passes below a suspended floor.

Flooding event: is defined as the escape of water from a sewerage system, irrespective of size as evidenced by standing water, running water or visible deposits of silt or sewage solids. It includes flooding due to overloaded sewers (hydraulic flooding) and due to other causes (FOC).

Number of incidents: is defined as the number of properties flooded during each flooding event from a public sewer including incidents on sewers transferred under the Transfer of

Page 29: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

28

Unique Reference PR19ANH_7

Private Sewers Regulations 2011 and pumping stations transferred in 2016.

Severe weather: is defined as individual rainfall events with a storm return period greater than 1 in 20 years. Flooding incidents caused by severe weather should be included in this measure.

Sewer length: Include the length of the entire network, including sewers that transferred to their responsibility under the Transfer of Public Sewers Regulations 2011. The company should separately record the length of transferred sewers, the calculation of this measure should be based on the latest measurements of the length.

The absolute number of incidents is divided by the total number of the company’s sewer connections and multiplied by 10,000 to derive the normalised value.

Specific exclusions As defined in the reporting guidance.

Reporting and

assurance This measure will be reported as both the absolute number of internal sewer flooding incidents and a normalised value of internal flooding incidents per 10,000 sewer connections.

Any changes to the number of sewer connections that will have a material impact on the performance of this measure should be highlighted in the report commentary.

Measurement unit

and decimal places Number of incidents per 10,000 sewer connections reported to two decimal places.

Measurement

timing Reporting year

Incentive form Revenue

Incentive type Outperformance and underperformance payments

Timing of

underperformance

and outperformance

payments

In-period

Price control

allocation 100% wastewater network plus

Frequency of

reporting Annual

Any other relevant

information NA

Links to relevant

external documents NA

Page 30: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

29

Performance commitment levels

Company

forecast Committed performance level

Unit 2019-20

2020-

21

2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment level number NA 1.68 1.63 1.58 1.44 1.34

Enhanced

underperformance

collar number NA NA NA NA NA

Standard

underperformance

collar number 3.35 3.35 3.35 3.35 3.35

Underperformance

deadband number NA NA NA NA NA

Outperformance

deadband number NA NA NA NA NA

Standard

outperformance

cap number 1.35 1.30 1.25 1.11 1.01

Enhanced

outperformance

cap number NA NA NA NA NA

Incentive rates

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard -10.944

Underperformance payment - enhanced NA

Outperformance payment - standard 10.994

Outperformance payment - enhanced NA

Page 31: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

30

1.1.10 Pollution incidents

Purpose: This performance commitment is designed to incentivise companies to

reduce the number of pollution incidents that impact the environment.

Benefits: Delivery of this performance commitment will improve the quality of the

environment by reducing the number of pollution incidents that occur.

Performance commitment definition and parameters

Unique Reference PR19ANH_8

Detailed definition

of performance

measure

Pollution Incidents is defined in the following guidance for PR19 – Water & Sewerage Company Environmental Performance Assessment (EPA) Methodology (version 3). Published November 2017 by the Environment Agency.

https://www.ofwat.gov.uk/wp-content/uploads/2017/12/WatCoPerfEPAmethodology_v3-Nov-2017-Final.pdf

The total number of pollution incidents (categories 1 to 3) per 10,000km of sewer length for which the company is responsible in a calendar year.

Additional detail on

measurement units As defined in the reporting guidance.

Specific exclusions As defined in the reporting guidance.

Reporting and

assurance

This measure will be reported as both the absolute number of pollution incidents and a normalised value of pollution incidents per 10,000km of sewer.

Any changes to the length of the wastewater network that will have a material impact on the performance of this measure should be highlighted in the report commentary.

Measurement unit

and decimal places Number of pollution incidents per 10,000 km of the wastewater network reported to two decimal places.

Measurement

timing Calendar year

Incentive form Revenue

Incentive type Outperformance and underperformance payments

Timing of

underperformance

and outperformance

payments

In-period

Price control

allocation 100% wastewater network plus

Page 32: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

31

Unique Reference PR19ANH_8

Frequency of

reporting Annual, on a calendar year basis. For example, performance assessment for 2020-21 will be based on the calendar year 2020, whereas 2024-25 assessment will be based on the calendar year 2024.

Any other relevant

information NA

Links to relevant

external documents https://www.ofwat.gov.uk/wp-content/uploads/2017/12/20171129-Incidents-and-their-classification-the-Common-Incident-Classification-Scheme-CICS-23.09.16.pdf

Incidents and their classification: the Common Incident Classification Scheme (CICS), Ref: 04_01, Issued 23/9/2016 by the Environment Agency

Performance commitment levels

Company

forecast Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment level Number NA 24.51 23.74 23.00 22.40 19.50

Enhanced

underperformance

collar Number NA NA NA NA NA

Standard

underperformance

collar Number 36.76 36.76 36.76 36.76 36.76

Underperformance

deadband Number NA NA NA NA NA

Outperformance

deadband Number NA NA NA NA NA

Standard

outperformance

cap Number 9.51 8.74 8.00 7.40 4.50

Enhanced

outperformance

cap Number NA NA NA NA NA

Page 33: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

32

Incentive rates

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard -0.445

Underperformance payment - enhanced NA

Outperformance payment - standard 0.295

Outperformance payment - enhanced NA

1.1.11 Risk of sewer flooding in a storm

Purpose: This performance commitment is designed to incentivise companies to

better understand flood risk in their region and utilise this knowledge to develop long term strategies and so over the long term reduce the risk of sewer flooding.

Benefits: Reduction of flood risk during storm events protects customers and the

environment from the disruption and costs associated with flood events. Reduced cost of flood resilience for customers through a better understanding of flood risks and appropriate interventions.

Performance commitment definition and parameters

Unique Reference PR19ANH_10

Detailed definition

of performance

measure

The performance commitment risk of sewer flooding in a storm is defined in the reporting guidance – risk of sewer flooding in a storm, published on 4 April 2019: https://www.ofwat.gov.uk/publication/reporting-guidance-risk-of-sewer-flooding-in-a-storm/

This measure will record the percentage of the region’s population at risk from internal hydraulic flooding from a 1 in 50-year storm, based on modelled predictions.

Additional detail on

measurement units See guidance document for full details of the calculation and measurements units.

Specific exclusions As defined in the guidance.

Reporting and

assurance

As defined in the guidance.

Measurement unit

and decimal places Percentage of population at risk, reported to two decimal places.

Measurement

timing Reporting year

Page 34: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

33

Unique Reference PR19ANH_10

Incentive form Reputational

Incentive type NA

Timing of

underperformance

and outperformance

payments

NA

Price control

allocation NA

Frequency of

reporting Annual

Any other relevant

information NA

Links to relevant

external documents NA

Performance commitment levels

Company

forecast Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment level % NA 9.75 9.75 9.75 9.75 9.75

Enhanced

underperformanc

e collar % NA NA NA NA NA

Standard

underperformanc

e collar % NA NA NA NA NA

Underperformanc

e deadband % NA NA NA NA NA

Outperformance

deadband % NA NA NA NA NA

Standard

outperformance

cap % NA NA NA NA NA

Enhanced

outperformance

cap % NA NA NA NA NA

Page 35: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

34

Incentive rates

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard NA

Underperformance payment - enhanced NA

Outperformance payment - standard NA

Outperformance payment - enhanced NA

1.1.12 Sewer collapses

Purpose: This performance commitment is designed to incentivise the company to

appropriately maintain and improve the asset health of the infrastructure or below-ground wastewater assets and demonstrate its commitment to its asset stewardship responsibility.

Benefits: This performance commitment helps to ensure that the overall asset

health of the below-ground wastewater assets is maintained and improved for the benefit of current and future generations.

Performance commitment definition and parameters

Unique Reference PR19ANH_13

Detailed definition

of performance

measure

Sewer collapses is defined in the reporting guidance - sewer collapses per 1000km (updated), published on 4 April 2019:

https://www.ofwat.gov.uk/publication/reporting-guidance-sewer-collapses-per-1000km/

Number of sewer collapses per 1000 kilometres of all sewers causing an impact on service to customers or the environment

Additional detail on

measurement units

Sewer collapse: A sewer collapse is considered to be where a structural failure has occurred to the pipe that results in a service impact to a customer or the environment and where action is taken to replace or repair the pipe to reinstate normal service. The measure intentionally does not refer to the magnitude of the collapse. The measure includes rising mains. Collapses on the entire network are to be reported.

Sewer length: Include the length of the entire network, including sewers that transferred to their responsibility under the Transfer of Public Sewers Regs 2011. The company should separately record the length of transferred sewers, the calculation of this measure should be based on the latest measurements of the length.

Specific exclusions As defined in the guidance.

Page 36: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

35

Unique Reference PR19ANH_13

Reporting and

assurance The company is also required to report the number of occasions where a failure has occurred to the pipe that results in either any contact with the company (i.e. an impact on service has caused someone to contact the company) or any unplanned escape of wastewater and results in spot repairs or relining.

Measurement unit

and decimal places Number of collapses per 1000km of sewer network, reported to two decimal places

Measurement

timing Reporting year

Incentive form Revenue

Incentive type Underperformance payments

Timing of

underperformance

and outperformance

payments

In-period

Price control

allocation 100% wastewater network plus

Frequency of

reporting Annual

Any other relevant

information NA

Links to relevant

external documents NA

Page 37: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

36

Performance commitment levels

Company

forecast Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023-

24 2024-25

Performance

commitment

level number NA 5.60 5.60 5.50 5.50 5.50

Enhanced

underperforma

nce collar number NA NA NA NA NA

Standard

underperforma

nce collar number 7.86 7.86 7.76 7.76 7.76

Underperforma

nce deadband number NA NA NA NA NA

Outperformanc

e deadband number NA NA NA NA NA

Standard

outperformance

cap number NA NA NA NA NA

Enhanced

outperformance

cap number NA NA NA NA NA

Incentive rates

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard -2.298

Underperformance payment - enhanced NA

Outperformance payment - standard NA

Outperformance payment - enhanced NA

Page 38: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

37

1.1.13 Treatment works compliance

Purpose: This performance commitment is designed to incentivise the company to

appropriately maintain and improve the asset health of the non-infrastructure or above-ground wastewater assets and demonstrate its commitment to its asset stewardship responsibility.

Benefits: This performance commitment helps to ensure that the overall asset

health of the above-ground wastewater assets is maintained and improved for the benefit of current and future generations.

Performance commitment definition and parameters

Unique Reference PR19ANH_14

Detailed definition

of performance

measure

Treatment works compliance is defined in the reporting guidance for PR19 – Water & Sewerage Company Environmental Performance Assessment (EPA) Methodology (version 3). Published November 2017 by the Environment Agency.

https://www.ofwat.gov.uk/wp-content/uploads/2017/12/WatCoPerfEPAmethodology_v3-Nov-2017-Final.pdf

The discharge permit compliance metric is reported as the number of failing sites (as a percentage of the total number of discharges) and not the number of failing discharges.

Additional detail on

measurement units A discharge can be confirmed as failing for a number of breaches of a numeric permit at wastewater treatment works and water treatment works, these are set out in the Environment Agency guidance above.

Specific exclusions NA

Reporting and

assurance No specific requirements.

Measurement unit

and decimal places Percentage compliance, reported to two decimal places.

Measurement

timing Calendar year

Incentive form Revenue

Incentive type Underperformance payments

Timing of

underperformance

and outperformance

payments

In-period

Page 39: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

38

Unique Reference PR19ANH_14

Price control

allocation 39% water network plus

61% wastewater network plus

Frequency of

reporting Annual, on a calendar year basis. For example, performance assessment for 2020-21 will be based on the calendar year 2020, whereas 2024-25 assessment will be based on the calendar year 2024.

Any other relevant

information NA

Links to relevant

external documents NA

Performance commitment levels

Company

forecast Committed performance level

Unit 2019-20

2020-

21

2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment level % NA 100.00 100.00 100.00 100.00 100.00

Enhanced

underperformance

collar % NA NA NA NA NA

Standard

underperformance

collar % 95.40 95.40 95.40 95.40 95.40

Underperformance

deadband % 99.00 99.00 99.00 99.00 99.00

Outperformance

deadband % NA NA NA NA NA

Standard

outperformance

cap % NA NA NA NA NA

Enhanced

outperformance

cap % NA NA NA NA NA

Page 40: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

39

Incentive rates

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard -1.348

Underperformance payment - enhanced NA

Outperformance payment - standard NA

Outperformance payment - enhanced NA

1.1.14 C-MeX

Purpose: This performance commitment is designed to incentivise companies to

improve the experience they provide to residential customers.

Benefits: This performance commitment should increase residential customer

satisfaction, by improving both the overall customer experience and companies’ handling of customer contacts.

Performance commitment definition and parameters

Unique Reference PR19ANH_1

Detailed definition

of performance

measure

The customer measure of experience (C-MeX) is a measure of customer satisfaction. A company’s C-MeX score is calculated as the weighted average of customer satisfaction (CSAT) scores from customer service (CS) and customer experience (CE) surveys.

Standard and higher performance payments under C-MeX depend on a company’s performance relative to those of other companies.

Higher performance payments are available if the company passes each of the following three ‘gates’:

the company is one of the top three performers by C-MeX score;

the company is at or above a cross-sector threshold of customer satisfaction performance based on the all-sector upper quartile (ASUQ) of the UK Customer Satisfaction Index (UKCSI); and

the company has lower than the industry average number of household complaints (per 10,000 connections).

Additional detail on

measurement units The company’s C-MeX score (determined before the application of any adjustment for the number of channels offered) is calculated using the following formula:

𝐶-𝑀𝑒𝑋 𝑠𝑐𝑜𝑟𝑒 = 50% ∗ 𝐶𝑆-𝐶𝑆𝐴𝑇 + 50% ∗ 𝐶𝐸-𝐶𝑆𝐴𝑇

Page 41: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

40

Unique Reference PR19ANH_1

Each CSAT score is rescaled to be out of 100.

Three points are deducted from the C-MeX score if the company does not offer at least five communication channels, including three online channels, to receive contacts from customers.

Standard payments

The company’s C-MeX incentive rate (determined before the application of any higher performance payment for passing the three gates) depends on its C-MeX score relative to those of other companies. Specifically, it depends on the company’s score relative to the median company’s score and either the highest or lowest performing company’s score. This is demonstrated as follows:

𝑖𝑓 𝑠𝑐𝑜𝑟𝑒 > 𝑚𝑒𝑑𝑖𝑎𝑛 ∶

(𝑠𝑐𝑜𝑟𝑒 − 𝑚𝑒𝑑𝑖𝑎𝑛) ∗ (6%/(𝑚𝑎𝑥𝑖𝑚𝑢𝑚 − 𝑚𝑒𝑑𝑖𝑎𝑛))

𝑖𝑓 𝑠𝑐𝑜𝑟𝑒 < 𝑚𝑒𝑑𝑖𝑎𝑛 ∶

(𝑠𝑐𝑜𝑟𝑒 − 𝑚𝑒𝑑𝑖𝑎𝑛) ∗ (12%/(𝑚𝑒𝑑𝑖𝑎𝑛 − 𝑚𝑖𝑛𝑖𝑚𝑢𝑚))

𝑖𝑓 𝑠𝑐𝑜𝑟𝑒 = 𝑚𝑒𝑑𝑖𝑎𝑛 ∶

0%

where:

‘score’ is the company’s C-MeX score in the reporting year;

‘median’ is the median score of all companies’ C-MeX scores in the reporting year;

‘maximum’ is the highest score achieved by a company in the reporting year; and

‘minimum’ is the lowest score achieved by a company in the reporting year.

Higher performance payments

Up to three companies could receive higher performance payments. The company with the highest score that passes the three gates receives an additional 6% of that year’s annual allowed residential retail revenue, potentially taking its total outperformance payments to 12%. If a second company qualifies, it will receive an additional 4% and if a third company qualifies it will receive an additional 2%. For the avoidance of doubt, if only one company passes the three gates it will receive an additional 6% regardless of whether it is has the highest C-MeX score across all companies.

The ‘C-MeX ASUQ’ threshold referred to in the three gates for higher rewards, above, is calculated using the following formula:

Page 42: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

41

Unique Reference PR19ANH_1

𝐶-𝑀𝑒𝑋 𝐴𝑆𝑈𝑄 = 𝐶-𝑀𝑒𝑋 𝑀𝑒𝑎𝑛 + (𝑈𝐾𝐶𝑆𝐼 𝐴𝑆𝑈𝑄

− 𝑈𝐾𝐶𝑆𝐼 𝑀𝑒𝑎𝑛) / 𝑈𝐾𝐶𝑆𝐼 𝑆𝐷 ∗ 𝐶-𝑀𝑒𝑋 𝑆𝐷

where:

‘C-MeX Mean’ is the mean average of all water companies’ C-MeX scores;

‘UKCSI ASUQ’ is the upper quartile of the CSI scores of all companies in the UKCSI report relating to the relevant year (eg for C-MeX in 2020-21, the UKCSI ASUQ would be based on data from the July 2021 UKCSI surveys);

‘UKCSI Mean’ is the mean average score of water companies in the UKCSI report relating to the relevant year;

‘UKCSI SD’ is the standard deviation of water companies’ scores in the UKCSI report relating to the relevant year; and

‘C-MeX SD’ is the standard deviation of the C-MeX scores of all water companies.

The underlying methodology for the UKCSI may change during the 2020-25 period. We will continue to use future iterations of the UKCSI upper quartile, mean and standard deviation for the purposes of C-MeX. However, if the UKCSI methodology moves away from a league table approach such that we cannot quantify an upper quartile or no longer has a sufficient number of water companies in its sample, we will use the last appropriate UKCSI results instead in our in-period determinations.

Specific exclusions NA

Reporting and

assurance The company will provide a statement that confirms whether the company offered at least five communication channels for receiving customer contacts and complaints and at least three online channels throughout the reporting year.

Further reporting and assurance should be in the form and manner set out in the guidance, to be finalised by March 2020.

Measurement unit

and decimal places Score out of 100 to two decimal places

Measurement

timing Reporting year

Incentive form Revenue

Incentive type Outperformance and underperformance payments

Timing of

underperformance In-period

Page 43: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

42

Unique Reference PR19ANH_1

and outperformance

payments

Price control

allocation 100% residential retail

Frequency of

reporting Annual

Any other relevant

information The company’s C-MeX payments are calculated by multiplying its incentive rate by its annual allowed residential retail revenue (as described in the company’s ‘Allowed revenue appendix’ or as updated following any interim determinations or in-period ODI adjustments in the 2020-25 period).

Links to relevant

external documents ‘PR19 final determinations – Customer measure of experience (C-MeX) and developer services measure of experience (D-MeX) policy appendix’

https://www.ccwater.org.uk/

https://www.instituteofcustomerservice.com/

Incentive rates

Incentive type Incentive rate

(% of annual allowed residential retail

revenue)

Underperformance payment – standard

rate

if company’s score < median score

(𝑠𝑐𝑜𝑟𝑒 − 𝑚𝑒𝑑𝑖𝑎𝑛) ∗ (12%/(𝑚𝑒𝑑𝑖𝑎𝑛− 𝑚𝑖𝑛𝑖𝑚𝑢𝑚))

Deadband

If company’s score = median score 0%

Outperformance payment – standard

rate

if company’s score > median score

(𝑠𝑐𝑜𝑟𝑒 − 𝑚𝑒𝑑𝑖𝑎𝑛)∗ (6%/(𝑚𝑎𝑥𝑖𝑚𝑢𝑚− 𝑚𝑒𝑑𝑖𝑎𝑛))

Outperformance payment – higher rate

(Applies if meeting the three gates for

highest payments and additional to

standard incentive rates)

+6% if the company has the highest C-MeX score of companies passing the three gates

+4% if the company has the second highest C-MeX score of companies passing the

three gates

+2% if the company has the third highest C-MeX score of companies passing the three

gates

Page 44: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

43

1.1.15 D-MeX

Purpose: This performance commitment is designed to incentivise companies to

improve the experience they provide to developer services (new connections) customers, including property developers, self-lay providers and those with new appointments and variations (NAVs).

Benefits: This performance commitment should increase developer customer

satisfaction, by improving the overall customer experience for all developer services customers.

Performance commitment definition and parameters

Unique Reference PR19ANH_2

Detailed definition

of performance

measure

D-MeX is a measure of customer satisfaction. A company’s overall D-MeX score is calculated from two components that contribute equally:

qualitative D-MeX score, based on the ratings provided by developer services customers who transacted with the company throughout the reporting year to a customer satisfaction survey; and

quantitative D-MeX score, based on the company’s performance against a set of selected Water UK performance metrics throughout the reporting year.

The survey results which are used to calculate the qualitative component of the company’s D-MeX score will be supplied by a survey agent appointed by Ofwat. This is supplied out of 100 to form the score for the qualitative component of D-MeX.

The set of Water UK performance metrics which are used to calculate the quantitative component of the company’s D-MeX score, in place at the time of PR19 final determinations publication, are set out in annex 2 of ‘PR19 final determinations: Customer measure of experience (C-MeX) and developer services measure of experience (D-MeX) policy appendix’. For each metric, a percentage is reported and a simple average of these metrics is taken. This is rescaled to be out of 100 to form the score for the quantitative component of D-MeX.

Additional detail on

measurement units The company’s D-MeX score is calculated using the following formula:

𝐷-𝑀𝑒𝑋 𝑠𝑐𝑜𝑟𝑒 = 50% ∗ 𝑄𝑢𝑎𝑙 + 50% ∗ 𝑄𝑢𝑎𝑛𝑡

where:

Page 45: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

44

Unique Reference PR19ANH_2

‘Qual’ is a simple average of satisfaction scores given by developer customers surveyed in the developer customer satisfaction survey in the reporting year; and

‘Quant’ is a simple average of the selected Water UK performance metrics which have non-zero volumes in the reporting year.

Outperformance and underperformance payments

The company’s D-MeX incentive rate depends on its D-MeX score relative to those of other companies. Specifically, it depends on the company’s score relative to the median company’s score and either the highest or lowest performing company’s score. This is demonstrated as follows:

𝑖𝑓 𝑠𝑐𝑜𝑟𝑒 > 𝑚𝑒𝑑𝑖𝑎𝑛 ∶

(𝑠𝑐𝑜𝑟𝑒 − 𝑚𝑒𝑑𝑖𝑎𝑛) ∗ (6%/(𝑚𝑎𝑥𝑖𝑚𝑢𝑚 − 𝑚𝑒𝑑𝑖𝑎𝑛))

𝑖𝑓 𝑠𝑐𝑜𝑟𝑒 < 𝑚𝑒𝑑𝑖𝑎𝑛 ∶

(𝑠𝑐𝑜𝑟𝑒 − 𝑚𝑒𝑑𝑖𝑎𝑛) ∗ (12%/(𝑚𝑒𝑑𝑖𝑎𝑛 − 𝑚𝑖𝑛𝑖𝑚𝑢𝑚))

𝑖𝑓 𝑠𝑐𝑜𝑟𝑒 = 𝑚𝑒𝑑𝑖𝑎𝑛 ∶

0%

where:

‘score’ is the company’s D-MeX score in the reporting year;

‘median’ is the median score of all companies’ D-MeX scores in the reporting year;

‘maximum’ is the highest score achieved by a company in the reporting year; and

‘minimum’ is the lowest score achieved by a company in the reporting year.

Specific exclusions NA

Reporting and

assurance The company will report the process the company has taken to assure itself that its performance against the selected Water UK metrics in D-MeX are an accurate reflection of its underlying performance in the reporting year, and any findings that indicate this is not the case.

Further reporting and assurance should be in the form and manner set out in the guidance, to be finalised by March 2020.

Measurement unit

and decimal places Score out of 100 to two decimal places

Measurement

timing Reporting year

Page 46: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

45

Unique Reference PR19ANH_2

Incentive form Revenue

Incentive type Outperformance and underperformance payments

Timing of

underperformance

and outperformance

payments

In-period

Price control

allocation Water network plus and wastewater network plus. The allocation between both controls will vary each reporting year based on the relative outturn developer services revenues collected by the company for water and wastewater services.

Frequency of

reporting Annual

Any other relevant

information The company’s D-MeX payments are calculated by multiplying its incentive rate by its annual actual developer services revenue as reported for the following components (for each of water and wastewater):

connection charges;

infrastructure charge receipts – new connections;

requisitioned mains;

requisitioned sewers;

diversions; and

other contributions (price control).

The Water UK metrics that form the basis of the quantitative component of D-MeX may change in the 2020-25 period. The Water UK metrics that contribute to the qualitative survey may change as well.

In determining whether to make changes to D-MeX as a performance commitment in light of changes to the Water UK metrics, our decision will be based on the principles that revisions are in customer interests, support consistent and fair comparisons between companies and align with our wider duties. We will consult with stakeholders prior to making any changes.

Links to relevant

external documents ‘PR19 final determinations – Customer measure of experience (C-MeX) and developer services measure of experience (D-MeX) policy appendix’

https://developerservices.water.org.uk

Page 47: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

46

Incentive rates

Incentive type Incentive rate

(% of annual actual developer services

revenue)

Underperformance payment – standard

rate

if company’s score < median score

(𝑠𝑐𝑜𝑟𝑒 − 𝑚𝑒𝑑𝑖𝑎𝑛) ∗ (12%/(𝑚𝑒𝑑𝑖𝑎𝑛− 𝑚𝑖𝑛𝑖𝑚𝑢𝑚))

Deadband

If company’s score = median score 0%

Outperformance payment – standard

rate

if company’s score > median score

(𝑠𝑐𝑜𝑟𝑒 − 𝑚𝑒𝑑𝑖𝑎𝑛)∗ (6%/(𝑚𝑎𝑥𝑖𝑚𝑢𝑚− 𝑚𝑒𝑑𝑖𝑎𝑛))

Page 48: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

47

1.2 Bespoke performance commitments

This section sets out the detail for each of the bespoke performance commitments

and outcome delivery incentives we are putting in place for the company for the

period 2020-2025.

Companies have developed bespoke performance commitments that reflect

customers’ preferences. Allowing companies to propose their own performance

commitments, allows them to innovate and target their customers’ values and

concerns in the context of their specific circumstances.

1.2.1 Percentage of population supplied by a single supply system

Purpose: This performance commitment incentivises the company to implement

permanent solutions to reduce the likelihood of water supply interruptions to customers due to prolonged resilience outages of its water treatment works.

Benefits: The benefit to customers will be to reduce their dependency on single

treated water supply sources and the associated negative social impacts of supply interruptions.

Performance commitment definition and parameters

Unique Reference PR19ANH_15

Detailed definition of

performance measure The proportion of all of the company’s water services household customers exposed to the risk of loss of supply due to a resilience event. This includes works failures in multiple source systems which result in the loss of supply to some customers.

Additional detail on

measurement units Performance is measured based on identifying the resulting water supply deficit (which includes household and non-household customer demands) if each of the company’s water treatment works were fully taken out of service for a prolonged period. The assumption for calculating this supply deficit is that the treatment works will be completely off-supply at a time of normal operating (non-drought) conditions (the remaining system and other treatment works output capabilities will be not affected). For the purposes of this performance commitment a prolonged period is considered to be at least seven days.

The water deficit is then converted to an equivalent number of household customers and the percentage of population at risk calculated. The number of customers affected is calculated using the companies reported per capita

Page 49: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

48

Unique Reference PR19ANH_15

consumption levels for the reporting year. Although they may be contributing to the overall supply deficit in terms of demand for water, for reporting purposes, non-household customers are not included in the conversion. The volume deficit is assumed to be distributed across the household customers only. The risk to the whole region is summed to form the performance across the operational region.

Specific exclusions NA

Reporting and

assurance The company shall provide external third party assurance that the reduction to the population at risk as determined in the base year 2020 is due to company actions, as opposed to changes in the modelling methodologies or changes in input data.

Measurement unit and

decimal places Percentage to one decimal place.

Measurement timing Reporting year

Incentive form Revenue

Incentive type Outperformance payments

Timing of

underperformance and

outperformance

payments

In-period

Price control allocation 100% water network plus

Frequency of reporting Annual

Any other relevant

information This performance commitment is closely linked with the new Internal interconnections programme performance commitment but there is no overlap of incentives.

Links to relevant

external documents NA

Page 50: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

49

Performance commitment levels

Company

forecast Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment level % NA 24.1 21.8 21.8 20.0 14.1

Enhanced

underperformance

collar % NA NA NA NA NA

Standard

underperformance

collar % NA NA NA NA NA

Underperformance

deadband % NA NA NA NA NA

Outperformance

deadband % NA NA NA NA NA

Standard

outperformance

cap % NA NA NA NA NA

Enhanced

outperformance

cap % NA NA NA NA NA

Incentive rates

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard NA

Underperformance payment - enhanced NA

Outperformance payment - standard 0.428117

Outperformance payment - enhanced NA

Page 51: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

50

1.2.2 Properties at risk of persistent low pressure

Purpose: This measure is designed to incentivise the company to reduce the

number of properties supplied by the company at risk of being affected by persistent low pressure.

Benefits: The benefit of this measure is to reduce the number of customers that are

affected by persistent low pressure.

Performance commitment definition and parameters

Unique Reference PR19ANH_16

Detailed definition of

performance measure

The number of properties that have experienced more than 25 low pressure days within a five year rolling period, measured at the end of each reporting year.

Additional detail on

measurement units

Low pressure reference level is defined in the reporting guidance published 11 December 2017 ‘Properties at risk of receiving low pressure’:

https://www.ofwat.gov.uk/publication/properties-at-risk-of-receiving-low-pressure/

Only days with low pressure events that are worse than the low pressure threshold will be counted.

The reference level applies to a single property and is measured on the customer’s side of any meter or company fittings.

Each low pressure event must be greater than, or equal to, one hour in the day to be included against this measure. Any pressure loggers that average over a time period of one hour should have two readings of a low pressure event to qualify, whereas any pressure loggers that average over a time period of greater than one hour will be expected to have one reading of a low pressure event.

Specific exclusions As defined in the reporting guidance.

Reporting and

assurance

No specific requirements.

Measurement unit and

decimal places

Number of properties to zero decimal places.

Measurement timing Reporting year

Incentive form Revenue

Incentive type Outperformance and underperformance payments

Timing of

underperformance and

outperformance

payments

In-period

Page 52: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

51

Unique Reference PR19ANH_16

Price control allocation 100% water network plus

Frequency of reporting Annual

Any other relevant

information

NA

Links to relevant

external documents

NA

Performance commitment levels

Company

forecast

Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment level Number NA 150 150 150 150 106

Enhanced

underperformance

collar Number NA NA NA NA NA

Standard

underperformance

collar Number NA NA NA NA NA

Underperformance

deadband Number NA NA NA NA NA

Outperformance

deadband Number NA NA NA NA NA

Standard

outperformance

cap Number NA NA NA NA NA

Enhanced

outperformance

cap Number NA NA NA NA NA

Page 53: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

52

Incentive rates

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard -0.012207

Underperformance payment - enhanced NA

Outperformance payment - standard 0.006340

Outperformance payment - enhanced NA

1.2.3 External sewer flooding

Purpose: This performance commitment is designed to incentivise companies to

reduce the number of external sewer flooding events.

Benefits: A reduction in external sewer flooding reduces disruption and other

negative social impacts for customers.

Performance commitment definition and parameters

Unique Reference PR19ANH_17

Detailed definition of

performance measure

The external sewer flooding measure is defined in the reporting guidance for PR19 – Sewer Flooding, updated on 27 April 2018: https://www.ofwat.gov.uk/wp-content/uploads/2018/03/Reporting-guidance-sewer-flooding-updated-April-2018.pdf. The performance commitment will be reported as the absolute number of external sewer flooding incidents per year as defined in the reporting guidance, including incidents caused by severe weather.

Additional detail on

measurement units

External flooding: is defined as flooding within the curtilage of a building normally used for residential, public, community and business purposes. Flooding event: is defined as the escape of water from a sewerage system, irrespective of size as evidenced by standing water, running water or visible deposits of silt or sewage solids. It includes flooding due to overloaded sewers (hydraulic flooding) and due to other causes (FOC). Number of incidents: is defined as the number of curtilages flooded during each flooding event from a public sewer including incidents on sewers transferred under the Transfer of Private Sewers Regulations 2011 and pumping stations transferred in 2016. Severe weather: is defined as individual rainfall events with a storm return period greater than 1-in-20 years. Flooding incidents caused by severe weather should be included in this measure.

Page 54: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

53

Unique Reference PR19ANH_17

Full definitions of all relevant terms are defined in the reporting guidance.

Specific exclusions Are as defined in the reporting guidance.

Reporting and

assurance

No specific requirements

Measurement unit and

decimal places

Number of incidents to zero decimal places

Measurement timing Reporting year

Incentive form Revenue

Incentive type Outperformance and underperformance payments

Timing of

underperformance and

outperformance

payments

In-period

Price control allocation 100% wastewater network plus

Frequency of reporting Annual

Any other relevant

information

NA

Links to relevant

external documents

NA

Page 55: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

54

Performance commitment levels

Company

forecast Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment level Number NA 4,191 4,141 4,091 4,041 3,991

Enhanced

underperformance

collar Number NA NA NA NA NA

Standard

underperformance

collar Number 6,287 6,287 6,287 6,287 6,287

Underperformance

deadband Number NA NA NA NA NA

Outperformance

deadband Number NA NA NA NA NA

Standard

outperformance

cap Number 2,292 2,242 2,192 2,142 2,092

Enhanced

outperformance

cap Number NA NA NA NA NA

Incentive rates

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard -0.004177

Underperformance payment - enhanced NA

Outperformance payment - standard 0.004177

Outperformance payment - enhanced NA

Page 56: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

55

1.2.4 Reactive mains bursts

Purpose: This performance commitment is designed to incentivise that the asset

health of the infrastructure and below-ground water mains network is being appropriately maintained and improved and that the company is committed to its asset stewardship responsibility.

Benefits: This performance commitment helps to ensure that the overall asset

health of the water mains network is maintained and improved for the benefit of current and future generations.

Performance commitment definition and parameters

Unique Reference PR19ANH_18

Detailed definition of

performance measure

The number of reactive mains bursts. Reactive bursts are defined as those that have been identified and reported by a customer or third party (using any communication channel) before they are repaired. A mains repair is defined in the reporting guidance for PR19 – Mains Repairs per 1000km, published 27 March 2018. https://www.ofwat.gov.uk/publication/reporting-guidance-mains-repairs-per-1000km/ It is reported as the number of reactive mains repairs per thousand kilometres of the entire water main network (excluding communication and supply pipes).

Additional detail on

measurement units

Mains repairs – This includes all physical repair work to mains from which water is lost. Mains length – This is the length of all pipes conveying treated water around the distribution point but not including communication pipes or supply pipes.

Specific exclusions NA

Reporting and

assurance

No further requirements.

Measurement unit and

decimal places

Number of reactive mains bursts, reported to zero decimal places.

Measurement timing Reporting year

Incentive form Reputational

Incentive type NA

Timing of

underperformance and

outperformance

payments

NA

Price control allocation NA

Page 57: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

56

Unique Reference PR19ANH_18

Frequency of reporting Annual

Any other relevant

information

NA

Links to relevant

external documents

NA

Performance commitment levels

Company

forecast Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment level Number NA 3,063 3,063 3,063 3,063 3,063

Enhanced

underperformance

collar Number NA NA NA NA NA

Standard

underperformance

collar Number NA NA NA NA NA

Underperformance

deadband Number NA NA NA NA NA

Outperformance

deadband Number NA NA NA NA NA

Standard

outperformance

cap Number NA NA NA NA NA

Enhanced

outperformance

cap Number NA NA NA NA NA

Incentive rates

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard NA

Underperformance payment - enhanced NA

Outperformance payment - standard NA

Outperformance payment - enhanced NA

Page 58: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

57

1.2.5 Bathing waters attaining excellent status

Purpose: The purpose of this performance commitment is to incentivise the

company to improve water quality at the beaches designated for swimming within its region, in line with its Water Industry National Environment Programme (WINEP) commitments.

Benefits: By encouraging the improvement of bathing water quality, this

performance commitment will enhance coastal environments, whilst also supporting the continued development of the leisure and tourism industries in the company’s region.

Performance commitment definition and parameters

Unique Reference PR19ANH_19

Detailed definition of

performance measure

The performance commitment measures the number of bathing waters in the company’s region that attain ‘Excellent’ status, as designated by the Environment Agency, based on an average of four years results.

The company currently has 49 designated bathing waters and new designations during the 2020-25 period will not be included in the reporting against this performance commitment.

Additional detail on

measurement units

If a bathing water is closed for sampling the company will use the most recent classification as reported by the Environment Agency. If a bathing water is de-designated during the period, it will not be counted and will reduce the potential for the company to perform.

Specific exclusions NA

Reporting and

assurance

No specific requirements

Measurement unit and

decimal places

Number of bathing waters classified by the Environment Agency as Excellent to zero decimal places

Measurement timing Calendar year

Incentive form Revenue

Incentive type Outperformance and underperformance payments

Timing of

underperformance and

outperformance

payments

End of period

Price control allocation 100% wastewater network plus

Frequency of reporting Annual, on a calendar year basis. For example, performance assessment for 2020-21 will be based on the

Page 59: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

58

Unique Reference PR19ANH_19

calendar year 2020, whereas 2024-25 assessment will be based on the calendar year 2024.

Any other relevant

information

NA

Links to relevant

external documents NA

Performance commitment levels

Company

forecast Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment level Number NA 33 33 34 35 36

Enhanced

underperformance

collar Number NA NA NA NA NA

Standard

underperformance

collar Number 25 25 26 27 28

Underperformance

deadband Number NA NA NA NA NA

Outperformance

deadband Number NA NA NA NA NA

Standard

outperformance

cap Number 38 38 39 40 41

Enhanced

outperformance

cap Number NA NA NA NA NA

Page 60: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

59

Incentive rates

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard -0.2248

Underperformance payment - enhanced NA

Outperformance payment - standard 0.1154

Outperformance payment - enhanced NA

1.2.6 Abstraction incentive mechanism

Purpose: The purpose of this performance commitment is to incentivise the

company to reduce abstraction from environmentally sensitive sites when flows or levels are low.

Benefits: The benefit of this performance commitment is that environmentally

sensitive sites are preserved by reducing water abstracted from them during lower levels or flows.

Performance commitment definition and parameters

Unique Reference PR19ANH_20

Detailed definition of

performance measure

The abstraction incentive mechanism (AIM) reduces abstraction of water at environmentally sensitive sites when flow or levels are below an agreed point otherwise known as a trigger. The trigger point is based on a level or flow, below which the AIM is considered to be “switched on”. This trigger will usually be related to the point at which damage is caused and is intended to prevent this from happening or ameliorate the negative impacts.

The company has included four sites for AIM for the period 2020-25:

Wixoe: The trigger threshold for this site is 0.004 m3/s and it has a baseline of 7.2 Ml/day

Wilsthorpe: The trigger threshold for this site is 0.003 m3/s and it has a baseline of 20.0 Ml/day

Marham Surface Water (River Nar): The trigger threshold for this site is 0.440 m3/s and it has a baseline of 10.1 Ml/day

Marham Ground Water: The trigger threshold for this site is 0.320 m3/s and it has a baseline of 11.2 Ml/day

The abstraction incentive mechanism is defined in the reporting guidance – Guidelines on the abstraction incentive mechanism, published in 2016:

Page 61: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

60

Unique Reference PR19ANH_20

https://www.ofwat.gov.uk/wp-content/uploads/2016/02/gud_pro20160226aim.pdf

Additional detail on

measurement units

AIM performance is measured in megalitres (Ml) and is equal to the average daily abstraction during the period when flows are at or below the trigger threshold minus the baseline average daily abstraction during the period when flows are at or below the trigger threshold, multiplied by the length of the period when flows are at or below the trigger threshold.

AIM performance in Ml = (average daily abstraction during period when flows are at or below the trigger threshold - baseline average daily abstraction during period when flows are at or below the trigger threshold) * length of period when flows are at or below the trigger threshold.

For example, in the circumstance that the AIM baseline is 5 Ml/day and the company abstracts an average of 4 Ml/day from the abstraction site when river flows are below the trigger threshold then, if flows are below the threshold for 100 days, the company has an improved performance relative to the baseline of (4 Ml/day minus 5 Ml/day)*100 days = -100 Ml. A negative number signifies an improved performance as average abstraction is less than the baseline.

Specific exclusions As defined in the reporting guidance.

Reporting and

assurance No specific requirements

Measurement unit and

decimal places Megalitres to zero decimal places

Measurement timing Reporting year

Incentive form Revenue

Incentive type Outperformance and underperformance payments

Timing of

underperformance and

outperformance

payments

In-period

Price control allocation 100% water resources

Frequency of reporting Annual

Any other relevant

information NA

Links to relevant

external documents NA

Page 62: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

61

Performance commitment levels (Marham – River Nar)

Company

forecast Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment level Megalitre NA -87 -87 -87 -87 -87

Enhanced

underperformance

collar Megalitre NA NA NA NA NA

Standard

underperformance

collar Megalitre 2,634 2,634 2,634 2,634 2,634

Underperformance

deadband Megalitre NA NA NA NA NA

Outperformance

deadband Megalitre NA NA NA NA NA

Standard

outperformance

cap Megalitre -8,886 -8,886 -8,886 -8,886 -8,886

Enhanced

outperformance

cap Megalitre NA NA NA NA NA

Incentive rates (Marham – River Nar)

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard -0.001198

Underperformance payment - enhanced NA

Outperformance payment - standard 0.000420

Outperformance payment - enhanced NA

Page 63: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

62

Performance commitment levels (Marham – Groundwater)

Company

forecast Committed performance level

Unit 2019-20 2020-21 2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment level Number NA 0 0 0 0 0

Enhanced

underperformance

collar Number NA NA NA NA NA

Standard

underperformance

collar Number 955 955 955 955 955

Underperformance

deadband Number NA NA NA NA NA

Outperformance

deadband Number NA NA NA NA NA

Standard

outperformance

cap Number -2,053 -2,053 -2,053 -2,053 -2,053

Enhanced

outperformance

cap Number NA NA NA NA NA

Incentive rates (Marham - groundwater)

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard -0.000813

Underperformance payment - enhanced NA

Outperformance payment - standard 0.000378

Outperformance payment - enhanced NA

Page 64: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

63

Performance commitment levels (Wilsthorpe)

Company

forecast

Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment level Number

NA -87 -87 -87 -87 -87

Enhanced

underperformance

collar

Number NA NA NA NA NA

Standard

underperformance

collar

Number 351 351 351 351 351

Underperformance

deadband Number NA NA NA NA NA

Outperformance

deadband Number NA NA NA NA NA

Standard

outperformance

cap

Number

-3,660 -3,660 -3,660 -3,660 -3,660

Enhanced

outperformance

cap

Number NA NA NA NA NA

Incentive rates (Wilsthorpe)

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard -0.000510

Underperformance payment - enhanced NA

Outperformance payment - standard 0.000050

Outperformance payment - enhanced NA

Page 65: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

64

Performance commitment levels (Wixoe)

Company

forecast Committed performance level

Unit 2019-20 2020-21 2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment level Number NA 0 0 0 0 0

Enhanced

underperformance

collar Number NA NA NA NA NA

Standard

underperformance

collar Number 680 680 680.0 680 680

Underperformance

deadband Number NA NA NA NA NA

Outperformance

deadband Number NA NA NA NA NA

Standard

outperformance

cap Number -1,325 -1,325 -1,325 -1,325 -1,325

Enhanced

outperformance

cap Number NA NA NA NA NA

Incentive rates (Wixoe)

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard -0.001541

Underperformance payment - enhanced NA

Outperformance payment - standard 0.000791

Outperformance payment - enhanced NA

Page 66: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

65

1.2.7 Customer awareness of the company’s Priority Services Register

Purpose: This performance commitment incentivises the company to increase

awareness of its Priority Services Register.

Benefits: This performance commitment helps to increase the number of customers

in vulnerable circumstances that are aware of the non-financial support they are able to receive by way of the company’s Priority Services Register..

Performance commitment definition and parameters

Unique Reference PR19ANH_21

Detailed definition of

performance measure

The percentage of customers who state, when asked, that they are aware of the company’s Priority Services Register.

The Priority Services Register provides free services to customers in vulnerable circumstances, these circumstances can be temporary or permanent. The service covers a number of measures that assist customers in a non-financial way.

This will be reported as an annual percentage. Research will be conducted in line with the Market Research Society code of conduct. The company should ensure that the sample size selected gives a reasonable statistical significance for the purpose of this performance

commitment.

Additional detail on

measurement units NA

Specific exclusions NA

Reporting and

assurance No specific requirements

Measurement unit and

decimal places Percentage of customers aware of the Priority Services Register, to one decimal place

Measurement timing Reporting year

Incentive form Reputational

Incentive type NA

Timing of

underperformance and

outperformance

payments

NA

Price control allocation NA

Frequency of reporting Annual

Page 67: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

66

Unique Reference PR19ANH_21

Any other relevant

information NA

Links to relevant

external documents NA

Performance commitment levels

Company

forecast Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment level % NA 47.5 52.0 56.5 61.0 65.0

Enhanced

underperformance

collar % NA NA NA NA NA

Standard

underperformance

collar % NA NA NA NA NA

Underperformance

deadband % NA NA NA NA NA

Outperformance

deadband % NA NA NA NA NA

Standard

outperformance

cap % NA NA NA NA NA

Enhanced

outperformance

cap % NA NA NA NA NA

Incentive rates

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard NA

Underperformance payment - enhanced NA

Outperformance payment - standard NA

Outperformance payment - enhanced NA

Page 68: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

67

1.2.8 Managing void properties

Purpose: This performance commitment is designed to incentivise the company to

reduce the number of false household void properties.

Benefits: Reduced number of void properties, which are occupied but not billed,

leads to fairer charges between customers and lower bills for customers already being billed.

Performance commitment definition and parameters

Unique Reference PR19ANH_23

Detailed definition of

performance measure The number of household false voids as a percent of the total number of household properties within the supply area. A false void property is a property that has been defined as a void property for longer than six months which is found to be occupied and using water. Void properties are defined as chargeable premises which are recorded as vacant with no charges levied.

The number of false voids is reassessed on an annual basis for each reporting year (1st April – 31st March) and the assessment incorporates both measured and unmeasured households.

Additional detail on

measurement units

Assessment will be made based on the audit of a sample of 1,000 properties to identify whether there is billable consumption taking place at each property. The assessment will be made only on households which have been classified as void for longer than 6 months and will take place at both metered and unmetered properties. The households in the sample will be selected from the company records at random and reviewed in early September and again in late October. The number of properties that have a meter in the sample that have consumption greater than 1m3 will be counted. Properties that do not have a meter will be checked for obvious signs of habitation and against third party credit referencing information to determine occupation. Those with evidence of occupation will be counted. The calculation for this performance commitment level (PCL) will be as follows: (E/D)*C = A (A/B)*100 = PCL% Where:

Page 69: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

68

Unique Reference PR19ANH_23

A = number of properties which are void and occupied (false voids) B = number of billable properties C = number of properties classed as void D = Sample number (ie 1000) E = Number of false voids found

Specific exclusions Excludes non-household properties. Additionally properties that are not billed as it is uneconomical to do so are not counted. Uneconomical means the incremental cost of sending a bill and the normal incremental cost of processing a payment made promptly in response to the bill is likely to be greater than the bill itself.

Reporting and

assurance

No specific requirements

Measurement unit and

decimal places

Percentage to two decimal places.

Measurement timing Reporting year

Incentive form Revenue

Incentive type Outperformance and underperformance payments

Timing of

underperformance and

outperformance

payments

In-period

Price control allocation 100% residential retail

Frequency of reporting Annual

Any other relevant

information

NA

Links to relevant

external documents

NA

Page 70: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

69

Performance commitment levels

Company

forecast Committed performance level

Unit 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25

Performance

commitment level % NA 0.50 0.40 0.35 0.30 0.25

Enhanced

underperformance

collar % NA NA NA NA NA

Standard

underperformance

collar % 0.75 0.65 0.60 0.55 0.50

Underperformance

deadband %

NA NA NA NA NA

Outperformance

deadband % NA NA NA NA NA

Standard

outperformance

cap % NA NA NA NA NA

Enhanced

outperformance

cap % NA NA NA NA NA

Incentive rates

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard -4.716

Underperformance payment - enhanced NA

Outperformance payment - standard 4.716

Outperformance payment - enhanced NA

Page 71: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

70

1.2.9 Operational carbon

Purpose: This performance commitment incentivises the company to reduce

greenhouse gas emissions arising from its operational activities.

Benefits: The performance commitment helps mitigate the impact of climate change

by reducing greenhouse gas emissions related to operational activities undertaken by the company.

Performance commitment definition and parameters

Unique Reference PR19ANH_24

Detailed definition of

performance measure The % reduction in real terms of gross operational carbon equivalent emissions from a 2019-20 baseline. The scope of the measure includes any greenhouse gas emissions emitted due to the operational activities, such as but not limited to grid electricity consumption, fuel consumption, and process emissions from sludge, wastewater and water treatment. As the measure tracks reductions in gross operational emissions, renewable energy generation offsets will not be included in the measurement.

Additional detail on

measurement units Operational carbon is calculated through the UK Water Industry Research Ltd (UKWIR) Carbon Accounting Workbook published on 8 May 2019 and reported in tonnes of carbon dioxide equivalent (tCO2e) emissions. The measure will report the percentage change in operational carbon emissions in each reporting year against the 2019-20 baseline emissions.

Specific exclusions NA

Reporting and

assurance

The company will provide external third party assurance that all data relating to operational greenhouse gas emissions is compliant with the version of the international

carbon reporting standard (ISO 14064, Part 1) which is in effect at the time of PR19 final determinations publication. and assured following an audit by an appropriately qualified independent third party. This includes the 2019-20 baseline.

Measurement of greenhouse gases can adopt either the grid emissions factor within the carbon accounting workbook or the ‘market-based’ emissions factor for electricity supplied via the grid. This means the actual emissions associated with the electricity purchased will be used in the calculation of operational emissions rather than the national average UK grid emissions factor. Performance shall reflect actions taken by the company itself to reduce greenhouse gas emissions.

Page 72: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

71

Unique Reference PR19ANH_24

Measurement unit and

decimal places

Percentage reduction in gross operational emissions to one decimal place

Measurement timing Reporting year

Incentive form Reputational

Incentive type NA

Timing of

underperformance and

outperformance

payments

NA

Price control allocation NA

Frequency of reporting Annual

Any other relevant

information

NA

Links to relevant

external documents

NA

Page 73: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

72

Performance commitment levels

Company

forecast Committed performance level.

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment level % NA 2.0 4.0 6.0 8.0 10.0

Enhanced

underperformance

collar % NA NA NA NA NA

Standard

underperformance

collar % NA NA NA NA NA

Underperformance

deadband % NA NA NA NA NA

Outperformance

deadband % NA NA NA NA NA

Standard

outperformance

cap % NA NA NA NA NA

Enhanced

outperformance

cap % NA NA NA NA NA

Incentive rates

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard NA

Underperformance payment - enhanced NA

Outperformance payment - standard NA

Outperformance payment - enhanced NA

Page 74: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

73

1.2.10 Capital carbon

Purpose: This performance commitment incentivises the company to reduce

greenhouse gas emissions arising from construction activities related to the delivery of its capital programme.

Benefits: The performance commitment helps mitigate the impact of climate change

by reducing greenhouse gas emissions during the construction, upgrading or refurbishment of assets needed to enhance or maintain service levels.

Performance commitment definition and parameters

Unique Reference PR19ANH_25

Detailed definition of

performance measure Percentage reduction in capital carbon emissions arising from construction activities during scheme delivery from a 2010 baseline. Capital carbon will be calculated for each scheme based on a need identified and a typical baseline solution that would have been delivered to resolve the need. The 2010 baseline for this measure has been updated to include emissions reduction activities that have been delivered over the previous two planning periods. For example, the baseline carbon for this measure has been updated to account for 80% of mains being laid through lower carbon no-dig techniques. The measure will report the programme level percentage reduction between the carbon equivalent emissions from the final scheme designs and the typical solutions identified in the baseline.

Additional detail on

measurement units Capital carbon will be measured in tonnes of carbon dioxide equivalent (tCO2e), therefore including the carbon dioxide equivalent global warming potential of other greenhouse gasses, such as methane.

The carbon management framework implemented by the company will continue to seek compliance with the PAS2080 (published May 2016) carbon management in infrastructure standard.

Specific exclusions NA

Reporting and

assurance

The company will provide external third-party assurance including that all data related to the quantification, baselining, monitoring and reporting of capital carbon emissions is in compliance with PAS 2080:2016 published May 2016.

Measurement unit and

decimal places

A percentage reduction in capital carbon emissions to one decimal place.

Measurement timing Reporting year

Page 75: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

74

Unique Reference PR19ANH_25

Incentive form Reputational

Incentive type NA

Timing of

underperformance and

outperformance

payments

NA

Price control allocation NA

Frequency of reporting Annual

Any other relevant

information

NA

Links to relevant

external documents

NA

Page 76: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

75

Performance commitment levels

Company

forecast

Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment level %

NA 61.0 62.0 63.0 64.0 65.0

Enhanced

underperformance

collar

%

NA NA NA NA NA

Standard

underperformance

collar

%

NA NA NA NA NA

Underperformance

deadband %

NA NA NA NA NA

Outperformance

deadband %

NA NA NA NA NA

Standard

outperformance

cap

%

NA NA NA NA NA

Enhanced

outperformance

cap

%

NA NA NA NA NA

Incentive rates

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard NA

Underperformance payment - enhanced NA

Outperformance payment - standard NA

Outperformance payment - enhanced NA

Page 77: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

76

1.2.11 Non-household retailer satisfaction

Purpose: The purpose of this performance commitment is to incentivise the

company to work with non-household retailers so that the retail market can best serve businesses, charities and public sector organisations.

Benefits: Improving the interaction between the company as a wholesale provider of

water and wastewater services and retail providers will enable the retail market to work effectively and ultimately drive the industry to provide better service at lower cost for all customers.

Performance commitment definition and parameters

Unique Reference PR19ANH_30

Detailed definition of

performance measure This measure is an average of three metrics:

Net Promoter Score (NPS)

Measures customers’ self-assessed likelihood of recommending a company or service to others. The score can be from -100 to +100.

Market performance standards (MPS)

Reported by MOSL and measures performance against standards in the market terms and code subsidiary documents. The maximum is 100.

Operational performance standards (OPS)

Measuring performance against standards in operational terms. The maximum is 100.

The above three metrics are then combined using the following equation:

Net promoter score + compliance with MPS +compliance with OPS /3 = combined retailer service score.

Additional detail on

measurement units The NPS score is based on customers’ answers as to how likely they would be to recommend a company or product to friends or colleagues, on a scale of 1 to 10. The score is calculated as the proportion of consumers that answer 9 or 10 (promoters) less the proportion that answers between 0 and 6 (detractors). Responses of 7 and 8 are labelled passives, and their behaviour falls between Promoters and Detractors and are not included in the calculation. The calculation is: (% Promoters – % Detractors) x 100 = NPS score. This gives a score within a range of -100 to +100.

Specific exclusions NA

Reporting and

assurance

Where the company carries out its own surveys the survey should be planned and carried out following social research

Page 78: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

77

Unique Reference PR19ANH_30

best practice (e.g. any applicable sections of a relevant code such as that published by the Market Research Society). The sample size should also be selected to give a reasonable statistical significance for the purpose of the performance commitment.

Measurement unit and

decimal places

Combined score to one decimal place

Measurement timing Reporting year

Incentive form NA

Incentive type Reputational

Timing of

underperformance and

outperformance

payments

NA

Price control allocation NA

Frequency of reporting Annual

Any other relevant

information

NA

Links to relevant

external documents

NA

Page 79: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

78

Performance commitment levels

Company

forecast Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment level number NA 74.6 75.7 76.9 78.0 79.1

Enhanced

underperformance

collar number NA NA NA NA NA

Standard

underperformance

collar number NA NA NA NA NA

Underperformance

deadband number NA NA NA NA NA

Outperformance

deadband number NA NA NA NA NA

Standard

outperformance

cap number NA NA NA NA NA

Enhanced

outperformance

cap number NA NA NA NA NA

Incentive rates

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard NA

Underperformance payment - enhanced NA

Outperformance payment - standard NA

Outperformance payment - enhanced NA

Page 80: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

79

1.2.12 Water Industry National Environment Programme

Purpose: This performance commitment measures the progress of the company in

delivering its agreed Water Industry National Environment Programme (WINEP) schemes in a timely manner.

Benefits: This performance commitment improves the natural environment by

encouraging the timely delivery of environmental improvement schemes. It will help ensure that water can be abstracted from rivers and lakes without any negative impacts on the environment.

Performance commitment definition and parameters

Unique Reference PR19ANH_32

Detailed definition of

performance measure

The cumulative number of schemes completed each year. The performance commitment is limited to schemes that were confirmed on 1 April 2019 within the Water Industry National Environment Programme (WINEP) and therefore had green status. The full list of included schemes is provided in

https://www.ofwat.gov.uk/publication/pr19-winep-programme-annual-update-for-2019/

Additional detail on

measurement units Each scheme completed by the company must be signed off by the Environment Agency in order for it to count towards the measure.

Specific exclusions The performance commitment excludes schemes that were uncertain and had an amber status on 1 April 2019.

Reporting and

assurance The company will secure confirmation from the Environment Agency that performance has been correctly reported. The view of the Environment Agency will be definitive.

Measurement unit and

decimal places The cumulative number of schemes completed each year to zero decimal places

Measurement timing Reporting year

Incentive form Revenue

Incentive type Outperformance and underperformance payments for all years apart from 2024-25.

Timing of

underperformance and

outperformance

payments

In-period

Price control allocation 15% water resources

85% wastewater network plus

Frequency of reporting Annual

Page 81: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

80

Unique Reference PR19ANH_32

Any other relevant

information There are strong links between the WINEP and other performance commitments or aspects of the company’s performance. Delivery of the obligations within the WINEP will drive significant improvements in river quality and bathing water quality in its region. There is also a clear link between the WINEP and the company’s natural capital performance commitment. It will seek to deliver WINEP obligations using natural capital solutions where feasible.

Links to relevant

external documents NA

Page 82: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

81

Performance commitment levels

Company

forecast Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023-

24 2024-25

Performance

commitment level Number NA 280 1,006 1,126 1,577 1,856

Enhanced

underperformance

collar Number NA NA NA NA NA

Standard

underperformance

collar Number 61 783 923 1375 NA

Underperformance

deadband Number NA NA NA NA NA

Outperformance

deadband Number 308 1,107 1,239 1,735 NA

Standard

outperformance

cap Number 545 1,271 1,411 1,866 NA

Enhanced

outperformance

cap Number NA NA NA NA NA

Incentive rates

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard -0.014

Underperformance payment - enhanced NA

Outperformance payment - standard 0.014

Outperformance payment - enhanced NA

Page 83: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

82

1.2.13 Water quality contacts

Purpose: To reduce water quality contacts relating to appearance, taste and odour.

Benefits: This performance commitment improves the appearance, taste and odour

of drinking water by incentivising the company to reduce the number of consumer contacts it receives in relation to the appearance, taste and odour of drinking water.

Performance commitment definition and parameters

Unique Reference PR19ANH_34

Detailed definition of

performance measure

The number of times the company is contacted by consumers due to the taste and odour of drinking water, or due to drinking water not being clear, reported per 1,000 population. Calculation is the number of contacts for appearance plus all taste/odour contacts multiplied by 1,000 divided by the resident population as reported to Drinking Water Inspectorate (DWI).

Additional detail on

measurement units

The consumer contact classification guidance is defined by the DWI in Information Letter 1/2006, 6 January 2006, at https://www.ofwat.gov.uk/publication/dwi-letter-customer-contacts-about-water-quality-appearance/ Consumers contact a water company for various water quality reasons. Only consumer contacts that are about appearance and taste and odours will be included in this measure.

Specific exclusions See guidance above for a full list of exclusions.

Reporting and

assurance

The company is also expected to report consumer contacts separately for appearance, taste and odour for the Discover Water website.

Measurement unit and

decimal places

Number of consumer contacts per 1,000 population, reported to two decimal places.

Measurement timing Calendar year

Incentive form Revenue

Incentive type Outperformance and underperformance payments

Timing of

underperformance and

outperformance

payments

In-period

Price control allocation 100% water network plus

Frequency of reporting Annual, on a calendar year basis. For example, performance assessment for 2020-21 will be based on data from the calendar year 2020.

Page 84: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

83

Unique Reference PR19ANH_34

Any other relevant

information

NA

Links to relevant

external documents

NA

Performance commitment levels

Company

forecast Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment level Number NA 1.09 1.01 0.93 0.85 0.77

Enhanced

underperformance

collar Number NA NA NA NA NA

Standard

underperformance

collar Number NA NA NA NA NA

Underperformance

deadband Number NA NA NA NA NA

Outperformance

deadband Number NA NA NA NA NA

Standard

outperformance

cap Number NA NA NA NA NA

Enhanced

outperformance

cap Number NA NA NA NA NA

Incentive rates

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard -2.676

Underperformance payment - enhanced NA

Outperformance payment - standard 1.338

Outperformance payment - enhanced NA

Page 85: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

84

1.2.14 Event risk index (ERI)

Purpose: This performance commitment incentivises the company to promote a

proactive approach to risk mitigation of water quality events, including understand the impact of events on customers.

Benefits: An improvement in this performance commitment indicates that the

company is reducing the occurrence and/or impact of water quality events on customers.

Performance commitment definition and parameters

Unique Reference PR19ANH_35

Detailed definition of

performance measure The Event Risk Index (ERI) is a measure of the risk arising from water quality events, as defined by the Drinking Water Inspectorate (DWI) in August 2018 as published here:

https://www.ofwat.gov.uk/publication/dwi-event-risk-index-eri-definition/

The following outlines the broad principles of the ERI measure:

the seriousness of each drinking water quality event (the Event Category score);

a measure of the company performance in managing the event (the Assessment Outcome score); and

the impact of each event – based on a simple measure of the population affected and duration in hours.

The event category score and assessment outcome scores are based on the judgement of the DWI inspector using the score guidance set out in the in the detailed definition (see link above).

Additional detail on

measurement units The ERI score for each notified event is calculated using the following formula:

ERI = (Seriousness x Assessment Outcome x Impact)

Total population served by the company

The ERI for a company, for any given calendar year, is the sum of the individual ERI scores for every event notified to the Inspectorate during the year.

Specific exclusions There are no specific exclusions, however, for some special rules on calculation of risk score refer to the definition linked above.

Reporting and

assurance

No specific requirements

Page 86: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

85

Unique Reference PR19ANH_35

Measurement unit and

decimal places

Number reported to three decimal places

Measurement timing Calendar year

Incentive form Reputational

Incentive type NA

Timing of

underperformance and

outperformance

payments

NA

Price control allocation NA

Frequency of reporting Annual, on a calendar year basis. For example, performance assessment for 2020-21 will be based on data from the calendar year 2020.

Any other relevant

information

NA

Links to relevant

external documents

NA

Page 87: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

86

Performance commitment levels

Company

forecast Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment level Number NA 15.000 15.000 15.000 15.000 15.000

Enhanced

underperformance

collar Number NA NA NA NA NA

Standard

underperformance

collar Number NA NA NA NA NA

Underperformance

deadband Number NA NA NA NA NA

Outperformance

deadband Number NA NA NA NA NA

Standard

outperformance

cap Number NA NA NA NA NA

Enhanced

outperformance

cap Number NA NA NA NA NA

Incentive rates

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard NA

Underperformance payment - enhanced NA

Outperformance payment - standard NA

Outperformance payment - enhanced NA

Page 88: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

87

1.2.15 British Standards Institution – standard for inclusive service

Purpose: This performance commitment incentivises the company to provide

assurance that the quality of support for customers in vulnerable circumstances is of a standard in line with the British Standards Institution (BSI) inclusive service provision.

Benefits: This performance commitment will help ensure that the company provides

a fair, flexible service that can be used by all customers equally, regardless of their health, age or personal circumstances.

Performance commitment definition and parameters

Unique Reference PR19ANH_36

Detailed definition of

performance measure This measure assesses the quality of the Priority Services scheme via the British Standard for Inclusive Service Provision certification BS 18477. To meet its targets for this performance commitment the

company must maintain the BS 18477 standard throughout the period. If this certification from BSI is not in place on 31 March of the reporting year, the performance commitment is reported as not maintained. The performance commitment applies each reporting year, and demonstration that the certification is in place must be tested and reported each reporting year. The BS 18477 certification is awarded by BSI Group (also known as the British Standards Institution). In the event that BSI Group cease providing certification for BS 18477 during the period 2020-25, the company should adopt any standard designed to directly succeed the existing standard. If one is not available, it will assess whether there exists other appropriate standards that can be used as an alternative independently assessed indicator of the quality of support for customers in vulnerable circumstances.

Additional detail on

measurement units

This measure is reported as ‘maintained’ or ‘not

maintained’.

Specific exclusions NA

Reporting and

assurance

No specific requirements

Measurement unit and

decimal places

Text (maintained or not maintained)

Measurement timing Reporting year

Incentive form Reputational

Page 89: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

88

Unique Reference PR19ANH_36

Incentive type NA

Timing of

underperformance and

outperformance

payments

NA

Price control allocation NA

Frequency of reporting Annual

Any other relevant

information

NA

Links to relevant

external documents

NA

Page 90: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

89

Performance commitment levels

Company

forecast Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment level text NA

Maintained

Maintained

Maintained

Maintained

Maintained

Enhanced

underperformance

collar text NA NA NA NA NA

Standard

underperformance

collar text NA NA NA NA NA

Underperformance

deadband text NA NA NA NA NA

Outperformance

deadband text NA NA NA NA NA

Standard

outperformance

cap text NA NA NA NA NA

Enhanced

outperformance

cap text NA NA NA NA NA

Incentive rates

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard NA

Underperformance payment - enhanced NA

Outperformance payment - standard NA

Outperformance payment - enhanced NA

Page 91: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

90

1.2.16 Helping those struggling to pay

Purpose: The purpose of this performance commitment is to incentivise the

company to increase the number of customers, who are struggling to pay their water bill, that receive financial support through one of the company’s financial support schemes. Benefits: The benefit of this performance commitment is an increase in the number

of customers receiving appropriate financial support which in turn could make these customers’ bills more affordable.

Performance commitment definition and parameters

Unique Reference PR19ANH_37

Detailed definition of

performance measure

The number of unique customers struggling to pay their bill, who are receiving financial assistance from one of the following schemes:

Forgiveness scheme

Breathing space

Concessionary tariffs

Charges holiday

Temporary instalment plans

Where a customer receives help from more than one type of financial support scheme the customer will only be counted once towards this measure.

Additional detail on

measurement units NA

Specific exclusions NA

Reporting and

assurance The company is expected to put in place external audit on an annual basis.

Measurement unit and

decimal places Number of unique customers receiving financial assistance to zero decimal places

Measurement timing Reporting year

Incentive form Reputational

Incentive type NA

Timing of

underperformance and

outperformance

payments

NA

Price control allocation NA

Frequency of reporting Annual

Page 92: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

91

Unique Reference PR19ANH_37

Any other relevant

information NA

Links to relevant

external documents NA

Performance commitment levels

Company

forecast Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment level Number NA

281,653

288,958

292,577

296,618

310,161

Enhanced

underperformance

collar Number NA NA NA NA NA

Standard

underperformance

collar Number NA NA NA NA NA

Underperformance

deadband Number NA NA NA NA NA

Outperformance

deadband Number NA NA NA NA NA

Standard

outperformance

cap Number NA NA NA NA NA

Enhanced

outperformance

cap Number NA NA NA NA NA

Incentive rates

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard NA

Underperformance payment - enhanced NA

Outperformance payment - standard NA

Outperformance payment - enhanced NA

Page 93: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

92

1.2.17 Smart metering delivery

Purpose: This performance commitment incentivises an increase in the number of

smart water meters that are installed at customer properties.

Benefits: Smart meters reduce the cost of meter readings and allow for more

regular readings to be taken. This improves the quality of data for the customer to better control their use, and the company to optimise its actions in response to effectively manage demand.

Performance commitment definition and parameters

Unique Reference PR19ANH_38

Detailed definition of

performance measure

The cumulative number of smart meters installed at household and non-household properties in the 2020-25 period. The performance commitment relates only to the replacement of existing basic meters with smart meters and the installation of smart meters on new connections.

We define new/replacement smart meters in this performance commitment as new/replacement meter installations that use Advanced metering infrastructure (AMI) technology that enables them to be read remotely through an integrated system of smart meters, communications networks, and data management systems. This system will comply with the company’s obligations under competition law and have the capability to:

record consumption data and comply with the appropriate regulations governing cold water meters;

allow ready access to this data by customers (directly or via contractors/agents) and the company at near real time, with data updated daily at a minimum, and made available at a minimum granularity of 1 hour intervals, or such greater frequency and/or granularity as reasonably requested by the customer or its contractors/agents;

enable the capability for automated leak alarms to be communicated to the customer and company;

transfer consumption data to the company remotely without requiring access to the meter or property; and

communicate with the internet.

We define existing meters as meters that were installed in the Anglian Water network prior to 1 April 2020 without smart meter capability.

Additional detail on

measurement units

The performance commitment measures the total number of smart meters installed annually for:

optant and selective programmes (where the company is installing new meters); and

Page 94: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

93

Unique Reference PR19ANH_38

smart metering roll-out (where the company is replacing existing basic meters).

We allowed funding for the installation of networks to support the installation of smart meters. These networks are only needed if smart meters are delivered. If the company fails to deliver at least 50% of the metering scheme (fewer than 548,198 meters by 2024-25) the company will incur £12.939m in additional underperformance payments at the next price review.

Specific exclusions A meter can only be counted once in the five year period for a property. For example, if a meter fails within the five years and is replaced, it cannot be recounted towards this performance commitment.

Reporting and

assurance No specific requirements

Measurement unit and

decimal places Number of smart meters to zero decimal places

Measurement timing Reporting year

Incentive form Revenue

Incentive type Underperformance payments

Timing of

underperformance and

outperformance

payments

End of period

Price control allocation 100% water network plus

Frequency of reporting Annual

Any other relevant

information NA

Links to relevant

external documents NA

Page 95: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

94

Performance commitment levels

Company

forecast Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment level Number NA

219,279

438,559

657,838

877,118

1,096,397

Enhanced

underperformance

collar Number NA NA NA NA NA

Standard

underperformance

collar Number NA NA NA NA NA

Underperformance

deadband Number NA NA NA NA NA

Outperformance

deadband Number NA NA NA NA NA

Standard

outperformance

cap Number NA NA NA NA NA

Enhanced

outperformance

cap Number NA NA NA NA NA

Incentive rates

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard -0.000014

Underperformance payment - enhanced NA

Outperformance payment - standard NA

Outperformance payment - enhanced NA

Page 96: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

95

1.2.18 Internal interconnection delivery

Purpose: This performance commitment incentivises the company to ensure that

customers in the region have sufficient water in the future.

Benefits: This performance commitment improves the company’s capability to

protect future customers against the supply risks presented through increasing population, sustainability reductions, drought risk, and a changing climate.

Performance commitment definition and parameters

Unique Reference PR19ANH_39

Detailed definition of

performance measure

The cumulative increase in megalitres per day (Ml/d) capacity delivered through the internal interconnection programme since 1 April 2020.

The identified schemes provide either additional treatment or transfer capacity. For intra-zonal transfer capacity this is the increased capacity to move water within a water resources zone (WRZ) to address issues for an individual planning zone (PZ). An increase will be recorded once schemes are delivered and assurance is provided that they are able to operate to the capacity benefit as defined in the table below. The capacity benefit is defined as the minimum the scheme can deliver on average over a year (note that the maximum capacity may be greater to achieve this annual average).

Below is the list of included schemes and average transfer capacity to be delivered by each scheme:

Scheme outcome description Capacity benefit

delivered (Ml/d)

WRZ to WRZ transfers

North Fenland WRZ to Ely WRZ 20.0

Central Lincolnshire WRZ to South Lincolnshire WRZ

63.0

South Lincolnshire WRZ to North Ruthamford WRZ

67.0

North Ruthamford WRZ to South Fenland WRZ

35.0

Ruthamford South WRZ to Ruthamford Central WRZ

7.0

Ely WRZ to Newmarket WRZ 20.0

Newmarket WRZ to Cheveley WRZ 1.0

Page 97: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

96

Unique Reference PR19ANH_39

Newmarket WRZ to Bury Haverhill WRZ

20.0

Bury Haverhill WRZ to East Suffolk WRZ

10.0

East Suffolk WRZ to South Essex WRZ

14.0

Norwich & the Broads WRZ to Happisburgh WRZ

1.3

Central Lincolnshire WRZ to Nottinghamshire WRZ

2.10

South Fenland WRZ to North Fenland WRZ

15.0

Norwich & the Boards WRZ to Norfolk Rural North WRZ

2.0

Bury Haverhill WRZ to Ixworth WRZ 3.0

Ixworth WRZ to Thetford WRZ 1.8

Norwich & the Boards WRZ to Norfolk Rural North WRZ

3.4

South Humber Bank WRZ – Transfer from Pyewipe to non-potable network

20.40

Intrazone transfers

Ruthamford South WRZ – Meppershall PZ

5.0

Ruthamford South WRZ – Woburn PZ 5.0

Bury Haverhill – Haverhill PZ 8.0

North Norflok Rural WRZ – Diddlington PZ

0.20

Treatment

South Humber Bank WRZ – Pyewipe water reuse treatment

6.0

North Fenland WRZ to Ely WRZ treatment

20.0

Ruthamford South WRZ – Meppershall PZ treatment

5.0

Total 355.2

Additional detail on

measurement units NA

Page 98: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

97

Unique Reference PR19ANH_39

Specific exclusions Due to the complex nature of the programme and associated interactions there are factors outside the company’s management control relating to the metaldehyde ban. These will be excluded from the calculation of underperformance incentives. If metaldehyde is not banned, or there is a delay in banning metaldehyde, then treatment requirements will need to be adapted to reflect this or in the case of delay, scheme commissioning

delayed to avoid the installation of expensive treatment technology for a short term issue.

Reporting and

assurance The company will provide external assurance by a third party to confirm:

the schemes delivered have been selected on delivering best value to customers;

the transfer meets the criteria of either linking up two water resource zones, provides additional capacity within a zone, or provides additional water treatment capacity;

the treatment or transfer scheme can provide the capacity benefit on an annual average basis;

the treatment or transfer schemes selected to be delivered or not delivered are not skewed by solution costs;

the increases are as a result of physical enhancements to the company asset base and not the result of changes in assumptions; and

that any exclusions are correctly reported.

If the company does not deliver schemes that have high average cost per Ml/d, the underperformance rate may be increased as part of the reconciliation at PR24 to protect customers.

Measurement unit and

decimal places Cumulative increase in megalitres per day (Ml/d) to one decimal place

Measurement timing Reporting year

Incentive form Revenue

Incentive type Underperformance payments.

In addition at PR24 we will recover allowed costs of any underperformance expected in 2024-25 using a rate of £

0.3158m per unit.

Timing of

underperformance and

outperformance

payments

End of period

Page 99: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

98

Unique Reference PR19ANH_39

Price control allocation 6% water resources

94% water network plus

Frequency of reporting Annual

Any other relevant

information NA

Links to relevant

external documents NA

Page 100: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

99

Performance commitment levels

Company

forecast

Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment level Ml/d NA 0.0 3.3 45.8 45.8 355.2

Enhanced

underperformance

collar Ml/d NA NA NA NA NA

Standard

underperformance

collar Ml/d NA NA NA NA NA

Underperformance

deadband Ml/d NA NA NA NA NA

Outperformance

deadband Ml/d NA NA NA NA NA

Standard

outperformance

cap Ml/d NA NA NA NA NA

Enhanced

outperformance

cap Ml/d NA NA NA NA NA

Incentive rates

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard - 0.0683

Underperformance payment - enhanced NA

Outperformance payment - standard NA

Outperformance payment - enhanced NA

Page 101: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

100

1.2.19 Value for money

Purpose: To incentivise the company to deliver a water and wastewater service that

represents value for money for customers.

Benefits: Assessing customer views on value for money is an important factor in

understanding drivers of legitimacy with customers and in ensuring that the quality of service provided to customers continues to improve.

Performance commitment definition and parameters

Unique Reference PR19ANH_40

Detailed definition of

performance measure

The average percentage of customers who respond that they are “satisfied” or “very satisfied” when asked:

“How satisfied are you with the value for money of sewerage services in your area?

And:

“How satisfied are you with the value for money of water services in your area?

The survey will give two different results for the two services and to arrive at the combined score a weighted average will be taken, with a weighting of 56:44 wastewater/water.

The survey is carried out by CCWater. It interviews 400 customers about Anglian Water, the research is demographically representative.

If CCWater discontinues this survey during the period, the company will put in place alternative arrangements to measure the same information using appropriately qualified third party organisations. Any alternative arrangements will be assured by an appropriately qualified independent third party.

Additional detail on

measurement units NA

Specific exclusions NA

Reporting and

assurance No specific requirements

Measurement unit and

decimal places Percentage to zero decimal places

Measurement timing Reporting year

Incentive form Reputational

Incentive type NA

Timing of

underperformance and NA

Page 102: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

101

Unique Reference PR19ANH_40

outperformance

payments

Price control allocation NA

Frequency of reporting Annual

Any other relevant

information NA

Links to relevant

external documents NA

Performance commitment levels

Company

forecast Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment level % NA 77 79 81 82 83

Enhanced

underperformance

collar % NA NA NA NA NA

Standard

underperformance

collar % NA NA NA NA NA

Underperformance

deadband % NA NA NA NA NA

Outperformance

deadband % NA NA NA NA NA

Standard

outperformance

cap % NA NA NA NA NA

Enhanced

outperformance

cap % NA NA NA NA NA

Page 103: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

102

Incentive rates

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard NA

Underperformance payment - enhanced NA

Outperformance payment - standard NA

Outperformance payment - enhanced NA

1.2.20 Delivery of water industry national environment programme

requirements

Purpose: This performance commitment incentivises the company to deliver its

requirements for the Water Industry National Environment Programme (WINEP).

Benefits: This performance commitment improves the natural environment by

encouraging the timely delivery of environmental improvement schemes. It will help ensure that water can be abstracted from rivers and lakes without any negative impacts on the environment.

Performance commitment definition and parameters

Unique Reference PR19ANH_NEP01

Detailed definition of

performance measure

Has the company “met” or “not met” all of its requirements for WINEP, in the reporting year. This measure tracks the completion of required schemes in each year, as per the latest WINEP programme published by DEFRA. If any scheme is not delivered by the time specified in the WINEP tracker titled “Completion Date (DD/MM/YY)”, the company will report “not met”. All WINEP schemes will be included including those reported under other performance commitments.

Additional detail on

measurement units

The performance commitment will measure against the latest WINEP tracker in the year in which performance is being reported. Therefore, performance for 2020-21 will be reported based on the latest WINEP programme on the 31st March 2021 and the schemes which have been delivered by this date.

Specific exclusions NA

Reporting and

assurance The company will secure confirmation from the Environment Agency that performance has been correctly reported. The view of the Environment Agency will be definitive.

Page 104: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

103

Unique Reference PR19ANH_NEP01

The company will report all requirements that it has not met in its Annual Performance Report (APR) and set out any interactions this performance measure has with any of its other performance commitments.

Measurement unit and

decimal places Text stating either “met” or “not met”.

Measurement timing Reporting year

Incentive form Reputational

Incentive type NA

Timing of

underperformance and

outperformance

payments

NA

Price control allocation NA

Frequency of reporting Annual

Any other relevant

information NA

Links to relevant

external documents NA

Page 105: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

104

Performance commitment levels

Company

forecast

Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment level Text NA met met met met met

Enhanced

underperformance

collar Text NA NA NA NA NA

Standard

underperformance

collar Text NA NA NA NA NA

Underperformance

deadband Text NA NA NA NA NA

Outperformance

deadband Text NA NA NA NA NA

Standard

outperformance

cap Text NA NA NA NA NA

Enhanced

outperformance

cap Text NA NA NA NA NA

Incentive rates

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard NA

Underperformance payment - enhanced NA

Outperformance payment - standard NA

Outperformance payment - enhanced NA

Page 106: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

105

1.2.21 Partnership working on pluvial and fluvial flood risk

Purpose: This performance commitment is designed to incentivise the company to

work in partnership to deliver investment to protect its wastewater treatment sites and water recycling network from pluvial, fluvial and coastal flooding.

Benefits: Protecting wastewater assets from pluvial, fluvial and coastal flooding

reduces the risk of service failures such as pollution.

Performance commitment definition and parameters

Unique Reference PR19ANH_42

Detailed definition of

performance measure

The cumulative number of pluvial, fluvial and coastal flood protection schemes delivered in partnership. Each scheme must mitigate flooding risks with return periods greater than 1-in-20 years at the company’s above ground wastewater treatment assets or water recycling network.

Additional detail on

measurement units

Partnerships are defined as projects where the company engages in activity with independent third-party organisations, agencies or individuals for the delivery of a shared objective.

Specific exclusions: The following types of projects are excluded from the measurement of this performance commitment:

business as usual delivery of capital projects by contractors; and

repair and maintenance or other framework contracts.

Reporting and

assurance: At the next price review the company will publish assurance by an appropriately qualified third party that:

Each scheme completed will allow Anglian wastewater treatment assets or its water recycling network to continue to operate during a pluvial, fluvial or coastal flooding event with greater than 1 in 20 return period.

Any schemes forecast to be completed have clear deliverable plans to be completed before 31 March 2025 and that the plans will deliver protection that allows the site to operate during pluvial, fluvial or coastal flooding events with greater than 1 in 20 return period.

Measurement unit

and decimal places Number of schemes to zero decimal places.

Measurement timing Reporting year

Incentive form Revenue

Incentive type Underperformance payment only for 2024-25.

Timing of

underperformance End of period

Page 107: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

106

Unique Reference PR19ANH_42

and outperformance

payments

Price control

allocation 100% wastewater network plus

Frequency of

reporting Annual

Any other relevant

information NA

Links to relevant

external documents NA

Performance commitment levels

Company

forecast

Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment level Numb

er NA NA NA NA 92

Enhanced

underperformance

collar

Number

NA NA NA NA NA

Standard

underperformance

collar

Number

NA NA NA NA NA

Underperformance

deadband Numb

er NA NA NA NA NA

Outperformance

deadband Numb

er NA NA NA NA NA

Standard

outperformance

cap

Number

NA NA NA NA NA

Enhanced

outperformance

cap

Number

NA NA NA NA NA

.

Page 108: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

107

Incentive rates

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard -0.0462

Underperformance payment - enhanced NA

Outperformance payment - standard NA

Outperformance payment - enhanced NA

1.2.22 Community Investment

Purpose: This performance commitment enables the company to understand how many

people benefit from its corporate community investment. It captures the community investment programmes through which the company and its alliances make a positive difference, and through which it adds social value to its communities.

Benefits: This performance commitment tracks the beneficiaries of the company’s

community investment programme and supports the drive towards reaching greater numbers of people.

Performance commitment definition and parameters

Unique Reference PR19ANH_43

Detailed definition of

performance measure The percentage increase in the number of people directly reached or supported by the company’s community investment activity, and those reached by its Alliances in the course of their work with the company from a 2020-21 baseline

The company will use the London Benchmarking Group (LBG) framework to measure the contribution that it makes to communities. The company will use the ‘LBG Guidance Manual’ that was published in 2018.

The Framework does not include people impacted indirectly by an activity. For example, a company may fund a vaccination campaign, and while the entire population of a region may have a reduced chance of catching a disease because a number of people were vaccinated, only the direct beneficiaries - the number of people who were actually vaccinated - is included. Similarly, if a company funds the development of an arts facility for a town, the direct beneficiaries are the number of people using the facility, not the whole population of the town that may or may not use it.

Page 109: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

108

Unique Reference PR19ANH_43

Additional detail on

measurement units

Outputs (of which beneficiary numbers are an example) are an expression of what happens or what is delivered through a community activity.

Specific exclusions The framework only captures community investment that is both charitable and voluntary.

Reporting and

assurance The company will publish a report each year, assured by an appropriately qualified third party to provide verification of the numbers provided.

Measurement unit and

decimal places Percentage improvement in units from 2020-21, to one decimal place.

Measurement timing Reporting year

Incentive form Reputational

Incentive type NA

Timing of

underperformance and

outperformance

payments

NA

Price control allocation NA

Frequency of reporting Annual

Any other relevant

information NA

Links to relevant

external documents NA

Page 110: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

109

Performance commitment levels

Company

forecast Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment level % NA 0 1.0 2.0 3.5 5.0

Enhanced

underperformance

collar NA NA NA NA NA NA

Standard

underperformance

collar NA NA NA NA NA NA

Underperformance

deadband NA NA NA NA NA NA

Outperformance

deadband NA NA NA NA NA NA

Standard

outperformance

cap NA NA NA NA NA NA

Enhanced

outperformance

cap NA NA NA NA NA NA

Incentive rates

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard NA

Underperformance payment - enhanced NA

Outperformance payment - standard NA

Outperformance payment - enhanced NA

Page 111: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

110

1.2.23 Customer trust

Purpose: This performance commitment captures the trust that customers place in the

company.

Benefits: The company is incentivised to improve the service and performance it

delivers to customers in such a way that they can place a greater level of trust in the company.

Performance commitment definition and parameters

Unique Reference PR19ANH_44

Detailed definition of

performance measure The improvement of the company relative to the industry average of the CCWater Trust score.

The calculation is:

{Company published score less mean average score of all water companies’ published scores in England and Wales}

less

{Company published score in 2019-20 less mean average score of all water companies’ published scores in England and Wales in 2019-20}

This performance commitment is calculated from the Consumer Council for Water’s survey. Each year the Consumer Council for Water (CCWater) undertakes a survey asking customers for feedback on their water and sewerage company. The results are published in a report.

Customers are asked to what extent they trust their water company on a scale of 1 – 10 with 1 being ‘do not trust them at all’ and 10 being ‘trust them completely’

Additional detail on

measurement units

This performance commitment will cease to apply if CCWater discontinues its annual question on the level of trust in water companies.

Specific exclusions NA

Reporting and

assurance No further requirements

Measurement unit and

decimal places CCWater Trust score, to two decimal places.

Measurement timing Reporting year

Incentive form Reputational

Page 112: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

111

Unique Reference PR19ANH_44

Incentive type NA

Timing of

underperformance and

outperformance

payments

NA

Price control allocation NA

Frequency of reporting Annual

Any other relevant

information NA

Links to relevant

external documents NA

Performance commitment levels

Company

forecast Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment level number NA 0 0.01 0.02 0.03 0.05

Enhanced

underperformance

collar number NA NA NA NA NA

Standard

underperformance

collar number NA NA NA NA NA

Underperformance

deadband number NA NA NA NA NA

Outperformance

deadband number NA NA NA NA NA

Standard

outperformance

cap number NA NA NA NA NA

Enhanced

outperformance

cap number NA NA NA NA NA

Page 113: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

112

Incentive rates

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard NA

Underperformance payment - enhanced NA

Outperformance payment - standard NA

Outperformance payment - enhanced NA

1.2.24 Natural capital impact

Purpose: This performance commitment captures the improvements the company

make to natural capital within its region.

Benefits: This performance commitment incentivises the company to monitor and

improve natural capital within its region.

Performance commitment definition and parameters

Unique Reference PR19ANH_45

Detailed definition

of performance

measure

The progress of the company to meet all 2024-25 targets for its four natural capital measures. To achieve an “On track” classification, the company must be on track for 2024/25 delivery of all four natural capital measures included in this performance commitment. If the company is not on track for one or more measures, then the performance commitment shall be marked as, “Fail” in the reporting year.

For the final 2024/25 year, To gain a “Met” classification, the company must meet its targets for all four natural capital measures identified in this performance commitment in the 2024/25 year. Should the company not meet the targets for all four measures in the 2024/25 year, the company performance will be marked as “Fail”.

The company will identify for each measure whether it is “on track” to delivering the relevant target by the 2024/25 year in each reporting year. The following four measures of natural capital are included:

Measure Detail Target

Water Quantity:

This measures the volume of water the company abstract from the environment.

220 litres per person per day by 2025.

Page 114: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

113

Unique Reference PR19ANH_45

Ground water quality

This measures activities to prevent nitrate from entering the soil and ground water system.

80 % of engaged farmers altering farming practices by 2025

Surface water quality

This measures the reduction of phosphate discharged by the company’s Water recycling centres (WRCs) in relation to its WINEP obligations.

100% of WINEP obligations to reduce phosphate discharges from WRCs are met.

Biodiversity

This metric measures the positive addition to biodiversity from the company’s activities.

10% biodiversity net gain by 2025 from a 2019 baseline

Additional detail

on measurement

units

Measure Further details

Water Quantity

This metric is based on distribution input data and population numbers as reported in yearbook data: Volume of water abstracted per person per day = [l/d total distribution input] / [Total population served] The metric is normalised by population served to isolate the impact of demand management on abstraction. The metric uses a three-year rolling average to account for seasonal and annual variation in demand.

Ground water quality

This metric measures engagement with farmers (in 43 targeted catchments) resulting in evidence of positive action being taken to reduce nitrate leaching to ground, for example, change in cropping practice or soil management. This measure is in line with the WINEP Measures Specification Forms agreed with the Environment Agency to show evidence that the scheme has reduced nitrate input/ leaching over the five year period. By the end of the 2020-25 period (December 2024) the success of the scheme measures will be based on:

The degree of total farmer engagement

The degree of positive engagement

Evidence of improvement in the mutual understanding the most appropriate nitrate leaching reduction measures

Evidence that the scheme has reduced nitrate input/ leaching over the five year period, and interpretation of what this means for future nitrate trends

At the end of the 2020-25 period the Environment Agency will sign off the scheme delivery. The key milestones and timetable for delivery as per the agreed Measures Specification Forms is as follows: :

Page 115: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

114

Unique Reference PR19ANH_45

Year 1 Q1 (2020) start-up meeting

Year 1 Q4 (2021) annual review

Year 2 Q4 (2022) annual review

Year 3 Q4 (2023) annual review and feedback assessment

Year 4 Q4 (2024) annual review

Year 5 Q2 (2024) scheme end – draft scheme report produced

Year 5 Q3 (Dec 2024) sign off of final scheme report

Surface water quality

The company will measure and report the reduction in nutrient load discharged by water recycling centres (WRCs) as a percentage of reduction required by the WINEP obligation/s. Phosphorous (P) load reduction will be based on 6mg/l Total Phosphorus (TP) concentration entering the WRC at the permitted dry weather flow (DWF) (eg 6 * 100 cubic meters per day (mcd)/1000 = 0.6kgd) this gives the baseline load currently being discharged to the water body. The new TP permit limit is then used to arrive at the reduced TP load to the water body, for example if the new limit is 2mg/l the load reduction will be 0.6 – 0.2 = 0.4kgd. Further explanation: Reductions in P concentrations in WRC discharges are calculated by:

a) Establishing the baseline P load discharged per day at the current permitted dry weather flow using either the current permitted P concentration in mg/l or, in the absence of a current permitted P limit, assuming a current P concentration of 6mg/l per day in discharges measured as Total P. The kg/d value is then used to establish the kg per annum load.

b) Establishing the reduced P load discharged following delivery of WINEP obligation.

Example: A WRC currently has a permitted DWF of 2000mcd and discharges effluent with a concentration of 6mg/l TP. A WINEP obligation requires the concentration to be reduced to 1mg/l TP. Baseline TP load calculated as follows: (DWF mcd multiplied by TP concentration in effluent) / 1000 (2000mcd X 6) / 1000 = 12 kg/d or 4380 kg per annum (assuming 365 days per year) Reduced TP load calculated as follows: (DWF mcd multiplied by TP concentration in effluent required by Environment Agency Environmental Permit) / 1000 (2000mcd X 1) / 1000 = 2kg/d or 730 kg per annum (assuming 365 days per year)

Page 116: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

115

Unique Reference PR19ANH_45

The km of river improved arising from the WINEP obligation/s are stated in the WINEP.

Biodiversity

The metric measures Biodiversity net gain (measures implemented to achieve net gain) The % change in the number of biodiversity units is based upon condition and extent of biodiversity as a result of construction and land management activities on the company’s land. Further explanation: The change in the number of biodiversity units on the company’s land as a result of its construction and land management activities, compared to the 2019 baseline. The baseline will be used as a starting point to measure the impact of a construction activity. Once the baseline is set, the number of biodiversity units lost will be recorded. The company will apply the mitigation hierarchy and where there are residual biodiversity impacts, create and/or enhance biodiversity elsewhere so that the net effect is a gain of 10% compared to the number of biodiversity units lost, at company level. This will be consistent with ‘The biodiversity metric 2.0 User guide’ first published 29th July 2019, which takes account of factors such as time to target condition and habitat creation difficulty. Biodiversity units are calculated using the Biodiversity Metric 2.0, as set out below: Area (ha) x Distinctiveness x Condition x Strategic significance x Connectivity = Biodiversity unit score Area – the area of land in question Distinctiveness - A number based on the type of habitat present. Condition - A number based on the quality of the habitat Strategic significance - A number based on whether the location of the development and or off-site work has been identified locally as significant for nature Connectivity - A number based on the proximity of the habitat patch to similar or related habitats

Specific exclusions Water Quantity: The measure uses distribution input data as a proxy for total water abstracted.

The litre per person per day figure should not be confused with Per Capita Consumption (PCC), as it includes non-household consumption and leakage.

Ground water quality: This measure excludes the groundwater catchments to AWS sources not listed in the 2020-25 WINEP as having a WFD_ND or WFD_IMP driver to address nitrate pollution of groundwater

Surface water quality: None

Page 117: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

116

Unique Reference PR19ANH_45

Biodiversity: Pipeline schemes on third party land are excluded. The target will apply to construction activities on company-owned land and treatment wetlands.

The measure excludes linear habitats such as hedgerows and rivers.

Reporting and

assurance The company will provide evidence each year, as part of its Annual performance report (APR), to confirm whether it is on track or not on track to delivering its targets by the 2024/25 year. For the 2024/25 year the company will provide additional assurance from an appropriately qualified third party to confirm whether the company has or has not met its targets.

Water Quantity: No further requirements

Ground water quality: The catchment scheme engagement plan will be updated and shared on an annual basis, as evidence of completed work for sign off.

Surface water quality: Reporting and assurance can be demonstrated in 2 ways:

1) Relevant WINEP obligations signed off with the Environment Agency (EA) at the end of each financial year as recorded & published in the Environment Agency’s annual Environmental Performance Assessment (EPA).

2) Compliance with new environmental permits issued by the Environment Agency demonstrated by permit reporting requirements and reported & published in the EA’s annual Environmental Performance Assessment (EPA).

Biodiversity: The company will maintain a data set of biodiversity unit gains and losses in order to report performance against its target at the end of 2020-25 period. It will be transparent about its progress and share its progress with stakeholders annually.

Measurement unit

and decimal places Text stating either “On track” or “Fail”.

For 2024/25, Text stating either “Met” or “Fail”

Measurement

timing Reporting year

Incentive form Reputational

Incentive type NA

Page 118: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

117

Unique Reference PR19ANH_45

Timing of

underperformance

and

outperformance

payments

NA

Price control

allocation NA

Frequency of

reporting Annual

Any other relevant

information NA

Links to relevant

external

documents

NA

Performance commitment levels

Company

forecast Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023

-24

2024-

25

Performance

commitment level Text NA

On track

On track

On track

On track

Met

Enhanced

underperformance

collar Text NA NA NA NA NA

Standard

underperformance

collar Text NA NA NA NA NA

Underperformance

deadband Text NA NA NA NA NA

Outperformance

deadband Text NA NA NA NA NA

Standard

outperformance

cap Text NA NA NA NA NA

Enhanced

outperformance

cap Text NA NA NA NA NA

Page 119: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

118

Incentive rates

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard NA

Underperformance payment - enhanced NA

Outperformance payment - standard NA

Outperformance payment - enhanced NA

Page 120: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

119

1.2.25 Regional Collaboration

Purpose: This metric measures the collaborative approach to measuring and

managing natural capital beyond the company’s operational boundaries. It aims to drive the development of a regional approach to assessing and considering natural capital in strategic planning and decision making.

Benefits: This performance commitment incentivises a collaborative approach that

will lead to longer-term benefits and efficiencies when delivering improvements to natural capital

Performance commitment definition and parameters

Unique Reference PR19ANH_46

Detailed definition of

performance measure The progress of the company to meet its 2024-25 performance commitment level. To achieve an “on track” classification, the company must be on track for delivery of a strategy, agreed set of metrics and baseline across the East of England by July 2024 according to its milestone plan.

If the company is not on track for delivery by July 2024, in the reporting year, then the performance commitment shall be marked as, “Fail” in the reporting year.

For the final 2024/25 year, the company shall either “Pass” or “Fail” in relation to this performance commitment. The company shall “Pass” if the strategy, agreed set of metrics and baseline across the East of England are delivered by March 2024. If the company does not deliver these aspects by March 2024 then the company shall “Fail” the performance commitment.

The company will bring together a multi-sector group, Natural Capital East, to create a strategy to explore and implement the development of agreed natural capital metrics, processes for evaluation and governance at the regional scale. This group must comprise 3 or more individual member organisations or groups.

Additional detail on

measurement units

NA

Specific exclusions NA

Reporting and

assurance A strategy and a milestone plan for the 2020-25 period will be produced in conjunction with Natural Capital East, with key elements including, but not limited to:

The agreement and verification of region wide metrics.

The production of a region wide baseline.

Page 121: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

120

Unique Reference PR19ANH_46

The strategy and milestone plan will be developed and published in the first year of the 2020-25 period and then annual progress against the milestone plan will be reported publically. A region-wide set of metrics and a baseline will be completed by July 2024.

Measurement unit and

decimal places For years 2020/21 to 2023/24, Text stating either “On track” or “Fail”.

For 2024/25, Text stating either “Pass” or “Fail”

Measurement timing Reporting year

Incentive form Reputational

Incentive type NA

Timing of

underperformance and

outperformance

payments

NA

Price control allocation NA

Frequency of reporting Annual

Any other relevant

information NA

Links to relevant

external documents NA

Page 122: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

121

Performance commitment levels

Company

forecast Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023-

24 2024-25

Performance

commitment level Text NA

On track

On track

On track

On Track

Pass

Enhanced

underperformance

collar Text NA NA NA NA NA

Standard

underperformance

collar Text NA NA NA NA NA

Underperformance

deadband Text NA NA NA NA NA

Outperformance

deadband Text NA NA NA NA NA

Standard

outperformance

cap Text NA NA NA NA NA

Enhanced

outperformance

cap Text NA NA NA NA NA

Incentive rates

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard NA

Underperformance payment - enhanced NA

Outperformance payment - standard NA

Outperformance payment - enhanced NA

Page 123: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

122

1.2.26 Cyber security

Purpose: This performance commitment incentivises the company to deliver its

operational technology cybersecurity mitigation plan.

Benefits: This investment is to mitigate the cyber threat to operational technology

(OT) and to comply with the network and information systems (NIS) regulations.

Performance commitment definition and parameters

Unique Reference PR19ANH_41

Detailed definition of

performance measure

Percentage of sites identified in the high risk Operational Technology (OT) Cybersecurity mitigation plan with actions fully completed.

Additional detail on

measurement units

The company will assess the OT Cyber risk at 106 sites and develop a plan of mitigation. This will set out the total number of sites which require investment to mitigate risk. Following these investigations, each of the 106 sites will be given a risk rating. These investigations will take place at the front end of the 2020-25 period.

By the end of the 2020-25 period, the company commits to completing its action plan for 100% of the high risk sites that are identified.

Specific exclusions NA

Reporting and

assurance Number of sites assessed as high risk to be reported on annual basis.

Number of sites mitigated to be reported on annual basis.

The company will provide assurance from an appropriately

qualified third party to confirm that the risk ratings assigned

to each site are appropriate and also to confirm completion

of its action plan for sites categorised as high risk.

Measurement unit and

decimal places

Percentage of high risk sites with mitigation actions completed.

Measurement timing Reporting year

Incentive form Underperformance payments

Incentive type Revenue

Timing of

underperformance and

outperformance

payments

End of period

Price control allocation 100% water network plus

Page 124: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

123

Unique Reference PR19ANH_41

Frequency of reporting Annual

Any other relevant

information NA

Links to relevant

external documents NA

Performance commitment levels

Company

forecast Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment level % NA NA NA NA NA 100%

Enhanced

underperformance

collar % NA NA NA NA NA

Standard

underperformance

collar % NA NA NA NA NA

Underperformance

deadband % NA NA NA NA NA

Outperformance

deadband % NA NA NA NA NA

Standard

outperformance

cap % NA NA NA NA NA

Enhanced

outperformance

cap % NA NA NA NA NA

Incentive rates

Incentive type Incentive rate (£m/unit)

Underperformance payment - standard -0.0431

Underperformance payment - enhanced NA

Outperformance payment - standard NA

Outperformance payment - enhanced NA

Page 125: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

124

1.2.27 Direct procurement for customers: Underperformance

incentive for Elsham treatment works and transfer scheme

Purpose: This performance commitment measures the progress of Anglian Water in

implementing a direct procurement for customers process to support the

appointment of a competitively appointed provider to construct and finance the

Elsham treatment works and transfer scheme.

Progress is measured against the satisfactory delivery of two key direct procurement

for customers control points. These are the Outline Business Case and the Full

Business Case. These need to be successfully delivered to allow the scheme to

progress to the point where a competitively appointed provider can be appointed.

Benefits: This performance commitment incentivises the timely and effective

completion of the procurement process to deliver the Elsham treatment works and

transfer scheme. The Elsham treatment works and transfer scheme is needed to

allow surplus water from East Lincolnshire and Elsham to be transferred south. This

will improve resilience associated with decreasing reductions to abstraction levels,

and increased growth and climate change impacts in other areas.

Customers benefit through the direct procurement for customers process as the

Elsham treatment works and transfer scheme is procured to deliver better customer

value.

Performance commitment definition and parameters

Unique Reference PR19ANH_47

Detailed definition of

performance measure General: Delivery of the Elsham treatment works and transfer scheme by way of direct procurement for customers is expected to deliver financial savings and promote innovation. Under this performance related mechanism Anglian Water will have to pay an underperformance payment for delays in procuring the Elsham treatment works and transfer scheme under a direct procurement for customers process.

The performance commitment measures successful and timely delivery of key direct procurement for customers control points, the Outline Business Case submission and the Full Business Case submission.

The measure is reported as the number of control points delivered by the target date within each reporting year.

The Elsham treatment works and transfer scheme is needed to allow surplus water from East Lincolnshire and Elsham to be transferred south. This will improve

Page 126: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

125

Unique Reference PR19ANH_47

resilience associated with decreasing reductions to abstraction levels, and increased growth and climate change impacts in other areas.

Anglian Water will make use of markets through a direct procurement process to maximise the value to customers of the Elsham treatment works and transfer scheme. This means that a competitively appointed provider will finance and manage the Elsham treatment works and transfer scheme, owning the assets for the duration of a contract. By doing this there is more opportunity for market forces to deliver the Elsham treatment works and transfer scheme efficiently.

Additional detail on

measurement units

The delivery points shall be as follows:

Delivery Point Target Date Weights of

incentive

Outline

Business Case

To be

determined

50%

Full Business

Case

To be

determined

50%

Anglian Water will only be able to claim completion of each control point following both (a) Anglian Water having provided the appropriate document by the prescribed date, and (b) Ofwat subsequently agreeing that the submission is satisfactory.

The target date for submission of both the Outline Business Case and the Full Business Case will subsequently be specified in the Elsham treatment works and transfer scheme Strategic Outline Case. Anglian Water will be required to submit for the Elsham treatment works and transfer scheme a Strategic Outline Case by no later than 31st December 2020.

At the Outline Business Case submission and Full Business Case submission stages, the procurement decision could recommend exit from direct procurement for customers. If this were to be the optimum output from the process, then

Page 127: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

126

Unique Reference PR19ANH_47

this would still be considered a successful completion of the control point, provided that Ofwat agrees that direct procurement for customers-exit is an appropriate and reasonable conclusion at that control point. In that eventuality there would not be an underperformance payment in relation to any subsequent delivery point.

The successful completion of each control point will be assessed against Anglian Water meeting the specific date set out in the Elsham treatment works and transfer scheme Strategic Outline Case.

Specific exclusions NA

Reporting and

assurance No specific requirements

Measurement unit and

decimal places The performance commitment measures are the number of control points which were due to be delivered in that reporting year, which have been delivered on or before the target date.

The measure will be reported to no decimal places

Measurement timing Reporting year

Incentive form Revenue

Incentive type Underperformance payments.

Timing of

underperformance and

outperformance

payments

End of period

Price control allocation 100% Water network plus

Frequency of reporting Annual

Any other relevant

information This performance commitment is designed to generate underperformance penalties as consequence of delays to the direct procurement for customers process that are within the control of Anglian Water (in this case, the submission of the Elsham treatment works and transfer scheme Outline Business Case and Full Business Case).

This underperformance is capped at £0.94m (2017/18, FYA CPIH prices)

Links to relevant

external documents NA

Page 128: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

127

Performance commitment levels

Company

forecast Committed performance level

Unit 2019-20 2020-

21

2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment

level

Control points

delivered TBA TBA TBA TBA TBA TBA

Enhanced

underperforman

ce collar Text NA NA NA NA NA

Standard

underperforman

ce collar Text NA NA NA NA NA

Underperforman

ce deadband Text NA NA NA NA NA

Outperformance

deadband Text NA NA NA NA NA

Standard

outperformance

cap Text NA NA NA NA NA

Enhanced

outperformance

cap Text NA NA NA NA NA

Incentive rates

Incentive type Incentive rate (£m/control point)

2017/18 FYA CPIH prices

Underperformance payment - standard -0.47

Underperformance payment - enhanced NA

Outperformance payment - standard NA

Outperformance payment - enhanced NA

Page 129: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

128

1.2.28 Direct procurement for customers: Outperformance payment

for Elsham treatment works and transfer scheme

Purpose. This performance commitment incentivises Anglian Water to procure

Elsham treatment works and transfer scheme under direct procurement for

customers in a way which demonstrates value for money to customers through

delivery by a competitively appointed third party provider.

Benefits: This performance commitment incentivises Anglian Water to procure

Elsham treatment works and transfer scheme under direct procurement for

customers, which is expected to bring financial savings and promote innovation.

Performance commitment definition and parameters

Unique Reference PR19ANH_48

Detailed definition of

performance measure Where Anglian Water successfully completes an agreed procurement process and, following approval by Ofwat, awards the Elsham treatment works and transfer scheme to a competitively appointed provider such that the contract is signed and fully effective in accordance with its terms, Anglian Water would be entitled to receive an incentive payment which would reflect the size and complexity of Elsham treatment works and transfer scheme and the procurement undertaken.

Anglian Water will develop and carry out a procurement process as agreed with Ofwat and award a contract to a competitively appointed provider to deliver the Elsham treatment works and transfer scheme. In general, the process comprises Anglian Water competitively tendering for a third-party to design, construct, finance, maintain and operate the scheme. Customers benefit where the Elsham treatment works and transfer scheme is procured at a lower whole life cost and if it is carried out efficiently.

We expect Anglian Water to procure the competitively appointed provider within timelines to be agreed with Ofwat. The full value of outperformance payment will be payable if the contract award of the Elsham treatment works and transfer scheme to the competitively appointed provider, occurs prior to the date as specified within Anglian Water’s Strategic Outline Case agreed with Ofwat. The outperformance payment will be zero if the contract is awarded after the date specified within the agreed Strategic

Outline Case.

For the Elsham treatment works and transfer scheme there will be an outperformance payment of £0.94m being 10 per cent of the scheme’s totex allowance in the period.

Page 130: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

129

Unique Reference PR19ANH_48

The Elsham treatment works and transfer scheme is needed to allow surplus water from East Lincolnshire and Elsham to be transferred south. This will improve resilience associated with decreasing reductions to abstraction levels, and increased growth and climate change impacts in other areas.

Anglian Water will make use of markets through a direct procurement process to maximise the value to customers of this scheme. This means that a competitively appointed provider will finance and manage the scheme, owning the assets for the duration of a contract. By doing this there is more opportunity for market forces to deliver the Elsham treatment works and transfer scheme efficiently.

Additional detail on

measurement units

This performance commitment will be measured in terms of whether a competitively appointed provider is appointed in circumstances where the direct procurement for customers scheme meets the qualifying criteria (principles).

Achievement will be when a contract is signed and fully effective in accordance with its terms.

Ofwat will, when the Full Business Case is formally submitted for approval, assess whether the scheme meets the qualifying criteria for the procurement of the scheme by way of a direct procurement for customers process.

At the Full Business Case submission Ofwat shall consider all relevant information. This shall include the ‘Principles applying to the DPC procurement process’ set out in Ofwat’s publication “Delivering Water 2020: Our methodology for the 2019 price review, Appendix 9: Direct procurement for customers” as maybe revised from time to time. For the avoidance of doubt Anglian Water shall not be eligible to receive an incentive payment prior to award of a contract to a competitively appointed provider

Specific exclusions NA

Reporting and

assurance No specific requirements

Measurement unit and

decimal places Competitive appointment of a third party provider in circumstances where the direct procurement for customers scheme meetings the qualifying criteria.

Measurement timing Reporting year

Incentive form Revenue

Incentive type Outperformance payment.

Timing of

underperformance and End of period

Page 131: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

130

Unique Reference PR19ANH_48

outperformance

payments

Price control allocation 100% Water network plus

Frequency of reporting Annual

Any other relevant

information Delivery of the Elsham treatment works and transfer scheme by way of direct procurement for customers is expected to bring financial savings and promote innovation. Under this performance related mechanism Anglian Water would derive a financial incentive for procuring the Elsham treatment works and transfer scheme under direct procurement for customers in a way which demonstrates value for money to customers through delivery by a competitively appointed third party provider.

Links to relevant

external documents PR19 DPC Technical Appendix Delivering Customer value in large projects

Page 132: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

131

Performance commitment levels

Compan

y

forecast Committed performance level

Unit 2019-

20

2020-

21

2021-

22

2022-

23

2023-

24

2024-

25

Performance

commitment level Competitive appointment

of a third party

provider

TBA TBA TBA TBA TBA TBA

Enhanced

underperformanc

e collar Text NA NA NA NA NA

Standard

underperformanc

e collar Text NA NA NA NA NA

Underperformanc

e deadband Text NA NA NA NA NA

Outperformance

deadband Text NA NA NA NA NA

Standard

outperformance

cap Text NA NA NA NA NA

Enhanced

outperformance

cap Text NA NA NA NA NA

Incentive rates

Incentive type Incentive rate £m

2017/18 FYA CPIH prices

Underperformance payment - standard NA

Underperformance payment - enhanced NA

Outperformance payment – standard

(occurs once only) 0.94

Outperformance payment - enhanced NA

Page 133: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

132

Annex 1: Key performance commitments for Anglian Water

Details of the key performance commitments that we present in Table 1.2 of ‘PR19 final determinations: Anglian Water final determination’, and their corresponding calculations, are provided in the table below.

Except where otherwise stated below, we calculate the required annual level of improvement for each performance commitment as the difference between the final determination 2024-25 performance commitment level and the company’s 2019-20 forecast:

2024.25 𝑃𝐶𝐿 − 2019.20 𝐹𝑜𝑟𝑒𝑐𝑎𝑠𝑡

2019.20 𝐹𝑜𝑟𝑒𝑐𝑎𝑠𝑡× 100 = 𝑋%

The calculations are not relevant for the Leakage and Per capita consumption (PCC)

performance commitments because these are set on a percentage reduction basis

from baseline.

Key common performance commitments

Measure Calculations

33% reduction in pollution incidents by 2024-25*

(19.5 − 29)𝑛𝑟/10000𝑘𝑚

29𝑛𝑟/10000𝑘𝑚× 100 = −33%

21% reduction in internal sewer flooding incidents by 2024-25*

(1.34 − 1.70)𝑛𝑟/10000𝑘𝑚

1.70𝑛𝑟/10000𝑘𝑚× 100 = −21%

55% reduction in water supply interruptions by 2024-25*

(5 − 11)𝑚𝑖𝑛

11𝑚𝑖𝑛× 100 = −55%

Key bespoke performance commitments

Measure Calculations

6% reduction in external sewer flooding incidents by 2024-25

(3,991 − 4,241)𝑛𝑟

4,241𝑛𝑟× 100 = −6%

10% reduction in operational carbon emissions by 2024-25

This is the target as specified in the relevant performance commitment.

*September 2018 submission data is used to calculate these values.

Page 134: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

133

Annex 2: Changes to performance commitments during the price control period

Introduction

In the PR19 Final Methodology (p56) we state that: Companies should commit to keeping the definitions of their performance

commitments unchanged during 2020-25 and, if any unavoidable changes are required, to follow our procedures for changes. 

Companies should commit that their ODI payments will only relate to real performance changes and not definitional, methodological or data changes in the performance commitment. 

We will be mindful of these points when we are assessing companies’ performance against their commitments and ODIs during the 2020-25 period. 

The purpose of this Annex is to provide clarity on our expected approach, in the event that a change to an element of a performance commitment is proposed.

PR19 performance commitments

Some PC definitions include references and/or links to materials, many of which are intended to be applied in the detailed interpretation of those definitions. These may include links on Ofwat’s website (and materials embedded on that site) and also references and/ or links to materials which have a variety of owners and are not necessarily in our control. In some cases, the performance commitment definition incorporates materials produced by a third party (for example, the Environment Agency, National Resources Wales, or Drinking Water Inspectorate).

Because such third parties may decide to make changes to their materials, in general we are setting PC definitions based on the versions of those materials which are in effect at the date of our PR19 final determination1, that is we include references and/or links to a specific version as of a certain fixed date, or refer to the material that is in effect at the time of PR19 final determination publication. These materials should be considered authoritative for the 2020-25 period and changes to performance commitment definitions (particularly where we consider these may result in a material change to the performance expectations or financial consequences for companies or customers) will only be made by exception. Examples of the circumstances in which a change to a performance commitment definition may be appropriate, and the ways in which we expect to address these, are set out below.

1 We may make an exception, in certain instances, to incorporate materials as revised from time to time. Examples include certain accreditations or registrations, certain legislative instruments and certain indices or other measures that are expected to move over time.

Page 135: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

134

Procedures for changing performance commitments

Our procedures for changing performance commitment appendices broadly align to existing practice in the 2015-20 period, but reflect that most ODIs are subject to annual in-period determinations in the 2020-25 period.

Errors in performance commitments

We use a similar process to that which applies in the 2015-20 period for unambiguous errors.

If a company identifies an unambiguous error in any aspect of the performance commitment, it should notify us as soon as possible, setting out clearly: 

what the error is;  why it is an unambiguous error;  why the error has only been identified at this point;  what correction the company considers is necessary to rectify the error; and  how the company has engaged with its customers and other relevant organisations on the proposed correction. 

We will consider the explanation and decide whether we consider that the error is unambiguous, if a correction is necessary and what that correction should be. We will also look for independent assurance from the company’s Customer Challenge Group or equivalent that the company has appropriately engaged its customers and that this is reflected in the company’s proposed correction. 

If we identify an unambiguous error, we will notify the company and other stakeholders, giving reasons. 

We will correct an unambiguous error by issuing a corrigendum on our website.

Changes to third party materials referred to in performance commitment

definitions

In some cases, the performance commitment definition incorporates material produced by a third party. Because, in general, performance commitment definitions are fixed at the date of our PR19 final determination, they do not incorporate subsequent changes made by third parties to these materials.

Where a change has been made by a third party to these materials and where a company considers these changes should be incorporated in the performance commitment definitions and should affect our assessment of company performance against PC levels and consequential ODIs, we expect companies to notify us as soon as they become aware of possible changes to such third party materials.  We expect the company to tell us why such a change should be made, providing supporting evidence and its views on how to deal with the timing of any change.

Page 136: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

135

As a default, we expect that any changes will apply from the beginning of the next charging year, but we recognise that there may be circumstances where it may be more appropriate for a change to apply from part-way through a charging year (for example, to align with a measure reported for another regulator). 

We will aim to consult with stakeholders proportionately as to our treatment of such changes prior to the in-period ODI determination process, so that these can be properly taken into consideration and companies know what data to report to us.

We will notify stakeholders of approved changes and issue updates to performance commitments on our website.

Improvements to performance commitment definitions in customers’

interests

A company may propose a change to a performance commitment definition if it can prove to our satisfaction that such change will represents a material improvement which is in customers’ interests (this might cover changes to reporting or assurance requirements for example). There will be a high bar for accepting any changes. The company will need to explain to us the impact of the proposed change, including the financial consequences for the company and customers, and provide us with compelling evidence as to why it represents a material improvement which is in customers’ interests.

If a company suggests an improvement to a PC definition we expect it to engage with its customers and relevant stakeholders and seek their views on if the new measure represents a material improvement which is in customers’ interests, making it clear to them what customers can expect from the change in relation to both the company’s performance and any associated financial consequences. This engagement should be carried out in a timely manner so that the company proposal can be finalised and the company can respond to the revised incentives from the new measure. Any engagement should be proportionate to the proposed change. The company should refine the measure in line with the feedback from customers and stakeholders. We expect customer challenge groups, or an equivalent, to challenge the company on the proportionality and quality of this engagement and the degree to which the results of this engagement are reflected in the company’s proposal. The proposed new measure and any supporting independent assurance should be published on the company website and submitted to us at the time. This is to include a full account of the engagement undertaken including methodology, sample selection, materials used and results.

We will aim to consult with stakeholders proportionately as to our treatment of such changes prior to the in-period ODI determination process so that these can be properly taken into consideration and companies know what data to report to us.

Where we consider that a proposed change for an in-period performance commitment definition is appropriate, we expect the change to apply from the beginning of the next charging year.

Page 137: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

PR19 final determinations: Anglian Water – Outcomes performance commitment appendix

136

Where there is insufficient and/or unconvincing evidence that the proposed change represents a material improvement we will continue to use the existing definition.

We will notify stakeholders of approved changes and issue updates to PC definitions on our website.

Reconciling ODIs following changes

We consider that in-period ODI determinations are the best way to ensure that companies are incentivised to perform.  However, we recognise that there may be occasions where it is not appropriate to translate company performance into adjustments to Price Controls where a change in the performance commitment appendix is made. Should such occasions arise, we will take company performance in the period 2020-25 fully into account at PR24.

Where changes are made further to a request to improve a PC definition, in-period determinations already undertaken will not be re-determined retrospectively. The following years' in-period determinations could be undertaken on the new basis, or could continue to be based on the existing definition and any difference applied at PR24. This will be decided on a case-by-case basis. In this latter case, following publication of its proposed change, the company should capture information in accordance with the changed performance commitment definition in addition to the existing definition. The company should report both measures to its customers and other stakeholders on an on-going basis. The reconciliation at PR24 would, where applicable, be in addition to any in-period determinations and could lead to changes in amounts from those that would be determined, which may be positive or negative. Any changes would be applied to customers' bills in the 2025-30 period or beyond.

“Bespoke” adjustments to performance commitments

Where any additional or different procedures are required for particular PCs these are specified in the relevant PC template.

This includes where the PC definition is under development or where it explicitly mentions a specific future change that may be made to it. In these cases, for example PC definitions relating to certain Delivering Procurement for Customers (DPC) projects, the process for developing the PC during 2020-25 is set out in the relevant PC template (to the extent that it differs in any respect from the change processes set out above). We expect companies to follow the development approach or change process set out or referred to in the performance commitment.

Page 138: Anglian Water Outcomes performance commitment appendix · 2020-05-20 · PR19 final determinations: Anglian Water – Outcomes performance commitment appendix 4 1.1.1 Water quality

OfwatCentre City Tower7 Hill StreetBirmingham B5 4UA

Phone: 0121 644 7500Fax: 0121 644 7533Website: www.ofwat.gov.ukEmail: [email protected]

December 2019

© Crown copyright 2019

This publication is licensed under the terms of the Open Government Licence v3.0 except where otherwise stated. To view this licence, visit nationalarchives.gov.uk/doc/open-government-licence/version/3.

Where we have identified any third party copyright information, you will need to obtain permission from the copyright holders concerned.

This document is also available from our website at www.ofwat.gov.uk.

Any enquiries regarding this publication should be sent to us at [email protected].

Ofwat (The Water Services Regulation Authority) is a non-ministerial government department. We regulate the water sector in England and Wales.