List of Annexure- Minutes of 27th Meeting of SRPC Page 1 of 2

ANNEXURES

ANNEXURE-I List of Participants

ANNEXURE-II PGCIL letter dated 28th

April 2015

ANNEXURE-III TANTRANSCO letter dated 23rd

April 2015

ANNEXRE-IV KSEBL letter dated 04th

May2015

ANNEXURE-V SRPC Secretariat letter dated 15.04.2015 - ICTs at Kozhikode S/S

ANNEXURE-VI Updated status of upcoming inter regional scheme

ANNEXURE-VII TSTRANSCO letter dated 02.05.2015 - Regarding strengthening of

Hyderabad

ANNEXURE-VIII TSTRANSCO letter dated 03.01.2015 regarding overloading of 220

kV lines

ANNEXURE-IX Note furnished by KSEBL( Madkathara – Areakode Line)

ANNEXURE-X SRPC Secretariat letter dated 12.02.2015- regarding Utilization of

Jeypore – Gazuwaka link to its full capacity

ANNEXURE-XI CTU letter dated 11th

March 2015- reply regarding Utilization of

Jeypore – Gazuwaka link to its full capacity

ANNEXURE-XII TSTRANSCO letter dated 24th

April 2015- regarding Jeypore-

Gazuwaka link to its rated capacity

ANNEXURE-XIII SRPC Secretariat Presentation on RSD

ANNEXURE-XIV SRPC Secretariat letter dated 12.03.2015- regarding procurement

action of ERS infrastructure.

ANNEXURE-XV TSTRANSCO letter dated 5th

May 2015- requested to examine

requirement of 125 MVAR bus reactors at 400 kV Gazwel and

Malkaram SS

Page 3: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

List of Annexure- Minutes of 27th Meeting of SRPC Page 2 of 2

ANNEXURE-XVI Relief observed during March and April 2015 wrt SCADA mapped

quantum

ANNEXURE-XVII SRLDC letter dated 8th

May 2015 - implementation of Under

Voltage relay scheme

ANNEXURE-XVIII RGMO analysis for incident that occurred on 07.04.2015 at 21:01

hrs

ANNEXURE-XIX RoP (25.02.2015) of CERC Petition 420/MP/2014

ANNEXURE-XX Relevant extracts from Minutes of NRPC Meetings-PSS Tuning

ANNEXURE-XXI SRPC Secretariat letter dated 15.04.2015 enclosing NLDC Letter

dated 06.04.2015 - regarding certification of line rating / equipment

rating for purpose of adopting seasonal rating

ANNEXURE-XXII Sharing the relief for SPS Trip Signals -TSTRANCO letter dated

29th

April 2015

ANNEXURE-XXIII SPS for load relief by constituents with two units in operation at

KKNPP

ANNEXURE-XXIV Details furnished by MCL

ANNEXURE-XXV Certification of CoD from RPCs - Communication dated 30.01.2015

received from CEA

ANNEXURE-XXVI Status of data, voice, internet communication and pending field

inputs

ANNEXURE-XXVII SRPC Secretariat letter dated 05.02.2015

ANNEXURE-XXVIII KSEBL letter dated 6th

May 2015

ANNEXURE-XXIX SRLDC caution / violation messages

ANNEXURE-XXX SRTS- II Presentation regarding implementation of AMR

Page 4: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

ANNEXURE – I (Page 1of 4)

27TH MEETING OF THE SOUTHERN REGIONAL POWER COMMITTEE

HELD AT HYDERABAD ON 12TH MAY 2015

LIST OF PARTICIPANTS

MEMBERS

Shri M. Sivasankar Chairperson, SRPC & CMD, KSEBL, Thiruvanathapuram Shri Mohd. Anwaruddin Director (Grid & Trans. Mgmt. ), APTRANSCO, Hyderabad

Shri H.Y. Dora CMD, APSPDCL, Tirupathi Shri M. Maheshwar Rao Managing Director, KPCL, Bengaluru Shri S. Sumanth Director (Transmission), KPTCL, Bengaluru Shri M.T.Manjunath Chief Engineer (E) , SLDC, KPTCL, Bengaluru Shri K. Venugopal Director (Trans. & SO), KSEBL, Thiruvanthapuram Shri M. A. Rawther Director (Distribution &Safety), KSEBL, Thiruvanthapuram Shri P.Annadurai Director (Distribution), TANGEDCO, Chennai Shri P. S. Ganesh Director (O), TANTRANSCO, Chennai Shri D.Prabhakar Rao CMD,TSTRANSCO, Hyderabad Shri D.Prabhakar Rao CMD, TSGENCO, Hyderabad Shri G. Narsing Rao Director (HR&GO) & JMD (FAC) , Hyderabad Shri T. Jagath Reddy Director (Trans. & Proj.), TSTRANSCO, Hyderabad Shri R. P. Sasmal Director (O), PGCIL, Gurgaon

Shri Thomas Joseph Chief Executive Officer., NTECL, Vallur, STPS Shri Satish Jindal Director & CEO (Trading), JSWEL, New Delhi Shri P.R.Raghuram Executive Director, POSOCO, SRLDC, Bengaluru Shri S.R. Bhat Member Secretary, SRPC, Bengaluru

OTHERS

Andhra Pradesh Transmission Corporation Ltd.

Shri S. Subrahmanyam Director (Projects) Shri A.K.V Bhaskar Superintending Engineer/SLDC Shri G.S.R. Murthy Superintending Engineer/Comml.

Andhra Pradesh Power Generation Corporation Ltd.

Shri K. Balaram Director (Thermal) Shri Somasekhara Rao Divisional Engineer (Gen)

Karnataka Power Transmission Corporation Ltd.

Shri A. J. Hosamani Chief Engineer Electrical (P&C) Shri D.Chethan Shri M. Renu Prasad Shri J.Ramakantha

Executive Engineer (E) Plg. Executive Engineer (EA to Dir/Trans) Executive Engineer/SLDC

Power Company of Karnataka Ltd.

Shri M. G. Suresh Babu Addl. Director (Projects) Shri I. M. Nagaiah Joint Director

Page 5: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

ANNEXURE – I

(Page 2 of 4)

Karnataka Power Corporation Ltd.

Shri P. Bhaskar Shri M. Shivamallu

Technical Director Chief Engineer (Elec.)

Kerala State Electricity Board Ltd.

Shri Austin D’Cruz Dy. Chief Engineer (Grid) Shri S.R. Anand Executive Engineer (LD)

Tamil Nadu Transmission Corporation Ltd.

Shri N. Krishnasami Chief Engineer (Operation) Shri P. Manohar Chief Engineer (P&C) Shri R. Kalaiselvan Director (Tr. Project) Shri P.Raja Gunanidhi Shri R. Shanmugam Shri P.Murugavelan

Executive Engineer (Grid) Executive Engineer/P&C Asst. Exec. Engineer (Grid)

Tamil Nadu Generation & Distribution Corporation Ltd.

Shri R. Santhana Kumar Executive Engineer/System Studies Telangana State Transmission Corporation Ltd.

Shri B. Vizian Kumar Shri S. Sairam

Chief Engineer (Plg., Comml. & Coord.) Chief Engineer/SLDC

Shri D.R.Vishwanath Rao Superintending Engineer / PS Shri J.V.H. Sastry Superintending Engineer Shri P.S.V.P. Anjaneya Rao Superintending Engineer/SLDC

Shri H.T.Vivekananda DE/Commercial Shri P.Suresh Babu DE / SLDC

Telangana State Generation Corporation Ltd.

Shri M. Sachidanandam Director (Thermal) Shri B. Devadas Chief Engineer (Gen) Ega Hanuman DE/Tech to CMD Telangana State Northern Power Distribution Company Ltd.

Shri B. Narsing Rao Director (OP) Telangana State Southern Power Distribution Company Ltd.

Shri Raghuma Reddy CMD, TSSPDCL

Electricity Department, Puducherry

Shri K. Mathivanan Superintending Engineer-I

Shri T. Chanemougam Executive Engineer

Page 6: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

ANNEXURE – I

(Page 3 of 4)

NTPC Limited

Shri R. Venkateswaran Regional Executive Director (SR) Shri C. V. Anand GM (Comml) - CC Shri K. Sudarshan Shri B. Rajendra Kumar Shri B. Ramesh

AGM (Comml.), SRHQ AGM (OS), SRHQ AGM (Comml), SRHQ

Neyveli Lignite Corporation Ltd.

Shri K.M. Suresh Babu Executive Director (Thermal) Shri S. Ravi Chief Manager/Plg./TPS-II

Nuclear Power Corporation Ltd.

Shri N.K. Jain Associate Director (Transmission) Shri K. P. Singh Chief Engineer

NTPC Tamilnadu Energy Company Ltd. (NTECL)

Shri K.M.K.Prusty AGM (Comml.)

JSW Energy Ltd.

Shri C. N. Singh Shri Veeresh Devaramani

Sr. Vice President/HOP DGM/O&M

Udupi Power Corporation Ltd.

Shri R. Partha Sarathy Head - BLR Office Shri Chandrashekhar Bobade General Manager

Power Grid Corporation of India Ltd.

Shri V. Sekhar Executive Director, SRTS-I Shri V. Sekhar Executive Director, SRTS- II Shri R.N.Singh General Manager / AM Shri Kamal Sarkar Shri H. R. Nagendran Shri P. N. Dixit Shri Kanilk Ram Shri P. Ranga Rao

General Manager General Manager/Proj. General Manager (Asstt. Management) General Manager (O&M), SRTS-I Addl. General Manager (OS),SRTS-I

Shri V. Thiagarajan Asst. General Manager Shri P. Srinivas Chief Manager (Comml.)

Power System Operation Corporation Ltd.

Shri Anbunesan Shri G. Madhukar

Addl. GM, SRLDC Dy. Manager, SRLDC

Page 7: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

ANNEXURE – I (Page 4 of 4)

Mahanadi Coalfields Ltd.

Shri Raghu Nandan General Manager (S & Mktg.)

South Central Railway

Shri P. L. Haranadh Dy. COM/F

Southern Regional Power Committee Secretariat

Shri Asit Singh Superintending Engineer Shri Anil Thomas Executive Engineer

Shri Meka Ramakrishna Executive Engineer Shri K.P.Madhu Executive Engineer

*****

Page 8: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Text Box
Annexure-II (Page 1of 5)
Page 9: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Text Box
Annexure-II (Page 2of 5)
Page 10: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Sticky Note
Marked set by server
server
Typewritten Text
Annexure-II
Page 11: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Text Box
Annexure-II (Page 4 of 5)
Page 12: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Typewritten Text
Annexure-II
server
Typewritten Text
Page 13: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Rectangle
server
Typewritten Text
Annexure-III
Page 14: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Rectangle
server
Typewritten Text
Annexure-III
Page 15: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Rectangle
server
Typewritten Text
Annexure-III
Page 16: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Rectangle
server
Typewritten Text
Annexure-III
Page 17: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

Annexure –IV (KSEBL letter dated 4th May 2015)

<16 Pages>

Page 18: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Typewritten Text
Annexure-IV
Page 19: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
Page 20: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
Page 21: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
Page 22: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
Page 23: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
Page 24: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
Page 25: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
Page 26: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
Page 27: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
Page 28: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
Page 29: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
Page 30: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
Page 31: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
Page 32: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
Page 33: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
Page 34: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Typewritten Text
Annexure-V
Page 35: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

Annexure –VI (Updated status of Inter Regional

Links) <7 Pages>

Page 36: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

Implement-ing (ckm)/ MVA Sch. COD COD/ COD Constraints/ Remarks

Status of upcoming Inter-Regional linksNarendra-Kolhapur 765 kV D/C line

Annexure‐ V

765 KV D/C Narendra (NewKudgi) - Kolhapur Line(Initially charged at 400 KV)

PGCIL 376 April’15 June 15As informed in 27th SRPCMeeting

LILO of circuits of Kolhapur –Mapusa 400 kV D/C Kolhapur

PGCIL 90 April’15 June 15As informed in 27th SRPCMeeting

400 KV D/C Narendra(New Kudgi) -Narendra PGCIL 354 April’15 June 15

As informed in 27th SRPCM ti(Existing) Line (Quad) Meeting

Kolhapur 765/ 400 kV S/S(GIS) (initially charged 400 kV)

PGCIL April’15June 15 As informed in 27th SRPC

Meeting

765/400 KV Narendra (NewKudgi) S/s (GIS) {charged at400 KV}

PGCIL April’15 June 15As informed in 27th SRPCMeeting

Extn. Narendra (Existing) 400/PGCIL April’15

June 15 As informed in 27th SRPC220 kV S/S

PGCIL April 15Meeting

Kudgi TPS – Narendra (new) 2xD/C Line M/s Kudgi

Limited (L&T

Feb’15June 15 As informed in 27th SRPC

Meeting

Narendra (new) - MadhugiriInfrastructure Development Projects Ltd.)

Narendra (new) Madhugiri765 kV D/C Line

Dec’15 Sept’16

Madhugiri - Bidadi 400 kVD/C (quad) Line

Dec’15 Sept’16

server
Typewritten Text
Page 37: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

Implement-ing (ckm)/ MVA Sch. COD Ant COD/ Act COD

Constraints/ Remarks

Wardha - Nizamabad 765 kV D/C line

Wardha-Nizamabad –Maheswaram (Hyderabad) 765kV D/C

PGCIL 1032 May 18 May 18

Wardha – Raipur PS 765 kV D/C PGCIL 713 Dec’15 Commissioned on 15-11-2014

Wardha – Aurangabad 765 kVD/C

PGCIL 690 Dec’15 July 14 Line commissioned in July 14.

Ni b d Di hi lli 400 kVNizamabad-Dichipalli 400 kVD/C

PGCIL 22 May 18 May 18

Nizamabad-YeddumailaramThis along with “Maheshwaram PG -Mahboobnagar 400 kV D/C line” was

(Shankarapalli) 400 kV D/Cg

through based (TBCB) route. wasrecommended GoI for

Maheshwaram PG 765/400 kV,2 1500 MVA S/S 2 240 MVAR

PGCIL 2x1500 2x240 Mar’18 Mar’18

2x1500 MVA S/S , 2x240 MVAR 2x240

Nizamabad 765/400 kV, 2x1500MVA S/S

PGCIL 2x1500 May 18 May 18

LILO of Hyderabad – KurnoolLILO of Hyderabad Kurnool400 S/C Line at Maheshwaram

PGCIL 7 Mar’ 18 Mar’ 18

Page 38: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

Transmission ElementImple-

mentingAgency

Line length (ckm)/

COD Constraints/ Remarks

WR‐SR 6000 MW HVDC Bipole Link [Raigarh (Chhatisgarh) ‐Pugalur/Trichur (TN/KER)]

g y ( )MVA

CapacitySch. Ant / Act

+/- 800 kV WR-SR HVDC Bipole Link [Raighar (Chhatisgarh) -Pugalur (Tamil Nadu)] - Kerala

PGCIL

Raigarh (existing) - Raigarh (HVDC Stn) –400 kV 2xD/C (quad) lines

6000 MW, HVDC Terminal Station at Raigarh 6000

6000 MW, HVDC terminal Station at Pugalur 6000

Raigarh (HVDC Stn) -Pugalur(HVDC Stn) 6000 MW, +/- 800 kV

The schemehad beenawarded toPGCIL(GoI

g ( ) g ( )HVDC bipole.2000 MW HVDC Link Pugalur (HVDC Stn) – North Trichur (HVDCStn) HVDC OH Line and UG cable in Kerala teritory at RoW issues2000 MW, HVDC Terminal Station at Pugalur (VSC based) PGCIL(GoI

circular dated10.12.2014)as informedin 26th SRPC

2000 MW, HVDC Terminal Station at North Trichur(VSC based)LILO of North Trichur – Cochin 400 kV D/C(Q) at North TrichurPugalur HVDC station-Pugalur existing S/S 400 kV D/C(Q) LinePugalur HVDC station-Arasur S/S 400 kV D/C (Q) line with 80 MVAR

meeting.switchable line reactor at Arasur end.Pugalur HVDC station-Thiruvalam S/S 400 kV D/C (Q) line with 80MVAR switchable line reactor at both endsPugalur HVDC station-Edayarpalayam S/S400 kV D/C (Q) line with 63MVAR switchable line reactor at Edayarpalayam endMVAR switchable line reactor at Edayarpalayam end

Edayarpalayam S/S-Udumalpet S/S400 kV D/C (Q) Line

400/230 kV, 2x500 MVA, Edayarpalayam S/S with 2x125 MVAR busreactors. 2x500

Page 39: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

T i i El t I l tiLine length ( k )/ MVA COD C t i t / R k

Angul - Srikakulam PS 765 kV D/C line

Transmission Element Implementing Agency

(ckm)/ MVA Capacity

COD Constraints / Remarks

Ant / ActSch.

Ant / Act

Angul Srikakulam PS 765 PGCIL Jun'15 Dec'15 Generation Project delayedAngul - Srikakulam PS 765kV D/C line

PGCIL 552 Jun 15 Dec 15 Generation Project delayed

Extn. 765/400 kV AngulSub station PGCIL 1x1500 Jun’15 Jun'15

Award placed in August, 2013Sub station

765 kV D/C Angul-Jharsuguda line PGCIL 580 Dec'15 Dec'15

RoW being faced. Hugeforestg involvement awaited.Critical stringing commencedfrom April 2015from April 2015

765 kV D/C Jharshuguda-Dharamjayagarh line PGCIL 230 Dec'15 Dec’15

Award placed in May, 2014Huge forest involvement

Page 40: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

Srikakulam P P- Vemagiri- IIP li t ti 765 kV D/C

M/s VizagTransmission

Li it d 30.08.201 J l ’16 U d i l t ti

Angul - Srikakulam PS 765 kV D/C line

Pooling station 765 kV D/Cline

Limited(A subsidiary of

PGCIL)

6 July’16 Under implementation

Srikakulam Pooling Station765/ 400 kV, 2x1500 MVA PS(400 kV - AIS & 765 kV –GIS)

PGCIL 2x1500 Jun'15 Jun'15 Work under progress

Srikakulam Pooling Station – The line has been approved asGarividi 400 kV (Quad) D/Cline with 80 MVARswitchable line reactor atGarividi end.

PGCIL

The line has been approved asISTS scheme forimplementation in SCPSPSR-37.

400/220 kV S/S at Maradam(Garividi) APTRANSCO Tenders will be called for

shortlyBehrampur- Gazuwaka 400kV D/C line M/s Talcher 290

CERC ROP (for 18.11.2014)enclosed

TransmissionCompany Limited(Subsidiary of M/sReliance PowerTransmission

CEA letter 17.11.2014 : Nophysical progress visible onground.The scheme needed to beimplemented without any

Talcher II – Behrampur 400kV D/C line 220

Talcher II- Rourkela 400 kVD/C Quad line 161

TransmissionCompany Limited)

implemented without anyfurther delay. Civil appeal inSupreme Court.

Behrampur 400/220 kV,2x315 MVA S/S 2x315

Page 41: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

Additional inter‐Regional AC link for import into Southern Region, i.e., Warora‐Warangal ‐Hyderabad‐ Kurnool 765 kV link 

CEA Notification dated 06.02.2015, CEA appointed PFC CL as BPCTransmission Elements Line Length

(ckm)/ MVA Capacity

Implementing

Agency

Sch COD

Constraints/ Remarks

Establishment of 765/400 kV substations at The scheme except a Warangal (New) with 2x1500 MVA transformer and

2x240 MVAR bus reactors.transmission element at (g) has been approved as ISTS scheme for implementation in SCPSPSR-37 (held on 31.07.14). The scheme was

bWarora Pool -Warangal (New) 765 kV D/C line with240 MVAR switchable line reactor at both ends.

)recommended to the GoI for implementation through TBCB by the Empowered Committee in its 33rd meeting held on 30 09 14 The

cWarangal (New) –Hyderabad 765 kV D/C line with330 MVAR switchable line reactor at Warangal end.

dWarangal (New) – Warangal (existing) 400 kV

(quad) D/C line.Hyderabad– Kurnool 765 kV D/C line with 240 held on 30.09.14. The

scheme was notified by CEA vide its notification dated 09.02.15. The scheme is under bidding with RECTPCL

eHyderabad Kurnool 765 kV D/C line with 240MVAR switchable line reactor at Kurnool end.

fWarangal (New) – Chilakaluripeta 765 kV D/C line

with 240 MVAR switchable line reactor at bothends.

as its BPC.

The transmission element at(g) was identified forimplementation under

g LILO of Kurnool-Thiruvalam 765 kV D/C atCuddapah

h compressed time schedulethrough regulated tariffmecha nism by PGCIL.

hCuddapah- Hoody 400 kV (quad) D/C line with 63MVAR switchable line reactor at both ends.

Page 42: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

T i i El t Li L th I l S h C t i t / R k

System strengthening within SR for transmitting power beyond Vemagiri

CEA Notification dated 06.02.2015, CEA appointed RECTPCL as BPCTransmission Elements Line Length

(ckm)/ MVA Capacity

Implementing

Agency

Sch COD

Constraints/ Remarks

a Vemagiri II – Chilakaluripeta 765 kV D/C line withThe scheme has been approved as ISTS scheme Vemagiri II Chilakaluripeta 765 kV D/C line with

240 MVAR switchable line reactor at both ends.pp

for implementation in SCPSPSR-37 (held on 31.07.14). The scheme except the transmission element at (e) and (h) was

b Chilakaluripeta – Cuddapah 765 kV D/C line with 240 MVAR switchable line reactor at both ends.

element at (e) and (h) was recommended to the GoI for implementation through TBCB by the Empowered Committee in its 33rd meeting

c Chilakaluripeta – Narsaraopeta 400 kV (quad) D/C line

dCuddapah – Madhugiri 400 kV (quad) D/C line with 80 MVAR switchable line reactor at both

held on 30.09.14. The scheme was notified by CEA vide its notification dated 09.02.15. The scheme is under bidding with RECTPCL

d with 80 MVAR switchable line reactor at both ends.

e Cuddapah-Hindupur 400 kV (quad) D/C line with 80 MVAR switchable line reactor at Hindupur end. g

as its BPC.

The transmission elements at(e) and (h) were identified forimplementation under

fSrikaukulam Pooling Station – Garividi 400 kV (Quad) D/C line with 80 MVAR switchable line reactor at Garividi end.

gEstablishment of 2x1500 MVA, 765/400 kV substation at Chilakaluripeta with 2x240 MVAR p

compressed time schedulethrough regulated tariffmechanism by PGCIL.

g substation at Chilakaluripeta with 2x240 MVAR bus reactors.

hEstablishment of 2x1500 MVA, 765/400 kV substation at Cuddapah with 2x240 MVAR bus reactors.

Page 43: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Text Box
Annexure-VII (Page 1of 5)
Page 44: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
Page 45: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
Page 46: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
Page 47: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Text Box
Annexure-VII (Page 5of 5)
Page 48: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Text Box
Annexure-VIII (Page 1of 2)
Page 49: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Text Box
Annexure-VIII (Page 2 of 2)
Page 50: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

KSEBL Note on ITEM No. 3.11

North Trissur - Kozhikode - Mylatti 400kV line

The 400kV North Trissur (Madakkathara) – Kozhikode (Areakode) DC line was approved

in the 30th

meeting and Kozhikode (Areakode) – Mylatty - Mangalore (Udupi) DC line in

the 35th

meeting of Standing Committee on Power System Planning in Southern Region as

regional scheme under system strengthening.

In the 30th

standing committee, KSEB said that the North Trissur-Kozhikode 400 kV Quad

D/C line might be implemented with fresh RoW and in case PGCIL faces difficulty in

obtaining fresh RoW then KSEB would spare RoW of its Trissur-Kozhikode 220 kV S/C

line for constructing the North Trissur- Kozhikode 400 kV D/C line. . While taking up this

line for the construction of 400kV line, the supply to Malaparamba is to be ensured. Hence

the construction can be taken up as a multi circuit line part by part (towards south of

Malaparamba and north of Malaparamba in sequence ensuring feeding to Malaparamba on

220kV level). As soon as the Edamon – Kochi portion of the Tirunelveli – Kochi line is

completed and further with the commissioning of Pugalur – Madakkathara HVDC link and

Udupi – Areakode link, this line becomes a major tie line. As the construction is to be

carried out time bound using the RoW of the existing 220kV feeder, it is proposed that the

work may be carried out by KSEBL. PGCIL and other constituents agreed to the proposal.

As per the 35th

meeting of Standing Committee on Power System Planning in Southern

Region, Udupi – Kozhikode (Areakode) 400kV DC was approved, subject to the

observations of ESCOMs in Karnataka within a month. During the SRPC meeting on 12th

May 2015, it was clarified that the ESCOMs of Karnataka has not furnished any comments.

The matter was discussed in detail and the apprehension raised by Karnataka was regarding

the reduction of support at Hassan when the line is constructed, which may lead to

overloading in Hiriyur area. Though the system studies do not indicate any such issues, the

apprehension of Karnataka needs to be addressed. SRLDC has explained the necessity of

the UPCL Kozhikode link in the 26th

SRPC meeting from the reliability point of view.

Further, under the PoC regime transmission charges will be borne by the concerned utility

using the system. The North Trissur Kozhikode Mylatty link is also critical in relieving

congestion in S1 S2. After deliberations, KPTCL had informed that they have no objection

if the other lines to the south of Areakode and the HVDC link are in place before connecting

Udupi to Areakode. However, KSEBL is facing severe transmission constraints in the

Northern Kerala. The supply to Northern Kerala from Areakode is dependent on the 220kV

Annexure-IX

(Page1 of 2)

Page 51: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

Areakode – Mylatty double circuit, which is LILOed at Orkattery (Vadakara), Kanhirode

and Taliparamba. Even now, during high demand period, there is no (N-1) security to the

north of Areakode even if the Mysore – Areakode 400kV line is commissioned. The issue is

regularly flagged by SRLDC and NLDC in their reports also. Hence, the line upto Mylatty

and the 400/220kV substation at Mylatty are to be completed as early as possible. The

interconnection of Udupi to Mylatty can be scheduled to match with the commissioning of

HVDC link at Madakkathara.

Obtaining a fresh RoW from Areakode to Mylatty is not easy in most of the stretches upto

Mylatty. From Mylatty, upto the Kerala border towards Udupi, fresh RoW is possible.

Further, considering the load growth of Northern Kerala, which is more than that of

Southern Kerala, many of the 110kV lines in this region needs to be upgraded. As on date,

doubling of some of the 110kV lines is in progress. Upgradation of some of the 110kV lines

to 220kV is being investigated for possible route of minimum issues on RoW. The

construction of the 400kV double circuit from Areakode to Mylatty, as part of system

strengthening approved in the 35th

Standing committee meeting, can be considered using the

RoW of existing 220kV DC provided the 220kV line is also accommodated as multi circuit.

Here also the construction has to be in steps of each stretch so that the feeding to the

existing 220kV substations is not affected. In view of the above, construction of this part of

the line will be convenient if executed by KSEB. It is apprehended that if this part of the

line is given on TBCB route, severe RoW issues may crop up resulting in the fate similar to

that of Edamon – Kochi stretch, Bangalore – Dharmapuri stretch, Yelahanka area, Mysore –

Kutta area etc. Udupi – Myaltty portion can be taken up to match with the completion of

HVDC link at Madakkathara. Since the line length is very small (about 100-120km), this

portion may be handed over to PGCIL for execution.

***

Annexure-IX

(Page2 of 2)

Page 52: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Rectangle
server
Rectangle
server
Typewritten Text
Annexure-X
server
Typewritten Text
Page 53: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Rectangle
server
Rectangle
server
Typewritten Text
Annexure-XI
Page 54: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Text Box
Annexure-XII (Page 1 of 4)
Page 55: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Text Box
Annexure-XII (Page 2 of 4)
Page 56: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Text Box
Annexure-XII (Page 3 of 4)
Page 57: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Text Box
Annexure-XII (Page 4 of 4)
Page 58: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

Annexure –XIII (SRPC Presentation on RSD)

<10 Pages>

Page 59: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

Reserve Shut

Down SRPC, Secretariat

Page 60: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

Reserve Shut Down-(RSD) It may be economical to shut down unit(s) if total

anticipated URS of the region is more than the ex-

bus installed capacity of an Unit or multiple units

with in the region , provided duration of such surplus

is more than the minimum time period required for

economical shut down start up operation of the

unit(s).

The Unit(s) selected shall be such that it should not

impact the drawal schedule of any beneficiary

after taking into RSD. If Drawal schedule is getting

affected concurrence of the affected utility need

to be taken

The Unit(s) with maximum variable charge and

satisfying above criteria can be selected for RSD.

Page 61: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

Requirements

Advance assessment of URS by the beneficiaries.

Intimation for RSD

Page 62: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

Pros and Cons Managing Huge Variation Between Maximum and

Minimum URS.

High URS during Night (Up to 2000 MW) Hours and

Virtually no URS during Peak Hours.

Average URS greater than 200 MW available for

Continuous 3 days

In Western Region Minimum period required for RSD is

3 Days.

Load management to be done during peak Hours.

Trade off Between Economics Vs Operational

Constraint/Flexibility.

Page 63: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
Page 64: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
Page 65: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

MW MW MW

22-Oct-14- to 24-Oct-14 507 657 1573

25-Oct-14- to 27-Oct-14 85 556 1262

Min URS Avg. URS Max URS

26 Slots of continuous three Days when average

URS was more than 200 MW

5 Slots of continuous three Days when average

URS was more than 500 MW

RSD Possibility Jan 2014- Jan 2015

Period

Page 66: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

Frequency Chart June 2014 to Jan 2015

Page 67: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

CGS Power Purchase cost per unit details for the Month of JANUARY 2015

Cost in Rs/KWHr

CGS Fixed cost Variable cost Total

NTPC- RSTPS 1&2 0.53 2.544 3.07

NTPC- RSTPS Stage 3 0.95 2.707 3.66

NTPC -Talcher STPS 0.80 1.465 2.27

NTPC -Simhadri STPS 1.64 2.737 4.38

NTECL- Vallur STPS 2.12 2.081 4.20

NLC -TPS-I (Expansion) 1.63 2.125 3.76

NLC -TPS II Stage-1 0.57 2.221 2.79

NLC -TPS II Stage-2 0.60 2.221 2.82

NPCIL - MAPS 2.057

NPCIL - KGS Units 1 -4 3.020

NPCIL - Kudankulam NPP 3.545

Page 68: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

Estimated Loss Due to Under Drawal

Page 69: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Rectangle
server
Rectangle
server
Typewritten Text
Annexure-XIV
Page 70: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Typewritten Text
Annexure-XIV
Page 71: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Typewritten Text
Annexure-XIV
Page 72: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Typewritten Text
Annexure-XIV
Page 73: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Typewritten Text
Annexure-XIV
Page 74: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Typewritten Text
Annexure-XIV
Page 75: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Typewritten Text
Annexure-XIV
Page 76: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Typewritten Text
Annexure-XIV
Page 77: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Typewritten Text
Annexure-XIV
Page 78: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Typewritten Text
Annexure-XIV
Page 79: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Text Box
Annexure-XV
Page 80: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

SRPC

Recomme

nded

Implemen

ted

%

Implement

ed

SCADA

Monitorabl

e at SRLDC

% Mapping

to SRLDC

wrt

Implement

ed

Relief

observed

during

March

2015

% Relief

observed

in March

2015

Relief

observed

during

April

2015

% Relief

observed

in April

2015

A B C=B/A D E=D/B F G=F/D H I=H/D

Andhra Pradesh 2782 1566 56% 772 49% 632 82% 473 61%

Telangana 2965 1752 59% 1427 81% 1139 80% 959 67%

Karnataka 3539 3560 101% 3555 100% 2737 77% 2569 72%

Kerala 1173 1207 103% 735 61% 571 78% 544 74%

Tamil Nadu 4176 3379 81% 2718 80% 1659 61% 1559 57%

Puducherry * 103 110 107% 110 100%

Southern Region 14738 11574 79% 9317 80% 6738 72% 6104 66%

AUFR+df/dt quantum in MW during March and April 2015

* Due to FEP problems, Puducherry data was not getting at SRLDC. The problem would be resolved with the commissiong of

new SCADA

server
Typewritten Text
Annexure-XVI
Page 81: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Typewritten Text
Annexure-XVII (Page1 of 2)
Page 82: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Typewritten Text
Annexure-XVII (Page2 of 2)
Page 83: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

Annexure –XVIII (RGMO Analysis for incident on 07-04-

2015 at 21:01 Hrs) <17 Pages>

Page 84: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

RGMO response of the generating units in SR region for the incident 07.04.2015 21:02 Hrs.

The event details are as follows:

DATE TIME FREQUENCY

FROM TO(21:02) DIFF

07-04-15 21:01 49.89 49.61

0.28

Station wise Summary:

STATION EXPECTED ACTUAL %

Lower Sileru 12.83 0.44 3.43

Upper Sileru 2.79 0.23 8.24

Vijaywada TPS 54.09 28.58 52.84

Rayalaseema TPs 38.76 16.00 41.28

SHARATHI 41.42 30.96 74.75

VARAHI 16.94 1.76 10.39

NAGJHERI 35.71 0.62 1.74

JINDAL 58.08 5.41 9.31

BTPS 23.54 2.78 11.81

RTPS 73.32 3.41 4.65

UPCL 45.78 0.00 0.00

IDDUKKI 30.81 34.16 110.87

NLCST2 60.22 2.69 4.47

RGDM 70.15 9.32 13.29

SIMST2 47.41 -4.67 -9.85

VALLUR 35.30 36.40 103.12

MTPS 53.48 20.90 39.08

NCTPS 25.05 20.00 79.84

NCTPS2 53.08 3.61 6.80

Tuticoran TPS 48.71 8.00 16.42

Kakatiya TPS 24.45 0.00 0.00

Kottagudem TPS 40.51 22.00 54.31

Total 1000.00 242.60 24.26

The trend of change in MW for different generators during the incident period (20:55 to 21:05) has

been plotted below for better visualization…

server
Typewritten Text
Annexure-XVIII
Page 85: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

49.2

49.3

49.4

49.5

49.6

49.7

49.8

49.9

50

50.1

340

345

350

355

360

365

370

375

380

8:5

0:0

5 P

M

8:5

0:4

5 P

M

8:5

1:2

5 P

M

8:5

2:0

5 P

M

8:5

2:4

5 P

M

8:5

3:2

5 P

M

8:5

4:0

5 P

M

8:5

4:4

5 P

M

8:5

5:2

5 P

M

8:5

6:0

5 P

M

8:5

6:4

5 P

M

8:5

7:2

5 P

M

8:5

8:0

5 P

M

8:5

8:4

5 P

M

8:5

9:2

5 P

M

9:0

0:0

5 P

M

9:0

0:4

5 P

M

9:0

1:2

5 P

M

9:0

2:0

5 P

M

9:0

2:4

5 P

M

9:0

3:2

5 P

M

9:0

4:0

5 P

M

9:0

4:4

5 P

M

9:0

5:2

5 P

M

9:0

6:0

5 P

M

9:0

6:4

5 P

M

9:0

7:2

5 P

M

9:0

8:0

5 P

M

9:0

8:4

5 P

M

9:0

9:2

5 P

M

Vallur U1

MW1

Freq

49.2

49.3

49.4

49.5

49.6

49.7

49.8

49.9

50

50.1

350

355

360

365

370

375

380

385

8:5

0:0

5 P

M

8:5

0:4

5 P

M

8:5

1:2

5 P

M

8:5

2:0

5 P

M

8:5

2:4

5 P

M

8:5

3:2

5 P

M

8:5

4:0

5 P

M

8:5

4:4

5 P

M

8:5

5:2

5 P

M

8:5

6:0

5 P

M

8:5

6:4

5 P

M

8:5

7:2

5 P

M

8:5

8:0

5 P

M

8:5

8:4

5 P

M

8:5

9:2

5 P

M

9:0

0:0

5 P

M

9:0

0:4

5 P

M

9:0

1:2

5 P

M

9:0

2:0

5 P

M

9:0

2:4

5 P

M

9:0

3:2

5 P

M

9:0

4:0

5 P

M

9:0

4:4

5 P

M

9:0

5:2

5 P

M

9:0

6:0

5 P

M

9:0

6:4

5 P

M

9:0

7:2

5 P

M

9:0

8:0

5 P

M

9:0

8:4

5 P

M

9:0

9:2

5 P

M

MW2

Freq

VALLUR U2

Page 86: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

49.2

49.3

49.4

49.5

49.6

49.7

49.8

49.9

50

50.1

50.2

355

356

357

358

359

360

361

362

363

364

365

8:5

0:3

1 P

M

8:5

1:1

0 P

M

8:5

1:4

9 P

M

8:5

2:2

8 P

M

8:5

3:0

7 P

M

8:5

3:4

6 P

M

8:5

4:2

5 P

M

8:5

5:0

4 P

M

8:5

5:4

3 P

M

8:5

6:2

2 P

M

8:5

7:0

1 P

M

8:5

7:4

0 P

M

8:5

8:1

9 P

M

8:5

8:5

8 P

M

8:5

9:3

7 P

M

9:0

0:1

6 P

M

9:0

0:5

5 P

M

9:0

1:3

4 P

M

9:0

2:1

3 P

M

9:0

2:5

2 P

M

9:0

3:3

1 P

M

9:0

4:1

0 P

M

9:0

4:4

9 P

M

9:0

5:2

8 P

M

9:0

6:0

7 P

M

9:0

6:4

6 P

M

9:0

7:2

5 P

M

9:0

8:0

4 P

M

9:0

8:4

3 P

M

9:0

9:2

2 P

M

9:1

0:0

1 P

M

VALLUR U3

MW3

Freq

49.20

49.30

49.40

49.50

49.60

49.70

49.80

49.90

50.00

50.10

50.20

504.0

506.0

508.0

510.0

512.0

514.0

516.0

518.0

520.0

2

0:5

6:0

0

2

0:5

6:4

0

2

0:5

7:2

0

2

0:5

8:0

0

2

0:5

8:4

0

2

0:5

9:2

0

2

1:0

0:0

0

2

1:0

0:4

0

2

1:0

1:2

0

2

1:0

2:0

0

2

1:0

2:4

0

2

1:0

3:2

0

2

1:0

4:0

0

2

1:0

4:4

0

2

1:0

5:2

0

2

1:0

6:0

0

2

1:0

6:4

0

2

1:0

7:2

0

2

1:0

8:0

0

2

1:0

8:4

0

2

1:0

9:2

0

2

1:1

0:0

0

2

1:1

0:4

0

2

1:1

1:2

0

2

1:1

2:0

0

2

1:1

2:4

0

2

1:1

3:2

0

2

1:1

4:0

0

2

1:1

4:4

0

2

1:1

5:2

0

2

1:1

6:0

0

MW5

Grid Freq

RGDM U5

Page 87: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

49.20

49.30

49.40

49.50

49.60

49.70

49.80

49.90

50.00

50.10

50.20

508.0

510.0

512.0

514.0

516.0

518.0

520.0

522.0

524.0

2

0:5

6:0

0

2

0:5

6:4

0

2

0:5

7:2

0

2

0:5

8:0

0

2

0:5

8:4

0

2

0:5

9:2

0

2

1:0

0:0

0

2

1:0

0:4

0

2

1:0

1:2

0

2

1:0

2:0

0

2

1:0

2:4

0

2

1:0

3:2

0

2

1:0

4:0

0

2

1:0

4:4

0

2

1:0

5:2

0

2

1:0

6:0

0

2

1:0

6:4

0

2

1:0

7:2

0

2

1:0

8:0

0

2

1:0

8:4

0

2

1:0

9:2

0

2

1:1

0:0

0

2

1:1

0:4

0

2

1:1

1:2

0

2

1:1

2:0

0

2

1:1

2:4

0

2

1:1

3:2

0

2

1:1

4:0

0

2

1:1

4:4

0

2

1:1

5:2

0

2

1:1

6:0

0

MW7

Grid Freq

RGDM U7

49.20

49.30

49.40

49.50

49.60

49.70

49.80

49.90

50.00

50.10

50.20

480.0

485.0

490.0

495.0

500.0

505.0

2

0:5

6:0

0

2

0:5

6:4

0

2

0:5

7:2

0

2

0:5

8:0

0

2

0:5

8:4

0

2

0:5

9:2

0

2

1:0

0:0

0

2

1:0

0:4

0

2

1:0

1:2

0

2

1:0

2:0

0

2

1:0

2:4

0

2

1:0

3:2

0

2

1:0

4:0

0

2

1:0

4:4

0

2

1:0

5:2

0

2

1:0

6:0

0

2

1:0

6:4

0

2

1:0

7:2

0

2

1:0

8:0

0

2

1:0

8:4

0

2

1:0

9:2

0

2

1:1

0:0

0

2

1:1

0:4

0

2

1:1

1:2

0

2

1:1

2:0

0

2

1:1

2:4

0

2

1:1

3:2

0

2

1:1

4:0

0

2

1:1

4:4

0

2

1:1

5:2

0

2

1:1

6:0

0

MW4 Grid Freq

RGDM U4

Page 88: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

49.20

49.30

49.40

49.50

49.60

49.70

49.80

49.90

50.00

50.10

50.20

495.0

500.0

505.0

510.0

515.0

520.0

525.0

2

0:5

6:0

0

2

0:5

6:4

0

2

0:5

7:2

0

2

0:5

8:0

0

2

0:5

8:4

0

2

0:5

9:2

0

2

1:0

0:0

0

2

1:0

0:4

0

2

1:0

1:2

0

2

1:0

2:0

0

2

1:0

2:4

0

2

1:0

3:2

0

2

1:0

4:0

0

2

1:0

4:4

0

2

1:0

5:2

0

2

1:0

6:0

0

2

1:0

6:4

0

2

1:0

7:2

0

2

1:0

8:0

0

2

1:0

8:4

0

2

1:0

9:2

0

2

1:1

0:0

0

2

1:1

0:4

0

2

1:1

1:2

0

2

1:1

2:0

0

2

1:1

2:4

0

2

1:1

3:2

0

2

1:1

4:0

0

2

1:1

4:4

0

2

1:1

5:2

0

2

1:1

6:0

0

MW6

Grid Freq

RGDM U6

49.1

49.2

49.3

49.4

49.5

49.6

49.7

49.8

49.9

50

50.1

248

249

250

251

252

253

254

255

256

257

258

20

:56

:44

20

:57

:03

20

:57

:22

20

:57

:41

20

:58

:00

20

:58

:19

20

:58

:38

20

:58

:57

20

:59

:16

20

:59

:35

20

:59

:54

21

:00

:13

21

:00

:32

21

:00

:51

21

:01

:10

21

:01

:29

21

:01

:48

21

:02

:07

21

:02

:26

21

:02

:45

21

:03

:04

21

:03

:23

21

:03

:42

21

:04

:01

21

:04

:20

21

:04

:39

21

:04

:58

21

:05

:17

21

:05

:36

21

:05

:55

21

:06

:14

21

:06

:33

KTPS U9 & U10

LOAD-X [MW] LOAD-IX [MW] FREQUENCY [HZ]

Page 89: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

49.40

49.50

49.60

49.70

49.80

49.90

50.00

50.10

206

208

210

212

214

216

218

220

222

224

20

:57

:00

20

:57

:30

20

:58

:00

20

:58

:30

20

:59

:00

20

:59

:30

21

:00

:00

21

:00

:30

21

:01

:00

21

:01

:30

21

:02

:00

21

:02

:30

21

:03

:00

21

:03

:30

21

:04

:00

21

:04

:30

21

:05

:00

21

:05

:30

21

:06

:00

21

:06

:30

21

:07

:00

21

:07

:30

MW3

Frequency

NCTPS U#3

49.40

49.50

49.60

49.70

49.80

49.90

50.00

50.10

198

200

202

204

206

208

210

212

214

216

218

20

:57

:00

20

:57

:30

20

:58

:00

20

:58

:30

20

:59

:00

20

:59

:30

21

:00

:00

21

:00

:30

21

:01

:00

21

:01

:30

21

:02

:00

21

:02

:30

21

:03

:00

21

:03

:30

21

:04

:00

21

:04

:30

21

:05

:00

21

:05

:30

21

:06

:00

21

:06

:30

21

:07

:00

21

:07

:30

MW2

Frequency

NCTPS U#2

Page 90: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

49.20

49.30

49.40

49.50

49.60

49.70

49.80

49.90

50.00

50.10

50.20

190

192

194

196

198

200

202

204

206

20

:55

:00

20

:55

:29

20

:55

:58

20

:56

:27

20

:56

:56

20

:57

:25

20

:57

:54

20

:58

:23

20

:58

:52

20

:59

:21

20

:59

:50

21

:00

:19

21

:00

:48

21

:01

:17

21

:01

:46

21

:02

:15

21

:02

:44

21

:03

:13

21

:03

:42

21

:04

:11

21

:04

:40

21

:05

:09

21

:05

:38

21

:06

:07

21

:06

:36

21

:07

:05

21

:07

:34

21

:08

:03

21

:08

:32

21

:09

:01

21

:09

:30

21

:09

:59

FREQMW

MTPS-U#1

49.2

49.3

49.4

49.5

49.6

49.7

49.8

49.9

50

50.1

50.2

185

190

195

200

205

210

20

:55

:00

20

:55

:23

20

:55

:46

20

:56

:09

20

:56

:32

20

:56

:55

20

:57

:18

20

:57

:41

20

:58

:04

20

:58

:27

20

:58

:50

20

:59

:13

20

:59

:36

20

:59

:59

21

:00

:22

21

:00

:45

21

:01

:08

21

:01

:31

21

:01

:54

21

:02

:17

21

:02

:40

21

:03

:03

21

:03

:26

21

:03

:49

21

:04

:12

21

:04

:35

21

:04

:58

21

:05

:21

21

:05

:44

21

:06

:07

21

:06

:30

21

:06

:53

21

:07

:16

21

:07

:39

MTPS-U#3

MW

FREQ

Page 91: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

49.2

49.3

49.4

49.5

49.6

49.7

49.8

49.9

50

50.1

50.2

185

190

195

200

205

210

215

20

:55

:00

20

:55

:24

20

:55

:48

20

:56

:12

20

:56

:36

20

:57

:00

20

:57

:24

20

:57

:48

20

:58

:12

20

:58

:36

20

:59

:00

20

:59

:24

20

:59

:48

21

:00

:12

21

:00

:36

21

:01

:00

21

:01

:24

21

:01

:48

21

:02

:12

21

:02

:36

21

:03

:00

21

:03

:24

21

:03

:48

21

:04

:12

21

:04

:36

21

:05

:00

21

:05

:24

21

:05

:48

21

:06

:12

21

:06

:36

21

:07

:00

21

:07

:24

21

:07

:48

MW

MTPS-U#4

49.2

49.3

49.4

49.5

49.6

49.7

49.8

49.9

50

50.1

50.2

190

195

200

205

210

215

220

2

0:5

5:0

0

2

0:5

5:0

0

2

0:5

5:0

0

2

0:5

6:0

0

2

0:5

6:0

0

2

0:5

7:0

0

2

0:5

7:0

0

2

0:5

7:0

0

2

0:5

8:0

0

2

0:5

8:0

0

2

0:5

9:0

0

2

0:5

9:0

0

2

1:0

0:0

0

2

1:0

0:0

0

2

1:0

0:0

0

2

1:0

1:0

0

2

1:0

1:0

0

2

1:0

2:0

0

2

1:0

2:0

0

2

1:0

2:0

0

2

1:0

3:0

0

2

1:0

3:0

0

2

1:0

4:0

0

2

1:0

4:0

0

2

1:0

5:0

0

2

1:0

5:0

0

2

1:0

5:0

0

2

1:0

6:0

0

2

1:0

6:0

0

2

1:0

7:0

0

2

1:0

7:0

0

2

1:0

7:0

0

MW1

FREQ

TTPS-U1

Page 92: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

49.2

49.3

49.4

49.5

49.6

49.7

49.8

49.9

50

50.1

50.2

200

202

204

206

208

210

212

214

2

0:5

5:0

0

2

0:5

5:0

0

2

0:5

5:0

0

2

0:5

6:0

0

2

0:5

6:0

0

2

0:5

7:0

0

2

0:5

7:0

0

2

0:5

7:0

0

2

0:5

8:0

0

2

0:5

8:0

0

2

0:5

9:0

0

2

0:5

9:0

0

2

1:0

0:0

0

2

1:0

0:0

0

2

1:0

0:0

0

2

1:0

1:0

0

2

1:0

1:0

0

2

1:0

2:0

0

2

1:0

2:0

0

2

1:0

2:0

0

2

1:0

3:0

0

2

1:0

3:0

0

2

1:0

4:0

0

2

1:0

4:0

0

2

1:0

5:0

0

2

1:0

5:0

0

2

1:0

5:0

0

2

1:0

6:0

0

2

1:0

6:0

0

2

1:0

7:0

0

2

1:0

7:0

0

2

1:0

7:0

0

MW2

FREQ

TTPS U2

49.2

49.3

49.4

49.5

49.6

49.7

49.8

49.9

50

50.1

50.2

200

202

204

206

208

210

212

214

2

0:5

5:0

0

2

0:5

5:0

0

2

0:5

5:0

0

2

0:5

6:0

0

2

0:5

6:0

0

2

0:5

7:0

0

2

0:5

7:0

0

2

0:5

8:0

0

2

0:5

8:0

0

2

0:5

8:0

0

2

0:5

9:0

0

2

0:5

9:0

0

2

1:0

0:0

0

2

1:0

0:0

0

2

1:0

0:0

0

2

1:0

1:0

0

2

1:0

1:0

0

2

1:0

2:0

0

2

1:0

2:0

0

2

1:0

3:0

0

2

1:0

3:0

0

2

1:0

3:0

0

2

1:0

4:0

0

2

1:0

4:0

0

2

1:0

5:0

0

2

1:0

5:0

0

2

1:0

5:0

0

2

1:0

6:0

0

2

1:0

6:0

0

2

1:0

7:0

0

2

1:0

7:0

0

MW3

FREQ

TTPS U3

Page 93: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

49.2

49.3

49.4

49.5

49.6

49.7

49.8

49.9

50

50.1

50.2

192

194

196

198

200

202

204

206

208

210

212

214

20

:55

:00

2

0:5

5:0

0

2

0:5

5:0

0

2

0:5

6:0

0

2

0:5

6:0

0

2

0:5

7:0

0

2

0:5

7:0

0

2

0:5

7:0

0

2

0:5

8:0

0

2

0:5

8:0

0

2

0:5

9:0

0

2

0:5

9:0

0

2

1:0

0:0

0

2

1:0

0:0

0

2

1:0

0:0

0

2

1:0

1:0

0

2

1:0

1:0

0

2

1:0

2:0

0

2

1:0

2:0

0

2

1:0

2:0

0

2

1:0

3:0

0

2

1:0

3:0

0

2

1:0

4:0

0

2

1:0

4:0

0

2

1:0

5:0

0

2

1:0

5:0

0

2

1:0

5:0

0

2

1:0

6:0

0

2

1:0

6:0

0

2

1:0

7:0

0

2

1:0

7:0

0

2

1:0

7:0

0

MW4

FREQ

TTPS-U4

49.2

49.3

49.4

49.5

49.6

49.7

49.8

49.9

50

50.1

50.2

208

208.5

209

209.5

210

210.5

211

211.5

2

0:5

5:0

0

2

0:5

5:0

0

2

0:5

5:0

0

2

0:5

6:0

0

2

0:5

6:0

0

2

0:5

7:0

0

2

0:5

7:0

0

2

0:5

7:0

0

2

0:5

8:0

0

2

0:5

8:0

0

2

0:5

9:0

0

2

0:5

9:0

0

2

1:0

0:0

0

2

1:0

0:0

0

2

1:0

0:0

0

2

1:0

1:0

0

2

1:0

1:0

0

2

1:0

2:0

0

2

1:0

2:0

0

2

1:0

2:0

0

2

1:0

3:0

0

2

1:0

3:0

0

2

1:0

4:0

0

2

1:0

4:0

0

2

1:0

5:0

0

2

1:0

5:0

0

2

1:0

5:0

0

2

1:0

6:0

0

2

1:0

6:0

0

2

1:0

7:0

0

2

1:0

7:0

0

2

1:0

7:0

0

MW5

FREQ

MTTPS-U5

Page 94: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

49.2

49.3

49.4

49.5

49.6

49.7

49.8

49.9

50

50.1

50.2

190

192

194

196

198

200

202

204

206

2

0:5

7:0

0

2

0:5

7:1

6

2

0:5

7:3

2

2

0:5

7:4

8

2

0:5

8:0

4

2

0:5

8:2

0

2

0:5

8:3

6

2

0:5

8:5

2

2

0:5

9:0

8

2

0:5

9:2

4

2

0:5

9:4

0

2

0:5

9:5

6

2

1:0

0:1

2

2

1:0

0:2

8

2

1:0

0:4

4

2

1:0

1:0

0

2

1:0

1:1

6

2

1:0

1:3

2

2

1:0

1:4

8

2

1:0

2:0

4

2

1:0

2:2

0

2

1:0

2:3

6

2

1:0

2:5

2

2

1:0

3:0

8

2

1:0

3:2

4

2

1:0

3:4

0

2

1:0

3:5

6

2

1:0

4:1

2

2

1:0

4:2

8

2

1:0

4:4

4

2

1:0

5:0

0

2

1:0

5:1

6

MW

FREQ

VTPS-U1

Page 95: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

49.2

49.3

49.4

49.5

49.6

49.7

49.8

49.9

50

50.1

50.2

188

189

190

191

192

193

194

195

20

:57

:00

2

0:5

7:1

6

2

0:5

7:3

2

2

0:5

7:4

8

2

0:5

8:0

4

2

0:5

8:2

0

2

0:5

8:3

6

2

0:5

8:5

2

2

0:5

9:0

8

2

0:5

9:2

4

2

0:5

9:4

0

2

0:5

9:5

6

2

1:0

0:1

2

2

1:0

0:2

8

2

1:0

0:4

4

2

1:0

1:0

0

2

1:0

1:1

6

2

1:0

1:3

2

2

1:0

1:4

8

2

1:0

2:0

4

2

1:0

2:2

0

2

1:0

2:3

6

2

1:0

2:5

2

2

1:0

3:0

8

2

1:0

3:2

4

2

1:0

3:4

0

2

1:0

3:5

6

2

1:0

4:1

2

2

1:0

4:2

8

2

1:0

4:4

4

2

1:0

5:0

0

2

1:0

5:1

6

MW

FREQ

VTPS U#2

49.75

49.80

49.85

49.90

49.95

50.00

50.05

50.10

166.0

168.0

170.0

172.0

174.0

176.0

178.0

20

:57

:00

20

:57

:18

20

:57

:36

20

:57

:54

20

:58

:12

20

:58

:30

20

:58

:48

20

:59

:06

20

:59

:24

20

:59

:42

21

:00

:00

21

:00

:18

21

:00

:36

21

:00

:54

21

:01

:12

21

:01

:30

21

:01

:48

21

:02

:06

21

:02

:24

21

:02

:42

21

:03

:00

21

:03

:18

21

:03

:36

21

:03

:54

21

:04

:12

21

:04

:30

21

:04

:48

21

:05

:06

21

:05

:24

21

:05

:42

21

:06

:00

MW

Frequency

VTPS-U5

Page 96: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

49.75

49.80

49.85

49.90

49.95

50.00

50.05

50.10

190.00

191.00

192.00

193.00

194.00

195.00

196.00

20

:57

:00

20

:57

:19

20

:57

:38

20

:57

:57

20

:58

:16

20

:58

:35

20

:58

:54

20

:59

:13

20

:59

:32

20

:59

:51

21

:00

:10

21

:00

:29

21

:00

:48

21

:01

:07

21

:01

:26

21

:01

:45

21

:02

:04

21

:02

:23

21

:02

:42

21

:03

:01

21

:03

:20

21

:03

:39

21

:03

:58

21

:04

:17

21

:04

:36

21

:04

:55

21

:05

:14

21

:05

:33

21

:05

:52

MW

Frequency

VTPS U6

49.2

49.3

49.4

49.5

49.6

49.7

49.8

49.9

50

50.1

160

165

170

175

180

185

20

:57

:01

20

:57

:20

20

:57

:39

20

:57

:58

20

:58

:17

20

:58

:36

20

:58

:55

20

:59

:14

20

:59

:33

20

:59

:52

21

:00

:11

21

:00

:30

21

:00

:49

21

:01

:08

21

:01

:27

21

:01

:46

21

:02

:05

21

:02

:24

21

:02

:43

21

:03

:02

21

:03

:21

21

:03

:40

21

:03

:59

21

:04

:18

21

:04

:37

21

:04

:56

21

:05

:15

21

:05

:34

21

:05

:53

21

:06

:12

21

:06

:31

21

:06

:50

MW

FRE

Q

RYTPS U1

Page 97: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

49.2

49.3

49.4

49.5

49.6

49.7

49.8

49.9

50

50.1

145

150

155

160

165

170

1752

0:5

7:0

1

20

:57

:20

20

:57

:39

20

:57

:58

20

:58

:17

20

:58

:36

20

:58

:55

20

:59

:14

20

:59

:33

20

:59

:52

21

:00

:11

21

:00

:30

21

:00

:49

21

:01

:08

21

:01

:27

21

:01

:46

21

:02

:05

21

:02

:24

21

:02

:43

21

:03

:02

21

:03

:21

21

:03

:40

21

:03

:59

21

:04

:18

21

:04

:37

21

:04

:56

21

:05

:15

21

:05

:34

21

:05

:53

21

:06

:12

21

:06

:31

21

:06

:50

MW

FREQ

RYTPS U2

49.2

49.3

49.4

49.5

49.6

49.7

49.8

49.9

50

50.1

147

148

149

150

151

152

153

154

155

156

157

20

:57

:01

20

:57

:17

20

:57

:33

20

:57

:49

20

:58

:05

20

:58

:21

20

:58

:37

20

:58

:53

20

:59

:09

20

:59

:25

20

:59

:41

20

:59

:57

21

:00

:13

21

:00

:29

21

:00

:45

21

:01

:01

21

:01

:17

21

:01

:33

21

:01

:49

21

:02

:05

21

:02

:21

21

:02

:37

21

:02

:53

21

:03

:09

21

:03

:25

21

:03

:41

21

:03

:57

21

:04

:13

21

:04

:29

21

:04

:45

21

:05

:01

21

:05

:17

RYTPS U3

Page 98: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

49.2

49.3

49.4

49.5

49.6

49.7

49.8

49.9

50

50.1

158

160

162

164

166

168

170

172

174

176

1782

0:5

7:0

1

20

:57

:17

20

:57

:33

20

:57

:49

20

:58

:05

20

:58

:21

20

:58

:37

20

:58

:53

20

:59

:09

20

:59

:25

20

:59

:41

20

:59

:57

21

:00

:13

21

:00

:29

21

:00

:45

21

:01

:01

21

:01

:17

21

:01

:33

21

:01

:49

21

:02

:05

21

:02

:21

21

:02

:37

21

:02

:53

21

:03

:09

21

:03

:25

21

:03

:41

21

:03

:57

21

:04

:13

21

:04

:29

21

:04

:45

21

:05

:01

21

:05

:17

MW

FREQ

RYTPS U4

49.3

49.4

49.5

49.6

49.7

49.8

49.9

50

50.1

145

150

155

160

165

170

175

180

185

190

195

20

:56

:01

20

:56

:20

20

:56

:39

20

:56

:58

20

:57

:17

20

:57

:36

20

:57

:55

20

:58

:14

20

:58

:33

20

:58

:52

20

:59

:11

20

:59

:30

20

:59

:49

21

:00

:08

21

:00

:27

21

:00

:46

21

:01

:05

21

:01

:24

21

:01

:43

21

:02

:02

21

:02

:21

21

:02

:40

21

:02

:59

21

:03

:18

21

:03

:37

21

:03

:56

21

:04

:15

21

:04

:34

21

:04

:53

21

:05

:12

21

:05

:31

21

:05

:50

MW

FREQ

RYTPS U5

Page 99: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

49.30

49.40

49.50

49.60

49.70

49.80

49.90

50.00

50.10

517

518

519

520

521

522

523

524

525

526

527

528

2

0:5

8:0

0

2

1:0

1:0

2

2

1:0

1:0

6

2

1:0

1:1

0

2

1:0

1:1

5

2

1:0

1:1

9

2

1:0

1:2

3

2

1:0

1:2

8

2

1:0

1:3

2

2

1:0

1:3

6

2

1:0

1:4

1

2

1:0

1:4

5

2

1:0

1:4

9

2

1:0

1:5

4

2

1:0

1:5

8

2

1:0

2:0

2

2

1:0

2:0

7

2

1:0

2:1

1

2

1:0

2:1

5

2

1:0

2:2

0

2

1:0

2:2

4

2

1:0

2:2

8

2

1:0

2:3

2

2

1:0

2:3

7

2

1:0

2:4

1

2

1:0

2:4

5

2

1:0

2:5

0

2

1:0

2:5

4

2

1:0

2:5

8

MW1

Freq

SIMHADRI-U1

49.30

49.40

49.50

49.60

49.70

49.80

49.90

50.00

50.10

510

511

512

513

514

515

516

2

0:5

8:0

0

2

1:0

1:0

2

2

1:0

1:0

6

2

1:0

1:1

0

2

1:0

1:1

5

2

1:0

1:1

9

2

1:0

1:2

3

2

1:0

1:2

8

2

1:0

1:3

2

2

1:0

1:3

6

2

1:0

1:4

1

2

1:0

1:4

5

2

1:0

1:4

9

2

1:0

1:5

4

2

1:0

1:5

8

2

1:0

2:0

2

2

1:0

2:0

7

2

1:0

2:1

1

2

1:0

2:1

5

2

1:0

2:2

0

2

1:0

2:2

4

2

1:0

2:2

8

2

1:0

2:3

2

2

1:0

2:3

7

2

1:0

2:4

1

2

1:0

2:4

5

2

1:0

2:5

0

2

1:0

2:5

4

2

1:0

2:5

8

MW2

Freq

SIMHADRI-U2

Page 100: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

49.30

49.40

49.50

49.60

49.70

49.80

49.90

50.00

50.10

460

470

480

490

500

510

520

2

0:5

8:0

0

2

1:0

1:0

2

2

1:0

1:0

6

2

1:0

1:1

0

2

1:0

1:1

5

2

1:0

1:1

9

2

1:0

1:2

3

2

1:0

1:2

8

2

1:0

1:3

2

2

1:0

1:3

6

2

1:0

1:4

1

2

1:0

1:4

5

2

1:0

1:4

9

2

1:0

1:5

4

2

1:0

1:5

8

2

1:0

2:0

2

2

1:0

2:0

7

2

1:0

2:1

1

2

1:0

2:1

5

2

1:0

2:2

0

2

1:0

2:2

4

2

1:0

2:2

8

2

1:0

2:3

2

2

1:0

2:3

7

2

1:0

2:4

1

2

1:0

2:4

5

2

1:0

2:5

0

2

1:0

2:5

4

2

1:0

2:5

8

MW3

Freq

SIMHADRI-U3

49.30

49.40

49.50

49.60

49.70

49.80

49.90

50.00

50.10

504

505

506

507

508

509

510

511

512

513

514

2

0:5

8:0

0

2

1:0

1:0

2

2

1:0

1:0

6

2

1:0

1:1

0

2

1:0

1:1

5

2

1:0

1:1

9

2

1:0

1:2

3

2

1:0

1:2

8

2

1:0

1:3

2

2

1:0

1:3

6

2

1:0

1:4

1

2

1:0

1:4

5

2

1:0

1:4

9

2

1:0

1:5

4

2

1:0

1:5

8

2

1:0

2:0

2

2

1:0

2:0

7

2

1:0

2:1

1

2

1:0

2:1

5

2

1:0

2:2

0

2

1:0

2:2

4

2

1:0

2:2

8

2

1:0

2:3

2

2

1:0

2:3

7

2

1:0

2:4

1

2

1:0

2:4

5

2

1:0

2:5

0

2

1:0

2:5

4

2

1:0

2:5

8

MW4

Freq

SIMHADRI-U4

Page 101: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

______________________________________________________________________________

ROP in Petition No. MP/420/2014 Page 1 of 3

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI

Petition No. 420/MP/2014 Subject : Endangering grid security due to non-implementation of

contingency demand disconnection scheme for sudden loss of wind generation as per CERC order dated 22.2.2014 in Petition No. 120/MP/2011, non-availability of LVRT protection, non scheduling of wind generation as per Regulation 6.5.23 (j) of the Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2010, Regulation 5.3 regarding lack of necessary demand estimation and not providing real time SCADA data to LDC.

Date of hearing : 26.2.2015

Coram : Shri Gireesh B. Pradhan, Chairperson Shri A.K. Singhal, Member Shri A.S. Bakshi, Member Petitioner : Southern Regional Load Despatch Centre Respondents : Tamil Nadu State Load Despatch Centre

Parties present : Shri V. Suresh, SRLDC Shri Pankaj Batra, CEA Shri S. Vallinayagam, Advocate, SLDC, Tamilnadu Shri S.K.Sonee, POSOCO Record of Proceedings

The representative of Southern Regional Load Despatch Centre (SRLDC) submitted as under:

(a) Regulation B (3) of the Central Electricity Authority (Technical Standards for Connectivity to the Grid) Regulations, 2007 provides that Low Voltage Ride Through (LVRT) is compulsory for machines installed after 15.4.2014 but for existing wind power generating stations, LVRT should be mutually discussed. It does not exempt any station from installing LVRT.

(b) The issue of installing LVRT has been discussed from the time when the installed capacity of wind in Sothern Regioin was 3000 MW.

server
Typewritten Text
Annexure-XIX
Page 102: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

______________________________________________________________________________

ROP in Petition No. MP/420/2014 Page 2 of 3

Presently, the installed capacity is around 13,000 MW. Out of this, 9000 MW wind capacity does not have LVRT.

(c) No tangible action has been taken with regard to installation of LVRT. The responsibility of monitoring installation LVRT has not been fixed under any Regulation.

2. The representative of CEA submitted as under:

(a) At the time of framing Central Electricity Authority (Technical Standards for Connectivity to the Grid) Regulations, 2007, it was thought that installation of LVRT on existing machines will have an implication on tariff. Since, ADMS scheme has not been implemented by the States, the grid becomes vulnerable due to emergency situations such as sudden variation of load/loss of wind generation or forced outages are there etc. Therefore, availability of LVRT is very important.

(b) STU/SLDC should be responsible to monitor installation of LVRT. LVRT should fall under the Connectivity Regulations of respective State.

3. In response to the Commission’s query regarding availability of LVRT on new generators, the representative of CEA submitted that status of LVRT on new generators will be filed after checking with generators.

4. The representative of POSOCO submitted that installation of LVRT needs to be ensured at the time of “connection” of the wind generators itself. The strictness of LVRT is necessary.

5. After hearing the parties, the Commission directed to admit the petition and issue notice to the respondents. The Commission directed to issue notice to Wind Energy Association and Solar Power Association of Southern Region. 6. The Commission directed the petitioner to implead Wind Energy Association and Solar Power Association of Southern Region as party to the petition and file revised memo of parties. 7. The Commission directed the petitioner to serve copy of the petition on the respondents, Wind Energy Association and Solar Power Association of Southern Region immediately. The respondents were directed to file their replies by 27.3.2015 with an advance copy to the petitioner, who may file its rejoinder, if any, on or before17.4.2015.

Page 103: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

______________________________________________________________________________

ROP in Petition No. MP/420/2014 Page 3 of 3

8. The Commission directed the respondents to submit on affidavit by 27.3.2015 status of LVRTs on wind generators in their respective States. 9. The petition shall be listed for hearing on 23.4.2015.

By order of the Commission

Sd/- (T. Rout)

Chief (Law)

Page 104: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

Annexure –XX (PSS Tuning-Relevant extracts from

Minutes of NRPC Meetings) <05 Pages>

Page 105: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
Page 106: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
Page 107: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
Page 108: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
Page 109: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
Page 110: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Rectangle
server
Typewritten Text
Annexure-XXI
server
Rectangle
Page 111: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
Page 112: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
Page 113: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
Page 114: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Rectangle
server
Typewritten Text
Annexure-XXII
Page 115: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Typewritten Text
Annexure-XXIII
Page 116: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Text Box
Annexure-XXIV (Page 1 of 2)
Page 117: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Text Box
Annexure-XXIV (Page 2 of 2)
Page 118: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Typewritten Text
Annexure-XXV
server
Rectangle
Page 119: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

Standby Data Channel Status

Non-availability of standby data channe at

Nelamangala,Talcher,Kochi,

LANCO & NellorePS,NelloreSAS,TPCIL,NTPL

Voice Communication status.

Non-availability of voice communication at Pugalur,

KolarHVAC,Hiriyur.Kalivathnapattu,Mysore,

Narendra,Trivandrum,TalcherHVDC,Hassan,Kochi,Palakkadu

Puduchery,Munirabad,

NTPC Kayamkulam,MAPS,Kaiga,NLC ST2,

NLC TS 1Expansion.&NLY TS 2Expansion, NTECL VALLUR

Internet communication

Reliable / Dedicated internet communication for

System operation-Status of confirmation.

Gateway

Providing Main &Standby gate way for all new/upcoming stations.

SCADA & COMMUNICATION Annexure- XXVI

Page 120: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
Page 121: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Typewritten Text
Annexure-XXVII
Page 122: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
Page 123: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Typewritten Text
Annexure-XXVIII
Page 124: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
Page 125: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
Page 126: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
server
Typewritten Text
Annexure-XXVIII
Page 127: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

Annexure-XIX

AlertEMERGEN

CY NC AlertEMERGENC

Y NC AlertEMERGEN

CY NC AlertEMERGENC

Y NC AlertEMERGENC

Y NC AlertEMERGEN

CY NC

December-14 7 8 1 5 10 0 0 0 0 27 20 1 16 7 0 0 0 0

January-15 2 7 0 4 7 0 2 1 0 7 13 0 6 9 0 0 3 0

February-15 9 21 1 5 24 3 0 1 1 11 10 0 8 6 0 0 3 0

March-15 11 22 1 6 13 0 5 3 0 10 17 0 9 6 0 0 0 0

December-14 11 9 0 8 12 0 1 1 0 10 7 1 21 27 2 0 0 0

January-15 3 8 0 5 8 0 5 5 0 5 4 1 12 26 4 0 1 0

February-15 9 15 0 7 16 2 2 2 0 7 6 0 15 16 1 0 0 0

March-15 13 27 3 6 5 1 5 2 0 8 6 0 14 28 2 0 0 0

December-14 2 0 0 3 0 0 1 0 0 7 9 2 9 10 2 0 0 0

January-15 2 3 0 0 1 0 2 3 0 13 29 0 14 27 1 0 0 0

February-15 3 2 0 1 3 0 1 3 0 5 12 0 4 13 0 0 0 0

March-15 0 2 0 0 2 0 7 5 0 6 29 0 5 23 0 0 0 0

December-14 2 6 0 2 4 0 0 2 0 4 5 0 4 10 0 0 0 0

January-15 0 6 0 1 8 0 0 1 0 1 4 0 1 11 1 0 0 0

February-15 2 3 0 1 2 0 1 0 0 0 1 0 1 2 0 0 0 0

March-15 2 5 1 1 4 0 1 1 0 3 1 0 3 5 0 0 0 0

December-14 7 6 0 7 6 0 4 6 0 0 0 0 7 6 0 0 0 0

January-15 5 7 0 4 7 0 0 2 0 0 2 0 6 11 2 0 1 0

February-15 4 2 0 4 1 0 0 0 0 2 0 0 3 2 0 0 0 0

March-15 7 1 0 5 1 0 1 4 0 6 0 0 1 1 0 0 0 0

Voltage Violation Messages

MonthAPTRANSCO TSTRANSCO KPTCL KSEB TANTRANSCO PUDUCHERY

Zero Crossing Violation Messages

Deviation Violation Messages

Loading Violation Messages

Frequency Violation Messages

server
Rectangle
server
Typewritten Text
Annexure-XXIX
Page 128: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

Annexure –XVII (SRTS-II- PPT on AMR)

<12 Pages>

server
Rectangle
server
Text Box
X
server
Text Box
X
Page 129: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical
Page 130: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

POPULATION OF SEMS

• NO OF SEMS > 900 (EXPECTED TO INCREASE BEYOND 1000 IN ONE YEAR)

• NO OF LOCATIONS > 150

• NO OF MAKES: AT PRESENT AROUND 4 MAKES (SML, L&T, WALLABY, ELSTER) OF METERS OF DIFFERENT

SERIES ARE INSTALLED AT DIFFERENT LOCATIONS OF SR

Page 131: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

CURRENT METHOD OF RELAY OF DATA TO RLDC

• DATA FROM EACH METER IS DOWNLOADED IN TO A HAND HELD DEVICE (DCD) THROUGH THE OPTICAL

PORT

• THE DATA IS FURTHER DOWNLOADED ON TO THE LOCAL PC USING MANUFACTURER PROPRIETARY

SOFTWARE.

• THIS DATA IS THEN TRANSMITTED TO SRLDC AS EMAIL ATTACHMENT

Page 132: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

• SRPC APPROVED IMPLEMENTATION OF THE AMR SCHEME BY POWERGRID IN THE 24TH MEETING HELD ON

15-03-2014 AT CHENNAI.

• IT WAS ALSO AGREED THAT POWERGRID COULD FIRM UP APPROPRIATE TECHNOLOGY FOR

IMPLEMENTATION, BASED ON THE EXPERIENCE IN OTHER REGIONS/UTILITIES

• ACCORDINGLY THE SYSTEMS BEING IMPLEMENTED IN NORTHERN REGION AND EASTERN REGION WERE

STUDIED

• ALSO NECESSARY INPUTS AND FEEDBACK WAS TAKEN FROM THE IMPLEMENTING AGENCIES (M/S

KALKITECH & M/S TCS)

Page 133: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

PROPOSED AMR IN SR

• THE AMR PROPOSED FOR SR IS ALSO ON THE SIMILAR LINES OF THE SCHEME THAT IS IMPLEMENTED IN NR

& ER WITH FEW MODIFICATIONS

• THE MAJOR ENHANCEMENT SOUGHT IN THE SCHEME IS TO HAVE A BETTER COMMUNICATION CHANNEL

Page 134: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

MAJOR COMPONENTS OF AMR

• DATA CONCENTRATOR UNIT (DCU) – TO BE INSTALLED AT EACH LOCATION

• COMMUNICATION CHANNEL

• CENTRAL DATA COLLECTION SYSTEM – TO BE ESTABLISHED AT RLDC

Page 135: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

PROPOSED HIRARCHY OF AMR IN SR

Page 136: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

ARCHITECTURE OF

THE PROPOSED AMR

SCHEME IN SR

Page 137: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

AMR IN SR

• ESTIMATED COST OF IMPLEMENTATION IS AROUND RS. 4.0-4.5 CRORE

• SYSTEM TO COVER AMC OF 4 YEARS AFTER THE EXPIRY OF WARRANTY OF ONE YEAR

• MAJOR ENDEAVOUR IS TO USE THE BANDWIDTH FROM THE EXISTING FIBER OPTIC NETWORK WHEREVER

POSSIBLE

• EXISTING BROADBAND CONNECTIVITY, IF AVAILABLE, TO INTERNET CAN ALSO BE USED FOR AMR

• GPRS WILL BE THE LAST OPTION WHERE BOTH FIBER/BROADBAND IS NOT AVAILABLE

Page 138: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

AMR IN SR

• AS AGREED IN THE 24TH SRPC MEETING, COORDINATION, OPERATION & MAINTENANCE SUBSEQUENTLY

AFTER THE INSTALLATION OF AMR INFRASTRUCTURE TO BE LOOKED AFTER BY THE RESPECTIVE UTILITY

• RECURRING COMMUNICATIONS EXPENDITURE, IF ANY (GPRS CHARGES) ARE TO BE BORNE BY THE OWNER

OF PREMISES WHERE THE INFRASTRUCTURE IS INSTALLED.

Page 139: ANNEXURES - Kar · 2015-06-29 · ANNEXURE-II PGCIL letter dated 28th April 2015 ANNEXURE-III TANTRANSCO letter dated 23rd April 2015 ... Shri A. J. Hosamani Chief Engineer Electrical

AMR IN SR

• DETAILED TECHNICAL SPECS AND SCOPE AND EXECUTION GUIDELINES ALONG WITH THE ESTIMATE ARE

UNDER PREPARATION AND SAME SHALL BE FORWARDED TO BENIFICIARIES AND SRLDC.

• AFTER THE RECEPT OF CONCURRENCE OF STAKEHOLEDERS, NECESSARY ACTION FOR TENDERING AND

AWARD SHALL BE TAKEN UP.

COOPERATION FROM ALL THE STAKEHOLDERS IS HIGHLY SOLICITED