ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings:
This page left intentionally blank.
CONSULTANT
NATIONAL ENGINEERING SERVICE PAKISTAN
Power Transmission and Distribution Group Electrotechnical documents
1 2 3 4 5 6 7 8
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8
Date
Drawn
Appr.
Date
D
C
B
Site As Built
Rev.
NESPAK COMM.
21.04.09
11.09.08
20.09.07
Saqib
SI
ASIF
RemarksRev.
Yousuf
Shaikh/Asif
07.05.07
Name Norm
GAKKHAR 500/220/132kV Substation Project
NTDC/WAPDA Ref.no.:132kV Trafo. Protection Panel
A5071 (3)G76001-A5071-U7401-D
A
+R4
=E13
Sheet 1-
1 Sh.
CopyRight (C) Siemens AG 2007 All Rights Reserved
Orig./Repl.f./Repl.by
A1Siemens PAK
NTDC/WAPDA
GAKKHAR 500/220/132kV Substation Project
=E13+R4
132kV Trafo. Protection Panel
Cover sheet
Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/
E13+R4(Rev_D)/
E13+R4.pro
Symbol library
Symbol library
Symbol library
Symbol library
1: 2:
3:
4:
PTD60617
H2_60617
Translate file
Translate file
Translate file
Translate file
A:
B:
C:
D:
b-Feld_e.etr
C_FB_E.etr
ELCAD-Version
7.3.1 SP2
Last used: 25.06.09
Archive: = / A / A / 1
V1.0.0
13.02.2007
Site As Built
LEGEND
1 2 3 4 5 6 7 8
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8
Date
Drawn
Appr.
DateRemarksRev.
Yousuf
Shaikh/Asif
07.05.07
Name Norm
GAKKHAR 500/220/132kV Substation Project
NTDC/WAPDA 132kV Trafo. Protection Panel
A5071 (3)G76001-A5071-S7403
B
+R4
=E13
Sheet 1-
1 Sh.
CopyRight (C) Siemens AG 2007 All Rights Reserved
Orig./Repl.f./Repl.by
Ref.no.:
AA1
BB - I
BB - II
To 11kV Switchgear
To Metering Panel
132kV 2000A
To Busbar Protection Panel
From 11KV
SIDE CT
SYMBOL DESCRIPTION
Siemens PAK
Overview diagram
7.3.1 SP2
Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/
E13+R4(Rev_D)/
E13+R4.pro
Symbol library
Symbol library
Symbol library
Symbol library
1: 2:
3:
4:
PTD60617
H2_60617
Translate file
Translate file
Translate file
Translate file
A:
B:
C:
D:
b-Feld_e.etr
C_FB_E.etr
ELCAD-Version
Archive: = / B / AA / 1
Last used: 25.06.09
V1.0.0
14.06.2004
1600-800-400/1A
3P Core 2
0.2 Core 1
200-100/1A
200-100/1A
200-100/1A
-Q1
Dyn 11
10/13 MVA
132/11.5 KV
Core1
Core2
Core3
Core4
Power Trafo
M
-F1
-T01
-F2
-T5
-Q9
P1
-T1
P2
-Q0
M
-Q2
0.2 15VA
3
200VA
(Y Phase)
10P20 60VA
10P20 30VA
10P20 30VA
(E13 CVT)
132kV / 110-110V
3
M
TCS1
-F87
-F50
87T
50/51
50N/51N
TCS2
50/51
87T
50N/51N
M
M
Circuit Breaker
Differential relay
Surge Arrestor
Power Transformer
Current Transformer
Voltage Transformer
Motorized Earthing Switch
Motorized Disconnector Switch
Over Current & Earth Fault Relay
Site As Built
1 2 3 4 5 6 7 8
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8
Date
Drawn
Appr.
Date
C
B
A
Rev.
NESPAK COMM.
REV.
11.09.08
20.09.07
06.07.07
SI
ASIF
ASIF
RemarksRev.
Yousuf
Shaikh/Asif
07.05.07
Name Norm
GAKKHAR 500/220/132kV Substation Project
NTDC/WAPDA
AC Heating and Power Circuit
132kV Trafo. Protection Panel
A5071 (3)G76001-A5071-S7406-C
S
+R4
=E13
Sheet 1+
2 Sh.
CopyRight (C) Siemens AG 2007 All Rights Reserved
Orig./Repl.f./Repl.by
Ref.no.:
D1Siemens PAK
Circuit diagram
7.3.1 SP2
Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/
E13+R4(Rev_D)/
E13+R4.pro
Symbol library
Symbol library
Symbol library
Symbol library
1: 2:
3:
4:
PTD60617
H2_60617
Translate file
Translate file
Translate file
Translate file
A:
B:
C:
D:
b-Feld_e.etr
C_FB_E.etr
ELCAD-Version
Archive: = / S / D / 1
wiring H07-K 1,5 black,if not other wise specifed
File name: 000127
Last used: 25.06.09
V1.0.0
14.06.2004
=E12
+R3
Line Protection Panel
2-X100
4
NE-031
1X3X4mm2
1
2
1-X100
3-X100
230V AC
2.5mm2
Cubicle Illumination
1
I >
2
-F100
/ZD1.1
3A
-S10121
22/ZD1.1
-H101
X1
X2
/ZD1.1
1/N/PE ~50Hz 230V
-B101
/ZD1.5
-R101
/ZD1.4
-S200 12/ZD1.6
Auto
Manual
L2
23
Cubicle Heating
34
-F102
/ZD1.7
N
Lin
1
I >
2L0
2.5 sq.mm
ELCB& Socket
L
-X50
N
PE
/ZD1.3
N
E
7-X100
8-X100
1
I >
2
-F101
/ZD1.1
6A
/RA3.2
L
DC Supply Supervision
/RA3.2
N
2-X100
4
NE-032
1X3X4mm2
1
2
=E14
+R3
1-X100
3
Line Protection Panel
Site As Built
1 2 3 4 5 6 7 8
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8
Date
Drawn
Appr.
Date
C
B
A
Rev.
NESPAK COMM.
REV.
11.09.08
20.09.07
06.07.07
SI
ASIF
ASIF
RemarksRev.
Yousuf
Shaikh/Asif
07.05.07
Name Norm
GAKKHAR 500/220/132kV Substation Project
NTDC/WAPDA
Maintenance Telephone
132kV Trafo. Protection Panel
A5071 (3)G76001-A5071-S7406-C
S
+R4
=E13
Sheet2-
2 Sh.
CopyRight (C) Siemens AG 2007 All Rights Reserved
Orig./Repl.f./Repl.by
Ref.no.:
D2Siemens PAK
Circuit diagram
7.3.1 SP2
Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/
E13+R4(Rev_D)/
E13+R4.pro
Symbol library
Symbol library
Symbol library
Symbol library
1: 2:
3:
4:
PTD60617
H2_60617
Translate file
Translate file
Translate file
Translate file
A:
B:
C:
D:
b-Feld_e.etr
C_FB_E.etr
ELCAD-Version
Archive: = / S / D / 2
wiring H07-K 1,5 black,if not other wise specifed
Last used: 25.06.09
=E12
+R3
Line Protection Panel
2-X200
4
E12-025
1X4X2.5mm2
1
2
1-X200
3
-X902
/ZD1.5
5
6
Telephone Socket
2-X200
4
E14-024
1X4X2.5mm2
1
2
=E14
+R3
Line Protection Panel
1-X200
3
Site As Built
1 2 3 4 5 6 7 8
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8
Date
Drawn
Appr.
Date
B
A
NESPAK COMM.
REV.
20.09.07
06.07.07
ASIF
ASIF
RemarksRev.
Yousuf
Shaikh/Asif
07.05.07
Name Norm
GAKKHAR 500/220/132kV Substation Project
NTDC/WAPDA
DC Power Supply
132kV Trafo. Protection Panel
A5071 (3)G76001-A5071-S7407-B
S
+R4
=E13
Sheet 1-
1 Sh.
CopyRight (C) Siemens AG 2007 All Rights Reserved
Orig./Repl.f./Repl.by
Ref.no.:
G1Siemens PAK
Circuit diagram
7.3.1 SP2
Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/
E13+R4(Rev_D)/
E13+R4.pro
Symbol library
Symbol library
Symbol library
Symbol library
1: 2:
3:
4:
PTD60617
H2_60617
Translate file
Translate file
Translate file
Translate file
A:
B:
C:
D:
b-Feld_e.etr
C_FB_E.etr
ELCAD-Version
Archive: = / S / G / 1
wiring H07-K 1,5 black,if not other wise specifed
Last used: 25.06.09
V1.0.0
14.06.2004
=E12
+R3
Line Protection Panel
2-X110
4
2-X120
4
2-X130
4
NK-073
1X3X4mm2
2
NK-074
1X3X4mm2
2
NK-075
1X3X4mm2
2
1-X110
3
1-X120
3
1-X130
3
2.5mm2
2II > >
431
-F110
/ZD1.3
6A
A1
A2
-K110
/ZRA1.1
INCOMING SUPPLY A
1314
23
24
2
II > >
431
-F120
/ZD1.3
6A
51
52
1-X140
/NA2.2
1L1+
61
62
4/NA2.2
1L1-
INCOMING SUPPLY B
1L+
1L-
2L+
2L-
3L+
3L-
2/NB2.2
2L1+
A1
A2
-K120
/ZRA1.1
5/NB2.2
2L1-
110V DC
110V DC
110V DC
33L1+
63L1-
-K110
71
72
/ZRA1.1
-H1
X1
X2
/ZD1.1
ALARMS
-K120
71
72
/ZRA1.1
2-X110
4
2-X120
4
2-X130
4
NK-076
1X3X4mm2
1
2
NK-077
1X3X4mm2
1
2
NK-078
1X3X4mm2
1
2
=E14
+R3
1-X110
3
1-X120
3
1-X130
3
Line Protection Panel
Site As Built
1 2 3 4 5 6 7 8
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8
Date
Drawn
Appr.
Date
B
A
NESPAK COMM.
REV.
20.09.07
06.07.07
ASIF
ASIF
RemarksRev.
Yousuf
Shaikh/Asif
07.05.07
Name Norm
GAKKHAR 500/220/132kV Substation Project
NTDC/WAPDA
Lockout with Synch.
132kV Trafo. Protection Panel
A5071 (3)G76001-A5071-S7408-B
S
+R4
=E13
Sheet 1-
1 Sh.
CopyRight (C) Siemens AG 2007 All Rights Reserved
Orig./Repl.f./Repl.by
Ref.no.:
MA1Siemens PAK
Circuit diagram
7.3.1 SP2
Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/
E13+R4(Rev_D)/
E13+R4.pro
Symbol library
Symbol library
Symbol library
Symbol library
1: 2:
3:
4:
PTD60617
H2_60617
Translate file
Translate file
Translate file
Translate file
A:
B:
C:
D:
b-Feld_e.etr
C_FB_E.etr
ELCAD-Version
Archive: = / S / MA / 1
wiring H07-K 1,5 black,if not other wise specifed
Last used: 25.06.09
=E13
/MA4
+S01
Local Control Cubicle
-F64
13
/ZND1.1
-F63
13
/ZND1.1
-F62
13
/ZND1.1
-F61
13
/ZND1.1
-F60
13
/ZND1.1
1-X1
1
E13-026
1X8X2.5mm2
6-X52
Lockout
=E00
/ME4
+CP60
-F65
13
/ZND1.1
-F66
13
/ZND1.1
-F67
13
/ZND1.1
-F68
13
/ZND1.1
-F69
13
/ZND1.1
3
1
E13-025
1X8X2.5mm2
23-X2
24
2E13-025
1X8X2.5mm2
2
2
41 Site As Built
1 2 3 4 5 6 7 8
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8
Date
Drawn
Appr.
Date
C
B
A
Site As Built
NESPAK COMM.
REV.
21.04.09
20.09.07
06.07.07
Saqib
ASIF
ASIF
RemarksRev.
Yousuf
Shaikh/Asif
07.05.07
Name Norm
GAKKHAR 500/220/132kV Substation Project
NTDC/WAPDA
Transformer Differential Protection
132kV Trafo. Protection Panel
A5071 (3)G76001-A5071-S7409-C
S
+R4
=E13
Sheet 1+
3 Sh.
CopyRight (C) Siemens AG 2007 All Rights Reserved
Orig./Repl.f./Repl.by
Ref.no.:
NA1
11K
V SWICHGEAR
132KV CURRENT TRANSFORMER
FROM CURRENT TRANSFORMER
Siemens PAK
Circuit diagram
7.3.1 SP2
Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/
E13+R4(Rev_D)/
E13+R4.pro
Symbol library
Symbol library
Symbol library
Symbol library
1: 2:
3:
4:
PTD60617
H2_60617
Translate file
Translate file
Translate file
Translate file
A:
B:
C:
D:
b-Feld_e.etr
C_FB_E.etr
ELCAD-Version
Archive: = / S / NA / 1
phase L1:Red, L2:Yellow, L3:Blue unless otherwise speifed wires are 4mm2
Last used: 25.06.09
=E13
/SA1
+S01
=E..
+S..
132KV Local Control Cubicle
200:100/1A
-T1, core 2, 60 VA
1-X612
2
3
4
..-X..
..
..
..
E13-917
1X4X6mm2
1
2
3
4
E13-918
1X4X6mm2
1
2
3
4
L1
L2
L3
N
L1
L2
L3
N
1-X600
2
3
4
5
6
7
10-X600
11
12
13
14
15
16
-X87
/ZNA1.1
21
23
25
27
1
3
5
7
2RMLG01
Test block
22
24
26
28
2
4
6
8
-F87
/ZNA1.6
Q1
Q3
Q5
Q7
R1
R3
R5
R7
7UT612
Transformer Differential
Protection Relay
R2
Q2
Q4
R4
R6
R8
Q6
Q8
Site As Built
1 2 3 4 5 6 7 8
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8
Date
Drawn
Appr.
Date
C
B
A
Site As Built
NESPAK COMM.
REV.
21.04.09
20.09.07
06.07.07
Saqib
ASIF
ASIF
RemarksRev.
Yousuf
Shaikh/Asif
07.05.07
Name Norm
GAKKHAR 500/220/132kV Substation Project
NTDC/WAPDA
DC Supply
Transformer Differential Protection
132kV Trafo. Protection Panel
A5071 (3)G76001-A5071-S7409-C
S
+R4
=E13
Sheet2+
3 Sh.
CopyRight (C) Siemens AG 2007 All Rights Reserved
Orig./Repl.f./Repl.by
Ref.no.:
NA2Siemens PAK
Circuit diagram
7.3.1 SP2
Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/
E13+R4(Rev_D)/
E13+R4.pro
Symbol library
Symbol library
Symbol library
Symbol library
1: 2:
3:
4:
PTD60617
H2_60617
Translate file
Translate file
Translate file
Translate file
A:
B:
C:
D:
b-Feld_e.etr
C_FB_E.etr
ELCAD-Version
Archive: = / S / NA / 2
wiring H07-K 1,5 black,if not other wise specifed
Last used: 25.06.09
/G1.41L1-
/G1.41L1+
-X87
/ZNA1.1
-F87
/ZNA1.8
-X87
/ZNA1.1
7UT612
Transformer Differential
Relay Power Supply
13
14
F1
F2
1615
/NA3.21L1-
/NA3.21L1+
Site As Built
1 2 3 4 5 6 7 8
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8
Date
Drawn
Appr.
Date
C
B
A
Site As Built
NESPAK COMM.
REV.
21.04.09
20.09.07
06.07.07
Saqib
ASIF
ASIF
RemarksRev.
Yousuf
Shaikh/Asif
07.05.07
Name Norm
GAKKHAR 500/220/132kV Substation Project
NTDC/WAPDA
Tripping Circuit
132kV Trafo. Protection Panel
A5071 (3)G76001-A5071-S7409-C
S
+R4
=E13
Sheet3-
3 Sh.
CopyRight (C) Siemens AG 2007 All Rights Reserved
Orig./Repl.f./Repl.by
Ref.no.:
NA3Siemens PAK
Circuit diagram
7.3.1 SP2
Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/
E13+R4(Rev_D)/
E13+R4.pro
Symbol library
Symbol library
Symbol library
Symbol library
1: 2:
3:
4:
PTD60617
H2_60617
Translate file
Translate file
Translate file
Translate file
A:
B:
C:
D:
b-Feld_e.etr
C_FB_E.etr
ELCAD-Version
Archive: = / S / NA / 3
wiring H07-K 1,5 black,if not other wise specifed
Last used: 25.06.09
/NA2.41L1+
/NA2.41L1-
-X87
/ZNA1.1
-F87
/ZNA1.8
-X87
/ZNA1.1
7UT612
Transformer Differential
Protection Trip
10
9F11
R4F10
1211
27
28
-F60
/ZND1.1
-F60A
/ZND2.2
da
/RA1.11L1-
/RA1.11L1+
Site As Built
1 2 3 4 5 6 7 8
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8
Date
Drawn
Appr.
Date
C
B
A
Site As Built
NESPAK COMM.
REV.
21.04.09
20.09.07
06.07.07
Saqib
ASIF
ASIF
RemarksRev.
Yousuf
Shaikh/Asif
07.05.07
Name Norm
GAKKHAR 500/220/132kV Substation Project
NTDC/WAPDA
O/C & E/F Protection
132kV Trafo. Protection Panel
A5071 (3)G76001-A5071-S7410-C
S
+R4
=E13
Sheet 1+
3 Sh.
CopyRight (C) Siemens AG 2007 All Rights Reserved
Orig./Repl.f./Repl.by
Ref.no.:
NB1
132KV CTs
CORE 3
Siemens PAK
Circuit diagram
7.3.1 SP2
Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/
E13+R4(Rev_D)/
E13+R4.pro
Symbol library
Symbol library
Symbol library
Symbol library
1: 2:
3:
4:
PTD60617
H2_60617
Translate file
Translate file
Translate file
Translate file
A:
B:
C:
D:
b-Feld_e.etr
C_FB_E.etr
ELCAD-Version
Archive: = / S / NB / 1
phase L1:Red, L2:Yellow, L3:Blue unless otherwise speifed wires are 4mm2
Last used: 25.06.09
=E13
/SA2
+S01
200-100/1A 60VA
1-X613
2
3
4
E13-925
1X4X6mm2
1
2
3
4
L1
L2
L3
N
1-X601
2
3
4
5
6
7
-X50A
/ZNA1.1
21
23
25
27
2RMLG01
Test block
22
24
26
28
-F50
/ZNA1.1
Q8.
Q6.
Q4.
Q2.
7SJ602
O/C & E/F
Protection Relay
Q7
Q5
Q3
Q1
Site As Built
1 2 3 4 5 6 7 8
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8
Date
Drawn
Appr.
Date
C
B
A
Site As Built
NESPAK COMM.
REV.
21.04.09
20.09.07
06.07.07
Saqib
ASIF
ASIF
RemarksRev.
Yousuf
Shaikh/Asif
07.05.07
Name Norm
GAKKHAR 500/220/132kV Substation Project
NTDC/WAPDA
DC SUPPLY
O/C & E/F Protection
132kV Trafo. Protection Panel
A5071 (3)G76001-A5071-S7410-C
S
+R4
=E13
Sheet2+
3 Sh.
CopyRight (C) Siemens AG 2007 All Rights Reserved
Orig./Repl.f./Repl.by
Ref.no.:
NB2Siemens PAK
Circuit diagram
7.3.1 SP2
Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/
E13+R4(Rev_D)/
E13+R4.pro
Symbol library
Symbol library
Symbol library
Symbol library
1: 2:
3:
4:
PTD60617
H2_60617
Translate file
Translate file
Translate file
Translate file
A:
B:
C:
D:
b-Feld_e.etr
C_FB_E.etr
ELCAD-Version
Archive: = / S / NB / 2
wiring H07-K 1,5 black,if not other wise specifed
Last used: 25.06.09
/G1.52L1-
/G1.42L1+
-X50A
/ZNA1.1
-F50
/ZNA1.3
-X50A
/ZNA1.1
O/C & E/F Relay
Power Supply
13
14
F1
F2
1615
/NB3.22L1-
/NB3.22L1+
Site As Built
1 2 3 4 5 6 7 8
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8
Date
Drawn
Appr.
Date
C
B
A
Site As Built
NESPAK COMM.
REV.
21.04.09
20.09.07
06.07.07
Saqib
ASIF
ASIF
RemarksRev.
Yousuf
Shaikh/Asif
07.05.07
Name Norm
GAKKHAR 500/220/132kV Substation Project
NTDC/WAPDA
Tripping Circuit
132kV Trafo. Protection Panel
A5071 (3)G76001-A5071-S7410-C
S
+R4
=E13
Sheet3-
3 Sh.
CopyRight (C) Siemens AG 2007 All Rights Reserved
Orig./Repl.f./Repl.by
Ref.no.:
NB3Siemens PAK
Circuit diagram
7.3.1 SP2
Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/
E13+R4(Rev_D)/
E13+R4.pro
Symbol library
Symbol library
Symbol library
Symbol library
1: 2:
3:
4:
PTD60617
H2_60617
Translate file
Translate file
Translate file
Translate file
A:
B:
C:
D:
b-Feld_e.etr
C_FB_E.etr
ELCAD-Version
Archive: = / S / NB / 3
wiring H07-K 1,5 black,if not other wise specifed
Last used: 25.06.09
/NB2.42L1+
/NB2.42L1-
-X50A
/ZNA1.1
-F50
/ZNA1.3
-X50A
/ZNA1.1
7SJ602
O/C & E/F
Protection Trip
43
F8
R3
F9
65
27
28
-F61
/ZND1.1
-F61A
/ZND2.2
da
/NC1.22L1+
/NC1.22L1- S
ite As Built
1 2 3 4 5 6 7 8
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8
Date
Drawn
Appr.
Date
C
B
A
Rev.
NESPAK COMM.
REV.
11.09.08
20.09.07
06.07.07
SI
ASIF
ASIF
RemarksRev.
Yousuf
Shaikh/Asif
07.05.07
Name Norm
GAKKHAR 500/220/132kV Substation Project
NTDC/WAPDA
Tripping Circuit
132kV Trafo. Protection Panel
A5071 (3)G76001-A5071-S7411-C
S
+R4
=E13
Sheet 1+
2 Sh.
CopyRight (C) Siemens AG 2007 All Rights Reserved
Orig./Repl.f./Repl.by
Ref.no.:
NC1Siemens PAK
Circuit diagram
7.3.1 SP2
Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/
E13+R4(Rev_D)/
E13+R4.pro
Symbol library
Symbol library
Symbol library
Symbol library
1: 2:
3:
4:
PTD60617
H2_60617
Translate file
Translate file
Translate file
Translate file
A:
B:
C:
D:
b-Feld_e.etr
C_FB_E.etr
ELCAD-Version
Archive: = / S / NC / 1
wiring H07-K 1,5 black,if not other wise specifed
Last used: 25.06.09
/NB3.42L1+
/NB3.42L1-
=E..
+R..
11KV Switchgear
11KV Side
Tripping
+P8
10-X1
1
E13-027
1X8X2.5mm2
..-X..
..
2
E13-027
1X8X2.5mm2
6-X1
27
28
-F62
/ZND1.1
-F62A
/ZND2.1
da
/NC2.12L1+
/NC2.12L1-
-F63A
/ZND2.2
da
=E00
/NB3
+RP7
132kV Busbar
Protection Trip
67-X1
1
E13-028
1X4X2.5mm2
7-X1
27
28
-F63
/ZND1.1
83
2
8
Site As Built
1 2 3 4 5 6 7 8
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8
Date
Drawn
Appr.
Date
C
B
A
Rev.
NESPAK COMM.
REV.
11.09.08
20.09.07
06.07.07
SI
ASIF
ASIF
RemarksRev.
Yousuf
Shaikh/Asif
07.05.07
Name Norm
GAKKHAR 500/220/132kV Substation Project
NTDC/WAPDA
Tripping Circuit
132kV Trafo. Protection Panel
A5071 (3)G76001-A5071-S7411-C
S
+R4
=E13
Sheet2-
2 Sh.
CopyRight (C) Siemens AG 2007 All Rights Reserved
Orig./Repl.f./Repl.by
Ref.no.:
NC2Siemens PAK
Circuit diagram
7.3.1 SP2
Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/
E13+R4(Rev_D)/
E13+R4.pro
Symbol library
Symbol library
Symbol library
Symbol library
1: 2:
3:
4:
PTD60617
H2_60617
Translate file
Translate file
Translate file
Translate file
A:
B:
C:
D:
b-Feld_e.etr
C_FB_E.etr
ELCAD-Version
Archive: = / S / NC / 2
wiring H07-K 1,5 black,if not other wise specifed
Last used: 25.06.09
/NC1.42L1-
/NC1.42L1+
=Fan Control
/M7
Panel
Transformer Fan Control Panel
Buchholz
Protection Trip
11-X1
1
E13-029
1X12X2.5mm2
925-X4
-F8
926
2
E13-029
1X12X2.5mm2
13-X1
27
28
-F64
/ZND1.1
-F64A
/ZRA1.6
21
Pressure Relief
Device Trip
945
946
3
14
27
28
-F69
/ZND1.1
Oil Temperature
Trip
917
-F6
918
4
15
27
28
-F65
/ZND1.1
-F65A
/ZRA1.5
21
WindingTemperature
Trip
967
-F7
968
5
16
27
28
-F66
/ZND1.1
-F66A
/ZRA1.5
21
Tap Changer
Protection Trip
921
-F9
922
6
17
27
28
-F67
/ZND1.1
-F67A
/ZRA1.5
21
=Sergi
/SH:9
Fire Protection Panel
Fire Fighting
Trip
12
1
E13-030
1X18X2.5mm2
801
802
2
E13-030
1X18X2.5mm2
18
27
28
-F68
/ZND1.1
723
724
-F68A
/ZRA1.4
21
/RA2.12L1+
/RA2.12L1-
Site As Built
1 2 3 4 5 6 7 8
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8
Date
Drawn
Appr.
Date
C
B
A
Rev.
NESPAK COMM.
REV.
11.09.08
20.09.07
06.07.07
SI
ASIF
ASIF
RemarksRev.
Yousuf
Shaikh/Asif
07.05.07
Name Norm
GAKKHAR 500/220/132kV Substation Project
NTDC/WAPDA
Trip Circuit-1 Supervision
132kV Trafo. Protection Panel
A5071 (3)G76001-A5071-S7412-C
S
+R4
=E13
Sheet 1+
2 Sh.
CopyRight (C) Siemens AG 2007 All Rights Reserved
Orig./Repl.f./Repl.by
Ref.no.:
ND1Siemens PAK
Circuit diagram
7.3.1 SP2
Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/
E13+R4(Rev_D)/
E13+R4.pro
Symbol library
Symbol library
Symbol library
Symbol library
1: 2:
3:
4:
PTD60617
H2_60617
Translate file
Translate file
Translate file
Translate file
A:
B:
C:
D:
b-Feld_e.etr
C_FB_E.etr
ELCAD-Version
Archive: = / S / ND / 1
wiring H07-K 1,5 black,if not other wise specifed
Last used: 25.06.09
=E13
/MA2
+S01
3-X52
26
29
30
51
E13-031
1X8X2.5mm2
1
2
3
4
5
1-X2
2
3
4
5
Transformer
Differential
Protection Trip
-F60
57
/ZND1.1
O/C & E/F
Protection Trip
-F61
57
/ZND1.1
11KV
Protection Trip
-F62
57
/ZND1.1
132KV Busbar
Protection Trip
-F63
57
/ZND1.1
Buchholz
Protection Trip
-F64
57
/ZND1.1
Pressure
Releif Trip
-F69
57
/ZND1.1
Oil Temperature
Protection Trip
-F65
57
/ZND1.1
Winding Temp.
Protection Trip
-F66
57
/ZND1.1
-F67
57
/ZND1.1
Tap Changer
Protection Trip
-F68
57
/ZND1.1
Fire
Protection Trip
1
1
-R1A
/ZND2.8
2
-R2A
/ZND2.8
2
-F701
/ZND2.2
13
14
21
22
RL2
RL3
Trip Circuit 1
Supervision Relay
RL1
27
28
1 -R3
/ZND2.8
2
Site As Built
1 2 3 4 5 6 7 8
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8
Date
Drawn
Appr.
Date
C
B
A
Rev.
NESPAK COMM.
REV.
11.09.08
20.09.07
06.07.07
SI
ASIF
ASIF
RemarksRev.
Yousuf
Shaikh/Asif
07.05.07
Name Norm
GAKKHAR 500/220/132kV Substation Project
NTDC/WAPDA
Trip Circuit-2 Supervision
132kV Trafo. Protection Panel
A5071 (3)G76001-A5071-S7412-C
S
+R4
=E13
Sheet2-
2 Sh.
CopyRight (C) Siemens AG 2007 All Rights Reserved
Orig./Repl.f./Repl.by
Ref.no.:
ND2Siemens PAK
Circuit diagram
7.3.1 SP2
Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/
E13+R4(Rev_D)/
E13+R4.pro
Symbol library
Symbol library
Symbol library
Symbol library
1: 2:
3:
4:
PTD60617
H2_60617
Translate file
Translate file
Translate file
Translate file
A:
B:
C:
D:
b-Feld_e.etr
C_FB_E.etr
ELCAD-Version
Archive: = / S / ND / 2
wiring H07-K 1,5 black,if not other wise specifed
Last used: 25.06.09
=E13
/MA3
+S01
34-X52
37
40
48
58
E13-032
1X8X2.5mm2
1
2
3
4
5
8-X2
9
10
11
12
Transformer
Differential
Protection Trip
-F60
68
/ZND1.1
O/C & E/F
Protection Trip
-F61
68
/ZND1.1
11kV
Protection Trip
-F62
68
/ZND1.1
132KV Busbar
Protection Trip
-F63
68
/ZND1.1
Buchholz
Protection Trip
-F64
68
/ZND1.1
Pressure
Releif Trip
-F69
68
/ZND1.1
Oil Temperature
Protection Trip
-F65
68
/ZND1.1
Winding Temp.
Protection Trip
-F66
68
/ZND1.1
-F67
68
/ZND1.1
Tap Changer
Protection Trip
-F68
68
/ZND1.1
Fire
Protection Trip
1
1
-R4A
/ZND2.8
2
-R5A
/ZND2.8
2
-F702
/ZND2.1
13
14
21
22
RL2
RL3
Trip Circuit 2
Supervision Relay
RL1
27
28
1 -R6
/ZND2.8
2
Site As Built
1 2 3 4 5 6 7 8
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8
Date
Drawn
Appr.
Date
A REV. 06.07.07 ASIF
RemarksRev.
Yousuf
Shaikh/Asif
07.05.07
Name Norm
GAKKHAR 500/220/132kV Substation Project
NTDC/WAPDA
11KV Side Tripping
132kV Trafo. Protection Panel
A5071 (3)G76001-A5071-S7413-A
S
+R4
=E13
Sheet 1-
1 Sh.
CopyRight (C) Siemens AG 2007 All Rights Reserved
Orig./Repl.f./Repl.by
Ref.no.:
NF1Siemens PAK
Circuit diagram
7.3.1 SP2
Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/
E13+R4(Rev_D)/
E13+R4.pro
Symbol library
Symbol library
Symbol library
Symbol library
1: 2:
3:
4:
PTD60617
H2_60617
Translate file
Translate file
Translate file
Translate file
A:
B:
C:
D:
b-Feld_e.etr
C_FB_E.etr
ELCAD-Version
Archive: = / S / NF / 1
wiring H07-K 1,5 black,if not other wise specifed
Last used: 25.06.09
=E..
+S..
11KV Switchgear
17-X2
3
E13-027
1X8X2.5mm2
..-X..
Transformer
Differential Trip
-F60
911/ZND1.1
18-X2
4
..
O/C & E/F
Trip
-F61
911/ZND1.1
132kV Busbar
Trip
-F63
911/ZND1.1
Buchholz
Trip
-F64
911/ZND1.1
Pressure Releif
Device Trip
-F69
911/ZND1.1
Oil Temperature
Trip
-F65
911/ZND1.1
Winding Temperature
Trip
-F66
911/ZND1.1
-F67
911/ZND1.1
Tap Changer
Trip
Fire Protection
Trip
-F68
911/ZND1.1
Site As Built
1 2 3 4 5 6 7 8
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8
Date
Drawn
Appr.
Date
B
A
NESPAK COMM.
REV.
20.09.07
06.07.07
ASIF
ASIF
RemarksRev.
Yousuf
Shaikh/Asif
07.05.07
Name Norm
GAKKHAR 500/220/132kV Substation Project
NTDC/WAPDA
Tripping Annunciation
132kV Trafo. Protection Panel
A5071 (3)G76001-A5071-S7414-B
S
+R4
=E13
Sheet 1+
3 Sh.
CopyRight (C) Siemens AG 2007 All Rights Reserved
Orig./Repl.f./Repl.by
Ref.no.:
RA1Siemens PAK
Circuit diagram
7.3.1 SP2
Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/
E13+R4(Rev_D)/
E13+R4.pro
Symbol library
Symbol library
Symbol library
Symbol library
1: 2:
3:
4:
PTD60617
H2_60617
Translate file
Translate file
Translate file
Translate file
A:
B:
C:
D:
b-Feld_e.etr
C_FB_E.etr
ELCAD-Version
Archive: = / S / RA / 1
wiring H07-K 1,5 black,if not other wise specifed
Last used: 25.06.09
/NA3.41L1+
/NA3.41L1-
110 VDC
-F50
/ZNA1.3
-F81
/ZRA1.7
7SJ602
F3
R5F4
21
Protection
Unhealthy
-F87
/ZNA1.8
7UT612
F3
R5
F4
-F701
/ZND2.3
-F701A
/ZND2.3
Trip Circuit 1
Faulty
13
da
-F702
/ZND2.4
-F702A
/ZND2.3
Trip Circuit 2
Faulty
13
da
=E13
/NA1
+S01
-F20
/ZND2.1
CB
Tripped
-F60
10
12
/ZND1.1
19-X2
3
E13-026
1X8X2.5mm2
1-X11
2-X11
4
E13-026
1X8X2.5mm2
22-X2
da
-F61
10
12
/ZND1.1
-F62
10
12
/ZND1.1
-F63
10
12
/ZND1.1
-F64
10
12
/ZND1.1
-F65
10
12
/ZND1.1
-F66
10
12
/ZND1.1
-F67
10
12
/ZND1.1
-F68
10
12
/ZND1.1
-F69
10
12
/ZND1.1
DC Supply Supervision
A1
A2
-K130
/ZRA1.1
Site As Built
1 2 3 4 5 6 7 8
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8
Date
Drawn
Appr.
Date
B
A
NESPAK COMM.
REV.
20.09.07
06.07.07
ASIF
ASIF
RemarksRev.
Yousuf
Shaikh/Asif
07.05.07
Name Norm
GAKKHAR 500/220/132kV Substation Project
NTDC/WAPDA
Annunciation Function
132kV Trafo. Protection Panel
A5071 (3)G76001-A5071-S7414-B
S
+R4
=E13
Sheet2+
3 Sh.
CopyRight (C) Siemens AG 2007 All Rights Reserved
Orig./Repl.f./Repl.by
Ref.no.:
RA2Siemens PAK
Circuit diagram
7.3.1 SP2
Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/
E13+R4(Rev_D)/
E13+R4.pro
Symbol library
Symbol library
Symbol library
Symbol library
1: 2:
3:
4:
PTD60617
H2_60617
Translate file
Translate file
Translate file
Translate file
A:
B:
C:
D:
b-Feld_e.etr
C_FB_E.etr
ELCAD-Version
Archive: = / S / RA / 2
wiring H07-K 1,5 black,if not other wise specifed
Last used: 25.06.09
/NC2.72L1+
/NC2.72L1-
=Trafo. Aux.
/M8
Control Panel
Transformer Auxiliary Control Panel
-F82
/ZRA1.7
Buchholz
Alarm
20-X2
1
E13-033
1X12X2.5mm2
725-X7
-K11
726-X7
2
E13-033
1X12X2.5mm2
23-X2
21
-F83
/ZRA1.6
Oil Temperature
Alarm
717
-K9
718
3
24
21
-F84
/ZRA1.6
WindingTemperature
Alarm
721
-K10
722
4
25
21
-F85
/ZRA1.6
729
-K12
730
5
26
21
Oil Level Low
Alarm
21
DC Supply Supervision
A1
A2
-K140
/ZRA1.1
Site As Built
1 2 3 4 5 6 7 8
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8
Date
Drawn
Appr.
Date
B
A
NESPAK COMM.
REV.
20.09.07
06.07.07
ASIF
ASIF
RemarksRev.
Yousuf
Shaikh/Asif
07.05.07
Name Norm
GAKKHAR 500/220/132kV Substation Project
NTDC/WAPDA
DC Supply Failure
132kV Trafo. Protection Panel
A5071 (3)G76001-A5071-S7414-B
S
+R4
=E13
Sheet3-
3 Sh.
CopyRight (C) Siemens AG 2007 All Rights Reserved
Orig./Repl.f./Repl.by
Ref.no.:
RA3Siemens PAK
Circuit diagram
7.3.1 SP2
Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/
E13+R4(Rev_D)/
E13+R4.pro
Symbol library
Symbol library
Symbol library
Symbol library
1: 2:
3:
4:
PTD60617
H2_60617
Translate file
Translate file
Translate file
Translate file
A:
B:
C:
D:
b-Feld_e.etr
C_FB_E.etr
ELCAD-Version
Archive: = / S / RA / 3
wiring H07-K 1,5 black,if not other wise specifed
Last used: 25.06.09
/D1.6L
/D1.6N
230V AC, 50Hz
DC Supply Failure
-K110
81
82
/ZRA1.1
A1
A2
-K270.
/ZRA1.1
-K120
81
82
/ZRA1.1
-K130
81
82
/ZRA1.1
-K140
81
82
/ZRA1.1
Site As Built
1 2 3 4 5 6 7 8
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8
Date
Drawn
Appr.
Date
D
C
B
Site As Built
Rev.
NESPAK COMM.
21.04.09
11.09.08
20.09.07
Saqib
SI
ASIF
RemarksRev.
Yousuf
Shaikh/Asif
07.05.07
Name Norm
GAKKHAR 500/220/132kV Substation Project
NTDC/WAPDA
Annunciation Function
132kV Trafo. Protection Panel
A5071 (3)G76001-A5071-S7415-D
S
+R4
=E13
Sheet 1+
7 Sh.
CopyRight (C) Siemens AG 2007 All Rights Reserved
Orig./Repl.f./Repl.by
Ref.no.:
RB1Siemens PAK
Circuit diagram
7.3.1 SP2
Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/
E13+R4(Rev_D)/
E13+R4.pro
Symbol library
Symbol library
Symbol library
Symbol library
1: 2:
3:
4:
PTD60617
H2_60617
Translate file
Translate file
Translate file
Translate file
A:
B:
C:
D:
b-Feld_e.etr
C_FB_E.etr
ELCAD-Version
Archive: = / S / RB / 1
wiring H07-K 1,5 black,if not other wise specifed
Last used: 25.06.09
=E13
/RA3
+CP51
Remote Control Panel
1-X9
1
E13-012
1X18X2.5mm2
17-X9
Transformer
Differential
Protection Trip
-F60
13
15
/ZND1.1
2
2
49
O/C & E/F
Protection Trip
-F61
13
15
/ZND1.1
3
3
50
Buchholz
Trip
-F64
13
15
/ZND1.1
4
4
51
Oil Temperature
Trip
-F65
13
15
/ZND1.1
5
5
52
Winding
Temperature
Trip
-F66
13
15
/ZND1.1
6
6
53
Tap Changer
Trip
-F67
13
15
/ZND1.1
7
7
54
Fire Protection
Trip
-F68
13
15
/ZND1.1
8
8
55
-F63A
/ZND2.2
10
Busbar
Protection
11
1
9
10
57
11KV Side
Trip
-F62
13
15
/ZND1.1
10
9
56
-F20
/ZND2.1
10
CB
Tripped
11
1
11
12
59
Pressure relief
Device Trip
-F69
13
15
/ZND1.1
12
11
58
Site As Built
1 2 3 4 5 6 7 8
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8
Date
Drawn
Appr.
Date
D
C
B
Site As Built
Rev.
NESPAK COMM.
21.04.09
11.09.08
20.09.07
Saqib
SI
ASIF
RemarksRev.
Yousuf
Shaikh/Asif
07.05.07
Name Norm
GAKKHAR 500/220/132kV Substation Project
NTDC/WAPDA
Annunciation Function
132kV Trafo. Protection Panel
A5071 (3)G76001-A5071-S7415-D
S
+R4
=E13
Sheet2+
7 Sh.
CopyRight (C) Siemens AG 2007 All Rights Reserved
Orig./Repl.f./Repl.by
Ref.no.:
RB2Siemens PAK
Circuit diagram
7.3.1 SP2
Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/
E13+R4(Rev_D)/
E13+R4.pro
Symbol library
Symbol library
Symbol library
Symbol library
1: 2:
3:
4:
PTD60617
H2_60617
Translate file
Translate file
Translate file
Translate file
A:
B:
C:
D:
b-Feld_e.etr
C_FB_E.etr
ELCAD-Version
Archive: = / S / RB / 2
wiring H07-K 1,5 black,if not other wise specifed
Last used: 25.06.09
=E13
/RA2
+CP51
Remote Control Panel
13-X9
1
E13-011
1X12X2.5mm2
9-X9
-F81
/ZRA1.7
11
Device
Unhealthy
73
14
2
37
AC Supply
Failure
-F100
11
12
/ZD1.1
15
5
40
-F101
11
12
/ZD1.1
-F102
/ZD1.8
11
14
12
-F701A
/ZND2.3
10
Trip Circuit Ckt. 1
Faulty
11
116
3
38
-F702A
/ZND2.3
10 11
1
17
4
39
Trip Circuit Ckt. 2
Faulty
18
1
E13-017
1X4X2.5mm2
1-X10
DC Supply
Failure
/RA4
-K270.
13
14
/ZRA1.1
19
2
10
20-X9
3
E13-017
1X4X2.5mm2
5-X10
Sergi Box
DC Supply
Failure
=Sergi
11
E13-030
1X18X2.5mm2
803
11
12
804
12
E13-030
1X18X2.5mm2
21
4
16
Site As Built
1 2 3 4 5 6 7 8
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8
Date
Drawn
Appr.
Date
D
C
B
Site As Built
Rev.
NESPAK COMM.
21.04.09
11.09.08
20.09.07
Saqib
SI
ASIF
RemarksRev.
Yousuf
Shaikh/Asif
07.05.07
Name Norm
GAKKHAR 500/220/132kV Substation Project
NTDC/WAPDA
Events Recorder
132kV Trafo. Protection Panel
A5071 (3)G76001-A5071-S7415-D
S
+R4
=E13
Sheet3+
7 Sh.
CopyRight (C) Siemens AG 2007 All Rights Reserved
Orig./Repl.f./Repl.by
Ref.no.:
RB3Siemens PAK
Circuit diagram
7.3.1 SP2
Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/
E13+R4(Rev_D)/
E13+R4.pro
Symbol library
Symbol library
Symbol library
Symbol library
1: 2:
3:
4:
PTD60617
H2_60617
Translate file
Translate file
Translate file
Translate file
A:
B:
C:
D:
b-Feld_e.etr
C_FB_E.etr
ELCAD-Version
Archive: = / S / RB / 3
wiring H07-K 1,5 black,if not other wise specifed
Last used: 25.06.09
=Event
+Recorder
Events Recorder
1-X10
1
E13-034
1X27X2.5mm2
2-X4
2 3
-F60A
/ZND2.2
10
Transformer
Differential
Protection Trip
11
1
4
2
47-X3
-F61A
/ZND2.2
10
O/C & E/F
Protection Trip
11
1
5
3
48
-F63A
/ZND2.2
20
Busbar
Protection
21
2
6
4
49
-F20
/ZND2.1
20
CB
Tripped
21
2
7
5
50
-F81
/ZRA1.7
12
Device
Unhealthy
84
8
6
51
-F62A
/ZND2.1
10
11KV Side
Trip
11
1
9
752
-F701A
/ZND2.3
20
21
2
11
9
53
Trip Circuit-1
Faulty
-F702A
/ZND2.3
20
21
2
12
10
54
Trip Circuit-2
Faulty
27
22
3-X21
DC Supply
Failure
-K270.
43
44
/ZRA1.1
10
8
403-X3
Site As Built
1 2 3 4 5 6 7 8
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8
Date
Drawn
Appr.
Date
D
C
B
Site As Built
Rev.
NESPAK COMM.
21.04.09
11.09.08
20.09.07
Saqib
SI
ASIF
RemarksRev.
Yousuf
Shaikh/Asif
07.05.07
Name Norm
GAKKHAR 500/220/132kV Substation Project
NTDC/WAPDA
Events Recorder
132kV Trafo. Protection Panel
A5071 (3)G76001-A5071-S7415-D
S
+R4
=E13
Sheet4+
7 Sh.
CopyRight (C) Siemens AG 2007 All Rights Reserved
Orig./Repl.f./Repl.by
Ref.no.:
RB4Siemens PAK
Circuit diagram
7.3.1 SP2
Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/
E13+R4(Rev_D)/
E13+R4.pro
Symbol library
Symbol library
Symbol library
Symbol library
1: 2:
3:
4:
PTD60617
H2_60617
Translate file
Translate file
Translate file
Translate file
A:
B:
C:
D:
b-Feld_e.etr
C_FB_E.etr
ELCAD-Version
Archive: = / S / RB / 4
wiring H07-K 1,5 black,if not other wise specifed
Last used: 25.06.09
=Event
+Recorder
Events Recorder
14-X10
11
E13-034
1X27X2.5mm2
3-X4
-F82
/ZRA1.7
11
Buchholz
Alarm
73
15
12
86-X3
-F85
/ZRA1.6
11
Oil Level
Low Alarm
73
16
13
87
-F83
/ZRA1.6
11
Oil Temp. hi
Alarm
73
17
14
88
-F84
/ZRA1.6
11 7
3
18
15
89
Winding
Temperature
High Alarm
21
164-X4
-F64A
/ZRA1.6
11
Buchholz
Trip
73
22
17
90-X3
-F65A
/ZRA1.5
11
Oil Temperature
Trip
73
23
18
91
-F66A
/ZRA1.5
11
Winding
Temperature
Trip
73
24
19
92
-F67A
/ZRA1.5
11
Tap Changer
Protection Trip
73
25
20
93
-F68A
/ZRA1.4
11
Fire Protection
System Trip
73
26
21
94
Site As Built
1 2 3 4 5 6 7 8
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8
Date
Drawn
Appr.
Date
D
C
B
Site As Built
Rev.
NESPAK COMM.
21.04.09
11.09.08
20.09.07
Saqib
SI
ASIF
RemarksRev.
Yousuf
Shaikh/Asif
07.05.07
Name Norm
GAKKHAR 500/220/132kV Substation Project
NTDC/WAPDA
Fault Recorder Function
132kV Trafo. Protection Panel
A5071 (3)G76001-A5071-S7415-D
S
+R4
=E13
Sheet5+
7 Sh.
CopyRight (C) Siemens AG 2007 All Rights Reserved
Orig./Repl.f./Repl.by
Ref.no.:
RB5Siemens PAK
Circuit diagram
7.3.1 SP2
Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/
E13+R4(Rev_D)/
E13+R4.pro
Symbol library
Symbol library
Symbol library
Symbol library
1: 2:
3:
4:
PTD60617
H2_60617
Translate file
Translate file
Translate file
Translate file
A:
B:
C:
D:
b-Feld_e.etr
C_FB_E.etr
ELCAD-Version
Archive: = / S / RB / 5
wiring H07-K 1,5 black,if not other wise specifed
Last used: 25.06.09
=E00
+XE01
Fault Recorder
1-X11
1
E13-035
1X18X2.5mm2
18-X151
2
-F60A
/ZND2.2
20
Transformer
Differential
Protection Trip
21
2
3
2
4-X209
-F61A
/ZND2.2
20
O/C & E/F
Protection Trip
21
2
4
3
5
-F20
/ZND2.1
30
CB
Tripped
31
3
5
4
6
Buchholz
Trip
-F64
17
19
/ZND1.1
6
5
7
Oil Temperature
Trip
-F65
17
19
/ZND1.1
7
6
8
Winding
Temperature
Trip
-F66
17
19
/ZND1.1
8
7
9
Tap Changer
Protection Trip
-F67
17
19
/ZND1.1
9
8
10
Fire Protection
System Trip
-F68
17
19
/ZND1.1
10
9
11
-F62A
/ZND2.1
20
11KV Side
Trip
21
2
11
10
12
-F63A
/ZND2.2
30
Busbar Protection
Trip
31
3
12
11
13
Site As Built
1 2 3 4 5 6 7 8
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8
Date
Drawn
Appr.
Date
D
C
B
Site As Built
Rev.
NESPAK COMM.
21.04.09
11.09.08
20.09.07
Saqib
SI
ASIF
RemarksRev.
Yousuf
Shaikh/Asif
07.05.07
Name Norm
GAKKHAR 500/220/132kV Substation Project
NTDC/WAPDA
Scada Function
132kV Trafo. Protection Panel
A5071 (3)G76001-A5071-S7415-D
S
+R4
=E13
Sheet6+
7 Sh.
CopyRight (C) Siemens AG 2007 All Rights Reserved
Orig./Repl.f./Repl.by
Ref.no.:
RB6Siemens PAK
Circuit diagram
7.3.1 SP2
Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/
E13+R4(Rev_D)/
E13+R4.pro
Symbol library
Symbol library
Symbol library
Symbol library
1: 2:
3:
4:
PTD60617
H2_60617
Translate file
Translate file
Translate file
Translate file
A:
B:
C:
D:
b-Feld_e.etr
C_FB_E.etr
ELCAD-Version
Archive: = / S / RB / 6
wiring H07-K 1,5 black,if not other wise specifed
Last used: 25.06.09
=SCADA
+PANEL
1-X12
1
E13-036
1X4X2.5mm2
..-X..
Scada Interface Cubicle
Transformer
Differential
Protection Trip
-F60
14
16
/ZND1.1
2
2
..
O/C & E/F
Protection Trip
-F61
14
16
/ZND1.1
3
Buchholz
Trip
-F64
14
16
/ZND1.1
4
Oil Temp.
High Trip
-F65
14
16
/ZND1.1
5
Winding
Temperature
High Trip
-F66
14
16
/ZND1.1
6
Tap Changer
Trip
-F67
14
16
/ZND1.1
7
Fire Protection
Trip
-F68
14
16
/ZND1.1
8
-F20
/ZND2.1
40
CB
Tripped
41
4
9
-F701A
/ZND2.3
30
Trip Ckt. 1
Faulty
31
3
10
-F702A
/ZND2.3
30
Trip Ckt. 2
Faulty
31
3
11
-F62A
/ZND2.1
30
11KV Side
Trip
31
3
12
-F63A
/ZND2.2
40
Busbar
Protection
41
4
13
Site As Built
1 2 3 4 5 6 7 8
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8
Date
Drawn
Appr.
Date
D
C
B
Site As Built
Rev.
NESPAK COMM.
21.04.09
11.09.08
20.09.07
Saqib
SI
ASIF
RemarksRev.
Yousuf
Shaikh/Asif
07.05.07
Name Norm
GAKKHAR 500/220/132kV Substation Project
NTDC/WAPDA
Fire Protection Circuit
132kV Trafo. Protection Panel
A5071 (3)G76001-A5071-S7415-D
S
+R4
=E13
Sheet7-
7 Sh.
CopyRight (C) Siemens AG 2007 All Rights Reserved
Orig./Repl.f./Repl.by
Ref.no.:
RB7Siemens PAK
Circuit diagram
7.3.1 SP2
Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/
E13+R4(Rev_D)/
E13+R4.pro
Symbol library
Symbol library
Symbol library
Symbol library
1: 2:
3:
4:
PTD60617
H2_60617
Translate file
Translate file
Translate file
Translate file
A:
B:
C:
D:
b-Feld_e.etr
C_FB_E.etr
ELCAD-Version
Archive: = / S / RB / 7
wiring H07-K 1,5 black,if not other wise specifed
Last used: 25.06.09
=Sergi
/SH:4
1-X13
3
E13-030
1X18X2.5mm2
201-X
Fire Protection Panel
2
Differential
Trip
-F60A
/ZND2.230
31
3
3
4
202
4
5
203
O/C & E/F
Trip
-F61A
/ZND2.2
30
31
3
5
6
204
6
7
205
Tap Changer Protection
Trip
-F67A
/ZRA1.5
12 8
4
7
8
206
8
9
207
Buchholz
Trip
-F64A
/ZRA1.6
12 8
4
9
10
208
Site As Built
1 2 3 4 5 6 7 8
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8
Date
Drawn
Appr.
Date
B
A
Rev.
NESPAK COMM.
11.09.08
20.09.07
SI
ASIF
RemarksRev.
Yousuf
Shaikh/Asif
07.05.07
Name Norm
GAKKHAR 500/220/132kV Substation Project
NTDC/WAPDA 132kV Trafo. Protection Panel
A5071 (3)G76001-A5071-S7416-B
S
+R4
=E13
Sheet 1-
1 Sh.
CopyRight (C) Siemens AG 2007 All Rights Reserved
Orig./Repl.f./Repl.by
Ref.no.:
ZD1Siemens PAK
List of Device
7.3.1 SP2
Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/
E13+R4(Rev_D)/
E13+R4.pro
Symbol library
Symbol library
Symbol library
Symbol library
1: 2:
3:
4:
PTD60617
H2_60617
Translate file
Translate file
Translate file
Translate file
A:
B:
C:
D:
b-Feld_e.etr
C_FB_E.etr
ELCAD-Version
Archive: = / S / ZD / 1
Last used: 25.06.09
V1.0.0
14.06.2004
-F100/D1.3
/RB2.3
-F101
/D1.6
/RB2.3
-S101
/D1.3
-H101
/D1.3
-H1
/G1.6
X1
X2
1
I >
2
1314
23
24
21
22
11
12
-F110
/G1.3
-F120
/G1.4
-X50
/D1.6
1
II > >
342
-R101
23
24
23
L N PE
/D1.4
11
12 L.
2
-X
.
.
-X902
-B101
/D2.5
/D1.4
-S200
/D1.5
/D1.4
-F102
N
/D1.5
Lin
I >
-S200
34
L0
12
N
E
11 1412
/RB2.4
Site As Built
1 2 3 4 5 6 7 8
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8
Date
Drawn
Appr.
DateRemarksRev.
Yousuf
Shaikh/Asif
07.05.07
Name Norm
GAKKHAR 500/220/132kV Substation Project
NTDC/WAPDA 132kV Trafo. Protection Panel
A5071 (3)G76001-A5071-S7417
S
+R4
=E13
Sheet 1-
1 Sh.
CopyRight (C) Siemens AG 2007 All Rights Reserved
Orig./Repl.f./Repl.by
Ref.no.:
ZNA1Siemens PAK
List of Device
7.3.1 SP2
Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/
E13+R4(Rev_D)/
E13+R4.pro
Symbol library
Symbol library
Symbol library
Symbol library
1: 2:
3:
4:
PTD60617
H2_60617
Translate file
Translate file
Translate file
Translate file
A:
B:
C:
D:
b-Feld_e.etr
C_FB_E.etr
ELCAD-Version
Archive: = / S / ZNA / 1
File name: 000162
Last used: 25.06.09
-X87
-X50A
-F50
2RMLG01
/NB1.5
/NB1.5
/NB1.5
/NB1.5
Q8
Q7
7SJ602
F14
F15
F17
F18
Binary inputs:
BE1
F9
F8
F11
F10
IL1
BE2
BE3
R3
R4
F16
Serial
Interf. BOption
Q6
Q5IL2
Q4
Q3IL3
Q2
3I0Q1
F1
F2Power
Supply
L+
L-
Command/alarm 3
Command/alarm 4
F5
Command/alarm 1
F6
F7
R1
R2Command/alarm 2
Live contact
F4
F3R5
12
/NA1.4
34
/NA1.4
/NB3.3
56
/NA1.4
/NB3.3
78
/NA1.4
910
/NA3.3
1112
/NA3.3
-F50
1314
/NA2.3
/NB2.3
/NB3.3
/RA1.2
/RA1.2
/NB2.3
1516
/NA2.3
/NB2.3
1718
1920
21
22
/NA1.4
/NB1.4
23
24
/NA1.4
/NB1.4
25
26
/NA1.4
/NB1.4
-F87
27
28
/NA1.4
/NB1.4
/NA1.5
/NA1.5
/NA1.5
/NA1.5
/NA1.5
/NA1.5
/NA1.5
/NA1.5
Q1
Q2
F14
F15
F16
Binary inputs:
BI1
I1L1
BI2
Q3
Q4I1L2
Q5
Q6I1L3
Q7
I7
F17
BI3
F11
F10
F13
F12
R3
R4
Command/alarm 3
Command/alarm 4
7UT612
C Option
F18
B Option
A Option
Serial Interfaces
F1
F2Power
Supply
L+
L-
Q8
R1
R2I2L1
R3
R4I2L2
R5
R6I2L3
R7
I8R8
F5Live contact
F3
F4M1
Command/alarm 1 F7
F6R1
Command/alarm 2 F9
F8R2
-F87
/NA2.3
/NA3.3
/RA1.3
/RA1.3
Site As Built
1 2 3 4 5 6 7 8
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8
Date
Drawn
Appr.
Date
C
B
A
Rev.
NESPAK COMM.
REV.
11.09.08
20.09.07
06.07.07
SI
ASIF
ASIF
RemarksRev.
Yousuf
Shaikh/Asif
07.05.07
Name Norm
GAKKHAR 500/220/132kV Substation Project
NTDC/WAPDA 132kV Trafo. Protection Panel
A5071 (3)G76001-A5071-S7418-C
S
+R4
=E13
Sheet 1+
2 Sh.
CopyRight (C) Siemens AG 2007 All Rights Reserved
Orig./Repl.f./Repl.by
Ref.no.:
ZND1Siemens PAK
List of Device
7.3.1 SP2
Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/
E13+R4(Rev_D)/
E13+R4.pro
Symbol library
Symbol library
Symbol library
Symbol library
1: 2:
3:
4:
PTD60617
H2_60617
Translate file
Translate file
Translate file
Translate file
A:
B:
C:
D:
b-Feld_e.etr
C_FB_E.etr
ELCAD-Version
Archive: = / S / ZND / 1
Last used: 25.06.09
-F60/NA3.3
/ND2.3
/MA1.3
/ND1.3
/NF1.2
/RA1.4
/RB1.2
/RB6.2
-F61
/NB3.3
/ND2.3
/MA1.3
/ND1.3
/NF1.3
/RA1.5
/RB1.3
/RB6.3
-F62
/NC1.3
/ND2.4
/MA1.3
/ND1.4
/RA1.5
/RB1.7
-F63
/NC1.5
/ND2.4
/MA1.3
/ND1.4
/NF1.3
/RA1.5
-F64
/NC2.2
/ND2.5
/MA1.3
/ND1.4
/NF1.4
/RA1.6
/RB1.3
/RB6.3
/RB5.4
-F65
/NC2.3
/ND2.5
/MA1.5
/ND1.5
/NF1.5
/RA1.6
/RB1.4
/RB6.4
/RB5.5
-F66
/NC2.4
/ND2.6
/MA1.5
/ND1.6
/NF1.5
/RA1.6
/RB1.5
/RB6.4
/RB5.5
-F67
/NC2.5
/ND2.6
/MA1.5
/ND1.6
/NF1.6
/RA1.7
/RB1.5
/RB6.5
/RB5.6
-F68
/NC2.6
/ND2.7
/MA1.5
/ND1.7
/NF1.6
/RA1.7
/RB1.6
/RB6.5
/RB5.6
-F69
/NC2.3
/ND2.5
/MA1.5
/ND1.5
/NF1.4
/RA1.7
/RB1.8
27
28
MVAJ25
13
24
57
68
911
10
12
13
15
14
16
17
19
21
23
Site As Built
1 2 3 4 5 6 7 8
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8
Date
Drawn
Appr.
Date
C
B
A
Rev.
NESPAK COMM.
REV.
11.09.08
20.09.07
06.07.07
SI
ASIF
ASIF
RemarksRev.
Yousuf
Shaikh/Asif
07.05.07
Name Norm
GAKKHAR 500/220/132kV Substation Project
NTDC/WAPDA 132kV Trafo. Protection Panel
A5071 (3)G76001-A5071-S7418-C
S
+R4
=E13
Sheet2-
2 Sh.
CopyRight (C) Siemens AG 2007 All Rights Reserved
Orig./Repl.f./Repl.by
Ref.no.:
ZND2Siemens PAK
List of Device
7.3.1 SP2
Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/
E13+R4(Rev_D)/
E13+R4.pro
Symbol library
Symbol library
Symbol library
Symbol library
1: 2:
3:
4:
PTD60617
H2_60617
Translate file
Translate file
Translate file
Translate file
A:
B:
C:
D:
b-Feld_e.etr
C_FB_E.etr
ELCAD-Version
Archive: = / S / ZND / 2
Last used: 25.06.09
-F702
-F62A
/ND2.8
/ND2.8
/ND2.8
/ND2.8
/ND2.8
/ND2.8
/NC1.3
/RB3.5
/RB5.7
/RB6.7
-F20
-F701
/RA1.4
/RB1.7
/RB3.4
/RB5.3
/RB6.6
-F60A
/ND1.8
/ND1.8
/ND1.8
/ND1.8
/ND1.8
/ND1.8
/NA3.3
/RB3.2
/RB5.2
/RB7.2
-F61A
/NB3.3
/RB3.3
/RB5.3
/RB7.3
27
28
-F63A
13
14
21
22
RL2
RL3
/NC1.4
/RB1.6
/RB3.3
/RB5.8
/RB6.8
-F702A
RL1
/RA1.4
/RB2.5
/RB3.6
/RB6.7
-F701A
/RA1.3
/RB2.4
/RB3.5
/RB6.6
1
3
2
4
5
7
-F701
7PA26
30
331
40
441
50
551
60
661
70
771
80
881
K1
K1
K1
K1
K1
K1
10
111
20
221
K1
K1
ad Trip K1
/RA1.3
-F702
/RA1.4
-R1A
-R2A
-R3
-R4A
-R5A
-R6
23
/ND1.7
/ND1.7
/ND1.8
/ND2.7
/ND2.7
/ND2.8
Site As Built
1 2 3 4 5 6 7 8
F
E
D
C
B
A
F
E
D
C
B
A
1 2 3 4 5 6 7 8
Date
Drawn
Appr.
Date
A NESPAK COMM.20.09.07 ASIF
RemarksRev.
Yousuf
Shaikh/Asif
07.05.07
Name Norm
GAKKHAR 500/220/132kV Substation Project
NTDC/WAPDA 132kV Trafo. Protection Panel
A5071 (3)G76001-A5071-S7419-A
S
+R4
=E13
Sheet 1-
1 Sh.
CopyRight (C) Siemens AG 2007 All Rights Reserved
Orig./Repl.f./Repl.by
Ref.no.:
ZRA1Siemens PAK
List of Device
7.3.1 SP2
Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/
E13+R4(Rev_D)/
E13+R4.pro
Symbol library
Symbol library
Symbol library
Symbol library
1: 2:
3:
4:
PTD60617
H2_60617
Translate file
Translate file
Translate file
Translate file
A:
B:
C:
D:
b-Feld_e.etr
C_FB_E.etr
ELCAD-Version
Archive: = / S / ZRA / 1
Last used: 25.06.09
-K110
/G1.3
/G1.4
/G1.4
/G1.4
/G1.4
/G1.6
/RA3.4
-K120
/G1.5
/G1.6
/RA3.5
-K130
/RA1.8
/RA3.5
-K140
/RA2.5
/RA3.6
-K270.
/RA3.4
/RB3.7
/RB2.6
A1
A2
13
14
23
24
A1
A2
13
14
33
34
21
22
43
44
31
32
51
52
43
44
61
62
71
72
81
82
-F68A
/NC2.7
/RB4.8
-F67A
/NC2.6
/RB4.7
/RB7.4
-F66A
/NC2.5
/RB4.7
-F65A
/NC2.4
/RB4.6
-F64A
/NC2.2
/RB4.6
/RB7.6
-F85
/RA2.4
/RB4.2
-F84
/RA2.3
/RB4.3
-F83
/RA2.2
/RB4.3
-F82
/RA2.2
/RB4.2
-F81
/RA1.2
/RB2.2
/RB3.4
7PA27
13
59
14
610
K1
K1
11
37
12
48
K1
K1
12 Trip K1
Site As Built
This Page intentionally left blank.