TECHNICAL DOCUMENTS AND DRAWING GUIDELINE TOTAL 24 PAGE (Including Cover) PROJECT CODE : A70003EA PROJECT NAME : ANGAMOS THMOELECTRIC POWER PLANT DOCUMENT No. : WD010-MZ731-00004 TITLE : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE OWNER: EMPRESA ELECTRICA ANGAMOS S.A. Purpose For Review For Information For Construction For ( ) B 2008/06/23 For Information J. Park S.H. Park Y.H. Jeong A 2008/03/10 For Information J. Park K.M.Jeon Y.H. Jeong PREP REVIEW APPR REVIEW REVIEW APPR Rev. No. DATE DESCRIPTION POSCO E&C Owner Contractor:

ANNEX 4 2 Technical Documents and Drowings

  • Upload
    22lalit

  • View
    561

  • Download
    5

Embed Size (px)

Citation preview

Page 1: ANNEX 4 2 Technical Documents and Drowings

TECHNICAL DOCUMENTS AND

DRAWING GUIDELINE TOTAL 24 PAGE (Including Cover)

● PROJECT CODE : A70003EA ● PROJECT NAME : ANGAMOS THMOELECTRIC POWER PLANT

● DOCUMENT No. : WD010-MZ731-00004 ● TITLE : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

● OWNER: EMPRESA ELECTRICA ANGAMOS S.A.

Purpose □ For Review

■ For Information

□ For Construction

□ For ( )

B 2008/06/23

For Information

J. Park S.H. Park Y.H. Jeong

A 2008/03/10

For Information

J. Park K.M.Jeon Y.H. Jeong

PREP REVIEW APPR REVIEW REVIEW APPR Rev.No. DATE

DESCRIPTION

POSCO E&C Owner

Contractor:

Page 2: ANNEX 4 2 Technical Documents and Drowings

ANGAMOS THERMOELECTRIC POWER PLANT

TITLE: TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004

REV. : B PAGE : 1 OF 23

1. GENERAL

All documents prepared by the Contractor or its sub-contractors shall be in English and shall bear a prominent reference to the Project and a full title block containing a unique identification number, revision number, source and type of document and descriptive title.

Documents shall be on ISO standard A-size sheets, except that separately submitted computer printouts may be on fan-fold paper suitably bound into an appropriate binder.

The Contractor shall submit to the Owner’s Engineer four (4) hard (printed) copies and soft copies of documentation, unless otherwise specified in the contract.

All printed documentation provided shall be of good quality, clear, legible and able to be used by the Owner’s Engineer to produce further copies by photocopying.

All soft copies shall be in a format to be agreed mutually. As a minimum, text documents shall be in Microsoft Word Version 2000, spreadsheets shall be in Microsoft Excel Version 2000, data bases shall be in Microsoft Access Version 2000, drawings shall be in AutoCAD Version 2006 and schedules shall be in Primavera 3.0.

Where the Contractor is required to specify the performance requirements for plant including, but not limited to, valves, control valves, instrumentation, motors, pumps and blowers the data and requirements shall be set out on in the format generally attached to the relevant specification or standard. Should the relevant standard not include specimen data sheets, the requirements shall be set out on a data sheet in a form generally recognized as appropriate in the industry.

2. SUBMISSION

The Contractor will submit all documents with the purpose stamped:

For Information For Approval of the Chilean Seismic Expert For Owner’s Review For Construction As Built

All documents shall be listed in Master Drawings and Document List (refer to Attachment #1). Documents submitted For Owner’s Review shall have been processed in accordance with the overall Approval Procedure of the Contractor and will be certified by the Contractor as having been fully examined by him and in compliance with the Contract.

Page 3: ANNEX 4 2 Technical Documents and Drowings

ANGAMOS THERMOELECTRIC POWER PLANT

TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004

REV. : B PAGE : 3 OF 26

The documents that need the approval of the Seismic Expert will be submitted both of them for Owner’s Review and Approval of the Seismic Expert simultaneously.(refer to the attachment #6) The Contractor shall allow a period of 14 days for the Owner’s Representative to review and comment on each submittal of documents, unless otherwise specified in the Contract. The Owner’s Representative will advise the Contractor of the status of all documents submitted for review as one of the following:

• Reviewed, without comments: The work may proceed on the basis of the document, to under exclusively responsibility of the Contractor • Reviewed, with comments: The contractor must take care of the commentaries by modifying the document or justifying it. The document shall be submitted for construction as soon as possible with the noted amendments. Work may, however, proceed pending formal release, based on the noted amendments always to under exclusively responsibility of the Contractor. • Disapproved Non-compliance with the Contract. The Owner’s representative will identify the non-compliance. Work shall not proceed based on the disapproved document. The document shall be re-submitted.

Revision of the Chilean Seismic Expert:

All the drawings and documents that must be submitted for approval of the Chilean Seismic Expert (Scope of Works of Seismic Expert) will be emitted by the Contractor with a stamp in that sense. Once reviewed the drawing or document the Expert will put a clearly visible stamp on it with some of the following categories:

• Rejected: The document will have to be corrected by the Contractor and to be put under the process of revision of the Seismic Expert again.

Page 4: ANNEX 4 2 Technical Documents and Drowings

ANGAMOS THERMOELECTRIC POWER PLANT

TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004

REV. : B PAGE : 4 OF 26

• Approved with commentaries The contractor must take care of the commentaries by modifying the document. The document shall be submitted for construction as soon as possible with the noted amendments. Work may, however, proceed pending formal release, based on the noted amendments always to under exclusively responsibility of the contractor.

• Approved for shipping It indicates that the structures and/or the equipment can be shipped towards Angamos but that the Contractor must again be made position of commentaries modifying the document and putting under it the revision of the Seismic Expert to be approved for Construction.

• Approved for construction

The stamps of the Seismic Expert will be in the document next to the title block, and that part of the document will be scanned for emission. The use of a “Visible Stamp” in the documents provided by the Seismic Expert can be implemented. And Seismic Expert will stamp a hard copy document (title page 0r title block area) and after taking a scan image provide a pdf version of it to the appropriate project document distribution list to expedite distribution of the information. Documents may have both stamps together “Approved with commentaries and Approved for shipping” simultaneously.

3. DRAWINGS AND DOCUMENTS

3.1 Codes and Standards

Drawings shall be to the latest edition of the following:

ISO 128-1982 Technical Drawings - General Principal of Presentation

ISO/R 129-1959 Engineering Drawings - Dimensions

3.2 General Requirements

Page 5: ANNEX 4 2 Technical Documents and Drowings

ANGAMOS THERMOELECTRIC POWER PLANT

TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004

REV. : B PAGE : 5 OF 26

Standard size shall be metric A0, A1, A2, A3 and A4. Drawings shall be prepared in such a way that photo-reduction to size A3 shall result in a legible and useable drawing.

Particular attention shall be paid in this respect to selection of fonts. Each drawing submitted shall clearly indicate the applicable status, e.g. Preliminary, for Information, for Approval, for Construction, As Built.

3.3 Drawing and Document Identification

A title block shall be provided at the bottom right hand corner of each drawing with a window each for the following minimum information: (refer to Attachment #3.)

• Name of Contractor

• Drawing Title and a brief description of the content

• Drawing No.

• Revision No.

Before Approval : A, B, C, D…. After Approval : 0, 1, 2, 3, …...

• Drawing Scale

• Drawing Date

• Drawn By

• Designed By

• Checked By

• Approved By

3.4 Drawing and Document Number

Page 6: ANNEX 4 2 Technical Documents and Drowings

ANGAMOS THERMOELECTRIC POWER PLANT

TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004

REV. : B PAGE : 6 OF 26

3.4.1 Definition of Code

Format N - WD NNN - AANNN - NNNNN

Uniit of No Code of Plant Complex PBS Code FBS Code Serial No.

• Unit No.

- AGM #1 - 1

- AGM #2 – 2

- Commom Facilities - 0

• Code of Plant Complex

It is defined to classify the property of equipment for the Project. WD is used as fixed code for this.

• Physical Breakdown Structure (PBS)

It is code structure to Classified the Property of equipment & System for Project. Refer to Attachment#4.

Page 7: ANNEX 4 2 Technical Documents and Drowings

ANGAMOS THERMOELECTRIC POWER PLANT

TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004

REV. : B PAGE : 7 OF 26

• Functional Breakdown Structure (FBS)

A A NNN

First Letter (Stage)

Second Letter (Working Filed) Third Letter (Working Classification)

- First Letter (Stage)

1) M : Project Management 2) E : Engineering 3) P : Procurement 4) C : Construction 5) Z : Common

- Second Letter (Working Field)

1) R : Process 2) C : Civil 3) A : Architecture 4) M : Mechanical 5) P : Piping 6) E : Electrical 7) J : I & C 8) L : Landscape 9) Z : Common

- Third Letter (Working Classification) : Refer to Attachment #4

Page 8: ANNEX 4 2 Technical Documents and Drowings

ANGAMOS THERMOELECTRIC POWER PLANT

TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004

REV. : B PAGE : 8 OF 26

3.4.1.2 Coding & numbering system for Drawing & Document

• Drawings

Example N - WD NNN - AANNN - NNNNN

Unit No.

Code of Plant Complex PBS Code FBS Code Serial No.

• Specification

Example N - WD NNN - AANNN - NNNNN

Unit No.

Code of Plant Complex PBS Code FBS Code Serial No.

• Calculation

Example N - WD NNN - AANNN - NNNNN

Unit No.

Code of Plant Complex PBS Code FBS Code Serial No.

Page 9: ANNEX 4 2 Technical Documents and Drowings

ANGAMOS THERMOELECTRIC POWER PLANT

TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004

REV. : B PAGE : 9 OF 26

• Reports / Manual/List

Example N - WD NNN - AANNN - NNNNN Unit No.

Code of Plant Complex PBS Code FBS Code Serial No.

3.4.2 CAD File Numbering system : same as the numbering system for Drawing

3.4.3 Manufacturers Document Numbers

Manufacturer documents are to be numbered as per section 3.4.1.

3.5 Drafting Standards

3.5.1 Scales

The following scales shall be applied. No others will be used unless specified by the Owner and the Contractor.

1:5

1:10

1:20

1:25

1:50

1:100

1:200

1:250

1:500

Page 10: ANNEX 4 2 Technical Documents and Drowings

ANGAMOS THERMOELECTRIC POWER PLANT

TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004

REV. : B PAGE : 10 OF 26

3.5.2 Dimensioning

All dimensions will be shown in millimetres unless specified otherwise by the Owner.

Leader lines shall start 2mm from the dimensioned element (unless that element is embedded within another) and end not less than 15mm away from the outer most element.

Dimension lines shall be a minimum of 10mm apart.

Dimension lines will take preference over leader lines with the leader line being broken around the dimension line.

3.5.3 Text

• Manual

Text shall have a minimum height of 3.5mm vertical upper case.

• CAD

Text shall have a minimum height by 2.5mm vertical upper case and conform to ISO 3098B style.

3.5.4 Line work

Sufficient variety of line thickness will be shown so as to provide a clear definition between components and dimensions.

4. EQUIPMENT TYPE AND NUMBER

4.1 Purpose and area of application

The power plant identification system is applied to clearly identify plants, systems, parts and components to their purpose, type and location.

The contents are in accordance with “KKS identification systems for Power Stations” issued by VGB Kraftwerkstechnik GmbH Essen. (refer to attachment #5)

4.2 Requirements to be met by the KKS identification system

Page 11: ANNEX 4 2 Technical Documents and Drowings

ANGAMOS THERMOELECTRIC POWER PLANT

TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004

REV. : B PAGE : 11 OF 26

In order to perform the set tasks the identification system must be capable of satisfying the following requirements:

• All installations and sub-systems have to be included,

• An adequate number of reserve codes must be available for future developments in power plant engineering,

• The classification of installations and sub-systems must be generally applicable to all types of power plant; all individual circuits and arrangements must, however, be clearly identifiable,

• Clear identification of all sub-systems,

• An identification used in a power plant must be non-recurring,

• Sub-division with graded details and a fixed in relevance to the data characters,

• Variable identification length depending upon the detailed requirements of the various areas of application,

• Independent identification of various systems must be possible,

• Ease of recognition ensured by clarity and an acceptable length for the identification,

• Plausibility check facility, especially for data processing,

4.3 Structure and application of the identification system KKS

KKS shall be applied for the process-related identification which identifies installations and equipment according to their assigned task in the power plant process.

A uniform identification structure was created with a maximum of four breakdown levels, except application to spare parts. And the Project shall utilize upto three breakdown levels with a maximum; the units referred to becoming smaller from left to right.

Table 1 summarizes the identification and type of data characters of the breakdown levels appearing in the KKS.

In the process-related identification the entire system is subdivided according to the function or process, since, whether for mechanical, electrical, control of civil

Page 12: ANNEX 4 2 Technical Documents and Drowings

ANGAMOS THERMOELECTRIC POWER PLANT

TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004

REV. : B PAGE : 12 OF 26

engineering, the equipment units and components must be identifiable in relation to the process.

The process-related identification is for many applications the most important identification, since it permits, for example, locations of electrical and control equipment, rooms, signals, and the identification in circuit diagrams related to particular functions.

In the electrical and instrumentation control engineering sectors, the equipment for auxiliary services, power supply, open-loop-control, instrumentation, etc,. is treated as a process engineering function. The same applies to structures in civil engineering work.

The process-related identification corresponds to the identification block “Plant” in DIN 40719, part2. This block has the prefix sign “=”. According to the standard, the prefix sign can be omitted provided that the identification remains unambiguous.

Page 13: ANNEX 4 2 Technical Documents and Drowings

ANGAMOS THERMOELECTRIC POWER PLANT

TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004

REV. : B PAGE : 13 OF 26

Serial Number Of Breakdown level

0

1

2

3

Name of Breakdown level Overall Function Equipment Component

Example Unit System Pump unit Pump

Note : Six (6) digit numbering system shall be used for spare parts.

M

<Breakdown levels >

Page 14: ANNEX 4 2 Technical Documents and Drowings

ANGAMOS THERMOELECTRIC POWER PLANT

TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004

REV. : B PAGE : 14 OF 26

• Usage of Breakdown Level Structure Serial number of breakdown level 0 1 2 3

Name of breakdown level

Overall plant Function Equipment Unit Component

Designation of data character G F0 F1 F2 F3 FN A1 A2 AN B1 B2 BN

Type of data character (A) or (N) (N)AAA NN AANNN (A) AANN

A = Alphabetical symbols (letters, special symbols) N = Numerical symbols (digits) () = The data characters may be omitted Breakdown levels 0

total plant

1 function

2 Equipment unit

3 component

Total plant

System code Equipment unit code Component code

Mechanical engineering Unit System Pump unit (pump)

Civil engineering Unit Unit

Structure, floor Structure, floor

Rolling door Fan unit

(motor) (fan)

Control and instrumentation (for mechanical and civil engineering)

Unit Unit Unit Unit

System Structure, floor System Unit coordinate level

Measuring circuit Measuring circuit Open-loop control Closed-loop control

Transducer Temp.sensor Push-button Controller

Electrical and control and instrumentation engineering

Unit Unit Unit Unit Unit Unit

Switchgear Transformer Transformer Transformer Elec. equipment cab Structure, floor

Switchgear assembly Fan unit Measuring circuit Terminal box Measuring circuit Junction box

Fuse Motor Indicator Terminal block Smoke detector Telephone jack

Page 15: ANNEX 4 2 Technical Documents and Drowings

ANGAMOS THERMOELECTRIC POWER PLANT

TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004

REV. : B PAGE : 15 OF 26

• Breakdowns, contents of KKS data character

0 1 2 3 Overall plant Function Equipment unit

component

G F0 F1F2F3 FN A1A2 AN A3

B1B2 BN

A or N N A A A N N

A A N N N

A

A A N N

prefix sign of process related identification Identification of power station units and unit independent plants Prefix No. of the function code counting of similar systems and plants System-classifying classifying sub-division of systems and plants into unit System-counting Counting sub-division of systems and plants into system sections and sub-systems Equipment-classifying classifying sub-division of mechanical equipment, open loop-control equipment-counting counting of similar mechanical equipment, open and closed loop-control Additional identification of breakdown level2 identification of pilot valves, multiple drives/el.loads, measuring points with multiple output/operating points Component-classifying Classifying sub-division of components signals or signal-applications Component – counting Counting of components or signals or signal-applications

type of data character

serial no. of breakdown level name of breakdown level

identification of data character

Page 16: ANNEX 4 2 Technical Documents and Drowings

ANGAMOS THERMOELECTRIC POWER PLANT

TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004

REV. : B PAGE : 16 OF 26

. • Function key (function identification)

Serial No. of breakdown level 1

Name of the breakdown level Function

Identification data character F0 F1F2F3 FN Type of character N A A A N N

• Main groups F1 • groups F1F2 • sub-groups F1F2F3

Function Key, main groups F1

Code Identification

A B C D

E H G H J K L M N P Q R S T U V W X Y Z

Grid and distribution systems Power transmission and auxiliary power supply Instrumentation and control equipment instrumentation and control equipment (when the function codes “CM” to “CT” are insufficient for the identification) conventional fuel supply and residues disposal handling of nuclear equipment water supply and disposal conventional heat generation nuclear heat generation reactor auxiliary systems steam, water, gas cycles main machine sets process energy supply for external users Cooling water systems Auxiliary systems Gas generation and treatment Ancillary systems -blocked- structures -blocked- Renewable energy plants Heavy machinery (not main machine sets) -blocked- workshop and office equipment

Page 17: ANNEX 4 2 Technical Documents and Drowings

ANGAMOS THERMOELECTRIC POWER PLANT

TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004

REV. : B PAGE : 17 OF 26

For complete function code list including system limits of function groups F1F2 and function sub-groups F1F2F3 see function code key (Refer to Attachment #5)

• Equipment unit key

2

Equipment unit

A1A2 AN A3

A A N N N N N

• Main groups A1 • Sub-groups A1A2

Equipment Unit Key, groups A1:

Code Identification

A

B

C

D

E

F

G

H

J

Mechanical equipments

Mechanical equipments

Direct measuring circuits

Closed-loop control circuits

Analog and binary signal conditioning

Indirect measuring circuits

Electrical equipment

Sub-assemblies of main and heavy machinery

Nuclear assemblies

For complete equipment units of the sub-groups A1A2 see equipment unit code key

Equipment unit identification Serial No. of breakdown level

Name of the breakdown level

Type of data character

Identification of data character

Page 18: ANNEX 4 2 Technical Documents and Drowings

ANGAMOS THERMOELECTRIC POWER PLANT

TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004

REV. : B PAGE : 18 OF 26

• Component identification

2

Component

B1B2 BN B3

A A N N N N N

• Main groups B1 • Sub-groups B1B2

Component code main groups B1:

Code Identification

K

M

Q

-

X

Y

Z

Mechanical components

Mechanical components

Instrumentation and control components

(not electrical)

Electrical components

Signal origin

Gated signals

Signal application

For complete components of the sub-groups B1B2 see component code key

In P & I diagrams breakdown level 3 is NOT used. In other document it may be used according to separate agreements.

The specification of subgroups of “Signal or use of signals” shall be discussed with participants at work.

Serial No. of breakdown level

Name of breakdown level

Identification of data character

Type of data character

Page 19: ANNEX 4 2 Technical Documents and Drowings

ANGAMOS THERMOELECTRIC POWER PLANT

TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004

REV. : B PAGE : 19 OF 26

4.4 Automation Systems Identification

• Functional groups identification

The automation system is divided into functional groups/subgroups according to functionally associated process sections.

The structure of the automation functional groups is showed in the following figure 4.1 and is made by:

Level 0 - Entire Plant

Level 1 - Function ; F1F2Y NN identify the code of the automation functional group;

Two numeric digits that identify the automation functional sub-groups. Figure 4.1

Function Sub-

groups

G F0 F1 F2 Y N N X X

In the following figure is represented a typical situation for automation system functional groups and sub-groups identification.

01

02

03

0n 0n 0n 0n 0n

03 03 03 03

02 02 02 02

01 01 01 01

LAYNN LBYNN MAYNN CJYNN CAYNN

AUTOMATION SYSTEMS

e.g. LAYNN is the automation functional group related to process system LA -

Feedwater System

LAYNN01 is the first functional sub-group of Feedwater System.

Page 20: ANNEX 4 2 Technical Documents and Drowings

ANGAMOS THERMOELECTRIC POWER PLANT

TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004

REV. : B PAGE : 20 OF 26

4.5 Pipeline identification

• Identification code

The code for the pipelines identification is made up by the Plant and the Function codes (level 0 and 1) as defined in Clause 3.2 and a third level code that identifies the line number.

Function Line Number

G F0 F1 F2 F3 N N A1 A2 N N N

• Line number

The code is made up by two alphabetical characters (A1A2) that identify the equipment, and three numeric digits (NNN) for the line counting.

• Line attributes

Additional information, that, are not part of the line identification code, but are useful to give the complete characterization of the line, follow the line identification code.

• Line diameter

This shall be indicated following line number, by up to four numeric digits that represent the nominal diameter in millimetres.

• Piping design specification

One alphabetic digit and one numerical digit refer to the piping class used

• Example

An example of line identification is the following:

Line Identification Code Attributes

Function Line Number Nominal Diameter Piping Class.

G F0 F1 F2 F3 N N A1 A2 N N N NNNN A1N

6 1 GDK 10 BR 010 1600 D2

The sample is related to a ND 1600 mm pipe, pertaining to the desalination block - section 1 System (i.e. distiller 61), which piping class is D2.

Page 21: ANNEX 4 2 Technical Documents and Drowings

ANGAMOS THERMOELECTRIC POWER PLANT

TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004

REV. : B PAGE : 21 OF 26

The numbering logic subdivision for pipelines, valves and measuring circuits is given in the Attachment #5.

Page 22: ANNEX 4 2 Technical Documents and Drowings

ANGAMOS THERMOELECTRIC POWER PLANT

TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004

REV. : B PAGE : 22 OF 26

4.6 Cables, Cable Raceways And Cable Raceway Parts Identification

• Cables The structure of the cables identification code is showed in figure 4.2 and is made by:

Level 0 - Entire;

Level 1 - Function; Level 1 will be identified with the code of the switchgear panel.

Two alpha or numeric characters for ”vertical subdivision”( optional);

The numbering element of the cable number comprises four numeric data characters. The first digit of the four numeric data characters serves to identify the application area as follows:

Application Area Description:

0 Power Cable > 1 KV

1 POWER CABLE ≤ 1 KV

2 C&I > 60 V - DC Commands And Interlocks

3 C&I > 60 V - AC Commands And Interlocks

4 C&I ≤ 60 V - Digital Instrumentation For Control

5 C&I ≤ 60 V - Digital Instrumentation For Protection

6 C&I ≤ 60 V - Analog Instrumentation For Control

7 C&I ≤ 60 V - Analog Instrumentation For Protection

8 C&I ≤ 60 V - Special (Bus etc.)

9 C&I ≤ 60 V - Communication Cables

Figure 4.2

Cables identification

Function Numbering

G F0 F1 F2 F3 N N AA or NN N N N [A(or N) where needed]

Vertical subdivision (where necessary) Application area

Page 23: ANNEX 4 2 Technical Documents and Drowings

ANGAMOS THERMOELECTRIC POWER PLANT

TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004

REV. : B PAGE : 23 OF 26

• Cable Raceways The structure of the cable raceways identification code is showed in figure 4.3 and is made by:

Level 0 - Entire Plant;

Level 1 – Function; as defined in this paragraph for the cable raceways the last two numeric digits are identifies the floors level (F3 NN is optional and relevant characters may be omitted);

two alphabetic digits for raceways assembly and two numeric digits for counting in each raceway assembly.

Figure 4.3

Cables raceways identification

Structure code Cable Way Type

Numbering

G F0 F1 F2 F3 AA NNN A

Cable Way Types The cable way types are the following

DT Cable Trays or Ladders UG Underground Pipe EC Exposed Cable Ways (Tray or Conduit)

Page 24: ANNEX 4 2 Technical Documents and Drowings

ANGAMOS THERMOELECTRIC POWER PLANT

TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004

REV. : B PAGE : 24 OF 26

4.7 Project related rules, agreements and procedures

• General rules on process-related identification

Piping & Instrument Diagrams (P&ID) are the basic documents (origins) for a Project related KKS coding.

Single line diagrams are the basic documents (origins) for a Project related KKS coding in electrical engineering. However, KKS codes for electrical consumers, measuring loops and items of I&C represented in Function Diagrams are originated in P & IDs.

For other engineering activities (e.g. layout planning, component engineering), KKS code must always be taken from the above mentioned basic documents.

In basic KKS documents (P&IDs and single line diagrams) the breakdown level 3 (component code) is never used.

Note: Special rules on point of installation identification and location identification have to be established within the relevant engineering disciplines (electrical, I&C and civil engineering). The basis are the KKS-Application Commentaries, Part B2, B3, and B4 by VGB.

• Rules on modifications and cancellations of KKS numbers. It is not allowed to change allocated KKS numbers for a Project, if these numbers have been released for the Project.

The original KKS number is still kept, even when another kind of equipment is used providing that the function according to the KKS equipment unit code is not changed (e.g. substitution of a gate valve by a globe valve).

If in a Project a hardware component is no longer used, it is not allowed to re-allocate its KKS number for another component in the same Project.

• Agreement on breakdown level “0” and the prefix number “F0”.

• General rules on other numbering code elements (FN, AN, BN).

Total Plant System Code prefix No.

“G” “F0” Contents

AES Comments is required

Page 25: ANNEX 4 2 Technical Documents and Drowings

ANGAMOS THERMOELECTRIC POWER PLANT

TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004

REV. : B PAGE : 25 OF 26

Numbering starts anew when one of the preceding code elements changes.

Numbering may be consecutive or grouping.

Numbering need not be continuous.

Numbering conventions, once established, may not be altered, not even in the event of changes made in the progress of planning.

Redundant zeros must be written.

An application-specific scheme of numbering may be established. However, such schemes may not have the effect of reserving numbers in other applications, not even within the same engineering discipline.

Management systems (e.g. computer checking programs, allocation sheets) have to assure, that no double KKS numbers occur in the Project.

If necessary, subdivisions of number ranges in Fn and An according to the division of work could be made. They have to be written down directly in the Function key code and must be respected by the Members.

• General rules regarding direction of numbering

Standard designations have priority in all cases.

Numbers are increased in media or process flow direction.

Project counting directives refereed to local layouts are related to breakdown level “0”, and prefix number for system code “F1” and structures (F1=U) only.

The counting is not related to any geographical direction (e.g. not from west to east, not from north to south).

• Writing modus of KKS code Following structures of the KKS code are allowed:

- in one line with space between Function Level, Equipment Unit Level (and Component Level).

e.g. 19PAB10 AP001 (-M01)

- in two (three) lines

Page 26: ANNEX 4 2 Technical Documents and Drowings

ANGAMOS THERMOELECTRIC POWER PLANT

TITLE: : TECHNICAL DOCUMENTS AND DRAWING GUIDELINE

DOC NO.: WD010-MZ731-00004

REV. : B PAGE : 26 OF 26

e.g. 19PAB10 AP001 (-M01)

5. ATTACHMENTS

Attachment #1 Master Drawing & Document List Rev.B

Attachment #2 Title Block

Attachment #3 Design Document Cover

Attachment #4 PBS and FBS Code

Attachment #5 Summary of KKS Key

Attachment #6 Approval Procedure of Drawing and Document Rev.B

Page 27: ANNEX 4 2 Technical Documents and Drowings

ATTACHEMENT # 1

MASTER DRAWING & DOCUMENT LIST( PROJECT: Angamos Thermoelectric Power Plant )

DISCIPLINE/WBS: AR (547 EA) As of 2008-06-13

DRAWING & Cate REV SH'T SI Draft Start Draft Completion Issue for IFR/Info. Comment Received IFC RemarksDOCUMENT gory NO. NO. ZE DESCRIPTION

NUMBER (Class)10% 50% 70% 90% 100%

0-WD090-EA124-00101 R A A1 Standards - Abbreviation, Legend & Symbols-1 (SCH) 2008-04-01 2008-06-03 2008-06-15 2008-06-30 2008-08-30

(ACT) 2008-04-01 2008-05-30 2008-06-13

0-WD090-EA124-00102 R A A1 Standards - Abbreviation, Legend & Symbols-2 (SCH) 2008-04-01 2008-06-03 2008-06-15 2008-06-30 2008-08-30

(ACT) 2008-04-01 2008-05-30 2008-06-13

0-WD090-EA124-00103 R A A1 Standards - Floor and Wall Junction Details (SCH) 2008-04-01 2008-06-03 2008-06-15 2008-06-30 2008-08-30

(ACT) 2008-04-01 2008-05-30 2008-06-13

0-WD090-EA124-00104 R A A1 Standards - Ceiling and Wall Junction Details (SCH) 2008-04-01 2008-06-03 2008-06-15 2008-06-30 2008-08-30

(ACT) 2008-04-01 2008-05-30 2008-06-13

0-WD090-EA124-00105 R A A1 Standards - Roof Details-1 (SCH) 2008-04-01 2008-06-03 2008-06-15 2008-06-30 2008-08-30

(ACT) 2008-04-01 2008-05-30 2008-06-13

0-WD090-EA124-00106 R A A1 Standards - Roof Details-2 (SCH) 2008-04-01 2008-06-03 2008-06-15 2008-06-30 2008-08-30

(ACT) 2008-04-01 2008-05-30 2008-06-13

0-WD090-EA124-00107 R A A1 Standards - Wall and Roof Penetration Details (SCH) 2008-04-01 2008-06-03 2008-06-15 2008-06-30 2008-08-30

(ACT) 2008-04-01 2008-05-30 2008-06-13

0-WD090-EA124-00108 R A A1 Standards - Block Wall Details (SCH) 2008-04-01 2008-06-03 2008-06-15 2008-06-30 2008-08-30

(ACT) 2008-04-01 2008-05-30 2008-06-13

0-WD090-EA124-00109 R A A1 Standards - Stair & Handrail Details (SCH) 2008-04-01 2008-06-03 2008-06-15 2008-06-30 2008-08-30

(ACT) 2008-04-01 2008-05-30 2008-06-13

0-WD090-EA124-00110 R A A1 Standards - Door Head Details (SCH) 2008-04-01 2008-06-03 2008-06-15 2008-06-30 2008-08-30

(ACT) 2008-04-01 2008-05-30 2008-06-13

0-WD090-EA124-00111 R A A1 Standards - Door Jamb Details (SCH) 2008-04-01 2008-06-03 2008-06-15 2008-06-30 2008-08-30

(ACT) 2008-04-01 2008-05-30 2008-06-13

Page 28: ANNEX 4 2 Technical Documents and Drowings

ATTACHEMENT #2

Page 29: ANNEX 4 2 Technical Documents and Drowings

ATTACHMENT #3

PURCHASE SPECIFICATION TOTAL PAGE

(Including Cover)

● PROJECT CODE : A70003EA ● PROJECT NAME : ANGAMOS THERMOELECTRIC POWER PLANT

● DOCUMENT No. : AGM-M-RFQ-001 ● TITLE : PURCHASE SPECIFICATION FOR STEAM TURBINE

AND GENERATOR WITH AUXILIARIES ● OWNER: EMPRESA ELECTRICA ANGAMOS S.A.

Purpose □ For Review

■ For Information

□ For Construction

□ For ( )

B 2008/06/23

For Information J. Park S.H. Park Y.H.Jeong

A 2008/02/29

J.N.Park M.S.Han C.H.Choi

For Comment M.H.Han H.S.Woo Y.H.Jeong

PREP REVIEW APPR REVIEW REVIEW APPR Rev.No. DATE

DESCRIPTION

POSCO E&C

Owner

REV. No.

Contractor

Subcontractor

Page 30: ANNEX 4 2 Technical Documents and Drowings

ATTACHEMENT # 4 A. PBS Code List (Level 1 & 2)

Level 1 Level 2

Code Description Code Description

000 General 010 Project Management

070 Structure

080 Civil

090 Architecture

100 Boiler & HRSG 110 Boiler proper

120 Draft System

130 Combustion Equipment

140 Soot Blowing & Blow Down System

150 Casing & Structure Steel

160 Chemical Injection & Sampling System

170 HRSG proper

180 Steam Drum

190 Miscellaneous Item for Boiler & HRSG

200 Turbine 210 Steam Turbine

220 Lub Oil System

230 Protective Device

240 Control Device

250 Sealing Device

260 Turning Gear System

270 Gas Turbine & Aux.

280 Wind Turbine & Hydro Turbine

290 Miscellaneous Item for Turbine

300 Auxiliary System 310 Steam System

320 Condensate System

330 Feed Water System

340 DH System

350 Make-up Water System

360 Closed Cooling Water System

370 Tank & Vessel

380 Piping & Valves

390 Miscellaneous Item

400 Generator 410 Generator

420 H2 & CO2 System

430 Generator Seal System

440 Excitation System

450 Generator Stator Cooling System

480 Solar System

490 Miscellaneous Item for Generator

500 Attendant Facilities 510 Sea Water Treatment System

Page 31: ANNEX 4 2 Technical Documents and Drowings

Level 1 Level 2

Code Description Code Description

520 Fuel Gas Treatment System

530 Coal Supply System

540 Ash Handling System

550 Lime Handling System

560 Aux. Boiler

570 Fire Fighting System

580 Emergency Diesel Generator

590 Miscellaneous Item for Attendant Facilities

600 Other Facilities 610 TGU for ORC

(Organic Rankine Cycle 620 WHOH System

, etc) 630 WHOR System

690 Miscellaneous Item

700 EIC 710 Power Receiving & Distribution Equipment

720 Motor & Control System

730 Panel & Box

740 Instrumentation Equipment

750 Auxiliaries Equipment

` 760 Process Control System

770 Package Control System

780 Special Instruments Equipment

790 Construction Material & Others

900 Utility & Common 910 Water & Waste Water Treatment/service System

920 Gas Service System

930 Oil Service System

940 Air Treatment System

950 Lifting & Transportation

960 Auxiliaries Facilities (HVAC, Elevator etc.)

990 Miscellaneous

Page 32: ANNEX 4 2 Technical Documents and Drowings

PBS Code List (Level 2 & 3) Level 2 Level 3

Code Description Code Description

080 Civil 081 Main Equipment Foundation

082 Auxiliary Equipment Foundation

083 Building Foundation

084 Underground Equipment

089 Civil Others

090 Architecture 091 Main Building

092 Auxiliary Building

093 Equipment For Building

099 Architecture Others

120 Draft System 121 Forced Draft Fan

122 Induced Draft Fan

123 Other Fan

124 Steam Coil Air Heater

125 Gas Air Preheater

126 Gas Gas Heater

127 Duct, Wind Box & OAP

128 Stack

130 Combustion Equipment 131 Burner

140 Shoot Blowing & Blow Down System 141 Soot Blowing System

142 Blow Down System

150 Casing & Structure Steel 151 Casing

152 Structure Steel

160 Chemical Injection & Sampling System 161 Chemical Injection System

162 Sampling System

270 Gas Turbine & Aux. 271 Gas Turbine

272 Air Intake System

273 Compressor

274 Combustor

275 Water/Steam Injection System

280 Wind Turbine & Hydro Turbine 281 Wind turbine generator system

282 Tower

285 Hydro Turbine

289 Miscellaneous

310 Steam System 311 Main & Reheat Steam System

312 Steam Bypass System

313 F.W Heater Extraction Steam System

314 F.W Heater Drain & Misc. System

316 Steam Blowing Out System

Page 33: ANNEX 4 2 Technical Documents and Drowings

Level 2 Level 3

Code Description Code Description

318 Aux. Steam System

320 Condensate System 321 Condenser

322 Condenser Tube Cleaning System

323 Condenser vacuum pump

324 Debris filter system

325 Condensate Pump

326 Condensate Polishing System

327 Condensate Booster Pump

330 Feed Water system 331 Feed Water Pump

332 Feed Water Heaters

333 Deaerator

340 DH System 341 DH Heaters

342 DH Water Circulation Pump

343 Heat Accumulator

350 Make-up Water System 351 Make-up Water Tank

352 Make-up Water Pump

360 Closed Cooling Water System 361 Heat Exchanger

362 Closed Cooling Water Pump

370 Tank & Vessel 371 Field Fabricated Tank

372 Shop Fabricated Tank

373 Vessel

380 Piping & Valves 381 Pipe & Fittings

382 Valves

383 Insulation

384 Specialty

385 Supports

480 Solar System 481 Solar Module

489 Miscellaneous Item for Solar Module

510 Sea Water Treatment Sys. & Circulating Water Sys. 511 Water Intake System

512 Hypochlorination Equipment

513 Desalination System

514 Circulating Water Pump

515 Sea Water Lift Pump

516 Brine Pump

517 Cooling Tower

520 Fuel Gas Treatment System 521 Gas Detecting System

522 Gas Heater

523 Gas Filter/Separator

524 Gas Reducing Station

Page 34: ANNEX 4 2 Technical Documents and Drowings

Level 2 Level 3

Code Description Code Description

525 Gas Metering System

526 Gas Analyzer

527 Gas Compressor

528 Flare System

530 Coal Supply Sysem 531 Coal Unloading System

532 Coal Storage System(Stacking Out & Reclaiming)

533 Coal Handling System

534 Coal Sampling System

535 Pulverized Coal System

536 Dust Control System

540 Ash Handling System 541 Bottom Ash Collection System

542 Bottom Ash Transport System

543 Bottom Ash Disposal System

544 Fly Ash Collection System

545 Fly Ash Transport System

546 Fly Ash Storage & Disposal System

547 Ash Water Supply System

548 Ash Disposal System

550 Lime Handling System 551 Lime Handling System

555 Not Used

570 Fire Fighting System 571 Hydrant System

572 Foam System

573 CO2 System

574 Water Sprinkler System

575 Fire Extinguisher

576 Fire Detection & Alarm System

590 Miscellaneous Item for Attendant Facilities 591 Single Point Mooring System

592 Unloading Arm

610 TGU for ORC 611 Turbine

612 Generator

613 Gear Box

614 Lub. Oil system

620 WHOH System 621 Oil Heat Exchanger

622 Oil Feed Pump

623 Expansion Tank

630 WHOR System 631 Isopentane Feed Pump

632 Vaporizer

633 Preheater

634 Recuperator

Page 35: ANNEX 4 2 Technical Documents and Drowings

Level 2 Level 3

Code Description Code Description

635 Air Cooled Condenser

636 Hot Well

710 Power Receiving & Distribution Equipment 711 Transformer

712 High Tension Panel

713 Low Tension Panel

714 Supervisory Monitoring Panel

715 Generator

716 UPS & AVR

717 Battery & Charger

719 Power Receiving & Distribution Equipment Others

720 Motor & Control System 721 Motor Control Center (MCC)

722 Drive Control System

723 Motor

724 Brake

729 Motor & Control System Others

730 Panel & Box 731 Operating Panel

732 Local Box

739 Panel & Box Others

740 Instrumentation Equipment 741 Flow Instrument

742 Level Instrument

743 Pressure Instrument

744 Temperature Instrument

745 Control, Shut off Valves

746 Analysing System

747 Gas Sampling/Warning System

749 Instrumentation Equipment Others

750 Auxiliaries Equipment 751 Sensor(Plant Devices), Switch

752 Paging, Interphone System

753 I-TV System

754 Score Board

759 Auxiliaries equipment others

760 Process Control System 761 Level 1 System

762 Level 2 System

763 Monitoring System(CMS/EMM)

769 Process Control System Others

770 Package Control System 779 Package Control System Others

780 Special Instruments Equipment 781 Weighing System

789 Special Instruments Equipment Others

790 Construction Material & 791 Construction Material

Page 36: ANNEX 4 2 Technical Documents and Drowings

Level 2 Level 3

Code Description Code Description Others

799 EIC Others

900 Utility & common 901 Piping

902 Manual Valve

903 Fittings

910 Water & Waste Water Treatment/Service System

911 Final effluent treatment system

912 Cooling water system

913 Waste water system

914 Demineralization system

915 Potable water system

916 Chemical dosing system

917 Advanced treatment system

918 Sewage water treatment system

919 Utility water supply system

920 Gas service system 921 Compressed air system

922 Steam system

923 Nitrogen system

924 Hydrogen system

925 Oxygen system

926 Argon system

927 Low pressure gas(BFG,COG,LDG,CFG) system

928 Fuel gas(LNG & LPG) system

929 Gas service system others

930 Oil service system 931 Fuel oil system

932 Lubrication oil system

933 Grease system

934 Hydraulic system

939 Oil service system others

940 Air Treatment System 941 De-Dusting System

945 De-NOx system

946 De-SOx system

947 De-Odor system

949 De-dusting system others

950 Lifting & transportation system 951 Crane

952 Hoist

953 Chain Block

959 Lifting & transportation system others

960 Auxiliaries Facilities (HVAC, Elevator etc.) 961 Elevator

Page 37: ANNEX 4 2 Technical Documents and Drowings

Level 2 Level 3

Code Description Code Description

962 Air-conditioner

963 Thermohygrostat

967 Ventilation System

969 Auxiliaries facilities others

990 Miscellaneous 991 Temporary

992 Pump

993 Others for Water Treatment System

999 Others

Page 38: ANNEX 4 2 Technical Documents and Drowings

B. FBS Sub-Code List

FBS CODE Description

COMMON 100 Drawing PIPING 101 General Layout (Plant Layout/Equipment Layout) MECH 102 PFD/UFD (Process Flow Diagram/Utility Flow Diagram) MECH 103 P&ID MECH 106 Process Flow Chart

CIVIL 110 General Drawing for Civil CIVIL 111 Excavation Drawing CIVIL 112 Pile Arrangement Drawing CIVIL 113 Temporary Work Drawing CIVIL 114 Foundation Drawing for Architecture CIVIL 115 Plan CIVIL 116 Section CIVIL 117 Anchor List CIVIL 118 Embedded List CIVIL 119 Road, Drainage, Pavement Drawing (Plant Utilities)

ARCH 120 General Drawing for Architecture ARCH 121 Structure Drawing of Building ARCH 122 Finish Drawing of Building ARCH 123 Finish & Structure Drawing of Building ARCH 124 Misc. Drawing for Architecture ARCH 125 HAVC & Plumbing for Building ARCH 126 Fire Fighting for Building ARCH 127 Misc. Drawing for Building Equipment

MECH 130 General Arrangement for Mech. System MECH 131 Equipment Assembly Drawing MECH 132 Steel Structure Assembly Drawing MECH 133 Equipment Detail Drawing MECH 134 Steel Structure Detail Drawing MECH 135 Information Drawing for Mechanical Items MECH 136 Misc. Drawing for Mechanical

PIPING 140 Plot Plan PIPING 141 Piping Route Plan PIPING 142 Piping Arrangement Drawing PIPING 143 Information Drawing of Piping PIPING 144 Piping ISO Drawing PIPING 145 Piping Spool/Shop Drawing PIPING 146 Piping Support Drawing PIPING 147 Structure Drawing for Piping

Page 39: ANNEX 4 2 Technical Documents and Drowings

FBS CODE Description

PIPING 148 Details of Piping Components

ELEC 150 Single Line Diagram ELEC 151 Cable Tray Plan ELEC 152 Embedded Conduit Plan ELEC 153 Sequence Diagram ELEC 154 Paging & Intercommunication System ELEC 155 Lighting & Receptacle Plan ELEC 156 Fire Detection & Alarm System ELEC 157 Heat Tracing And Freeze Protection ELEC 158 Details of Electric Components ELEC 159 Cathodic Protection

I & C 160 System Configuration I & C 161 Control & Instrument Diagram I & C 162 Functional Block Diagram I & C 163 Control Loop Diagram I & C 164 Control Logic Diagram I & C 165 Control Circuit Diagram I & C 166 CRT Graphic Display I & C 167 Instrument Air Piping Plan

ELEC 170 Equipment / Room Arrangement ELEC 171 Equipment Location & Wiring Plan ELEC 172 Grounding / Lightning Plan ELEC 173 Cable Block Diagram ELEC 174 Cable Schedule ELEC 175 Installation Detail ELEC 176 Interconnection Diagram ELEC 177 Information Drawing ELEC 178 Equipment Outline Drawing

COMMON 190 Drawing List COMMON 191 Typical & Standard Drawing COMMON 192 Information Drawing for Construction COMMON 193 Detailed Drawing or Temporary Works COMMON 194 Detailed Drawing for Insulation COMMON 195 Computer Graphic View COMMON 196 Miscellaneous Drawing in General

COMMON 200 Specification COMMON 210 Spec. for Inquiry COMMON 220 Spec. for Project Contract

Page 40: ANNEX 4 2 Technical Documents and Drowings

FBS CODE Description

COMMON 230 Spec. for Purchase COMMON 240 Spec. for Design COMMON 241 Design Criteria COMMON 242 Piping Material Spec. COMMON 243 Insulation Spec. COMMON 244 Painting Spec. COMMON 250 Spec. For Inspection And Test In General(ITP) COMMON 251 Spec. For Fabrication COMMON 260 Spec. for Construction COMMON 261 Welding Procedure Spec. COMMON 290 Process Description/Functional Description

COMMON 300 Calculation

COMMON 400 Data Sheet & List COMMON 410 Bill of Material COMMON 420 Spare Parts & Tool List COMMON 421 Spare Parts COMMON 422 Tool List COMMON 430 Utility Consumption List COMMON 431 Consumables List COMMON 432 Lubrication Oil List COMMON 440 Equipment List COMMON 441 Line List COMMON 442 Valve & Piping Component List COMMON 443 Load List COMMON 444 Motor List COMMON 445 Instrument List COMMON 446 Sensor List COMMON 450 Signal List COMMON 451 I/O List COMMON 452 Interface/Interlock List COMMON 460 Data Sheet

COMMON 500 Engineering Report COMMON 510 Feasibility Study Report COMMON 511 Site Survey Report COMMON 512 Basic Engineering & Design Plan COMMON 519 Miscellaneous COMMON 520 Technical Bid Evaluation(TBE) COMMON 530 Interdisciplinary Document Review Request COMMON 540 Design Review/Verification/Validation COMMON 550 Design Change Notice(DCN)

Page 41: ANNEX 4 2 Technical Documents and Drowings

FBS CODE Description

COMMON 600 Manual & REF. Information COMMON 610 Operation/Maintenance Manual COMMON 620 Erection/Installation Manual COMMON 630 Manual for Commissioning/Start Up COMMON 631 PAT Manual/Check Sheet COMMON 632 FAT Manual/Check Sheet COMMON 640 Documents of Client/Licensor Supply Items COMMON 650 Rules & Regulations COMMON 651 Data Book COMMON 652 Industrial Standards and Codes COMMON 660 Catalogs COMMON 670

Reference Information

COMMON 700 Project Management Document COMMON 710 Project General COMMON 711 Quality/Safety/Environment Management COMMON 712 Claim/Change Order COMMON 713 Lessons Learned COMMON 714 Invoice/Insurance COMMON 715 Government/Authorities/Agent COMMON 719 Miscellaneous COMMON 720 Proposal/Contract Documents COMMON 730 Project Execution COMMON 731 Project Execution Plan/Procedures COMMON 740 Schedule Control/Management COMMON 741 Planning/Progress Control COMMON 750 Cost Control / Financial Status COMMON 751 Cost Estimation COMMON 760 Procurement Management COMMON 761 Procurement Plan COMMON 762 Inquiry / RFP(Request for proposal) COMMON 763 Purchase Order / Contract COMMON 765 Customs Clearance / Transportation / Insurance COMMON 766 Site Material COMMON 767 Manufacturing Management COMMON 768 Inspection/Test Report COMMON 769 Non Conformity Report(NCR)/Punch List COMMON 770 Installation & Commissioning COMMON 771 Supervision Report COMMON 772 Commissioning Plan COMMON 773 Commissioning Report COMMON 774 PAC (Preliminary Acceptance Certification) COMMON 775 FAC (Final Acceptance Certification)

Page 42: ANNEX 4 2 Technical Documents and Drowings

FBS CODE Description

COMMON 780 POST-Contract Management COMMON 790 MOM/MOU

Page 43: ANNEX 4 2 Technical Documents and Drowings

ATTACHEMENT # 5 Summary of KKS Key

Function Key

Main Groups & Codes A Grid And Distribution Systems B Power Transmission And Auxiliary Power Supply C Instrumentation And Control Equipment E Conventional Fuel Supply And Residues Disposal G Water Supply And Disposal H Conventional Heat Generation L Steam, Water, Gas Cycles M Main Machine Sets N Process Energy Supply For External Users P Cooling Water Systems Q Auxiliary Systems S Ancillary Systems U Structures V Plant And Disciplines General Documents X Heavy Machinery (Not Main Machine Sets)

Systems

A** Grid And Distribution Systems

AC 380(420)kV systems ACA 380(420)kV systems (free for

use) AE* 132 kV Systems AP Control consoles

APA Control consoles (free for use)

AQ Measuring and metering equipment

AQA Measuring and metering equipment (free for use)

AR Protection equipment ARA Protection equipment (free

for use) AS Decentralized panel and

cabinets ASA Circuit breaker appurtenance ASB Multiplication, conversion,

decoupling ASC Transducer appurtenance ASD Compressed air, hydraulics ASJ Automated controls, closed-

loop control ASL Grid simulation, voltage

group selection ASM Measuring equipment ASN Auxiliary power supply ASP Recording ASQ Metering ASR Protection ASS Synchronization AST Transformation ASU Panels and cabinets for

auxiliary equipment ASV Group, intermediate and

general terminal blocks ASW Indication, manual and

general terminal blocks

ASX Alarm annunciation AT Transformer equipment

ATA Transformer equipment (free for use)

AU Open-loop control, check back and auxiliary equipment

AUA Open-loop control, check back and auxiliary equipment (free for use)

AV Marshalling racks AVA Marshalling racks (free for

use) AW Instrument panels AWA Instrument panels (free for

use) AX Central equipment

AXA Central equipment (free for use)

AY Communication equipment AYA Telephone system (PABX) AYB Control console telephone

system AYC Alarm system (acoustic) AYD Alarm system (optical) AYE Fire alarm system AYF Clock system AYG Remote control system AYH Telemetry system AYJ Remote metering system AYK HF carrier telephone system AYL Staff paging system, wireless AYM Staff paging system,

inductive AYN Staff paging system,

hardwired AYP Optical monitoring system AYQ Environmental monitoring

system AYS Radiotelephone system

Page 44: ANNEX 4 2 Technical Documents and Drowings

B** Power Transmission And Auxiliary Power Supply

BA* Power Transmission BAA Generator Bus Duct And

Accessories BAB Static Starter Output Breaker BAC Generator Circuit Breaker BAT Step-Up Transformers, Including

Cooling Sys BAU Transformers Oil Treatment

Systems BAW Earthing and lighting protection

systems BAX Fluid supply system for control and

protection equipment BAY Control and protection equipment

BB* MV Distribution Boards And Transformers - Normal System

BBA 11 kV Switchboard BBB 11 kV Switchboard BBC 11 kV Switchboard BBD 11 kV Switchboard BBE 11 kV Switchboard BBF 11 kV Switchboard BBG MV Distribution Boards BBH MV Distribution Boards BBJ MV Distribution Boards BBK MV Distribution Boards BBL MV Distribution Boards BBM MV Distribution Boards BBN MV Distribution Boards BBO MV Distribution Boards BBP MV Distribution Boards BBQ MV Distribution Boards BBR MV Distribution Boards BBS MV Distribution Boards BBT MV Auxiliary Power Transformers BBX Fluid supply system for control and

protection equipment BBY Control and protection equipment

BC* MV Distribution Boards And Transformers General Purpose

BCA MV Distribution Boards BCT Start-Up, Offsite, General Purpose

Transformer BCX Fluid supply system for control and

protection equipment BCY Control and protection equipment

BF* LV Main Distribution Boards And Transformer Normal System

BFA 0,4 KV Power Centre BFB 0,4 KV Power Centre BFC 0,4 KV Power Centre BFD 0,4 KV Power Centre BFE 0,4 KV Power Centre BFF 0,4 KV Power Centre BFG 0,4 KV Power Centre BFH 0,4 KV Power Centre BFJ 0,4 KV Power Centre BFK 0,4 KV Power Centre BFL LV Main Distribution Boards BFM LV Main Distribution Boards BFN LV Main Distribution Boards BFP LV Main Distribution Boards BFQ LV Main Distribution Boards BFR LV Main Distribution Boards BFS LV Main Distribution Boards BFT LV Auxiliary Power Transformers BFU LV Auxiliary Power Transformers

BH* LV Main Distribution Boards And Transformer General Purpose

BHA 0,4 KV Power Centre BHB 0,4 KV Power Centre BHC 0,4 KV Power Centre BHD 0,4 KV Power Centre BHE 0,4 KV Power Centre BHF 0,4 KV Power Centre BHG 0,4 KV Power Centre BHH 0,4 KV Power Centre BHJ 0,4 KV Power Centre BHK 0,4 KV Power Centre BHL LV Main Distribution Boards BHM LV Main Distribution Boards BHN LV Main Distribution Boards BHP LV Main Distribution Boards BHQ LV Main Distribution Boards BHR LV Main Distribution Boards BHS LV Main Distribution Boards BHT LV Auxiliary Power Transformers BHU LV Auxiliary Power Transformers BHX Fluid supply system for control and

protection equipment BHY Control and protection equipment

BJ* LV Sub distribution Boards And Transformers Normal System

BJA 0,4 KV Motor Control Centre BJB 0,4 kV Motor Control Centre BJC 0,4 KV Motor Control Centre BJD 0,4 KV Motor Control Centre BJE LV Sub distribution Boards BJF LV Sub distribution Boards BJG LV Sub distribution Boards BJH LV Sub distribution Boards BJJ LV Sub distribution Boards BJK LV Sub distribution Boards BJL LV Sub distribution Boards BJM LV Sub distribution Boards BJN LV Sub distribution Boards BJP LV Sub distribution Boards BJQ LV Sub distribution Boards BJR LV Sub distribution Boards BJS LV Sub distribution Boards BJT LV Sub distribution Transformer BJX Fluid supply system for control and

protection equipment BJY Control and protection equipment

BL* LV Sub distribution Boards And Transformers General Purpose

BLA 0,4 KV Motor Control Centre BLB 0,4 KV Motor Control Centre BLC 0,4 KV Motor Control Centre BLD 0,4 KV Motor Control Centre BLE 0,4 KV Motor Control Centre BLF 0,4 KV Motor Control Centre BLG 0,4 KV Motor Control Centre BLH 0,4 KV Motor Control Centre BLJ 0,4 KV Motor Control Centre BLK 0,4 KV Motor Control Centre BLL LV Sub distribution Boards BLM LV Sub distribution Boards BLN LV Sub distribution Boards BLP LV Sub distribution Boards BLQ LV Sub distribution Boards BLR LV Sub distribution Boards BLS LV Sub distribution Boards BLT LV Auxiliary Power Transformer

Page 45: ANNEX 4 2 Technical Documents and Drowings

BLX Fluid supply system for control and protection equipment

BLY Control and protection equipment BM* LV Distribution Boards and

Transformers, (Diesel) Emergency Power System 1

BMA 0,4 KV Power Centre BMB 0,4 KV Power Centre BMC LV Sub distribution Boards BMD LV Sub distribution Boards BME LV Sub distribution Boards BMF LV Sub distribution Boards BMG LV Sub distribution Boards BMH LV Sub distribution Boards BMJ LV Sub distribution Boards BMK LV Sub distribution Boards BML LV Sub distribution Boards BMM LV Sub distribution Boards BMN LV Sub distribution Boards BMP LV Sub distribution Boards BMQ LV Sub distribution Boards BMR LV Sub distribution Boards BMS LV Sub distribution Boards BMT LV Auxiliary Power Transformer BMX Fluid supply system for control and

protection equipment BMY Control and protection equipment

BP Power installation for large variable-speed drives (e.g. for feedwater pump, excitation equipment, not power adjusters in switch gear)

BPA Power installations for large variable-speed drives (free for use)

BPX Fluid supply system for control and protection equipment

BPY Control and protection equipment BR* LV Distribution Boards (Converters),

Emergency Power System 1 BRA 220 V UPS Emergency Light BRB 220 V UPS Emergency Light BRC 220 V UPS for I & C BRD 220 V UPS For I & C BRE 220 V UPS Emergency BRF 220 V UPS Emergency BRG 220 V UPS for I & C BRH 220 V UPS for I & C BRJ LV Distribution Boards BRK LV Distribution Boards BRL LV Distribution Boards BRM LV Distribution Boards BRN LV Distribution Boards BRP LV Distribution Boards BRQ LV Distribution Boards BRR LV Distribution Boards BRS LV Distribution Boards BRT Converter (rotary) BRU Converter (static), inverter

BRV Emergency power generating equipment (if not under *X* = Heavy Machinery)

BRX Fluid supply system for control and protection equipment

BRY Control and protection equipment BT* Battery Systems

BTA Batteries 220 V BTB Batteries 220 V BTC Batteries 110 V BTD Batteries 110 V BTE Batteries 220 V BTF Batteries 220 V BTL Battery Chargers 220 V BTM Battery Chargers 220 V BTN Battery Chargers 110 V BTP Battery Chargers 110 V BTQ Battery Chargers 220 V BTR Battery Chargers 220 V BTS Battery Chargers 110 V BTT Battery Chargers 110 V BTW Common equipment (free for use) BTZ DC Distribution Board

BU Direct voltage distribution boards, normal system

BUA Direct voltage distribution boards, normal system (free for use)

BUX Fluid supply system for control and protection equipment

BV* DC Distribution Boards, Emergency System

BVA 220 V DC Distribution Board BVB 220 V DC Distribution Board BVC 110 V DC Distribution Board BVD 110 V DC Distribution Board BVE 24 V DC Distribution Board BVF 24 V DC Distribution Board BVG 220 V DC Distribution Board BVH 220 V DC Distribution Board BVJ 110 V DC Distribution Board BVK 110 V DC Distribution Board BVL 24 V DC Distribution Board BVM 24 V DC Distribution Board BVN DC Distribution Boards BVP DC Distribution Boards BVQ DC Distribution Boards BVR DC Distribution Boards BVS DC Distribution Boards BVX Fluid supply system for control and

protection equipment BVY Control and protection equipment

BY Control and protection equipment BYA Control and protection equipment

(free for use)

C** Instrumentation And Control Systems

CA* Protective Interlocking CAA BOP Protection System CAB Gas Turbine Protection System CAC Steam Turbine Protection System CAD HRSG Protection System CAE BMS Protection System CAY Aux Boiler Protection System

CB* Functional Group Control, Sub loop Control

CBA-CBN Cabinets For Functional Group Control

CBP Cabinets For Synchronisation CBQ Cabinets For Auxiliary Power

Change-Over CC* Binary Signal Conditioning

CCA-CCQ Cabinets For Binary Signal Conditioning

CD* Drive Control Interface

Page 46: ANNEX 4 2 Technical Documents and Drowings

CDA-CDQ Cabinets For Drive Control Interface

CE* Annunciation CEA-CEH Cabinets For Annunciation

System CEJ Fault Recording (SER) CEK Fault Recording (OSCILLO)

CF* Measurement Recording CFA-CFF Cabinets For Measurement CFQ Cabinets For Recording (Meters,

Pen Recorders) CG Closed-loop control (excl. power

section) CH* Protection (Excluding Reactor

Protection) CHA Generator Transformer Protection

CJ* Unit Coordination Level CJA Unit Control System (Including

Cabinets) CJD Start-Up And Set-Point Control

(Including Cabinets) CJF Boiler Control System (Incl.

Cabinets) CJJ Instrumentation And Control

Cabinets For Turbine Set CJP Instrument & Control Cabinets For

Gas Turbine Set CJU-CJY Instrumentation And

Control Cabinets For Other Main And Heavy Machinery

CK* Process Computer System CKA-CKH Online Supervisory And

Diagnostic Computer Distributed Process System

CKJ Access control computer (free for use)

CKN Process computer system (free for use)

CU* Closed/Loop Control (Power Section) CV* Marshalling Racks CW* Control Room

CWA BTG Control Desk CWB Process Computer Console CWC Operator Interface Station (OIS) CWF Main Contr. Pan.-Unit

Elect.Vert.Board CWG Main Contr.Pan-Common Elect-

Vert-Boards CWK Main Contr.Pan-BTG Vert.Boards CWQ Cabinets For Voltage Distribution

CX* Local Control Stations CY* Communication Equipment

CYA Telephone System (PABX) CYB Direct Wire Telephone System CYC Paging System (Acoustic) CYD Paging System (Optical) CYE Fire Alarm System CYF Clock System CYG Remote control system CYH Pocket Radio Paging System CYJ Loudspeaker Paging CYK Messenger Call System CYL Staff paging system, wireless CYM Prayer Room Sound System CYN Staff Paging System, Hardwired CYP Optical monitoring system CYQ Gas detection system CYR Pneumatic tube system CYS Radiotelephone system

E** Conventional Fuel Supply And Residues Disposal

EG* Supply Of Liquid Fuels (Heavy Oil) EGA Receiving Equipment Incl. Pipeline EGB Tank Farm EGC Pump System EGD Piping System EGR Residues Removal System EGT Heating Medium System EGX Fluid Supply System For Control And

Protection EGY Control And Protection Equipment

EK* Supply Of Gaseous Fuel EKA Receiving Equipment Including Pipe

Line EKB Moisture Separation System EKC Heating System EKD Main Reducing Station, Expansion

Turbine EKE Mechanical Cleaning, Scrubbing

EKF Storage System EKG Piping System EKH Main Pressure Boosting System EKK Fluid supply system for control and

protection equipment EKR Residues Removal System EKT Heating Medium System EKV Lubricant supply system EKW Sealing fluid supply system EKX Fluid Supply System For Control And

Protection EKY Control And Protection Equipment

EN* SUPPLY OF OTHER FUELS (GASOIL) ENA Receiving Equipment ENB Tank Farm ENC Pump System END Piping System ENY Control And Protection Equipment

G** Water Supply And Disposal

GA Raw water supply GAA Extraction, mechanical cleaning GAC Piping and channel system GAD Storage system GAV Lubricant supply system GAX Fluid supply system for control and

protection equipment GAY Control and protection equipment

GB* Treatment System (Carbonate Hardness Removal) Included Cooling Tower-Make Up Water Treatment System

GBB Filtering Mechanical Cleaning System

GBC Aeration, Gas Injection System GBD Precipitation System (E.G. For

Carbonate Hardness Removal)

Page 47: ANNEX 4 2 Technical Documents and Drowings

GBE Acid Proportioning System (e.g. For Carbonate Hardness Removal)

GBF Ion Exchange, Reverse Osmosis System (e.g. For Carbonate Hardness Removal)

GBG Evaporation System (e.g. For Carbonate Hardness Removal)

GBH Deaeration, Drying System GBJ Preheating, Cooling System GBK Piping Storage, Pump Systems For

Main Fluid GBL Storage System Fluid Treatment

System (If Not Part Of Another System)

GBN Chemicals Supply System GBP Regeneration. Flushing Equipment GBQ Injection System For Main Fluid (For

Hardness Stabilisation) GBR Flushing Water And Residues

Removal System Included Neutralization

GBS Sludge Thickening System GBT Heating, Cooling And Flushing Fluid

Distribution System GBX Fluid Supply System For Control

And Protection GBY Control And Protection Equipment

GC* Treatment System (Demineralisation)

GCA Treatment System GCB Filtering. Mechanical Cleaning

System GCC Aeration, Gas Injection System GCD Precipitation System (E.G. For

Carbonate Hardness Removal) GCE Acid Proportioning System (E.G.

For Carbonate Hardness Removal) GCF Ion Exchange, Reverse Osmosis

System GCG Evaporation System (E.G. For

Carbonate Hardness Removal) GCH Deaeration, Drying System GCJ Preheating, Cooling System GCK Piping System, Temporary Storage

System, Pump System For Main Fluid

GCL Storage System Outside Fluid Treatment System (If Not Part Of Another System)

GCN Chemicals Supply System GCP Regeneration, Flushing Equipment GCQ Injection System For Main Fluid GCR Flushing Water And Residues

Removal System Included Neutralization

GCS Sludge Thickening System GCT Heating, Cooling And Flushing Fluid

Distribution System GCV Lubricant supply system GCX Fluid Supply System For Control

And Protection GCY Control And Protection Equipment

GD* Treatment System Of Sea Water (Desalination)

GDB Steam System GDC Condensate System GDD Precipitation System (E.G. For

Carbonate Hardness Removal) GDE Acid Cleaning System

GDF Ion Exchange, Reverse Osmosis System (E.G. For Carbonate Hardness Removal)

GDG Multiflash System, Evaporation System (E.G. For Demineralisation)

GDH Deaeration, Drying System GDJ Preheating, Cooling System GDK Brine System 10-70 Brine Recirculation 80 Brine Blow Down GDL Storage system outside fluid

treatment system (if not part of another system) GDM Product Water System GDN Chemical Supply System

10-30 Antiscale 40-60 Antifoam 70-90 Sodium Sulphite

GDP Sea Water System GDQ Injection System For Main Fluid GDR Flushing Water And Residues

Removal System Included Neutralization

GDS Sludge Thickening System GDT Service Water System GDU Gas Extraction System GDV Lubricant supply system GDW On Load Cleaning System GDX Fluid Supply System For Control

And Protection GDY Control And Protection Equipment

GE* Treatment System Of Desalinated Water (Blending)

GEL Limestone Transfer System GEM Desalinated Water GEN Chemical Dosing System

20-30 Caustic Soda 40-60 Electro chlorination System 70 Polyelectrolyte Dosing (Wash

water) 80 Potable Water Chlorine Dosing

GEP Sea Water (For Treatment) GET Wash water System

10-69 Limestone Units 70-79 Recovery System 80-99 Sea Water Filters

GEU Gas Extraction System GEW Service Water System

GH* Distribution System (Not Drinking Water)

GHB Distribution System FTER Treatment (Carbonate Hardness Removal)

GHC Distribution System FTER Treatment (Demineralization)

GHD Distribution System FTER Treatment (Others)

GHE Service Water Dist. System GK* Drinking Water Supply

GKA Receiving Point GKB Storage, Forwarding And

Distribution System GKC Drinking water supply (free for use

e.g. building-specific) GKX Fluid supply system for control and

protection equipment GKY Control and protection equipment

GM Plant Drainage System GMA Central Discharge System

Page 48: ANNEX 4 2 Technical Documents and Drowings

GMB Gas Turbine Drainage Circuit GMC Oily Water Plant Drainage) GME Process drainage system in

structures for conventional fuel supply and residue disposal GMG Process drainage system in

structures for water supply and disposal

GMH Process drainage system in structures for conventional heat generation

GMJ Desalination Plant Drainage GMJ Blending Plant Drainage GML Process drainage system in

structures for steam water cycle GMM Process drainage system in

structures for main machine sets GMN Process drainage system in

structures for process energies supply

GMP Process drainage system in structures for circulating (cooling)

water systems GMQ Process drainage system in

structures for auxiliary systems GMX Fluid supply system for control and

protection equipment GMY Control and protection equipment

GN* Plant Drains Treatment System GNB Filtering, Mechanical Cleaning

System GNC Aeration, Gas Injection System GND Precipitation System (E.G. For

Carbonate Hardness Removal) GNE Acid Proportioning System (E.G.

For Carbonate Hardness Removal) GNF Ion Exchange System (E.G. For

Demineralisation) GNG Evaporation System (E.G. For

Demineralisation) GNH Deaeration, Drying System GNJ Preheating, Cooling System GNK Piping System, Temporary Storage

System, Pump System For Main Fluid

GNL Storage System Outside Fluid Treatment System (If Not Part Of Another System)

GNN Chemicals Supply System GNP Regeneration, Flushing Equipment GNQ Injection System For Main Fluid GNR Flushing Water And Residues

Removal System Included Neutralization

GNS Sludge Thickening System GNT Heating, Cooling And Flushing Fluid

Distribution System GNV Lubricant supply system GNX Fluid Supply System For Control

And Protection

GNY Control And Protection Equipment GQ* Domestic Waste Water And

Drainage System GQA Central Discharge System GQB Storage GQX Fluid supply system for control and

protection equipment 0

GQY Control and protection equipment GR* Domestic Waste Water

Treatment System GRB Filtering. Mechanical Cleaning

System GRC Aeration, Gas Injection System GRD Precipitation System (E.G. For

Carbonate Hardness Removal) GRE Acid Proportioning System (E.G.

For Carbonate Hardness Removal) GRF Ion Exchange System (E.G. For

Demineralisation) GRG Evaporation System (E.G. For

Demineralisation) GRH Deaeration, Drying System GRJ Preheating, Cooling System GRK Piping System, Temporary Storage

System, Pump System For Main Fluid

GRL Storage System Outside Fluid Treatment System (If Not Part Of Another System)

GRN Chemicals Supply System GRP Regeneration, Flushing Equipment GRQ Injection System For Main Fluid GRR Flushing Water And Residues

Removal System Included Neutralization

GRS Sludge Thickening System GRT Heating, Cooling And Flushing Fluid

Distribution System GRV Lubricant supply system GRX Fluid Supply System For Control

And Protection GRY Control And Protection Equipment GU* Rainwater, Drainage System

Including Treatment System GUA Rainwater collection and drainage

systems (free for use e.g building-specific) GUB Rainwater collection and drainage

systems (free for use e.g building-

specific) GUX Fluid supply system for control and

protection equipment GUY Control and protection equipment

GY Control and protection equipment

H** Conventional Heat Generation

HA* Pressure System HAA LP Part-Flow Feed Heating System

(Flue Gas Heated) HAB HP Part-Flow Feed Heating System

(Flue Gas Heated) HAC Economiser System HAD Evaporator System

HAG Circulating System (Not Used In Natural Circulation Boiler)

HAH HP Superheater System HAJ Reheat System HAK Secondary Reheat System HAM Triflux System HAN Pressure System Drainage &

Venting Systems

Page 49: ANNEX 4 2 Technical Documents and Drowings

HAV Lubricant supply system HAW Sealing fluid supply system HAX Fluid Supply System For Control

And Protection HAY Control And Protection Equipment

HB* Support Structure And Steam Generator Interior

HBA Frame Including Foundations HBB Enclosure, Insulation HBC Brick Lining Incl. Insulating

Brickwork HBD Platforms And Stairways HBK Steam Generator Interior

HC* Fireside Heat Transferring Surface Cleaning Equipments

HCA Air Soot blowing System HCB Steam Soot blowing System HCC Water Soot blowing System HCD Flushing Equipment HCE Rapping Gear HCF Shot Cleaning System HCV Lubricant supply system HCW Sealing Fluid Supply System HCX Fluid supply system for control and

protection equipment HCY Control And Protection Equipment

HH* Main Firing System HHA Main Burners HHB Retarded Combustion Grate HHC Grate Combustion System HHD Others Burner Equipment (E.G.

Vapour Burner, Flue Dust Burner) HHE Pulverized Coal Bin, Forwarding

And Distribution System HHF Oil Temporary Storage Pump And

Distribution System HHG Gas Pressure Reduction,

Distribution System HHH Temporary Storage, Forwarding

And Distribution System For Other Fuels, Fluid 1-3

HHK Temporary Storage, Forwarding And Distribution System For Other Fuels, Fluid 1-3

HHL Combustion Air Supply System HHM Atomized Medium Supply System

(Steam) HHN Atomized Medium Supply System

(Air) HHP Coolant Supply System (Steam) HHQ Coolant Supply System (Air) HHR Purging Medium Supply System

(Steam) HHS Purging Medium Supply System

(Air) HHT Heating Medium Supply System

(Steam)

HHU Heating Medium Supply System (Hot Water)

HHV Electric Heating System HHX Fluid Supply System For Control

And Protection HHY Control And Protection Equipment HHZ Electric heating system

HJ Ignition firing equipment (if separate) HJA Ignition burners HJG Gas pressure reduction, distribution

system HJL Combustion air supply system HJM Atomizer medium supply system

(steam) HJN Atomizer medium supply system

(air) HJP Cooling supply system (steam) HJQ Cooling supply system (air) HJR Purging medium supply system

(steam) HJS Purging medium supply system (air) HJT Heating medium supply system

(steam) HJU Heating medium supply system (hot

water) HJX Fluid supply system for control and

protection equipment HJY Control and protection equipment

HL* Combustion Air System HLA Ducting System HLB Fan System, Forced-Drought Fan

System HLC External Air Heating System (Not

Flue-Gas-Heated HLD Air Heating System (Flue-Gas-

Heated HLU Air pressure relief system HLY Control And Protection Equipment

HN* Flue Gas Exhaust HNA Ducting System HNC Induced-Drought Fan System HNC Smoke Stack System (Chimney) HNE Smoke stack system HNF Flue Gas Recirculation System HNW Sealing fluid supply system HNX Fluid supply system for control and

protection equipment HNY Control And Protection Equipment

HV Lubricant supply system HX Fluid supply system for control and

protection equipment HY* Control And Protection

Equipment HYA Field Instrumentation Control Valves HYC Instrumentation Erection Material

(Cables) HYE Automation And Control System

L** Steam Water Gas Cycles

LA* Feed water System LAA Storage Deaeration (Incl. Feed

water Tank) LAB Feed water Piping System (Excl.

Feed water Pump And Feed water Heating System)

LAC Feed water Pump System LAD HP Feed water Heating System

LAE HP Desuperheating Spray System LAF IP Desuperheating Spray System LAH Start-Up And Shutdown Piping

System LAJ Start-Up And Shutdown Pump

System LAR Emergency Feed water Piping

System Incl. Storage (Excl.

Page 50: ANNEX 4 2 Technical Documents and Drowings

Emergency Feed water Pump System)

LAS Emergency Feed water Pump System

LAT Back-Up Emergency Feed water System

LAV Lubricant supply system LAW Feed water Sealing Water System LAX Fluid Supply System For Control

And Protection LAY Control And Protection Equipment

LB* Steam System LBA Main Steam Piping System LBB Hot Reheat Piping System LBC Cold Reheat Piping System LBD Extraction Piping System LBE Back Pressure Piping System LBF HP Reducing Station LBG Auxiliary Steam Piping System LBH Start-Up/Shut-Down Steam System LBJ Moisture Separator/Reheater (MSR) LBK Main Steam Safety/Relief System

Inside Reactor Containment For Single-Cycle Plants

LBL IP Reducing Station LBQ Extract. Steam Piping Sys. (HP

Feed water Heater) LBR Piping System For Branch Or

Auxiliary Turbine LBS Extraction Steam Piping System For

LP Feed water Heating (Main Condensate)

LBT Emergency Condensing System LBU Common Dump Line LBV Lubricant supply system LBW Sealing Steam System LBX Fluid Supply System For Control

And Protection LBY Control And Protection Equipment

LC* Condensate System LCA Main Condensate Piping System

(Excl. Main Condensate Pump System, LP Feed water Heating

System, Condensate Polishing Plant)

LCB Main Condensate Pump System LCC LP Feed water Heating System LCE Condensate Desuperheating Spray

System LCF Branch Turbine Condensate Piping

System LCG Branch Turbine Condensate Pump

System LCH HP Heater Drains System LCJ LP Heater Drains System LCL Steam Generator Drains System LCM Clean Drains System (Collecting

And Return Systems) LCN Aux Steam Condensate System

(Collecting And Return Systems) LCP Stand-By Condensate System Incl.

Storage And Pump System LCQ Steam Generator Blow down

System LCR Stand-By Condensate Distribution

System LCS Reheater Drains (Moisture

Separator/Reheater) LCT Moisture Separator Drains (Moisture

Separator/Reheater) LCV Lubricant supply system LCW Sealing And Cooling Drains System LCX Fluid Supply System For Control

And Protection LCY Control And Protection Equipment

LF* Common Installation For Steam, Water, Gas Cycles

LFC Common Drain And Vent System LFG Secondary-Side Steam Generator

Tube sheet Lancing System LFJ Steam Generator Lay-Up System LFN Proportioning System For Feed

water, Condensate System, Included Proportioning In Boiler And Turbine Area

LY Control and protection equipment

M** Main Machine Sets

MA* Steam Turbine Plant MAA HP Turbine MAB IP Turbine MAC LP Turbine MAD Bearings MAG Condensing System MAH Motive Water System (If Separate

From “MAJ”) MAJ Air Removal System MAK Transmission Gear Between Prime

Mover & Driven Machine Included Turning Gear

MAL Drain And Vent System MAM Leak Off Steam System MAN Turbine Bypass Station, Included

Desuperheating Spray System MAP LP Turbine Bypass MAQ Venting System (If Separate From

“MAL”) MAV Lubricant Supply System MAW Sealing, Heating And Cooling

Steam System

MAX Non Electric Control And Protection Equipment, Included Fluid Supply System

MAY Electrical Control And Protection Equipments

MB* Gas Turbine Plant MBA Turbine Compressor Rotor With

Common Casing MBB Turbine Casing And Rotor MBC Compressor Casing And Rotor MBD Bearings MBE GT Vibration Monitoring System MBF GT Foundation Components MBG GT Enclosure Ventilation MBH Cooling And Sealing Gas System MBI GT Bleed Air System MBJ Start-Up Unit MBK Transmission Gear Between Prime

Mover & Driven Machine Included Turning Gear

MBL Intake Air, Cold Gas System (Open Cycle)

MBM Combustion Chamber (Gas Heating Combustion)

Page 51: ANNEX 4 2 Technical Documents and Drowings

MBN Fuel Supply System (Liquid) MBO GT & Reduction Gearbox Enclosure

Axial Exhaust Type MBP Fuel Supply System (Gaseous) MBQ Ignition Fuel Supply System (If

Separate) MBR Exhaust Gas System (Open Cycle) MBS Storage System MBT Motive Gas Generator Unit

Including Combustion Chamber MBU Additive System MBV Lubricant Supply System MBW Sealing Oil Supply System MBX Non Electric Control. & Protection

Equipments, Included Fluid Supply System

MBY Electrical Control And Protection Equipments

MBZ Lubricant And Control Medium Treatment

MK* Generator Plant MKA Generator Complete, Included

Stator, Rotor And All Integral Cooling Equipment

MKB Exciter Set (Use Only if “MKC” Is Not Sufficient for Identification)

MKC Exciter Set, Complete (10 Auxiliary Excitation, 20 Main Excitation Unit)

MKD Bearings MKF Stator/Rotor Liquid Cooling System,

Included Coolant Supply System MKG Stator/Rotor Gas Cooling System,

Included Coolant Supply System

MKH Stator/Rotor Nitrogen Cooling System, Included Coolant Supply System

MKP Secondary cooling water system MKQ Exhaust Gas System (If Separate

From “MKG” and “MKH”) MKU Stator/Rotor Cooling Oil Cooling

System, Included Coolant Supply System

MKV Lubricant Supply System (If Separate System For Generator)

MKW Sealing Oil System, Included Supply And Treatment

MKX Fluid supply system for control and protection equipment

MKY Control And Protection Equipment MM* Compressor Plant

MMA Compressor Including Internal System

MMC Air Intake Piping System MMD Bearings MME Inter-cooling System MMF After-cooling System MMG Final Cooling System MMH Discharge Piping System MMV Lubricant Supply System MMW Sealing Fluid Supply System MMX Fluid Supply System For Control

And Protection MMY Control And Protection Equipment

P** Cooling Water System

PA* Circulating (Main Cooling) Water System

PAA Extraction, Cleaning For Direct Cooling

PAB Circulating Water Piping And Culvert System

PAC Circulating Water Pump System PAD Recirculating cooling System,

Outfall Cooling System PAE Cooling Tower Pump System (If

Separate) PAH Condenser Cleaning System

Included All Appurtenances. PAR Make-Up Water Piping System PAS Make-Up Water Pump System PAV Lubricant Supply System PAX Fluid Supply System For Control

And Protection PAY Control And Protection Equipment PAZ Cathodic Protection

PB* Circulating (Main Cooling) Water Treatment System

PBA Discharge From Fluid Treatment System

PBB Filtering, Mechanical Cleaning System

PBC Aeration, Gas Injection System PBD Precipitation System (E.G. For

Carbonate Hardness Removal) PBE Acid Proportioning System (E.G.

For Carbonate Hardness Removal) PBF Ion Exchange System (E.G. For

Demineralisation)

PBG Evaporation System (E.G. For Demineralisation)

PBH Deaeration, Drying System PBJ Preheating, Cooling System PBK Piping System, Temporary Storage

System, Pump System For Main Fluid

PBL Storage System Outside Fluid Treatment System (If Not Part Of Another System)

PBN Chemicals Supply System PBP Regeneration, Flushing Equipment PBQ Injection System For Main Fluid PBR Flushing Water And Residues

Removal System Included Neutralization

PBS Sludge Thickening System PBT Heating, Cooling And Flushing Fluid

Distribution System PBX Fluid Supply System For Control

And Protection PBY Control And Protection Equipment

PC* Service (Secondary Cooling) Water System

PCA Extraction, Mechanical Cleaning For Direct Cooling

PCB Piping And Culvert System PCC Pump System PCD Recirculating Cooling System,

Outfall Cooling System PCH Heat Exchanger Cleaning System PCM Service Water System For

Generator, Motor Generator Cooling PCV Lubricant supply system

Page 52: ANNEX 4 2 Technical Documents and Drowings

PCX Fluid Supply System For Control And Protection

PCY Control And Protection Equipment PD* Service (Secondary Cooling) Water

Treatment System PDA Discharge From Fluid Treatment

System (If Not Part Of Another System)

PDB Filtering, Mechanical Cleaning System

PDC Aeration, Gas Injection System PDD Precipitation System (E.G. For

Carbonate Hardness Removal) PDE Acid Proportioning System (E.G.

For Carbonate Hardness Removal) PDF Ion Exchange System (E.G. For

Demineralisation) PDG Evaporation System (E.G. For

Demineralisation) PDH Deaeration, Drying System PDJ Preheating, Cooling System PDK Piping System, Temporary Storage

System, Pump System For Main Fluid

PDL Storage System Outside Fluid Treatment System (If Not Part Of Another System)

PDN Chemicals Supply System PDP Regeneration, Flushing Equipment PDQ Injection System For Main Fluid PDR Flushing Water And Residues

Removal System Included Neutralization

PDS Sludge Thickening System PDT Heating, Cooling And Flushing Fluid

Distribution System PDX Fluid Supply System For Control

And Protection PDY Control And Protection Equipment

PG* Closed Cooling Water System For Conventional Area

PGA Closed cooling water unit PGB Closed Cooling Water Piping

System PGC Closed Cooling Water Pump

System PGD Closed Water Cooler PGF Pressure system PGH Closed cooling water system for

main groups *E* and *H*

PGL Closed cooling water system for main groups *G*, *L*, *N* and *P*

PGM Closed cooling water system for main groups *B*, *M* and *X*

PGX Fluid Supply System For Control And Protection

PGY Control And Protection Equipment PH* Closed Cooling Water Treatment

System PHA Discharge From Fluid Treatment

System (If Not Part Of Another System)

PHB Filtering, Mechanical Cleaning System

PHC Aeration, Gas Injection System PHD Precipitation System (E.G. For

Carbonate Hardness Removal) PHE Acid Proportioning System (E.G.

For Carbonate Hardness Removal) PHF Ion Exchange System (E.G. For

Demineralisation) PHG Evaporation System (E.G. For

Demineralisation) PHH Deaeration, Drying System PHJ Preheating, Cooling System PHK Piping System, Temporary Storage

System, Pump System For Main Fluid

PHL Storage System Outside Fluid Treatment System (If Not Part Of Another System)

PHN Chemicals Supply System PHP Regeneration, Flushing Equipment PHQ Injection System For Main Fluid PHR Flushing Water And Residues

Removal System Included Neutralization

PHS Sludge Thickening System PHT Heating, Cooling And Flushing Fluid

Distribution System PHX Fluid Supply System For Control

And Protection PHY Control And Protection Equipment

PV Lubricant supply system PX Fluid supply system for control and

protection equipment PY Control and protection equipment

Q** Auxiliary System

QC* Central Chemical Supply QCA Chemical Reagents System QCB Boiler Dosing System QCC Hydrazine supply and distribution QCD Chemical dosing unit QCE Ammonia supply and distribution QCF Iron-sulphate supply and distribution QCG Sodium-nitrite supply and

distribution QCH Sulphuric acid supply and

distribution QCV Lubricant supply system QCX Fluid supply system for control and

protection equipment QCY Central Chemical Supply Functional

Group

QE* General Compressed Air And Carrier Air Supply

QEA Central Compressed Air And Carrier Air Generation System

QEB Central Compressed Air And Carrier Air Distribution

QEC Air filter unit QEE Compressed air supply system for

main groups *E* QEH Compressed air supply system for

main groups *H* QEL Compressed air supply system for

main groups *G*,*L*, *N* and *P* QEM Compressed air supply system for

main groups *B*, *M* and *X*

Page 53: ANNEX 4 2 Technical Documents and Drowings

QEQ Compressed air supply system for main groups *Q*

QES Compressed air supply system for main groups *S*

QEV Lubricant supply system QEW Sealing fluid supply system QEX Fluid supply system for control and

protection equipment QEY Control And Protection Equipment

QF* General Control Air Supply QFA Central Control Air Generation

System QFB Central Control Air Distribution

System QFC GT Instrument Air Circuit QFD Desalination Plant Instrument Air

Distribution System QFE Blending Plant Instrument Air QFP Potable Water Pump Instrument Air

Distribution System QFF Control air treatment system QFH Control air supply system for main

group *H* QFL Control air supply system for main

group *G*,*L*,*N* and *P* QFM Control air supply system for main

group *B*,*M* and *X* QFQ Control air supply system for main

group *Q* QFS Control air supply system for main

group *S* QFV Lubricant supply system QFW Sealing fluid supply system QFX Fluid supply system for control and

protection equipment QFY Control And Protection Equipment

QH* Auxiliary Steam Generating System QHA Pressure System QHB Support Structure And Enclosure QHC Fireside Heat Transfer Surface

Cleaning Equipment QHD Ash And Slag Removal QHE Blow down System Flash Drain

System QHF Bunker, Feeder And Pulverizing

System QHG Boiler Water Circulation System

(Also for Electrode Steam Boiler) QHH Main Firing System (Also For

Electric Heating) QHJ Ignition Firing Equipment (If

Separate) QHL Combustion Air System QHM Gas Heating System (For Closed

Cycle) QHN Fuel Gas Exhaust (Without Gas

Treatment) QHP Mechanical Dust Handling System QHQ Electrostatic Precipitator QHR Chemical Flue Gas Treatment

System, Included Residues Removal, Adsorptiv Process

QHS Chemical Flue Gas Treatment System, Included Residues Removal, Catalytic Process

QHT Chemical Flue Gas Treatment System, Included Residues Removal, Absorptiv Process

QHU Flue Gas Reheating System QHV Lubricant supply system QHX Fluid Supply System For Control

And Protection QHY Control And Protection Equipment

QJ* Central Gas Supply, Also Inert Gas QJA Gas supply and distribution system QJB Nitrogen Gas Supply System QJD Gas Supply And Distribution System

N2 (Nitrogen) QJF Gas Supply And Distribution System

H2 (Hydrogen) QJH Gas supply and distribution system

CH4(methane) QJK Gas Supply And Distribution System

CO2 (Carbon Dioxide) QJM Gas supply and distribution system

C2H2(acetylene) QJP Gas supply and distribution system

C3H8(propane gas) QJR Gas supply and distribution system

N2O (laughing gas) QJV Lubricant supply system QJW Sealing fluid supply system QJX Fluid supply system for control and

protection equipment QJY Control And Protection Equipment

QK* Chilled Water System For Conventional Area

QKA Central Chilled Water Plant QKY Control And Protection Equipment

QL* Feed water Steam Condensate Cycle Of Auxiliary Steam Generating And Distribution

QLA Feed water System QLB Steam System QLC Condensate System QLD Condensate Polishing Plant QLF Common Equipment For Auxiliary

Steam Generation And Distribution Systems

QLV Lubricant supply system QLX Fluid supply system for control and

protection equipment QLY Control And Protection Equipment

QM Air humidifying system QU* Sampling System For Conventional

Area QUA Sampling System QUB I & C Laboratory QUE Sampling systems for main group

*E* QUH Sampling systems for main group

*H*(gas-side QUL Sampling systems for WHRB *N*,*M* and *N* QUP Sampling systems for main group

*G* and *P* QUQ Sampling systems for main group

*Q* QUS Sampling systems for main group

*S* QUX Fluid supply system for control and

protection equipment QUY Control And Protection Equipment

S** Ancillary System

Page 54: ANNEX 4 2 Technical Documents and Drowings

SA* Heating, Ventilation Air-Conditioning (HVAC) System

SAA Refrigeration plant (if not part of *QK*)

SAB HVAC System for S/S and 400kV GIS control building

SAC For Control & Electrical Buildings/Subs. Building

SAD For Aux. Boiler Building & Diesel Building

SAE HVAC System for steam turbine SAF For Fuel Oil Pump Room &

Hydrogen Building SAG For Water Treatment Building SAH Heating, ventilation, air-conditioning

(HVAC) systems in structures for conventional heat

generation SAL Heating, ventilation, air-conditioning

(HVAC) systems in structures for steam-water cycle SAM For Turbine Building SAN Heating, ventilation, air-conditioning

(HVAC) systems in structures for process energy

supply systems SAP Heating, ventilation, air-conditioning

(HVAC) systems in structures for circulating

(cooling) water systems SAQ For Cooling Water Pump House SAS For Fire Fighting

Building/Workshop SAU Heating, ventilation, air-conditioning

(HVAC) systems in general services structures

SAX Fluid supply system for control and protection equipment

SAV For Administration Building SAY Control And Protection Equipment

SB* Space Heating Systems SBA Central Heating Plant SBC For Control & Elect. Building/Subs.

Building SBD For Aux. Boiler Building & Diesel

Building SBE Space heating systems in structures

for conventional fuel supply and residue disposal

SBF For District Heating Building SBG For Water Treatment Building SBH For Boiler House SBL Space heating systems in structures

for steam-water cycle SBM For Turbine Building SBN Space heating systems in structures

for process energy supply systems SBP Space heating systems in structures

for circulating (cooling)water systems SBQ For Cooling Water Pump House SBS For Fire Fighting Building/Workshop SBU Space heating systems in general

service structures SBV For Administration Building SBY Control And Protection Equipment

SC* Stationary Compressed Air Supplies

SCA Compressed Air Generation System SCB Compressed Air Distribution System SCE Blending Plant Compressed Air SCP Potable Water Pump Compressed

Air Distribution System SCY Control And Protection Equipment

SD* Stationary Cleaning Systems SDY Control And Protection Equipment

SG* Stationary Fire Protection Systems

SGA Fire Water System Conventional Area

SGB Fire Water System Nuclear Area 1 SGC Spray Deluge Systems

Conventional Area SGD Spray Deluge Systems, Nuclear

Area 1 SGE Sprinkler Systems SGF Foam Fire-Fighting Systems SGG Tank Roof, Tank Shell Cooling

Systems SGJ CO2 Fire-Fighting Systems SGK Halon Fire-Fighting Systems SGL Powder Fire-Fighting Systems SGV Lubricant supply system SGX Fluid Supply System For Control &

Protection Equipment SGY Control And Protection Equipment

SM* Cranes, Stationary Hoists And Conveying Appliance

SMA Overhead cranes SMB Monorail hoist SMC Other cranes SMF Cranes, stationary hoist and

conveying appliances in structures for flue gas chemical treatment

SMG Cranes, stationary hoists and conveying appliances in structures for water supply and waste water disposal

SMH Cranes, stationary hoists and conveying appliances in structures for conventional heat generation

SML Cranes, stationary hoists and conveying appliances in structures for steam-water cycle.

SMM In Turbine Building SMN Cranes, stationary hoist and

conveying appliances in structures for process energy supply for external users

SMP In Circulating Water Intake Structures

SMQ Cranes, stationary hoists and conveying appliances in structures for auxiliary systems

SMS In Ancillary System Building SMU Cranes, stationary hoists and

conveying appliances in general service structures

SMW In Workshop Building SMX Fluid supply system for control and

protection equipment SMY Cranes Stationary Hoists &

Conveying Appliance SN* Elevators

SNA Elevators for plant SNC Switchgear Building

Page 55: ANNEX 4 2 Technical Documents and Drowings

SNE Elevators in structures for conventional fuel supply and residue disposal

SNG Elevators in structures for water supply and waste water disposal

SNH Elevators in structures for conventional heat generation

SNL Elevators in structures for steam-water cycle

SNM Elevators in structures for main machine sets

SNN Elevators in structures for process energy supply systems

SNP Elevators in structures for circulating (cooling)water systems

SNQ Elevators in structures for auxiliary systems

SNS Elevators in structures for ancillary systems

SNU Elevators in general service structures

SNY Control And Protection Equipment SP Railway installations ST* Workshop, Stores, Laboratory

Equipment & Staff Amenities Outside Controlled Area

STA Workshop Equipment Outside Controlled Area

STC Maintenance Areas Outside Controlled Area

STE Stores And Filling Station Equipment

STG Laboratory Equipment STG Staff Amenities STP Staff amenities STY Control And Protection Equipment

U** Structures

UA* Structures For Grid And Distribution System

UAA Switchyard Structure UAB 220 KV Indoor GIS Switchgear

Building UAC Substation Buildings UAE Structure for pneumatic control

system UAG Structure For Transformers UAH Structure for supports and

equipment UAW Civil works for earthing/grounding

outside buildings UAX Special Structure (Plant Specific) UAY Bridge structure UAZ Trenches/ducting structure

UB* Structures For Power Trans. & Aux. Power Supplies

UBA Switchgear Building UBC Structure For Offsite System

Transformers UBD Structure for LV/LV auxiliary power

transformer station UBE Structure for LV/LV auxiliary power

transformer GT UBF Structure For Generator

Transformers UBG Structure for MV/LV auxiliary power

transformer station UBH Structure for MV/LV auxiliary power

transformer GT UBJ Structure For Transformer Tracks UBK Transformer Maintenance Build UBL Structure for step-up transformer-ST UBM Structure for step-up auxiliary

transformer UBN Structure for oil pits collecting/oil

separators UBP Structure for transformer tracks UBQ Live line washing equipment

building UBU Structure for electro-module for gas

turbine UBV Gas turbine busduct foundations UBW Steam turbine busduct foundations UBX Special Structure (Plant Specific) UBY Bridge structures UBZ Trenches/ducting structures

UC* Structures For Instrument. And Control

UCA Aux. Control Room & Electrical Building

UCB Control Station Building UCL Structure for measuring equipment UCP Cooling water monitoring structure UCX Special Structure (Plant Specific) UCY Bridge structures UCZ Ducting Structure

UD* Structures For Desalination Plant UDA Desalination Plant UDB Desalination Plant C.B.

UE* Structure For Conv. Fuel Supply And Res.Dis.

UEF Structures for unloading and reception of liquid fuels

UEG Structures for storage of liquid fuels UEH Structure For Unload And Rec. Of

Liquid Fuel UEJ Structure For Storage Of Liquid

Fuels UEL Fuel Oil Pump House UEM Fuel Oil Treatment Area UEK Structures for unloading and

reception of gaseous fuels UEN structures for treatment of gaseous

fuels UEX Special Structure (Plant Specific) UEY Bridge structures UEZ Trenches/ducting structures

UG* Structures For Water Supply And Disposal

UGA Structure For Raw Water Supply UGB Structures for neutralization system UGC Structures for demineralization

system UGD Structure For Demineralising

System (Water Treat.) UGE Structure For Neutralisation System UGF Fire Water Tank UGG Miscellaneous Tanks UGH Gen. Drainage Structure UGK Structures for drinking water supply

system UGM Structures for process drainage

system UGN Water Storage Tanks

Page 56: ANNEX 4 2 Technical Documents and Drowings

UGP Sludge Thickener (I/A) UGQ Sludge Dewatering Building (I/E) UGR Sludge Storage Structure (I/A) UGT Structures for water recovery from

waste water UGU Structure For Effluent Disposal UGV Structure For Sewerage Plant UGW Structures for water supply and

disposal UGX Special (Plant Specific) UGY Bridge structures UGZ Ducting Structure

UH* Structures For Conventional Heat. Gen.

UHA Steam Gen. Encl. Steam Gen. Building (B.H.)

UHC Steam generator superstructure (HRSG)

UHN Smoke Stack, Incl. Structure For Fuel Gas Cir.

UHQ Ventilators Structures UHU Structure For Fuel Gas Reheating

System UHV Structure For Combustion Air

Circulation UHX Special Structure (Plant Specific) UHY Bridge structures UHZ Ducting Structure

UL* Structures For Steam, Water, Gas Cycles

ULA Feed water Pump House ULB Structures for steam systems ULC Structure For Condensate System ULF Structures for common installations

of steam-water cycle ULV Underground Septic Tank ULX Special Structure (Plant Specific) ULY Bridge structures ULZ Trenches/ducting structures

UM* Structures For Main Machine Sets UMA Steam Turbine Building UMB Gas Turbine Generators Bldg. UMC ST-Foundation complete UMD GT-Foundation complete UME Foundation for ST-components incl.

air cooled condenser UMF Foundation for GT-components incl.

recooler UMG Structures for gas turbine bypass

stack UMJ Diesel Engine Building UMK Structures for elec. generator plant UMM Compressor Building UMP Turbine Generator Pedestal UMX Special Structure (Plant Specific) UMZ Trenches/ducting structures

UN Structures for process energy supply systems

UNA Structures for process steam system

UND Structures for process hot water systems

UNX Special structures (plant-specific) UNY Bridge structures UNZ Trenches/ducting structures

UP* Structures For Circulating (Cooling) Water System Intake

UPA Sea Or River Cooling Water Intake

UPB Circ. Water Int. Culvert From Int. The P.H.

UPC Pump House UPD Chlorination Building UPE Circ. Water Pipes From Pump

House To T.B. UPX Chemical Dosing Plant UPY Bridge structures UPZ Trenches/ducting structures

UQ* Structures For Circulating (Cooling) Water System Outlet

UQA Discharge Channel Pipes From T.B. To Disc. Basin

UQB Circ. Water Outfall Culvert From D.B. To Out Ch.

UQC Outfall Channel UQD Bridge Channel UQE Routing Structure For Circ. Water

Discharge UQG Structures for central gas supply for

closed gas cycles UQH Structures for auxiliary steam

generating system UQJ Structures for central gas supply

system, incl. inert gas UQK Structures for chilled water systems UQL Structures for aux. steam

distribution UQM Structures for air humidifying

system UQN Sea Water Discharge Culvert UQP Hypo chlorination Plant UQS Structures for central oil supply and

disposal system UQU Structures for sampling system UQX Special structures (plant-specific) UQY Bridge structures UQZ Trenches/ducting structures

US* Structures For Ancillary Systems USA Condition Building USB Structures for space heating

systems USC Structures for stationary

compressed air supply system USD Structures for fire water storage USG Fire Pump House USH Civil works for fire water ring main USJ Civil works for fire water basin USK Special structures (plant-specific) USL Bridge structures USM Trenches/ducting structures USS Dirty Oil Pump UST Workshop And Stores Building USU Chlorination Plant Store USV Laboratories Building

UT* Structures For Auxiliary Systems UTF Compressed Air System Building UTG Central Gas Sup. Sys. Build. H2,

CO2 Sup. Sys. UTH Auxiliary Boilers UTJ Chimney For Aux. Boilers

UX* Structures For External System (Power Plant Specific)

UXA Ducts, Galleries, Structure For Slip., Cable Tunnel.

UXX Special Structure (Plant-Specific) UY* General Service Structures

UYA Service Building UYB Amenities Building

Page 57: ANNEX 4 2 Technical Documents and Drowings

UYC Administration Building UYD Lockers And Canteen Building UYE Car Port & Guard House UYF Security Gate House UYG Information Centre UYH Training Facilities UYJ Medical Centre UYP Fire Station UYR Car Workshop And Garage UYS Fuel Filling Station UYY Bridge

UZ* Structure For Transformer, Traffic Fence Guard.

UZA Works Roadways, Paths, Incl. Assoc. Structure

UZB Fencing, gates and barriers UZC P. Station Urbanisation Station UZD Car Parking Area UZJ Fencing And Gates UZM Protective structures against

external impact UZX Special structures (plant-specific) UZY Bridge structures UZZ Trenches/ducting structures

X** Heavy Machinery (Not Main Machine Sets)

XJ* Diesel Engine Plant XJA Engine XJB Turbocharger, Blower XJG Liquid Cooling System XJH Air Inter-cooling System XJK Transmission Gear Between Prime

Mover And Driven Machine XJN Fuel Systems XJP Starting Equipment (Included

Flywheel) XJQ Air Intake System

XJR Exhaust Gas System XJV Lubricant Supply System XJW Sealing fluid supply system XJX Fluid Supply System For Control

And Protection Equipment XJY Control And Protection Equipment

XK* Generator Plant XKA Gen. Frame Incl. Stat. Rot. And

Cool Equip. XKC Exciter Set

Y** Site

YA* Same As Y YAE Site Preparation YAG Geognostic Survey YAP Piling (I/A)

YAS Structures For Site Preparation YAZ Ducts (Temp. Provision For Site

Prep.)

Z WORKSHOP AND OFFICE EQUIPMENT

Page 58: ANNEX 4 2 Technical Documents and Drowings

Equipment Unit Key

Main Groups

A Mechanical Equipment B Mechanical Equipment C Direct Measuring Circuits D Closed Loop Control Circuits E Analog And Binary Signal Conditioning F Indirect Measuring Circuits (Gated, Corrected, Suppressed) G Electrical Equipment H Subassemblies Of Main And Heavy Machinery

Equipment Unit Key Codes

A Mechanical Equipment AA Valves, Dampers, Etc. (Incl.

Actuators, Also Manual, Rupture Disk, Equipment)

AB Isolating Elements, Air Locks AC Heat Exchangers, Heat Transfer

Surfaces AE Turning, Driving, Lifting And Slewing

Gear (Also Manipulator) AF Continuous Conveyors, Feeders

(Escalators) AG Generator Units AH Heating, Cooling And Air

Conditioning Units AJ Size Reduction Equipment, Only As

Part Of Process AK Compacting And Packaging

Equipment, Only As Part Of Process

AM Mixers, Agitators

AN Compressor Units, Fans AP Pump Units AS Adjusting And Tensioning

Equipment For Non Electrical Variable (Use Only If Final Control Element Itself Forms A Structural Entity With Another Equipment Unit)

AT Cleaning, Drying, Filtering And Separating Equipment, Excl. "BT"

AU Braking, Gearbox, Coupling Equipment, Non Electrical Converters

AV Combustion Equipment AW Stationary Tooling, Treatment

Equipment AX Test And Monitoring Equipment For

Plant Maintenance

B Mechanical Equipment BB Storage Equipment (Vessels,

Tanks) BE Shafts (For Erection And

Maintenance Only) BF Foundations BN Jet Pumps, Ejectors, Injectors BP Flow Restrictors, Limiters, Orifices

(Not Metering Orifices)

BQ Hangers, Supports, Racks, Piping Penetrations

BR Piping, Ductwork, Chutes BS Silencers BT Flue Gas Catalytic Converter

Modules BU Insulation, Sheathing

C Direct Measuring Circuits CD Density CE Electrical Variables (E.G. Current,

Voltage, Power, Electrical Frequency)

CF Flow, Rate CG Distance, Length, Position, Direction

Of Rotation CH Manual Input (As Manually

Operated Sensor/E.G. Fire Detector)

CJ Power (Mechanical, Thermal) CK Time CL Level (Also For Dividing Line) CM Moisture, Humidity

CP Pressure CQ Quality Variables (Analysis Material

Properties Other Than "CD", "CM", "CV")

CR Radiation variables CS Velocity, Speed, Frequency

(Mechanical), Acceleration CT Temperature CU Combined And Other Variables CV Viscosity CW Weight, Mass CY Vibration, Expansion

D Closed Loop Control Circuits DD Density DE Electrical Variables (E.G. Current,

Voltage, Power, Electrical Frequency)

Page 59: ANNEX 4 2 Technical Documents and Drowings

DF Flow Rate DG Distance, Length, Position, Direction

Of Rotation DH Manual input as manually operated

sensor (e.g. fire detector) DJ Power (Mechanical, Thermal) DK Time DL Level (Also For Dividing Line) DM Moisture, Humidity DP Pressure DQ Quality Variables (Analysis, Material

Properties Other Than "DD","DM","DV")

DR Radiation variables DS Velocity, Speed, Frequency

(Mechanical) Acceleration DT Temperature DU Combined And Other Variables DV Viscosity DW Weight, Mass DX Neutron flux DY Vibration Expansion

E Analog And Binary Signal Conditioning EA Open Loop Control (Unit Control) EB Open Loop Control (Group Control) EC Open Loop Control (Subgroup

Control) EE Open Loop Control (Sub loop

Control) EG Alarm. Annunciation (Alarm Logics) EH Alarm, Annunciation (Hard Wired

Alarm Annunciation System) EM Process Computer (Access Control

And NPP Specific Tasks)

EN Process Computer (Status Display Computer, Criterion Display)

EP Process Computer (Supervisory Computer)

ER Reactor protection EU Combined Analogue And Binary

Signal Conditioning EY Protection (Protective Logic, Priority,

Non Equipment Unit Related) EZ Protection (Equipment Unit

Protection)

F Indirect Measuring Circuits (Gated, Corrected, Suppressed, Calculated) FD Density FE Electrical Variables (E.G. Current,

Voltage, Power, Electrical Frequency)

FF Flow, Rate FG Distance, Length, Position, Direction

Of Rotation FJ Power (Mechanical, Thermal) FK Time FL Level (Also For Dividing Line) FM Moisture, Humidity FP Pressure

FQ Quality Variables (Analysis, Material Properties Other Than "FD", "FM", "FV")

FR Radiation variables FS Velocity, Speed, Frequency

(Mechanical), Acceleration FT Temperature FU Combined And Other Variables FV Viscosity FW Weight, Mass FX Neutron flux FY Vibration, Expansion

G Electrical Equipment GA Junction Boxes And Cable/Bus Bar

Penetrations (For Drive Related Binary)

GB Junction Boxes And Cable/Bus Bar Penetrations (For Non Drive Related Binary Transmitters)

GC Junction Boxes And Cable/Bus Bar Penetrations(For Analogue Safety I & C Transmitters Silt)

GD Junction Boxes And Cable/Bus Bar Penetrations (For Power Cables > 1 KV)

GE Junction Boxes And Cable/Bus Bar Penetrations (For Power Cables < 1 KV)

GF Junction Boxes And Cable/Bus Bar Penetrations General Purpose < 60V)

GG Penetrations/Cable Covers GH Electrical And Instrumentation And

Control Installation Units Identified As Per Process System (E.G. Cubicles, Boxes Without Installation Space Code)

GK Information Display And Operator Control Equipment For Process Computers And Automation System

GM Junction Boxes For Light Current Systems Of National Telecommunications Services

GP Junction Boxes For Lighting GQ Sub distribution For Power Sockets GR DC Generating Equipment,

Batteries GS Switchgear Equipment If Not

Identified Under Process Equipment GT Transformer Equipment GU Converter Equipment GV Structure Related Earthing And

Lightning Protection Equipment Surge Arrests

GW Cabinet Power Supply Equipment GX Actuating Equipment For Electrical

Variables GY Junction Boxes For Light Current

System (Not National Common.) GZ Hangers, Supports And Racks For

Electrical And Instrumentation And Control Equipment)

Page 60: ANNEX 4 2 Technical Documents and Drowings

H Subassemblies Of Main And Heavy Machinery HA Machine Stationary Assembly HB Machine Rotating Assembly

HD Bearing Assembly

Page 61: ANNEX 4 2 Technical Documents and Drowings

Component Key

Main Groups

K Mechanical Components M Mechanical Components Q Instrumentation and Control Components (non-electrical) “-“ Electrical Components X Signal Origins Y Gated Signals Z Signal Applications

Component Key Codes

K Mechanical Components KA Gate Valves, Globe Valves,

Dampers, Cocks, Rupture, Disks, Orifices

KB Gates, Doors, Dam Boards KC Heat Exchangers, Coolers KD Vessels, Tanks, Pools, Surge Tanks

(Fluid Systems) KE Turning, Driving, Lifting And Slewing

Gear KF Continuous Conveyors, Feeders KJ Size Reduction Machines

KJ Size Reduction Machines KK Compacting, Packaging Machines KM Mixers, Agitators KN Compressors, Blowers, Fans KP Pumps KT Cleaning Machine, Dryers,

Separators, Filters KV Burners, Grates KW Stationary Tooling And Treatment

Machines For Maintenance

M Mechanical Components MB Brakes MF Foundations MG Gearboxes MK Clutches, Couplings MM Engines, Not Electrical MP Piping Supports

MR Piping Components, Ductwork Components

MS Positioners, Not Electrical MT Turbines MU Transmission Gear, Non Electrical,

Converter And Boosters Other Than Coupling And Gearboxes

Q Instrumentation and Control Components (non-electrical) QB Sensors if not structurally integral

with *QP*, metering orifices QH Signaling devices QN Controllers, flybolt governor QP Measuring instruments, testing

equipment

QR Instrument piping QS Condensation chambers (datum

reservoir)in measuring circuits QT Thermowells and pockets for

protection of sensors

“-” Electrical Components

Page 62: ANNEX 4 2 Technical Documents and Drowings

- A Assemblies And Subassemblies - B Transducers For Non Electrical Variables And Vice Versa - C Capacitors - D Binary Elements, Delay Devices, Memory Devices - E Special Components - F Protective Devices - G Generators, Power Supply - H Signalling Devices - K Relays, Contractors - L Inductors - M Motors - N Amplifiers, Controllers - P Measuring Instruments Testing Equipment - Q Power Switchgear - R Resistors - S Switches, Selectors - T Transformers - U Modulators, Converters From Electrical To Other Electrical - Variables - V Tubes, Semiconductors - W Transmission Paths, Waveguides, Aerials - X Terminals, Plugs, Sockets - Y Electrical Positioners E.G. Solenoids (Not Motors) - Z Termination, Balancing, Equipment, Filters, Limits, Cable Termination, Equalisers, Hybrid

Transformer