36
ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings:

ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK

  • Upload
    others

  • View
    31

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK

ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings:

Page 2: ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK

This page left intentionally blank.

Page 3: ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK

CONSULTANT

NATIONAL ENGINEERING SERVICE PAKISTAN

Power Transmission and Distribution Group Electrotechnical documents

1 2 3 4 5 6 7 8

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8

Date

Drawn

Appr.

Date

D

C

B

Site As Built

Rev.

NESPAK COMM.

21.04.09

11.09.08

20.09.07

Saqib

SI

ASIF

RemarksRev.

Yousuf

Shaikh/Asif

07.05.07

Name Norm

GAKKHAR 500/220/132kV Substation Project

NTDC/WAPDA Ref.no.:132kV Trafo. Protection Panel

A5071 (3)G76001-A5071-U7401-D

A

+R4

=E13

Sheet 1-

1 Sh.

CopyRight (C) Siemens AG 2007 All Rights Reserved

Orig./Repl.f./Repl.by

A1Siemens PAK

NTDC/WAPDA

GAKKHAR 500/220/132kV Substation Project

=E13+R4

132kV Trafo. Protection Panel

Cover sheet

Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

E13+R4(Rev_D)/

E13+R4.pro

Symbol library

Symbol library

Symbol library

Symbol library

1: 2:

3:

4:

PTD60617

H2_60617

Translate file

Translate file

Translate file

Translate file

A:

B:

C:

D:

b-Feld_e.etr

C_FB_E.etr

ELCAD-Version

7.3.1 SP2

Last used: 25.06.09

Archive: = / A / A / 1

V1.0.0

13.02.2007

Site As Built

Page 4: ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK

LEGEND

1 2 3 4 5 6 7 8

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8

Date

Drawn

Appr.

DateRemarksRev.

Yousuf

Shaikh/Asif

07.05.07

Name Norm

GAKKHAR 500/220/132kV Substation Project

NTDC/WAPDA 132kV Trafo. Protection Panel

A5071 (3)G76001-A5071-S7403

B

+R4

=E13

Sheet 1-

1 Sh.

CopyRight (C) Siemens AG 2007 All Rights Reserved

Orig./Repl.f./Repl.by

Ref.no.:

AA1

BB - I

BB - II

To 11kV Switchgear

To Metering Panel

132kV 2000A

To Busbar Protection Panel

From 11KV

SIDE CT

SYMBOL DESCRIPTION

Siemens PAK

Overview diagram

7.3.1 SP2

Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

E13+R4(Rev_D)/

E13+R4.pro

Symbol library

Symbol library

Symbol library

Symbol library

1: 2:

3:

4:

PTD60617

H2_60617

Translate file

Translate file

Translate file

Translate file

A:

B:

C:

D:

b-Feld_e.etr

C_FB_E.etr

ELCAD-Version

Archive: = / B / AA / 1

Last used: 25.06.09

V1.0.0

14.06.2004

1600-800-400/1A

3P Core 2

0.2 Core 1

200-100/1A

200-100/1A

200-100/1A

-Q1

Dyn 11

10/13 MVA

132/11.5 KV

Core1

Core2

Core3

Core4

Power Trafo

M

-F1

-T01

-F2

-T5

-Q9

P1

-T1

P2

-Q0

M

-Q2

0.2 15VA

3

200VA

(Y Phase)

10P20 60VA

10P20 30VA

10P20 30VA

(E13 CVT)

132kV / 110-110V

3

M

TCS1

-F87

-F50

87T

50/51

50N/51N

TCS2

50/51

87T

50N/51N

M

M

Circuit Breaker

Differential relay

Surge Arrestor

Power Transformer

Current Transformer

Voltage Transformer

Motorized Earthing Switch

Motorized Disconnector Switch

Over Current & Earth Fault Relay

Site As Built

Page 5: ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK

1 2 3 4 5 6 7 8

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8

Date

Drawn

Appr.

Date

C

B

A

Rev.

NESPAK COMM.

REV.

11.09.08

20.09.07

06.07.07

SI

ASIF

ASIF

RemarksRev.

Yousuf

Shaikh/Asif

07.05.07

Name Norm

GAKKHAR 500/220/132kV Substation Project

NTDC/WAPDA

AC Heating and Power Circuit

132kV Trafo. Protection Panel

A5071 (3)G76001-A5071-S7406-C

S

+R4

=E13

Sheet 1+

2 Sh.

CopyRight (C) Siemens AG 2007 All Rights Reserved

Orig./Repl.f./Repl.by

Ref.no.:

D1Siemens PAK

Circuit diagram

7.3.1 SP2

Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

E13+R4(Rev_D)/

E13+R4.pro

Symbol library

Symbol library

Symbol library

Symbol library

1: 2:

3:

4:

PTD60617

H2_60617

Translate file

Translate file

Translate file

Translate file

A:

B:

C:

D:

b-Feld_e.etr

C_FB_E.etr

ELCAD-Version

Archive: = / S / D / 1

wiring H07-K 1,5 black,if not other wise specifed

File name: 000127

Last used: 25.06.09

V1.0.0

14.06.2004

=E12

+R3

Line Protection Panel

2-X100

4

NE-031

1X3X4mm2

1

2

1-X100

3-X100

230V AC

2.5mm2

Cubicle Illumination

1

I >

2

-F100

/ZD1.1

3A

-S10121

22/ZD1.1

-H101

X1

X2

/ZD1.1

1/N/PE ~50Hz 230V

-B101

/ZD1.5

-R101

/ZD1.4

-S200 12/ZD1.6

Auto

Manual

L2

23

Cubicle Heating

34

-F102

/ZD1.7

N

Lin

1

I >

2L0

2.5 sq.mm

ELCB& Socket

L

-X50

N

PE

/ZD1.3

N

E

7-X100

8-X100

1

I >

2

-F101

/ZD1.1

6A

/RA3.2

L

DC Supply Supervision

/RA3.2

N

2-X100

4

NE-032

1X3X4mm2

1

2

=E14

+R3

1-X100

3

Line Protection Panel

Site As Built

Page 6: ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK

1 2 3 4 5 6 7 8

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8

Date

Drawn

Appr.

Date

C

B

A

Rev.

NESPAK COMM.

REV.

11.09.08

20.09.07

06.07.07

SI

ASIF

ASIF

RemarksRev.

Yousuf

Shaikh/Asif

07.05.07

Name Norm

GAKKHAR 500/220/132kV Substation Project

NTDC/WAPDA

Maintenance Telephone

132kV Trafo. Protection Panel

A5071 (3)G76001-A5071-S7406-C

S

+R4

=E13

Sheet2-

2 Sh.

CopyRight (C) Siemens AG 2007 All Rights Reserved

Orig./Repl.f./Repl.by

Ref.no.:

D2Siemens PAK

Circuit diagram

7.3.1 SP2

Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

E13+R4(Rev_D)/

E13+R4.pro

Symbol library

Symbol library

Symbol library

Symbol library

1: 2:

3:

4:

PTD60617

H2_60617

Translate file

Translate file

Translate file

Translate file

A:

B:

C:

D:

b-Feld_e.etr

C_FB_E.etr

ELCAD-Version

Archive: = / S / D / 2

wiring H07-K 1,5 black,if not other wise specifed

Last used: 25.06.09

=E12

+R3

Line Protection Panel

2-X200

4

E12-025

1X4X2.5mm2

1

2

1-X200

3

-X902

/ZD1.5

5

6

Telephone Socket

2-X200

4

E14-024

1X4X2.5mm2

1

2

=E14

+R3

Line Protection Panel

1-X200

3

Site As Built

Page 7: ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK

1 2 3 4 5 6 7 8

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8

Date

Drawn

Appr.

Date

B

A

NESPAK COMM.

REV.

20.09.07

06.07.07

ASIF

ASIF

RemarksRev.

Yousuf

Shaikh/Asif

07.05.07

Name Norm

GAKKHAR 500/220/132kV Substation Project

NTDC/WAPDA

DC Power Supply

132kV Trafo. Protection Panel

A5071 (3)G76001-A5071-S7407-B

S

+R4

=E13

Sheet 1-

1 Sh.

CopyRight (C) Siemens AG 2007 All Rights Reserved

Orig./Repl.f./Repl.by

Ref.no.:

G1Siemens PAK

Circuit diagram

7.3.1 SP2

Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

E13+R4(Rev_D)/

E13+R4.pro

Symbol library

Symbol library

Symbol library

Symbol library

1: 2:

3:

4:

PTD60617

H2_60617

Translate file

Translate file

Translate file

Translate file

A:

B:

C:

D:

b-Feld_e.etr

C_FB_E.etr

ELCAD-Version

Archive: = / S / G / 1

wiring H07-K 1,5 black,if not other wise specifed

Last used: 25.06.09

V1.0.0

14.06.2004

=E12

+R3

Line Protection Panel

2-X110

4

2-X120

4

2-X130

4

NK-073

1X3X4mm2

2

NK-074

1X3X4mm2

2

NK-075

1X3X4mm2

2

1-X110

3

1-X120

3

1-X130

3

2.5mm2

2II > >

431

-F110

/ZD1.3

6A

A1

A2

-K110

/ZRA1.1

INCOMING SUPPLY A

1314

23

24

2

II > >

431

-F120

/ZD1.3

6A

51

52

1-X140

/NA2.2

1L1+

61

62

4/NA2.2

1L1-

INCOMING SUPPLY B

1L+

1L-

2L+

2L-

3L+

3L-

2/NB2.2

2L1+

A1

A2

-K120

/ZRA1.1

5/NB2.2

2L1-

110V DC

110V DC

110V DC

33L1+

63L1-

-K110

71

72

/ZRA1.1

-H1

X1

X2

/ZD1.1

ALARMS

-K120

71

72

/ZRA1.1

2-X110

4

2-X120

4

2-X130

4

NK-076

1X3X4mm2

1

2

NK-077

1X3X4mm2

1

2

NK-078

1X3X4mm2

1

2

=E14

+R3

1-X110

3

1-X120

3

1-X130

3

Line Protection Panel

Site As Built

Page 8: ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK

1 2 3 4 5 6 7 8

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8

Date

Drawn

Appr.

Date

B

A

NESPAK COMM.

REV.

20.09.07

06.07.07

ASIF

ASIF

RemarksRev.

Yousuf

Shaikh/Asif

07.05.07

Name Norm

GAKKHAR 500/220/132kV Substation Project

NTDC/WAPDA

Lockout with Synch.

132kV Trafo. Protection Panel

A5071 (3)G76001-A5071-S7408-B

S

+R4

=E13

Sheet 1-

1 Sh.

CopyRight (C) Siemens AG 2007 All Rights Reserved

Orig./Repl.f./Repl.by

Ref.no.:

MA1Siemens PAK

Circuit diagram

7.3.1 SP2

Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

E13+R4(Rev_D)/

E13+R4.pro

Symbol library

Symbol library

Symbol library

Symbol library

1: 2:

3:

4:

PTD60617

H2_60617

Translate file

Translate file

Translate file

Translate file

A:

B:

C:

D:

b-Feld_e.etr

C_FB_E.etr

ELCAD-Version

Archive: = / S / MA / 1

wiring H07-K 1,5 black,if not other wise specifed

Last used: 25.06.09

=E13

/MA4

+S01

Local Control Cubicle

-F64

13

/ZND1.1

-F63

13

/ZND1.1

-F62

13

/ZND1.1

-F61

13

/ZND1.1

-F60

13

/ZND1.1

1-X1

1

E13-026

1X8X2.5mm2

6-X52

Lockout

=E00

/ME4

+CP60

-F65

13

/ZND1.1

-F66

13

/ZND1.1

-F67

13

/ZND1.1

-F68

13

/ZND1.1

-F69

13

/ZND1.1

3

1

E13-025

1X8X2.5mm2

23-X2

24

2E13-025

1X8X2.5mm2

2

2

41 Site As Built

Page 9: ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK

1 2 3 4 5 6 7 8

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8

Date

Drawn

Appr.

Date

C

B

A

Site As Built

NESPAK COMM.

REV.

21.04.09

20.09.07

06.07.07

Saqib

ASIF

ASIF

RemarksRev.

Yousuf

Shaikh/Asif

07.05.07

Name Norm

GAKKHAR 500/220/132kV Substation Project

NTDC/WAPDA

Transformer Differential Protection

132kV Trafo. Protection Panel

A5071 (3)G76001-A5071-S7409-C

S

+R4

=E13

Sheet 1+

3 Sh.

CopyRight (C) Siemens AG 2007 All Rights Reserved

Orig./Repl.f./Repl.by

Ref.no.:

NA1

11K

V SWICHGEAR

132KV CURRENT TRANSFORMER

FROM CURRENT TRANSFORMER

Siemens PAK

Circuit diagram

7.3.1 SP2

Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

E13+R4(Rev_D)/

E13+R4.pro

Symbol library

Symbol library

Symbol library

Symbol library

1: 2:

3:

4:

PTD60617

H2_60617

Translate file

Translate file

Translate file

Translate file

A:

B:

C:

D:

b-Feld_e.etr

C_FB_E.etr

ELCAD-Version

Archive: = / S / NA / 1

phase L1:Red, L2:Yellow, L3:Blue unless otherwise speifed wires are 4mm2

Last used: 25.06.09

=E13

/SA1

+S01

=E..

+S..

132KV Local Control Cubicle

200:100/1A

-T1, core 2, 60 VA

1-X612

2

3

4

..-X..

..

..

..

E13-917

1X4X6mm2

1

2

3

4

E13-918

1X4X6mm2

1

2

3

4

L1

L2

L3

N

L1

L2

L3

N

1-X600

2

3

4

5

6

7

10-X600

11

12

13

14

15

16

-X87

/ZNA1.1

21

23

25

27

1

3

5

7

2RMLG01

Test block

22

24

26

28

2

4

6

8

-F87

/ZNA1.6

Q1

Q3

Q5

Q7

R1

R3

R5

R7

7UT612

Transformer Differential

Protection Relay

R2

Q2

Q4

R4

R6

R8

Q6

Q8

Site As Built

Page 10: ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK

1 2 3 4 5 6 7 8

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8

Date

Drawn

Appr.

Date

C

B

A

Site As Built

NESPAK COMM.

REV.

21.04.09

20.09.07

06.07.07

Saqib

ASIF

ASIF

RemarksRev.

Yousuf

Shaikh/Asif

07.05.07

Name Norm

GAKKHAR 500/220/132kV Substation Project

NTDC/WAPDA

DC Supply

Transformer Differential Protection

132kV Trafo. Protection Panel

A5071 (3)G76001-A5071-S7409-C

S

+R4

=E13

Sheet2+

3 Sh.

CopyRight (C) Siemens AG 2007 All Rights Reserved

Orig./Repl.f./Repl.by

Ref.no.:

NA2Siemens PAK

Circuit diagram

7.3.1 SP2

Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

E13+R4(Rev_D)/

E13+R4.pro

Symbol library

Symbol library

Symbol library

Symbol library

1: 2:

3:

4:

PTD60617

H2_60617

Translate file

Translate file

Translate file

Translate file

A:

B:

C:

D:

b-Feld_e.etr

C_FB_E.etr

ELCAD-Version

Archive: = / S / NA / 2

wiring H07-K 1,5 black,if not other wise specifed

Last used: 25.06.09

/G1.41L1-

/G1.41L1+

-X87

/ZNA1.1

-F87

/ZNA1.8

-X87

/ZNA1.1

7UT612

Transformer Differential

Relay Power Supply

13

14

F1

F2

1615

/NA3.21L1-

/NA3.21L1+

Site As Built

Page 11: ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK

1 2 3 4 5 6 7 8

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8

Date

Drawn

Appr.

Date

C

B

A

Site As Built

NESPAK COMM.

REV.

21.04.09

20.09.07

06.07.07

Saqib

ASIF

ASIF

RemarksRev.

Yousuf

Shaikh/Asif

07.05.07

Name Norm

GAKKHAR 500/220/132kV Substation Project

NTDC/WAPDA

Tripping Circuit

132kV Trafo. Protection Panel

A5071 (3)G76001-A5071-S7409-C

S

+R4

=E13

Sheet3-

3 Sh.

CopyRight (C) Siemens AG 2007 All Rights Reserved

Orig./Repl.f./Repl.by

Ref.no.:

NA3Siemens PAK

Circuit diagram

7.3.1 SP2

Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

E13+R4(Rev_D)/

E13+R4.pro

Symbol library

Symbol library

Symbol library

Symbol library

1: 2:

3:

4:

PTD60617

H2_60617

Translate file

Translate file

Translate file

Translate file

A:

B:

C:

D:

b-Feld_e.etr

C_FB_E.etr

ELCAD-Version

Archive: = / S / NA / 3

wiring H07-K 1,5 black,if not other wise specifed

Last used: 25.06.09

/NA2.41L1+

/NA2.41L1-

-X87

/ZNA1.1

-F87

/ZNA1.8

-X87

/ZNA1.1

7UT612

Transformer Differential

Protection Trip

10

9F11

R4F10

1211

27

28

-F60

/ZND1.1

-F60A

/ZND2.2

da

/RA1.11L1-

/RA1.11L1+

Site As Built

Page 12: ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK

1 2 3 4 5 6 7 8

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8

Date

Drawn

Appr.

Date

C

B

A

Site As Built

NESPAK COMM.

REV.

21.04.09

20.09.07

06.07.07

Saqib

ASIF

ASIF

RemarksRev.

Yousuf

Shaikh/Asif

07.05.07

Name Norm

GAKKHAR 500/220/132kV Substation Project

NTDC/WAPDA

O/C & E/F Protection

132kV Trafo. Protection Panel

A5071 (3)G76001-A5071-S7410-C

S

+R4

=E13

Sheet 1+

3 Sh.

CopyRight (C) Siemens AG 2007 All Rights Reserved

Orig./Repl.f./Repl.by

Ref.no.:

NB1

132KV CTs

CORE 3

Siemens PAK

Circuit diagram

7.3.1 SP2

Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

E13+R4(Rev_D)/

E13+R4.pro

Symbol library

Symbol library

Symbol library

Symbol library

1: 2:

3:

4:

PTD60617

H2_60617

Translate file

Translate file

Translate file

Translate file

A:

B:

C:

D:

b-Feld_e.etr

C_FB_E.etr

ELCAD-Version

Archive: = / S / NB / 1

phase L1:Red, L2:Yellow, L3:Blue unless otherwise speifed wires are 4mm2

Last used: 25.06.09

=E13

/SA2

+S01

200-100/1A 60VA

1-X613

2

3

4

E13-925

1X4X6mm2

1

2

3

4

L1

L2

L3

N

1-X601

2

3

4

5

6

7

-X50A

/ZNA1.1

21

23

25

27

2RMLG01

Test block

22

24

26

28

-F50

/ZNA1.1

Q8.

Q6.

Q4.

Q2.

7SJ602

O/C & E/F

Protection Relay

Q7

Q5

Q3

Q1

Site As Built

Page 13: ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK

1 2 3 4 5 6 7 8

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8

Date

Drawn

Appr.

Date

C

B

A

Site As Built

NESPAK COMM.

REV.

21.04.09

20.09.07

06.07.07

Saqib

ASIF

ASIF

RemarksRev.

Yousuf

Shaikh/Asif

07.05.07

Name Norm

GAKKHAR 500/220/132kV Substation Project

NTDC/WAPDA

DC SUPPLY

O/C & E/F Protection

132kV Trafo. Protection Panel

A5071 (3)G76001-A5071-S7410-C

S

+R4

=E13

Sheet2+

3 Sh.

CopyRight (C) Siemens AG 2007 All Rights Reserved

Orig./Repl.f./Repl.by

Ref.no.:

NB2Siemens PAK

Circuit diagram

7.3.1 SP2

Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

E13+R4(Rev_D)/

E13+R4.pro

Symbol library

Symbol library

Symbol library

Symbol library

1: 2:

3:

4:

PTD60617

H2_60617

Translate file

Translate file

Translate file

Translate file

A:

B:

C:

D:

b-Feld_e.etr

C_FB_E.etr

ELCAD-Version

Archive: = / S / NB / 2

wiring H07-K 1,5 black,if not other wise specifed

Last used: 25.06.09

/G1.52L1-

/G1.42L1+

-X50A

/ZNA1.1

-F50

/ZNA1.3

-X50A

/ZNA1.1

O/C & E/F Relay

Power Supply

13

14

F1

F2

1615

/NB3.22L1-

/NB3.22L1+

Site As Built

Page 14: ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK

1 2 3 4 5 6 7 8

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8

Date

Drawn

Appr.

Date

C

B

A

Site As Built

NESPAK COMM.

REV.

21.04.09

20.09.07

06.07.07

Saqib

ASIF

ASIF

RemarksRev.

Yousuf

Shaikh/Asif

07.05.07

Name Norm

GAKKHAR 500/220/132kV Substation Project

NTDC/WAPDA

Tripping Circuit

132kV Trafo. Protection Panel

A5071 (3)G76001-A5071-S7410-C

S

+R4

=E13

Sheet3-

3 Sh.

CopyRight (C) Siemens AG 2007 All Rights Reserved

Orig./Repl.f./Repl.by

Ref.no.:

NB3Siemens PAK

Circuit diagram

7.3.1 SP2

Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

E13+R4(Rev_D)/

E13+R4.pro

Symbol library

Symbol library

Symbol library

Symbol library

1: 2:

3:

4:

PTD60617

H2_60617

Translate file

Translate file

Translate file

Translate file

A:

B:

C:

D:

b-Feld_e.etr

C_FB_E.etr

ELCAD-Version

Archive: = / S / NB / 3

wiring H07-K 1,5 black,if not other wise specifed

Last used: 25.06.09

/NB2.42L1+

/NB2.42L1-

-X50A

/ZNA1.1

-F50

/ZNA1.3

-X50A

/ZNA1.1

7SJ602

O/C & E/F

Protection Trip

43

F8

R3

F9

65

27

28

-F61

/ZND1.1

-F61A

/ZND2.2

da

/NC1.22L1+

/NC1.22L1- S

ite As Built

Page 15: ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK

1 2 3 4 5 6 7 8

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8

Date

Drawn

Appr.

Date

C

B

A

Rev.

NESPAK COMM.

REV.

11.09.08

20.09.07

06.07.07

SI

ASIF

ASIF

RemarksRev.

Yousuf

Shaikh/Asif

07.05.07

Name Norm

GAKKHAR 500/220/132kV Substation Project

NTDC/WAPDA

Tripping Circuit

132kV Trafo. Protection Panel

A5071 (3)G76001-A5071-S7411-C

S

+R4

=E13

Sheet 1+

2 Sh.

CopyRight (C) Siemens AG 2007 All Rights Reserved

Orig./Repl.f./Repl.by

Ref.no.:

NC1Siemens PAK

Circuit diagram

7.3.1 SP2

Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

E13+R4(Rev_D)/

E13+R4.pro

Symbol library

Symbol library

Symbol library

Symbol library

1: 2:

3:

4:

PTD60617

H2_60617

Translate file

Translate file

Translate file

Translate file

A:

B:

C:

D:

b-Feld_e.etr

C_FB_E.etr

ELCAD-Version

Archive: = / S / NC / 1

wiring H07-K 1,5 black,if not other wise specifed

Last used: 25.06.09

/NB3.42L1+

/NB3.42L1-

=E..

+R..

11KV Switchgear

11KV Side

Tripping

+P8

10-X1

1

E13-027

1X8X2.5mm2

..-X..

..

2

E13-027

1X8X2.5mm2

6-X1

27

28

-F62

/ZND1.1

-F62A

/ZND2.1

da

/NC2.12L1+

/NC2.12L1-

-F63A

/ZND2.2

da

=E00

/NB3

+RP7

132kV Busbar

Protection Trip

67-X1

1

E13-028

1X4X2.5mm2

7-X1

27

28

-F63

/ZND1.1

83

2

8

Site As Built

Page 16: ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK

1 2 3 4 5 6 7 8

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8

Date

Drawn

Appr.

Date

C

B

A

Rev.

NESPAK COMM.

REV.

11.09.08

20.09.07

06.07.07

SI

ASIF

ASIF

RemarksRev.

Yousuf

Shaikh/Asif

07.05.07

Name Norm

GAKKHAR 500/220/132kV Substation Project

NTDC/WAPDA

Tripping Circuit

132kV Trafo. Protection Panel

A5071 (3)G76001-A5071-S7411-C

S

+R4

=E13

Sheet2-

2 Sh.

CopyRight (C) Siemens AG 2007 All Rights Reserved

Orig./Repl.f./Repl.by

Ref.no.:

NC2Siemens PAK

Circuit diagram

7.3.1 SP2

Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

E13+R4(Rev_D)/

E13+R4.pro

Symbol library

Symbol library

Symbol library

Symbol library

1: 2:

3:

4:

PTD60617

H2_60617

Translate file

Translate file

Translate file

Translate file

A:

B:

C:

D:

b-Feld_e.etr

C_FB_E.etr

ELCAD-Version

Archive: = / S / NC / 2

wiring H07-K 1,5 black,if not other wise specifed

Last used: 25.06.09

/NC1.42L1-

/NC1.42L1+

=Fan Control

/M7

Panel

Transformer Fan Control Panel

Buchholz

Protection Trip

11-X1

1

E13-029

1X12X2.5mm2

925-X4

-F8

926

2

E13-029

1X12X2.5mm2

13-X1

27

28

-F64

/ZND1.1

-F64A

/ZRA1.6

21

Pressure Relief

Device Trip

945

946

3

14

27

28

-F69

/ZND1.1

Oil Temperature

Trip

917

-F6

918

4

15

27

28

-F65

/ZND1.1

-F65A

/ZRA1.5

21

WindingTemperature

Trip

967

-F7

968

5

16

27

28

-F66

/ZND1.1

-F66A

/ZRA1.5

21

Tap Changer

Protection Trip

921

-F9

922

6

17

27

28

-F67

/ZND1.1

-F67A

/ZRA1.5

21

=Sergi

/SH:9

Fire Protection Panel

Fire Fighting

Trip

12

1

E13-030

1X18X2.5mm2

801

802

2

E13-030

1X18X2.5mm2

18

27

28

-F68

/ZND1.1

723

724

-F68A

/ZRA1.4

21

/RA2.12L1+

/RA2.12L1-

Site As Built

Page 17: ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK

1 2 3 4 5 6 7 8

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8

Date

Drawn

Appr.

Date

C

B

A

Rev.

NESPAK COMM.

REV.

11.09.08

20.09.07

06.07.07

SI

ASIF

ASIF

RemarksRev.

Yousuf

Shaikh/Asif

07.05.07

Name Norm

GAKKHAR 500/220/132kV Substation Project

NTDC/WAPDA

Trip Circuit-1 Supervision

132kV Trafo. Protection Panel

A5071 (3)G76001-A5071-S7412-C

S

+R4

=E13

Sheet 1+

2 Sh.

CopyRight (C) Siemens AG 2007 All Rights Reserved

Orig./Repl.f./Repl.by

Ref.no.:

ND1Siemens PAK

Circuit diagram

7.3.1 SP2

Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

E13+R4(Rev_D)/

E13+R4.pro

Symbol library

Symbol library

Symbol library

Symbol library

1: 2:

3:

4:

PTD60617

H2_60617

Translate file

Translate file

Translate file

Translate file

A:

B:

C:

D:

b-Feld_e.etr

C_FB_E.etr

ELCAD-Version

Archive: = / S / ND / 1

wiring H07-K 1,5 black,if not other wise specifed

Last used: 25.06.09

=E13

/MA2

+S01

3-X52

26

29

30

51

E13-031

1X8X2.5mm2

1

2

3

4

5

1-X2

2

3

4

5

Transformer

Differential

Protection Trip

-F60

57

/ZND1.1

O/C & E/F

Protection Trip

-F61

57

/ZND1.1

11KV

Protection Trip

-F62

57

/ZND1.1

132KV Busbar

Protection Trip

-F63

57

/ZND1.1

Buchholz

Protection Trip

-F64

57

/ZND1.1

Pressure

Releif Trip

-F69

57

/ZND1.1

Oil Temperature

Protection Trip

-F65

57

/ZND1.1

Winding Temp.

Protection Trip

-F66

57

/ZND1.1

-F67

57

/ZND1.1

Tap Changer

Protection Trip

-F68

57

/ZND1.1

Fire

Protection Trip

1

1

-R1A

/ZND2.8

2

-R2A

/ZND2.8

2

-F701

/ZND2.2

13

14

21

22

RL2

RL3

Trip Circuit 1

Supervision Relay

RL1

27

28

1 -R3

/ZND2.8

2

Site As Built

Page 18: ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK

1 2 3 4 5 6 7 8

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8

Date

Drawn

Appr.

Date

C

B

A

Rev.

NESPAK COMM.

REV.

11.09.08

20.09.07

06.07.07

SI

ASIF

ASIF

RemarksRev.

Yousuf

Shaikh/Asif

07.05.07

Name Norm

GAKKHAR 500/220/132kV Substation Project

NTDC/WAPDA

Trip Circuit-2 Supervision

132kV Trafo. Protection Panel

A5071 (3)G76001-A5071-S7412-C

S

+R4

=E13

Sheet2-

2 Sh.

CopyRight (C) Siemens AG 2007 All Rights Reserved

Orig./Repl.f./Repl.by

Ref.no.:

ND2Siemens PAK

Circuit diagram

7.3.1 SP2

Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

E13+R4(Rev_D)/

E13+R4.pro

Symbol library

Symbol library

Symbol library

Symbol library

1: 2:

3:

4:

PTD60617

H2_60617

Translate file

Translate file

Translate file

Translate file

A:

B:

C:

D:

b-Feld_e.etr

C_FB_E.etr

ELCAD-Version

Archive: = / S / ND / 2

wiring H07-K 1,5 black,if not other wise specifed

Last used: 25.06.09

=E13

/MA3

+S01

34-X52

37

40

48

58

E13-032

1X8X2.5mm2

1

2

3

4

5

8-X2

9

10

11

12

Transformer

Differential

Protection Trip

-F60

68

/ZND1.1

O/C & E/F

Protection Trip

-F61

68

/ZND1.1

11kV

Protection Trip

-F62

68

/ZND1.1

132KV Busbar

Protection Trip

-F63

68

/ZND1.1

Buchholz

Protection Trip

-F64

68

/ZND1.1

Pressure

Releif Trip

-F69

68

/ZND1.1

Oil Temperature

Protection Trip

-F65

68

/ZND1.1

Winding Temp.

Protection Trip

-F66

68

/ZND1.1

-F67

68

/ZND1.1

Tap Changer

Protection Trip

-F68

68

/ZND1.1

Fire

Protection Trip

1

1

-R4A

/ZND2.8

2

-R5A

/ZND2.8

2

-F702

/ZND2.1

13

14

21

22

RL2

RL3

Trip Circuit 2

Supervision Relay

RL1

27

28

1 -R6

/ZND2.8

2

Site As Built

Page 19: ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK

1 2 3 4 5 6 7 8

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8

Date

Drawn

Appr.

Date

A REV. 06.07.07 ASIF

RemarksRev.

Yousuf

Shaikh/Asif

07.05.07

Name Norm

GAKKHAR 500/220/132kV Substation Project

NTDC/WAPDA

11KV Side Tripping

132kV Trafo. Protection Panel

A5071 (3)G76001-A5071-S7413-A

S

+R4

=E13

Sheet 1-

1 Sh.

CopyRight (C) Siemens AG 2007 All Rights Reserved

Orig./Repl.f./Repl.by

Ref.no.:

NF1Siemens PAK

Circuit diagram

7.3.1 SP2

Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

E13+R4(Rev_D)/

E13+R4.pro

Symbol library

Symbol library

Symbol library

Symbol library

1: 2:

3:

4:

PTD60617

H2_60617

Translate file

Translate file

Translate file

Translate file

A:

B:

C:

D:

b-Feld_e.etr

C_FB_E.etr

ELCAD-Version

Archive: = / S / NF / 1

wiring H07-K 1,5 black,if not other wise specifed

Last used: 25.06.09

=E..

+S..

11KV Switchgear

17-X2

3

E13-027

1X8X2.5mm2

..-X..

Transformer

Differential Trip

-F60

911/ZND1.1

18-X2

4

..

O/C & E/F

Trip

-F61

911/ZND1.1

132kV Busbar

Trip

-F63

911/ZND1.1

Buchholz

Trip

-F64

911/ZND1.1

Pressure Releif

Device Trip

-F69

911/ZND1.1

Oil Temperature

Trip

-F65

911/ZND1.1

Winding Temperature

Trip

-F66

911/ZND1.1

-F67

911/ZND1.1

Tap Changer

Trip

Fire Protection

Trip

-F68

911/ZND1.1

Site As Built

Page 20: ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK

1 2 3 4 5 6 7 8

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8

Date

Drawn

Appr.

Date

B

A

NESPAK COMM.

REV.

20.09.07

06.07.07

ASIF

ASIF

RemarksRev.

Yousuf

Shaikh/Asif

07.05.07

Name Norm

GAKKHAR 500/220/132kV Substation Project

NTDC/WAPDA

Tripping Annunciation

132kV Trafo. Protection Panel

A5071 (3)G76001-A5071-S7414-B

S

+R4

=E13

Sheet 1+

3 Sh.

CopyRight (C) Siemens AG 2007 All Rights Reserved

Orig./Repl.f./Repl.by

Ref.no.:

RA1Siemens PAK

Circuit diagram

7.3.1 SP2

Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

E13+R4(Rev_D)/

E13+R4.pro

Symbol library

Symbol library

Symbol library

Symbol library

1: 2:

3:

4:

PTD60617

H2_60617

Translate file

Translate file

Translate file

Translate file

A:

B:

C:

D:

b-Feld_e.etr

C_FB_E.etr

ELCAD-Version

Archive: = / S / RA / 1

wiring H07-K 1,5 black,if not other wise specifed

Last used: 25.06.09

/NA3.41L1+

/NA3.41L1-

110 VDC

-F50

/ZNA1.3

-F81

/ZRA1.7

7SJ602

F3

R5F4

21

Protection

Unhealthy

-F87

/ZNA1.8

7UT612

F3

R5

F4

-F701

/ZND2.3

-F701A

/ZND2.3

Trip Circuit 1

Faulty

13

da

-F702

/ZND2.4

-F702A

/ZND2.3

Trip Circuit 2

Faulty

13

da

=E13

/NA1

+S01

-F20

/ZND2.1

CB

Tripped

-F60

10

12

/ZND1.1

19-X2

3

E13-026

1X8X2.5mm2

1-X11

2-X11

4

E13-026

1X8X2.5mm2

22-X2

da

-F61

10

12

/ZND1.1

-F62

10

12

/ZND1.1

-F63

10

12

/ZND1.1

-F64

10

12

/ZND1.1

-F65

10

12

/ZND1.1

-F66

10

12

/ZND1.1

-F67

10

12

/ZND1.1

-F68

10

12

/ZND1.1

-F69

10

12

/ZND1.1

DC Supply Supervision

A1

A2

-K130

/ZRA1.1

Site As Built

Page 21: ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK

1 2 3 4 5 6 7 8

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8

Date

Drawn

Appr.

Date

B

A

NESPAK COMM.

REV.

20.09.07

06.07.07

ASIF

ASIF

RemarksRev.

Yousuf

Shaikh/Asif

07.05.07

Name Norm

GAKKHAR 500/220/132kV Substation Project

NTDC/WAPDA

Annunciation Function

132kV Trafo. Protection Panel

A5071 (3)G76001-A5071-S7414-B

S

+R4

=E13

Sheet2+

3 Sh.

CopyRight (C) Siemens AG 2007 All Rights Reserved

Orig./Repl.f./Repl.by

Ref.no.:

RA2Siemens PAK

Circuit diagram

7.3.1 SP2

Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

E13+R4(Rev_D)/

E13+R4.pro

Symbol library

Symbol library

Symbol library

Symbol library

1: 2:

3:

4:

PTD60617

H2_60617

Translate file

Translate file

Translate file

Translate file

A:

B:

C:

D:

b-Feld_e.etr

C_FB_E.etr

ELCAD-Version

Archive: = / S / RA / 2

wiring H07-K 1,5 black,if not other wise specifed

Last used: 25.06.09

/NC2.72L1+

/NC2.72L1-

=Trafo. Aux.

/M8

Control Panel

Transformer Auxiliary Control Panel

-F82

/ZRA1.7

Buchholz

Alarm

20-X2

1

E13-033

1X12X2.5mm2

725-X7

-K11

726-X7

2

E13-033

1X12X2.5mm2

23-X2

21

-F83

/ZRA1.6

Oil Temperature

Alarm

717

-K9

718

3

24

21

-F84

/ZRA1.6

WindingTemperature

Alarm

721

-K10

722

4

25

21

-F85

/ZRA1.6

729

-K12

730

5

26

21

Oil Level Low

Alarm

21

DC Supply Supervision

A1

A2

-K140

/ZRA1.1

Site As Built

Page 22: ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK

1 2 3 4 5 6 7 8

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8

Date

Drawn

Appr.

Date

B

A

NESPAK COMM.

REV.

20.09.07

06.07.07

ASIF

ASIF

RemarksRev.

Yousuf

Shaikh/Asif

07.05.07

Name Norm

GAKKHAR 500/220/132kV Substation Project

NTDC/WAPDA

DC Supply Failure

132kV Trafo. Protection Panel

A5071 (3)G76001-A5071-S7414-B

S

+R4

=E13

Sheet3-

3 Sh.

CopyRight (C) Siemens AG 2007 All Rights Reserved

Orig./Repl.f./Repl.by

Ref.no.:

RA3Siemens PAK

Circuit diagram

7.3.1 SP2

Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

E13+R4(Rev_D)/

E13+R4.pro

Symbol library

Symbol library

Symbol library

Symbol library

1: 2:

3:

4:

PTD60617

H2_60617

Translate file

Translate file

Translate file

Translate file

A:

B:

C:

D:

b-Feld_e.etr

C_FB_E.etr

ELCAD-Version

Archive: = / S / RA / 3

wiring H07-K 1,5 black,if not other wise specifed

Last used: 25.06.09

/D1.6L

/D1.6N

230V AC, 50Hz

DC Supply Failure

-K110

81

82

/ZRA1.1

A1

A2

-K270.

/ZRA1.1

-K120

81

82

/ZRA1.1

-K130

81

82

/ZRA1.1

-K140

81

82

/ZRA1.1

Site As Built

Page 23: ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK

1 2 3 4 5 6 7 8

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8

Date

Drawn

Appr.

Date

D

C

B

Site As Built

Rev.

NESPAK COMM.

21.04.09

11.09.08

20.09.07

Saqib

SI

ASIF

RemarksRev.

Yousuf

Shaikh/Asif

07.05.07

Name Norm

GAKKHAR 500/220/132kV Substation Project

NTDC/WAPDA

Annunciation Function

132kV Trafo. Protection Panel

A5071 (3)G76001-A5071-S7415-D

S

+R4

=E13

Sheet 1+

7 Sh.

CopyRight (C) Siemens AG 2007 All Rights Reserved

Orig./Repl.f./Repl.by

Ref.no.:

RB1Siemens PAK

Circuit diagram

7.3.1 SP2

Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

E13+R4(Rev_D)/

E13+R4.pro

Symbol library

Symbol library

Symbol library

Symbol library

1: 2:

3:

4:

PTD60617

H2_60617

Translate file

Translate file

Translate file

Translate file

A:

B:

C:

D:

b-Feld_e.etr

C_FB_E.etr

ELCAD-Version

Archive: = / S / RB / 1

wiring H07-K 1,5 black,if not other wise specifed

Last used: 25.06.09

=E13

/RA3

+CP51

Remote Control Panel

1-X9

1

E13-012

1X18X2.5mm2

17-X9

Transformer

Differential

Protection Trip

-F60

13

15

/ZND1.1

2

2

49

O/C & E/F

Protection Trip

-F61

13

15

/ZND1.1

3

3

50

Buchholz

Trip

-F64

13

15

/ZND1.1

4

4

51

Oil Temperature

Trip

-F65

13

15

/ZND1.1

5

5

52

Winding

Temperature

Trip

-F66

13

15

/ZND1.1

6

6

53

Tap Changer

Trip

-F67

13

15

/ZND1.1

7

7

54

Fire Protection

Trip

-F68

13

15

/ZND1.1

8

8

55

-F63A

/ZND2.2

10

Busbar

Protection

11

1

9

10

57

11KV Side

Trip

-F62

13

15

/ZND1.1

10

9

56

-F20

/ZND2.1

10

CB

Tripped

11

1

11

12

59

Pressure relief

Device Trip

-F69

13

15

/ZND1.1

12

11

58

Site As Built

Page 24: ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK

1 2 3 4 5 6 7 8

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8

Date

Drawn

Appr.

Date

D

C

B

Site As Built

Rev.

NESPAK COMM.

21.04.09

11.09.08

20.09.07

Saqib

SI

ASIF

RemarksRev.

Yousuf

Shaikh/Asif

07.05.07

Name Norm

GAKKHAR 500/220/132kV Substation Project

NTDC/WAPDA

Annunciation Function

132kV Trafo. Protection Panel

A5071 (3)G76001-A5071-S7415-D

S

+R4

=E13

Sheet2+

7 Sh.

CopyRight (C) Siemens AG 2007 All Rights Reserved

Orig./Repl.f./Repl.by

Ref.no.:

RB2Siemens PAK

Circuit diagram

7.3.1 SP2

Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

E13+R4(Rev_D)/

E13+R4.pro

Symbol library

Symbol library

Symbol library

Symbol library

1: 2:

3:

4:

PTD60617

H2_60617

Translate file

Translate file

Translate file

Translate file

A:

B:

C:

D:

b-Feld_e.etr

C_FB_E.etr

ELCAD-Version

Archive: = / S / RB / 2

wiring H07-K 1,5 black,if not other wise specifed

Last used: 25.06.09

=E13

/RA2

+CP51

Remote Control Panel

13-X9

1

E13-011

1X12X2.5mm2

9-X9

-F81

/ZRA1.7

11

Device

Unhealthy

73

14

2

37

AC Supply

Failure

-F100

11

12

/ZD1.1

15

5

40

-F101

11

12

/ZD1.1

-F102

/ZD1.8

11

14

12

-F701A

/ZND2.3

10

Trip Circuit Ckt. 1

Faulty

11

116

3

38

-F702A

/ZND2.3

10 11

1

17

4

39

Trip Circuit Ckt. 2

Faulty

18

1

E13-017

1X4X2.5mm2

1-X10

DC Supply

Failure

/RA4

-K270.

13

14

/ZRA1.1

19

2

10

20-X9

3

E13-017

1X4X2.5mm2

5-X10

Sergi Box

DC Supply

Failure

=Sergi

11

E13-030

1X18X2.5mm2

803

11

12

804

12

E13-030

1X18X2.5mm2

21

4

16

Site As Built

Page 25: ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK

1 2 3 4 5 6 7 8

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8

Date

Drawn

Appr.

Date

D

C

B

Site As Built

Rev.

NESPAK COMM.

21.04.09

11.09.08

20.09.07

Saqib

SI

ASIF

RemarksRev.

Yousuf

Shaikh/Asif

07.05.07

Name Norm

GAKKHAR 500/220/132kV Substation Project

NTDC/WAPDA

Events Recorder

132kV Trafo. Protection Panel

A5071 (3)G76001-A5071-S7415-D

S

+R4

=E13

Sheet3+

7 Sh.

CopyRight (C) Siemens AG 2007 All Rights Reserved

Orig./Repl.f./Repl.by

Ref.no.:

RB3Siemens PAK

Circuit diagram

7.3.1 SP2

Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

E13+R4(Rev_D)/

E13+R4.pro

Symbol library

Symbol library

Symbol library

Symbol library

1: 2:

3:

4:

PTD60617

H2_60617

Translate file

Translate file

Translate file

Translate file

A:

B:

C:

D:

b-Feld_e.etr

C_FB_E.etr

ELCAD-Version

Archive: = / S / RB / 3

wiring H07-K 1,5 black,if not other wise specifed

Last used: 25.06.09

=Event

+Recorder

Events Recorder

1-X10

1

E13-034

1X27X2.5mm2

2-X4

2 3

-F60A

/ZND2.2

10

Transformer

Differential

Protection Trip

11

1

4

2

47-X3

-F61A

/ZND2.2

10

O/C & E/F

Protection Trip

11

1

5

3

48

-F63A

/ZND2.2

20

Busbar

Protection

21

2

6

4

49

-F20

/ZND2.1

20

CB

Tripped

21

2

7

5

50

-F81

/ZRA1.7

12

Device

Unhealthy

84

8

6

51

-F62A

/ZND2.1

10

11KV Side

Trip

11

1

9

752

-F701A

/ZND2.3

20

21

2

11

9

53

Trip Circuit-1

Faulty

-F702A

/ZND2.3

20

21

2

12

10

54

Trip Circuit-2

Faulty

27

22

3-X21

DC Supply

Failure

-K270.

43

44

/ZRA1.1

10

8

403-X3

Site As Built

Page 26: ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK

1 2 3 4 5 6 7 8

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8

Date

Drawn

Appr.

Date

D

C

B

Site As Built

Rev.

NESPAK COMM.

21.04.09

11.09.08

20.09.07

Saqib

SI

ASIF

RemarksRev.

Yousuf

Shaikh/Asif

07.05.07

Name Norm

GAKKHAR 500/220/132kV Substation Project

NTDC/WAPDA

Events Recorder

132kV Trafo. Protection Panel

A5071 (3)G76001-A5071-S7415-D

S

+R4

=E13

Sheet4+

7 Sh.

CopyRight (C) Siemens AG 2007 All Rights Reserved

Orig./Repl.f./Repl.by

Ref.no.:

RB4Siemens PAK

Circuit diagram

7.3.1 SP2

Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

E13+R4(Rev_D)/

E13+R4.pro

Symbol library

Symbol library

Symbol library

Symbol library

1: 2:

3:

4:

PTD60617

H2_60617

Translate file

Translate file

Translate file

Translate file

A:

B:

C:

D:

b-Feld_e.etr

C_FB_E.etr

ELCAD-Version

Archive: = / S / RB / 4

wiring H07-K 1,5 black,if not other wise specifed

Last used: 25.06.09

=Event

+Recorder

Events Recorder

14-X10

11

E13-034

1X27X2.5mm2

3-X4

-F82

/ZRA1.7

11

Buchholz

Alarm

73

15

12

86-X3

-F85

/ZRA1.6

11

Oil Level

Low Alarm

73

16

13

87

-F83

/ZRA1.6

11

Oil Temp. hi

Alarm

73

17

14

88

-F84

/ZRA1.6

11 7

3

18

15

89

Winding

Temperature

High Alarm

21

164-X4

-F64A

/ZRA1.6

11

Buchholz

Trip

73

22

17

90-X3

-F65A

/ZRA1.5

11

Oil Temperature

Trip

73

23

18

91

-F66A

/ZRA1.5

11

Winding

Temperature

Trip

73

24

19

92

-F67A

/ZRA1.5

11

Tap Changer

Protection Trip

73

25

20

93

-F68A

/ZRA1.4

11

Fire Protection

System Trip

73

26

21

94

Site As Built

Page 27: ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK

1 2 3 4 5 6 7 8

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8

Date

Drawn

Appr.

Date

D

C

B

Site As Built

Rev.

NESPAK COMM.

21.04.09

11.09.08

20.09.07

Saqib

SI

ASIF

RemarksRev.

Yousuf

Shaikh/Asif

07.05.07

Name Norm

GAKKHAR 500/220/132kV Substation Project

NTDC/WAPDA

Fault Recorder Function

132kV Trafo. Protection Panel

A5071 (3)G76001-A5071-S7415-D

S

+R4

=E13

Sheet5+

7 Sh.

CopyRight (C) Siemens AG 2007 All Rights Reserved

Orig./Repl.f./Repl.by

Ref.no.:

RB5Siemens PAK

Circuit diagram

7.3.1 SP2

Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

E13+R4(Rev_D)/

E13+R4.pro

Symbol library

Symbol library

Symbol library

Symbol library

1: 2:

3:

4:

PTD60617

H2_60617

Translate file

Translate file

Translate file

Translate file

A:

B:

C:

D:

b-Feld_e.etr

C_FB_E.etr

ELCAD-Version

Archive: = / S / RB / 5

wiring H07-K 1,5 black,if not other wise specifed

Last used: 25.06.09

=E00

+XE01

Fault Recorder

1-X11

1

E13-035

1X18X2.5mm2

18-X151

2

-F60A

/ZND2.2

20

Transformer

Differential

Protection Trip

21

2

3

2

4-X209

-F61A

/ZND2.2

20

O/C & E/F

Protection Trip

21

2

4

3

5

-F20

/ZND2.1

30

CB

Tripped

31

3

5

4

6

Buchholz

Trip

-F64

17

19

/ZND1.1

6

5

7

Oil Temperature

Trip

-F65

17

19

/ZND1.1

7

6

8

Winding

Temperature

Trip

-F66

17

19

/ZND1.1

8

7

9

Tap Changer

Protection Trip

-F67

17

19

/ZND1.1

9

8

10

Fire Protection

System Trip

-F68

17

19

/ZND1.1

10

9

11

-F62A

/ZND2.1

20

11KV Side

Trip

21

2

11

10

12

-F63A

/ZND2.2

30

Busbar Protection

Trip

31

3

12

11

13

Site As Built

Page 28: ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK

1 2 3 4 5 6 7 8

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8

Date

Drawn

Appr.

Date

D

C

B

Site As Built

Rev.

NESPAK COMM.

21.04.09

11.09.08

20.09.07

Saqib

SI

ASIF

RemarksRev.

Yousuf

Shaikh/Asif

07.05.07

Name Norm

GAKKHAR 500/220/132kV Substation Project

NTDC/WAPDA

Scada Function

132kV Trafo. Protection Panel

A5071 (3)G76001-A5071-S7415-D

S

+R4

=E13

Sheet6+

7 Sh.

CopyRight (C) Siemens AG 2007 All Rights Reserved

Orig./Repl.f./Repl.by

Ref.no.:

RB6Siemens PAK

Circuit diagram

7.3.1 SP2

Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

E13+R4(Rev_D)/

E13+R4.pro

Symbol library

Symbol library

Symbol library

Symbol library

1: 2:

3:

4:

PTD60617

H2_60617

Translate file

Translate file

Translate file

Translate file

A:

B:

C:

D:

b-Feld_e.etr

C_FB_E.etr

ELCAD-Version

Archive: = / S / RB / 6

wiring H07-K 1,5 black,if not other wise specifed

Last used: 25.06.09

=SCADA

+PANEL

1-X12

1

E13-036

1X4X2.5mm2

..-X..

Scada Interface Cubicle

Transformer

Differential

Protection Trip

-F60

14

16

/ZND1.1

2

2

..

O/C & E/F

Protection Trip

-F61

14

16

/ZND1.1

3

Buchholz

Trip

-F64

14

16

/ZND1.1

4

Oil Temp.

High Trip

-F65

14

16

/ZND1.1

5

Winding

Temperature

High Trip

-F66

14

16

/ZND1.1

6

Tap Changer

Trip

-F67

14

16

/ZND1.1

7

Fire Protection

Trip

-F68

14

16

/ZND1.1

8

-F20

/ZND2.1

40

CB

Tripped

41

4

9

-F701A

/ZND2.3

30

Trip Ckt. 1

Faulty

31

3

10

-F702A

/ZND2.3

30

Trip Ckt. 2

Faulty

31

3

11

-F62A

/ZND2.1

30

11KV Side

Trip

31

3

12

-F63A

/ZND2.2

40

Busbar

Protection

41

4

13

Site As Built

Page 29: ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK

1 2 3 4 5 6 7 8

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8

Date

Drawn

Appr.

Date

D

C

B

Site As Built

Rev.

NESPAK COMM.

21.04.09

11.09.08

20.09.07

Saqib

SI

ASIF

RemarksRev.

Yousuf

Shaikh/Asif

07.05.07

Name Norm

GAKKHAR 500/220/132kV Substation Project

NTDC/WAPDA

Fire Protection Circuit

132kV Trafo. Protection Panel

A5071 (3)G76001-A5071-S7415-D

S

+R4

=E13

Sheet7-

7 Sh.

CopyRight (C) Siemens AG 2007 All Rights Reserved

Orig./Repl.f./Repl.by

Ref.no.:

RB7Siemens PAK

Circuit diagram

7.3.1 SP2

Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

E13+R4(Rev_D)/

E13+R4.pro

Symbol library

Symbol library

Symbol library

Symbol library

1: 2:

3:

4:

PTD60617

H2_60617

Translate file

Translate file

Translate file

Translate file

A:

B:

C:

D:

b-Feld_e.etr

C_FB_E.etr

ELCAD-Version

Archive: = / S / RB / 7

wiring H07-K 1,5 black,if not other wise specifed

Last used: 25.06.09

=Sergi

/SH:4

1-X13

3

E13-030

1X18X2.5mm2

201-X

Fire Protection Panel

2

Differential

Trip

-F60A

/ZND2.230

31

3

3

4

202

4

5

203

O/C & E/F

Trip

-F61A

/ZND2.2

30

31

3

5

6

204

6

7

205

Tap Changer Protection

Trip

-F67A

/ZRA1.5

12 8

4

7

8

206

8

9

207

Buchholz

Trip

-F64A

/ZRA1.6

12 8

4

9

10

208

Site As Built

Page 30: ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK

1 2 3 4 5 6 7 8

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8

Date

Drawn

Appr.

Date

B

A

Rev.

NESPAK COMM.

11.09.08

20.09.07

SI

ASIF

RemarksRev.

Yousuf

Shaikh/Asif

07.05.07

Name Norm

GAKKHAR 500/220/132kV Substation Project

NTDC/WAPDA 132kV Trafo. Protection Panel

A5071 (3)G76001-A5071-S7416-B

S

+R4

=E13

Sheet 1-

1 Sh.

CopyRight (C) Siemens AG 2007 All Rights Reserved

Orig./Repl.f./Repl.by

Ref.no.:

ZD1Siemens PAK

List of Device

7.3.1 SP2

Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

E13+R4(Rev_D)/

E13+R4.pro

Symbol library

Symbol library

Symbol library

Symbol library

1: 2:

3:

4:

PTD60617

H2_60617

Translate file

Translate file

Translate file

Translate file

A:

B:

C:

D:

b-Feld_e.etr

C_FB_E.etr

ELCAD-Version

Archive: = / S / ZD / 1

Last used: 25.06.09

V1.0.0

14.06.2004

-F100/D1.3

/RB2.3

-F101

/D1.6

/RB2.3

-S101

/D1.3

-H101

/D1.3

-H1

/G1.6

X1

X2

1

I >

2

1314

23

24

21

22

11

12

-F110

/G1.3

-F120

/G1.4

-X50

/D1.6

1

II > >

342

-R101

23

24

23

L N PE

/D1.4

11

12 L.

2

-X

.

.

-X902

-B101

/D2.5

/D1.4

-S200

/D1.5

/D1.4

-F102

N

/D1.5

Lin

I >

-S200

34

L0

12

N

E

11 1412

/RB2.4

Site As Built

Page 31: ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK

1 2 3 4 5 6 7 8

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8

Date

Drawn

Appr.

DateRemarksRev.

Yousuf

Shaikh/Asif

07.05.07

Name Norm

GAKKHAR 500/220/132kV Substation Project

NTDC/WAPDA 132kV Trafo. Protection Panel

A5071 (3)G76001-A5071-S7417

S

+R4

=E13

Sheet 1-

1 Sh.

CopyRight (C) Siemens AG 2007 All Rights Reserved

Orig./Repl.f./Repl.by

Ref.no.:

ZNA1Siemens PAK

List of Device

7.3.1 SP2

Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

E13+R4(Rev_D)/

E13+R4.pro

Symbol library

Symbol library

Symbol library

Symbol library

1: 2:

3:

4:

PTD60617

H2_60617

Translate file

Translate file

Translate file

Translate file

A:

B:

C:

D:

b-Feld_e.etr

C_FB_E.etr

ELCAD-Version

Archive: = / S / ZNA / 1

File name: 000162

Last used: 25.06.09

-X87

-X50A

-F50

2RMLG01

/NB1.5

/NB1.5

/NB1.5

/NB1.5

Q8

Q7

7SJ602

F14

F15

F17

F18

Binary inputs:

BE1

F9

F8

F11

F10

IL1

BE2

BE3

R3

R4

F16

Serial

Interf. BOption

Q6

Q5IL2

Q4

Q3IL3

Q2

3I0Q1

F1

F2Power

Supply

L+

L-

Command/alarm 3

Command/alarm 4

F5

Command/alarm 1

F6

F7

R1

R2Command/alarm 2

Live contact

F4

F3R5

12

/NA1.4

34

/NA1.4

/NB3.3

56

/NA1.4

/NB3.3

78

/NA1.4

910

/NA3.3

1112

/NA3.3

-F50

1314

/NA2.3

/NB2.3

/NB3.3

/RA1.2

/RA1.2

/NB2.3

1516

/NA2.3

/NB2.3

1718

1920

21

22

/NA1.4

/NB1.4

23

24

/NA1.4

/NB1.4

25

26

/NA1.4

/NB1.4

-F87

27

28

/NA1.4

/NB1.4

/NA1.5

/NA1.5

/NA1.5

/NA1.5

/NA1.5

/NA1.5

/NA1.5

/NA1.5

Q1

Q2

F14

F15

F16

Binary inputs:

BI1

I1L1

BI2

Q3

Q4I1L2

Q5

Q6I1L3

Q7

I7

F17

BI3

F11

F10

F13

F12

R3

R4

Command/alarm 3

Command/alarm 4

7UT612

C Option

F18

B Option

A Option

Serial Interfaces

F1

F2Power

Supply

L+

L-

Q8

R1

R2I2L1

R3

R4I2L2

R5

R6I2L3

R7

I8R8

F5Live contact

F3

F4M1

Command/alarm 1 F7

F6R1

Command/alarm 2 F9

F8R2

-F87

/NA2.3

/NA3.3

/RA1.3

/RA1.3

Site As Built

Page 32: ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK

1 2 3 4 5 6 7 8

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8

Date

Drawn

Appr.

Date

C

B

A

Rev.

NESPAK COMM.

REV.

11.09.08

20.09.07

06.07.07

SI

ASIF

ASIF

RemarksRev.

Yousuf

Shaikh/Asif

07.05.07

Name Norm

GAKKHAR 500/220/132kV Substation Project

NTDC/WAPDA 132kV Trafo. Protection Panel

A5071 (3)G76001-A5071-S7418-C

S

+R4

=E13

Sheet 1+

2 Sh.

CopyRight (C) Siemens AG 2007 All Rights Reserved

Orig./Repl.f./Repl.by

Ref.no.:

ZND1Siemens PAK

List of Device

7.3.1 SP2

Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

E13+R4(Rev_D)/

E13+R4.pro

Symbol library

Symbol library

Symbol library

Symbol library

1: 2:

3:

4:

PTD60617

H2_60617

Translate file

Translate file

Translate file

Translate file

A:

B:

C:

D:

b-Feld_e.etr

C_FB_E.etr

ELCAD-Version

Archive: = / S / ZND / 1

Last used: 25.06.09

-F60/NA3.3

/ND2.3

/MA1.3

/ND1.3

/NF1.2

/RA1.4

/RB1.2

/RB6.2

-F61

/NB3.3

/ND2.3

/MA1.3

/ND1.3

/NF1.3

/RA1.5

/RB1.3

/RB6.3

-F62

/NC1.3

/ND2.4

/MA1.3

/ND1.4

/RA1.5

/RB1.7

-F63

/NC1.5

/ND2.4

/MA1.3

/ND1.4

/NF1.3

/RA1.5

-F64

/NC2.2

/ND2.5

/MA1.3

/ND1.4

/NF1.4

/RA1.6

/RB1.3

/RB6.3

/RB5.4

-F65

/NC2.3

/ND2.5

/MA1.5

/ND1.5

/NF1.5

/RA1.6

/RB1.4

/RB6.4

/RB5.5

-F66

/NC2.4

/ND2.6

/MA1.5

/ND1.6

/NF1.5

/RA1.6

/RB1.5

/RB6.4

/RB5.5

-F67

/NC2.5

/ND2.6

/MA1.5

/ND1.6

/NF1.6

/RA1.7

/RB1.5

/RB6.5

/RB5.6

-F68

/NC2.6

/ND2.7

/MA1.5

/ND1.7

/NF1.6

/RA1.7

/RB1.6

/RB6.5

/RB5.6

-F69

/NC2.3

/ND2.5

/MA1.5

/ND1.5

/NF1.4

/RA1.7

/RB1.8

27

28

MVAJ25

13

24

57

68

911

10

12

13

15

14

16

17

19

21

23

Site As Built

Page 33: ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK

1 2 3 4 5 6 7 8

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8

Date

Drawn

Appr.

Date

C

B

A

Rev.

NESPAK COMM.

REV.

11.09.08

20.09.07

06.07.07

SI

ASIF

ASIF

RemarksRev.

Yousuf

Shaikh/Asif

07.05.07

Name Norm

GAKKHAR 500/220/132kV Substation Project

NTDC/WAPDA 132kV Trafo. Protection Panel

A5071 (3)G76001-A5071-S7418-C

S

+R4

=E13

Sheet2-

2 Sh.

CopyRight (C) Siemens AG 2007 All Rights Reserved

Orig./Repl.f./Repl.by

Ref.no.:

ZND2Siemens PAK

List of Device

7.3.1 SP2

Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

E13+R4(Rev_D)/

E13+R4.pro

Symbol library

Symbol library

Symbol library

Symbol library

1: 2:

3:

4:

PTD60617

H2_60617

Translate file

Translate file

Translate file

Translate file

A:

B:

C:

D:

b-Feld_e.etr

C_FB_E.etr

ELCAD-Version

Archive: = / S / ZND / 2

Last used: 25.06.09

-F702

-F62A

/ND2.8

/ND2.8

/ND2.8

/ND2.8

/ND2.8

/ND2.8

/NC1.3

/RB3.5

/RB5.7

/RB6.7

-F20

-F701

/RA1.4

/RB1.7

/RB3.4

/RB5.3

/RB6.6

-F60A

/ND1.8

/ND1.8

/ND1.8

/ND1.8

/ND1.8

/ND1.8

/NA3.3

/RB3.2

/RB5.2

/RB7.2

-F61A

/NB3.3

/RB3.3

/RB5.3

/RB7.3

27

28

-F63A

13

14

21

22

RL2

RL3

/NC1.4

/RB1.6

/RB3.3

/RB5.8

/RB6.8

-F702A

RL1

/RA1.4

/RB2.5

/RB3.6

/RB6.7

-F701A

/RA1.3

/RB2.4

/RB3.5

/RB6.6

1

3

2

4

5

7

-F701

7PA26

30

331

40

441

50

551

60

661

70

771

80

881

K1

K1

K1

K1

K1

K1

10

111

20

221

K1

K1

ad Trip K1

/RA1.3

-F702

/RA1.4

-R1A

-R2A

-R3

-R4A

-R5A

-R6

23

/ND1.7

/ND1.7

/ND1.8

/ND2.7

/ND2.7

/ND2.8

Site As Built

Page 34: ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK

1 2 3 4 5 6 7 8

F

E

D

C

B

A

F

E

D

C

B

A

1 2 3 4 5 6 7 8

Date

Drawn

Appr.

Date

A NESPAK COMM.20.09.07 ASIF

RemarksRev.

Yousuf

Shaikh/Asif

07.05.07

Name Norm

GAKKHAR 500/220/132kV Substation Project

NTDC/WAPDA 132kV Trafo. Protection Panel

A5071 (3)G76001-A5071-S7419-A

S

+R4

=E13

Sheet 1-

1 Sh.

CopyRight (C) Siemens AG 2007 All Rights Reserved

Orig./Repl.f./Repl.by

Ref.no.:

ZRA1Siemens PAK

List of Device

7.3.1 SP2

Project:F:/Ghakkar/132kV/132kV Site As Built/Prot. Panel/

E13+R4(Rev_D)/

E13+R4.pro

Symbol library

Symbol library

Symbol library

Symbol library

1: 2:

3:

4:

PTD60617

H2_60617

Translate file

Translate file

Translate file

Translate file

A:

B:

C:

D:

b-Feld_e.etr

C_FB_E.etr

ELCAD-Version

Archive: = / S / ZRA / 1

Last used: 25.06.09

-K110

/G1.3

/G1.4

/G1.4

/G1.4

/G1.4

/G1.6

/RA3.4

-K120

/G1.5

/G1.6

/RA3.5

-K130

/RA1.8

/RA3.5

-K140

/RA2.5

/RA3.6

-K270.

/RA3.4

/RB3.7

/RB2.6

A1

A2

13

14

23

24

A1

A2

13

14

33

34

21

22

43

44

31

32

51

52

43

44

61

62

71

72

81

82

-F68A

/NC2.7

/RB4.8

-F67A

/NC2.6

/RB4.7

/RB7.4

-F66A

/NC2.5

/RB4.7

-F65A

/NC2.4

/RB4.6

-F64A

/NC2.2

/RB4.6

/RB7.6

-F85

/RA2.4

/RB4.2

-F84

/RA2.3

/RB4.3

-F83

/RA2.2

/RB4.3

-F82

/RA2.2

/RB4.2

-F81

/RA1.2

/RB2.2

/RB3.4

7PA27

13

59

14

610

K1

K1

11

37

12

48

K1

K1

12 Trip K1

Site As Built

Page 35: ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK
Page 36: ANNEXURE. C. 132KV Power Transformer Protection Panel …€¦ · ANNEXURE. C. 132KV Power Transformer Protection Panel Drawings ... Siemens PAK

This Page intentionally left blank.