ESIA AlbaniaAnnex 3.6 – Technical Drawings –Working Strip, ConstructionMethods and Crossings

Page 2: Annex 3.6 Technical Drawings – Working Strip, Construction

CHECK TRANS ADRIATIC PIPELINE

CLIENT:

DATE

0131979

REV

Layout of Pipe Yards

PROJECT:

ISSUE, SCOPE OF REVISION PREP. APR.

TITLE:

SCALE PROJECT DRAWING NO: SHEET OF

No scale Figure 4.3-6 2/17

PB SAA

Size:A4

Trans Adriatic Pipeline (TAP)

Albania ESIA Report

SOURCE:

Annex 3.6 - Technical Drawings - Working Strip, Construction Methods and Crossings

ALB

1-3-4. Source: APPENDIX 1 – Preliminary Logistic Report Albania Document Reference G APL00-ILF-100-F-TRP-0002_00

1 2

3 4

2. Figure 4-2 of Appendix 3: Comparison of Logistic Concepts Greece

00 13/12/12 Issued for Information

Page 3: Annex 3.6 Technical Drawings – Working Strip, Construction

CHECK TRANS ADRIATIC PIPELINE

CLIENT:

DATE

0131979

REV

PROJECT:

ISSUE, SCOPE OF REVISION PREP. APR.

TITLE:

SCALE PROJECT DRAWING NO: SHEET OF

No scale Figure 4.3-7 3/17

ALB DAL SAA

Size:A4

Trans Adriatic Pipeline (TAP)

Albania ESIA Report

Example Photographs of Pipeline Construction Camps Parking for trucks

and trailers

Workshop

Stores

Offices

First Aid

Room

Staff Canteen

Leisure Room

Accom

odatio

n B

uild

ings

Parking for cars

Generator Fuel Stati-

Wastewater

Fence

Heli landing area

General Layout of a Pipeline Construction Camp

Annex 3.6 - Technical Drawings - Working Strip, Construction Methods and Crossings

Typical Layout of Construction Workers’ Camp

Source: APPENDIX 1 – Preliminary Logistic Report Albania Document Reference G APL00-ILF-100-F-TRP-0002_00

00 13/12/12 Issued for Information

Page 4: Annex 3.6 Technical Drawings – Working Strip, Construction

Pipe Delivery Truck for Main Highways Special Delivery Vehicle for Difficult Terrain

Special Delivery Vehicle for Un-made Roads

CHECK TRANS ADRIATIC PIPELINE

CLIENT:

DATE

0131979

REV

Pipe Delivery Trucks and Special Vehicles

PROJECT:

ISSUE, SCOPE OF REVISION PREP. APR.

TITLE:

SCALE PROJECT DRAWING NO: SHEET OF

No scale Figure 4.3-8 4/17

DAL SAA

Size:A4

Trans Adriatic Pipeline (TAP)

Albania ESIA Report

ALB

Annex 3.6 - Technical Drawings - Working Strip, Construction Methods and Crossings

Source: APPENDIX 1 – Preliminary Logistic Report Albania Document Reference F APL00-ILF-100-F-TRP-0002_00

00 13/12/12 Issued for Information

Page 5: Annex 3.6 Technical Drawings – Working Strip, Construction

CHECK TRANS ADRIATIC PIPELINE

CLIENT:

DATE

0131979

REV

Hydrotesting Overview

PROJECT:

ISSUE, SCOPE OF REVISION PREP. APR.

TITLE:

SCALE PROJECT DRAWING NO: SHEET OF

No scale Figure 4.4-10 5/17

SAA

Size:A4

Trans Adriatic Pipeline (TAP)

Albania ESIA Report

DAL ALB

Annex 3.6 - Technical Drawings - Working Strip, Construction Methods and Crossings

SOURCE: ERM 2012

SPREAD 1 (49km) SPREAD 2 (27km)

SP

RE

AD

3 (

13km

)

SPREAD 4 (45km) SPREAD 5 (36km) SPREAD 6 (41.8km)

00 13/12/12 Issued for Information

Page 6: Annex 3.6 Technical Drawings – Working Strip, Construction

CHECK TRANS ADRIATIC PIPELINE

CLIENT:

DATE

0131979

REV

PROJECT:

ISSUE, SCOPE OF REVISION PREP. APR.

TITLE:

SCALE PROJECT DRAWING NO: SHEET OF

No scale Figure 4.4-11 6/17

SAA

Size:A4

Trans Adriatic Pipeline (TAP)

Typical Components of Microtunnelling (Note: image depicts a marine microtunnel and is only indicative of the technique)

Example of Casing/Jacking Pipe

Microtunnel Boring Machines (MTBM)

A MTBM in the Jacking Shaft

Albania ESIA Report

DAL ALB

Annex 3.6 - Technical Drawings - Working Strip, Construction Methods and Crossings

Typical Jack and Bore Method

Source: ERM SpA (January 2012)

Source: Herrenknecht, 2011 (retrieved November 2011)

Source: Photobucket 2011 (retrieved November 2011)

Source: Acelvakond 2011 (retrieved November 2011)

00 13/12/12 Issued for Information

Page 7: Annex 3.6 Technical Drawings – Working Strip, Construction

CHECK TRANS ADRIATIC PIPELINE

CLIENT:

DATE

0131979

REV

Pipeline Construction: Major Road - Crossings with Casing Pipe (Thrust Boring) for 48” pipeline

PROJECT:

ISSUE, SCOPE OF REVISION PREP. APR.

TITLE:

SCALE PROJECT DRAWING NO: SHEET OF

No scale Figure 4.4-12 7/17

SAA

Size:A4

Trans Adriatic Pipeline (TAP)

Albania ESIA Report

Annex 3.6 - Technical Drawings - Working Strip, Construction Methods and Crossings

DAL ALB 00 13/12/12 Issued for Information

Page 8: Annex 3.6 Technical Drawings – Working Strip, Construction

CHECK TRANS ADRIATIC PIPELINE

CLIENT:

DATE

0131979

REV

Annex 3.6 - Technical Drawings - Working Strip, Construction Methods and Crossings

Pipeline Construction: Minor Road Crossing (Open Cut) for 48” Pipeline Type I, II, III & IV

PROJECT:

ISSUE, SCOPE OF REVISION PREP. APR.

TITLE:

SCALE PROJECT DRAWING NO: SHEET OF

No scale Figure 4.4-13 8/17

SAA

Size:A4

Trans Adriatic Pipeline (TAP)

Albania ESIA Report

DAL ALB SOURCE:

00 13/12/12 Issued for Information

Page 9: Annex 3.6 Technical Drawings – Working Strip, Construction

CHECK TRANS ADRIATIC PIPELINE

CLIENT:

DATE

0131979

REV

Pipeline Construction: Railway Crossing with Casing Pipe (Thrust Boring) for 48” Pipeline

PROJECT:

ISSUE, SCOPE OF REVISION PREP. APR.

TITLE:

SCALE PROJECT DRAWING NO: SHEET OF

No scale Figure 4.4-14 9/17

SAA

Size:A4

Trans Adriatic Pipeline (TAP)

Albania ESIA Report

Annex 3.6 - Technical Drawings - Working Strip, Construction Methods and Crossings

DAL ALB SOURCE: 00 13/12/12 Issued for Information

Page 10: Annex 3.6 Technical Drawings – Working Strip, Construction

CHECK TRANS ADRIATIC PIPELINE

CLIENT:

DATE

0131979

REV

Pipeline Construction: Railway Crossings (Thrust Boring) for 48” Pipeline (no casing)

PROJECT:

ISSUE, SCOPE OF REVISION PREP. APR.

TITLE:

SCALE PROJECT DRAWING NO: SHEET OF

No scale Figure 4.4-15 10/17

SAA

Size:A4

Trans Adriatic Pipeline (TAP)

Albania ESIA Report

Annex 3.6 - Technical Drawings - Working Strip, Construction Methods and Crossings

DAL ALB SOURCE: 00 13/12/12 Issued for Information

Page 11: Annex 3.6 Technical Drawings – Working Strip, Construction

Typical River Crossings

CHECK TRANS ADRIATIC PIPELINE

CLIENT:

DATE

0131979

REV

Pipeline Construction: Typical River Crossings

PROJECT:

ISSUE, SCOPE OF REVISION PREP. APR.

TITLE:

SCALE PROJECT DRAWING NO: SHEET OF

No scale Figure 4.4-16 11/17

SAA

Size:A4

Trans Adriatic Pipeline (TAP)

Albania ESIA Report

Annex 3.6 - Technical Drawings - Working Strip, Construction Methods and Crossings

DAL ALB

Source: APL00-ILF-125-F-TRS-0001 Rev 0D Attachment A - Typical Drawings, Civil Hydraulics Engineering Concept, TAP Route Corovode to Berat

00 13/12/12 Issued for Information

Page 12: Annex 3.6 Technical Drawings – Working Strip, Construction

Typical River Crossings

CHECK TRANS ADRIATIC PIPELINE

CLIENT:

DATE

0131979

REV

Pipeline Construction: River Crossings

PROJECT:

ISSUE, SCOPE OF REVISION PREP. APR.

TITLE:

SCALE PROJECT DRAWING NO: SHEET OF

No scale Figure 4.4-17 12/17

SAA

Size:A4

Trans Adriatic Pipeline (TAP)

Albania ESIA Report

Annex 3.6 - Technical Drawings - Working Strip, Construction Methods and Crossings

DAL ALB

Source: APL00-ILF-125-F-TRS-0001 Rev 0D Attachment A - Typical Drawings, Civil Hydraulics Engineering Concept, TAP Route Corovode to Berat

00 13/12/12 Issued for Information

Page 13: Annex 3.6 Technical Drawings – Working Strip, Construction

Horizontal Direction Drilling (HDD)

Source

26th Onshore Pipeline Engineering Course; Construction principles, JP Kenny Ltd, Matthew Guite; London, June 2011

CHECK TRANS ADRIATIC PIPELINE

CLIENT:

DATE

0131979

REV

Pipeline Construction: Horizontal Direction Drill-ings (HDD)

PROJECT:

ISSUE, SCOPE OF REVISION PREP. APR.

TITLE:

SCALE PROJECT DRAWING NO: SHEET OF

No scale Figure 4.4-18 13/17

SAA

Size:A4

Trans Adriatic Pipeline (TAP)

Albania ESIA Report

Annex 3.6 - Technical Drawings - Working Strip, Construction Methods and Crossings

DAL ALB 00 13/12/12 Issued for Information

Page 14: Annex 3.6 Technical Drawings – Working Strip, Construction

CHECK TRANS ADRIATIC PIPELINE

CLIENT:

DATE

0131979

REV

Pipeline Construction: Typical River Bed Laying

PROJECT:

ISSUE, SCOPE OF REVISION PREP. APR.

TITLE:

SCALE PROJECT DRAWING NO: SHEET OF

No scale Figure 4.4-19 14/17

SAA

Size:A4

Trans Adriatic Pipeline (TAP)

Albania ESIA Report

Annex 3.6 - Technical Drawings - Working Strip, Construction Methods and Crossings

DAL ALB

Source: CPL00-ENT-125-F-DFT-0012_0C Typical Installation in/along Riverzones for 48” Pipeline

00 13/12/12 Issued for Information

Page 15: Annex 3.6 Technical Drawings – Working Strip, Construction

Protection against Erosion with Sandbags Pipeline Protection in Washout Area

CHECK TRANS ADRIATIC PIPELINE

CLIENT:

DATE

0131979

REV

Methods of Pipeline Stabilisation: Protection

PROJECT:

ISSUE, SCOPE OF REVISION PREP. APR.

TITLE:

SCALE PROJECT DRAWING NO: SHEET OF

No scale Figure 4.4-20 15/17

SAA

Size:A4

Trans Adriatic Pipeline (TAP)

Albania ESIA Report

Annex 3.6 - Technical Drawings - Working Strip, Construction Methods and Crossings

DAL ALB

Source: CPL00-ENT-125-F-DFT-0011_0B--Pipe Protection in washout area.pdf

00 13/12/12 Issued for Information

Page 16: Annex 3.6 Technical Drawings – Working Strip, Construction

SOURCE:

CPL00-ENT-125-F-DFT-0012_0C--Concrete Slab Protection for dirt roads CHECK TRANS ADRIATIC PIPELINE

CLIENT:

DATE

0131979

REV

Methods of Pipeline Stabilisation: Concrete Slab Protection for Dirty Roads for 48” Pipeline

PROJECT:

Trans Adriatic Pipeline (TAP)

Albania ESIA Report

ISSUE, SCOPE OF REVISION PREP. APR.

TITLE:

SCALE PROJECT DRAWING NO: SHEET OF

No scale Figure 4.4-21 16/17

SAA

Size:A4

Annex 3.6 - Technical Drawings - Working Strip, Construction Methods and Crossings

DAL ALB 00 13/12/12 Issued for Information

Page 17: Annex 3.6 Technical Drawings – Working Strip, Construction

CHECK TRANS ADRIATIC PIPELINE

CLIENT:

DATE

0131979

REV

Cross Section Layout of Reinstated Working Strip along Modified Ridge

PROJECT:

ISSUE, SCOPE OF REVISION PREP. APR.

TITLE:

SCALE PROJECT DRAWING NO: SHEET OF

No scale Figure 4.4-22 17/17

SAA

Size:A4

Trans Adriatic Pipeline (TAP)

Albania ESIA Report

Annex 3.6 - Technical Drawings - Working Strip, Construction Methods and Crossings

PIB ALB

Source: Working strip (ENT 2012) Doc. Ref. CPL00-ENT-100-F-DFT-0001, Rev.:03, 2012-10-19

00 13/12/12 Issued for Information

Page 18: Annex 3.6 Technical Drawings – Working Strip, Construction

Trans Adriatic Pipeline AG – Albania (Branch Office)Torre Drin, Rruga Abdi Toptani

Tirana, AlbaniaTel.: + 355 44 306 937Fax: + 355 42 265 685

[email protected]

Date 01/2013

Copyright Reserved: This document may not be copied, shown to or placed at the disposal of third parties without prior consent of TAP AG.The latest version of the document is registered in the TAP Project's Database.