ANNUAL ENVIRONMENTAL REPORT Licence Register Number P0795-01 Licensee Cadbury Ireland Limited Location of Installation Shinnagh,
Rathmore, County Kerry
Report for (year) 2008
Emissions from the installation: There have been some changes in emission points from the site since the initial granting of the licence in December 2007 as follows:
Emissions to Air: The boiler stack that was in place at the time the licence was issued has now been dismantled and replaced with a new stack. The original boilers are no longer in use and two new boilers have been commissioned in their place. The initial proposal for the replacement work submitted to the Agency was dated 27th March 2008 with additional information being requested by the Agency on 10th April. Final approval subject to compliance with the licence was issued on 12th June. There have been no changes to the fuel used (heavy fuel oil) to date. Emissions are measured approximately every 6 months by an external consultancy firm as described in Condition 4.2 of the licence with the annual figures (as reported in the AER spreadsheet incorporated in this document as Appendix 1) calculated on the basis of concentration at time of measurement and volume of heavy fuel oil used during the year. The full report is retained by the site Quality & Environment Manager and is controlled as an externally generated document. Emissions to Water (Surface Water discharge point SW1): The location of the discharge point to the receiving waters (the River Blackwater) is being changed in conjunction with the introduction of the divert system on the outflow. The acute toxicity of the undiluted final effluent as discharged at SW1 has been verified as being non-toxic in compliance with Condition 6.12 with results submitted to the Agency on 12 June 2008. A flow dependent sampler is in place at the nominated discharge point with testing taking place either in the on-site laboratory or in an external facility. The monitoring results for the year are reported in the AER spreadsheet (Appendix 1 of this report). Emissions to Water (Storm Water discharge point SW2): The current storm water discharge SW2 is being upgraded to include a silt trap and oil separator in compliance with Condition 3.8 of the licence. Drainage systems on site are being upgraded so that discharges from this point in the future will consist solely of the influent stream (flowing from the western side of the site) and the run-off from the employee car park. Emissions to Water (Storm Water discharge point SW3): Storm water discharge SW3 is being developed so that the storm waters which have been discharging to ground (a stone soakaway) on the eastern side of the site will be passing through a silt trap and oil separator. Monitoring and diversion mechanisms will also be installed on this system. The only part of the site which will be not be draining through this new discharge point once the current drainage work is completed will be the employee car park.
Emissions to land: There are no process emissions to land. As required by Condition 6.14 of the licence, a hydrogeological investigation of the site has been carried out. Three groundwater monitoring points have been identified upstream of the site (using the existing wells) with two new monitoring points created downstream of the site within the area of the WWTP. This report was submitted to the Agency on 12th February and is awaiting final approval. As a result of this recommendations of this report, biannual monitoring of groundwater will be carried out on site. Waste management record: Waste management records for the site for 2008 are included in the AER spreadsheet which comprises Appendix 1 of this report. Resource consumption summary: 2008 2007 Process water usage 122,550 m3 from wells 135, 638 m3 from wells Heavy fuel oil usage 3,667.1 tonnes 3,892.67 tonnes Diesel usage 0.23 tonnes 0.23 tonnes Gas usage 9.324 tonnes 8.9 tonnes Complaints summary No complaints of an environmental nature related to the operation of the facility have been received since the IPPC licence was issued in December 2007 Schedule of Environmental Objectives and Targets The Schedule of Environmental Objectives and Targets is included in Appendix 2, with Table 1 listing the specific Schedule for 2009. Environmental Management Programme (report for 2008) The 2008 report on the Environmental Management Programme for the site forms Appendix 3 of this report. Environmental Management Programme (proposal for 2009) The Environmental Management Programme for the site for the years 2009 – 2013 is described in Table 2 of Appendix 2 as it forms part of the overall Schedule of Environmental Objectives and Targets. Pollution Release and Transfer Register (report for 2008) All category specific PRTR pollutants are reported within the AER spreadsheet which forms Appendix 1 of this report. Pollution Release and Transfer Register (proposal for 2009) It is proposed to continue following all relevant guidelines as issued by the Agency, including the requirement to submit details electronically.
Noise monitoring report summary Condition 6.15 of the licence requires that a noise survey of the site operations be carried out annually. Monitoring was undertaken at six monitoring stations in the vicinity of the site, which were selected as representing noise sensitive locations in the local area. Where audible, emissions from the site were continuous and steady, and there were no occurrences of clearly audible tonal components (which would have resulted in a breach of schedule B4). Daytime noise levels as measured at all six stations were within the limit of 55dB as specified in the licence. Nighttime levels were lower than the 45dB at five out of the six monitoring stations, but exceeded this at the sixth point at which measurements took place (an unoccupied cottage). The definition of the latter as a noise sensitive location is being reviewed and it is likely that a more suitable NSL in the same area will be identified for the 2009 survey. Additional information was requested following the initial submission of the report on 3rd December, with the Agency issuing final approval of the report on 6th March. The full report is retained by the site Quality & Environment Manager and is controlled as an externally generated document. Ambient monitoring report summary No ambient monitoring is to be carried out as part of this licence. Tank and pipeline testing and inspection report Details of the tank and pipeline testing reports are included as Appendix 4 of this report. Reported incidents summary Date Reported incident 25/01/08 Hydraulic fluid spillage from compactor 10/03/08 Hydraulic fluid spillage from cocoa mass tanker 29/04/08 Heavy fuel oil spillage from pipeline 25/06/08 Non-reporting of incidents of (1) No flow rate recorded at SW1 as
probe detached on 2/03/08 (2) discharge at SW1 shown as in excess of ELV on 3 dates in May and (3) discharge at SW1 shown as in excess of ELV on 5 dates in June
11/07/08 ELVs for COD and TSS exceeded at SW1 1/08/08 ELV for flow to river exceeded at SW1 (heavy rainfall) 5/09/08 ELV for COD exceeded at SW1 6/09/08 ELV for COD exceeded at SW1 11/12/08 pH of discharge to river (continuous monitoring), COD, TSS and
BOD ELVs all exceeded at SW1 (14/01/09) Non-reporting by fax of incident of 11/12/08 Energy Efficiency audit report summary Condition 7.1 of the licence requires that an audit of energy efficiency of the site be carried out within one year of date of grant of the licence. This report was submitted to the Agency on 3rd December with final approval issued on 6th March 2009. Recommendations arising from the audit have been incorporated into the Schedule of Environmental Objectives and Targets for 2009. The full report is retained by the site
Quality & Environment Manager and is controlled as an externally generated document. Report on the assessment of the efficiency of use of raw materials in processes and the reduction in waste generated The report indicates that ingredient losses for 2008 amounted to 0.62% when the ingredient input figure is compared with the finished product output. Report on progress made and proposals being developed to minimise water demand and the volume of trade effluent discharge Process water used and wastewater discharged are regarded as Key Process Indicators for the site with quantities used per tonne of crumb monitored on a monthly basis for the last number of years. One initiative that was implemented at the end of 2008 was the installation of locks on hoses inside the factory. Hoses can therefore only be operated with the knowledge of management. The environmental awareness program scheduled to run during the first part of 2009 also raises awareness of the importance of saving resources such as water. Some discussions have been held to date with chemical suppliers which may lead to further opportunities for water reduction in CIP processes in the future (while still being mindful of food safety requirements). Review of residuals management plan The residuals management plan has been submitted to the Agency and is currently awaiting approval of costings (last communication dated 19/309) Statement of measures in relation to prevention of environmental damage and remedial actions (Environmental Liabilities) IPPC Licence P0795-01 includes a condition on Environmental Liabilities (12.2.1) which states; “The licensee shall as part of the AER provide an annual statement as to the measures taken or adopted at the site in relation to the prevention of environmental damage, and the financial provisions in place in relation to the underwriting of costs for remedial actions following anticipated events (including closure) or accidents/incidents, as may be associated with the carrying on of the activity.” The following measures are implemented on site in relation to preventing environmental damage.
• A full site specific ELRA has been carried out which identified mitigation measures at the facility and site.
• The RMP and costing have been prepared and submitted to the Agency and are awaiting approval. A Parent Company Guarantee will be drafted pending approval of the RMP costs by the Agency.
• IPPC annual contribution • Site wide training; IPPC and environmental awareness training is being rolled
out across the site. Approximately 50% of all staff have received training and the remainder are scheduled for 2009.
• Spill kits and containment booms are positioned throughout the site and are clearly signed.
• Weekly inspections are carried out of holding areas, bunds and spill kits.
• The Rathmore site is accredited to the 14001 standard and maintains an Environmental Management System (EMS) which complies to the standard and is audited regularly and revised for continual improvement. Revisions of the EMS have incorporated IPPCL requirements.
• Corporate Compliance Audits are also carried out and Cadbury has a Purple goes Green initiative.
• Regional Environmental Meetings rotate around different sites where environmental staff meet to discuss and share experience from their sites.
• Cadbury Ireland Ltd. maintain a high level of insurance to cover any unplanned pollution event or incident.
Environmental Liabilities Risk Assessment Review A full site specific ELRA has been submitted to the Agency and is currently awaiting approval. (02/03/09).
Appendix 1: AER spreadsheet
Facility ID & Activities
| PRTR# : P0795 | Facility Name : Cadbury Ireland Limited | Filename : Sheet1.xls | Return Year : 2008 | 4904
Version 1.1.01REFERENCE YEAR 2008
1. FACILITY IDENTIFICATIONParent Company Name Cadbury Ireland Limited
Facility Name Cadbury Ireland LimitedPRTR Identification Number P0795
Licence Number P0795-01
Waste or IPPC Classes of ActivityNo. class_name
7.2.1
The treatment and processing of milk, the quantity of milk received being greater than 200 tonnes per day (average value on a yearly basis).
Address 1 ShinnaghAddress 2 RathmoreAddress 3 County KerryAddress 4
Country IrelandCoordinates of Location 11800928
River Basin DistrictNACE Code 105
Main Economic Activity Manufacture of dairy productsAER Returns Contact Name Jocelyn Cathalin
AER Returns Contact Email Address [email protected] Returns Contact Position Quality & Environment Manager
AER Returns Contact Telephone Number 064-58004AER Returns Contact Mobile Phone Number 087 9059792
AER Returns Contact Fax Number 064-58368Production Volume 0.0
Production Volume UnitsNumber of Installations 1
Number of Operating Hours in Year 0Number of Employees 0
User Feedback/CommentsWeb Address
2. PRTR CLASS ACTIVITIESActivity Number Activity Name8c Treatment and processing of milk
3. SOLVENTS REGULATIONS (S.I. No. 543 of 2002)Is it applicable?
Have you been granted an exemption ?If applicable which activity class applies (as per
Schedule 2 of the regulations) ?Is the reduction scheme compliance route being
used ?
AER Returns Worksheet
Page 1
Releases to Air
4.1 RELEASES TO AIR | PRTR# : | Facility Name : * Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button | Filename : Sheet2.xls | Return Year : Nitroge 03/04/2009 17:278 12 20 20 28 28 6 7 6 6 6
SECTION A : SECTOR SPECIFIC PRTR POLLUTANTS
QUANTITY
No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 Emission Point 2 T (Total) KG/YearA (Accidental) KG/Year
F (Fugitive) KG/Year
0.0 0.0 0.0 0.0 0.0
08 Nitrogen oxides (NOx/NO2) M ALTKane May Quintox KM9160 flue gas analyser 25998.5 25998.5 51997.0 0.0 0.0
11 Sulphur oxides (SOx/SO2) M BS EN 14791:2005 15165.5 15165.5 30331.0 0.0 0.086 Particulate matter (PM10) M ISO 9096 9311.0 9311.0 18622.0 0.0 0.0
02 Carbon monoxide (CO) M ALTKane May Quintox KM9160 flue gas analyser 1400.0 1400.0 2800.0 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
SECTION B : REMAINING PRTR POLLUTANTS
QUANTITY
No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year0.0 0.0 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
SECTION C : REMAINING POLLUTANT EMISSIONS (As required in your Licence)
QUANTITY
Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year0.0 0.0 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
Additional Data Requested from Landfill operators
Landfill:* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
Please enter summary data on the quantities of methane flared and / or utilised
additional_pollutant_no T (Total) kg/Year M/C/E Method CodeDesignation or
DescriptionFacility Total Capacity m3
per hourTotal estimated methane generation (as pe
site model) 0.0 N/AMethane flared 0.0 0.0 (Total Flaring Capacity)
Methane utilised in engine/s 0.0 0.0 (Total Utilising Capacity)Net methane emission (as reported in Sectio
A above) 0.0 N/A
For the purposes of the National Inventory on Greenhouse Gases, landfill operators are requested to provide summary data on landfill gas (Methane) flared or utilised on their facilities to accompany the figures for total methane generated. Operators should only report their Net methane (CH4) emission to the environment under T(total) KG/yr for Section A: Sector specific PRTR pollutants above. Please complete the table below:
Method Used
RELEASES TO AIRPOLLUTANT METHOD
Method Used
RELEASES TO AIRPOLLUTANT METHOD
Method Used
RELEASES TO AIRPOLLUTANT METHOD
Method Used
Page 1
Releases to Waters
4.2 RELEASES TO WATERS | PRTR# : | Facility Name : | Filename : Sheet3.xls | Return Year : Total nitrogen | 03/04/2009 17:278 11 19 20 28 35 6 8 6 6 6
SECTION A : SECTOR SPECIFIC PRTR POLLUTANTS Data on ambient monitoring of storm/surface water or groundwater, conducted as part of your licence requirements, should NOT be submitted under AER / PRTR Reporting as this only concerns Releases from your facility
QUANTITYSW1
No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 Emission Point 2 Emission Point 3 T (Total) KG/Year
A (Accidental) KG/Year
F (Fugitive) KG/Year
0.0 0.0 0.0 0.0 0.0 0.012 Total nitrogen M ALT ETG03 (Ganimede) 1128.35 0.0 0.0 1128.35 0.0 0.0
13 Total phosphorus M ALT
HACH method adapted from Standard Methods for the Examination of Water and Wastewater 672.95 0.0 0.0 672.95 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
SECTION B : REMAINING PRTR POLLUTANTS
QUANTITY
No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year0.0 0.0 0.0 0.00.0 0.0 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
SECTION C : REMAINING POLLUTANT EMISSIONS (as required in your Licence)
QUANTITYSW1
Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 Emission Point 2 Emission Point 3 T (Total) KG/Year
A (Accidental) KG/Year
F (Fugitive) KG/Year
0.0 0.0 0.0 0.0 0.0 0.0
303 BOD M OTH
Oxygen Sensitive Electrode used to measure changes in dissolved oxygen content of material over 5 day incubation period 1776.25 0.0 0.0 1776.25 0.0 0.0
306 COD M CRM
HACH method adapted from J Water Pollution Control Federation 1964 10185.41 0.0 0.0 10185.41 0.0 0.0
238 Ammonia (as N) M ALT
Nessler method adapted from Standard Methods for the Examination of Water and Wastewater 58.32 0.0 0.0 58.32 0.0 0.0
314 Fats, Oils and Greases M ALTET 0834 Based on APHA 2005:5520:D 1.0 0.0 0.0 1.0 0.0 0.0
332 Ortho-phosphate (as PO4) M ALT
HACH method adapted from Standard Methods for the examination of water and wastewater 597.27 0.0 0.0 597.27 0.0 0.0
240 Suspended Solids M ALT Gravimetric methods 3559.82 0.0 0.0 3559.82 0.0 0.00.0 0.0 0.0 0.0 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
RELEASES TO WATERSPOLLUTANT
Method Used
RELEASES TO WATERSPOLLUTANT
Method Used
RELEASES TO WATERSPOLLUTANT
Method Used
Page 1
Releases to Wastewater or Sewer
4.3 RELEASES TO WASTEWATER OR SEWER | PRTR# : | Facility Name : | Filename : Sheet4.xls | Return Year : * Select a row by double-clicking on 03/04/2009 17:278 8 16 16 6 6 6 6
SECTION A : PRTR POLLUTANTS
QUANTITY
No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year0.0 0.0 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
SECTION B : REMAINING POLLUTANT EMISSIONS (as required in your Licence)
QUANTITY
Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year0.0 0.0 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
OFFSITE TRANSFER OF POLLUTANTS DESTINED FOR WASTE-WATER TREATMENT OR SEWERPOLLUTANT METHOD
Method Used
OFFSITE TRANSFER OF POLLUTANTS DESTINED FOR WASTE-WATER TREATMENT OR SEWERPOLLUTANT METHOD
Method Used
Page 1
Releases to Land
4.4 RELEASES TO LAND | PRTR# : | Facility Name : | Filename : Sheet5.xls | Return Year : | 03/04/2009 17:278 9 17 17 6 6 6 6
SECTION A : PRTR POLLUTANTS
QUANTITY
No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year0.0 0.0 0.00.0 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
SECTION B : REMAINING POLLUTANT EMISSIONS (as required in your Licence)
QUANTITY
Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year0.0 0.0 0.0
* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button
RELEASES TO LANDPOLLUTANT METHOD
Method Used
RELEASES TO LANDPOLLUTANT METHOD
Method Used
Page 1
Treatment & Transfers of Waste
5. ONSITE TREATMENT & OFFSITE TRANSFERS OF WASTE | PRTR# : 17 05 03 | Facility Name : 05 01 05 | Filename : Sheet6.xls | Return Year : 13 05 03 | 03/04/2009 17:275 24
Transfer Destination European Waste Code HazardousQuantity T/Year Description of Waste
Waste Treatment Operation M/C/E Method Used
Location of Treatment
Name and Licence / Permit No. of Recoverer / Disposer /
BrokerAddress of Recoverer /
Disposer / Broker
Name and Address of Final Destination i.e. Final Recovery / Disposal Site (HAZARDOUS
WASTE ONLY)
Licence / Permit No. of Final Destination i.e. Final Recovery / Disposal Site (HAZARDOUS
WASTE ONLY)
Within the Country 02 05 02 No 194.0 Sludges from on site effluent treatment R10 M Weighed Offsite in Ireland
McGill Environmental Services CK(S) 302/06 (waste collection permit holder Munster Waste WCP LK/008/08(d))
Ballinvoher, Castletownroche, Co.Cork
Within the Country 20 03 01 No 59.0Mixed muncipal waste (general compactor and yard skip) D1 M Weighed Offsite in Ireland
Killarney Waste Disposal W0217-01 (waste collection permit WCP LK/072/07(d))
Aughnacureen, Killarney, Co. Kerry
Within the Country 16 07 08 Yes 12.0 Waste oil R9 M Weighed Offsite in Ireland
Lehane Environmental & Industrial Services Limited (waste collection permit WCP/LK/066/06c)
Unit 5, Wallingstown Industrial Estate, Little Island, Cork
Rilta Environmental , Rathcoole, Co. Dublin 192-2
Within the Country 15 01 01 No 4.0Cardboard removed from site in dedicated cardboard compactor R3 M Weighed Offsite in Ireland
Killarney Waste Disposal W0217-01 (waste collection permit WCP LK/072/07(d))
Aughnacureen, Killarney, Co. Kerry
Within the Country 13 05 03 Yes 12.0 Interceptor Waste R9 M Weighed Offsite in Ireland
Lehane Environmental & Industrial Services Limited (waste collection permit WCP/LK/066/06c)
Unit 5, Wallingstown Industrial Estate, Little Island, Cork
Rilta Environmental , Rathcoole, Co. Dublin 192-2
Within the Country 02 05 02 No 42.0 Sludges from on site effluent treatment R10 M Weighed Offsite in Ireland
Waddock Composting WP 01/02 (waste collection permit Lehane WCP LK/066/06c) Killamaster, Co. Carlow
To Other Countries 15 02 02 Yes 4.0 Oil containing absorbents, cloths, filters D10 E Volume Calculation Abroad
Lehane Environmental & Industrial Services Limited (waste collection permit WCP/LK/066/06c)
Unit 5, Wallingstown Industrial Estate, Little Island, Cork ATM Netherlands 03 / 7623
Within the Country 20 01 35 Yes 0.07 WEEE R4 M Weighed Offsite in Ireland
Lehane Environmental & Industrial Services Limited (waste collection permit WCP/LK/066/06c)
Unit 5, Wallingstown Industrial Estate, Little Island, Cork
KMK Metals Recycling Ltd, Cappincur Industrial Estate, Co. Offaly 113-03
Within the Country 05 01 05 Yes 116.0 Hydrocarbon oil R9 M Weighed Offsite in Ireland
Lehane Environmental & Industrial Services Limited (waste collection permit WCP/LK/066/06c)
Unit 5, Wallingstown Industrial Estate, Little Island, Cork
Rilta Environmental , Rathcoole, Co. Dublin 192-2
To Other Countries 17 05 03 Yes 324.0 Potentially contaminated soil D8 M Weighed Abroad
Lehane Environmental & Industrial Services Limited (waste collection permit WCP/LK/066/06c)
Unit 5, Wallingstown Industrial Estate, Little Island, Cork U Nord, Brenen, Germany 2006 / 008
Within the Country 17 04 05 No 14.3 Scrap metal R4 M Weighed Offsite in Ireland
Cork Metal Company CK (S) 204 /05 (waste collection permit WCP LK/024/05c) Dublin Hill, Cork
Within the Country 20 01 21 Yes 0.0136 Fluorescent lamp tubes R5 C Weighed Offsite in IrelandIrish Lamp Recycling Company WCP LK/057/06c
Blackpark, Kilkenny Road, Athy, Co.Kildare
Irish Lamp Recycling Company 02 2000B
Within the Country 20 01 35 Yes 0.0136 WEEE R5 C Weighed Offsite in IrelandIrish Lamp Recycling Company WCP LK/057/06c
Blackpark, Kilkenny Road, Athy, Co.Kildare
Irish Lamp Recycling Company 02 2000B
Within the Country 20 01 33 Yes 0.0136 Battery R4 C Weighed Offsite in IrelandIrish Lamp Recycling Company WCP LK/057/06c
Blackpark, Kilkenny Road, Athy, Co.Kildare
Irish Lamp Recycling Company 02 2000B
Within the Country 06 04 04 Yes 0.0136 Mercury R4 C Weighed Offsite in IrelandIrish Lamp Recycling Company WCP LK/057/06c
Blackpark, Kilkenny Road, Athy, Co.Kildare
Irish Lamp Recycling Company 02 2000B
Within the Country 20 01 35 Yes 0.0136 Fittings R5 C Weighed Offsite in IrelandIrish Lamp Recycling Company WCP LK/057/06c
Blackpark, Kilkenny Road, Athy, Co.Kildare
Irish Lamp Recycling Company 02 2000B
Within the Country 18 01 03 Yes 0.01 Waste from healthcare checks D9 E Volume Calculation Offsite in Ireland
Healthcare Waste Management Services WCP/LK/049/08d
The Royal Mews, 10 Dublin Street, Carlow
Eco-Safe Systems, Unit A, Allied Industrial Estate, Kylemore Road, Ballyfermot, Dublin 10 54-2
Method Used
Page 1
Treatment & Transfers of Waste
Within the Country 16 05 06 Yes 0.05COD vials and other unused laboratory chemicals D9 E Volume Calculation Offsite in Ireland
Johnston Logistics Limited WCP LK/056/07(c)
Blackchurch, Rathcoole, Co. Dublin
Shannon Environmental Services Ltd, Smithstown Industrial Estate, Shannon, Co. Clare 41 -1
Within the Country 17 09 04 No 120.04 Mixed construction waste D1 M Weighed Offsite in Ireland
Vincent Reen WP 07/16 (waste collection permit for Nigel O'Connor WCP LK/504/07b)
Old Chapel, Rathmore, Co.Kerry
Within the Country 17 09 04 No 1314.38 Mixed construction waste D1 M Weighed Offsite in Ireland
Vincent Reen WP 07/16 (waste collection permit for Michael Quirke WCP LK /177/07c)
Old Chapel, Rathmore, Co.Kerry
* Select a row by double-clicking the Description of Waste then click the delete button
Page 2
Appendix 2: Schedule of Environmental Objectives and Targets
Schedule of Environmental Objectives + Targets – Cadbury Ireland Rathmore, Co. Kerry (P0795‐01) ____________________________________________________________________________________
Page 1 of 5
SCHEDULE OF ENVIRONMENTAL OBJECTIVES + TARGETS
for period
2009 ‐ 2013
Licence Reg No P0795‐01
Licensee Cadbury Ireland Rathmore
Location of Installation Rathmore, Co. Kerry
Project No. Rev Date Prepared By Status
12448-6006 B March 2009 MWP + Cadburys Rathmore Controlled
Schedule of Environmental Objectives + Targets – Cadbury Ireland Rathmore, Co. Kerry (P0795‐01) ____________________________________________________________________________________
Page 2 of 5
CONTENTS
1. INTRODUCTION 2. SCOPE
3. FORMAT 4. DISCUSSION 5. LIMITATIONS
APPENDICES
TABLE 1 ‐ ENVIRONMENTAL OBJECTIVES + TARGETS
TABLE 2 – ENVIRONMENTAL MANAGEMENT PROGRAMME 2008 ‐ 2012
Schedule of Environmental Objectives + Targets – Cadbury Ireland Rathmore, Co. Kerry (P0795‐01) ____________________________________________________________________________________
Page 3 of 5
1. INTRODUCTION This document has been prepared to satisfy Condition No’s 2.2.2.2 and 2.2.2.3 of Cadbury Ireland
Rathmore IPPC License (P0795‐01), and includes the first annual review. The document outlines
Cadburys Rathmore environmental objectives and targets and the Environmental Management
Programme (EMP) which defines the actions and a time schedule for achieving these objectives and
targets.
2. SCOPE 2.1 Environmental Objectives: Cadbury Ireland Rathmore environmental objectives are based on:
statutory obligations, and in particular IPPC licence requirements
an extensive corporate level environment policy; and
a facility specific environmental management system.
2.2 Environmental Targets: The proposed targets are specific tasks which have been identified as being
necessary for the achievement of environmental objectives. These targets will be reviewed and
updated periodically to ensure they appropriately address environmental goals.
2.3 Environmental Management Programme (EMP): The EMP outlined in this document, which sets
out the schedule of how and when objectives and targets will be achieved, has been established
through extensive assessment of the identified environmental aspects of the facility’s operation and
management. The proposed plan sets out the priorities and actions to be pursued over the next five
years to achieve environmental goals.
Schedule of Environmental Objectives + Targets – Cadbury Ireland Rathmore, Co. Kerry (P0795‐01) ____________________________________________________________________________________
Page 4 of 5
3. FORMAT
The Schedule of Environmental Objectives and Targets is presented in 2 No. tables as follows:
Table 1 ‐ Environmental Objectives and Targets. This table outlines
The environmental aspects to be addressed
The environmental objective relative to the aspect
The targets which detail performance requirements to achieve environmental objectives
Specific schemes / actions necessary to meet environmental targets
Priority of action
Table 2 ‐ Environmental Management Programme. This table follows on from Table 1 and outlines
the schedule and responsibility for achieving environmental actions and targets outlined in Table 1.
4. DISCUSSION Environmental Objectives were divided into two main categories, namely:
i) Operational Objectives‐ which incorporates twelve broad categories of operational aspects
identified as having potential to influence the environmental performance of the facility
ii) Management Objectives – which incorporates the twelve categories of aspects associated with
the facilities environmental management system
Schedule of Environmental Objectives + Targets – Cadbury Ireland Rathmore, Co. Kerry (P0795‐01) ____________________________________________________________________________________
Page 5 of 5
4.1 Operational Objectives:
The actions and time frames proposed for achievement of Operational Objectives have been
determined based on the Schedule of Environmental Objectives and Targets developed for Year 1 (2008)
through to Year 5 (2012).
The 5‐year Programme has been reviewed and revised forward to incorporate a Programme for the next
5 years; Year 2 (2009) to Year 6 (2013).
Many of the operational objectives identified in Year 1 are due to be completed in Year 2 (2009).
Given the significant financial costs involved, the proposed programme affords some priority to those
actions with most potential to reduce environmental impacts within the main target categories, namely
storm water and wastewater management issues.
4.2 Management Objectives:
Cadbury Ireland Rathmore currently has an Environmental Management System (EMS) in place which is
accredited to ISO14001. The EMS has been reviewed and minor modifications are ongoing to
incorporate the requirements of the IPPC Licence.
Many site procedures have been updated, including the Monitoring Procedure, Corrective and
Preventive Action Procedure and Communication Procedure. The EMS will be further reviewed and
updated throughout Year 2 (2009) and the following years in keeping with principles of Continual
Improvement.
5. LIMITATIONS
Targets for achieving objectives which had a considerable amount of large engineering works have been
extended in part due to adverse weather conditions.
Page 1 of 9
Table 1 Environmental Objectives and Targets ‐ Cadbury Ireland Ltd, Rathmore, Co. Kerry
OPERATIONAL REQUIREMENTS ASPECT OBJECTIVE TARGETS ACTION PRIORITY
Storm Water Management
No soil, surface water or groundwater contamination as a result of storm water discharges from the site
Maintain a silt trap and oil separator on storm water discharges
All pump sumps storage tanks, lagoons or other treatment plant chambers from which spillage of environmentally significant materials might occur shall be fitted with high liquid level alarms
The provision of a catchment system to collect any leaks from flange and valves of all over‐ground pipes to be examined
Ensure that contaminated storm waters currently discharging to ground at the eastern side of the installation, discharge to the River Blackwater via a silt trap and oil separator
Install suitable monitoring and a diversion mechanism on the discharge to ensure that contaminated storm water is diverted to the on‐site WWTP
Monitor ground water biannually
2 no. full retention separators shall be installed on SW3 (primary storm water outfall from the site). 1 no. bypass separator shall be fitted on SW2 (western outfall).
High liquid level alarms shall be fitted at the emergency tank and divert tanks.
Storm water drainage system to be upgraded to include monitoring and diversion of contaminated storm water.
New storm water outfall shall be constructed as part of the upgrade works.
Storm water upgrade works shall include monitoring and divert mechanisms. TOC and hydrocarbon monitors shall be installed.
Kerry drains to undertake limited additional testing and survey based on gaps identified in review
Continue with existing storm water pipelines remediation/ upgrading
Organise for sampling and analysis of ground water twice per year
HIGH
HIGH
HIGH
MEDIUM
HIGH
HIGH
HIGH
MEDIUM
Water Resource management
Encourage water conservation
Targets to be established for reduction in water consumption
Recycling/ Reuse: Storm water holding / firewater retention tank shall be fitted with connection points to allow for reuse of water in a fire event.
Continue with water project on site
Further investigations into recycling and reuse initiative options
MEDIUM
Page 2 of 9
Table 1 continued Environmental Objectives and Targets
OPERATIONAL REQUIREMENTS ASPECT OBJECTIVE TARGETS ACTION PRIORITY
Wastewater Management
No soil, surface water or groundwater contamination as a result of wastewater discharges from the site No substance shall be discharged in a manner or at a concentration that following initial dilution causes tainting of fish or shellfish
In order to protect the quality of a water body, emissions to waters from the wastewater treatment plant shall not exceed emission limit values outline in table B.2.2 of Schedule B of the facilities IPPC licence
Continuous monitoring: ‐ No flow shall exceed the specified limit ‐ No pH shall deviate from the specified range ‐ No temperature value shall exceed the limit value Composite Sampling: ‐ No pH shall deviate from the specified range ‐ Other than pH + flow, 8 of 10 consecutive
composite results shall not exceed the emission limit value.
‐ No individual result shall exceed 1.2 times the emission limit value
Discrete sampling: ‐ Other than pH + temperature, no grab sample
value shall exceed 1.2 times the emission limit value
Permanent phosphorus removal
equipment to be installed at the WWTP. Review sludge level with phosphorus removal equipment
Foul sewers shall be remediated as part of ongoing works.
Monitoring of pH, flow and temperature shall be maintained at the outfall.
TOC monitor and divert mechanism shall be installed at the treated effluent outfall. Refer to Proposals for Storm water Management report for details.
HIGH
MEDIUM
HIGH
HIGH
Energy Use a) Reduce Installations Energy Consumption
b) Increase the use of renewable energy
Increase the boiler TDS level on the boilers from 3,000 to 3,500 ppm by end 2009.
Review on basis of concerns raised by water treatment company that this target may not be achievable. Review additional opportunities for energy use reduction and efficiency
MEDIUM
Power generation
Reduce Installations use of conventional power generation
Incorporate clean energy technologies options for power generation
Investigate if any new or emerging possibilities for clean energy in 2009.
MEDIUM
Page 3 of 9
Page 4 of 9
Table 1 continued ‐ Environmental Objectives and Targets
OPERATIONAL REQUIREMENTS ASPECT OBJECTIVE TARGETS ACTION PRIORITY
Waste Management
Reduce the environmental impact of the Installations waste
a) Waste Generation: Reduce the volume of waste generated at the Installation
b) Waste Handling: No soil, surface water or groundwater contamination as a result of waste collection or disposal
c) Waste Storage: No soil, surface water or groundwater contamination as a result of waste storage
a) Increase volume of recyclable material of total waste produced. Quantifiable target to be set.
b) ‐ Waste sent‐off site for recovery or disposal shall be transported only by authorised waste contractors ( Licensed or permitted)
‐ All waste to be disposed of at a licensed or permitted facility
c) Waste shall be stored in designated areas protected against spillage and leachate run‐off
Establish set targets for waste reduction
Identify areas where recyclable materials can be increased
MEDIUM
Fuel & Chemical Storage
No soil, surface water or groundwater contamination as a result of fuel + chemical stored on‐site
i) All tanks, containers and drum storage areas shall be rendered impervious to the materials stored therein
ii) All inlets, outlets, vent pipes, valves and gauges to be stored within the bunded area
iii) All drainage from bunded areas to be diverted for collection and safe disposal
iv) Adequate supply of containment booms and/or suitable absorbent material to contain and absorb any spillage
i) ‐ All tanks/drum storage to be bunded locally or remotely to a volume of not less than 110% capacity of the largest tank
‐ Minor remediation as outlined in HFO assessment report to be carried out ‐ Caustic + Nitric bunds to be tested ‐ Assessment of self bunded tanks to be carried out
ii) Investigate the possibility of using spill tray at HFO bund to overcome difficulties of positioning gauge within the bunded area
iii) Establish plan for drainage from bunded areas to be diverted for collection and safe disposal
iv) Review requirements for spill kits + replace where necessary
MEDIUM
Page 5 of 9
Table 1 continued ‐ Environmental Objectives and Targets
OPERATIONAL REQUIREMENTS
ASPECT OBJECTIVE TARGETS ACTION PRIORITY
Air Emissions Operations + activities at the facility shall not result in the release of significant levels of pollutants to the atmosphere
Emissions to the atmosphere from the installation shall not exceed emission limit values set out in the IPPC licence
Emission of oxides of sulphur shall not exceed 1700mg/m3
Emissions of nitrogen oxides (as NO2) shall not exceed 900mg/m3
No emissions of offensive odours outside the boundaries of the premises.
Continuous monitoring:
‐ No 24 hour mean value shall exceed the emission limit value
‐ 97% of all 30 minute mean values taken continuously over an annual period shall not exceed 1.2 times the emission limit value
‐ No 30 minute mean value shall exceed twice the emission limit value
Non‐continuous Monitoring
‐ For flow, no hourly or daily mean value shall exceed the relevant limit value
‐ For all other parameters, no 30 minute mean value shall exceed the emission limit value
Bi‐annual monitoring of stack emissions to be carried out to ensure targets are being complied with
MEDIUM
Noise Emissions
Noise generated on‐site shall not impact the amenity of neighbouring properties
Noise from the installation shall not give rise to sound pressure levels (Leq, T) ,measured at sensitive locations of the installation which exceed the limit value(s) of 55dB(A) for Daytime noise and 45dB(A) for night‐time noise
Annual noise survey to be carried out to ensure targets are met
Review Noise Sensitive Locations in proximity to the site
MEDIUM
Fugitive Emissions
No soil, surface water or groundwater contamination as a result of fugitive emission from the site
Complete the identification of fugitive emissions from the facility by June 2009
Implement any actions identified in the fugitive emissions reduction programme
MEDIUM
Page 6 of 9
Table 1 continued ‐ Environmental Objectives and Targets
OPERATIONAL REQUIREMENTS
ASPECT OBJECTIVE TARGETS ACTION PRIORITY
Material Handling: Minimise preventable losses of all materials through handling procedures
Take all measures required to ensure no inadvertent losses of ingredients to drain (e.g. while unloading milk tankers to silos)
Review unloading systems to ensure all ingredients captured in system
MEDIUM ‐ Ongoing review
Material processing: Reduce, where possible, the losses of food materials in all processes; while being mindful of possible food safety limitations. Target – that annual ingredient losses do not exceed 0.5%
Monitor ingredients in vs finished goods out. Monitor effectiveness of other measures detailed below
Rathmore system is generally set up to recover within process rather than loss – but there are a couple of existing areas where there is no recovery step built in. All new equipment to incorporate recovery step. Manual recovery of material to take place as far as possible otherwise
MEDIUM ‐ Ongoing review and optimisation
Goods consumption (specifically crumb raw materials of (1) milk (2) sugar (3) cocoa mass (4) butter oil)
Reduce the facilities overall raw material resource consumption per tonne of finished product
Material storage: Minimise preventable losses of all relevant (potentially sensitive) materials while in storage. Milk in silos and reclaim/rework in process tanks have potential to deteriorate hence becoming unfit for use and then must be disposed of – thus not only resulting in loss of valuable raw materials but also extra loading onto the site effluent plant.
Aim to evaporate all milk on day of delivery. Monitor and record condition of any stored milk in silos. Monitor condition of all reclaim / rework in production area
MEDIUM Ongoing. Twice daily Every shift
Facility + Equipment Maintenance
Adequate control of plant + equipment so that hazardous breakdown is prevented
Ensure maintenance programme in SAP includes all key equipment that is central to meeting targets / monitoring systems by June 2009.
Continue with maintenance programme. Review + update if necessary
HIGH
Page 7 of 9
Table 1 continued ‐ Environmental Objectives and Targets
ENVIRONMENTAL MANAGEMENT SYSTEM REQUIREMENTS
ASPECT OBJECTIVE TARGET ACTION PRIORITY
Management + Reporting Structure
Make provision for management of the activity on a planned basis having regard to the desirability of ongoing assessment, recording and reporting of matters affecting the environment
Existing management + reporting structure to be reviewed and updated by December 2008
Responsibilities in relation to quality, environment, health + safety and general operating procedures are outlined
Review annually + update as necessary
MEDIUM
Schedule of Environmental Objectives + Targets
As above Establish schedule of environmental objectives + targets by June 2008
Review annually + update as necessary
HIGH
Environmental Management Programme
As above Established 5 year environmental management programme by June 2008
Review annually + update as necessary
HIGH
Documentation As above Existing environmental management documentation system to be reviewed by December 2008
Review annually + update as necessary
MEDIUM
Data Management system
As above Establish a data management system for collation, achieving, assessing and graphically presenting environmental monitoring data by June 2008
Review annually + update as necessary
HIGH
Corrective Action
As above Existing corrective action procedure to be reviewed by December 2008
Review annually + update as necessary
MEDIUM
Page 8 of 9
Table 1 continued ‐ Environmental Objectives and Targets
ENVIRONMENTAL MANAGEMENT SYSTEM REQUIREMENTS
ASPECT OBJECTIVE TARGET ACTION PRIORITY
Awareness + Training
Increase the environmental awareness of employees
All employees are familiar with the Group’s environmental policy by December 2008.
Review annually + update as necessary
Continue with site wide IPPC awareness training throughout 2009. Complete training of Mass Tanker drivers.
MEDIUM
Communication Programme
Communicate environmental performance with interested parties
Ensure interested parties + members of the public can obtain information concerning the environmental performance of the installation
Notice board of contact details for environmental queries has been installed. This is included in the communication procedure.
LOW
Efficient Process Control
Adequate control of processes under all modes of operation
Establish a programme for the control of processes and monitoring of process control performance
Continue with Regional KPI initiative; Environmental Governance pack to address KPIs in 2009.
MEDIUM
Accident Prevention
Provide for the protection of the environment by preventing accidents
Ensure no major accidents occur
Reduce the number of minor accidental events with environmental and/or health & safety consequences
Establish specific remedial measures at problem locations where measures are targeted to reduce particular types of commonly occurring accidents.
Maintain compliance with health and safety codes;
Review existing accident prevention procedures
Carry out safety audits to ensure that best practices are maintained
Review accident data annually as a basis for output monitoring and determining future local safety schemes + programmes. Review schemes a suitable period after implementation and take action as necessary. Carry out prompt emergency repair to damaged and distressed plant + equipment
MEDIUM
Page 9 of 9
Table 1 continued ‐ Environmental Objectives and Targets
ENVIRONMENTAL MANAGEMENT SYSTEM REQUIREMENTS
ASPECT OBJECTIVE TARGET ACTION PRIORITY
Emergency Response
Provide for the protection of the environment by mitigating potential consequences of unplanned events
Prevention of escalation of the emergency
Protection of natural and physical resources
Develop and improve staff capabilities to respond effectively to environmental emergencies
Review existing emergency response programme to include the following:
Policies and procedures,
Response plans,
Operational guidelines,
Technical guidance on emergency response
MEDIUM
Reporting Report on the environmental performance of the facility to interested parties
Prepare + submit to the Agency an Annual Environmental Report (AER)
Prepare Pollution Release and Transfer Register (PRTR) annually
MEDIUM
Page 1 of 8
TABLE 2: ENVIRONMENTAL MANAGEMENT PROGRAMME – 2009 ‐ 2013
OPERATIONAL REQUIREMENTS
ACTION ASPECT YEAR 2 2009
YEAR 3 2010
YEAR 4 2011
YEAR 5 2012
YEAR 6 2013
RESPONSIBILITY
Storm Water Management
Complete installation of bypass separator on SW2 (Western outfall)
Storm water drainage systems upgrading‐, including monitoring + diversion of storm water (Phase 2) to include 2000m3 holding tank /firewater retention tank
Fit high liquid level alarms at emergency tank and divert tanks
2 no. full retention separators to be installed on SW3 (primary storm water outfall)
TOC and Hydrocarbon monitors to be installed
Kerry drains to undertake limited additional testing and survey based on gaps identified in review
Continue with upgrading of pipework
Routine monitoring of storm water discharges
Ground water sampling and analysis twice per year
Continue with upgrading of pipework
Routine monitoring of storm water discharges
Ground water sampling and analysis twice per year
Continue with upgrading of pipework
Routine monitoring of storm water discharges
Ground water sampling and analysis twice per year
Continue with upgrading of pipework
Routine monitoring of storm water discharges
Ground water sampling and analysis twice per year
Continue with upgrading of pipework
Routine monitoring of storm water discharges
Ground water sampling and analysis twice per year
MWP ‐ External Engineering Consultant to implement + oversee infrastructural works
Cadbury Quality and Environment Manager to carry out routine monitoring
Page 2 of 8
OPERATIONAL REQUIREMENTS ACTION ASPECT
YEAR 2 2009
YEAR 3 2010
YEAR 4 2011
YEAR 5 2012
YEAR 6 2013
RESPONSIBILITY
Water Resource management
Establish targets for reducing the quantity of fresh water used on site
Fit storm water holding / firewater retention tank with connection points to allow for reuse of water in a fire event
Continue with water projects on site
Further investigations into recycling and re‐use initiative options
Review of targets
Further investigations into recycling and re‐use initiative options
Review of targets
Further investigations into recycling and re‐use initiative options
Review of targets
Further investigations into recycling and re‐use initiative options
Review of targets
Cadbury Quality and Environment Manager to commission audit
Wastewater Management
Install TOC monitor, divert mechanism and diversion chamber
Bunding of Tanks + Divert drain from River
Remediation of Existing balance tanks (Replacement option)
Dispose of sludge build‐up from balance tanks
Review sludge levels with phosphorous removal equipment installed
Survey + Improve WWTP safety + access
Continue with upgrading of process/foul drains
Routine monitoring at outfall
Continue with WWTP safety + access improvements
Continue with upgrading of process/foul drains
Routine monitoring at outfall
Installation of Activated sludge plant (Phase 1)
Continue with upgrading of process/foul drains
Routine monitoring at outfall
Installation of Activated sludge plant (Phase 2)
Continue with upgrading of process/foul drains
Routine monitoring at outfall
Installation of Activated sludge plant (Phase 3)
Continue with upgrading of process/foul drains
Routine monitoring at outfall
Installation of Activated sludge plant (Phase 3)
MWP ‐ External Engineering Consultant to implement + oversee infrastructural works
Cadbury Quality and Environment Manager to carry out routine monitoring
Page 3 of 8
OPERATIONAL REQUIREMENTS
ACTION ASPECT
YEAR 2 2009
YEAR 3 2010
YEAR 4 2011
YEAR 5 2012
YEAR 6 2013
RESPONSIBILITY
Energy Use Review targets for energy use reduction
Increase the boiler TDS level on the boilers from 3,000 to 3,500 ppm.
Review targets for energy use reduction in 2010.
Review targets for energy use reduction
Review targets for energy use reduction
Review targets for energy use reduction
Cadbury Quality and Environment Manager to commission audit
Power generation Investigate if any new or emerging possibilities for clean energy in 2009.
Establish targets for use of clean energy technologies
Review targets Review targets Review targets Review targets Cadbury Quality and Environment Manager to commission audit
Waste Management
Establish set targets for waste reduction
Identify areas where recyclable materials can be increased
Review targets for waste reduction + reuse
Review targets for waste reduction + reuse
Review targets for waste reduction + reuse
Review targets for waste reduction + reuse
Cadbury Quality and Environment Manager to commission audit
Fuel & Chemical Storage
Commence works for local / remote bunding of tanks + drums
Commence containment works for inlets, outlets, vent pipes, valves and gauges
Establish schedule for assessment /integrity testing of bunds + tanks
Continue with weekly inspection and include spill kits
Continue with containment works for inlets, outlets, vent pipes, valves and gauges
Review spill kit requirements
Commence scheduled assessment /integrity testing of bunds + tanks
Review spill kit requirements
Review spill kit requirement
Review spill kit requirement
MWP + Metlab
Page 4 of 8
OPERATIONAL REQUIREMENTS
ACTION ASPECT
YEAR 2 2009
YEAR 3 2010
YEAR 4 2011
YEAR 5 2012
YEAR 6 2013
RESPONSIBILITY
Air Emissions Carry out stack emission monitoring surveys (April + Sept)
Continue ongoing monitoring through daily logs
Carry out stack emission monitoring surveys (April + Sept)
Carry out stack emission monitoring surveys (April + Sept)
Carry out stack emission monitoring surveys (April + Sept)
Carry out stack emission monitoring surveys (April + Sept)
Cadbury Quality and Environment Manager to commission monitoring events
Noise Emissions Carry out boundary noise survey
Review Noise Sensitive Locations in proximity to the site
Carry out boundary noise survey
Carry out boundary noise survey
Carry out boundary noise survey
Carry out boundary noise survey
Cadbury Quality and Environment Manager to commission monitoring events
Fugitive Emissions
Complete the identification of fugitive emissions from the facility by June 2009
Implement any actions identified in fugitive emissions reduction programme
Review annually Review annually Review annually Review annually Cadbury Quality and Environment Manager to commission this work
Page 5 of 8
OPERATIONAL REQUIREMENTS
ACTION ASPECT YEAR 2 2009
YEAR 3 2010
YEAR 4 2011
YEAR 5 2012
YEAR 6 2013
RESPONSIBILITY
Goods Consumption
Finalise and approve all materials procedures
Review + update material handling procedures to minimise losses
Review + update material processing procedures to minimise losses
Review + update material storage procedures to minimise losses
Review + update material handling procedures to minimise losses
Review + update material processing procedures to minimise losses
Review + update material storage procedures to minimise losses
Review + update material handling procedures to minimise losses
Review + update material processing procedures to minimise losses
Review + update material storage procedures to minimise losses
Review + update material handling procedures to minimise losses
Review + update material processing procedures to minimise losses
Review + update material storage procedures to minimise losses
Cadbury Quality and Environment Manager
Facility & Equipment Maintenance
Continue with maintenance programme. Review + update if necessary
Continue with maintenance programme Review + update if necessary
Continue with maintenance programme. Review + update if necessary
Continue with maintenance programme. Review + update if necessary
Continue with maintenance programme. Review + update if necessary
Cadbury Quality and Environment Manager + Health + Safety Officer
Page 6 of 8
ENVIRONMENTAL MANAGEMENT SYSTEMS REQUIREMENTS
ACTION ASPECT
YEAR 2 2009
YEAR 3 2010
YEAR 4 2011
YEAR 5 2012
YEAR 6 2013
RESPONSIBILITY
Management + Reporting Structure
Review annually + update as necessary
Review annually + update as necessary
Review annually + update as necessary
Review annually + update as necessary
Review annually + update as necessary
Cadbury Quality and Environment Manager
Schedule of Environmental Objectives + Targets
Review annually + update as necessary
Review annually + update as necessary
Review annually + update as necessary
Review annually + update as necessary
Review annually + update as necessary
Cadbury Quality and Environment Manager and support from MWP
Environmental Management Programme
Review annually + update as necessary
Review annually + update as necessary
Review annually + update as necessary
Review annually + update as necessary
Review annually + update as necessary
Cadbury Quality and Environment Manager and support from MWP
Documentation Review annually + update as necessary
Review annually + update as necessary
Review annually + update as necessary
Review annually + update as necessary
Review annually + update as necessary
Cadbury Quality and Environment Manager
Data Management system
Review annually + update as necessary
Review annually + update as necessary
Review annually + update as necessary
Review annually + update as necessary
Review annually + update as necessary
Cadbury Quality and Environment Manager
Page 7 of 8
ENVIRONMENTAL MANAGEMENT SYSTEMS REQUIREMENTS
ACTION ASPECT
YEAR 2 2009
YEAR 3 2010
YEAR 4 2011
YEAR 5 2012
YEAR 6 2013
RESPONSIBILITY
Corrective Action Review annually + update as necessary
Review annually + update as necessary
Review annually + update as necessary
Review annually + update as necessary
Review annually + update as necessary
Cadbury Quality and Environment Manager
Awareness + Training
Review annually + update as necessary
Continue with site wide IPPC awareness training throughout 2009
Complete training of Mass Tanker drivers
Review annually + update as necessary
Review annually + update as necessary
Review annually + update as necessary
Review annually + update as necessary
Cadbury Quality and Environment Manager + Health + Safety Officer
Communication Programme
Review annually + update as necessary
Review annually + update as necessary
Review annually + update as necessary
Review annually + update as necessary
Review annually + update as necessary
Cadbury Quality and Environment Manager
Efficient Process Control
Continue with Regional KPI initiative; Environmental Governance pack to address KPIs in 2009.
Review annually + update as necessary
Review annually + update as necessary
Review annually + update as necessary
Review annually + update as necessary
Cadbury Quality and Environment Manager
Page 8 of 8
ENVIRONMENTAL MANAGEMENT SYSTEMS REQUIREMENTS
ACTION ASPECT
YEAR 2 2009
YEAR 3 2010
YEAR 4 2011
YEAR 5 2012
YEAR 6 2013
RESPONSIBILITY
Accident Prevention
Review existing accident prevention procedures
Carry out safety audits to ensure that best practices are maintained
Carry out prompt emergency repair to damaged and distressed plant + equipment
Review existing accident prevention procedures
Carry out safety audits to ensure that best practices are maintained
Carry out prompt emergency repair to damaged and distressed plant + equipment
Review existing accident prevention procedures
Carry out safety audits to ensure that best practices are maintained
Carry out prompt emergency repair to damaged and distressed plant + equipment
Review existing accident prevention procedures
Carry out safety audits to ensure that best practices are maintained
Carry out prompt emergency repair to damaged and distressed plant + equipment
Review existing accident prevention procedures
Carry out safety audits to ensure that best practices are maintained
Carry out prompt emergency repair to damaged and distressed plant + equipment
Cadbury Quality and Environment Manager + Health + Safety Officer
Emergency Response
Review annually + update as necessary
Review annually + update as necessary
Review annually + update as necessary
Review annually + update as necessary
Review annually + update as necessary
Cadbury Quality and Environment Manager + Health + Safety Officer
Reports AER to be submitted to Agency by 31 March
PRTR to be submitted to Agency by 31 March
AER to be submitted to Agency by 31 March
PRTR to be submitted to Agency by 31 March
AER to be submitted to Agency by 31 March
PRTR to be submitted to Agency by 31 March
AER to be submitted to Agency by 31 March
PRTR to be submitted to Agency by 31 March
AER to be submitted to Agency by 31 March
PRTR to be submitted to Agency by 31 March
Cadbury Quality and Environment Manager
Appendix 3: Environmental Management System report (2008)
REVIEW of ENVIRONMENTAL MANAGMENT PROGRAMME
Review for AER
2008
Licence Reg No P0795‐01
Licensee Cadbury Ireland Rathmore
Location of Installation Rathmore, Co. Kerry
Project No. Rev Date Prepared By Status
12448-6025 D March 2009 H. Dalton Controlled
ENVIRONMENTAL MANAGEMENT PROGRAMME – 2009 REVIEW
OPERATIONAL REQUIREMENTS
Aspect YEAR 1 ‐ 2008 STATUS / COMMENT
i) Kerry drains to complete pressure testing and survey of underground pipework
Initial survey completed, and reviewed by Malachy Walsh and Partners (MWP) engineers. Further limited survey has been requested based on review.
ii) Continue with upgrading of pipework New contract in 2009
iii) Assess need for Firewater Retention facility Completed
iv) Fit high liquid level alarms at the WWTP balance tank, emergency tank and divert tanks
Some already exist on main holding tank and remainder as part of the phosphorous contract
v) 2 no. full retention separators to be installed on SW3 (primary storm water outfall)
To be completed by April 2009
vi) Storm water drainage systems upgrading ‐ including monitoring + diversion of contaminated storm water {Phase 1) to include 220m3
monitoring tank
Storm Water contract; To be completed by April 2009
vii) Construct new storm water outfall as part of upgrading works Storm Water contract; To be completed by April 2009
viii) TOC and Hydrocarbon monitors to be installed Quote received from Gilroys; To be completed by April 2009
ix) Remediation of existing storm water soakaway at eastern boundary Completed in Phase 1A. May require review after Phase 1B.
Storm Water Management
x) Routine monitoring 1st sample sent for monthly external QC. Results under review and to be compared with internal results.
Page 2 of 8
OPERATIONAL REQUIREMENTS
Aspect YEAR 1 ‐ 2008 STATUS / COMMENT
i) Carry out audit to identify opportunities for reduction in the quantity of water used on‐site
Water project is ongoing at the site. Hoses are now locked off in the factory. Water Resource
management
ii) Check for leaks Hygiene audits ongoing at the moment.
i) Install Phosphorus removal equipment at WWTP Temporary removal equipment on site currently and permanent solution to be installed
ii) Install TOC monitor + divert mechanism at treated effluent outfall
Quote received from Gilroys. Quote approved, order placed
iii) Continue with upgrading of process/foul drains Works ongoing. Review of drain survey resulted in gaps Drain survey; Works to follow
Wastewater Management
iv) Routine monitoring at outfall Monitoring procedure in place. Audit to be scheduled in 2009
i) Carry out audit to identify opportunities for energy use reduction + efficiency
Audit carried out and report completed. Summary Report sent to EPA Energy Use
ii) Establish targets based on audit for energy use reduction Targets reviewed and 2009 target included in the next Schedule of Objectives and Targets
Power generation
i) Investigate possibilities for use of clean energy technologies Airtricity currently supplying electricity (95% renewable)
Waste Management
Carry out audit to identity areas where waste can be reduced Waste folder compiled by JC. All permits and licences contained within. Ongoing management of records
Page 3 of 8
OPERATIONAL REQUIREMENTS
Aspect YEAR 1 ‐ 2008 STATUS / COMMENT
i) Establish plan for drainage from bunded areas to be diverted for collection and safe disposal
Recommendations to be implemented in next Phase of work
ii) Provide spill kits / containments booms at all fuel + chemical storage areas
Inventory to be included in SAP system. Kits are in place with signage. Training on IPPC includes spill kits and daily inspections also include kits.
iii) Assess integrity of Heavy Fuel Oil Bund (Completed) Recommendations to be implemented in next Phase of work
iv) Assess integrity of Nitrite and Caustic bunds Metlab report complete. Bunds in good condition.
Fuel & Chemical Storage
v) Investigate options for suitable containments of spills / leaks at inlets, outlets, vent pipes, valves and gauges
Raw Material Intake Assessment carried out. PK to review spill trays etc.
i) Install + commission new boilers Boilers up and running; daily logs are completed
ii) Decommission old boilers Stack removal complete, old boilers are decommissioned on site.
Air Emissions
iii) Carry out stack emission monitoring On SAP and will be scheduled going forward
(Monitoring of new boilers carried out; within limits)
Noise Emissions i) Carry out boundary noise survey Dixon Brosnan conducted noise survey. Report submitted to EPA Dec 4th. Noise sensitive locations to be reviewed
Page 4 of 8
OPERATIONAL REQUIREMENTS
Aspect YEAR 1 ‐ 2008 STATUS / COMMENT
i)Establish programme for identification + reduction of fugitive emissions from the facility by December 2008
Identification to be completed ‐ Ongoing Fugitive Emissions
ii) Interim action ‐ examine the need for catchment system to collect any leaks from flanges and valves of overground pipes.
Included in the Raw Materials Intake Assessment (remote bunding – part of Storm Water contract)
i) Review Material Handling procedures Ongoing; Developing a Table
ii) Review Material Processing procedures Ongoing
Goods Consumption
iii) Review Material Storage procedures Ongoing; May develop a table with a map.
Facility & Equipment Maintenance
Establish a comprehensive programme for planning, scheduling and tracking preventative maintenance activities that provides a systematic way of ensuring they are not neglected
In place with SAP. Maintenance Procedure has been updated to reflect current management within SAP.
Page 5 of 8
Environmental Management Programme 2008‐Continued
ENVIRONMENTAL MANAGEMENT SYSTEM REQUIREMENTS
Aspect YEAR 1 ‐ 2008 STATUS / COMMENT
Amend the existing documented management structure to include all personnel associated with the installation.
Structure updated and reflects current organisation. Management + Reporting Structure
Responsibilities in relation to the quality, the environment, health + safety and general operating procedures to be outlined
Job descriptions detailing responsibilities in Environmental Manual
Schedule of Environmental Objectives + Targets
Identify all environmental aspects associated with site activities and establish means for control.
COMPLETED FOR 2008 – reviewed & updated for 2009
Year 2 to 6 identified as 2009 ‐ 2013
Environmental Management Programme
Prioritise objectives + targets and set deadlines for achieving compliance with environmental targets
COMPLETED FOR 2008 –reviewed & updated for 2009
Year 2 to 6 identified as 2009 ‐ 2013
Documentation Establish procedure outlining the environmental management documentation system
Documentation Procedure has been revised and approved. Will be audited in 2009.
Data Management system
Document the procedure for the data management system Data managed per procedures and records; ongoing
Page 6 of 8
ENVIRONMENTAL MANAGEMENT SYSTEM REQUIREMENTS
Aspect YEAR 1 ‐ 2008 STATUS / COMMENT
Corrective Action
Amend and update the existing corrective action procedure to take account of IPPC licence requirements
Procedure approved and in use
Awareness + Training
Review training and document all environmental training undertaken by employees
Training Assessment Records developed. Ongoing; further records to be developed. Enviro training of new staff and staff on new projects. IPPC awareness training has been rolled out on site. Approximately 50% of staff are trained.
i) Write standard operating procedure for communication programme
SOP written and approved Communication Programme
ii) Notice board of contact details for environmental queries has been installed.
The notice board is installed at the entrance
Establish a programme for the control of processes and monitoring of process control performance Ongoing. There is a Regional KPI initiative in Cadbury; Environmental
Governance pack to address KPIs will be developed and distributed in 2009.
Existing key process indicators to be reviewed by December 2008 Ongoing. There is a Regional KPI initiative in Cadbury; Environmental Governance pack to address KPIs will be developed and distributed in 2009.
Efficient Process Control
Methods for measuring + controlling KPIs to be established by December 2008 Ongoing. There is a Regional KPI initiative in Cadbury; Environmental
Governance pack to address KPIs will be developed and distributed in 2009.
Page 7 of 8
ENVIRONMENTAL MANAGEMENT SYSTEM REQUIREMENTS
Aspect YEAR 1 ‐ 2008 STATUS / COMMENT
i) Review existing accident prevention procedures Ongoing
ii) Carry out safety audits to ensure that best practices are maintained
Ongoing
Accident Prevention
iii) Carry out prompt emergency repair to damaged and distressed plant + equipment
Ongoing
Emergency Response
Review existing emergency response programme Review is ongoing; amalgamating documents from Safety Systems also
i)AER to be submitted to Agency by 31 March COMPLETED
ii) PRTR to be submitted to Agency by 31 March COMPLETED
iii) Residuals Management to be submitted to the Agency by 5 June COMPLETED /awaiting approval
iv) Environmental Liabilities Risk Assessment to be completed by 5 December
COMPLETED /awaiting approval
Reports
v) Hydro geological Site investigation to be completed by 5 December
COMPLETED /awaiting approval
Note:
This is a review of the 2008 EMP. The EMP has been revised for 2009 ‐2013 and this facilitates the continuation of the management of the targets and actions.
Page 8 of 8
Appendix 4: Tanks and pipelines testing reports
12448 – Cadbury IPPC Licence Implementation
Infrastructure Testing
Summary Report
March 2009
Consulting Engineers: Client:Malachy Walsh & Partners Cadbury Ireland Ltd.Reenpoint ShinnaghBlennerville RathmoreTralee Co. KerryCo. Kerry
Document Amendment Record
Project No Rev Date Prepared Reviewed Approved Status
12448 6032-A March 2009 P. Kelly H. Dalton M. O’Sullivan Current
Infrastructure Testing Summary Report 1
12448 – Cadbury IPPC Licence Implementation
Table of Contents
1.0 Introduction........................................................................................................................................1
2.0 Testing...............................................................................................................................................1
2.1 Heavy Fuel Oil Bund .....................................................................................................................1
2.2 Nitric and Caustic Bunds...............................................................................................................1
2.3 Testing of Underground Pipes ......................................................................................................1
2.4 Testing of Tanks & Containers......................................................................................................2
Appendix A – Test Certificates for Nitric Acid Bund and Caustic Soda Bund
Appendix B – Results of Water Tightness Tests on Underground Pipelines
Infrastructure Testing Summary Report 2
12448 – Cadbury IPPC Licence Implementation
1.0 Introduction This report summarises the tank and pipeline testing that has been carried out to date to satisfy Condition 6.10 of IPPC Licence No. P0795-01. Testing is ongoing and this report will be updated as testing progresses.
Condition No. 6.10
The integrity and water tightness of all underground pipes, tanks, bunding structures and containers and their resistance to penetration by water or other materials carried or stored therein shall be tested and demonstrated by the licensee. This testing shall be carried out by the licensee at least once every three years and reported to the Agency on each occasion. This testing shall be carried out in accordance with any guidance published by the Agency. A written record of all integrity tests and any maintenance or remedial work arising from them shall be maintained by the licensee.
2.0 Testing
2.1 Heavy Fuel Oil Bund A detailed inspection was carried out by Malachy Walsh and Partners as described in our report titled “Structural Assessment of Heavy Fuel Oil Bund”. The conclusion of the report was that the bund is fit for its design purpose and that only minor remedial work is necessary to ensure that it can deliver on its design intent, i.e. pipe penetrations shall be properly sealed. Remedial works to the bund are to be carried out this week. A summary report of the visual re-test shall be submitted to the Agency next week.
2.2 Nitric and Caustic Bunds As advised in our correspondence of 20th June 2008, Bodycote Metlab were contracted to test the nitric acid and caustic soda bunds. The tests, which involved (a) visual inspection, (b) dye penetrant inspection of welds and (c) ultrasonic test of thickness of steel lining were carried out in August 2008. Both bunds were found to be in good order. The results of these tests are enclosed in Appendix A.
2.3 Testing of Underground Pipes Kerry Drains Services have carried out a CCTV survey and water tightness testing of the foul and surface water drainage on site. The survey was carried out in May and June 2008. The drainage systems were tested by means of water tightness tests in accordance with Appendix G of “IPC Guidance Note on Storage and Transfer of Materials for Scheduled Activities”. The CCTV survey and water tightness test reports were completed in July 2008.
The following is a summary of the results of the water tightness testing:
Drainage System Lines Passed Lines Failed Lines for Review
Foul Drains 56 runs 12 runs 6 runs
Storm Drains 38 runs 16 runs 8 runs
Infrastructure Testing Summary Report 1
12448 – Cadbury IPPC Licence Implementation
The results sheets for the water tightness tests are enclosed in Appendix B. Malachy Walsh and Partners have a copy of the CCTV survey. This can be submitted to the Agency if required.
Malachy Walsh and Partners are currently assessing the survey of the drainage system and are preparing a programme of works for remedial works. Part of this assessment includes identifying any gaps in the initial CCTV survey and water tightness tests. It is intended that remedial works to the drainage systems will commence in June of this year, as part of Phase III of the IPPC Licence Implementation Works.
2.4 Testing of Tanks & Containers There are 3 no. underground tanks at the WWTP site. These include the east and west divert tanks and the primary settlement tank. These tanks will be monitored through the use of localised groundwater monitoring as recommended in Appendix G of ‘Guidance Note on Storage and Transfer of Materials for Scheduled Activities’. Two new groundwater monitoring boreholes have been installed down gradient of the wastewater treatment plant as part of the Hydrogeological Assessment of the site. These boreholes will permit monitoring of the underground tanks. This is in line with our discussions with the Agency which occurred in a meeting on 25th June 2008.
The Hydrogeology Report, January 2009, which was prepared by TEC Ltd. shows that there was no contamination in soil or groundwater samples at the wastewater treatment plant and recommended that no additional remediation is required. Bi-annual groundwater monitoring will be carried out in line with the report recommendations.
Infrastructure Testing Summary Report 2
12448 – Cadbury IPPC Licence Implementation
Appendix A – Test Certificates for Nitric Acid Bund and Caustic Soda Bund
Infrastructure Testing Summary Report 3
12448 – Cadbury IPPC Licence Implementation
Appendix B – Results of Water Tightness Tests on Underground Pipelines
Infrastructure Testing Summary Report 4
BODYCOTE METLAB
Unit 6 Airways Technology Park, Ballygarvan, Cork. T: (021) 4311614 F: (021) 4311714 email: [email protected] Bodycote Metlab - registered in Ireland (No. 84894) - Bodycote Metlab is the trading name of Metlab (Int) Limited
Report No: C 6667-8 Client: Cadburys
Job No: C 10874
Date: 7/08/2008 Address: Rathmore,
Co.Kerry
Ultrasonic & Dye penetrant Inspection
Report Page: 1 OF 2
Location of test: Rathmore NDT Specification: EN 1714 & EN 571 Client Ref: Nitric acid tank bund Material: Carbon steel Weld Process TIG
Surface finish: Smooth Component: Primary welds & shell plates Capacity: Not supplied Heat Treatment: N/A
Calibration Block: A4 & sensitivity block Scan Surface: Acceptable Couplant: Ultrasonic Gel Flaw Detector: Sonatest sitescan
Probe Type: WK CD 10 Serial No: 18288
Probes Angle 0° Probes MHz 5MHz Twin
Ref dB 56db Scan dB 72db
Compression probe Scan level : 2ND Back wall echo to full screen height Shear wave probe Scan level: DAC + 14db
Summary: Bodycote Metlab was requested by Mr. Liam O’Flynn of Cadburys to conduct an inspection survey on the Nitric acid storage
tank bund located at the rear of the plant on the 7th of August 2008.
Please note that access was restricted to one side of the bund due to the tank location.
Inspection details:
An ultrasonic thickness measurement survey was carried out on the floor and wall plates to check for any variations in wall
thicknesses that may suggest corrosion activity is present.
A dye penetrant inspection was carried out on all the primary welds mainly concentrating on ‘T-Joints’ and any seam welds
which would be susceptible to leaking or cracking from expansion etc.
Results:
UTM- Over 150 readings were taken throughout the bund; these were all consistent and ranged between 3.1mm & 3.2mm.
DPI- No significant weld defects were found at the time of inspection.
Visual- No obvious signs of leaking or product staining were observed.
Procedure/Technique Ref: P(UT) EN 1 P(DPI) EN 3 Acceptance Standard: Report findings Test Restrictions: Isolated areas of scale (product) on certain sections of floor plate Technician Bodycote Metlab Approval Client approval
Name: (Cert no :) Signature: Date:
Colin Geary PCN II No 208984 13-08-2008
Name: (Position) Signature: Date:
John Coughlan Operations Manager 13-08-2008
Name: Signature Date
Form No: NDT 008 Rev 03
The results are only applicable to the items tested. This test report shall not be reproduced except in full without written approval of the laboratory.
BODYCOTE METLAB
Unit 6 Airways Technology Park, Ballygarvan, Cork. T: (021) 4311614 F: (021) 4311714 email: [email protected] Bodycote Metlab - registered in Ireland (No. 84894) - Bodycote Metlab is the trading name of Metlab (Int) Limited
Page 2 of 2
55% Nitric acid concentrate
Thickness measurements & Dye penetrant was carried out on seam welds
Form No: NDT 008 Rev 03
The results are only applicable to the items tested. This test report shall not be reproduced except in full without written approval of the laboratory.
BODYCOTE METLAB
Unit 6 Airways Technology Park, Ballygarvan, Cork. T: (021) 4311614 F: (021) 4311714 email: [email protected] Bodycote Metlab - registered in Ireland (No. 84894) - Bodycote Metlab is the trading name of Metlab (Int) Limited
Report No: C 6668-8 Client: Cadburys
Job No: C 10874
Date: 7/08/2008 Address: Rathmore,
Co.Kerry
Ultrasonic & Dye penetrant Inspection
Report Page: 1 OF 2
Location of test: Rathmore NDT Specification: EN 1714 & EN 571 Client Ref: Caustic soda liquor tank bund Material: Carbon steel Weld Process TIG
Surface finish: Smooth Component: Primary welds & shell plates Capacity: Not supplied Heat Treatment: N/A
Calibration Block: A4 & sensitivity block Scan Surface: Acceptable Couplant: Ultrasonic Gel Flaw Detector: Sonatest sitescan
Probe Type: WK CD 10 Serial No: 18288
Probes Angle 0° Probes MHz 5MHz Twin
Ref dB 56db Scan dB 72db
Compression probe Scan level : 2ND Back wall echo to full screen height Shear wave probe Scan level: DAC + 14db
Summary: Bodycote Metlab was requested by Mr. Liam O’Flynn of Cadburys to conduct an inspection survey on the Caustic soda liquor
storage tank bund located at the rear of the plant on the 7th of August 2008.
Inspection details:
An ultrasonic thickness measurement survey was carried out on the floor and wall plates to check for any variations in wall
thicknesses that may suggest corrosion activity is present.
A dye penetrant inspection was carried out on all the primary welds mainly concentrating on ‘T-Joints’ and any seam welds
which would be susceptible to leaking or cracking from expansion etc, and also where floor buckling was occurring.
Results: UTM- Over 300 readings were taken throughout the bund; these were all consistent and ranged between 3.0mm & 3.2mm.
DPI- No significant weld defects were found at the time of inspection.
Visual- No obvious signs of leaking or product staining were observed.
Procedure/Technique Ref: P(UT) EN 1 P(DPI) EN 3 Acceptance Standard: Report findings Test Restrictions: Technician Bodycote Metlab Approval Client approval
Name: (Cert no :) Signature: Date:
Colin Geary PCN II No 208984 13-08-2008
Name: (Position) Signature: Date:
John Coughlan Operations Manager 13-08-2008
Name: Signature Date
Form No: NDT 008 Rev 03
The results are only applicable to the items tested. This test report shall not be reproduced except in full without written approval of the laboratory.
BODYCOTE METLAB
Unit 6 Airways Technology Park, Ballygarvan, Cork. T: (021) 4311614 F: (021) 4311714 email: [email protected] Bodycote Metlab - registered in Ireland (No. 84894) - Bodycote Metlab is the trading name of Metlab (Int) Limited
Page 2 of 2
The results are only applicable to the items tested. This test report shall not be reproduced except in full without written approval of the l
Rear end of bund