ANNUAL ENVIRONMENTAL REPORT Licence Register Number P0795-01 Licensee Cadbury Ireland Limited Location of Installation Shinnagh, Rathmore, County Kerry Report for (year) 2008

ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

ANNUAL ENVIRONMENTAL REPORT Licence Register Number P0795-01 Licensee Cadbury Ireland Limited Location of Installation Shinnagh,

Rathmore, County Kerry

Report for (year) 2008

Page 2: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Emissions from the installation: There have been some changes in emission points from the site since the initial granting of the licence in December 2007 as follows:

Emissions to Air: The boiler stack that was in place at the time the licence was issued has now been dismantled and replaced with a new stack. The original boilers are no longer in use and two new boilers have been commissioned in their place. The initial proposal for the replacement work submitted to the Agency was dated 27th March 2008 with additional information being requested by the Agency on 10th April. Final approval subject to compliance with the licence was issued on 12th June. There have been no changes to the fuel used (heavy fuel oil) to date. Emissions are measured approximately every 6 months by an external consultancy firm as described in Condition 4.2 of the licence with the annual figures (as reported in the AER spreadsheet incorporated in this document as Appendix 1) calculated on the basis of concentration at time of measurement and volume of heavy fuel oil used during the year. The full report is retained by the site Quality & Environment Manager and is controlled as an externally generated document. Emissions to Water (Surface Water discharge point SW1): The location of the discharge point to the receiving waters (the River Blackwater) is being changed in conjunction with the introduction of the divert system on the outflow. The acute toxicity of the undiluted final effluent as discharged at SW1 has been verified as being non-toxic in compliance with Condition 6.12 with results submitted to the Agency on 12 June 2008. A flow dependent sampler is in place at the nominated discharge point with testing taking place either in the on-site laboratory or in an external facility. The monitoring results for the year are reported in the AER spreadsheet (Appendix 1 of this report). Emissions to Water (Storm Water discharge point SW2): The current storm water discharge SW2 is being upgraded to include a silt trap and oil separator in compliance with Condition 3.8 of the licence. Drainage systems on site are being upgraded so that discharges from this point in the future will consist solely of the influent stream (flowing from the western side of the site) and the run-off from the employee car park. Emissions to Water (Storm Water discharge point SW3): Storm water discharge SW3 is being developed so that the storm waters which have been discharging to ground (a stone soakaway) on the eastern side of the site will be passing through a silt trap and oil separator. Monitoring and diversion mechanisms will also be installed on this system. The only part of the site which will be not be draining through this new discharge point once the current drainage work is completed will be the employee car park.

Page 3: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Emissions to land: There are no process emissions to land. As required by Condition 6.14 of the licence, a hydrogeological investigation of the site has been carried out. Three groundwater monitoring points have been identified upstream of the site (using the existing wells) with two new monitoring points created downstream of the site within the area of the WWTP. This report was submitted to the Agency on 12th February and is awaiting final approval. As a result of this recommendations of this report, biannual monitoring of groundwater will be carried out on site. Waste management record: Waste management records for the site for 2008 are included in the AER spreadsheet which comprises Appendix 1 of this report. Resource consumption summary: 2008 2007 Process water usage 122,550 m3 from wells 135, 638 m3 from wells Heavy fuel oil usage 3,667.1 tonnes 3,892.67 tonnes Diesel usage 0.23 tonnes 0.23 tonnes Gas usage 9.324 tonnes 8.9 tonnes Complaints summary No complaints of an environmental nature related to the operation of the facility have been received since the IPPC licence was issued in December 2007 Schedule of Environmental Objectives and Targets The Schedule of Environmental Objectives and Targets is included in Appendix 2, with Table 1 listing the specific Schedule for 2009. Environmental Management Programme (report for 2008) The 2008 report on the Environmental Management Programme for the site forms Appendix 3 of this report. Environmental Management Programme (proposal for 2009) The Environmental Management Programme for the site for the years 2009 – 2013 is described in Table 2 of Appendix 2 as it forms part of the overall Schedule of Environmental Objectives and Targets. Pollution Release and Transfer Register (report for 2008) All category specific PRTR pollutants are reported within the AER spreadsheet which forms Appendix 1 of this report. Pollution Release and Transfer Register (proposal for 2009) It is proposed to continue following all relevant guidelines as issued by the Agency, including the requirement to submit details electronically.

Page 4: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Noise monitoring report summary Condition 6.15 of the licence requires that a noise survey of the site operations be carried out annually. Monitoring was undertaken at six monitoring stations in the vicinity of the site, which were selected as representing noise sensitive locations in the local area. Where audible, emissions from the site were continuous and steady, and there were no occurrences of clearly audible tonal components (which would have resulted in a breach of schedule B4). Daytime noise levels as measured at all six stations were within the limit of 55dB as specified in the licence. Nighttime levels were lower than the 45dB at five out of the six monitoring stations, but exceeded this at the sixth point at which measurements took place (an unoccupied cottage). The definition of the latter as a noise sensitive location is being reviewed and it is likely that a more suitable NSL in the same area will be identified for the 2009 survey. Additional information was requested following the initial submission of the report on 3rd December, with the Agency issuing final approval of the report on 6th March. The full report is retained by the site Quality & Environment Manager and is controlled as an externally generated document. Ambient monitoring report summary No ambient monitoring is to be carried out as part of this licence. Tank and pipeline testing and inspection report Details of the tank and pipeline testing reports are included as Appendix 4 of this report. Reported incidents summary Date Reported incident 25/01/08 Hydraulic fluid spillage from compactor 10/03/08 Hydraulic fluid spillage from cocoa mass tanker 29/04/08 Heavy fuel oil spillage from pipeline 25/06/08 Non-reporting of incidents of (1) No flow rate recorded at SW1 as

probe detached on 2/03/08 (2) discharge at SW1 shown as in excess of ELV on 3 dates in May and (3) discharge at SW1 shown as in excess of ELV on 5 dates in June

11/07/08 ELVs for COD and TSS exceeded at SW1 1/08/08 ELV for flow to river exceeded at SW1 (heavy rainfall) 5/09/08 ELV for COD exceeded at SW1 6/09/08 ELV for COD exceeded at SW1 11/12/08 pH of discharge to river (continuous monitoring), COD, TSS and

BOD ELVs all exceeded at SW1 (14/01/09) Non-reporting by fax of incident of 11/12/08 Energy Efficiency audit report summary Condition 7.1 of the licence requires that an audit of energy efficiency of the site be carried out within one year of date of grant of the licence. This report was submitted to the Agency on 3rd December with final approval issued on 6th March 2009. Recommendations arising from the audit have been incorporated into the Schedule of Environmental Objectives and Targets for 2009. The full report is retained by the site

Page 5: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Quality & Environment Manager and is controlled as an externally generated document. Report on the assessment of the efficiency of use of raw materials in processes and the reduction in waste generated The report indicates that ingredient losses for 2008 amounted to 0.62% when the ingredient input figure is compared with the finished product output. Report on progress made and proposals being developed to minimise water demand and the volume of trade effluent discharge Process water used and wastewater discharged are regarded as Key Process Indicators for the site with quantities used per tonne of crumb monitored on a monthly basis for the last number of years. One initiative that was implemented at the end of 2008 was the installation of locks on hoses inside the factory. Hoses can therefore only be operated with the knowledge of management. The environmental awareness program scheduled to run during the first part of 2009 also raises awareness of the importance of saving resources such as water. Some discussions have been held to date with chemical suppliers which may lead to further opportunities for water reduction in CIP processes in the future (while still being mindful of food safety requirements). Review of residuals management plan The residuals management plan has been submitted to the Agency and is currently awaiting approval of costings (last communication dated 19/309) Statement of measures in relation to prevention of environmental damage and remedial actions (Environmental Liabilities) IPPC Licence P0795-01 includes a condition on Environmental Liabilities (12.2.1) which states; “The licensee shall as part of the AER provide an annual statement as to the measures taken or adopted at the site in relation to the prevention of environmental damage, and the financial provisions in place in relation to the underwriting of costs for remedial actions following anticipated events (including closure) or accidents/incidents, as may be associated with the carrying on of the activity.” The following measures are implemented on site in relation to preventing environmental damage.

• A full site specific ELRA has been carried out which identified mitigation measures at the facility and site.

• The RMP and costing have been prepared and submitted to the Agency and are awaiting approval. A Parent Company Guarantee will be drafted pending approval of the RMP costs by the Agency.

• IPPC annual contribution • Site wide training; IPPC and environmental awareness training is being rolled

out across the site. Approximately 50% of all staff have received training and the remainder are scheduled for 2009.

• Spill kits and containment booms are positioned throughout the site and are clearly signed.

• Weekly inspections are carried out of holding areas, bunds and spill kits.

Page 6: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

• The Rathmore site is accredited to the 14001 standard and maintains an Environmental Management System (EMS) which complies to the standard and is audited regularly and revised for continual improvement. Revisions of the EMS have incorporated IPPCL requirements.

• Corporate Compliance Audits are also carried out and Cadbury has a Purple goes Green initiative.

• Regional Environmental Meetings rotate around different sites where environmental staff meet to discuss and share experience from their sites.

• Cadbury Ireland Ltd. maintain a high level of insurance to cover any unplanned pollution event or incident.

Environmental Liabilities Risk Assessment Review A full site specific ELRA has been submitted to the Agency and is currently awaiting approval. (02/03/09).

Page 7: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Appendix 1: AER spreadsheet

Page 8: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Facility ID & Activities

| PRTR# : P0795 | Facility Name : Cadbury Ireland Limited | Filename : Sheet1.xls | Return Year : 2008 | 4904

Version 1.1.01REFERENCE YEAR 2008

1. FACILITY IDENTIFICATIONParent Company Name Cadbury Ireland Limited

Facility Name Cadbury Ireland LimitedPRTR Identification Number P0795

Licence Number P0795-01

Waste or IPPC Classes of ActivityNo. class_name

7.2.1

The treatment and processing of milk, the quantity of milk received being greater than 200 tonnes per day (average value on a yearly basis).

Address 1 ShinnaghAddress 2 RathmoreAddress 3 County KerryAddress 4

Country IrelandCoordinates of Location 11800928

River Basin DistrictNACE Code 105

Main Economic Activity Manufacture of dairy productsAER Returns Contact Name Jocelyn Cathalin

AER Returns Contact Email Address [email protected] Returns Contact Position Quality & Environment Manager

AER Returns Contact Telephone Number 064-58004AER Returns Contact Mobile Phone Number 087 9059792

AER Returns Contact Fax Number 064-58368Production Volume 0.0

Production Volume UnitsNumber of Installations 1

Number of Operating Hours in Year 0Number of Employees 0

User Feedback/CommentsWeb Address

2. PRTR CLASS ACTIVITIESActivity Number Activity Name8c Treatment and processing of milk

3. SOLVENTS REGULATIONS (S.I. No. 543 of 2002)Is it applicable?

Have you been granted an exemption ?If applicable which activity class applies (as per

Schedule 2 of the regulations) ?Is the reduction scheme compliance route being

used ?

AER Returns Worksheet

Page 1

Page 9: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Releases to Air

4.1 RELEASES TO AIR | PRTR# : | Facility Name : * Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button | Filename : Sheet2.xls | Return Year : Nitroge 03/04/2009 17:278 12 20 20 28 28 6 7 6 6 6

SECTION A : SECTOR SPECIFIC PRTR POLLUTANTS

QUANTITY

No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 Emission Point 2 T (Total) KG/YearA (Accidental) KG/Year

F (Fugitive) KG/Year

0.0 0.0 0.0 0.0 0.0

08 Nitrogen oxides (NOx/NO2) M ALTKane May Quintox KM9160 flue gas analyser 25998.5 25998.5 51997.0 0.0 0.0

11 Sulphur oxides (SOx/SO2) M BS EN 14791:2005 15165.5 15165.5 30331.0 0.0 0.086 Particulate matter (PM10) M ISO 9096 9311.0 9311.0 18622.0 0.0 0.0

02 Carbon monoxide (CO) M ALTKane May Quintox KM9160 flue gas analyser 1400.0 1400.0 2800.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

SECTION B : REMAINING PRTR POLLUTANTS

QUANTITY

No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year0.0 0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

SECTION C : REMAINING POLLUTANT EMISSIONS (As required in your Licence)

QUANTITY

Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year0.0 0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

Additional Data Requested from Landfill operators

Landfill:* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

Please enter summary data on the quantities of methane flared and / or utilised

additional_pollutant_no T (Total) kg/Year M/C/E Method CodeDesignation or

DescriptionFacility Total Capacity m3

per hourTotal estimated methane generation (as pe

site model) 0.0 N/AMethane flared 0.0 0.0 (Total Flaring Capacity)

Methane utilised in engine/s 0.0 0.0 (Total Utilising Capacity)Net methane emission (as reported in Sectio

A above) 0.0 N/A

For the purposes of the National Inventory on Greenhouse Gases, landfill operators are requested to provide summary data on landfill gas (Methane) flared or utilised on their facilities to accompany the figures for total methane generated. Operators should only report their Net methane (CH4) emission to the environment under T(total) KG/yr for Section A: Sector specific PRTR pollutants above. Please complete the table below:

Method Used

RELEASES TO AIRPOLLUTANT METHOD

Method Used

RELEASES TO AIRPOLLUTANT METHOD

Method Used

RELEASES TO AIRPOLLUTANT METHOD

Method Used

Page 1

Page 10: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Releases to Waters

4.2 RELEASES TO WATERS | PRTR# : | Facility Name : | Filename : Sheet3.xls | Return Year : Total nitrogen | 03/04/2009 17:278 11 19 20 28 35 6 8 6 6 6

SECTION A : SECTOR SPECIFIC PRTR POLLUTANTS Data on ambient monitoring of storm/surface water or groundwater, conducted as part of your licence requirements, should NOT be submitted under AER / PRTR Reporting as this only concerns Releases from your facility

QUANTITYSW1

No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 Emission Point 2 Emission Point 3 T (Total) KG/Year

A (Accidental) KG/Year

F (Fugitive) KG/Year

0.0 0.0 0.0 0.0 0.0 0.012 Total nitrogen M ALT ETG03 (Ganimede) 1128.35 0.0 0.0 1128.35 0.0 0.0

13 Total phosphorus M ALT

HACH method adapted from Standard Methods for the Examination of Water and Wastewater 672.95 0.0 0.0 672.95 0.0 0.0

0.0 0.0 0.0 0.0 0.0 0.0* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

SECTION B : REMAINING PRTR POLLUTANTS

QUANTITY

No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year0.0 0.0 0.0 0.00.0 0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

SECTION C : REMAINING POLLUTANT EMISSIONS (as required in your Licence)

QUANTITYSW1

Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 Emission Point 2 Emission Point 3 T (Total) KG/Year

A (Accidental) KG/Year

F (Fugitive) KG/Year

0.0 0.0 0.0 0.0 0.0 0.0

303 BOD M OTH

Oxygen Sensitive Electrode used to measure changes in dissolved oxygen content of material over 5 day incubation period 1776.25 0.0 0.0 1776.25 0.0 0.0

306 COD M CRM

HACH method adapted from J Water Pollution Control Federation 1964 10185.41 0.0 0.0 10185.41 0.0 0.0

238 Ammonia (as N) M ALT

Nessler method adapted from Standard Methods for the Examination of Water and Wastewater 58.32 0.0 0.0 58.32 0.0 0.0

314 Fats, Oils and Greases M ALTET 0834 Based on APHA 2005:5520:D 1.0 0.0 0.0 1.0 0.0 0.0

332 Ortho-phosphate (as PO4) M ALT

HACH method adapted from Standard Methods for the examination of water and wastewater 597.27 0.0 0.0 597.27 0.0 0.0

240 Suspended Solids M ALT Gravimetric methods 3559.82 0.0 0.0 3559.82 0.0 0.00.0 0.0 0.0 0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

RELEASES TO WATERSPOLLUTANT

Method Used

RELEASES TO WATERSPOLLUTANT

Method Used

RELEASES TO WATERSPOLLUTANT

Method Used

Page 1

Page 11: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Releases to Wastewater or Sewer

4.3 RELEASES TO WASTEWATER OR SEWER | PRTR# : | Facility Name : | Filename : Sheet4.xls | Return Year : * Select a row by double-clicking on 03/04/2009 17:278 8 16 16 6 6 6 6

SECTION A : PRTR POLLUTANTS

QUANTITY

No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year0.0 0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

SECTION B : REMAINING POLLUTANT EMISSIONS (as required in your Licence)

QUANTITY

Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year F (Fugitive) KG/Year0.0 0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

OFFSITE TRANSFER OF POLLUTANTS DESTINED FOR WASTE-WATER TREATMENT OR SEWERPOLLUTANT METHOD

Method Used

OFFSITE TRANSFER OF POLLUTANTS DESTINED FOR WASTE-WATER TREATMENT OR SEWERPOLLUTANT METHOD

Method Used

Page 1

Page 12: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Releases to Land

4.4 RELEASES TO LAND | PRTR# : | Facility Name : | Filename : Sheet5.xls | Return Year : | 03/04/2009 17:278 9 17 17 6 6 6 6

SECTION A : PRTR POLLUTANTS

QUANTITY

No. Annex II Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year0.0 0.0 0.00.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

SECTION B : REMAINING POLLUTANT EMISSIONS (as required in your Licence)

QUANTITY

Pollutant No. Name M/C/E Method Code Designation or Description Emission Point 1 T (Total) KG/Year A (Accidental) KG/Year0.0 0.0 0.0

* Select a row by double-clicking on the Pollutant Name (Column B) then click the delete button

RELEASES TO LANDPOLLUTANT METHOD

Method Used

RELEASES TO LANDPOLLUTANT METHOD

Method Used

Page 1

Page 13: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Treatment & Transfers of Waste

5. ONSITE TREATMENT & OFFSITE TRANSFERS OF WASTE | PRTR# : 17 05 03 | Facility Name : 05 01 05 | Filename : Sheet6.xls | Return Year : 13 05 03 | 03/04/2009 17:275 24

Transfer Destination European Waste Code HazardousQuantity T/Year Description of Waste

Waste Treatment Operation M/C/E Method Used

Location of Treatment

Name and Licence / Permit No. of Recoverer / Disposer /

BrokerAddress of Recoverer /

Disposer / Broker

Name and Address of Final Destination i.e. Final Recovery / Disposal Site (HAZARDOUS

WASTE ONLY)

Licence / Permit No. of Final Destination i.e. Final Recovery / Disposal Site (HAZARDOUS

WASTE ONLY)

Within the Country 02 05 02 No 194.0 Sludges from on site effluent treatment R10 M Weighed Offsite in Ireland

McGill Environmental Services CK(S) 302/06 (waste collection permit holder Munster Waste WCP LK/008/08(d))

Ballinvoher, Castletownroche, Co.Cork

Within the Country 20 03 01 No 59.0Mixed muncipal waste (general compactor and yard skip) D1 M Weighed Offsite in Ireland

Killarney Waste Disposal W0217-01 (waste collection permit WCP LK/072/07(d))

Aughnacureen, Killarney, Co. Kerry

Within the Country 16 07 08 Yes 12.0 Waste oil R9 M Weighed Offsite in Ireland

Lehane Environmental & Industrial Services Limited (waste collection permit WCP/LK/066/06c)

Unit 5, Wallingstown Industrial Estate, Little Island, Cork

Rilta Environmental , Rathcoole, Co. Dublin 192-2

Within the Country 15 01 01 No 4.0Cardboard removed from site in dedicated cardboard compactor R3 M Weighed Offsite in Ireland

Killarney Waste Disposal W0217-01 (waste collection permit WCP LK/072/07(d))

Aughnacureen, Killarney, Co. Kerry

Within the Country 13 05 03 Yes 12.0 Interceptor Waste R9 M Weighed Offsite in Ireland

Lehane Environmental & Industrial Services Limited (waste collection permit WCP/LK/066/06c)

Unit 5, Wallingstown Industrial Estate, Little Island, Cork

Rilta Environmental , Rathcoole, Co. Dublin 192-2

Within the Country 02 05 02 No 42.0 Sludges from on site effluent treatment R10 M Weighed Offsite in Ireland

Waddock Composting WP 01/02 (waste collection permit Lehane WCP LK/066/06c) Killamaster, Co. Carlow

To Other Countries 15 02 02 Yes 4.0 Oil containing absorbents, cloths, filters D10 E Volume Calculation Abroad

Lehane Environmental & Industrial Services Limited (waste collection permit WCP/LK/066/06c)

Unit 5, Wallingstown Industrial Estate, Little Island, Cork ATM Netherlands 03 / 7623

Within the Country 20 01 35 Yes 0.07 WEEE R4 M Weighed Offsite in Ireland

Lehane Environmental & Industrial Services Limited (waste collection permit WCP/LK/066/06c)

Unit 5, Wallingstown Industrial Estate, Little Island, Cork

KMK Metals Recycling Ltd, Cappincur Industrial Estate, Co. Offaly 113-03

Within the Country 05 01 05 Yes 116.0 Hydrocarbon oil R9 M Weighed Offsite in Ireland

Lehane Environmental & Industrial Services Limited (waste collection permit WCP/LK/066/06c)

Unit 5, Wallingstown Industrial Estate, Little Island, Cork

Rilta Environmental , Rathcoole, Co. Dublin 192-2

To Other Countries 17 05 03 Yes 324.0 Potentially contaminated soil D8 M Weighed Abroad

Lehane Environmental & Industrial Services Limited (waste collection permit WCP/LK/066/06c)

Unit 5, Wallingstown Industrial Estate, Little Island, Cork U Nord, Brenen, Germany 2006 / 008

Within the Country 17 04 05 No 14.3 Scrap metal R4 M Weighed Offsite in Ireland

Cork Metal Company CK (S) 204 /05 (waste collection permit WCP LK/024/05c) Dublin Hill, Cork

Within the Country 20 01 21 Yes 0.0136 Fluorescent lamp tubes R5 C Weighed Offsite in IrelandIrish Lamp Recycling Company WCP LK/057/06c

Blackpark, Kilkenny Road, Athy, Co.Kildare

Irish Lamp Recycling Company 02 2000B

Within the Country 20 01 35 Yes 0.0136 WEEE R5 C Weighed Offsite in IrelandIrish Lamp Recycling Company WCP LK/057/06c

Blackpark, Kilkenny Road, Athy, Co.Kildare

Irish Lamp Recycling Company 02 2000B

Within the Country 20 01 33 Yes 0.0136 Battery R4 C Weighed Offsite in IrelandIrish Lamp Recycling Company WCP LK/057/06c

Blackpark, Kilkenny Road, Athy, Co.Kildare

Irish Lamp Recycling Company 02 2000B

Within the Country 06 04 04 Yes 0.0136 Mercury R4 C Weighed Offsite in IrelandIrish Lamp Recycling Company WCP LK/057/06c

Blackpark, Kilkenny Road, Athy, Co.Kildare

Irish Lamp Recycling Company 02 2000B

Within the Country 20 01 35 Yes 0.0136 Fittings R5 C Weighed Offsite in IrelandIrish Lamp Recycling Company WCP LK/057/06c

Blackpark, Kilkenny Road, Athy, Co.Kildare

Irish Lamp Recycling Company 02 2000B

Within the Country 18 01 03 Yes 0.01 Waste from healthcare checks D9 E Volume Calculation Offsite in Ireland

Healthcare Waste Management Services WCP/LK/049/08d

The Royal Mews, 10 Dublin Street, Carlow

Eco-Safe Systems, Unit A, Allied Industrial Estate, Kylemore Road, Ballyfermot, Dublin 10 54-2

Method Used

Page 1

Page 14: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Treatment & Transfers of Waste

Within the Country 16 05 06 Yes 0.05COD vials and other unused laboratory chemicals D9 E Volume Calculation Offsite in Ireland

Johnston Logistics Limited WCP LK/056/07(c)

Blackchurch, Rathcoole, Co. Dublin

Shannon Environmental Services Ltd, Smithstown Industrial Estate, Shannon, Co. Clare 41 -1

Within the Country 17 09 04 No 120.04 Mixed construction waste D1 M Weighed Offsite in Ireland

Vincent Reen WP 07/16 (waste collection permit for Nigel O'Connor WCP LK/504/07b)

Old Chapel, Rathmore, Co.Kerry

Within the Country 17 09 04 No 1314.38 Mixed construction waste D1 M Weighed Offsite in Ireland

Vincent Reen WP 07/16 (waste collection permit for Michael Quirke WCP LK /177/07c)

Old Chapel, Rathmore, Co.Kerry

* Select a row by double-clicking the Description of Waste then click the delete button

Page 2

Page 15: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Appendix 2: Schedule of Environmental Objectives and Targets

Page 16: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Schedule of Environmental Objectives + Targets – Cadbury Ireland Rathmore, Co. Kerry (P0795‐01) ____________________________________________________________________________________  

Page 1 of 5 

            

SCHEDULE OF ENVIRONMENTAL OBJECTIVES + TARGETS  

for period   

2009 ‐ 2013       

Licence Reg No  P0795‐01 

Licensee   Cadbury Ireland Rathmore 

Location of Installation  Rathmore, Co. Kerry 

    

Project No. Rev Date Prepared By Status

12448-6006 B March 2009 MWP + Cadburys Rathmore Controlled

 

 

Page 17: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Schedule of Environmental Objectives + Targets – Cadbury Ireland Rathmore, Co. Kerry (P0795‐01) ____________________________________________________________________________________  

Page 2 of 5 

    CONTENTS      

1. INTRODUCTION  2. SCOPE 

 3. FORMAT  4. DISCUSSION  5. LIMITATIONS 

    APPENDICES  

TABLE 1 ‐  ENVIRONMENTAL OBJECTIVES + TARGETS  

TABLE 2 – ENVIRONMENTAL MANAGEMENT PROGRAMME 2008 ‐ 2012  

 

 

Page 18: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Schedule of Environmental Objectives + Targets – Cadbury Ireland Rathmore, Co. Kerry (P0795‐01) ____________________________________________________________________________________  

Page 3 of 5 

 1. INTRODUCTION This  document  has  been  prepared  to  satisfy  Condition  No’s  2.2.2.2  and  2.2.2.3  of  Cadbury  Ireland 

Rathmore  IPPC  License  (P0795‐01),  and  includes  the  first  annual  review.    The  document  outlines 

Cadburys  Rathmore  environmental  objectives  and  targets  and  the  Environmental  Management 

Programme  (EMP) which defines  the  actions  and  a  time  schedule  for  achieving  these objectives  and 

targets.   

    2. SCOPE  2.1  Environmental Objectives: Cadbury Ireland Rathmore environmental objectives are based on: 

statutory obligations, and in particular IPPC licence requirements 

an extensive corporate level environment policy; and 

a facility specific environmental management system. 

 2.2 Environmental Targets: The proposed targets are specific tasks which have been identified as being 

necessary for the achievement of environmental objectives.  These targets will be reviewed and 

updated periodically to ensure they appropriately address environmental goals.   

 

2.3 Environmental Management Programme  (EMP):   The EMP outlined  in  this document, which  sets 

out  the  schedule of how and when objectives and  targets will be achieved, has been established 

through extensive assessment of the identified environmental aspects of the facility’s operation and 

management.  The proposed plan sets out the priorities and actions to be pursued over the next five 

years to achieve environmental goals.    

  

 

 

Page 19: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Schedule of Environmental Objectives + Targets – Cadbury Ireland Rathmore, Co. Kerry (P0795‐01) ____________________________________________________________________________________  

Page 4 of 5 

 3. FORMAT 

The Schedule of Environmental Objectives and Targets is presented in 2 No. tables as follows: 

 

Table 1 ‐ Environmental Objectives and Targets.  This table outlines 

The environmental aspects to be addressed 

The environmental objective relative to the aspect 

The targets which detail performance requirements to achieve environmental objectives  

Specific schemes / actions necessary to meet environmental targets 

Priority of action 

  

Table 2  ‐ Environmental Management Programme.    This table follows on from Table 1 and outlines 

the schedule and responsibility for achieving environmental actions and targets outlined in Table 1.   

 

 4.  DISCUSSION  Environmental Objectives were divided into two main categories, namely: 

i) Operational Objectives‐ which incorporates twelve broad categories of operational aspects 

identified as having potential to influence the environmental performance of the facility  

 

ii) Management Objectives – which incorporates  the twelve categories of aspects associated with 

the facilities environmental management system 

 

 

 

Page 20: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Schedule of Environmental Objectives + Targets – Cadbury Ireland Rathmore, Co. Kerry (P0795‐01) ____________________________________________________________________________________  

Page 5 of 5 

 4.1 Operational Objectives:  

The  actions  and  time  frames  proposed  for  achievement  of  Operational  Objectives  have  been 

determined based on the Schedule of Environmental Objectives and Targets developed for Year 1 (2008) 

through to Year 5 (2012).  

 

The 5‐year Programme has been reviewed and revised forward to incorporate a Programme for the next 

5 years; Year 2 (2009) to Year 6 (2013).  

 

Many of the operational objectives identified in Year 1 are due to be completed in Year 2 (2009). 

 Given  the significant  financial costs  involved,  the proposed programme affords some priority  to  those 

actions with most potential to reduce environmental impacts within the main target categories, namely 

storm water and wastewater management issues. 

 

4.2  Management Objectives: 

Cadbury Ireland Rathmore currently has an Environmental Management System (EMS) in place which is 

accredited  to  ISO14001.    The  EMS  has  been  reviewed  and  minor  modifications  are  ongoing  to 

incorporate the requirements of the IPPC Licence.    

Many  site  procedures  have  been  updated,  including  the  Monitoring  Procedure,  Corrective  and 

Preventive Action  Procedure  and Communication  Procedure.    The  EMS will  be  further  reviewed  and 

updated  throughout  Year  2  (2009)  and  the  following  years  in  keeping  with  principles  of  Continual 

Improvement.  

  5. LIMITATIONS 

Targets for achieving objectives which had a considerable amount of large engineering works have been 

extended in part due to adverse weather conditions.   

 

 

Page 21: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Page 1 of 9 

 

Table 1      Environmental Objectives and Targets  ‐ Cadbury Ireland Ltd, Rathmore, Co. Kerry 

OPERATIONAL  REQUIREMENTS ASPECT  OBJECTIVE  TARGETS  ACTION  PRIORITY 

Storm Water Management  

No soil, surface water or groundwater contamination as a result of storm water discharges from the site 

Maintain a silt trap and oil separator on storm water discharges  

All pump sumps storage tanks, lagoons or other treatment plant chambers from which spillage of environmentally significant materials might occur  shall be fitted with high liquid level alarms 

The provision of a catchment system to collect any leaks from flange and valves of all over‐ground pipes to be examined 

Ensure that contaminated storm waters currently discharging to ground at the eastern side of the installation, discharge to the River Blackwater via a silt trap and oil separator 

Install suitable monitoring and a diversion mechanism on the discharge to ensure that contaminated storm water is diverted to the on‐site WWTP 

Monitor ground water biannually 

  2 no. full retention separators shall be installed on SW3 (primary storm water outfall from the site). 1 no. bypass separator shall be fitted on SW2 (western outfall).   

High liquid level alarms shall be fitted at the emergency tank and divert tanks.  

Storm water drainage system to be upgraded to include monitoring and diversion of contaminated storm water.  

New storm water outfall shall be constructed as part of the upgrade works.  

Storm water upgrade works shall include monitoring and divert mechanisms. TOC and hydrocarbon monitors shall be installed.  

Kerry drains to undertake limited additional testing and survey based on gaps identified in review 

Continue with existing storm water pipelines  remediation/ upgrading  

Organise for sampling and analysis of ground water twice per year 

 HIGH 

  

 

HIGH 

 

HIGH 

MEDIUM  

HIGH 

 

HIGH 

 

HIGH 

 

MEDIUM 

 

Water Resource management  

 

Encourage  water conservation  

 

Targets to be established for reduction in water consumption  

Recycling/ Reuse: Storm water holding / firewater retention tank shall be fitted with connection points to allow for reuse of water in a fire event.  

Continue with water project on site 

Further investigations into recycling and reuse initiative options 

 MEDIUM 

 

Page 22: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Page 2 of 9 

 

 

Table 1 continued  Environmental Objectives and Targets  

OPERATIONAL REQUIREMENTS ASPECT  OBJECTIVE  TARGETS  ACTION  PRIORITY 

Wastewater Management 

 No soil, surface water or groundwater contamination as a result of wastewater discharges from the site   No substance shall be discharged in a manner or at a concentration that following initial dilution causes tainting of fish or shellfish 

In order to protect the quality of a water body, emissions to waters from the wastewater treatment plant shall not exceed emission limit values outline in table B.2.2 of Schedule B of the facilities IPPC licence 

Continuous monitoring: ‐ No flow shall exceed the specified limit ‐ No pH shall deviate from the specified range ‐ No temperature value shall exceed the limit value Composite Sampling: ‐ No pH shall deviate from the specified range ‐ Other than pH + flow, 8 of 10 consecutive 

composite results shall not exceed the emission limit value. 

‐ No individual result shall exceed 1.2 times the emission limit value 

Discrete sampling: ‐ Other than pH + temperature, no grab sample 

value shall exceed 1.2 times the emission limit value  

  Permanent phosphorus removal 

equipment to be installed at the WWTP. Review sludge level with phosphorus removal equipment 

Foul sewers shall be remediated as part of ongoing works.  

Monitoring of pH, flow and temperature shall be maintained at the outfall.  

TOC monitor and divert mechanism shall be installed at the treated effluent outfall. Refer to Proposals for Storm water Management report for details.  

 

HIGH 

   

MEDIUM 

HIGH 

 

HIGH 

 

Energy Use   a) Reduce Installations Energy Consumption  

b) Increase the use of renewable energy 

Increase the boiler TDS level on the boilers from 3,000 to 3,500 ppm by end 2009.  

Review on basis of concerns raised by water treatment company that this target may not be achievable.  Review additional opportunities for energy use reduction and efficiency  

 

 MEDIUM

 

 

Power generation 

Reduce Installations use of conventional  power generation 

Incorporate clean energy technologies options for power generation 

Investigate if any new or emerging possibilities for clean energy in 2009. 

 MEDIUM

 

Page 23: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Page 3 of 9 

 

 

Page 24: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Page 4 of 9 

 

Table 1 continued ‐ Environmental Objectives and Targets  

OPERATIONAL REQUIREMENTS ASPECT  OBJECTIVE  TARGETS  ACTION  PRIORITY 

Waste Management 

Reduce the environmental impact of the Installations waste 

a) Waste Generation: Reduce the volume of waste generated at the Installation 

b) Waste Handling: No soil, surface water or groundwater contamination as a result of waste collection or disposal 

c) Waste Storage: No soil, surface water or groundwater contamination as a result of waste storage 

 

 

a) Increase volume of recyclable material of total waste produced.  Quantifiable target to be set. 

 

b)    ‐ Waste sent‐off site for recovery or disposal shall be transported only by authorised waste contractors ( Licensed or permitted) 

 ‐ All waste to be disposed of at a licensed or permitted facility  

 

 

c)   Waste shall be stored in designated areas protected against spillage and leachate run‐off 

 

 

Establish set targets for waste reduction 

 

Identify areas where recyclable materials can be increased 

 

MEDIUM 

 

Fuel & Chemical Storage 

No soil, surface water or groundwater contamination as a result of fuel + chemical stored  on‐site 

i) All tanks, containers and drum storage areas shall be rendered impervious to the materials stored therein 

ii) All inlets, outlets, vent pipes, valves and gauges to be stored within the bunded area 

iii) All drainage from bunded areas to be diverted for collection and safe disposal 

iv) Adequate supply of containment booms and/or suitable absorbent material to contain and absorb any spillage  

i) ‐ All tanks/drum storage to be bunded locally or remotely to a volume of  not less than 110% capacity of the largest tank  

‐ Minor remediation as outlined in HFO      assessment report to be carried out ‐  Caustic + Nitric bunds to be tested ‐  Assessment of self bunded tanks to be carried out 

ii) Investigate the possibility of using spill tray at HFO bund to overcome difficulties of positioning gauge within the bunded area 

iii) Establish plan for drainage from bunded areas to be diverted for collection and safe disposal 

iv) Review requirements for spill kits + replace where necessary 

 

MEDIUM 

 

 

Page 25: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Page 5 of 9 

 

Table 1 continued ‐ Environmental Objectives and Targets  

OPERATIONAL REQUIREMENTS 

ASPECT  OBJECTIVE  TARGETS  ACTION  PRIORITY 

Air Emissions  Operations + activities at the facility shall not result in the release of significant levels of pollutants to the atmosphere 

 

 

Emissions to the atmosphere from the installation shall not exceed emission limit values set out in the IPPC licence 

Emission of oxides of sulphur shall not exceed 1700mg/m3  

Emissions of nitrogen oxides (as NO2) shall not exceed 900mg/m3 

No emissions of offensive odours outside the boundaries of the premises. 

Continuous monitoring: 

‐ No 24 hour mean value shall exceed the emission limit value 

‐ 97% of all 30 minute mean values taken continuously over an annual period shall not exceed 1.2 times the emission limit value 

‐ No 30 minute mean value shall exceed twice the emission limit value 

Non‐continuous Monitoring 

‐ For flow, no hourly or daily mean value shall exceed the relevant limit value 

‐ For all other parameters, no 30 minute mean value shall exceed the emission limit value 

Bi‐annual monitoring of stack emissions to be carried out to ensure targets are being complied with 

 

 

 

MEDIUM 

 

Noise Emissions 

Noise generated on‐site shall not impact the amenity of neighbouring properties 

Noise from the installation shall not give rise to sound pressure levels (Leq, T) ,measured at sensitive locations of the installation which exceed the limit value(s) of 55dB(A) for Daytime noise and 45dB(A) for night‐time noise  

Annual noise survey to be carried out to ensure targets are met 

Review Noise Sensitive Locations in proximity to the site 

 

MEDIUM 

 

Fugitive Emissions 

No soil, surface water or groundwater contamination as a result of fugitive emission from the site 

Complete the identification of fugitive emissions from the facility by June 2009 

Implement any actions identified in the fugitive emissions reduction programme 

 

MEDIUM 

 

 

Page 26: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Page 6 of 9 

 

Table 1 continued ‐ Environmental Objectives and Targets  

 

OPERATIONAL REQUIREMENTS 

ASPECT  OBJECTIVE  TARGETS  ACTION  PRIORITY 

Material Handling: Minimise preventable losses of all materials through handling procedures  

Take all measures required to ensure no inadvertent losses of ingredients to drain (e.g. while unloading milk tankers to silos) 

Review unloading systems to ensure all ingredients captured in system 

MEDIUM  ‐ Ongoing review 

Material processing: Reduce, where possible, the losses of food materials in all processes; while being mindful of possible food safety limitations.  Target – that annual ingredient losses do not exceed 0.5%  

Monitor ingredients in vs finished goods out. Monitor effectiveness of other measures detailed below  

Rathmore system is generally set up to recover within process rather than loss – but there are a couple of existing areas where there is no recovery step built in.  All new equipment to incorporate recovery step.  Manual recovery of material to take place as far as possible otherwise 

MEDIUM  ‐ Ongoing review and optimisation 

Goods consumption (specifically crumb raw materials of (1) milk (2) sugar (3) cocoa mass (4) butter oil) 

Reduce the facilities overall raw material resource consumption per tonne of finished product 

Material storage: Minimise preventable losses of all relevant (potentially sensitive) materials while in storage.  Milk in silos and reclaim/rework  in process tanks have potential to deteriorate hence becoming unfit for use and then must be disposed of – thus not only resulting in loss of valuable raw materials but also extra loading onto the site effluent plant. 

   Aim to evaporate all milk on day of delivery.   Monitor and record condition of any stored milk in silos.  Monitor condition of all reclaim / rework in production area 

MEDIUM  Ongoing. Twice daily Every shift  

Facility + Equipment Maintenance 

Adequate control of plant + equipment so that hazardous breakdown is prevented 

Ensure maintenance programme in SAP includes all key equipment that is central to meeting targets / monitoring systems by June 2009. 

 

Continue with maintenance programme.  Review + update if necessary  

HIGH 

 

Page 27: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Page 7 of 9 

 

Table 1 continued ‐ Environmental Objectives and Targets  

ENVIRONMENTAL MANAGEMENT SYSTEM REQUIREMENTS 

ASPECT  OBJECTIVE  TARGET  ACTION  PRIORITY 

Management + Reporting Structure 

Make provision for management of the activity on a planned basis having regard to the desirability of ongoing assessment, recording and reporting of matters affecting the environment 

Existing management + reporting structure to be reviewed and updated by December 2008 

Responsibilities in relation to quality, environment, health + safety and general operating procedures are outlined 

Review annually + update as necessary 

 MEDIUM 

 

Schedule of Environmental Objectives + Targets 

          As above  Establish schedule of environmental objectives + targets by June 2008 

Review annually + update as necessary  

 

HIGH 

Environmental Management Programme 

          As above  Established 5 year environmental management programme by June 2008 

Review annually + update as necessary  

 

HIGH 

Documentation            As above  Existing environmental management documentation system to be reviewed by December 2008 

Review annually + update as necessary  

 

 MEDIUM 

 

Data Management system 

          As above  Establish a data management system for collation, achieving, assessing and graphically presenting environmental monitoring data by June 2008 

Review annually + update as necessary  

 

HIGH 

Corrective Action 

            As above  Existing corrective action procedure to be reviewed by December 2008 

Review annually + update as necessary  

 

 MEDIUM 

 

Page 28: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Page 8 of 9 

 

Table 1 continued ‐ Environmental Objectives and Targets  

ENVIRONMENTAL MANAGEMENT SYSTEM REQUIREMENTS 

ASPECT  OBJECTIVE  TARGET  ACTION  PRIORITY 

Awareness + Training 

Increase the environmental awareness of employees 

All employees are familiar with the Group’s environmental policy by December 2008. 

Review annually + update as necessary  

Continue with site wide IPPC awareness training throughout 2009.  Complete training of Mass Tanker drivers. 

 MEDIUM 

 

Communication Programme 

Communicate environmental performance with interested parties 

Ensure interested parties + members of the public can obtain information concerning the environmental performance of the installation 

Notice board of contact details for environmental queries has been installed.  This is included in the communication procedure. 

LOW 

Efficient Process Control 

Adequate control of processes under all modes of operation 

Establish a programme for the control of processes and monitoring of process control performance  

Continue with Regional KPI initiative; Environmental Governance pack to address KPIs in 2009. 

 MEDIUM 

 

Accident Prevention 

Provide for the protection of the environment by  preventing  accidents   

Ensure no major accidents occur 

Reduce the number of minor accidental events with environmental and/or health & safety consequences 

Establish specific remedial measures at problem locations where measures are targeted to reduce particular types of commonly occurring accidents.    

Maintain compliance with health and safety codes;  

 

Review existing accident prevention procedures  

Carry out safety audits to ensure that best practices are maintained 

Review accident data annually as a basis for output monitoring and determining future local safety schemes + programmes.  Review schemes a suitable period after implementation and take action as necessary.  Carry out prompt emergency repair to damaged and distressed plant + equipment 

 MEDIUM 

Page 29: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Page 9 of 9 

 

Table 1 continued ‐ Environmental Objectives and Targets  

ENVIRONMENTAL MANAGEMENT SYSTEM REQUIREMENTS 

ASPECT  OBJECTIVE  TARGET  ACTION  PRIORITY 

Emergency Response 

Provide for the protection of the environment by mitigating potential consequences of unplanned events 

Prevention of escalation of the emergency 

Protection of natural and physical resources 

Develop and improve staff capabilities to respond effectively to environmental emergencies 

Review existing emergency response programme to include the following:

Policies and procedures,

Response plans,

Operational guidelines,

Technical guidance on emergency response  

 MEDIUM 

 

Reporting   Report on the environmental performance of the facility to interested parties 

  Prepare + submit to the Agency an Annual Environmental Report (AER) 

Prepare Pollution Release and Transfer Register (PRTR) annually 

 MEDIUM 

 

 

Page 30: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Page 1 of 8 

 

 

TABLE 2:        ENVIRONMENTAL MANAGEMENT PROGRAMME – 2009 ‐ 2013 

OPERATIONAL  REQUIREMENTS   

ACTION   ASPECT YEAR 2 2009 

YEAR 3 2010 

YEAR 4 2011 

YEAR 5 2012 

YEAR 6 2013 

RESPONSIBILITY 

Storm Water Management  

Complete installation of bypass separator  on SW2 (Western outfall) 

Storm water drainage systems upgrading‐, including monitoring + diversion of storm water (Phase 2) to include  2000m3 holding tank /firewater retention tank 

Fit high liquid level alarms at emergency tank and divert tanks 

2 no. full retention separators to be installed on SW3 (primary storm water outfall) 

TOC and Hydrocarbon monitors to be installed 

Kerry drains to undertake limited additional testing and survey based on gaps identified in review 

Continue with upgrading of pipework 

Routine monitoring of storm water discharges 

Ground water sampling and analysis twice per year 

Continue with upgrading of pipework 

Routine monitoring of storm water discharges 

Ground water sampling and analysis twice per year 

 

Continue with upgrading of pipework 

Routine monitoring of storm water discharges 

Ground water sampling and analysis twice per year 

 

Continue with upgrading of pipework 

Routine monitoring of storm water discharges 

Ground water sampling and analysis twice per year 

 

 

Continue with upgrading of pipework 

Routine monitoring of storm water discharges 

Ground water sampling and analysis twice per year 

 

 

MWP ‐ External Engineering Consultant to implement + oversee infrastructural works 

Cadbury Quality and Environment Manager to carry out routine monitoring 

Page 31: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Page 2 of 8 

 

 

OPERATIONAL  REQUIREMENTS   ACTION   ASPECT 

YEAR 2 2009 

YEAR 3 2010 

YEAR 4 2011 

YEAR 5 2012 

YEAR 6 2013 

RESPONSIBILITY 

Water Resource management  

 

 Establish targets for reducing the quantity of fresh water used on site 

 Fit storm water holding / firewater retention tank with connection points to allow for reuse of water in a fire event 

 Continue with water projects on site 

 Further investigations into recycling and re‐use initiative options  

 Review of targets  

 Further investigations into recycling and re‐use initiative options  

Review of targets 

Further investigations into recycling and re‐use initiative options 

Review of targets 

Further investigations into recycling and re‐use initiative options 

Review of targets 

Cadbury Quality and Environment Manager to commission audit 

Wastewater Management 

Install TOC monitor, divert mechanism and diversion chamber 

Bunding of Tanks + Divert drain from River 

Remediation of Existing balance tanks (Replacement option) 

Dispose of sludge build‐up from balance tanks 

Review sludge levels with phosphorous removal equipment installed 

Survey + Improve WWTP safety + access 

Continue with upgrading of process/foul drains  

Routine monitoring at outfall 

Continue with WWTP safety + access improvements  

 

Continue with upgrading of process/foul drains  

 

Routine monitoring at outfall 

 

Installation of   Activated sludge plant (Phase 1)  

Continue with upgrading of process/foul drains  

 

Routine monitoring at outfall 

 

Installation of Activated sludge plant (Phase 2) 

Continue with upgrading of process/foul drains  

 

Routine monitoring at outfall 

 

Installation of Activated sludge plant (Phase 3) 

Continue with upgrading of process/foul drains  

 

Routine monitoring at outfall 

 

Installation of Activated sludge plant (Phase 3) 

MWP ‐ External Engineering Consultant to implement + oversee infrastructural works 

Cadbury Quality and Environment Manager to carry out routine monitoring 

Page 32: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Page 3 of 8 

 

 

OPERATIONAL  REQUIREMENTS   

ACTION   ASPECT 

YEAR 2 2009 

YEAR 3 2010 

YEAR 4 2011 

YEAR 5 2012 

YEAR 6 2013 

RESPONSIBILITY 

Energy Use   Review targets for energy use reduction 

Increase the boiler TDS level on the boilers from 3,000 to 3,500 ppm. 

 Review targets for energy use reduction in 2010. 

Review targets for energy use reduction 

Review targets for energy use reduction 

Review targets for energy use reduction 

Cadbury Quality and Environment Manager to commission audit 

Power generation  Investigate if any new or emerging possibilities for clean energy in 2009. 

Establish targets for use of clean energy technologies  

Review targets   Review targets  Review targets  Review targets  Cadbury Quality and Environment Manager to commission audit 

Waste Management 

Establish set targets for waste reduction 

Identify areas where recyclable materials can be increased 

Review targets for waste reduction + reuse  

Review targets for waste reduction + reuse 

Review targets for waste reduction + reuse 

Review targets for waste reduction + reuse 

Cadbury Quality and Environment Manager to commission audit 

Fuel & Chemical Storage 

Commence works for local / remote bunding of tanks + drums  

Commence containment works for inlets, outlets, vent pipes, valves and gauges 

Establish schedule for assessment /integrity testing of bunds + tanks 

Continue with weekly inspection and include spill kits 

Continue with containment works for inlets, outlets, vent pipes, valves and gauges  

Review spill kit requirements 

 

Commence scheduled assessment /integrity testing of bunds + tanks  

Review spill kit requirements 

Review spill kit requirement 

Review spill kit requirement 

MWP + Metlab 

Page 33: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Page 4 of 8 

 

 

OPERATIONAL REQUIREMENTS   

ACTION   ASPECT 

YEAR 2 2009 

YEAR 3 2010 

YEAR 4 2011 

YEAR 5 2012 

YEAR 6 2013 

RESPONSIBILITY 

Air Emissions  Carry out stack emission monitoring surveys  (April  + Sept) 

Continue ongoing monitoring through daily logs 

Carry out stack emission monitoring surveys (April  + Sept)  

Carry out stack emission monitoring surveys (April + Sept) 

 

Carry out stack emission monitoring surveys  (April + Sept)  

 

Carry out stack emission monitoring surveys  (April + Sept)  

 

Cadbury Quality and Environment Manager to commission monitoring events 

Noise Emissions  Carry out boundary noise survey  

Review Noise Sensitive Locations in proximity to the site 

Carry out boundary noise survey  

Carry out boundary noise survey  

Carry out boundary noise survey  

Carry out boundary noise survey 

Cadbury Quality and Environment Manager to commission monitoring events 

Fugitive Emissions 

Complete the identification of fugitive emissions from the facility by June 2009 

Implement any actions identified in fugitive emissions reduction programme 

Review annually  Review annually  Review annually   Review annually  Cadbury Quality and Environment Manager to commission this work 

Page 34: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Page 5 of 8 

 

 

 

OPERATIONAL  REQUIREMENTS   

ACTION   ASPECT YEAR 2 2009 

YEAR 3 2010 

YEAR 4 2011 

YEAR 5 2012 

YEAR 6 2013 

RESPONSIBILITY 

Goods Consumption 

Finalise and approve all materials procedures  

 

Review + update material handling procedures to minimise losses 

Review + update material processing procedures to minimise losses 

Review + update material storage procedures to minimise losses 

Review + update material handling procedures to minimise losses 

Review + update material processing procedures to minimise losses 

Review + update material storage procedures to minimise losses 

Review + update material handling procedures to minimise losses 

Review + update material processing procedures to minimise losses 

Review + update material storage procedures to minimise losses 

Review + update material handling procedures to minimise losses 

Review + update material processing procedures to minimise losses 

Review + update material storage procedures to minimise losses 

Cadbury Quality and Environment Manager 

Facility & Equipment Maintenance 

Continue with maintenance programme.  Review + update if necessary 

Continue with maintenance programme Review + update if necessary 

Continue with maintenance programme. Review + update if necessary 

Continue with maintenance programme. Review + update if necessary 

Continue with maintenance programme. Review + update if necessary 

Cadbury Quality and Environment Manager + Health + Safety Officer 

 

Page 35: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Page 6 of 8 

 

 

ENVIRONMENTAL MANAGEMENT SYSTEMS  REQUIREMENTS   

ACTION   ASPECT 

YEAR 2 2009 

YEAR 3 2010 

YEAR 4 2011 

YEAR 5 2012 

YEAR 6 2013 

RESPONSIBILITY 

Management + Reporting Structure 

Review annually + update as necessary  

Review annually + update as necessary 

Review annually + update as necessary 

Review annually + update as necessary 

Review annually + update as necessary 

Cadbury Quality and Environment Manager 

Schedule of Environmental Objectives + Targets 

Review annually + update as necessary  

Review annually + update as necessary 

Review annually + update as necessary 

Review annually + update as necessary 

Review annually + update as necessary 

Cadbury Quality and Environment Manager and support from MWP 

Environmental Management Programme 

Review annually + update as necessary  

 

 

Review annually + update as necessary  

 

Review annually + update as necessary 

 

 

Review annually + update as necessary  

 

 

Review annually + update as necessary 

Cadbury Quality and Environment Manager and support from MWP 

Documentation  Review annually + update as necessary  

 

Review annually + update as necessary 

 

Review annually + update as necessary 

 

Review annually + update as necessary 

 

Review annually + update as necessary 

 

Cadbury Quality and Environment Manager 

Data Management system 

Review annually + update as necessary  

Review annually + update as necessary 

Review annually + update as necessary 

Review annually + update as necessary 

Review annually + update as necessary 

 

Cadbury Quality and Environment Manager 

Page 36: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Page 7 of 8 

 

 

ENVIRONMENTAL MANAGEMENT SYSTEMS  REQUIREMENTS   

ACTION   ASPECT 

YEAR 2 2009 

YEAR 3 2010 

YEAR 4 2011 

YEAR 5 2012 

YEAR 6 2013 

RESPONSIBILITY 

Corrective Action  Review annually + update as necessary  

Review annually + update as necessary 

Review annually + update as necessary 

Review annually + update as necessary 

Review annually + update as necessary 

Cadbury Quality and Environment Manager 

Awareness + Training 

Review annually + update as necessary  

Continue with site wide IPPC awareness training throughout 2009 

Complete training of Mass Tanker drivers 

Review annually + update as necessary 

Review annually + update as necessary 

Review annually + update as necessary 

Review annually + update as necessary 

Cadbury Quality and Environment Manager + Health + Safety Officer 

Communication Programme 

Review annually + update as necessary  

Review annually + update as necessary 

Review annually + update as necessary 

Review annually + update as necessary 

Review annually + update as necessary 

Cadbury Quality and Environment Manager 

Efficient Process Control 

Continue with Regional KPI initiative; Environmental Governance pack to address KPIs in 2009. 

  

Review annually + update as necessary 

Review annually + update as necessary 

Review annually + update as necessary 

Review annually + update as necessary 

Cadbury Quality and Environment Manager 

Page 37: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Page 8 of 8 

 

 

ENVIRONMENTAL MANAGEMENT SYSTEMS  REQUIREMENTS   

ACTION   ASPECT 

YEAR 2 2009 

YEAR 3 2010 

YEAR 4 2011 

YEAR 5 2012 

YEAR 6 2013 

RESPONSIBILITY 

Accident Prevention 

Review existing accident prevention procedures  

Carry out safety audits to ensure that best practices are maintained 

Carry out prompt emergency repair to damaged and distressed plant + equipment  

Review existing accident prevention procedures  

Carry out safety audits to ensure that best practices are maintained 

Carry out prompt emergency repair to damaged and distressed plant + equipment  

Review existing accident prevention procedures  

Carry out safety audits to ensure that best practices are maintained 

 Carry out prompt emergency repair to damaged and distressed plant + equipment 

Review existing accident prevention procedures  

Carry out safety audits to ensure that best practices are maintained 

Carry out prompt emergency repair to damaged and distressed plant + equipment  

Review existing accident prevention procedures  

Carry out safety audits to ensure that best practices are maintained 

Carry out prompt emergency repair to damaged and distressed plant + equipment 

 

Cadbury Quality and Environment Manager + Health + Safety Officer 

Emergency Response 

Review annually + update as necessary  

Review annually + update as necessary 

Review annually + update as necessary 

Review annually + update as necessary 

Review annually + update as necessary 

Cadbury Quality and Environment Manager + Health + Safety Officer 

Reports  AER to be submitted to Agency by 31 March 

PRTR to be submitted to Agency by 31 March  

 

AER to be submitted to Agency by 31 March 

PRTR to be submitted to Agency by 31 March  

 

AER to be submitted to Agency by 31 March 

PRTR to be submitted to Agency by 31 March  

 

AER to be submitted to Agency by 31 March 

PRTR to be submitted to Agency by 31 March  

 

AER to be submitted to Agency by 31 March 

PRTR to be submitted to Agency by 31 March  

 

Cadbury Quality and Environment Manager 

 

 

Page 38: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Appendix 3: Environmental Management System report (2008)

Page 39: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

 

 

 

 

 

           

REVIEW of ENVIRONMENTAL MANAGMENT PROGRAMME 

Review for AER 

2008       

Licence Reg No  P0795‐01 

Licensee   Cadbury Ireland Rathmore 

Location of Installation  Rathmore, Co. Kerry 

    

Project No. Rev Date Prepared By Status

12448-6025 D March 2009 H. Dalton Controlled

 

 

 

 

 

 

Page 40: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

 

ENVIRONMENTAL MANAGEMENT PROGRAMME – 2009 REVIEW 

OPERATIONAL  REQUIREMENTS 

Aspect  YEAR 1 ‐ 2008  STATUS / COMMENT 

i) Kerry drains to complete pressure testing and survey of underground pipework 

Initial survey completed, and reviewed by Malachy Walsh and Partners (MWP) engineers.  Further limited survey has been requested based on review.  

ii) Continue with upgrading of pipework  New contract in 2009 

iii) Assess need for Firewater Retention facility   Completed 

iv) Fit high liquid level alarms at the WWTP balance tank, emergency tank and divert tanks 

Some already exist on main holding tank and remainder as part of the phosphorous contract 

v)  2 no. full retention separators to be installed on SW3 (primary storm water outfall) 

To be completed by April 2009 

vi) Storm water drainage systems upgrading ‐ including monitoring + diversion of contaminated storm water {Phase 1)  to include  220m3 

monitoring tank 

Storm Water contract; To be completed by April 2009 

vii) Construct new storm water outfall as part of upgrading works  Storm Water contract; To be completed by April 2009 

viii)  TOC and Hydrocarbon monitors to be installed  Quote received from Gilroys; To be completed by April 2009 

ix) Remediation of existing storm water soakaway at eastern boundary  Completed in Phase 1A.  May require review after Phase 1B. 

Storm Water Management  

x) Routine monitoring   1st sample sent for monthly external QC.  Results under review and to be compared with internal results. 

 

 

Page 2 of 8

 

Page 41: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

 

 

OPERATIONAL  REQUIREMENTS 

Aspect  YEAR 1 ‐ 2008  STATUS / COMMENT 

i) Carry out audit to identify opportunities for reduction in the quantity of water used on‐site 

Water project is ongoing at the site. Hoses are now locked off in the factory.   Water Resource 

management  

  ii) Check for leaks   Hygiene audits ongoing at the moment. 

i) Install Phosphorus removal equipment at WWTP  Temporary removal equipment on site currently and permanent solution to be installed  

ii) Install TOC monitor + divert mechanism at treated effluent outfall 

Quote received from Gilroys.  Quote approved, order placed 

iii) Continue with upgrading of process/foul drains   Works ongoing. Review of drain survey resulted in gaps  Drain survey; Works to follow 

Wastewater Management 

iv) Routine monitoring at outfall  Monitoring procedure in place.  Audit to be scheduled in 2009   

i) Carry out audit to identify opportunities for energy use reduction + efficiency 

Audit carried out and report completed. Summary Report sent to EPA  Energy Use  

ii) Establish targets based on audit for energy use reduction  Targets reviewed and 2009 target included in the next Schedule of Objectives and Targets 

Power generation 

i) Investigate possibilities for use of clean energy technologies  Airtricity  currently supplying electricity (95% renewable) 

Waste Management 

Carry out audit to identity areas where waste can be reduced  Waste folder compiled by JC. All permits and licences contained within. Ongoing management of records 

 

Page 3 of 8

 

Page 42: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

 

OPERATIONAL  REQUIREMENTS 

Aspect  YEAR 1 ‐ 2008  STATUS / COMMENT 

i) Establish plan for drainage from bunded areas to be diverted for collection and safe disposal  

Recommendations to be implemented in next Phase of work 

ii) Provide spill kits / containments booms at all fuel + chemical storage areas 

Inventory to be included in SAP system. Kits are in place with signage.  Training on IPPC includes spill kits and daily inspections also include kits. 

iii) Assess integrity of Heavy Fuel Oil Bund (Completed)  Recommendations to be implemented in next Phase of work 

iv) Assess integrity of Nitrite and Caustic bunds  Metlab report complete. Bunds in good condition. 

Fuel & Chemical Storage 

v) Investigate options for suitable containments of spills / leaks at inlets, outlets, vent pipes, valves and gauges  

Raw Material Intake Assessment carried out. PK to review spill trays etc. 

i) Install + commission new boilers  Boilers up and running; daily logs are completed 

ii) Decommission old boilers  Stack removal complete, old boilers are decommissioned on site.  

Air Emissions 

iii) Carry out stack emission monitoring  On SAP and will be scheduled going forward 

 (Monitoring of new boilers carried out; within limits) 

Noise Emissions  i)  Carry out boundary noise survey   Dixon Brosnan conducted noise survey. Report submitted to EPA Dec 4th. Noise sensitive locations to be reviewed 

 

Page 4 of 8

 

Page 43: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

 

 

OPERATIONAL  REQUIREMENTS 

Aspect  YEAR 1 ‐ 2008  STATUS / COMMENT 

i)Establish programme for identification + reduction of fugitive emissions from the facility by December 2008 

Identification to be completed ‐ Ongoing Fugitive Emissions 

ii) Interim action ‐ examine the need for catchment system to collect any leaks from flanges and valves of overground pipes. 

Included in the Raw Materials Intake Assessment (remote bunding – part of Storm Water contract) 

i) Review Material Handling procedures  Ongoing; Developing a Table 

ii) Review Material Processing procedures  Ongoing 

Goods Consumption 

iii) Review Material Storage procedures  Ongoing; May develop a table with a map. 

Facility & Equipment Maintenance 

Establish a comprehensive programme for planning, scheduling and tracking preventative maintenance activities that provides a systematic way of ensuring they are not neglected 

In place with SAP.  Maintenance Procedure has been updated to reflect current management within SAP.  

 

Page 5 of 8

 

Page 44: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

 

 

Environmental Management Programme 2008‐Continued  

ENVIRONMENTAL MANAGEMENT SYSTEM REQUIREMENTS 

Aspect  YEAR 1 ‐ 2008  STATUS / COMMENT 

Amend the existing documented management structure to include all personnel associated with the installation. 

Structure updated and reflects current organisation.  Management + Reporting Structure 

Responsibilities in relation to the quality, the environment, health + safety and general operating procedures to be outlined 

Job descriptions detailing responsibilities in Environmental Manual 

Schedule of Environmental Objectives + Targets 

Identify all environmental aspects associated with site activities and establish means for control.  

COMPLETED FOR 2008 – reviewed & updated for 2009  

Year 2 to 6 identified as 2009 ‐ 2013 

Environmental Management Programme 

Prioritise  objectives + targets and set deadlines for achieving compliance with environmental targets 

 

COMPLETED FOR 2008 –reviewed & updated for 2009  

Year 2 to 6 identified as 2009 ‐ 2013 

Documentation  Establish procedure outlining the environmental management documentation system  

Documentation Procedure has been revised and approved.  Will be audited in 2009. 

Data Management system 

Document the procedure for the data management system   Data managed per procedures and records; ongoing 

 

 

Page 6 of 8

 

Page 45: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

 

ENVIRONMENTAL MANAGEMENT SYSTEM REQUIREMENTS 

Aspect  YEAR 1 ‐ 2008  STATUS / COMMENT 

Corrective Action 

Amend and update the existing corrective action procedure to take account of IPPC licence requirements 

Procedure approved and in use 

Awareness + Training 

Review training and  document all environmental training undertaken by employees 

Training Assessment Records developed.  Ongoing; further records to be developed. Enviro training of new staff and staff on new projects. IPPC awareness training has been rolled out on site. Approximately 50% of staff are trained. 

i) Write standard operating procedure for communication programme  

SOP written and approved Communication Programme 

ii) Notice board of contact details for environmental queries has been installed.   

The notice board is installed at the entrance 

Establish a programme for the control of processes and monitoring of process control performance   Ongoing.  There is a Regional KPI initiative in Cadbury; Environmental 

Governance pack to address KPIs will be developed and distributed in 2009.  

Existing key process indicators to be reviewed by December 2008 Ongoing.  There is a Regional KPI initiative in Cadbury; Environmental Governance pack to address KPIs will be developed and distributed in 2009.  

Efficient Process Control 

Methods for measuring + controlling KPIs to be established by December 2008  Ongoing.  There is a Regional KPI initiative in Cadbury; Environmental 

Governance pack to address KPIs will be developed and distributed in 2009.  

 

Page 7 of 8

 

Page 46: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

 

ENVIRONMENTAL MANAGEMENT SYSTEM REQUIREMENTS 

Aspect  YEAR 1 ‐ 2008  STATUS / COMMENT 

i) Review existing accident prevention procedures   Ongoing 

ii) Carry out safety audits to ensure that best practices are maintained 

Ongoing  

Accident Prevention 

iii) Carry out prompt emergency repair to damaged and distressed plant + equipment 

Ongoing 

Emergency Response 

Review existing emergency response programme  Review is ongoing; amalgamating documents from Safety Systems also 

i)AER to be submitted to Agency by 31 March  COMPLETED 

ii) PRTR to be submitted to Agency by 31 March   COMPLETED 

iii) Residuals Management to be submitted to the Agency by 5 June  COMPLETED /awaiting approval 

iv) Environmental Liabilities Risk Assessment to be completed by 5 December  

COMPLETED /awaiting approval 

Reports 

v) Hydro geological Site investigation to be completed by 5 December   

COMPLETED /awaiting approval 

 

Note: 

This is a review of the 2008 EMP. The EMP has been revised for 2009 ‐2013 and this facilitates the continuation of the management of the targets and actions.   

 

Page 8 of 8

 

Page 47: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

Appendix 4: Tanks and pipelines testing reports

Page 48: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

12448 – Cadbury IPPC Licence Implementation

Infrastructure Testing

Summary Report

March 2009

Consulting Engineers: Client:Malachy Walsh & Partners Cadbury Ireland Ltd.Reenpoint ShinnaghBlennerville RathmoreTralee Co. KerryCo. Kerry

Document Amendment Record

Project No Rev Date Prepared Reviewed Approved Status

12448 6032-A March 2009 P. Kelly H. Dalton M. O’Sullivan Current

Infrastructure Testing Summary Report 1

Page 49: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

12448 – Cadbury IPPC Licence Implementation

Table of Contents

 

1.0  Introduction........................................................................................................................................1 

2.0  Testing...............................................................................................................................................1 

2.1  Heavy Fuel Oil Bund .....................................................................................................................1 

2.2  Nitric and Caustic Bunds...............................................................................................................1 

2.3  Testing of Underground Pipes ......................................................................................................1 

2.4  Testing of Tanks & Containers......................................................................................................2 

Appendix A – Test Certificates for Nitric Acid Bund and Caustic Soda Bund

Appendix B – Results of Water Tightness Tests on Underground Pipelines

Infrastructure Testing Summary Report 2

Page 50: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

12448 – Cadbury IPPC Licence Implementation

1.0 Introduction This report summarises the tank and pipeline testing that has been carried out to date to satisfy Condition 6.10 of IPPC Licence No. P0795-01. Testing is ongoing and this report will be updated as testing progresses.

Condition No. 6.10

The integrity and water tightness of all underground pipes, tanks, bunding structures and containers and their resistance to penetration by water or other materials carried or stored therein shall be tested and demonstrated by the licensee. This testing shall be carried out by the licensee at least once every three years and reported to the Agency on each occasion. This testing shall be carried out in accordance with any guidance published by the Agency. A written record of all integrity tests and any maintenance or remedial work arising from them shall be maintained by the licensee.

2.0 Testing

2.1 Heavy Fuel Oil Bund A detailed inspection was carried out by Malachy Walsh and Partners as described in our report titled “Structural Assessment of Heavy Fuel Oil Bund”. The conclusion of the report was that the bund is fit for its design purpose and that only minor remedial work is necessary to ensure that it can deliver on its design intent, i.e. pipe penetrations shall be properly sealed. Remedial works to the bund are to be carried out this week. A summary report of the visual re-test shall be submitted to the Agency next week.

2.2 Nitric and Caustic Bunds As advised in our correspondence of 20th June 2008, Bodycote Metlab were contracted to test the nitric acid and caustic soda bunds. The tests, which involved (a) visual inspection, (b) dye penetrant inspection of welds and (c) ultrasonic test of thickness of steel lining were carried out in August 2008. Both bunds were found to be in good order. The results of these tests are enclosed in Appendix A.

2.3 Testing of Underground Pipes Kerry Drains Services have carried out a CCTV survey and water tightness testing of the foul and surface water drainage on site. The survey was carried out in May and June 2008. The drainage systems were tested by means of water tightness tests in accordance with Appendix G of “IPC Guidance Note on Storage and Transfer of Materials for Scheduled Activities”. The CCTV survey and water tightness test reports were completed in July 2008.

The following is a summary of the results of the water tightness testing:

Drainage System Lines Passed Lines Failed Lines for Review

Foul Drains 56 runs 12 runs 6 runs

Storm Drains 38 runs 16 runs 8 runs

Infrastructure Testing Summary Report 1

Page 51: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

12448 – Cadbury IPPC Licence Implementation

The results sheets for the water tightness tests are enclosed in Appendix B. Malachy Walsh and Partners have a copy of the CCTV survey. This can be submitted to the Agency if required.

Malachy Walsh and Partners are currently assessing the survey of the drainage system and are preparing a programme of works for remedial works. Part of this assessment includes identifying any gaps in the initial CCTV survey and water tightness tests. It is intended that remedial works to the drainage systems will commence in June of this year, as part of Phase III of the IPPC Licence Implementation Works.

2.4 Testing of Tanks & Containers There are 3 no. underground tanks at the WWTP site. These include the east and west divert tanks and the primary settlement tank. These tanks will be monitored through the use of localised groundwater monitoring as recommended in Appendix G of ‘Guidance Note on Storage and Transfer of Materials for Scheduled Activities’. Two new groundwater monitoring boreholes have been installed down gradient of the wastewater treatment plant as part of the Hydrogeological Assessment of the site. These boreholes will permit monitoring of the underground tanks. This is in line with our discussions with the Agency which occurred in a meeting on 25th June 2008.

The Hydrogeology Report, January 2009, which was prepared by TEC Ltd. shows that there was no contamination in soil or groundwater samples at the wastewater treatment plant and recommended that no additional remediation is required. Bi-annual groundwater monitoring will be carried out in line with the report recommendations.

Infrastructure Testing Summary Report 2

Page 52: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

12448 – Cadbury IPPC Licence Implementation

Appendix A – Test Certificates for Nitric Acid Bund and Caustic Soda Bund

Infrastructure Testing Summary Report 3

Page 53: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

12448 – Cadbury IPPC Licence Implementation

Appendix B – Results of Water Tightness Tests on Underground Pipelines

Infrastructure Testing Summary Report 4

Page 54: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

BODYCOTE METLAB

Unit 6 Airways Technology Park, Ballygarvan, Cork. T: (021) 4311614 F: (021) 4311714 email: [email protected] Bodycote Metlab - registered in Ireland (No. 84894) - Bodycote Metlab is the trading name of Metlab (Int) Limited

Report No: C 6667-8 Client: Cadburys

Job No: C 10874

Date: 7/08/2008 Address: Rathmore,

Co.Kerry

Ultrasonic & Dye penetrant Inspection

Report Page: 1 OF 2

Location of test: Rathmore NDT Specification: EN 1714 & EN 571 Client Ref: Nitric acid tank bund Material: Carbon steel Weld Process TIG

Surface finish: Smooth Component: Primary welds & shell plates Capacity: Not supplied Heat Treatment: N/A

Calibration Block: A4 & sensitivity block Scan Surface: Acceptable Couplant: Ultrasonic Gel Flaw Detector: Sonatest sitescan

Probe Type: WK CD 10 Serial No: 18288

Probes Angle 0° Probes MHz 5MHz Twin

Ref dB 56db Scan dB 72db

Compression probe Scan level : 2ND Back wall echo to full screen height Shear wave probe Scan level: DAC + 14db

Summary: Bodycote Metlab was requested by Mr. Liam O’Flynn of Cadburys to conduct an inspection survey on the Nitric acid storage

tank bund located at the rear of the plant on the 7th of August 2008.

Please note that access was restricted to one side of the bund due to the tank location.

Inspection details:

An ultrasonic thickness measurement survey was carried out on the floor and wall plates to check for any variations in wall

thicknesses that may suggest corrosion activity is present.

A dye penetrant inspection was carried out on all the primary welds mainly concentrating on ‘T-Joints’ and any seam welds

which would be susceptible to leaking or cracking from expansion etc.

Results:

UTM- Over 150 readings were taken throughout the bund; these were all consistent and ranged between 3.1mm & 3.2mm.

DPI- No significant weld defects were found at the time of inspection.

Visual- No obvious signs of leaking or product staining were observed.

Procedure/Technique Ref: P(UT) EN 1 P(DPI) EN 3 Acceptance Standard: Report findings Test Restrictions: Isolated areas of scale (product) on certain sections of floor plate Technician Bodycote Metlab Approval Client approval

Name: (Cert no :) Signature: Date:

Colin Geary PCN II No 208984 13-08-2008

Name: (Position) Signature: Date:

John Coughlan Operations Manager 13-08-2008

Name: Signature Date

Form No: NDT 008 Rev 03

The results are only applicable to the items tested. This test report shall not be reproduced except in full without written approval of the laboratory.

Page 55: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

BODYCOTE METLAB

Unit 6 Airways Technology Park, Ballygarvan, Cork. T: (021) 4311614 F: (021) 4311714 email: [email protected] Bodycote Metlab - registered in Ireland (No. 84894) - Bodycote Metlab is the trading name of Metlab (Int) Limited

Page 2 of 2

55% Nitric acid concentrate

Thickness measurements & Dye penetrant was carried out on seam welds

Form No: NDT 008 Rev 03

The results are only applicable to the items tested. This test report shall not be reproduced except in full without written approval of the laboratory.

Page 56: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

BODYCOTE METLAB

Unit 6 Airways Technology Park, Ballygarvan, Cork. T: (021) 4311614 F: (021) 4311714 email: [email protected] Bodycote Metlab - registered in Ireland (No. 84894) - Bodycote Metlab is the trading name of Metlab (Int) Limited

Report No: C 6668-8 Client: Cadburys

Job No: C 10874

Date: 7/08/2008 Address: Rathmore,

Co.Kerry

Ultrasonic & Dye penetrant Inspection

Report Page: 1 OF 2

Location of test: Rathmore NDT Specification: EN 1714 & EN 571 Client Ref: Caustic soda liquor tank bund Material: Carbon steel Weld Process TIG

Surface finish: Smooth Component: Primary welds & shell plates Capacity: Not supplied Heat Treatment: N/A

Calibration Block: A4 & sensitivity block Scan Surface: Acceptable Couplant: Ultrasonic Gel Flaw Detector: Sonatest sitescan

Probe Type: WK CD 10 Serial No: 18288

Probes Angle 0° Probes MHz 5MHz Twin

Ref dB 56db Scan dB 72db

Compression probe Scan level : 2ND Back wall echo to full screen height Shear wave probe Scan level: DAC + 14db

Summary: Bodycote Metlab was requested by Mr. Liam O’Flynn of Cadburys to conduct an inspection survey on the Caustic soda liquor

storage tank bund located at the rear of the plant on the 7th of August 2008.

Inspection details:

An ultrasonic thickness measurement survey was carried out on the floor and wall plates to check for any variations in wall

thicknesses that may suggest corrosion activity is present.

A dye penetrant inspection was carried out on all the primary welds mainly concentrating on ‘T-Joints’ and any seam welds

which would be susceptible to leaking or cracking from expansion etc, and also where floor buckling was occurring.

Results: UTM- Over 300 readings were taken throughout the bund; these were all consistent and ranged between 3.0mm & 3.2mm.

DPI- No significant weld defects were found at the time of inspection.

Visual- No obvious signs of leaking or product staining were observed.

Procedure/Technique Ref: P(UT) EN 1 P(DPI) EN 3 Acceptance Standard: Report findings Test Restrictions: Technician Bodycote Metlab Approval Client approval

Name: (Cert no :) Signature: Date:

Colin Geary PCN II No 208984 13-08-2008

Name: (Position) Signature: Date:

John Coughlan Operations Manager 13-08-2008

Name: Signature Date

Form No: NDT 008 Rev 03

The results are only applicable to the items tested. This test report shall not be reproduced except in full without written approval of the laboratory.

Page 57: ANNUAL ENVIRONMENTAL REPORT Licensee Cadbury Ireland

BODYCOTE METLAB

Unit 6 Airways Technology Park, Ballygarvan, Cork. T: (021) 4311614 F: (021) 4311714 email: [email protected] Bodycote Metlab - registered in Ireland (No. 84894) - Bodycote Metlab is the trading name of Metlab (Int) Limited

Page 2 of 2

The results are only applicable to the items tested. This test report shall not be reproduced except in full without written approval of the l

Rear end of bund

Form No: NDT 008 Rev 03

aboratory.