ANNUAL REPORT 1312

Mayor’s Message 2

General Manager’s Report 3

1. Elected Members 4

1.1 Your Councillors 4

1.2 Council and Committees 5

1.3 Appointed Council Representation on Sub-Committees, Advisory Committees and External Organisations 7

1.4 Councillors Attendance at Meetings 8

1.5 Remuneration of Councillors 9

2. Key Corporate Functions and Achievements 10

2.1 Corporate 10

2.2 Community Planning and Development 13

2.3 Infrastructure and Services 21

2.4 Kingborough Waste Services 27

2.5 Copping Refuse Disposal Site 27

3. Governance 28

3.1 Contracts for the Supply of Goods and Services 29

3.2 Financial Assistance and Grants 30

3.3 Human Resource Policies 32

3.4 Senior Staff 32

3.5 Public Interest Disclosures 32

3.6 Public Health Statement 33

4. Financial Results for the Year - Analysis of Annual Financial Report 34

4.1 Introduction 34

4.2 Operating Statement 34

4.3 Operating Revenues 35

4.4 Operating Expenditure 37

4.5 Analysis of Cash Position 38

4.6 Analysis of Financial Position 40

4.7 Key Financial Indicators 41

APPENDIX I: Abridged Annual Financial Report 43

APPENDIX II: Performance Manager 51

APPENDIX III: Nature of Complaints 67

Contents

2

ww

w.k

ingb

orou

gh.ta

s.gov

.au

It is a pleasure to present the Annual Report for 2012/13 which provides detail on the progress and achievements of Council over the past 12 months.

I will point to some of these later but underpinning every activity is our annual budget, this being also governed by Council’s Long Term Financial Plan which aims to improve Council’s financial sustainability into the future. Council is aware that there is intense scrutiny on rate increases and has tried this year to get the balance right, ensuring that service levels are maintained, that cost efficiencies continue and that the Long Term Financial Plan is not compromised.

Our capital works program continues with a focus on asset maintenance rather than new infrastructure. This has involved a long overdue major upgrade to Old Station Road, Coningham, with reconstruction to the section of Snug Tiers Road close to Snug School, and major works for Coolamon Road and Jenkins Street, Taroona. Extensive rehabilitation works at the old Barretta tip site are also progressing well.

Whilst the difficult environment for most of the retail and tourism sectors continues, it is good to see progress with the development of Channel Court with the anticipated opening of a large new shopping centre in late September.

There was also great news of the expansion of Vodafone in Kingston, with 750 additional jobs. Our thanks to the Federal and State Governments for the support provided. This significant growth would unlikely to have been considered without the recently completed Kingston Bypass. This is an example of the economic benefits ensuing from the provision of good quality infrastructure.

A major focus for Council over the past year has been planning for the old Kingston High School site. A detailed consultation process, guided by consultants, has led to a detailed Development Plan which is to be considered by Council. The Plan provides I believe, an excellent pathway forward for Council and the community. Further discussions with the State Government will be necessary in the first instance but Council is determined to see that this remarkable opportunity to develop an excellent sub-regional centre of which we can all be proud, is achieved.

A substantial, direct Federal Government grant enabled the establishment of a Digital Hub in a refurbished area of the Kingston Beach Hall. One-on-one and group programmes to facilitate internet use and in particular, that of high speed broadband are proving immensely popular.

An independent review done by the Regional Australia Institute recently categorised Kingborough as ‘one of the most resilient, innovative and highly skilled places in regional Australia’.

To finish I would like to thank all Councillors and our excellent staff for their hard work and accomplishments over the past year.

Dr Graham BuryMAYOR

Mayor’s Message

AN

NU

AL REPO

RT 2012/13

3

General Manager’s ReportThis year’s Annual Report outlines the achievements of Council in meeting its objectives, activities and performance indicators which was outlined in the Annual Plan adopted by Council in June 2012. The Annual Report also provides comment on those objectives and performance indicators which were not achieved.

During the year Council completed and/or committed to $8.1M of capital works. The capital works have included a wide range of projects including:

Road and Footpaths $4,082,083

Bridges and Jetties $307,196

Stormwater $357,405

Recreation and Reserves $1,217,356

Kingborough Sports Precinct Improvements $1,005,193

Copping Refuse Disposal Site Capital Injection $260,000

Information Technology Equipment $108,293

Taroona Landslip Study $224,931

After many years of planning and discussion Council has finally completed the upgrading of Old Station Road, Coningham. The works which included the upgrading the sea wall, drainage and the re-sealing of the road and will reopen to the public in September 2013.

Council, during the year, also completed works at the Kingborough Sports Precinct. These works have provided all of the pedestrian linkages, upgraded parking facilities and new directional signage.

The tender for the development of a roundabout at the Beach Road/Channel Highway intersection in Margate was approved by Council in May 2013. The roundabout will begin construction in September 2013.

Council, during the year, has worked with consultants Beca and Hill PDA culminating in the finalisation of a development plan and economic analysis for the former Kingston High School site. Discussions continue with the Tasmanian Government on the potential transfer of the site to Council to allow the development plan to commence the implementation phase. It is hoped that the first stage of implementing the plan will see the construction of a new Integrated Care Centre by the Department of Health and Human Services.

The Annual Report provides detailed comments in relation to the financial management of Council and the results achieved for the year in review. It is pleasing to note that an unqualified audit opinion was received from the Auditor General.

During the year Council also determined to appoint an Audit Committee which will be independently chaired. The Audit Committee will provide an oversight and recommendations to Council in relation to its ongoing financial management.

There have been many successes during the past 12 months, too many for me to highlight and summarise here, so please continue reading the Annual Report with the confidence that the Council is continually reviewing how we do things to ensure that we best meet the needs of the Kingborough community into the future.

I would like to express my appreciation to the Mayor and Councillors for their support during the past 12 months. The hard working staff are also to be congratulated for their efforts in assisting Council to meet the needs and expectations of its community during the year.

Paul WestGENERAL MANAGER

4

ww

w.k

ingb

orou

gh.ta

s.gov

.au

1. Elected Members

1.1 Your Councillors

Mayor Dr Graham Bury99 Tinderbox Road, Blackmans Bay 7052Ph: 6211 8274 (W) 6229 8399 (H)E: [email protected]

Councillor Bernadette BlackPO Box 130, Blackmans Bay 7052Mob: 0404 060 507E: [email protected] 

Councillor Julian BushPostal Address: 20 Stoney Steps, South Hobart 7004Ph/Fax: 6223 6259Mob: 0427 931 418E: [email protected] 

Councillor Paul Chatterton161B Wells Parade, Blackmans Bay 7052Ph: 6229 6085Fax: 6229 6190E: [email protected]

 Councillor Flora Fox105 Wingara Road,Howden 7054Ph: 6267 2851Fax: 6267 2236E: [email protected]

Councillor David GraceUnit 35, 1684 Channel Highway, Margate 7054Ph: 6267 2974Fax: 6267 2963Mob: 0438 679 200E: [email protected]

Deputy Mayor Steve Wass55 Estuary Drive, Blackmans Bay 7052Ph: 6229 1706Mob: 0412 634 647E: [email protected]

Councillor Michele HigginsPO Box 14, Woodbridge 7162Mob: 0427 674 684E: [email protected] 

Councillor Roger McGinniss20 Fraser Street,Firthside 7050Ph: 6229 1344Mob: 0428 396 429E: [email protected]

Councillor Susan Nolan29 Staff Road,Electrona 7054Ph: 6267 9670E: [email protected]

Councillor Nic Street35 Woodlands Drive, Blackmans Bay   7052Ph: 6229 2792Mob: 0418 573 554E: [email protected]

Councillor Paula Wriedt4 Raft Court, Kingston   7050Ph: 6229 4045E: [email protected]

AN

NU

AL REPO

RT 2012/13

5

1.2 Council and CommitteesDuring the 2012/13 year the Council was made up of twelve elected Councillors. Elections for Councillors were previously held every two years with six Councillors retiring at each election. Those Councillors who were elected in 2009 recently had their terms extended to October 2014, with those elected in 2011 having their term of office reduced by one year. As a result in October 2014 there will be a full spill of Councillor positions with all those elected being appointed for a four year term.

Council was subjected to a Local Government Board Review recently which recommended that the number of elected Councillors for Kingborough be reduced from the current twelve to ten – this change will coincide with the next election.

The Mayor and Deputy Mayor are also elected directly by the electors of Kingborough and will from 2014 serve in those positions for a period of four years. Ordinary Council meetings are usually held on the fourth Monday of each month commencing at 6pm. During 2012/13 year in review, Council had five committees:

• PlanningAuthority;

• GovernanceandFinance;

• InfrastructureandRecreationalServices;

• CommunityDevelopmentandArts;and

• EnvironmentandDevelopment.

The Planning Authority and Infrastructure and Recreational Services Committees met monthly. The Governance and Finance, Community Development and Arts, and the Environment and Development Committees usually met bi-monthly.

The committees discussed various aspects of Council business and, where necessary, made recommendations for consideration by Council. The Planning Authority Committee considered development applications and had full delegation to determine matters that came before it.

The Infrastructure and Recreational Services Committee had delegated authority to accept tenders up to the amount provided in the estimates for specific projects, without reference to Council.

Council and committee meetings are open to the public (except where an item is considered to be of a confidential nature in accordance with the Local Government (Meeting Procedures) Regulations 2005). Meeting schedules are advertised in the Mercury Newspaper, on Council’s website and at the Council offices.

The following table details the membership of the various committees during the year under review:

COMMITTEE COUNCILLORS

Planning Authority Committee

Chairperson: Cr Bush

Deputy Chairperson: Cr Fox

Cr Black

Mayor Cr Dr Bury

Cr Bush

Cr Chatterton

Cr Grace

Cr Fox

Cr Higgins

Cr McGinniss

Cr Nolan

Cr Street

Deputy Mayor Cr Wass

Cr Wriedt

Community Development and Arts Committee

Chairperson: Cr Higgins

Deputy Chairperson: Cr Nolan

Cr Black

Mayor Cr Dr Bury

Cr Grace

Cr Higgins

Cr Nolan

Cr Street

Governance and Finance Committee

Chairperson: Cr Chatterton

Deputy Chairperson: Mayor Cr Dr Bury

Mayor Cr Dr Bury

Cr Chatterton

Cr McGinniss

Cr Nolan

Cr Street

Cr Wriedt

Infrastructure and Recreational Services Committee

Chairperson: Deputy Mayor Cr Wass

Deputy Chairperson: Cr Bush

Cr Bush

Cr Fox

Cr Grace

Cr McGinniss

Deputy Mayor Cr Wass

Cr Wriedt

Environment and Development Committee

Chairperson: Cr Fox

Deputy Chairperson: Cr Higgins

Cr Black

Cr Bush

Cr Chatterton

Cr Fox

Cr Higgins

Deputy Mayor Cr Wass

6

ww

w.k

ingb

orou

gh.ta

s.gov

.au

The issues for which each committee is responsible is as follows:

PLANNING AUTHORITY COMMIT TEE (ALL 12 COUNCILLORS)

Statutory Planning Authority responsibilitiesDevelopment ApplicationsSubdivision Approvals 

Planning Scheme AmendmentsLegal matters related to Statutory PlanningPlanning Appeals

COMMUNITY DEVELOPMENT AND ARTS COMMIT TEE (6 COUNCILLORS)

Community DevelopmentCommunity InformationFamily Day CareManor GardensYouthEducation and LearningArts and Cultural

Community EventsPositive AgeingCommunity Safety and PolicingAbel Tasman Art & Design PrizeAustralia Day AwardsKingborough Sports Centre

GOVERNANCE AND FINANCE COMMIT TEE (6 COUNCILLORS)

Strategic and Operational PlansCorporate CommunicationHuman ResourcesPartnershipsRisk Management and InsurancesInformation TechnologyBudget ManagementEconomic Development 

Financial Strategy and Management- Revenue and Rating- Grants- Loan Borrowing- Compliance- Related Policies- Financial Reporting

Tourism, Marketing and Visitor Services

INFRASTRUC TURE AND RECREATIONAL SERVICES COMMIT TEE (6 COUNCILLORS)

Asset Management Program (incl. forward planning and maintenance)Capital WorksRoads, Footpaths and Cycleways (incl. access, mobility)Streetscape Design (incl. lighting, signs, furniture, vegetation)Stormwater ManagementTraffic Management 

Waste ManagementSporting Grounds and FacilitiesRecreation Reserves (incl. playgrounds, parks and gardens)Public Buildings (incl. public halls, toilets)Tracks and Trails DevelopmentMarine Structures (incl. jetties, boat ramps)Property Management

ENVIRONMENT AND DEVELOPMENT COMMIT TEE (6 COUNCILLORS)

Natural Resource ManagementClimate ChangeVegetation management (incl. weeds, tree clearing, conservation)Water QualityPollution Control and NuisancesPublic HealthBuilding ControlCompliance and EnforcementFire Hazards and Fire Management 

Emergency ManagementSettlement, Local Area and Master PlanningSea Change and Demographic IssuesKingborough Planning Scheme ReviewKingston CBD DevelopmentTransport PlanningCoastal ManagementRecreation and Open Space PlanningAnimal Control

AN

NU

AL REPO

RT 2012/13

7

1.3 Appointed Council Representation on Sub-Committees, Advisory Committees and External Organisations

COMMITTEE NAME TYPE OF COMMITTEE APPOINTEE

Abel Tasman Art Prize Committee Community Cr Higgins

Code of Conduct Council Cr Chatterton, Deputy Mayor Cr Wass, Cr Wriedt

Kingborough Municipal Emergency Planning Statutory Mayor Cr Dr Bury

Kingborough Access Advisory Committee Section 24 Special CommitteeCr Fox (Chairperson)Cr Black

Bruny Island Advisory Committee Section 24 Special Committee Cr Grace (Chairperson)

Southern Water Regional Mayor Cr Dr Bury

Positive Ageing Advisory Committee Council Cr Nolan (Chairperson)

Channel Heritage Museum Community Cr Street

Kingborough Bicycle Users Group Section 24 Special Committee Cr Fox (Chairperson)

Kingborough Community Enterprise Centre Community Cr Chatterton

Kingborough Community and Police Liaison Group Community Cr Wriedt

Local Government Association of Tasmania StatewideMayor Cr Dr BuryDeputy Mayor Cr Wass (Proxy)

Cycling South Regional Cr Fox

Southern Waste Strategy Authority Regional Cr Bush

Southern Tasmanian Councils Authority Regional Mayor Cr Dr Bury, General Manager

Kingborough Road Safety Committee Section 24 Special CommitteeCr Grace (Chairperson)Cr Wriedt

National Sea Change Taskforce National Local Government Body Cr Higgins

Coming Out Proud Program – Community Liaison Committee

Community Cr Higgins

Kingborough Sports Complex Users Group Advisory Committee

CouncilDeputy Mayor Cr Wass (Chairperson)Cr Chatterton

Huon Valley/Kingborough Tourism Steering Committee Community Cr Nolan

Youth Advisory Network Kingborough Community Cr Black

Copping Refuse Disposal Site Joint Authority RegionalMayor Cr Dr BuryCr Wriedt (Proxy)

Cat Control Committee Community Cr Bush

Twin Ovals Sports Pavilion Advisory Group CouncilDeputy Mayor Cr Wass (Chairperson)Cr Street

Kingborough Arts and Culture Advisory Committee Section 24 Special CommitteeCr Higgins (Chairperson)Mayor Cr Dr Bury

Anzac Centenary Commemoration Advisory Group Council Deputy Mayor Cr Wass

8

ww

w.k

ingb

orou

gh.ta

s.gov

.au

1.4 Councillors Attendance at MeetingsThe following table details Councillor attendance at Council meeitngs, S.23 Comittees and Workshops during the year.

COU

NCI

LSP

ECIA

L M

EETI

NG

SPL

AN

NIN

GCO

MM

UN

ITY

DEV

ELO

PMEN

T A

ND

ART

S

GO

VER

NA

NCE

A

ND

FIN

AN

CE

INFR

AST

RUCT

URE

A

ND

RES

OU

RCE

MA

NA

GEM

ENT

ENV

IRO

NM

ENT

AN

D

DEV

ELO

PMEN

TW

ORK

SHO

PSLE

AVE

OF

ABS

ENCE

APP

ROV

ED

DU

RIN

G T

HE

PERI

OD

Poss

ible

A

tten

danc

e12

412

56

105

21

MEM

BER

NO

N-

MEM

BER

MEM

BER

NO

N-

MEM

BER

MEM

BER

NO

N-

MEM

BER

MEM

BER

NO

N-

MEM

BER

May

or C

r Dr B

ury

104

95

58

321

8 Au

gust

- 29

Sep

tem

ber 2

012

22-2

8 M

arch

201

3

Dep

uty

May

or C

r Was

s12

412

11

95

16

Cr B

lack

114

103

48

30 A

ugus

t - 2

3 Se

ptem

ber 2

012

11-2

5 Ja

nuar

y 20

13

Cr B

ush

93

101

82

135

July

- 23

Aug

ust 2

012

Cr C

hatt

erto

n12

412

64

15

Cr F

ox10

310

17

514

11-2

9 Se

ptem

ber 2

012

21-2

8 Fe

brua

ry 2

013

Cr G

race

123

103

16

115

Cr H

iggi

ns10

48

55

928

Aug

ust -

3 O

ctob

er 2

012

21-2

8 M

arch

201

3

Cr M

cGin

niss

124

121

510

318

12 N

ovem

ber -

22

Nov

embe

r 201

2

Cr N

olan

124

125

619

Cr S

tree

t12

412

55

2016

-30

Janu

ary

2013

Cr W

ried

t10

411

57

924

-27

Nov

embe

r 201

2 26

Janu

ary

- 2 F

ebru

ary

2013

Not

e: S

peci

al M

eetin

gs a

lso

incl

ude

the

Annu

al G

ener

al M

eetin

g

AN

NU

AL REPO

RT 2012/13

9

1.5 Remuneration of CouncillorsSection 72(cb) of the Local Government Act 1993 requires that a statement of the total allowances and expenses paid to the Mayor, Deputy Mayor and Councillors be included in the Annual Report.

During the year, Council paid a total of $429,728 in allowances and expenses for Councillors. Councillors were provided at their choice, a home personal computer and a telephone/fax/printer, for which all costs were funded by Council. A fully maintained motor vehicle is also provided to the Mayor for use on Council related business.

Council at its meeting on 26 November 2012 determined that the following information relating to the payment of allowances and reimbursement of expenses of office was to be included on the Governance and Finance Committee agendas and was also to be provided in the Annual Report:

1. Allowancespaidduringthefinancialyear;

2. Reimbursements paid under the Payment of Councillors Expenses and Provision of Facilities Policy broken down into:

(i)mileageclaims;

(ii)telephoneandinternetcosts;

(iii)conferenceandmeetingexpensespaid/claimed;

(iv)childcare;and

(v) other reimbursements claimed

3. Code of Conduct costs incurred attributed to individual Councillors when complaints which have been lodged are substantiated and upheld.

The following table provides the required information:

Councillor

Mayoral Allowance

$

Deputy Mayoral

Allowance$

Councillor Allowance

$

COUNCILLOR EXPENSES 

TOTAL $

Mileage $

Bruny Ferry

$

Internet and

Telephone $

Child Care

$

Conference and Meeting Attendance

$

Code of Conduct

$

Mayor Cr Dr Bury 63,119 - 25,248 5,463 105 2,002 - 2,441 - $98,378

Deputy Mayor Cr Wass - 17,543 25,248 - - 759 - 2,300 - $45,850

Cr Black - - 25,248 632 - 1,768 330 458 - $28,436

Cr Bush - - 25,248 - 15 2,069 - - - $27,333

Cr Chatterton - - 25,248 - - 1,115 - 682 - $27,045

Cr Fox - - 25,248 1,960 - 1,051 - 914 - $29,173

Cr Grace - - 25,248 4,898 285 4,858 - 873 1,445 $37,608

Cr Higgins - - 25,248 - - 1,696 - 1,473 - $28,418

Cr McGinniss - - 25,248 - - 1,278 - - - $26,527

Cr Nolan - - 25,248 - - 1,135 - 1,444 - $27,828

Cr Street - - 25,248 - - 1,100 - - - $26,348

Cr Wriedt - - 25,248 - - 593 485 458 - $26,784

TOTAL $63,119 $17,543 $302,980 $12,954 $405 $19,424 $815 $11,044 $1,445 $429,728

NOTES:• Mileage for Mayor Cr Dr Bury includes the cost of the Mayoral vehicle less amounts reimbursed by the Mayor for incidental private use of Council Vehicle ($1,104)• Bruny Ferry = cost of fares at $15 per trip• Cr Black claim in October was for reimbursement of mileage, telephone/internet and childcare expenses for period 1 December 2011 to 8 October 2012• Cr Fox claimed in July for May and June 2012 expenses • Deputy Mayor Cr Wass conference attendance includes costs associated with the June 2012 ALGA National General Assembly• Mileage expenses paid to Cr Grace in 2012/13 includes backpay of $381.89 for the period November 2011 to June 2012 to reflect the correct rate for

reimbursement • Internet and Telephone Expenses are for 13 Months (June 2012 to June 2013)

10

ww

w.k

ingb

orou

gh.ta

s.gov

.au

2. Key Corporate Functions and Achievements

2.1 Corporate

The Organisational Development Department is responsible for the development of Council’s corporate communications and employee development programs. This area develops and implements strategies, policies and procedures through the provision of human resources and industrial relations services.

KEY ACHIEVEMENTS

STAFFINGCouncil employed a staff of 180 effective full-time equivalent employees as at 30 June 2013, including Kingborough Waste Services (KWS). Recruitment of staff was undertaken in accordance with Council’s recruitment policies. During the year, 14 new staff members were recruited, including permanent, temporary and fixed term employees. Fifteen employees terminated their employment with Council voluntarily or their temporary employment/contract ended during the year.

TRAINING AND DEVELOPMENTCouncil is committed to supporting staff in furthering their careers and learning opportunities. In 2012/13, 20 staff completed vocational qualifications at the Diploma, Certificate IV and Certificate III level. Thirty-five staff were enrolled in vocational and degree level qualifications including engineering, project management, civil construction, business administration, local government, horticulture and civil design.

INDUSTRIAL RELATIONSCouncil’s employment conditions are negotiated through an enterprise agreement process with staff and representative unions. The Kingborough Council Enterprise Agreement No. 7 of 2012 commenced in July 2012. The agreement provides for a 3.5 per cent or $32 per week (whichever is higher) wage increase each year over a three year period. The agreement expires in June 2015.

WORK HEALTH AND SAFETYCouncil is committed to providing a safe and healthy work environment for its employees. Council’s Work Health and Safety Committees implemented a Work Health and Safety Action Plan and risk registers for key worksites. A compliance assessment of the operations of the Works Department was completed in preparation for the introduction of the new Work Health and Safety Act and associated regulations and codes of practice in 2013.

Incidents and work health and safety performance statistics were reported regularly to Council’s Governance and Finance Committee. There were 25 workers compensation claims lodged during 2012/13, of which five claims resulted in more than one week off work.

Council’s Working Well Program included a range of initiatives such as fitness classes, employee immunisation programs, the employee assistance program for staff and their families, presentations on health issues, such as mental wellbeing and first aid training.

Other operational safety training courses included traffic management, working in confined spaces and electrical awareness. Council and KWS staff also attended sessions with the Office of the Anti-Discrimination Commissioner on anti-discrimination awareness training.

CORPORATE COMMUNICATIONS AND EVENTSCouncilcontinuestodevelopitsonlineandsocialmediapresence. Councilcurrentlymanagesfourfacebookpages;yspaceKingborough, Kingborough Council, Kingborough Family Day Care and Kingborough Sports Centre and a Twitter account to cover arts and cultural news and events, KC_ArtsCulture.

Council continues to provide a range of printed information to the community. Four editions of the Kingborough News were distributed to all households during the year. The Information Directory was distributed in February 2013 and the regular advertisement, Snapshot on Kingborough, featured in the Kingborough Chronicle newspaper.

2.1.1 Organisational Development

Council aims to provide professional corporate support services across the organisation through strong financial management and human resources practices, as well as responsive and flexible information systems.

AN

NU

AL REPO

RT 2012/13

11

2.1.2 FinanceThe Finance Department is responsible for the provision of financial reporting, ensuring the application of appropriate governance controls and the provision of support services for Council.

Finance is also responsible for the management of Council’s financial assets including the investment of surplus funds, placement and operation of all insurance policies and the operation of the Bruny Island Service Centre which includes an Australia Post branch.

KEY ACHIEVEMENTS

AUDIT COMMITTEECouncil resolved to establish an Audit Committee at its meeting of 25 March 2013. The Audit Committee will play an important role in ensuring good governance and financial management at Council through frequent reviews of Council’s policies, processes and systems.

The committee consists of five members, including three independent members and two Councillors, appointed by the Council for a maximum term of four years. One of the independent committee members is also appointed by Council as the Chairperson.

Operating procedures for the Audit Committee were developed based on industry best practice. An expression of interest was issued for independent member positions and Council approved the appointment of the three independent members and two Councillors at its meeting of 27 May 2013.

The first meeting of the Audit Committee is scheduled for 31 July 2013. Agenda items for the first meeting will include a review of financial statements for 2012/13 and consideration of a Fraud Policy.

REPORTING IMPROVEMENTSCouncil continues to improve and refine its financial reporting by seeking to maximise the use of existing reporting tools and systems. During 2012/13 an exercise was undertaken to automate the production of the monthly financial report. This process also identified a number of improvements in the way that information was presented in the report. The automation of the monthly report will improve the timeliness and accuracy of information being provided to Councillors and managers, leading to an overall improvement in financial management.

RATES PAYMENTS USING BPAY VIEWCouncil has recently introduced a new method of receiving and paying rates notices called BPAY View. This method involves the ratepayer opting to receive their rates notice electronically through their internet banking provider. Receiving rates notices electronically reduces costs for Council and is better for the environment. Ratepayers in Kingborough have embraced this option with a large number opting to sign up for this service.

12

ww

w.k

ingb

orou

gh.ta

s.gov

.au

2.1.3 Information ServicesThe Information Services Department provides information technology, information management and customer services. Key functions and responsibilities of the department include records management, provision and maintenance of Information Technology (IT) hardware and application software, website management, helpdesk support, telecommunications and the provision of hosted services to the Huon Valley Council.

The Customer Services Unit provides a range of services for both external and internal customers including the provision of general Council information, lodgment of service requests, pre-assessment of building and planning applications, facilities bookings, cashiering and a range of internal administrative activities. The department is also responsible for coordination of Civic Centre building management.

KEY ACHIEVEMENTS

DIGITAL LOCAL GOVERNMENT PROGRAMCouncil secured funding under the Federal Government’s Digital Local Government Program, to develop ways of using the National Broadband Network (NBN) high-speed broadband connectivity to improve the quality, availability and timeliness of local government services.

The project involves the implementation of high definition video conferencing equipment, internet cloud based services and an online booking system to deliver a range of training, community engagement workshops and committee meetings as well as collaboration services for its arts and culture programs using the high-speed NBN.

Council is continuing to research innovative uses for the technology, including teleworking, online meetings between customers and Council staff, and Councillor workshops with proponents of major developments.

Recent delays in the rollout of the NBN in the Kingston Central Area will impact on the launch date for initial services (initially scheduled for September 2013) and at the time of publishing this report connection of the Kingborough Civic Centre to the NBN has been delayed by at least nine months.

VIRTUALISATION OF SERVERSCouncil continues to migrate its core business servers onto virtual server infrastructure, improving manageability and reducing operational costs. Costs savings have been realised through reduced electricity consumption and hardware maintenance costs.

ENTERPRISE CONTENT MANAGEMENT SYSTEM (ECMS)Council’s ECMS has been used to further streamline business process and increase efficiencies across the organisation. In particular, the process for the accounts payable invoice approvals process has been redesigned to reduce approval and payment times by storing and distributing invoices electronically.

The department has introduced high speed scanning hardware and image capture software to streamline work process and improve efficiencies in the distribution and storage of electronic records.

The physical building application and payroll/personnel documents were converted into an electronic format to improve management and accessibility and reduce risk of loss.

OFFSITE RECORDS STORAGECouncil has relocated its long-term physical records to a new facility following a review of the suitability and compliance of existing arrangements. The new state-of-the-art facility is dedicated to the management of physical and electronic records in a controlled and secure environment.

NETWORK UPGRADEThe shared data link between Kingborough and Huon Valley Councils has been upgraded. The link utilises existing infrastructure operated by Tasmanet and provides increased reliability, manageability and bandwidth.

SURVEY NETWORK UPGRADEIn conjunction with Position Partners, Council has installed a Network Base Station at the Civic Centre. The equipment, which provides electronic fixed survey reference point, greatly improves the accuracy and range of operation of satellite survey equipment used south of the Hobart CBD.

AN

NU

AL REPO

RT 2012/13

13

2.2 Community Planning and Development

2.2.1 Community and Recreational ServicesThe Community and Recreational Services Department provides a comprehensive range of community-related programs, services and facilities for the residents of Kingborough. Key responsibility areas include the provision of services for children, youth and older people, community events, public consultation, social planning and facilitation of a broad range of arts and cultural related activities. The department also undertakes planning for the development of recreational facilities and programs, liaison with a wide range of groups on local community issues and referral to specialist support services.

KEY ACHIEVEMENTS

ARTS AND CULTURAL DEVELOPMENTThe implementation of the Kingborough Arts and Cultural Strategy continued in 2012/13, with a key achievement being the opening of the Kingston Beach Arts Hub Gallery at the rear of the Kingston Beach Hall. The gallery has hosted a number of exhibitions throughout the year and is filling a niche in Kingborough as a public venue for the display of artwork. The Abel Tasman Art & Design Prize was conducted for the first time under a new format that opened up the competition to students from throughout Tasmania, with expanded parameters to include design. The general exhibition was installed at the Kingston Beach Arts Hub, with the finalists displayed at the Henry Jones Art Hotel. Tim Haley took out the major award of a three week trip to the Netherlands, with his winning piece Cardboard Consult, a rounded desk constructed from cardboard with Blackwood veneers and aluminium facings.

The inaugural Kingborough Art Prize was conducted in May 2013, through a partnership between Council and the Kingborough Lions Club. One hundred artists participated in the event, which was displayed over a two week period at the Kingston Beach Hall. During this time, over 2,000 people visited the exhibition and 52 artworks were sold. Council acquired the winning artwork (Kate Piekutowski’s Gathering) for display in the Civic Centre.

COMMUNITY DEVELOPMENTThe Kingston Beach Digital Hub was officially opened in January 2013 and has proven to be an extremely popular service for members of the community seeking training in the use of the internet and broadband applications. The Digital Hub is open six days per week and provides free training on both a one-on-one and small group basis. The third ‘Love Living Locally’ event was held in April to celebrate local produce and producers. The event was extremely successful with 2,000 people in attendance and over 50 stallholders showcasing local plants, food, arts, crafts, music and information. A photo competition was held in conjunction with this event with the theme ‘Love the Life in My Backyard’.

A new event was organised to celebrate the winter solstice, featuring a lantern walk, bonfire, entertainment and fire twirling displays. The event formed part of the Winter Warmers Program, which was designed to engage the community in healthy pursuits during the winter months. Other activities included warm vocals singing session, hot salsa dance classes and body burn and stretch classes at the Kingborough Sports Centre.

CHILDREN’S SERVICESThe Kids Allowed Program continued in 2012/13 with activities and workshops held for young children throughout the year. Sessions have included a variety of experiences such as storytelling, playgroups, crafts, artwork, cooking and mini-sports. Activities were held in vacant premises in Church Street and Channel Court. A Kid’s Bucket List of suggested ‘must-do’ activities in Kingborough was put together for the summer holidays. Parents reported that this was a valuable resource in keeping their children entertained and active. Council was formally acknowledged for its work in consulting with children by the Commissioner for Children during the launch of the Involving Children in Decision Making Toolkit.

RECREATIONAL PLANNINGA review and update of the Kingborough Sport and Recreation Plan was completed during the year with the final document endorsed by Council following assessment of feedback received during the public consultation period. The plan provides a strategic approach to the development of new and upgrading of existing sport and recreation facilities in Kingborough.

The implementation of the Kingborough Tracks and Trails Action Plan continued during the year, with the most significant project being the awarding of a contract for the construction of an extension of the Alum Cliffs Track through to the Shot Tower. Kingborough partnered with a number of neighbouring Councils to develop the Greater Hobart Trails Website (www.greaterhobarttrails.com.au) to provide information on available walking, cycling, mountain biking and horse riding trails in the area.

Council aims to deliver a diverse range of services, programs and facilities necessary to maintain and build a healthy and sustainable community. An additional aim is to provide clear policy and sound practice to effectively manage land use, natural resources, public and environmental health, building activity and the safety, function and convenience of places within Kingborough in accordance with its statutory obligations.

14

ww

w.k

ingb

orou

gh.ta

s.gov

.au

The Kingborough Mountain Bike Park was officially opened in December 2012 and a management plan prepared for the ongoing maintenance of the facility. The development of a skate park at Alonnah on Bruny Island was completed, along with the construction of new clubrooms and changerooms at the Woodbridge Oval.

YOUTH SERVICESThe Youth Advisory Council (YAK) met on a regular basis throughout the year, with a number of members undertaking their Duke of Edinburg Award, for which Council is a licenced facilitator. Weekly workshops were provided at Council’s Youth Centre (yspace), including cooking classes, circus skills, face painting, first aid, Christmas cuisine and cupcake making.

A Youth Enterprise Scheme was conducted as an alternative education program involving disengaged young people learning financial literacy and carpentry skills. The group made a range of contemporary wooden furniture that was sold at Salamanca Market. A school holiday program was conducted in each of the three holiday periods, with activities including surfing, kayaking, movies, bowling and fishing.

Funding was obtained through the Proceeds of Crime Act to reduce the incidence of graffiti in the area. The project includes the removal of graffiti by youth offenders, implementing crime prevention through environmental design initiatives, installation of closed circuit television cameras and a diversionary program aimed at hard to reach and disengaged young people. Council maintained its membership of the Kingborough Interagency Support Team that provides individual case management of at risk young people through a collaborative approach.

SENIORSThe Kingborough Positive Ageing Advisory Committee met on a regular basis throughout the year to progress the implementation of the Positive Ageing Plan and the associated Positive Ageing Policy. A major initiative was the Kingborough Positive Ageing Expo held during March 2013. The event was well received by both those in attendance and by the 30 exhibitors. The Kingborough Volunteer Program was introduced during the year to provide services to assist older people to remain in their own home for longer. Funded by the Department of Health and Ageing through the Home and Community Care Scheme, the Volunteer Program proved to be in high demand, with 50 volunteers and 90 clients registered by the end of June 2013.

2.2.2 Kingborough Sports Centre PrecinctThe Kingborough Sports Centre provides a range of sporting and recreational activities that caters for an average of 3,000 users per week. Major activities include basketball, netball, volleyball, indoor soccer, indoor cricket, squash, pilates, table tennis, dance, Zumba, Crossfit and gymnastics. A fully equipped Fitness Centre provides a variety of services, classes and equipment to meet the needs of clients of all ages.

The Kingborough Sports Complex has been transformed during the last two years, with the establishment of the new Kingston High School and many other sporting and recreational facilities on the site. The school has an agreement with Council for shared use of the original multi-court in the Sports Centre, as well as the Lightwood Park sports ground.

KEY ACHIEVEMENTS

FOOTPATHS AND CARPARKINGThe provision of additional carparking, footpaths, lighting and signage around Kingston View Drive to enhance traffic and pedestrian amenity was undertaken as a capital works contract during the year.

New carparks were constructed on the western side of Kingston View Drive and off Lightwood Drive behind the Kingston Scout Hall. The carpark servicing the Kingston Tennis Club was sealed and footpaths were provided down to the playing fields at the Twin Ovals and Lightwood Park.

FOOTPATHS AND CARPARKINGConsistent signage was installed throughout the Kingborough Sports Centre Precinct, including an entrance sign and directional signage both within and outside of the site. Navigational icons help to direct visitors to the destination points for the various sports that are played within the precinct. The signage was developed by a graphic design company following consultation with user groups.

FITNESS CENTREA change to the operations of the Fitness Centre took place during the year with the decision by Council to cease the practice of purchasing electronic equipment and instead obtain these on a lease basis. Twenty-one new pieces of equipment ranging from treadmills, elliptical trainers, exercise bikes and Jacobs Ladders arrived in July 2012 and were immediately put to use with an open day for the community. In an Australian first, the equipment is able to harness human power and feed this back into the grid, a saving of 32 per cent on the operation of the previous electric machines.

TWIN OVALSThe Twin Ovals entered their second year of operation, with both the cricket and AFL grounds maintained to a high standard. Management of the Pavilion was resolved with the assistance of an Advisory Group that recommended a five year lease to the two anchor tenant clubs. Council signed off on a lease in the joint names of the Kingborough Tigers Football Club and the Kingborough District Cricket Club from 1 April 2013.

AN

NU

AL REPO

RT 2012/13

15

2.2.3 Manor Gardens ClubManor Gardens is a day respite centre located at Firthside. Manor Gardens was established in 1996 and operates six days per week from Monday to Saturday and is also open on the first and third Sunday of each month.

Manor Gardens is open to frail-aged residents, those who are socially isolated and people suffering from memory loss or associated conditions. Different programs run each day to cater for the various groups of clients. Clients have access to transport to and from Manor Gardens, morning and afternoon tea, healthy home cooked lunches, outings and a wide variety of inhouse activities like gardening, music, poetry, art, bowls and exercise programs.

KEY ACHIEVEMENTS

ENHANCED FACILITIESThe Rotary Club of Kingborough continued its support for Manor Gardens, replacing garden sleepers and providing a new water feature for the enjoyment of clients. Discussions commenced for the development of a new facility that will cater for the growing demand for services provided by Manor Gardens.

2.2.4 Family Day CareFamily Day Care is a home based childcare service providing quality care in the homes of registered Educators (formerly known as Carers) supported by a coordination unit. Family Day Care provides nurturing care in a secure and enriching home environment for babies and children up to 12 years of age. In Family Day Care, children learn through play whilst mixing with a small group. They participate in activities planned by the educator to suit each child’s individual needs. Children are able to connect with their world and community in real and meaningful ways.

KEY ACHIEVEMENTS

NATIONAL QUALITY STANDARDSThe Kingborough Family Day Care Scheme continued its successful transition to the National Quality Framework. The Statewide Family Day Care forum held in May was attended by 20 staff and educators from Kingborough Family Day Care. At the end of June 2013 the scheme had 44 active educators as well as seven support/relief educators.

LIGHTWOOD PARKSand slitting on the Lightwood Park soccer pitch was undertaken to improve the drainage capacity of the ground. The Kingborough Lions Soccer Club installed fencing to delineate the warm-up area from the playing field, as required as part of their entry into the Statewide Victory League. A new club, known as the Summerleas Eagles Cricket Club took up residence on the cricket ground vacated by the Kingston Crows.

16

ww

w.k

ingb

orou

gh.ta

s.gov

.au

2.2.5 Environmental HealthThe Environmental Health Department covers a wide range of public and environmental health aspects of the natural and built environment that may affect the health and wellbeing of the community. Key functions and responsibilities include food safety and surveillance, public health risk activities, immunisation programs, notifiable disease investigation, water quality monitoring, safety of public buildings, wastewater, noise management and air quality and the monitoring, education and regulatory management of these activities.

KEY ACHIEVEMENTS

BROWNS RIVER CATCHMENT MANAGEMENT AND MONITORINGCouncil commenced a stormwater monitoring program for the Browns River Catchment in April 2012. The aim of the program was to identify potential sources of faecal pollution to Browns River through the sampling of stormwater drains at 13 sites located in the central urban area of Kingston. As a result of this monitoring and data review, Council resolved to continue to advise the public, by means of advisory signage, that analysis results indicate that the water quality of Browns River renders it unsuitable for use as a primary contact recreational water body. Council willcontinue to further develop and implement the Browns River Catchment Management Plan, identifying and addressing point sources of pollution when they occur.

FOOD SURVEILLANCE AND MANAGEMENT PROGRAMCouncil continues to be actively involved in the Southern Regional Food Surveillance Program. This program aims to ensure that food manufactured and sold complies with the Food Act 2003 and the Food Standards Code.

Sampling and surveillance was conducted on a monthly basis, results collated and food business proprietors involved in the round of sampling were notified of the results. These results can be used to identify problematic areas or trends within food businesses or in some cases, can act as a trigger for more regular food inspections. This program remains extremely beneficial in identifying a number of issues across a range of food businesses.

Council initiated and implemented electronic food business inspection checklists. Inspection forms were developed and this has proved to be a more efficient way for Environmental Health Officers to complete inspections and enables information to be emailed to food business proprietors where preferred. This process has been received very positively by food businesses and ensures increased efficiency in record keeping for Council.

SCHOOL IMMUNISATION PROGRAMCouncil continues to coordinate and implement a range of immunisation programs. The school immunisation program is conducted in February/March/April and September/October each year.

This year, the program was expanded significantly and involved large catch-up programs with multiple dose vaccines. Students in Grades 7, 9 and 10 were offered vaccines for Human Papillomavirus (Grade 7 students and Grade 9 boys only) and Diphtheria, Tetanus and Whooping Cough (Grade 7, 9 and 10). A total of 2,363 vaccines were administered to 1,901 students. Council’s regular immunisation clinics are held twice-monthly at the Kingston Community Health Centre and a total of 662 vaccines were administered to 399 infants.

AN

NU

AL REPO

RT 2012/13

17

2.2.6 Climate ChangeReducing the carbon footprint of Council and its community is a key focus as well as planning for the now inevitable climate change impacts that will affect our community and Kingborough’s ecosystems.

KEY ACHIEVEMENTS

COUNCIL ENERGY REDUCTIONThe energy auditing system is being implemented at key Council buildings to allow for the tracking of progress towards reduction targets as well as the ability to quickly respond to significant changes in energy usage and planning for energy reduction initiatives. A review of the Climate Change and Energy Action Plan is being undertaken including the identification of revised corporate and community carbon footprint reduction targets.

CLIMATE CHANGE ADAPTATIONCouncil participated in the development of the Regional Climate Change Adaptation Strategy 2013–2017 which has been adopted and will provide an overarching vision that will be able to feed into the Kingborough Council Strategic Plan.

A coastal vulnerability assessment of the Kingborough coastline has been undertaken with the subsequent report identifying the key localities where further research and possible remediation should be targeted.

A project entitled Triggers for Change is being implemented to enable Council to develop a climate change adaption implementation strategy and mainstream climate change adaptation actions into its operations.

The Kingborough Community Resilience Project was commenced and will be undertaken over a 12 month period. The project officer will be working to understand the level of community resilience to the potential impacts of climate change and natural disasters and implementing initiatives to improve it.

ALTERNATIVE ENERGYCouncil worked with Sustainable Living in Kingborough (SLiK) on a project to identify best value domestic photo-voltaic energy generation options with an information report being available on Council’s website.

18

ww

w.k

ingb

orou

gh.ta

s.gov

.au

2.2.7 Natural Resource ManagementCouncil’s Natural Resource Management (NRM) Unit is part of the Environmental Services Department. The core work of the unit involves developing and protecting a network of healthy natural areas in the Kingborough municipality. Our bushland and coastal areas are coming under greater pressure as Kingborough continues to grow. The NRM Unit is involved with a variety of functions that range from strategic vegetation management, managing environmental weeds and supporting environmental volunteers, through to programs aimed at improving urban stormwater discharges.

KEY ACHIEVEMENTS

D’ENTRECASTEAUX CHANNEL PROJECTKingborough Council is working with stakeholders of the D’Entrecasteaux Channel and lower Huon Estuary to collaboratively manage the D’Entrecasteaux Channel in a sustainable manner. The D’Entrecasteaux Channel Project area encompasses the waterway between mainland Tasmania and Bruny Island, including the lower Huon Estuary and North West Bay.

The key achievements for the project this year have been the official launch of the project to stakeholders, the establishment of the project web page (on the Kingborough Council website), the release of the State of the D’Entrecasteaux Channel and lower Huon Estuary Report 2012 and building the relationships with project partners to continue the project.

Funding partners for 2012/13 were Kingborough Council, the Derwent Estuary Program, Southern Water, NRM South, Tassal and Huon Valley Council. The project has also linked with the Derwent Estuary Program as part of the International River Foundation’s Twinning Program. This partnership provides an excellent opportunity for the stakeholders of the D’Entrecasteaux Channel to learn from the success and challenges of restoring the neighbouring Derwent Estuary.

The main focus for the D’Entrecasteaux Channel Project over the next 12 months will be to review the previous management and action plans for the D’Entrecasteaux Channel region with the view of preparing a new management plan for the D’Entrecasteaux Channel and lower Huon Estuary waterways. Development of the new plan will be conducted in consultation with key stakeholders and the general community.

RESTORING COFFEE CREEK RESERVEIn 2012/13 Council completed an Environmental Management Plan for Council’s bushland reserve adjacent to Coffee Creek. The reserve, located off Patriarch Drive at Huntingfield, is home to one of the last colonies of the nationally endangered Forty-Spotted Pardalote. The management plan is guiding the restoration of the critical habitat of the birds, including the control of weeds, management of stormwater and planting of new areas to increase amenity and biodiversity. On National Tree Day the community came together in the reserve to plant 750 native plants beside Coffee Creek to extend the habitat of the threatened Pardalote.

TACKLING ENVIRONMENTAL WEEDSCouncil’s NRM Unit coordinates a strategic weed management program across the municipality. The program is guided by the Channel and Bruny Island Weed Management Strategies, local catchment and reserve plans and a prioritisation of Council’s bushland and coastal reserves. Council’s Weeds Crew work across the municipality tackling environmental weeds in parks, reserves and on Council managed roadsides. In 2012/13 the Weeds Crew spent 2,200 hours controlling environmental weeds.

Council also delivers a community education and awareness program to assist landowners to identify and manage weed issues on their properties. In partnership with NRM South, Council delivered a Wildlife Friendly Gardens Program which provided thirty landowners who live adjacent to bushland reserves with a support service to identify and remove weeds and replace them with local native species.

KINGBOROUGH CAT MANAGEMENT PROGRAMThis program operates in partnership with the Tasmanian Conservation Trust where the Council funded project officer is located. The project officer undertook numerous community based responsible cat ownership initiatives which included:

• Developmentoftelevisionadvertisementsandacattrappingeducationalvideo;

• Attendanceatcommunityforumstodisplayandpresentoncatmanagementissues;

• DevelopmentofthecatmanagementsectionoftheCouncilwebsite;

• UndertakingareviewofCatManagementBy-lawsinAustraliaandpresentingapositionpapertoCouncil;and

• Commissioning of a community attitudes survey on responsible cat ownership.

Progress has been made on Council’s decision to declare the Boronia Beach Reserve a cat prohibited area under the provisions of the Cat Management Act 2009.

AN

NU

AL REPO

RT 2012/13

19

2.2.8 ComplianceCouncil’s Compliance Unit is tasked with administering Council’s By-laws and regulations on animal control, fire abatement, statutory nuisances and parking, ensuring residents and visitors to Kingborough comply with local and state laws.

Predominantly this unit investigates breaches of the Dog Control Act 2000, Traffic Act 1925 and the Local Government Act 1993. Compliance also enforces Council’s By-laws and assists both Building and Planning Departments with investigations of technical breaches of the Kingborough Planning Scheme.

Compliance takes a lead role in assisting the municipality to be bushfire safe through the annual fire hazard abatement program.

KEY ACHIEVEMENTS

INVESTIGATIONS Compliance have successfully implemented a planned approach to managing the investigation and resolution of serious dog attacks through the Kingborough Investigations Model.

The model is founded upon contemporary investigations processes and include the use of evidence matrix, resource spreadsheets and contemporaneous recording of incidents and client contact using Council’s Pathway customer service modules.

Historically many owners of dogs that have been involved in an attack acted aggressively towards Compliance Officers as they were of the mistaken belief that their dog would be destroyed due to the attack. The new process involves the dog owner and the victim being involved in the investigations process from the beginning with the focus on ensuring another attack cannot occur into the future. Measures taken by dog owners have included new dog proof fencing on their property, relocation of their dog to more suitable accommodation and the installation of a dangerous dog compound in accordance with the Dog Control Act 2000.

Compliance action is determined using the Braithwaite Model of Enforcement, based around a hierarchical and escalating nature of regulatory engagement determined by the severity of the offence and the persons willingness to address the issues causing the non-compliance. The new process has resulted in higher levels of compliance with the law, shorter investigation times and less confrontation.

ANNUAL FIRE HAZARD ABATEMENT PROGRAMCompliance implemented a new approach to bushfire hazard abatement in 2012 through the implementation of the annual fire hazard abatement program. A review was conducted in August 2012 with the program fully operational through the 2012/13 fire season.

The program ensured that the vast majority of properties where a hazard had been identified achieved abatement within 21 days of notification. Compulsory clearance orders were issued on two properties where owners did not meet abatement within the time period.

20

ww

w.k

ingb

orou

gh.ta

s.gov

.au

2.2.9 Development Services

2.2.9.1 Planning Services

2.2.9.2 Development Engineering

2.2.9.3 Building Services

2.2.9.4 Plumbing Services

KEY ACHIEVEMENTS

MEETING STATUTORY REQUIREMENTSCouncil continued to implement quality assurance safeguards that ensure statutory planning and building requirements were met and that the Kingborough community was provided with an efficient development approval service. The Pathway process management system ensured that all timeframes and mandatory referrals were observed and assessment protocols followed. Routine audits were carried out by senior staff and all assessments and permits issued were independently vetted and endorsed by senior staff prior to issue. All planning appeals, applications received and permits issued were routinely reported to the Planning Authority Committee and to Council. Staff represented Council at a number of Tribunal and Commission hearings during the year.

KINGBOROUGH PLANNING SCHEME REVIEWDuring this year a draft Kingborough Planning Scheme was prepared. A preliminary draft was released for public comment late in 2012, with public meetings held within local areas. Around 300 submissions were received. The draft scheme was further refined at a regional level and a coordinated release of all Southern Tasmanian draft planning schemes occurred in June 2013. A second public consultation period then occurred. Council was represented on the Southern Regional Planning Project Technical Reference Group, providing professional input and local knowledge into the development of the Southern Regional Model Planning Scheme. The draft Kingborough Land Use Strategy was also expanded upon and updated as more information became available during the year.

LIVEABLE CITIES PROJECT – FORMER KINGSTON HIGH SCHOOL SITEAt the beginning of this year the Liveable Cities Project commenced. Consultants were commissioned to carry out the necessary detailed investigations that would determine the optimum development solution for the former Kingston High School site. This project was jointly funded by the Australian Government (through their Liveable Cities Program), Council and the Tasmanian Government. The project was completed in June 2013 with a final Development Plan provided to Council. The project was overseen by a steering committee with community, Council and State agency representatives. The Development Plan provides for a mix of public open space, community facilities and commercial opportunities on the site. The future development of this site will provide Kingborough with some very significant economic, social and recreational benefits.

The Development Services Department of Council has the responsibility for urban and environmental planning, development engineering, building and plumbing. While the sections work collaboratively, each section controls specific areas and legislation relevant to their particular focus.

Planning Services is responsible for the assessment of development applications, issuing planning permits and monitoring compliance in accordance with the Land Use Planning and Approvals Act 1993 and the Kingborough Planning Scheme 2000. This includes consultation, referral and assessment of planning applications, mediation and the formulation, issue and monitoring of permit conditions. Planning staff conduct reviews of the Planning Scheme and process any amendment applications. Staff also act as advocates for Council and expert witnesses before the Resource Management and Planning Appeals Tribunal and the Tasmanian Planning Commission.

Development Engineering ensures that all infrastructure requirements are met in accordance with the conditions in approved permits, particularly in regard to the monitoring of works associated with subdivision developments and roadworks. Staff provide a link between the regulatory planning area of Council and Infrastructure Services, as well as external referral agencies such as TasWater and the Department of Infrastructure, Energy and Resources.

Building Services administers the Building Permit Authority function of Council as well as providing a Building Surveying consultancy. The team is responsible for the implementation of legislation controlling building and construction, including the Tasmanian Building Regulations 2000, the Building Act 2000 and the Building Code of Australia. These statutes set the minimum standards for construction in Tasmania. Council is also represented on the Building Regulation Advisory Committee that provides advice on building regulatory matters to the Minister for Justice.

Plumbing Services work closely with Building Services and is responsible for the administration of plumbing permits and all plumbing matters pertaining to development applications. Plumbing staff provide plumbing advice to other departments within Council as well as the general public. Council officers inspect plumbing works during construction and also prepare and maintain house connection details of all plumbing installations.

AN

NU

AL REPO

RT 2012/13

21

2.3 Infrastructure and ServicesCouncil aims to provide strong management of the community’s assets by maintaining, operating and constructing Council’s infrastructure assets at a sustainable level that is acceptable and affordable for the community and meets statutory requirements.

2.3.1 Engineering ServicesEngineering Services is primarily responsible for the delivery of Council’s engineering functions which includes engineering investigation, project planning, asset maintenance and management, tender specification, contract supervision, project administration, design, subdivision planning and supervision, the programming of Council works and the provision of customer service.

The department is also responsible for setting the specifications for the maintenance and upgrading of Council’s existing infrastructure assets and to identify, specify and administer capital works projects for the construction of new assets.

KEY ACHIEVEMENTS

CAPITAL WORKS PROGRAMThere were 119 projects listed on the program for the 2012/13 financial year and Council achieved a completion rate of 85 per cent of the projects. The remaining balance mainly comprised of projects identified to be carried forward to the 2013/14 capital works program.

The program for 2012/13 saw a number of major road reconstructions take place that have resulted in a significant improvement to the levels of service provided. The roads identified for renewal were identified through Council’s asset management processes which take into account a number of engineering indicators as well as the consideration of the required levels of service for items such as pedestrian access and safety, drainage capacity limitations or increased development necessitating increased capacity.

The program delivered upgrades to Kingston Beach (Browns River), Jenkins Street, Coolamon Road, Groningen Road, Old Station Road and Snug Tiers Road.

The development of the Kingborough Sports Centre continues to draw a high number of sporting events and general patrons, which required additional services to be provided to support these activities. A significant project was delivered that provided additional parking, pedestrian access, landscaping and lighting to the precinct which has received a positive response from patrons.

MANAGING OUR WASTESince the opening of the new Barretta Waste Management Facility and the creation of Kingborough Waste Services (KWS), the management of waste in Kingborough has seen a dramatic change in the efficiency of waste handling and positive outcomes yielded from increased recovery rates and re-use opportunities.

Improvements to the site management, facilities and operational infrastructure continue, and again the site operated with zero downtime providing a high level of customer service to commercial and non commercial clients.

Management are constantly monitoring commodity prices and stockpiling material to achieve the highest return whilst balancing the site requirements for stockpiling limits.

The development of the KWS website has improved the market exposure of KWS and in particular has resulted in improvements to the revenue generated through Re-Use Shop sales. The increased revenue and diversion rates have again contributed to balancing inflation costs keeping operating costs low.

REHABILITATION OF THE BARRETTA LANDFILLThe rehabilitation of the former Barretta landfill site is now well progressed with the majority of the bulk earthworks complete. The work to date has also included:

• Installationofgascaptureandmanagementinfrastructure;

• Newandrehabilitationworksonstormwaterandleachatemanagementpipedinfrastructure;

• Newstormwaterstorageandrecirculationponds;

• Newleachatestoragepondandpumpstation;

• Rehabilitationoftheformerwetlandsarea;and

• Shaping and capping of the majority of the main landfill site.

22

ww

w.k

ingb

orou

gh.ta

s.gov

.au

The rehabilitation continues to be closely monitored to ensure compliance with Environmental Protection Agency requirements and guidelines with zero non-conformances to date.

The works are tracking ahead of program and budget.

ROADS AND FOOTPATHSCouncil continues a strong commitment to road safety through the delivery of educational material, coordination with Tasmania Police on enforcement and through the delivery of engineering solutions derived from network risk assessments.

The engineering solutions have been focused primarily on unsealed rural roads where there have been deficiencies identified that require mitigation measures to reduce risk. This has led to a number of annual programs that result in the installation of safety barriers, passing bays on narrow roads and sight distance works. These annual programs are funded in Council’s five year capital works program as ongoing programs.

STORMWATERWork continues on the capture of previously unrecorded stormwater assets with captured information feeding directly into Council’s asset management and GIS systems. The capture is predominately undertaken using survey grade global positioning system equipment by Council which results in a high level of accuracy and fast capture speed.

This information is used to assess and prioritise capital and planned maintenance activities and to guide future upgrade and rehabilitation programs.

AN

NU

AL REPO

RT 2012/13

23

2.3.2 Works DepartmentThe Works Department is responsible for the construction and maintenance of roads, bridges, reserves, halls and buildings, sports ovals and stormwater systems. It is also responsible for the maintenance and replacement of Council’s vehicles, maintenance of machinery and equipment. The focus of the Works Department is a schedule of maintenance activities, although some capital works projects are also undertaken.

KEY ACHIEVEMENTS

STAFF DEVELOPMENT AND INITIATIVESCouncil has a proactive approach to work health and safety and undertakes reviews of its work practices to ensure that timely, efficient and effective services are being provided to the community.

A range of corporate and individual staff training programs were implemented during the financial year. Staff embraced the opportunity to improve current skill bases and to learn new technology related to local government service delivery.

With changing work practices, Council provided the opportunity for employees to undertake new and enhanced skills based training with formal qualifications gained by a number of employees as the result.

WORK HEALTH AND SAFETYCouncil maintained the Safety Circle Work Health and Safety (WHS) program implemented in 2010/11. A series of management and staff workshops were held. A monthly WHS review meeting is held that links into corporate WHS meetings.

INFRASTRUCTURE INSPECTIONSAll scheduled asset and infrastructure inspections were achieved. Each year, Council is audited by its insurer MAV Insurance to ensure that it is complying with its inspection obligations and is scored and rated accordingly on performance.

24

ww

w.k

ingb

orou

gh.ta

s.gov

.au

Council is responsible for approximately 523 kilometres of road of which 250 kilometres are sealed and 273 kilometres unsealed. There are 71 bridges within the road network and approximately 205 kilometres of footpaths.

In addition, Council maintains 257.7 kilometres of stormwater drainage system that includes open drains, culverts, piped stormwater drains and pits. As part of the drainage system Council has two gross pollutant traps - one at Kingston Wetlands and one at Blackmans Bay Beach to collect rubbish that gets washed into the stormwater system before it enters into the rivers hence reducing pollution of the environment. The estimated replacement value of the stormwater system is in excess of $74M.

The Roads and Stormwater Unit sets the priorities for the maintenance planning and upgrading of the existing road network and bridges and identifying, specifying and administers capital works projects for the construction of new assets. Capital works projects may be undertaken by external contractors or by Council’s own workforce.

KEY ACHIEVEMENTS

MAINTENANCE OF OUR ROADSCouncil undertakes a range of programmed inspections on assets such as sealed and gravel roads and ancillary infrastructure, bridges, footpaths, walkways and tracks. These inspections assist with the prioritisation of repairs such as grading, potholing as well as ensuring public safety.

Council re-sheets at least one third of its gravel network annually. Roads are treated on a cyclic program with each road re-graveled every three to four years on average.

A structured street-sweeping program is undertaken to keep stormwater pits free from debris. The CBD and major urban areas are swept weekly with all other areas swept on an as required basis.

Upgrading works during the year included:

• WingaraRoadboatrampoverlayandextension;

• SummerleasRoad–culvertextension;

• MaranoaRoadfootpathandsafetyfencereplacement;

• ChannelHighway,Taroonafootpathandfencereplacement;

• ConinghamCarparkdrainageandfencesinstalled;

• ScottsRoad–culvertrepairs,blastedandconcreted;

• Bikesafegratesinstalled;

• KingstonBeachpontoonrefurbished;

• Stormwaterpipeblastingofhighpriorityareastopreventflooding;

• ResolutionRoad,BrunyIslandculvertextension;

• ProctorsRoadandNierinnaRoad–sealing;

• AllensRivuletRoad,bridgeapproachsealed;and

• Adventure Bay – red gravel footpath adjacent to the foreshore installed.

2.3.3 Roads and Bridges

AN

NU

AL REPO

RT 2012/13

25

2.3.4 Recreation and ReservesCouncil maintains a number of buildings, reserves, sporting facilities, playgrounds and recreational facilities. In addition it assists landcare groups operating throughout Kingborough.

KEY ACHIEVEMENTS

MAINTENANCE OF RECREATIONAL FACILITIESCouncil maintains 13 ovals including the new Twin Ovals facility and the external facilities within the broader Kingborough Sports Centre Precinct. In addition, a significant proportion of the Reserves crew’s activities are associated with the maintenance of public reserves and grassed verge areas which are maintained in accordance with scheduled programs. Garden beds and street planting also formed part of a regular maintenance schedule.

A range of infrastructure was inspected and maintained in accordance with specified safety standards with all playgrounds usually inspected on a weekly basis. All public toilets were cleaned as scheduled and daily and weekly rubbish collections across the municipality were undertaken.

Assistance and support was provided to a range of landcare groups who undertake valuable work in the community. Natural bushland and the Kingston Wetlands were managed and maintained by Council’s Natural Resource Management Unit in close consultation with the Works Department.

During the 2012/13 year several recreation and reserves projects were completed, these include:

• A Black Water dump station for the disposal of waste from caravans and portable toilets was installed within the Alonnah ServiceCentregroundsonBrunyIsland;

• ThetenniscourtatPierson’sPointinTinderboxwasre-surfacedwithaconcreteoverlay;

• Improvements were made to Silverwater Park in Woodbridge including the relocation of the playground, concrete paths andanextensiontotheparkingarea;

• The Greenhill Drive Playground and Park was upgraded with the playground being extended and new equipment installed, severalmaturetreesplantedandnewpicnicbenchesinstalled;

• In conjunction with the Margate Cricket Club, and with the assistance of a Sport and Recreation grant, the centre of the Margate Oval was levelled and a new synthetic cricket pitch installed and several large dips and hollows in the outfield were alsolevelled;

• NewirrigationsystemwithIMMSsoftwarewasinstalledatLightwoodParkOval;and

• New ball nets to prevent soccer balls being kicked out of the grounds were installed at Lightwood Park and Gormley Oval.

TRACKS AND TRAILSA range of walking tracks were inspected and repaired in accordance with Australian Standards with many unsafe and defective areas being upgraded.

There is extensive network of tracks and trails within Kingborough including coastal trails, urban trails and natural bushland trails. The network provides access for a variety of experiences including walks, mountain bike riding and horse riding.

This year the Kettering Point Walking Track was upgraded to make it safer and more convenient for track users. The track was widened and several obstacles removed and now runs through to the Trial Bay Foreshore Reserve.

A new track was constructed at the top of Bonnie Brae Road in Taroona. This is a short walk to the top of Bonnet Hill giving spectacular views of the Derwent River and surrounds.

Council continues to work on improvements to the Alum Cliffs Track. This year much of the ground work has been completed with a new link for the track from Taronga Road through to the Shot Tower scheduled for construction over the coming months.

26

ww

w.k

ingb

orou

gh.ta

s.gov

.au

Council owns and maintains a wide range of public buildings and 14 community halls. The Reserves Unit manages these assets and undertakes or coordinates regulatory and scheduled inspections of all facilities. Scheduled maintenance activities are derived from inspection outcomes and are completed on a prioritised risk assessed basis.

Council also undertakes non-programmed maintenance due to infrastructure failures or vandalism. Specific capital works are undertaken by Council while others are completed by external contractors.

Council inspected and maintained all public halls and buildings, both internally and externally, to agreed standards and specifications. Regulatory inspections were completed in accordance with building compliance standards. Both programmed and non-programmed maintenance activities were completed on a prioritised and risk rated basis.

All halls were cleaned on a weekly basis to ensure they were in presentable condition for users.

Council continued with its re–wiring program and installation of roof anchor points program on Council’s hall and buildings.

The new Kingston Beach Digital Hub was constructed at the Kingston Beach Hall, which was also had a complete internal re-paint.

2.3.5 Halls and Buildings

AN

NU

AL REPO

RT 2012/13

27

2.4 Kingborough Waste Services

2.5 Copping Refuse Disposal Site

In April 2011, Council resolved to establish Kingborough Waste Services as a corporation in accordance with Section 21 of the Local Government Act 1993. Following ministerial approval, Kingborough Waste Services (KWS) Pty Ltd commenced trading on 1 July 2011 and is responsible for operating the Barretta Waste Management Facility, including the waste transfer station, the weighbridge and Re-Use Shop.

In establishing KWS, Council determined that an independent Board would be appointed to manage the operations of the company. The Board consists of two independent non executive directors, the Chair, Mr Ronald Ward and Director, Ms Joanna Orr and two Council staff (General Manager and Executive Manager Engineering Services). The Board meets bi-monthly and reports to Council’s Governance and Finance Committee on all operational and financial matters.

KWS employs 11 full-time staff and three casual staff who operate from the Barretta Waste Management Facility.

KEY ACHIEVEMENTS

There has been a continued focus on the development of business critical documentation with a strong focus on work health and safety and business continuity. Significant progress has been achieved in the quality of safety documentation and systems for the operations which has been backed by a very low incident record for the reporting period.

A waste diversion rate of 25 per cent was set by the Board which represents a significant improvement on previous levels. This was achieved with a recorded diversion rate of 25.9 per cent.

The average price per sale for the Re-Use Shop has been steadily growing despite the seasonal variations normally expected, with an average sale $9.39 resulting in monthly budgets consistently being reached or exceeded.

Ferrous metal recycling has also had a major improvement with 944 tonnes collected for the period which is up from 754 tonnes collected in the previous year. Combined with managed stockpiling and strong negotiation of price, non ferrous metals returned well above the budgeted $27,000 returning $46,383.

The company has also taken on a number of industry initiatives such as the Drum Muster program providing a collection point for surplus agricultural chemical containers. KWS also provides facilities for the collection of e-waste (electronics such as old televisions, computers and equipment). These services provide an environmental benefit and do not have a cost impact on the business as they are externally funded initiatives.

Council has a 20 per cent ownership interest in the Copping Refuse Disposal Site Joint Authority.

The authority’s objectives include the management and operation of the refuse disposal site at Copping in accordance with its development proposal and environmental management plan.

28

ww

w.k

ingb

orou

gh.ta

s.gov

.au

3. GovernanceKingborough Council is required to operate within the legislative framework established for local government in Tasmania. Council is required to appoint a General Manager for a term not exceeding five years. During the year the Council entered into a new contract of employment with the General Manager for a further period of five years.

The Local Government Act 1993 outlines the roles of the General Manager. In particular sections 62 and 63 detail the functions and powers of the General Manager which, in essence, are to manage and direct the human and financial resources of the Council to achieve optimum use of the public monies and the most effective uses of the organisation’s business assets and human resources. The General Manager is to ensure Council is provided with professional advice and support in its strategic and policy making roles.

AN

NU

AL REPO

RT 2012/13

29

3.1 Contracts for the Supply of Goods and Services

CONTRACT PERIOD VALUE OF TENDER CONTRACTOR

Former Kingston High School Site Assessment 08/12 – 05/13 $359,820 Beca Pty LtdGPO Box 7079, Melbourne

Hall, Public Toilet and Barbecue Cleaning Contract Extension 11/12 – 11/13 $32,000

(Est. per annum)CleencoPO Box 108, Moonah

Retaining Wall Stabilisation – Channel Highway, Taroona 09/12 – 01/13 $153,126 DCS Civil Pty Ltd

181 East Tinderbox Road, Blackmans Bay

Kerbside Recycling – Contract Extension 02/13 – 08/13 $220,000 (Est. for period)

Aussie Waste Management Pty Ltd123 Mornington Road, Mornington

Barretta Waste Management Facility – Water Sampling 10/12 – 09/13 $39,954 Elgin Associates Pty Ltd

5 Allison Street, West Hobart

Roadside Slashing 11/12 – 06/13 $135,828 Statewide Earthworks Pty Ltd52 Atkins Road, Granton

Roadside Spraying 11/12 – 06/13 $41,234 Southern Turf Specialists Pty Ltd5 Morella Drive, Huonville

Kingston View Drive – Car Park and Footpaths 12/12 – 04/13 $1,014,766 DCS Civil Pty Ltd

181 East Tinderbox Road, Blackmans Bay

Snug Tiers Road Bridge Replacement 12/12 – 03/13 $90,380 Hazell Bros GroupPO Box 430, Moonah

Open Drain Stabilisation 12/12 – 04/13 $117,000 Batchelor Civil Contracting Pty Ltd115 Browns Road, Kingston

Coolamon Road Stabilisation 01/13 – 05/13 $268,301 Andrew Walter Constructions2 Whitestone Drive, Austins Ferry

Taroona Landslide Investigations - Stages 2 and 3 02/13 – 02/15 $201,818 GHD Pty Ltd

2 Salamanca Place, Hobart

Old Station Road Rehabilitation 02/13 – 10/13 $535,621 Spectran Pty LtdGPO Box 1422, Hobart

Kingston Beach Master Plan – Stage 2 02/13 – 09/13 $435,908 Spectran Pty Ltd

GPO Box 1422, Hobart

Alum Cliffs Track Extension 08/13 – 10/13 $149,535 Batchelor Civil Contracting Pty Ltd115 Browns Road, Kingston

Kerbside Household Waste and Recycling Collection 09/13 – 09/18 $766,595

(Est. per annum)Aussie Waste Management Pty Ltd123 Mornington Road, Mornington

Snug Tiers Road Improvements 04/13 – 10/13 $559,787 Batchelor Civil Contracting Pty Ltd115 Browns Road, Kingston

Groningen Road Reconstruction 04/13 – 08/13 $302,845 RCCC Pty LtdPO Box 575, Kingston

Kingston Bypass Wetlands 07/13 – 06/18 $73,710 Syrinx Environmental Pty LtdHigh Street, Northcote, Victoria

Margate Roundabout – Channel Highway 09/13 – 12/13 $640,602 DCS Civil Pty Ltd

181 East Tinderbox Road, Blackmans Bay

Supply and Delivery Red Gravel – Annual Contract 07/13 – 06/14 $250,000

(Est. for year)Duggans Pty Ltd8420 Channel Highway, Cradoc

Supply and Delivery Aggregate – Annual Contract 07/13 – 06/14 $206,000

(Est. for year)Hazell Bros GroupPO Box 430, Moonah

Bitumen Seal and Reseal – Annual Contract 07/13 – 06/14 $220,000

(Est. for year)Roadways Pty LtdPO Box 303, Glenorchy

During the year the public tender process was applied in all instances where the value of the works or goods or services was in excess of $100,000 (excluding GST), which is the amount prescribed in the Local Government (General) Regulations 2005.

30

ww

w.k

ingb

orou

gh.ta

s.gov

.au

3.2 Financial Assistance and Grants

NAME AMOUNT DESCRIPTIONEconomic Development $71,457 2012/13 Rates Remissions

Charitable Organisations $59,921 2012/13 Rates Remissions

Kingborough Community Enterprise Centre $25,000 Yearly Funding

Dept Primary Industries, Parks, Water and Environment $23,812 Derwent Estuary Program Contribution

Kingborough Bowls Club Inc. $21,000 Foregone Interest on Loan

Cycling South $11,000 Operating Costs Contribution

Kingborough District Cricket Club $8,700 2012/13 Community Grant

Tas Canine Defence League $5,727 Dogs Home Contribution

Conservation Covenant $5,233 2012/13 Rates Remissions

Channel Men’s Shed Inc. $5,000 2012/13 Community Grant

Kingborough Life Church $5,000 2012/13 Community Grant

Kettering Community Association Inc. $4,970 2012/13 Community Grant

Bruny Island Mens Shed $4,785 2012/13 Community Grant

Huntingfield Pony and Riding Club Inc. $4,780 2012/13 Community Grant

Taroona Environment Network Inc. $3,818 2012/13 Community Grant

Channel Historical and Folk Museum Association Inc. $3,500 2012/13 Annual Grant

Kingborough Gymnastics Association $3,000 2012/13 Community Grant

Scouts Australia - Tasmanian Branch $2,800 2012/13 Community Grant

Hobart Cat Centre $2,400 Cat Centre Contribution

Kingborough Lions United Football Club $2,000 2012/13 Community Grant

Southern Football Club Inc. $2,000 2012/13 Community Grant

Taroona Football Club $2,000 2012/13 Community Grant

Taroona Community Hall Management Committee $1,955 2012/13 Community Grant

Community Organisations $1,814 2012/13 Rates Remissions

Grow $1,600 2012/13 Community Grant

Fleurty’s $1,500 2013 Sculpture Prize

Riding for Disabled (Kingborough) $1,500 2012/13 Community Grant

Possums Playcentre Association Inc. $1,417 2012/13 Community Grant

Bruny Island Environment Network Inc. $1,093 2012/13 Community Grant

Channel Junior Football Club $750 2012/13 Community Grant

South Channel Ratepayers and Residents Association Inc. $730 2012/13 Community Grant

Taroona Playgroup $513 2012/13 Community Grant

Get Shucked $500 2012/13 Community Grant

Christian Schools Tasmania $455 Contribution - Antarctic Flight Participant

Dr Anne Morgan $455 Donation - Birdsong Publication

Kingborough Huon Rural Youth Club $455 2012/13 Community Grant

Bruny Island Primary Industry Group $400 Donation - 2013 Easter Carnival

Taroona Primary School $400 2012 School Poster Competition

St Aloysius Catholic College $400 2012 School Poster Competition

Woodbridge District High School $400 2012 School Poster Competition

Bruny Island District School $350 2012 School Poster Competition

Kingborough Life Church $340 Donation - Partial Fees for Planning Applications

Channel Regional Arts Group $300 Donation - Art Trail

Lions Club of Kingborough Inc. $300 Donation - ANZAC Sports Day

Kingston Primary School $300 2012 School Poster Competition

South Channel Ratepayers and Residents Association Inc. $285 Contribution - Middleton Fair

Birchalls Bookshop $250 Sponsorship - Childrens Book Event

Kingston Blues Netball Club $250 Donation - Bus for TNL Grand Final

Kingston Fire Station Volunteer (G Renshaw) $250 Donation

AN

NU

AL REPO

RT 2012/13

31

University of Tasmania $250 Sponsorship - UTAS Science Investigation Awards 2013

Blackmans Bay Primary School $250 2012 School Poster Competition

Calvin Christian School $250 2012 School Poster Competition

Southern Christian College $250 2012 School Poster Competition

Channel Christian School $250 2012 School Poster Competition

Browns River History Group $245 Donation - History Walk Brochure Printing

Maranoa Heights Community Centre $206 Donation - Fundraising Banner

Campbell Nicol $200 Donation - Harvard Model United Nations Conference 2013

Liam Quin $200 Donation - National Schools Underwater Hockey Competition

Samuel Lohrey $200 Donation - National Schools Underwater Hockey Competition

Aimee Medwin $100 Donation - State Representation 2013 FFA National Girls Championships

Blake Sculthorpe $100 Donation - Futsal Championships

Calvin Christian School $100 2012 School Citizenship Award

Chloe Nasrat $100 Donation - Hollins Trophy

Ebony Webb $100 Donation - National Cross Country Championships

Elisa Stalker $100 Donation - Little Athletics Championships

Ella Tantari $100 Donation - State Representation 2013 FFA National Girls Championships

Eloise Dick $100 Donation - U13 Girls National Football Titles

Emma White $100 Donation - U13 Aust Netball Assoc Carnival

Georgina Osborn $100 Donation - Women’s Artistic Gymnastics

Haylee Driessen $100 Donation - U13 Aust Netball Assoc Carnival

Huonville Primary School $100 Donation - Student Leaders Conference 2013

Jake Hughes $100 Donation - 2012 GKR Karate National Championships

Jessie Rowland $100 Donation - ITF Taekwondo Aus 2012

Joshua Rowland $100 Donation - ITF Taekwondo Aus 2012

Lachlan Watt $100 Donation - U15 Tas Touch Football Team

Macey Hope $100 Donation - 2012 Track and Field Competition

Mackenzie Evans $100 Donation - National Cross Country Championships

Molly-Rose Parry $100 Donation - 2013 National Futsal School Championships

Oliver Lohrey $100 Donation - Australian National Gymnastics - July 2013

Ruby Smee $100 Donation - 2012 School Sport Aust Cross Country

Sorin Vanzino $100 Donation - National Cross Country Championships

St Aloysius Catholic College $100 2012 School Citizenship Award

William Hughes $100 Donation - 2012 GKR Karate National Championships

Woodbridge School $100 Donation - Educational School Camp

Blackmans Bay Primary School $50 2012 School Citizenship Award

Illawarra Primary School $50 2012 School Citizenship Award

Kingston High School $50 2012 School Citizenship Award

Kingston Primary School $50 2012 School Citizenship Award

Margate Primary School $50 2012 School Citizenship Award

Snug Primary School $50 2012 School Citizenship Award

Southern Christian College $50 2012 School Citizenship Award

Taroona High School $50 2012 School Citizenship Award

Taroona Primary School $50 2012 School Citizenship Award

Woodbridge School $50 2012 School Citizenship Award

Alzheimers Australia TAS $50 Donation

Cancer Council $50 Donation

GiveNow (Beyond Blue) $50 Donation

$302,365

3.2 Financial Assistance and Grants... continued

NAME AMOUNT DESCRIPTION

32

ww

w.k

ingb

orou

gh.ta

s.gov

.au

3.3 Human Resource Policies

3.4 Senior Staff

3.5 Public Interest Disclosures

Section 72 of the Local Government Act 1993 requires that a statement be provided relating to the total annual remuneration paid to senior members of staff. The annual remuneration is:

• thetotalofthesalarypayable;

• employersuperannuationcontributions;

• thevalueofprivateuseofanymotorvehicle;and

• anyotherbenefits.

For the purposes of this statement an arbitrary benefit value of $10,000 has been used for employees who have private use of a Council vehicle. In all instances these vehicles are available for specific or ‘pooled’ use.

TOTAL REMUNERATION NUMBER OF EMPLOYEES

$230,000 - $250,000 1

$140,000 - $160,000 1

$120,000 - $140,000 3

$100,000 - $120,000 6

The Public Interest Disclosures Act 2002 provides a mechanism to manage and regulate disclosures made to and against a public body in the public interest. It also protects those who make bona fide disclosures.

The Act applies to all public bodies including Councils. The Tasmanian Act mirrors legislation in all other States and Territories dealing with the same issues. The Act is ultimately administered by the Ombudsman, who must report each year to Parliament on disclosures and outcomes. In compliance with the Act, Council has developed policies and procedures to deal with such disclosures which may be obtained from Council’s website: www.kingborough.tas.gov.au or at the Civic Centre. During the year no disclosure or allegation of corrupt conduct was made to Council which would meet the Public Interest Disclosure Act 2002 guidelines.

Council has determined that it may satisfy itself that it is complying with Section 63(2) of the Local Government Act 1993 by ensuring that:

1. allemployeesareappointedandpromotedaccordingtomeritandwithoutdiscrimination;and

2. all employees receive fair and equitable treatment without discrimination.

The General Manager is to provide annually to Council a formal statement to the effect that all necessary policies and procedures are in place to ensure compliance and that all staff are aware of equal opportunity requirements. The statement is to be incorporated into Council’s Annual Report.

The following statement was provided by the General Manager to Council at the Council Meeting held on 24 September 2012: For the purposes of Section 63(2) of the Local Government Act 1993, I hereby advise Council that appropriate policies and procedures are in place to ensure that all employees are appointed and promoted according to merit and without discrimination; all employees receive fair and equitable treatment without discrimination and are made aware of equal opportunity requirements.

AN

NU

AL REPO

RT 2012/13

33

3.6 Public Health StatementSection 72(1)(ab) of the Local Government Act 1993 requires a statement of the Council’s goals and objectives in relation to public health activities to be included in the Annual Report.

Council’s Public and Environmental Health functions are undertaken by the Environmental Health Unit which is a part of the Environmental Services Department. The unit’s organisational structure consists of a Manager Environmental Services, Senior Environmental Health Officer, one full-time Environmental Health Officer, two part-time Environmental Health Officers and one part-time Administration Officer. A Medical Officer of Health and two Nurse Immunisers are employed on a casual basis.

Functions administered by the Unit in accordance with the provisions of the Local Government Act 1993, Public Health Act 1997, Food Act 2003, Building Act 2000, Environmental Management and Pollution Control Act 1994, Burial and Cremation Act 2002 and other identified programs include:• Foodsafety• Notifiablediseases• Immunisations• Placesofassembly• Publichealthriskactivities• Unhealthypremises• Waterqualityincludingrecreational,bathingandprivatewatersuppliers• Publichealthandenvironmentalnuisances• Publichealtheducationandpromotion• Emergencymanagement• Climatechange• Onsitewastewatermanagement• Privateburials• Pollution(air,liquidandsolid)

Operational statistics reflecting core environmental health activities undertaken during 2012/13 include:

ACTIVITY TOTAL

Registered Food Businesses 249

Registered Temporary Food Businesses 213

Food Samples (Informal) 9

Notifiable Disease Notifications/Investigation 11

Vaccines administered at Council immunisation clinics (incl. School Immunisation Program) 3,025

Registered Public Health Risk Activities 4

Registered Water Carters 9

Licensed Permanent Places of Assembly 52

Licensed Temporary Places of Assembly 16

Customer Requests (Public Health/Environmental Nuisances) 141

Food Handlers attending Council coordinated workshops 148

Recreational Water Samples 175

Special Plumbing Permits (onsite wastewater) issued 77

34

ww

w.k

ingb

orou

gh.ta

s.gov

.au

4. Financial Results for the Year - Analysis of Annual Financial Report

4.1 Introduction

When evaluating an entity’s financial performance it is important to distinguish between operating, non operating and capital items as well as non-recurring one-off items. The above table breaks down Council’s overall result to assist in assessing Council’s underlying financial performance.

The 2012/13 net operating surplus before depreciation, interest and dividend income is $2.958M, being $0.142M above budget.

The 2012/13 net operating result after depreciation but before interest and dividend income is a deficit of $4.009M, being $0.170M higher than the budget. The variation was primarily due to increased expenses for workers compensation insurance, electricity and water charges.

The overall 2012/13 result is a surplus of $0.519M, compared to a budgeted deficit result for 2012/13 of $2.089M. The variation of $2.608M relates primarily to the reduction in the provision for the rehabilitation of the Barretta tip. Council had been carrying a provision of $5.0M for this project since 2009, and a review undertaken in June 2013 has resulted in the reduction of this provision to $2.293M.

An abbreviated Annual Financial Report, which comprises four financial statements, is attached as an appendix to the Annual Report. The following is a commentary on the contents of those statements.

The complete Annual Financial Report, including notes to the accounts which provide additional detail and explanation of specific aspects of the financial statements, is available from Council’s website or from the Civic Centre.

The Annual Financial Report meets the requirements of the Local Government Act 1993 and Australian Accounting Standards and has been audited by the Tasmanian Audit Office.

4.2 Operating Statement

STATEMENT OF COMPREHENSIVE INCOME - CONSOLIDATED

Year Ended 30 June 2013

Actual 2012/13

$’000

Budget 2012/13

$’000

Total Revenue 32,926 29,614

Total Expenses 28,623 26,798

Net Operating Surplus (Deficit) before Dep’n and Finance 4,303 2,816

Depreciation 6,967 6,655

Net Operating Surplus (Deficit) before: (2,664) (3,839)

Interest Received 621 540

Borrowing Cost 0 0

Net Adjustment to Barretta Provision 1,362 0

Dividends - Southern Water 1,200 1,210

NET SURPLUS (DEFICIT) 519 (2,089)

Table1: Underlying Financial Performance

AN

NU

AL REPO

RT 2012/13

35

Council must continue to develop strategies to ensure depreciation is fully funded and break-even net operating results are consistently achieved in future financial years. In May 2012 Council adopted a Long Term Financial Plan (LTFP) and a Long Term Asset Management Plan (LTAMP). The LTFP covers a 10 year planning horizon from 2011/12 to 2020/21, and is an important part of Council’s overall financial management framework.

The LTFP aims to improve Council’s overall financial sustainability into the future. The key principles underpinning the LTFP are:• Maintainingafairandequitableratingstructure;• Maintainingcurrentservicelevels;• ContinuousimprovementinCouncil’sfinancialperformance,soastoachieveoperatingsurpluses;• Progressivelyincreasingfundingforassetmaintenanceandrenewal;and• ContinuousimprovementinCouncil’sfinancialposition.

The LTFP and LTAMP can be downloaded from Council’s website or from the Civic Centre.

4.3 Operating RevenuesThis section analyses the actual revenues of Council for 2012/13 compared to budget.

REVENUE TYPEActual

2012/13 $’000

Budget 2012/13

$’000

Variance $’000

Rates and Levies 20,732 20,500 232

User Charges and Statutory Fees 2,990 3,148 (158)

Grants - Operating 3,992 3,528 464

Other Revenue 1,821 1,828 (7)

Total Operating Revenue 29,536 29,004 532

Interest and Dividends 1,821 1,750 71

Barretta Provision Adjustment 1,362 0 1,362

Grants - Capital 1,398 400 998

Contributions 247 210 37

Net Gain from Sale of Assets 485 - 485

Non Cash Contributions 1,185 - 1,185

Net Gain from Investment 76 - 76

Total Revenue 36,109 31,364 4,745

Table 2: Actual 2012/13 Revenue compared to Budget

Total operating revenue for 2012/13 was $4.745M or 15.1% higher than budget.

Rates and levies were 1.1% higher than budget due to better than expected supplementary rates, charges and levies during the year.

User charges and statutory fees were $0.158M lower than budget and included shortfalls within planning and subdivision fees, $0.062Mandbuildingandplanning fees,$0.127M;offsetbyan increase in ratingcertificates$0.036M.Theoverall shortfallprimarily resulted from the downturn in activity within the housing sector.

Operating grants included amounts for new projects including the Kingborough Urban Arts Project, the Kingborough Digital Hub, and the Kingborough Cat Management Program. The Family Day Care Scheme and Manor Gardens Day Respite Centre also received additional grants in excess of budget during the year.

Interest and dividend income for 2012/13 was $0.071M better than budget due to higher than expected cash and investment balances throughout the year.

36

ww

w.k

ingb

orou

gh.ta

s.gov

.au

Council is entitled to priority dividend payments as part owner of the Tasmanian Water and Sewerage Corporation (Southern Region) Pty Ltd. The 2012/13 dividend income was $1.200M.

The adjustment to the Barretta provision $1.362M relates to the revision of the estimated rehabilitation costs for the tip site. The remainder of the $2.770M adjustment has been made against expenditure.

Capital grants include all monies received from State, Federal and community sources for the purposes of funding the capital worksprogram.Capitalgrantsfor2012/13includedtheCommonwealthRoadstoRecovery,$0.388M;DigitalLocalGovernmentProgram, $0.324M;Taroona Landslide Risk Assessment, $0.250M; the State Government Liveable Cities Program, $0.200M;TaroonaRetainingWallRehabilitation,$0.127M;KingstonBypassWetlandsProject,$0.100M;andthesafersuburbsprogram,$0.010M.

Revenue reported under contributions relate to external funds received from developers under the public open space and tree preservation policies or other contributions received from the public for capital works or operational purposes.

Non-cash contributions are made up of assets transferred to Council from property developers in the form of infrastructure (roads and stormwater etc) where at the completion of the development Council assumes responsibility for maintaining and replacing the infrastructure. The 2012/13 balance of $1.185M included contributed roads and stormwater infrastructure.

Net gain from investment of $0.076M relates to the net increase in assets of the Copping Waste Authority.

The table below graphically presents the level of Council’s main operating revenue streams.

Table 3: Operating Revenue Analysis

User charges relate to the recovery of service delivery costs through the charging for Council’s services and facilities. These include the hire of halls and sporting grounds, Kingborough Sports Centre fees, Family Day Care fees and waste disposal fees.

Statutory fees and fines relate mainly to those levied in accordance with legislative requirements. They include building fees, planning fees, environmental health fees, parking fines and dog registrations and fees.

Operating grants are funds received from both the State and Federal Government for the purpose of delivering Council services.

Other Council revenue comprises reimbursements for government pensioner rates remissions, State Government works contract, private works income and motor tax contribution.

-

5,000

10,000

15,000

20,000

25,000

Rates and Levies User Charges and Statutory Fees

Grants - Operating Other Revenue

$'00

0

Operating Revenue

Actual 2012/13 Budget 2012/13

AN

NU

AL REPO

RT 2012/13

37

4.4 Operating Expenditure

EXPENDITURE TYPEActual

2012/13 $’000

Budget 2012/13

$’000

Variance $’000

Depreciation 6,967 6,655 312

Employee Costs 12,185 11,940 245

Materials and Contracts 10,476 9,921 555

Other Expenses 4,864 3,893 971

Levies to State Government 1,097 1,044 53

Total Operating Expenditure 35,590 33,453 2,137

Table 4: Actual 2012/13 Expenditure compared to Budget

Total operating expenditure for 2012/13 was $2.137M or 6.4% higher than budget.

Depreciation was $0.312M higher than budget due to the amount of capital works completed during the year.

Employee expenses were $0.245M above budget due to new positions in the Community Services area that are funded through grants.

Materials and contracts exceeded budget by $0.555M or 5.6%. This variation relates primarily to the timing of payments for the site rehabilitation at Barretta, $0.603M;payments to consultants for the report into the futureuseof theoldKingstonHighSchoolsite,$0.289M;increasedelectricityandwatercharges,$0.238M;theallocationofworksinprogresscompletedin2012/13 as operating expenditure, $0.770M, offset by the remaining adjustment to the Barretta provision, $1.345M.

Other expenses were over budget by $0.971M primarily due to contributions to community assets, $0.806M.

The table below graphically presents the level of Council’s main operating expenditure streams.

Table 5: Operating Expenditure Analysis

This section analyses the actual expenditure of Council for 2012/13 compared to budget.

-2,000 4,000 6,000 8,000

10,000 12,000 14,000

Depreciation Employee Costs Materials and Contracts

Other Expenses

$'00

0

Operating Expenditure

Actual 2012/13 Budget 2012/13

38

ww

w.k

ingb

orou

gh.ta

s.gov

.au

Cash Flow Statement

This section analyses the cash flows from the operating, investing and financing activities of Council for the 2012/13 year. The cash flow from operating activities is a key factor in determining the level of capital expenditure that can be sustained without using existing cash reserves.

The analysis is based on three main categories of cash flows:

1. OPERATING ACTIVITIES - refers to the cash generated or used in the normal service delivery functions of Council.

2. INVESTING ACTIVITIES - refers to cash generated or used in the enhancement or creation of infrastructure and other assets. These activities also include the acquisition and sale of other assets such as vehicles, property and equipment.

3. FINANCING ACTIVITIES - refers to cash generated or used in the financing of Council functions and include borrowings from financial institutions and loans to other organisations.

4.5 Analysis of Cash Position

STATEMENT OF CASH FLOWS

Year Ended 30 June 2013

Actual 2012/13 Inflows

(Outflows) $’000

Budget 2012/13 Inflows

(Outflows) $’000

Net Cash Flow from Operating Activities 4,029 4,166

Net Cash Flow used in Investing Activities (6,560) (7,503)

Net Cash Flow from Financing Activities 1,398 400

NET (DECREASE)/INCREASE IN CASH HELD (1,133) (2,937)

Cash at the beginning of the year 13,164 10,070

CASH AT THE END OF THE YEAR 12,031 7,133

Table 6: Cash Flow Analysis

Overall cash decreased $1.133M during 2012/13, with operating activities generating cash of $4.029M.

Cash generated from operating activities was less than budget by $0.137M primarily due to the timing of dividend payments from Southern Water.

Cash outflows from investing activities includes proceeds from the sale of assets $0.610M.

Cash generated from financing activities, $1.398M, relates to capital grants which were detailed in section 4.3.

AN

NU

AL REPO

RT 2012/13

39

Statutory reserves are funds that must be used in accordance with legislative and contractual obligations. These funds are not available for any other purpose and include developer deposits.

Carried forward capital funds and discretionary funds are set aside by Council for a specific purpose and unless there is a Council resolution to the contrary these funds should only be used for those purposes.

Other commitments include the net of receivables, payables and GST liability as at 30 June 2013.

The unrestricted cash balance was adversely impacted by the additional spend related to the Barretta rehabilitation of $0.603M, and the increased electricity and water charges $0.238M.

A breakdown of the discretionary reserves is below. At 30 June 2013 the plant and equipment replacement reserve was higher than anticipated due to the deliveries not received prior to 30 June. The administrative reserve included the LGA grant for quarter one and two of 2013/14, $1.017M.

RESTRICTED AND UNRESTRICTED CASH AND INVESTMENTSActual

2012/13 $’000

Budget 2012/13

$’000

Variance $’000

Total Cash at Year End 12,031 7,134 4,897

Restricted Cash and Investments

- Trust Funds and Deposits 1,173 1,000 173

- Carried Forward Capital Funds 4,437 - 4,437

- Specific Purposes and Discretionary Reserves 4,808 2,380 2,428

Unrestricted Cash at Year End 1,613 3,754 (2,141)

Table 7: Cash Balance Analysis

Cash and cash equivalents held by Council are restricted in part and not fully available for Council’s operations. The unrestricted cash balance as at 30 June 2013 is shown in the following table.

RESERVEActual

2012/13 $’000

Budget 2012/13

$’000

Variance $’000

Public Open Space 1,295 1,156 139

Car Parking 46 46 -

Boronia Hill Reserve 11 11 -

Plant Replacement 1,626 964 662

Office Equipment Replacement - 100 (100)

Hall Equipment Replacement - 69 (69)

Sports Centre Equipment Replacement - 82 (82)

Emergency Reserve 155 150 5

Emergency Services Reserve - 2 (2)

Tree Preservation Reserve 293 200 93

Administration Reserve 1,117 100 1,017

Unexpended Specific Purpose Grants 265 - 265

TOTAL 4,808 2,880 1,928

Table 8: Reserve Balances 30 June 2013

40

ww

w.k

ingb

orou

gh.ta

s.gov

.au

Statement of Financial Position

4.6 Analysis of Financial Position

Council has a net worth of $594.574M as at 30 June 2013, a decrease of $0.225M from the previous year. The decrease is primarily due to a revaluation of Council’s infrastructure assets.

In accounting terms, a ‘current’ asset or liability is either an asset that will be fully used, or a liability that will fall due, over the next 12 months.

Current assets as at 30 June 2013 comprised cash and investments of $12.031M and receivables of $1.779M. The investments are with cash management funds or in direct deposits with banking institutions, and are independently rated as being secure investments. The sources of funds which have been invested are incomplete capital works projects, payments received in advance, financial reserves and the cash surplus.

The value of non-current assets as at 30 June 2013 comprised property, infrastructure, plant and equipment, $476.950M, investment in Southern Water, $112.623M and investment in Copping Waste Authority, $0.591M.

Non-current assets decreased $1.170M during 2012/13 primarily due to:

• Revaluation adjustment, $1.022M

• Depreciation, $6.953M

• Disposed assets or assets moved from work in progress to expense, $2.285M

Partly offset by:

• Additions, $8.782M

• Increase in valuation of ownership interests in Southern Water and Copping Waste Authority, $0.323M

Propertyandinfrastructureadditionsincludedroadworks,$3.441M;Stormwaterdrainage,$1.126M;andotherinfrastructure,$2.598M.

Total liabilities as at 30 June 2013 included creditors, $2.043M, the Barretta rehabilitation provision, $2.293M, and employee provisions $2.298M.

STATEMENT OF FINANCIAL POSITION

As at 30 June 2013

Actual 2012/13

$’000

Budget 2012/13

$’000

Total Current Assets 13,825 9,004

Total Non-Current Assets 590,171 573,711

TOTAL ASSETS 603,997 582,715

Total Current Liabilities 7,959 6,188

Total Non-Current Liabilities 1,463 4,557

TOTAL LIABILITIES 9,422 10,745

NET ASSETS 594,574 571,970

TOTAL COMMUNITY EQUITY 594,574 571,970

Table 9: Council’s Underlying Financial Position

AN

NU

AL REPO

RT 2012/13

41

Financial IndicatorsThe following graphs illustrate the key financial indicators for the 2011/12 financial year, the 2012/13 financial year and the 2013/14 budget estimates.

It is important to note that the ratios are only indicators of financial performance and should not be considered in isolation when determining financial sustainability. It is important to consider the ratios over time to consider trends. The results taken together over time indicate good or poor performance.

Underlying Result RatioThe underlying result ratio expresses operating revenue over operating expenditure as a percentage. A result greater than 1.00 indicates a surplus. The larger the surplus, the higher the sustainability rating. A negative result indicates a deficit which cannot be sustained in the long term.

The underlying result ratios are calculated from using revenue from the comprehensive income statement adjusted for capital grants income, developer contributions and any other material one-off (non-recurring) items of revenue.

The underlying result ratio remains slightly below the benchmark of 1.00 despite some improvement over the three year period. This indicates Council is not currently fully funding its depreciation expense.

Table 10: Underlying Performance Trend Analysis

As detailed earlier, Council has adopted a Long Term Financial Plan (LTFP) and a Long Term Asset Management Plan (LTAMP). The LTFP aims to improve Council’s overall financial sustainability into the future.

Self Financing RatioThis is a measure of Council’s ability to fund the replacement of assets from cash generated from operations. The ratio is calculated as the net operating cash flows divided by the total operating revenue. The higher the percentage the more effectively this can be done.

Whilst Council’s percentage over the period has been consistently above 10%, which is considered ‘reasonable’ from a financial sustainability viewpoint, a percentage of 20% is a strong benchmark. As previously mentioned Council has developed a LTFP which will guide it in generating increased cash from operations to fund new assets and asset renewals.

4.7 Key Financial Indicators

Table 11: Self Financing Trend Analysis

0.40

0.50

0.60

0.70

0.80

0.90

1.00

2012 2013 2014

Underlying Result Ratio

0%

5%

10%

15%

20%

2012 2013 2014

Self Financing Ratio

42

ww

w.k

ingb

orou

gh.ta

s.gov

.au

Liquidity RatioThis measures Council’s ability to pay existing liabilities in the next 12 months.

A ratio of more than 1.00 means that there is more cash and other liquid assets than short term liabilities. Cash includes current cash, bank balances and investments less, where possible, cash committed for asset development not already accrued, plus receivables. Liabilities include creditors and accruals and short term debt obligations.

The graph illustrates Council has a strong ongoing liquidity position. The reduction in 2013 represents the additional spending on Barretta rehabilitation during 2012/13 of $0.603M more than the amount collected in revenue specifically for the project.

Investment Gap Ratio and Renewal Gap RatioThe Investment Gap Ratio (light blue bar) indicates whether Council will maintain its physical capital by re-investing in or renewing non-current assets. The ratio is calculated as the ‘total capital spend’ divided by the depreciation expense. A result of greater than one indicates that spending is faster than the overall rate of depreciation. This ratio is well above the 100% benchmark which is consistent with Council’s investment in new assets, including the Twin Ovals and the redeveloped Barretta Waste Transfer Station.

30%

70%

110%

150%

2012 2013 2014

Asset Renewal / Replacement

The Renewal Gap Ratio indicates whether a Council has been maintaining existing assets at a consistent rate. The ratio is calculated as the total renewal and upgrade expenditure divided by the depreciation expense. A result of greater than one indicates that spending on existing assets is greater than the rate of depreciation. This ratio is well below the 100% long term benchmark in 2011/12 and 2012/13 financial years. In 2013/14, with a fully expended capital works program, including carry forwards, the ratio is expected to be above 100%. Council has developed a Long Term Asset Management plan and has funding strategies built into its Long Term Financial Plan.

Presently there are no detrimental impacts to Council infrastructure or the community as a result of a low renewal gap ratio. However if Council fails to act over the next three to five years the risk of poorly maintained infrastructure into the future will increase.

Table 13: Asset Renewal/Replacement Trend Analysis

Table 12: Liquidity Trend Analysis

-

0.50

1.00

1.50

2.00

2012 2013 2014

Liquidity Ratio

AN

NU

AL REPO

RT 2012/13

43

APPENDIX I: Abridged Annual Financial Report

KINGBOROUGH

COUNCILCOUNCIL

ABRIDGED ANNUAL FINANCIAL REPORT

For the Year Ended 30 June 2013

44

ww

w.k

ingb

orou

gh.ta

s.gov

.au

2 August 2013

Paul WestGeneral Manager

In my opinion, the information reported in this abridged financial report is consistent with the full annual financial report from which it is derived.

Statement of the General Manager

A complete copy of the financial report for the year ended 30 June 2013 is available from Kingborough Council's website at www.kingborough.tas.gov.au or from Customer Services located at the Civic Centre, 15 Channel Highway, Kingston.

AN

NU

AL REPO

RT 2012/13

45

Actual Budget Actual2013 2013 2012$'000 $'000 $'000

IncomeRecurrent IncomeRates and fire levies 20,732      20,500         19,771        Statutory fees and fines 1,113         1,250            1,203           User fees 1,877         1,898            1,815           Grants ‐ operating 3,992         3,528            4,175           Contributions ‐ cash 247            210               468              Interest 621            540               827              Other income 3,183         1,828            1,904           Investment revenue from Water Corporation 1,200         1,210            1,213           

32,965      30,964         31,375        

Capital IncomeCapital grants received specifically for new or upgraded assets 1,398         400               923              Contributions ‐ non‐monetary assets 1,185         ‐                2,323           Net gain/(loss) on disposal of property, infrastructure, plant andequipment

485              ‐                (2)                  

Share of net profits/(losses) of investment in associate 76              ‐                ‐               

Total income 36,109      31,364         34,619        

ExpensesEmployee benefits (12,185)     (11,940)        (11,077)       Materials and services (10,476)     (9,921)          (10,707)       Depreciation and amortisation (6,967)       (6,655)          (6,724)         Other expenses (4,864)       (3,893)          (4,626)         Levies to State Government (1,097)       (1,044)          (1,014)         

Total expenses  (35,590)     (33,453)        (34,147)       

Surplus / (deficit)  519            (2,089)          472              

Other comprehensive incomeItems that will not be reclassified to surplus or deficitFair value adjustment to investment in Southern Water 247            ‐                ‐               

Net asset revaluation increment (decrement) (1,022)         ‐                (19,250)        

Comprehensive result (256)             (2,089)          (18,777)        

Statement of Comprehensive Income

For the Year Ended 30 June 2013

46

ww

w.k

ingb

orou

gh.ta

s.gov

.au

2013 2012

$'000 $'000

Assets

Current assets

Cash and cash equivalents 12,031 13,164

Trade and other receivables 1,779 1,294

Other assets 15 18

Total current assets 13,825 14,475

Non-current assets

Investment in associates 591 255

Investment in water corporation 112,623 112,376

Property, infrastructure, plant and equipment 476,950 478,690

Intangible assets 7 20

Total non-current assets 590,171 591,341

Total assets 603,997 605,816

Liabilities

Current liabilities

Trade and other payables 3,658 2,729

Trust funds and deposits 1,173 1,310

Provisions 3,128 2,366

Total current liabilities 7,959 6,405

Non-current liabilities

Provisions 1,463 4,612

Total non-current liabilities 1,463 4,612

Total liabilities 9,422 11,017

Net Assets 594,574 594,799

Equity

Accumulated surplus 244,878 244,811

Reserves 349,697 349,988

Total Equity 594,574 594,799

As at 30 June 2013Statement of Financial Position

AN

NU

AL REPO

RT 2012/13

47

AssetAccumulated Revaluation Fair Value Other

Total Surplus Reserve Reserve Reserves2013 2013 2013 2013 2013

2013 $'000 $'000 $'000 $'000 $'000

Balance at beginning of the financial year 594,799         244,811         340,581         646                   8,761             

Surplus / (deficit) for the year 519                 519                 ‐                   ‐                    ‐                 Adjustment for prior year building assets ‐                  ‐                  ‐                   ‐                    ‐                 Other Comprehensive Income: ‐                  ‐                  ‐                   ‐                    ‐                 

Net asset revaluation increment(decrement) (1,022)            ‐                  (1,022)            ‐                    ‐                 Fair value adjustment to investment in Southern Water 247                 ‐                  ‐                   247                   ‐                 

Transfers between reserves and accumulated surplus 31                   (453)                ‐                   ‐                    484                Balance at the end of the financial year 594,574         244,878         339,559         893                   9,244             

AssetAccumulated Revaluation Fair Value Other

Total Surplus Reserve Reserve Reserves2012 2012 2012 2012 2012

2012 $'000 $'000 $'000 $'000 $'000

Balance at beginning of the financial year 609,800         240,633         359,831         646                   8,690             

Surplus / (deficit) for the year 472                 472                 ‐                   ‐                    ‐                 Adjustment for prior year building assets 3,777              3,777              ‐                   ‐                    ‐                 Other Comprehensive Income: ‐                  ‐                  ‐                   ‐                    ‐                 

Net asset revaluation increment(decrement) (19,250)          ‐                  (19,250)          ‐                    ‐                 Fair value initial adjustment to investment in Southern Water ‐                  ‐                  ‐                   ‐                    ‐                 

Transfer to accumulated surplus (0)                    (71)                  ‐                   ‐                    71                  Balance at the end of the financial year 594,799         244,811         340,581         646                   8,761             

For the Year Ended 30 June 2013Statement of Changes in Equity

48

ww

w.k

ingb

orou

gh.ta

s.gov

.au

2013 2012Inflows/ Inflows/

(Outflows) (Outflows)$'000 $'000

Cash flows from operating activitiesRates and fire levies 20,632 19,681 Statutory fees and fines 1,401 1,739 User fees 1,877 1,815 Grants 3,992 4,175 Developer contributions 247 468 Other cash inflows, incl. reimbursements 1,807 1,890 Dividend revenue from Southern Water 1,008 1,213 Interest 621 827 Payments to suppliers (14,739) (15,966) Payments to employees (11,720) (10,903) Payments to Government (1,097) (1,014) Net cash provided by (used in) operating activities 4,029 3,925

Cash flows from investing activitiesProceeds from sale of property, infrastructure, plant and equipment 610 214 Payment for investment in Copping Waste Authority (260) - Payments for property, infrastructure, plant and equipment (6,910) (7,003) Net cash provided by (used in) investing activities (6,560) (6,789)

Cash flows from financing activities (Advances) repayments for community organisation loans - (335) Capital grants 1,398 923 Net cash provided by (used in) financing activities 1,398 588

Net increase (decrease) in cash and cash equivalents (1,133) (2,276) Cash and cash equivalents at the beginning of the financial year 13,164 15,440

Cash and cash equivalents at the end of the financial year 12,031 13,164

Statement of Cash FlowsFor the Year Ended 30 June 2013

AN

NU

AL REPO

RT 2012/13

49

Publ

icCo

mm

unit

yRe

crea

tion

Oth

er20

13A

dmin

istr

atio

nTr

ansp

ort

Serv

ices

Am

enit

ies

& C

ultu

reH

ealt

hW

elfa

reN

ot A

ttri

bute

d To

tal

$'00

0$'

000

$'00

0$'

000

$'00

0$'

000

$'00

0$'

000

$'00

0RE

VEN

UES

Ra

tes

& L

evie

s0

01,14

71,60

70

00

17,978

20,7

32

Gra

nts

& S

ubsi

dies

038

80

01,01

00

2,02

81,96

45,

390

O

ther

072

244

1,94

81,35

825

674

6,03

59,

987

To

tal

046

01,

391

3,55

52,

368

256

2,10

225

,977

36,1

09

EXPE

NSE

S6,

440

10,0

821,

487

4,57

15,

354

585

2,65

74,

414

35,5

90

Net

Res

ult

(6,4

40)

(9,6

22)

(96)

(1,0

16)

(2,9

86)

(329

)(5

55)

21,5

6351

9

ASS

ETS

5,96

932

2,49

187

59,3

5576

,377

05,

455

134,

263

603,

997

Publ

icCo

mm

unit

yRe

crea

tion

Oth

er20

12A

dmin

istr

atio

nTr

ansp

ort

Serv

ices

Am

enit

ies

& C

ultu

reH

ealt

hW

elfa

reN

ot A

ttri

bute

dTo

tal

$'00

0$'

000

$'00

0$'

000

$'00

0$'

000

$'00

0$'

000

$'00

0RE

VEN

UES

Ra

tes

& L

evie

s0

01,01

41,49

00

00

17,267

19,7

71

Gra

nts

& S

ubsi

dies

038

70

053

60

1,74

92,42

65,

098

O

ther

015

427

268

61,42

412

417

56,91

59,

750

To

tal

054

11,

286

2,17

61,

960

124

1,92

426

,608

34,6

19

EXPE

NSE

S5,

591

8,68

91,

406

6,52

55,

815

428

2,62

73,

065

34,1

46

Net

Res

ult

(5,5

91)

(8,1

48)

(120

)(4

,349

)(3

,855

)(3

04)

(703

)23

,543

473

ASS

ETS

6,09

132

3,76

487

60,3

4075

,807

05,

455

134,

272

605,

816

Func

tion

s/A

ctiv

itie

s of

the

Cou

ncil

For

the

Year

End

ed 3

0 Ju

ne 2

013

50

ww

w.k

ingb

orou

gh.ta

s.gov

.au

AN

NU

AL REPO

RT 2012/13

51

APPENDIX II: Performance Manager

Pag

e 1

of 3

2

Goo

d

Des

crip

tion

Freq

.U

OM

Targ

etA

ctua

lSt

atus

Targ

etA

ctua

lSt

atus

Com

men

t

Dep

uty

Gen

eral

Man

ager

4.2.

3.1

Fund

and

sup

port

the

Huo

n Tr

ail m

arke

ting

prog

ram

and

pr

ovid

e su

ffici

ent a

nd s

uita

ble

tour

ism

infr

astr

uctu

re (e

g m

arin

e an

d fo

resh

ore

faci

litie

s, to

ilets

, par

king

, pic

nic

area

s,

Qua

rter

ly%

100

100

100

100

Huo

n Tr

ail p

rogr

am fu

lly fu

nded

and

all

nece

ssar

y su

ppor

t pro

vide

d.

4.4.

2.1

Carr

y ou

t reg

ular

revi

ews

of th

e KC

A M

aste

r Pla

n an

d th

e Ki

ngst

on s

truc

ture

pla

n w

ithin

the

mun

icip

al a

rea'

s se

ttle

men

t st

rate

gy.

Qua

rter

ly%

100

100

100

100

Dra

ft L

and

Use

Str

ateg

y co

mpl

eted

whi

ch in

clud

es a

ll st

ruct

ure

plan

s fo

r mai

n to

wns

.

4.4.

3.1

Iden

tify

the

appr

opria

te d

evel

opm

ent o

ppor

tuni

ties

that

be

st m

eet t

he o

bjec

tives

of t

he K

CA M

aste

r pla

n an

d ne

gotia

te

with

Sta

te G

over

nmen

t and

the

priv

ate

deve

lopm

ent s

ecto

r ac

cord

ingl

y.

Qua

rter

ly%

100

100

100

100

Com

plet

ion

of K

HS

poje

ct in

clud

ed id

entif

icat

ion

of

deve

lopm

ent o

port

uniti

es w

ithin

cen

tral

Kin

gsto

n.

4.4.

4.1

Prep

are

a de

velo

pmen

t pla

n fo

r the

form

er K

ings

ton

Hig

h Sc

hool

site

, suc

h th

at it

com

plem

ents

the

futu

re s

usta

inab

le

deve

lopm

ent o

f the

Kin

gsto

n Ce

ntra

l Are

a

Qua

rter

ly%

100

100

100

100

Dev

elop

men

t Pla

n fo

r KH

S fu

lly c

ompl

eted

.

5.1.

3.1

Supp

ort s

ervi

ce p

rovi

ders

(Met

ro a

nd p

rivat

e co

mpa

nies

) to

dev

elop

pub

lic in

form

atio

n pr

ogra

ms

to in

crea

se a

war

enes

s of

the

avai

labl

e se

rvic

es.

Qua

rter

ly%

100

100

100

100

Ong

oing

liai

son

occu

rrin

g w

ith M

etro

.

5.1.

4.1

Supp

ort l

ocal

em

ploy

ers,

if re

quire

d, to

dev

elop

ince

ntiv

e op

tions

for e

mpl

oyee

use

of s

hare

d ve

hicl

e tr

ansp

ort t

o an

d fr

om th

eir p

lace

of e

mpl

oym

ent.

Qua

rter

ly%

100

010

00

No

prog

ress

mad

e - n

ot p

art o

f Cou

ncil'

s co

re b

usin

ess.

5.1.

5.1

Supp

ort s

ervi

ce p

rovi

ders

(Met

ro a

nd p

rivat

e co

mpa

nies

if

requ

ired)

to d

eter

min

e a

need

s ba

sed

appr

oach

to th

e ex

pans

ion

of e

xist

ing

serv

ices

to m

eet t

he c

urre

nt a

nd fu

ture

gr

owth

nee

ds o

f the

Qua

rter

ly%

100

100

100

100

Ong

oing

liai

son

occu

rrin

g w

ith M

etro

.

5.2.

2.2

Supp

ort D

IER

in a

ny fu

ture

inve

stig

atio

ns o

f the

via

bilit

y of

a 'C

iti L

ink'

type

bus

ser

vice

bet

wee

n m

ajor

cen

tres

.Q

uart

erly

%10

040

100

40O

nly

part

ly p

rogr

esse

d - n

ot C

ounc

il's

busi

ness

and

lim

ited

reso

urce

s av

aila

ble

to e

ngag

e w

ith D

IER

on th

is

issu

e.5.

5.1.

1 Su

ppor

t DIE

R an

d ex

istin

g w

ater

bas

ed s

ervi

ce p

rovi

ders

, as

requ

ired,

to id

entif

y th

e fe

asib

ility

of a

ltern

ativ

e w

ater

bas

ed

tran

spor

t sol

utio

ns.

Qua

rter

ly%

100

100

100

100

Ong

oing

liai

son

occu

rrin

g an

d ST

CA p

roje

ct

supp

orte

d.

5.5.

3.2

Liai

se w

ith D

IER,

Cro

wn

Land

Ser

vice

s, M

etro

and

priv

ate

serv

ice

prov

ider

s to

inve

stig

ate

incr

ease

d se

rvic

es to

sup

port

a

park

and

ride

faci

lity,

and

to p

lan

futu

re in

fras

truc

ture

de

velo

pmen

t

Qua

rter

ly%

100

100

100

100

Ong

oing

liai

son

with

DIE

R an

d M

etro

.

4.5.

2.1

Purs

ue o

ppor

tuni

ties

for l

ocal

farm

ers

mar

kets

, the

val

ue

addi

ng o

f loc

al a

gric

ultu

ral p

rodu

cts

and

the

tour

ism

pro

mot

ion

of lo

cal f

ood

(e.g

. foo

d tr

ails

).

Qua

rter

ly%

100

100

100

100

Com

plet

ed a

s pa

rt o

f the

ong

oing

Huo

n Tr

ail

impl

emen

tatio

n.

Str

ateg

ic A

ctio

n Re

port

King

boro

ugh

Coun

cil

Att

enti

on R

equi

red

On

Targ

et

For t

he y

ear e

ndin

g 30

/06/

2013

Resu

ltYT

D R

esul

t

52

ww

w.k

ingb

orou

gh.ta

s.gov

.au

Pag

e 2

of 3

2

Goo

d

Des

crip

tion

Freq

.U

OM

Targ

etA

ctua

lSt

atus

Targ

etA

ctua

lSt

atus

Com

men

t

Str

ateg

ic A

ctio

n Re

port

King

boro

ugh

Coun

cil

Att

enti

on R

equi

red

On

Targ

et

For t

he y

ear e

ndin

g 30

/06/

2013

Resu

ltYT

D R

esul

t

Com

mun

ity

and

Recr

eati

onal

Ser

vice

s3.

1.1.

1 A

dvoc

ate

for t

he p

rovi

sion

of h

ealth

pro

mot

ions

and

se

rvic

es th

roug

h a

rang

e of

initi

ativ

es.

Qua

rter

ly%

100

100

100

100

Adv

ocac

y fo

r hea

lth s

ervi

ces

is a

n on

goin

g pr

iorit

y pa

rtic

ular

ly fo

r you

th a

nd s

enio

rs, a

nd is

sup

port

ed

thro

ugh

the

Posi

tive

Age

ing

Plan

and

You

th S

ervi

ces.

3.1.

1.2

Cont

inue

to p

rovi

de C

ounc

il re

pres

enta

tion

on th

e Br

uny

Isla

nd H

ealth

Adv

isor

y Co

mm

ittee

.Q

uart

erly

%10

00

100

0Co

unci

l par

ticip

atio

n on

this

Com

mitt

ee is

no

long

er

rele

vant

.3.

1.1.

3 Id

entif

y op

port

uniti

es to

wor

k in

par

tner

ship

with

the

com

mun

ity to

pro

vide

act

iviti

es a

nd p

rogr

ams

that

enc

oura

ge a

he

alth

y lif

esty

le.

Qua

rter

ly%

100

100

100

100

Part

ners

hips

dev

elop

ed fo

r the

del

iver

y of

pro

gram

s fo

r you

th, s

enio

rs a

nd th

e ge

nera

l com

mun

ity v

ia th

e Ki

ngbo

roug

h Sp

orts

Cen

tre.

3.1.

1.4

Cont

inue

to p

rovi

de C

ounc

il re

pres

enta

tion

and

supp

ort

initi

ativ

es o

f the

Pre

mie

r's P

hysi

cal A

ctiv

ity C

ounc

il's

Loca

l G

over

nmen

t Sub

com

mitt

ee.

Qua

rter

ly%

100

010

00

Com

mitt

ee h

as b

een

disb

ande

d.

3.1.

2.2

Dev

elop

app

ropr

iate

indi

cato

rs fo

r com

mun

ity h

ealth

and

qu

ality

of l

ife a

nd u

se th

ese

to d

rive

impr

ovem

ent

Qua

rter

ly%

100

100

100

100

Com

mun

ity h

ealth

figu

res

for K

ingb

orou

gh o

btai

ned

and

used

for g

rant

app

licat

ions

.3.

1.2.

3 Es

tabl

ish

linka

ges

betw

een

qual

ity o

f life

mea

sure

s an

d Co

unci

l's p

lann

ing

and

prog

ram

s.Q

uart

erly

%10

010

010

010

0Pr

ogra

m p

lann

ing

is li

nked

to q

ualit

y of

life

mea

sure

s.

3.2.

1.2

Enga

ge w

ith a

bro

ad ra

nge

of c

omm

unity

par

tner

s, in

clud

ing

othe

r lev

els

of G

over

nmen

t, to

fost

er c

omm

unity

st

reng

ths

and

build

com

mun

ity c

apac

ity

Qua

rter

ly%

100

100

100

100

Enga

gem

ent w

ith a

rang

e of

com

mun

ity g

roup

s, N

GO

's an

d go

vern

men

t age

ncie

s oc

curs

on

an

ongo

ing

basi

s.3.

2.2.

2 Im

plem

ent a

ctio

ns a

s id

entif

ied

in th

e Ki

ngbo

roug

h Po

sitiv

e A

gein

g St

rate

gy, Y

outh

Pol

icy,

Rec

reat

ion

Plan

and

Tr

acks

& T

rails

Str

ateg

y an

d th

e A

rts

& C

ultu

ral S

trat

egy.

Qua

rter

ly%

100

100

100

100

Impl

emen

tatio

n of

str

ateg

ies

occu

rs o

n an

ong

oing

ba

sis.

3.2.

4.1

Supp

ort t

he o

ngoi

ng o

pera

tion

of th

e Yo

uth

Act

ion

Net

wor

k of

Kin

gbor

ough

and

its

ende

avou

rs to

add

ress

issu

es

such

as

hom

eles

snes

s an

d cr

isis

acc

omm

odat

ion

Qua

rter

ly%

100

100

100

100

Adm

inis

trat

ive

supp

ort i

s pr

ovid

ed to

sup

port

the

oper

atio

ns o

f YA

NK

as o

utlin

ed in

Cou

ncil'

s Yo

uth

Stra

tegy

and

ass

ocia

ted

polic

y.3.

2.4.

2 Co

ntin

ue to

sup

port

the

oper

atio

ns o

f the

Kin

gbor

ough

Fa

mily

Day

Car

e Se

rvic

e an

d M

anor

Gar

dens

Res

pite

Cen

tre

Qua

rter

ly%

100

100

100

100

Supp

ort p

rovi

ded

to u

nder

pin

the

oper

atio

ns o

f the

Ki

ngbo

roug

h Fa

mily

Day

Car

e Sc

hem

e an

d M

anor

G

arde

ns R

espi

te C

entr

e in

201

2/13

.3.

2.4.

3 Pr

omot

e pr

ogra

ms

that

reco

gnis

e an

d va

lue

cont

ribut

ions

from

the

aged

and

peo

ple

with

dis

abili

ties

Qua

rter

ly%

100

100

100

100

Cont

ribut

ions

of t

he a

ged

and

peop

le w

ith a

dis

abili

ty

are

prom

oted

thro

ugh

the

King

boro

ugh

Posi

tive

Age

ing

Plan

and

initi

ativ

es o

f the

Acc

ess

Adv

isor

y Co

mm

ittee

.3.

2.7.

1 Pr

ovid

e an

ann

ual g

rant

s pr

ogra

m to

ass

ist t

he

deve

lopm

ent a

nd o

pera

tion

of p

roje

cts,

prog

ram

s an

d ac

tiviti

esQ

uart

erly

%10

010

010

010

0Co

mm

unity

Gra

nt P

rogr

am p

rovi

ded

in 2

012/

13.

3.2.

7.2

Prov

ide

appr

opria

te re

cogn

ition

for t

he w

ork

of

volu

ntee

rs in

the

com

mun

ity th

roug

h th

e an

nual

Aus

tral

ia D

ay

Aw

ards

pro

gram

and

Vol

unte

er R

ecog

nitio

n ev

ents

Qua

rter

ly%

100

100

100

100

Aus

tral

ia D

ay A

war

ds E

vent

con

duct

ed in

201

3.

AN

NU

AL REPO

RT 2012/13

53

Pag

e 3

of 3

2

Goo

d

Des

crip

tion

Freq

.U

OM

Targ

etA

ctua

lSt

atus

Targ

etA

ctua

lSt

atus

Com

men

t

Str

ateg

ic A

ctio

n Re

port

King

boro

ugh

Coun

cil

Att

enti

on R

equi

red

On

Targ

et

For t

he y

ear e

ndin

g 30

/06/

2013

Resu

ltYT

D R

esul

t

3.2.

7.3

Prov

ide

info

rmat

ion

and

assi

stan

ce to

com

mun

ity g

roup

s on

how

to a

cces

s ex

tern

al g

rant

opp

ortu

nitie

sQ

uart

erly

%10

010

010

010

0St

aff a

ssis

tanc

e of

fere

d to

com

mun

ity g

roup

s on

how

to

acc

ess

gran

ts a

nd p

repa

re a

pplic

atio

ns.

3.3.

1.1

Cont

inue

to d

evel

op a

nd im

plem

ent C

ounc

il's

Emer

genc

y M

anag

emen

t Pla

n an

d Co

mm

unity

Rec

over

y Pl

anQ

uart

erly

%10

010

010

010

0Pl

ans

are

revi

ewed

and

upd

ated

on

an o

ngoi

ng b

asis

.

3.3.

1.2

Dev

elop

a K

ingb

orou

gh E

nviro

nmen

tal H

ealth

Em

erge

ncy

Man

agem

ent S

ub-P

lan

and

inco

rpor

ate

its

oper

atio

nal r

equi

rem

ents

into

the

King

boro

ugh

Emer

genc

y M

anag

emen

t Pla

n.

Qua

rter

ly%

100

100

100

100

A K

ingb

orou

gh E

mer

genc

y M

anag

emen

t Pla

n ha

s be

en d

evel

oped

.

3.3.

1.3

Cont

inue

to d

evel

op a

nd v

alid

ate

Coun

cil's

Flu

Clin

ic

Ope

ratio

ns S

ub-P

lan

for i

nflu

enza

pan

dem

ic m

anag

emen

tQ

uart

erly

%10

010

010

010

0In

corp

orat

ed a

s pa

rt o

f Em

erge

ncy

Man

agem

ent

Plan

ning

.3.

3.1.

5 Co

-ord

inat

e an

Em

erge

ncy

Man

agem

ent C

omm

ittee

and

fa

cilit

ate

activ

ities

to e

nsur

e Co

unci

l rea

dine

ss fo

r em

erge

ncy

situ

atio

ns.

Qua

rter

ly%

100

100

100

100

Emer

genc

y M

anag

emen

t Com

mitt

ee m

eets

on

a re

gula

r bas

is a

nd u

nder

take

s em

erge

ncy

resp

onse

ex

erci

ses.

3.3.

2.2

Revi

ew a

nd c

ontr

ibut

e to

com

preh

ensi

ve e

mer

genc

y m

anag

emen

t pla

ns, i

n co

llabo

ratio

n w

ith o

ther

s, fo

r the

m

unic

ipal

are

a.

Qua

rter

ly%

100

100

100

100

The

Emer

genc

y M

anag

emen

t Pla

n is

sub

ject

to

ongo

ing

revi

ew a

nd te

stin

g in

col

labo

ratio

n w

ith

stak

ehol

ders

.3.

3.2.

3 Pa

rtic

ipat

e on

the

Polic

e an

d Co

mm

unity

Lia

ison

Gro

up.

Qua

rter

ly%

100

100

100

100

Coun

cillo

rs a

nd s

taff

part

icip

ate

on th

e Ki

ngbo

roug

h Po

lice

and

Com

mun

ity L

iais

on G

roup

.3.

3.5.

1 W

ork

with

Pol

ice

and

com

mun

ity g

roup

s to

iden

tify

and

impl

emen

t com

mun

ity s

afet

y pr

ogra

ms

appr

opria

te fo

r the

Ki

ngbo

roug

h m

unic

ipal

are

a.

Qua

rter

ly%

100

100

100

100

3.3.

5.2

Part

icip

ate

on th

e Ki

ngbo

roug

h In

tera

genc

y Su

ppor

t Pa

nel a

nd a

ssis

t in

the

iden

tific

atio

n of

inte

rven

tion

oppo

rtun

ities

to a

ssis

t "at

risk

" you

ng p

eopl

e.

Hal

f Yea

rly%

100

100

100

100

Coun

cil's

You

th O

utre

ach

Offi

cer p

artic

ipat

es o

n th

is

pane

l.

3.4.

1.1

Prov

ide

a ne

twor

k of

com

mun

ity fa

cilit

ies

that

are

with

in

easy

reac

h of

peo

ple

Qua

rter

ly%

100

100

100

100

Coun

cil p

rovi

des

a ne

twor

k of

hal

ls, p

layg

roun

ds,

rese

rves

and

spo

rtin

g fa

cilit

ies

thro

ugho

ut th

e M

unic

ipal

Are

a an

d co

ntin

ually

revi

ews

thei

r ap

prop

riate

ness

.3.

4.1.

2 Pr

omot

e m

ulti-

func

tiona

l ven

ues,

faci

litie

s an

d sp

ace

suita

ble

for a

div

erse

rang

e of

eve

nts

and

activ

ities

for a

ll ag

es

and

cultu

res

Qua

rter

ly%

100

100

100

100

Faci

litie

s ar

e pr

omot

ed v

ia C

ounc

il's

web

site

, med

ia

rele

ases

and

sho

wca

se e

vent

s.

3.4.

2.2

Iden

tify

oppo

rtun

ities

to w

ork

in p

artn

ersh

ip w

ith th

e co

mm

unity

to im

prov

e re

crea

tiona

l ser

vice

s an

d ac

tiviti

esQ

uart

erly

%10

010

010

010

0Co

unci

l par

tner

s w

ith a

rang

e of

com

mun

ity a

nd

spor

ting

grou

ps to

del

iver

eve

nts

and

proj

ects

.3.

4.2.

3 Pr

ovid

e a

rang

e of

recr

eatio

nal a

ctiv

ities

and

ser

vice

s th

at

mee

t the

reas

onab

le n

eeds

of t

he c

omm

unity

.Q

uart

erly

%10

010

010

010

0A

ctiv

ities

pro

vide

d th

roug

h th

e Ki

ngbo

roug

h Sp

orts

Ce

ntre

, with

recr

eatio

nal f

acili

ties

prov

ided

th

roug

hout

the

Mun

icip

al a

rea.

3.4.

2.4

Div

ersi

fy a

nd in

crea

se u

tilis

atio

n of

spo

rt a

nd re

crea

tion

faci

litie

s.Q

uart

erly

%10

010

010

010

0D

iver

sific

atio

n of

use

of s

port

ing

faci

litie

s is

an

unde

rlyin

g pr

inci

ple

of b

oth

the

Spor

t and

Rec

reat

ion

Stra

tegy

and

the

Spor

tsgr

ound

Use

r Pol

icy.

54

ww

w.k

ingb

orou

gh.ta

s.gov

.au

Pag

e 4

of 3

2

Goo

d

Des

crip

tion

Freq

.U

OM

Targ

etA

ctua

lSt

atus

Targ

etA

ctua

lSt

atus

Com

men

t

Str

ateg

ic A

ctio

n Re

port

King

boro

ugh

Coun

cil

Att

enti

on R

equi

red

On

Targ

et

For t

he y

ear e

ndin

g 30

/06/

2013

Resu

ltYT

D R

esul

t

3.4.

3.2

Faci

litat

e op

en c

omm

unic

atio

n an

d co

llabo

ratio

n w

ith a

ra

nge

of s

take

hold

er g

roup

s w

ith re

spec

t to

thei

r rec

reat

iona

l an

d le

isur

e ne

eds

Qua

rter

ly%

100

100

100

100

Inte

ract

ion

with

spo

rtin

g cl

ubs

occu

rs o

n a

regu

lar

basi

s th

roug

h bo

th fo

rmal

and

info

rmal

cha

nnel

s.

3.4.

3.3

Impl

emem

nt th

e on

goin

g ob

ject

ives

of t

he S

port

s Co

mpl

ex M

aste

r Pla

nQ

uart

erly

%0

100

010

0Pr

ogre

ssed

on

an o

ngoi

ng b

asis

in a

ccor

danc

e w

ith

fund

ing

oppo

rtun

ities

.3.

4.4.

2 Pr

ovid

e an

d pr

omot

e ap

prop

riate

spo

rt, r

ecre

atio

n an

d le

isur

e fa

cilit

ies

and

prog

ram

s to

mee

t the

cha

ngin

g ne

eds

of

the

com

mun

ity.

Qua

rter

ly%

100

100

100

100

Prog

ress

ed th

roug

h th

e Ki

ngbo

roug

h Sp

ort a

nd

Recr

eatio

n Pl

an.

3.4.

4.3

Ass

ist i

n pr

ovid

ing

and

impr

ovin

g re

crea

tiona

l fac

ilitie

s an

d pr

ogra

ms

and

enco

urag

e in

crea

sed

part

icip

atio

n in

st

ruct

ured

, inf

orm

al a

nd p

assi

ve re

crea

tion.

Qua

rter

ly%

100

100

100

100

Faci

lity

deve

lopm

ent a

nd im

prov

emen

ts h

ave

been

ad

dres

sed

thro

ugh

the

King

boro

ugh

Spor

t and

Re

crea

tion

Plan

.3.

4.4.

4 D

evel

op m

ulti-

use

faci

litie

s w

ithin

the

mun

icip

al a

rea

by

prov

idin

g fa

cilit

ies

and

prog

ram

s th

at a

re s

afe

and

acce

ssib

le fo

r pe

ople

of a

ll ag

es a

nd a

bilit

ies.

Qua

rter

ly%

100

100

100

100

The

mul

tiple

use

of f

acili

tes

is p

rom

oted

as

a po

licy

prin

cipl

e w

ithin

the

Spor

t and

Rec

reat

ion

Stra

tegy

.

3.4.

5.1

Reco

gnis

e ed

ucat

ion

as a

n in

tegr

al c

ompo

nent

of

com

mun

ity d

evel

opm

ent a

nd in

corp

orat

e w

ithin

rele

vant

st

rate

gies

.

Qua

rter

ly%

100

100

100

100

The

impo

rtan

ce o

f edu

catio

n is

reco

gnis

ed in

a

num

ber o

f str

ateg

ies

and

inco

rpor

ated

into

pro

gram

de

velo

pmen

t.3.

4.5.

2 Pr

omot

e an

d en

cour

age

the

prin

cipl

e of

life

long

lear

ning

w

ithin

the

com

mun

ity.

Qua

rter

ly%

100

100

100

100

Prin

cipl

e of

life

long

lear

ning

is p

rom

oted

thro

ugh

the

Posi

tive

Age

ing

Plan

and

the

King

ston

Bea

ch D

igita

l H

ub.

3.4.

5.3

Wor

k in

par

tner

ship

with

gov

ernm

ent a

nd n

on-

gove

rnm

ent a

genc

ies

on p

rogr

ams

to s

uppo

rt y

oung

peo

ple

to

rem

ain

with

in th

e ed

ucat

ion

syst

em.

Qua

rter

ly%

100

100

100

100

Alte

rnat

e ed

ucat

ion

prog

ram

s of

fere

d th

roug

h ys

pace

an

d U

rban

Art

s Pr

ojec

t.

3.4.

5.4

Adv

ocat

e fo

r edu

catio

nal a

nd tr

aini

ng p

rovi

ders

to

esta

blis

h ac

cess

ible

edu

catio

n pr

ogra

ms

in K

ingb

orou

gh.

Qua

rter

ly%

100

100

100

100

Adv

ocac

y fo

r loc

al e

duca

tion

optio

ns o

ccur

s on

an

ongo

ing

basi

s. D

irect

pro

visi

on o

f tra

inin

g pr

ovid

ed a

t ys

pace

and

the

Dig

ital H

ub.

3.5.

1.2

Esta

blis

h an

Art

s an

d Cu

ltura

l Adv

isor

y Co

mm

ittee

to

assi

st w

ith th

e de

velo

pmen

t and

impl

emen

tatio

n of

the

stra

tegy

.Q

uart

erly

%10

010

010

010

0Co

mm

ittee

est

ablis

hed

and

subs

eque

nlty

dis

band

ed

to b

e re

plac

ed b

y th

e Ki

ngbo

roug

h A

rts

Task

forc

e.

3.5.

1.3

Faci

litat

e ac

cess

to C

ounc

il ow

ned

faci

litie

s fo

r use

by

even

t org

anis

ers.

Qua

rter

ly%

100

100

100

100

Ass

ista

nce

prov

ided

to e

vent

org

anis

ers

on a

vaila

ble

faci

litie

s an

d is

sues

ass

ocia

ted

with

thei

r use

for

com

mun

ity e

vent

s.3.

5.1.

4 Id

entif

y im

prov

emen

ts to

faci

litie

s to

sup

port

the

cond

uct

of a

rts

and

cultu

ral a

ctiv

ities

.Q

uart

erly

%10

010

010

010

0Fa

cilit

y im

prov

emen

ts id

entif

ied

in th

e A

rts

and

Cultu

ral D

evel

opm

ent S

trat

egy

and

impl

emen

ted

on

and

ongo

ing

basi

s.3.

5.2.

1 Pr

ovid

e as

sist

ance

to o

rgan

isat

ions

invo

lved

in th

e pr

omot

ion

of K

ingb

orou

gh’s

cultu

ral h

erita

ge.

Qua

rter

ly%

100

100

100

100

Supp

ort p

rovi

ded

to a

rang

e of

com

mun

ity g

roup

s th

at h

ave

an in

volv

emen

t in

prom

otin

g th

e he

ritag

e of

th

e ar

ea.

AN

NU

AL REPO

RT 2012/13

55

Pag

e 5

of 3

2

Goo

d

Des

crip

tion

Freq

.U

OM

Targ

etA

ctua

lSt

atus

Targ

etA

ctua

lSt

atus

Com

men

t

Str

ateg

ic A

ctio

n Re

port

King

boro

ugh

Coun

cil

Att

enti

on R

equi

red

On

Targ

et

For t

he y

ear e

ndin

g 30

/06/

2013

Resu

ltYT

D R

esul

t

3.5.

3.1

Act

ivel

y su

ppor

t a w

ide

rang

e of

art

istic

and

cre

ativ

e en

deav

ours

, com

mun

ity in

itiat

ives

and

bui

ld p

artn

ersh

ips

with

re

leva

nt c

omm

unity

gro

ups.

Qua

rter

ly%

100

100

100

100

Prog

ress

ed th

roug

h th

e im

plem

enta

tion

of th

e A

rts

and

Cultu

ral D

evel

opm

ent S

trat

egy.

3.5.

3.2

Ensu

re a

cces

s to

faci

litie

s is

acc

essi

ble

and

equi

tabl

e fo

r al

l mem

bers

of t

he c

omm

unity

.Q

uart

erly

%10

010

010

010

0A

dvic

e so

ught

on

acce

ss is

sues

from

Acc

ess

Adv

isor

y Co

mm

ittee

3.5.

4.1

Seek

par

ticip

atio

n fr

om a

wid

e ra

nge

of c

omm

unity

gr

oups

in e

vent

s an

d ac

tiviti

es c

ondu

cted

or f

acili

tate

d by

Co

unci

l.

Qua

rter

ly%

100

100

100

100

Com

mun

ity g

roup

s in

vite

d to

par

ticip

ate

in C

ounc

il ev

ents

suc

h as

Lov

e Li

ving

Loc

ally

, the

Kin

gsto

n Be

ach

Lant

ern

Para

de a

nd Y

outh

Wee

k.3.

5.4.

3 M

aint

ain

netw

orks

and

cur

rent

con

tact

s fo

r com

mun

ity

grou

ps a

nd o

rgan

isat

ions

.Q

uart

erly

%10

010

010

010

0Cu

rren

t con

tact

s an

d re

gula

r com

mun

icat

ion

mai

ntai

ned.

4.4.

5.1

Fina

lise

and

impl

emen

t the

Kin

gbor

ough

Spo

rts

Com

plex

M

aste

r Pla

nQ

uart

erly

%0

100

010

0M

aste

rpla

n an

d si

gnag

e st

rate

gy c

ompl

ete.

Sig

nage

im

plem

ente

d as

par

t of c

arpa

rk, l

ight

ing

and

pede

stria

n w

alkw

ay u

pgra

de.

5.3.

1.1

Dev

elop

a s

erie

s of

wal

king

map

s th

at id

entif

y m

ajor

se

rvic

es, r

etai

l cen

tres

ser

vice

s an

d th

e w

alkw

ay li

nks

betw

een

them

.

Qua

rter

ly%

100

100

100

100

Ong

oing

wor

k co

nduc

ted

both

inho

use

and

thro

ugh

exte

rnal

con

sulta

nt to

iden

tify

and

map

link

ages

.

Com

mun

ity

& R

ecre

atio

nal S

ervi

ces

& A

sset

Man

agem

ent

3.4.

1.3

Crea

te a

rolli

ng p

acka

ge o

f str

ateg

ies

for u

pgra

de o

f Co

unci

l pub

lic fa

cilit

ies

(pla

ygro

unds

, pub

lic to

ilets

, com

mun

ity

halls

, mar

ine

stru

ctur

es, s

port

ing

grou

nds

and

faci

litie

s).

Qua

rter

ly%

100

100

100

100

Dev

elop

men

t and

impl

emen

tatio

n of

str

ateg

ies

occu

rs

on a

n on

goin

g ba

sis.

Com

mun

ity

Serv

ices

1.1.

1.2

Supp

ort t

he o

pera

tions

and

act

iviti

es o

f Cou

ncil

initi

ated

Sp

ecia

l and

Adv

isor

y Co

mm

ittee

s.Q

uart

erly

%10

010

010

010

0O

ngoi

ng s

uppo

rt p

rovi

ded.

1.6.

2.1

Dev

elop

app

ropr

iate

str

ateg

ies

for e

ffect

ive

publ

ic

cons

ulta

tion

proc

esse

s th

roug

h th

e Co

mm

unity

Par

ticip

atio

n an

d Co

mm

unic

atio

n St

rate

gies

, Act

ions

1.1

.1.4

and

1.2

.1.3

Qua

rter

ly%

100

100

100

100

Com

mun

ity c

onsu

latio

n to

olki

t dev

elop

ed th

at

incl

udes

par

ticip

atio

n an

d co

mm

unic

atio

n st

rate

gies

.

Dev

elop

men

t Ser

vice

s2.

1.1.

3 In

vest

igat

e th

e in

corp

orat

ion

of in

form

atio

n re

latin

g to

de

velo

pmen

t con

stra

ints

from

clim

ate

chan

ge ri

sks

on 3

37

cert

ifica

tes.

Qua

rter

ly%

100

100

100

100

This

info

rmat

ion

is in

clud

ed w

hen

rele

vant

and

ther

e is

an

ongo

ing

mon

itorin

g of

oth

er o

ppor

tuni

ties

to

impr

ove

the

notif

icat

ion

syst

em.

2.1.

4.1

Inco

rpor

ate

clim

ate

chan

ge p

rovi

sion

s as

par

t of t

he

deve

lopm

ent o

f the

new

Kin

gbor

ough

Pla

nnin

g Sc

hem

e.Q

uart

erly

%10

010

010

010

0Cl

imat

e ch

ange

rela

ted

issu

es a

re b

eing

add

ress

ed a

s pa

rt o

f the

dev

elop

men

t of t

he n

ew p

lann

ing

sche

me.

2.4.

4.1

Und

erta

ke a

revi

ew o

f the

Kin

gbor

ough

Pla

nnin

g Sc

hem

e in

resp

ect t

o co

asta

l dev

elop

men

t con

trol

s.Q

uart

erly

%10

010

010

010

0Co

asta

l con

trol

s ar

e in

corp

orat

ed a

s pa

rt o

f the

new

dr

aft p

lann

ing

sche

me.

56

ww

w.k

ingb

orou

gh.ta

s.gov

.au

Pag

e 6

of 3

2

Goo

d

Des

crip

tion

Freq

.U

OM

Targ

etA

ctua

lSt

atus

Targ

etA

ctua

lSt

atus

Com

men

t

Str

ateg

ic A

ctio

n Re

port

King

boro

ugh

Coun

cil

Att

enti

on R

equi

red

On

Targ

et

For t

he y

ear e

ndin

g 30

/06/

2013

Resu

ltYT

D R

esul

t

2.6.

2.2

Esta

blis

h a

com

plia

nce

syst

em to

aud

it an

d en

forc

e de

velo

pmen

t per

mit

cond

ition

s.Q

uart

erly

%10

010

010

010

0Cu

rren

t sys

tem

is o

pera

ting

satis

fact

orily

with

in

spec

toria

l sta

ff (in

clud

ing

plan

ners

) mon

itorin

g pe

rmit

cond

ition

s. C

ounc

il's

Com

plia

nce

staf

f ass

ist

occa

sion

ally

.2.

7.3.

1 D

evel

op a

nd im

plem

ent t

he g

reen

spa

ces

man

agem

ent

stra

tegy

.Q

uart

erly

%0

500

50Pl

anni

ng O

ffice

r and

Rec

reat

iona

l Pla

nner

mee

t re

gula

rly to

pro

gres

s th

is p

roje

ct b

ut it

stil

l has

som

e to

go

bef

ore

com

plet

ion.

2.7.

4.1

Und

erta

ke a

revi

ew o

f the

Kin

gbor

ough

Pla

nnin

g Sc

hem

e gr

een

spac

e pr

ovis

ions

incl

udin

g co

nsid

erin

g co

nsis

tenc

y w

ith

regi

onal

sta

ndar

ds.

Qua

rter

ly%

100

100

100

100

This

issu

e ha

s be

en a

ddre

ssed

as

part

of t

he

deve

lopm

ent o

f the

new

pla

nnin

g sc

hem

e.

2.9.

3.1

Und

erta

ke a

revi

ew o

f the

wee

d m

anag

emen

t pro

visi

ons

in th

e Ki

ngbo

roug

h Pl

anni

ng S

chem

e.Q

uart

erly

%10

010

010

010

0Th

is is

sue

has

been

add

ress

ed a

s pa

rt o

f the

de

velo

pmen

t of t

he n

ew p

lann

ing

sche

me.

3.4.

1.4

Dev

elop

and

impl

emen

t a P

ublic

Ope

n Sp

ace

Mas

ter P

lan

ensu

ring

that

ther

e ar

e ap

prop

riate

link

ages

for t

he s

trat

egic

us

age

of C

ounc

il fa

cilit

ies

and

venu

es.

Qua

rter

ly%

100

5010

050

The

Plan

ning

Offi

cer a

nd R

ecre

atio

nal P

lann

er m

eet

regu

larly

to p

rogr

ess

this

pro

ject

but

ther

e is

stil

l som

e w

ay to

go

befo

re c

ompl

etio

n.3.

4.4.

1 Id

entif

y ba

rrie

rs to

par

ticip

atio

n in

recr

eatio

nal a

ctiv

ities

an

d pu

t in

plac

e m

easu

res

to a

llevi

ate

and

redu

ce th

ese.

Qua

rter

ly%

100

100

100

100

Ong

oing

mon

itorin

g of

this

issu

e is

occ

urrin

g.

3.5.

2.2

Iden

tify,

pro

tect

and

pro

vide

inte

rpre

tatio

n of

Cou

ncil

owne

d or

man

aged

faci

litie

s of

his

toric

al s

igni

fican

ce.

Qua

rter

ly%

100

5010

050

A g

reat

dea

l of w

ork

has

been

don

e on

the

deve

lopm

ent o

f a lo

cal h

erita

ge li

st fo

r the

new

pl

anni

ng s

chem

e. F

urth

er w

ork

will

be

nece

ssar

y to

ta

ke th

is li

st a

nd o

ther

sou

rce

mat

eria

l for

war

d an

d th

en d

evel

op in

terp

retiv

e m

ater

ial f

or p

ublic

vie

win

g.

4.1.

2.1

In c

olla

bora

tion

with

the

Tasm

ania

n Pl

anni

ng

Com

mis

sion

and

loca

l gov

ernm

ent i

n so

uthe

rn T

asm

ania

to

prep

are

a ne

w p

lann

ing

sche

me

- and

sub

sequ

ently

revi

ew a

nd

upda

te th

e pl

anni

ng s

chem

e.

Qua

rter

ly%

100

100

100

100

Goo

d pr

ogre

ss h

as b

een

mad

e in

pre

parin

g th

e ne

w

sche

me

in c

onju

nctio

n w

ith th

e Co

mm

issi

on a

nd

othe

r Cou

ncils

.

4.1.

3.1

Dev

elop

a c

omm

unity

con

sulta

tion

polic

y/pr

ogra

m th

at

prov

ides

ong

oing

opp

ortu

nitie

s to

obt

ain

com

men

t on

the

sett

lem

ent s

trat

egy,

new

pla

nnin

g sc

hem

e, s

ubse

quen

t rev

iew

s of

the

plan

ning

sch

eme

Qua

rter

ly%

100

100

100

100

A c

ompr

ehen

sive

con

sulta

tion

prog

ram

was

follo

wed

as

par

t of t

he p

repa

ratio

n of

the

new

sch

eme.

4.1.

4.1

Util

ise

the

Path

way

sof

twar

e to

the

max

imum

ext

ent

with

in C

ounc

il to

ens

ure

all s

tatu

tory

requ

irem

ents

are

met

- an

d th

at s

taff

are

appr

opria

tely

trai

ned

and

qual

ified

to c

arry

out

Qua

rter

ly%

100

100

100

100

Ong

oing

func

tion

and

proc

eedi

ng v

ery

succ

essf

ully

.

4.1.

5.1

Esta

blis

h a

coor

dina

ted

pack

age

of in

tern

al c

ompl

ianc

e sy

stem

s th

at id

entif

y ill

egal

dev

elop

men

ts, p

rovi

de p

ublic

in

form

atio

n, m

onito

r exi

stin

g pe

rmits

and

pur

sue

pote

ntia

l pr

osec

utio

ns.

Qua

rter

ly%

100

100

100

100

Ong

oing

func

tion

with

mat

eria

l bei

ng p

rodu

ced

as

nece

ssar

y.

AN

NU

AL REPO

RT 2012/13

57

Pag

e 7

of 3

2

Goo

d

Des

crip

tion

Freq

.U

OM

Targ

etA

ctua

lSt

atus

Targ

etA

ctua

lSt

atus

Com

men

t

Str

ateg

ic A

ctio

n Re

port

King

boro

ugh

Coun

cil

Att

enti

on R

equi

red

On

Targ

et

For t

he y

ear e

ndin

g 30

/06/

2013

Resu

ltYT

D R

esul

t

4.2.

1.1

Iden

tify

the

best

loca

tions

for f

utur

e in

dust

rial

deve

lopm

ent a

nd e

nsur

e th

at th

e pl

anni

ng s

chem

e pr

ovid

es fo

r su

ffici

ent a

nd s

uita

bly

zone

d la

nd, t

oget

her w

ith a

ssoc

iate

d pu

blic

Qua

rter

ly%

100

100

100

100

Ach

ieve

d as

par

t of t

he n

ew p

lann

ing

sche

me,

plu

s th

e pr

epar

atio

n of

a re

gion

al in

dust

rial s

trat

egy

that

lo

oked

at K

ingb

orou

gh n

eeds

and

opp

ortu

nitie

s fo

r in

dust

rial l

and.

4.3.

1.1

Cons

ult w

ith lo

cal c

omm

uniti

es to

iden

tify

loca

l val

ues

and

the

desi

red

futu

re c

hara

cter

of l

ocal

tow

nshi

ps.

Qua

rter

ly%

100

100

100

100

This

was

ach

ieve

d as

par

t of t

he c

onsu

ltatio

n fo

r the

ne

w p

lann

ing

sche

me.

4.3.

2.1

Prep

are

stru

ctur

e or

pre

cinc

t pla

ns fo

r eac

h to

wns

hip

(with

in a

bro

ader

set

tlem

ent s

trat

egy

for t

he m

unic

ipal

are

a)

that

indi

cate

futu

re d

evel

opm

ent d

irect

ions

and

the

need

for

loca

l

Qua

rter

ly%

100

100

100

100

Stru

ctur

e pl

ans

for a

ll se

ttle

men

ts a

re in

clud

ed in

the

King

boro

ugh

Land

Use

Str

ateg

y.

4.3.

4.1

Enco

urag

e, a

nd w

here

app

ropr

iate

, req

uire

the

cons

truc

tion

of b

uild

ings

that

take

into

acc

ount

her

itage

co

nser

vatio

n, p

ublic

saf

ety,

ene

rgy

effic

ienc

y, w

ater

re-u

se a

nd

aest

hetic

am

enity

.

Qua

rter

ly%

100

100

100

100

Ong

oing

func

tion

for s

taff

- bot

h pl

anni

ng a

nd

build

ing.

4.4.

1.1

Am

end

the

King

boro

ugh

plan

ning

sch

eme

to e

nsur

e th

e ef

fect

ive

regu

latio

n of

futu

re d

evel

opm

ent w

ithin

the

KCA

.Q

uart

erly

%10

010

010

010

0Th

is h

as b

een

achi

eved

as

part

of t

he n

ew p

lann

ing

sche

me.

4.4.

2.1

Carr

y ou

t reg

ular

revi

ews

of th

e KC

A M

aste

r Pla

n an

d th

e Ki

ngst

on s

truc

ture

pla

n w

ithin

the

mun

icip

al a

rea'

s se

ttle

men

t st

rate

gy.

Qua

rter

ly%

100

100

100

100

This

has

bee

n ac

hiev

ed a

s pa

rt o

f the

Kin

gbor

ough

La

nd U

se S

trat

egy.

4.5.

1.1

Ensu

re th

at th

e Ki

ngbo

roug

h pl

anni

ng s

chem

e pr

ovid

es

for t

he c

ontin

ued

agric

ultu

ral o

ppor

tuni

ties

to o

ccur

on

good

ag

ricul

tura

l lan

d an

d th

e po

tent

ial f

ette

ring

from

adj

oini

ng

urba

n

Qua

rter

ly%

100

100

100

100

This

has

bee

n co

nsid

ered

as

part

of t

he n

ew p

lann

ing

sche

me.

4.5.

4.1

Mak

e pu

blic

ly a

vaila

ble

all r

elev

ant n

atur

al re

sour

ce

man

agem

ent d

ata

and

utili

se th

is in

form

atio

n in

bot

h pr

oact

ive

plan

ning

str

ateg

ies

and

whe

n as

sess

ing

deve

lopm

ent p

ropo

sals

.

Qua

rter

ly%

010

00

100

This

info

rmat

ion

is b

eing

incl

uded

on

Coun

cil's

GIS

sy

stem

as

it be

com

es a

vaila

ble

(or o

n an

y ot

her

appr

opria

te fo

rm) a

nd th

en p

rovi

ded

to th

e pu

blic

up

on re

ques

t.4.

6.2.

1 En

sure

that

set

tlem

ent s

trat

egie

s id

entif

y fu

ture

po

pula

tion

and

busi

ness

nee

ds a

nd s

ubse

quen

tly, t

he

King

boro

ugh

plan

ning

sch

eme

prov

ides

for a

dequ

ate

land

for

futu

re d

evel

opm

ent a

nd

Qua

rter

ly%

100

100

100

100

This

has

bee

n ac

hiev

ed a

s pa

rt o

f the

Kin

gbor

ough

La

nd U

se S

trat

egy.

5.2.

1.1

Supp

ort s

ervi

ce p

rovi

ders

in d

eter

min

ing

the

high

prio

rity

site

s fo

r pub

lic tr

ansp

ort f

acili

ties.

Qua

rter

ly%

100

100

100

100

Ong

oing

liai

son

is o

ccur

ring

as n

eces

sary

.

5.4.

2.1

Ensu

re a

cces

sibl

e an

d su

ffici

ent p

arki

ng is

ava

ilabl

e at

key

po

ints

and

clo

se to

com

mun

ity n

eeds

.Q

uart

erly

%10

010

010

010

0O

ngoi

ng a

ctio

n is

take

n in

this

rega

rd a

nd a

s ne

cess

ary.

58

ww

w.k

ingb

orou

gh.ta

s.gov

.au

Pag

e 8

of 3

2

Goo

d

Des

crip

tion

Freq

.U

OM

Targ

etA

ctua

lSt

atus

Targ

etA

ctua

lSt

atus

Com

men

t

Str

ateg

ic A

ctio

n Re

port

King

boro

ugh

Coun

cil

Att

enti

on R

equi

red

On

Targ

et

For t

he y

ear e

ndin

g 30

/06/

2013

Resu

ltYT

D R

esul

t

Envi

ronm

enta

l Ser

vice

s2.

1.1.

4 Pr

ovid

e up

date

s on

clim

ate

chan

ge m

atte

rs o

n Co

unci

l's

web

site

.Q

uart

erly

%10

010

010

010

0W

ebsi

te u

p to

dat

e.

2.1.

2.1

Prog

ress

impl

emen

tatio

n of

CCE

AP

corp

orat

e em

issi

ons

redu

ctio

n ac

tions

tow

ards

ach

ievi

ng e

mis

sion

redu

ctio

n ta

rget

s.Q

uart

erly

%10

050

100

50In

vent

ory

met

hod

need

dev

elop

men

t.

2.1.

2.2

Trac

k pr

ogre

ss to

war

ds e

mis

sion

redu

ctio

n ta

rget

s.Q

uart

erly

%0

750

75M

ore

atte

ntio

n to

inve

ntor

ies

requ

ired.

2.1.

2.3

Eval

uate

pro

gres

s re

gard

ing

emis

sion

redu

ctio

n ta

rget

s an

d se

t rev

ised

targ

ets.

Qua

rter

ly%

100

5010

050

No

prog

ress

tow

ards

set

ting

revi

sed

targ

ets.

2.1.

3.1

Prog

ress

impl

emen

tatio

n of

CCE

AP

Act

ion

12.0

- Co

mm

unity

and

Ene

rgy

Gre

enho

use

Com

mitm

ent.

Qua

rter

ly%

100

7510

075

Som

e pr

ogre

ss m

ade

on lo

cal p

roje

cts.

2.2.

1.1

Dev

elop

a C

limat

e Ch

ange

Ada

ptat

ion

Plan

.Q

uart

erly

%10

075

100

75Tr

igge

rs fo

r Cha

nge

proj

ect o

n sc

hedu

le.

2.2.

1.2

Impl

emen

t Clim

ate

Chan

ge A

dapt

atio

n Re

spon

se

Stra

tegy

.Q

uart

erly

%10

075

100

75Tr

igge

rs fo

r Cha

nge

proj

ect o

n sc

hedu

le.

2.3.

1.1

Com

mis

sion

and

/or p

artic

ipat

e in

a s

erie

s of

clim

ate

chan

ge s

tudi

es (p

rimar

ily re

late

d to

sea

leve

l ris

e an

d st

orm

su

rge)

to b

ette

r inf

orm

Cou

ncil

on p

ossi

ble

futu

re h

azar

ds a

nd

risks

Qua

rter

ly%

100

9010

090

Fina

l Coa

stal

Vul

nera

bilit

y re

port

stil

l to

be re

ceiv

ed.

2.3.

1.2

Dev

elop

and

ado

pt a

risk

man

agem

ent r

espo

nse

stra

tegy

.Q

uart

erly

%10

010

010

010

0Co

mm

unity

Res

ilien

ce P

roje

ct c

omm

ence

d.

2.1.

1.1

Prog

ress

impl

emen

tatio

n of

Clim

ate

Chan

ge a

nd E

nerg

y A

ctio

n Pl

an 2

009

- 201

2 (C

CEA

P) A

ctio

n 9.

0 - C

limat

e Co

mm

unic

atio

ns.

Qua

rter

ly%

100

7510

075

Trig

gers

for C

hang

e pr

ojec

t on

trac

k.

2.3.

3.2

Dev

elop

and

impl

emen

t a b

ushl

and

man

agem

ent

stra

tegy

for C

ounc

il pr

oper

ties

Qua

rter

ly%

100

5010

050

Map

ping

and

eva

luat

ion

prog

ress

ing

slow

ly.

2.4.

2.1

Impl

emen

t pro

gram

s to

enh

ance

the

heal

th o

f Ki

ngbo

roug

h’s

coas

tal a

nd m

arin

e ha

bita

ts a

nd w

ater

way

s.Q

uart

erly

%10

010

010

010

0Br

owns

Riv

er m

onito

ring

and

Der

wen

t Est

uary

Pr

ogra

m o

ccur

ring.

2.4.

2.2

Prep

are

a St

ate

of th

e D

’Ent

reca

stea

ux C

hann

el re

port

..Q

uart

erly

%10

010

010

010

0Re

port

pre

pare

d an

d re

leas

ed. F

urth

er s

tate

dat

a to

be

inco

rpor

ated

.2.

4.2.

3 A

pply

for f

undi

ng p

rogr

ams

as th

ey c

ome

avai

labl

e to

as

sist

in D

'Ent

reca

stea

ux p

rogr

ams..

Qua

rter

ly%

100

100

100

100

Maj

or a

pplic

atio

n su

bmitt

ed b

ut u

nsuc

cess

ful.

2.4.

3.1

Faci

litat

e a

D'E

ntre

cast

eaux

Cha

nnel

wor

king

gro

up w

ith

com

mun

ity, i

ndus

try

and

inte

r-go

vern

men

tal p

artic

ipan

ts.

Qua

rter

ly%

100

100

100

100

Proj

ect c

ontin

ues

succ

essf

ully

.

2.5.

1.1

Und

erta

ke a

ctio

ns to

enh

ance

the

heal

th o

f Ki

ngbo

roug

h's

bush

land

are

as a

nd w

ildlif

e ha

bita

tsQ

uart

erly

%10

010

010

010

0Ke

y N

RM p

roje

cts

bein

g pr

ogre

ssed

.

2.5.

2.1

Act

ivel

y su

ppor

t com

mun

ity b

ased

bus

hlan

d ca

re g

roup

sQ

uart

erly

%10

010

010

010

0O

ngoi

ng s

uppo

rt p

rovi

ded.

2.5.

3.1

Part

icip

ate

and

be a

n ac

tive

part

ner i

n st

rate

gic

NRM

So

uth

prog

ram

s, in

clud

ing

Mou

ntai

n to

Mar

ine.

Qua

rter

ly%

100

100

100

100

Ong

oing

rela

tions

hip

cont

inue

d.

AN

NU

AL REPO

RT 2012/13

59

Pag

e 9

of 3

2

Goo

d

Des

crip

tion

Freq

.U

OM

Targ

etA

ctua

lSt

atus

Targ

etA

ctua

lSt

atus

Com

men

t

Str

ateg

ic A

ctio

n Re

port

King

boro

ugh

Coun

cil

Att

enti

on R

equi

red

On

Targ

et

For t

he y

ear e

ndin

g 30

/06/

2013

Resu

ltYT

D R

esul

t

2.5.

3.2

Revi

se a

nd im

prov

e th

e us

e an

d im

plem

enta

tion

of

vege

tatio

n of

fset

mec

hani

sms.

Qua

rter

ly%

100

100

100

100

Gui

delin

es d

evel

oped

and

ado

pted

.

2.5.

3.3

Seek

opp

ortu

nitie

s fo

r ass

ista

nce

with

nat

ural

are

a ne

twor

k pr

ogra

m d

evel

opm

ent a

nd im

plem

enta

tion.

Qua

rter

ly%

100

7510

075

Som

e w

ork

cont

inue

s bu

t inc

reas

ed re

sour

cing

re

quire

d.2.

5.4.

1 Pr

ovid

e bo

th s

trat

egic

and

tech

nica

l NRM

inpu

t int

o th

e de

velo

pmen

t app

rova

l pro

cess

Qua

rter

ly%

100

100

100

100

Det

aile

d as

sess

men

ts a

nd in

put p

rovi

ded.

2.5.

5.3

Seek

opp

ortu

nitie

s fo

r ass

ista

nce

with

the

prog

ram

de

velo

pmen

t and

impl

emen

tatio

n.Q

uart

erly

%10

075

100

75So

me

map

ping

occ

urrin

g.

2.5.

6.1

Prov

ide

both

str

ateg

ic a

nd te

chni

cal N

RM in

put i

nto

the

deve

lopm

ent a

ppro

val p

roce

ss.

Qua

rter

ly%

100

100

100

100

Det

aile

d as

sess

men

ts a

nd in

put p

rovi

ded.

2.6.

1.1

Impl

emen

t the

pro

visi

ons

of th

e St

ate

Stor

mw

ater

Pol

icy

whe

n ap

prov

ed.

Qua

rter

ly%

100

5010

050

Stra

tegi

c st

orm

wat

er m

anag

emen

t ina

daqu

atel

y re

sour

ced

curr

ently

.2.

6.1.

2 Co

ntin

ue p

roje

cts

unde

r the

Kin

gsto

n In

tegr

ated

St

orm

wat

er S

trat

egy.

Qua

rter

ly%

100

8010

080

King

ston

Byp

ass

Wet

land

s pr

ogre

ssin

g.

2.6.

1.3

Part

icip

ate

in th

e D

erw

ent E

stua

ry P

rogr

am S

torm

wat

er

Task

forc

e an

d st

orm

wat

er m

onito

ring

prog

ram

.Q

uart

erly

%10

010

010

010

0O

ngon

g pa

rtic

ipat

ion

occu

rrin

g.

2.6.

1.4

Obt

ain

exte

rnal

fund

ing

to a

ssis

t in

wat

er m

anag

emen

t pr

ogra

ms

as th

ey b

ecom

e av

aila

ble.

Qua

rter

ly%

100

100

100

100

Onl

y lim

ited

oppo

rtun

ities

.

2.6.

2.2

Esta

blis

h a

com

plia

nce

syst

em to

aud

it an

d en

forc

e de

velo

pmen

t per

mit

cond

ition

s.Q

uart

erly

%10

010

100

10Tr

ial u

nder

take

n by

Com

plia

nce

but n

ot c

ontin

ued.

2.6.

3.1

Und

erta

ke a

ctio

ns s

peci

fied

in re

vise

d St

ate

of

Envi

ronm

ent R

epor

t.Q

uart

erly

%10

00

100

0SO

E pr

oces

s no

long

er u

tilis

ed.

2.6.

3.1

Upd

ate

and

impl

emen

t the

Nor

th W

est B

ay R

iver

Ca

tchm

ent M

anag

emen

t Pla

n.Q

uart

erly

%10

050

100

50Pl

an re

view

com

mis

sion

ed.

2.6.

3.2

Impl

emen

t the

Whi

tew

ater

Cre

ek M

anag

emen

t Pla

n.Q

uart

erly

%10

010

010

010

0Pr

iorit

y si

tes

addr

esse

d.2.

6.3.

3 Fu

rthe

r dev

elop

the

Brow

ns R

iver

Cat

chm

ent

Man

agem

ent P

lan.

Qua

rter

ly%

100

2510

025

Back

grou

nd m

onito

ring

bein

g un

dert

aken

and

repo

rt

pres

ente

d to

Cou

ncil.

2.9.

1.1

Impl

emen

t prio

rity

actio

ns id

entif

ied

in s

trat

egy.

Qua

rter

ly%

100

100

100

100

Und

erta

ken

ongo

jng.

2.9.

1.2

Und

erta

ke a

revi

ew o

f str

ateg

y an

d im

plem

ent r

evis

ed

prio

rity

actio

ns.

Qua

rter

ly%

100

100

100

100

Revi

ew c

ompl

eted

.

2.9.

2.1

Impl

emen

t prio

rity

actio

ns id

entif

ied

in s

trat

egy.

Qua

rter

ly%

100

100

100

100

Und

erta

ken

ongo

ing.

2.9.

4.1

Prov

ide

supp

ort a

nd u

p to

dat

e in

form

atio

n on

wee

d m

anag

emen

t to

the

com

mun

ity.

Qua

rter

ly%

100

8010

080

Goo

d su

ppor

t but

web

site

nee

ds fi

nalis

atio

n.

2.9.

6.1

Act

ivel

y pa

rtic

ipat

e in

com

mun

ity b

ased

cat

con

trol

in

itiat

ives

.Q

uart

erly

%10

010

010

010

0Pr

ogra

m b

eing

impl

emen

ted

by P

roje

ct O

ffice

r.

2.9.

6.2

Prov

ide

supp

ort a

nd u

p to

dat

e in

form

atio

n on

fera

l an

imal

man

agem

ent t

o th

e co

mm

unity

.Q

uart

erly

%10

010

010

010

0Pr

ovid

ed a

s re

ceiv

ed.

2.9.

6.3

Und

erta

ke a

revi

ew o

f the

Sta

te o

f Env

ironm

ent R

epor

t to

refle

ct o

n th

e im

port

ance

of t

he fe

ral a

nim

al is

sue.

Qua

rter

ly%

100

010

00

Stat

e of

Env

ironm

ent p

roce

ss n

o lo

nger

util

ised

.

60

ww

w.k

ingb

orou

gh.ta

s.gov

.au

Pag

e 10

of 3

2

Goo

d

Des

crip

tion

Freq

.U

OM

Targ

etA

ctua

lSt

atus

Targ

etA

ctua

lSt

atus

Com

men

t

Str

ateg

ic A

ctio

n Re

port

King

boro

ugh

Coun

cil

Att

enti

on R

equi

red

On

Targ

et

For t

he y

ear e

ndin

g 30

/06/

2013

Resu

ltYT

D R

esul

t

3.1.

2.4

Und

erta

ke a

targ

eted

food

sur

veill

ance

and

food

bus

ines

s au

ditin

g pr

ogra

m a

nd re

port

out

com

es to

food

bus

ines

s pr

oprie

tors

, the

pub

lic a

nd C

ounc

il.

Qua

rter

ly%

100

100

100

100

Stru

ctur

ed p

rogr

am c

ontin

ues.

3.1.

3.1

Coor

dina

te a

nd im

plem

ent i

mm

unis

atio

n pr

ogra

ms

for

the

com

mun

ity in

acc

orda

nce

with

the

Nat

iona

l Hea

lth a

nd

Med

ical

Res

earc

h Co

unci

l Im

mun

isat

ion

Sche

dule

.

Qua

rter

ly%

100

100

100

100

Prog

ram

s co

ntin

ue.

3.1.

3.2

Incl

ude

the

publ

ic h

ealth

impa

cts

of c

limat

e ch

ange

in

the

clim

ate

chan

ge a

dapt

atio

n st

rate

gy.

Qua

rter

ly%

100

4010

040

Back

grou

nd in

form

atio

n be

ing

accu

mul

ated

for

Trig

gers

for C

hang

e pr

ojec

t.

Com

plia

nce

3.3.

3.1

Cont

inue

to d

eliv

er p

rofe

ssio

nal a

nim

al m

anag

emen

t se

rvic

es a

nd c

ondu

ct p

ublic

aw

aren

ess/

educ

atio

n pr

ogra

ms

that

in

form

the

com

mun

ity a

bout

ani

mal

con

trol

.

Qua

rter

ly%

100

100

100

100

Serv

ice

prov

ided

and

repo

rted

to C

ounc

il.

3.3.

3.2

Impl

emen

t an

annu

al fi

re h

azar

d ab

atem

ent p

rogr

am th

at

educ

ates

and

pro

tect

s re

side

nts

and

prop

erty

ow

ners

from

the

pote

ntia

l im

pact

of w

ildfir

e.

Qua

rter

ly%

100

100

100

100

Und

erta

ken

as re

sour

cing

allo

ws.

Gen

eral

Man

ager

/Gov

erna

nce

1.1.

3.1

In c

onju

nctio

n w

ith th

e de

velo

pmen

t of A

ctio

n 1.

2.1.

3 Co

mm

unic

atio

n St

rate

gy a

nd A

ctio

n 1.

1.1.

4 Co

mm

unity

Pa

rtic

ipat

ion

Stra

tegy

, im

plem

ent a

n aw

aren

ess

cam

paig

n to

in

crea

se p

artic

ipat

ion

Qua

rter

ly%

00

00

The

Min

iste

r for

Loc

al G

over

nmen

t ann

ounc

ed d

urin

g th

e ye

ar th

at th

e 20

13 e

lect

ion

for C

ounc

illor

s w

ould

be

pos

tpon

ed u

ntil

Oct

ober

201

4. T

he n

ew e

lect

ion

date

will

coi

ncid

e w

ith th

e in

trod

uctio

n of

'all-

in a

ll-ou

t' el

ectio

ns fo

r Cou

ncill

ors,

May

ors

and

Dep

uty

May

ors.

The

Cou

ncill

or n

umbe

rs fo

r Kin

gbor

oguh

will

al

so b

e re

duce

d fr

om th

e cu

rren

t 12

to 1

0 at

the

next

el

ectio

n. A

n in

form

atio

n pr

ogra

m w

ill b

e co

nsid

ered

pr

ior t

o th

e 20

14 e

lect

ion.

1.3.

1.1

Act

ivel

y pa

rtic

ipat

e in

the

Sout

hern

Tas

man

ian

Coun

cils

A

utho

rity

and

supp

ort t

he d

evel

opm

ent a

nd im

plem

enta

tion

of

regi

onal

str

ateg

ies,

incl

udin

g re

gion

al p

lann

ing

and

deve

lopm

ent,

Qua

rter

ly%

100

100

100

100

Coun

cil c

ontin

ued

durin

g th

e ye

ar to

act

ivel

y pa

rtic

ipat

e in

the

activ

ities

of t

he S

TCA

.

1.3.

1.2

Act

ivel

y su

ppor

t the

Loc

al G

over

nmen

t Ass

ocia

tion

of

Tasm

ania

and

the

com

mitm

ent t

o th

e St

atew

ide

Part

ners

hip

Agr

eem

ent o

n Co

mm

unic

atio

n an

d Co

nsul

tatio

n w

ith th

e St

ate

Gov

ernm

ent.

Qua

rter

ly%

100

100

100

100

Coun

cil c

ontin

uted

to a

ctiv

ely

part

icip

ate

in th

e ac

tiviit

es o

f the

LG

AT

durin

g th

e ye

ar.

AN

NU

AL REPO

RT 2012/13

61

Pag

e 11

of 3

2

Goo

d

Des

crip

tion

Freq

.U

OM

Targ

etA

ctua

lSt

atus

Targ

etA

ctua

lSt

atus

Com

men

t

Str

ateg

ic A

ctio

n Re

port

King

boro

ugh

Coun

cil

Att

enti

on R

equi

red

On

Targ

et

For t

he y

ear e

ndin

g 30

/06/

2013

Resu

ltYT

D R

esul

t

1.3.

2.1

Expl

ore

oppo

rtun

ities

for r

esou

rce

shar

ing

with

oth

er

Coun

cils

and

oth

er re

leva

nt o

rgan

isat

ions

on

key

stra

tegi

c in

itiat

ives

.

Qua

rter

ly%

100

5010

050

Coun

cil c

ontin

ues

to u

nder

take

som

e lim

ited

reso

urce

sh

arin

g op

port

uniti

es o

ther

cou

ncils

. In

Apr

il 20

13

Coun

cil r

esol

ved

to in

vite

repr

esen

tativ

es o

f the

Huo

n Va

lley

Coun

cil t

o m

eet w

ith K

ingb

orou

gh C

ounc

il to

di

scus

s is

sues

of c

omm

on in

tere

st to

bot

h co

unci

ls,

rang

ing

from

sha

red

serv

ices

to th

e po

ssib

ility

of a

m

erge

r bet

wee

n th

e tw

o co

unci

ls a

t som

e fu

ture

tim

e.

In Ju

ne 2

013

the

May

or o

f Huo

n Va

lley

advi

sed

Coun

cil

that

unt

il su

ch ti

me

as a

new

Gen

eral

Man

ager

had

be

en a

ppoi

nted

to th

at C

ounc

il th

ey w

ould

not

be

in a

po

sitio

n to

con

side

r Kin

gbor

ough

's re

ques

t.

1.3.

3.1

Act

ivel

y re

sear

ch a

nd d

evel

op o

ppor

tuni

ties

for i

nitia

ting

join

t pro

ject

s an

d ob

tain

ing

exte

rnal

gra

nts

for p

rogr

ams

of

com

mun

ity b

enef

it.

Qua

rter

ly%

100

100

100

100

A n

umbe

r of g

rant

app

licat

ions

wer

e su

cces

sful

dur

ing

the

year

. A

pplic

atio

ns w

ere

subm

itted

for f

undi

ng

whe

n ap

prop

riate

with

a re

ason

able

leve

l of s

ucce

ss

bein

g ac

hiev

ed.

1.3.

3.2

Dev

elop

and

mai

ntai

n st

rong

net

wor

ks a

nd

com

mun

icat

ion

chan

nels

with

oth

er s

pher

es o

f Gov

ernm

ent.

Qua

rter

ly%

100

100

100

100

King

boro

ugh

cont

inue

s to

hav

e co

ntac

t with

the

othe

r sh

pere

s of

gov

ernm

ent a

nd h

as a

ctiv

ely

soug

ht to

w

ork

with

var

ious

dep

artm

ents

whe

n ne

cess

ary.

1.4.

3.2

Cond

uct p

ublic

mee

tings

/for

ums

in lo

cal a

reas

that

focu

s on

loca

l iss

ues

of in

tere

st.

Qua

rter

ly%

100

100

100

100

The

mai

n fo

cus

this

yea

r has

bee

n th

e de

velo

pmen

t of

the

new

Kin

gbor

ough

Pla

nnin

g Sc

hem

e. A

num

ber o

f pu

blic

mee

ting

/ inf

orm

atio

n se

ssio

ns w

ere

cond

ucte

d du

ring

the

year

. Th

ere

was

a c

once

rted

effo

rt m

ade

to

gain

com

mun

ity in

put i

nto

the

wor

k of

the

cons

ulta

nts

appo

inte

d to

pre

pare

the

Dev

elop

men

t Pla

n fo

r the

fo

rmer

Kin

gsto

n H

igh

Scho

ol s

ite.

Publ

ic in

form

atio

n se

ssio

ns w

ere

cond

ucte

d as

par

t of t

his

proj

ect.

Co

unci

l rep

rese

ntat

ives

als

o re

gula

rly a

tten

ded

vario

us

com

mun

ity m

eetin

gs d

urin

g th

e ye

ar in

clud

ing

the

quar

terly

Kin

gbor

ough

Com

mun

ity C

onsu

ltativ

e Fo

rum

gro

up.

1.5.

1.2

Ensu

re th

at a

ll st

atut

ory

requ

irem

ents

are

bei

ng m

et.

Qua

rter

ly%

100

100

100

100

Coun

cil m

akes

eve

ry e

ffort

to e

nsur

e th

at it

com

plie

s w

ith a

ll of

the

stat

utor

y re

quire

men

ts im

pose

d on

loca

l go

vern

men

t.1.

5.2.

1 Re

view

and

upd

ate

gove

rnan

ce a

nd c

orpo

rate

pol

icie

s an

d pr

oced

ures

to e

ncom

pass

cha

ngin

g le

gisl

ativ

e an

d st

atut

ory

requ

irem

ents

.

Qua

rter

ly%

100

100

100

100

Polic

ies

and

proc

edur

es a

re re

gula

rly re

view

ed a

nd

upda

te w

here

app

ropr

iate

.

62

ww

w.k

ingb

orou

gh.ta

s.gov

.au

Pag

e 12

of 3

2

Goo

d

Des

crip

tion

Freq

.U

OM

Targ

etA

ctua

lSt

atus

Targ

etA

ctua

lSt

atus

Com

men

t

Str

ateg

ic A

ctio

n Re

port

King

boro

ugh

Coun

cil

Att

enti

on R

equi

red

On

Targ

et

For t

he y

ear e

ndin

g 30

/06/

2013

Resu

ltYT

D R

esul

t

1.5.

3.1

Mai

ntai

n po

licie

s on

dec

isio

n m

akin

g, c

orpo

rate

eth

ics

and

code

of c

ondu

ct a

rran

gem

ents

whi

ch u

phol

d th

e St

rate

gic

Plan

cor

e va

lues

.

Qua

rter

ly%

100

100

100

100

1.6.

1.1

Dev

elop

and

mai

ntai

n an

inte

grat

ed s

trat

egic

and

op

erat

iona

l pla

nnin

g pr

oces

s th

at m

eets

legi

slat

ive

requ

irem

ents

and

enc

oura

ges

finan

cial

sus

tain

abili

ty.

Qua

rter

ly%

100

100

100

100

A re

view

of t

he S

trat

egic

Pla

n an

d th

e ad

optio

n of

the

forw

ard

Act

ion

Plan

s w

ere

cons

ider

ed b

y Co

unci

l in

Mar

ch 2

013.

1.6.

3.1

Ensu

re th

e go

als

and

benc

hmar

ks o

f the

Tas

man

ia

Toge

ther

202

0 pr

ogra

m a

re in

corp

orat

ed in

to th

e st

rate

gic

plan

ning

pro

cess

for t

he b

enef

it of

the

King

boro

ugh

com

mun

ity.

Qua

rter

ly%

100

100

100

100

The

Stat

e G

over

nmen

t dur

ing

the

year

wou

nd-u

p th

e ac

tiviti

es o

f the

Tas

man

ia T

oget

her B

oard

. W

here

ap

prop

riate

con

side

ratio

n is

giv

en to

the

goal

s an

d be

nchm

arks

set

by

Tasm

ania

Tog

ethe

r.2.

3.3.

1 A

pply

for f

undi

ng p

rogr

ams

as th

ey b

ecom

e av

aila

ble.

Qua

rter

ly%

100

100

100

100

App

licat

ions

for f

undn

g ar

e su

bmitt

ed w

here

pr

ogra

ms

are

iden

tifie

d as

bei

ng a

key

prio

rity

and

Coun

cil c

an re

adily

mee

t fun

ing

guid

elin

es.

3.2.

3.2

Wor

k in

par

tner

ship

with

the

Stat

e G

over

nmen

t and

ot

her s

take

hold

ers

to s

uppo

rt p

olic

ies

deal

ing

with

a b

road

ra

nge

of s

ocia

l iss

ues

Qua

rter

ly%

100

7510

075

Liai

son

cont

inue

s th

roug

h th

e co

mm

unity

ser

vice

s ar

ea.

With

the

curr

ent b

udge

tary

issu

es fa

ced

by th

e St

ate

Gov

ernm

ent i

t con

tinue

s to

be

diffi

cult

to g

ain

muc

h tr

actio

n on

add

ition

al fu

ndin

g or

pro

gram

s fo

r Ki

ngbo

roug

h.3.

2.5.

1 A

dvoc

ate

for a

fford

able

hou

sing

and

cris

is

acco

mm

odat

ion

for p

eopl

e in

nee

dQ

uart

erly

%10

050

100

50Th

e pr

ovis

ion

of a

fford

able

hou

sing

and

cris

is

acco

mm

odat

ion

is n

ot a

cor

e fu

nctio

n of

loca

l go

vern

men

t - it

is c

lear

ly a

resp

onsi

bilit

y of

the

Stat

e G

over

nmen

t. C

ounc

il co

ntin

ues

to m

aint

ain

a le

vel o

f ad

voca

cy o

n bo

th o

f the

se is

sues

with

the

Stat

e G

over

nmen

t.3.

2.5.

2 Lo

ok fo

r opp

ortu

nitie

s to

wor

k co

llabo

rativ

ely

with

G

over

nmen

t Dep

artm

ents

and

oth

er c

omm

unity

bas

ed

orga

nisa

tions

to im

prov

e se

rvic

es w

ithin

Kin

gbor

ough

.

Qua

rter

ly%

100

100

100

100

The

Coun

cil's

com

mun

ity s

ervi

ces

area

con

tinue

s to

lo

ok fo

r opp

ortu

niiti

es to

wor

k co

llabo

rativ

ely

with

the

vario

us G

over

nmen

t dep

artm

ents

.3.

3.4.

1 In

corp

orat

e ris

k an

d sa

fety

prin

cipl

es in

Cou

ncil

stra

tegi

es,

plan

s, pr

ogra

ms

and

activ

ities

.Q

uart

erly

%10

010

010

010

0Th

e im

plem

enta

tion

of th

e W

orkp

lace

Hea

lth a

nd

Safe

ty re

gula

tions

con

tinue

s to

be

a hi

gh p

riorit

y fo

r th

e Co

unci

l.4.

2.2.

1 Co

llabo

rate

with

the

Dep

artm

ent o

f Eco

nom

ic

Dev

elop

men

t to

attr

act n

ew b

usin

esse

s to

Kin

gbor

ough

.Q

uart

erly

%10

010

010

010

0Co

unci

l did

par

ticip

ate

with

DED

in re

latio

n to

the

deve

lopm

ent o

f the

Reg

iona

l Eco

nom

ic D

evel

opm

ent

Plan

for S

outh

ern

Tasm

ania

. It

is d

iffic

ult t

o ac

hiev

e m

any

tang

ible

out

com

es a

s a

resu

lt of

the

curr

ent

budg

et is

sues

face

d by

the

Stat

e G

over

nmen

t.

AN

NU

AL REPO

RT 2012/13

63

Pag

e 13

of 3

2

Goo

d

Des

crip

tion

Freq

.U

OM

Targ

etA

ctua

lSt

atus

Targ

etA

ctua

lSt

atus

Com

men

t

Str

ateg

ic A

ctio

n Re

port

King

boro

ugh

Coun

cil

Att

enti

on R

equi

red

On

Targ

et

For t

he y

ear e

ndin

g 30

/06/

2013

Resu

ltYT

D R

esul

t

4.3.

5.1

Liai

se a

nd c

olla

bora

te w

ith th

e St

ate

Gov

ernm

ent t

o id

entif

y op

port

uniti

es fo

r affo

rdab

le h

ousi

ng w

ithin

Ki

ngbo

roug

h.

Qua

rter

ly%

100

5010

050

The

Stat

e G

over

nmen

t rec

ently

ann

ounc

ed p

lans

for

affo

rdab

le h

ousi

ng to

be

deve

lope

d on

land

ow

ned

by

it at

Hun

tingf

ield

. Pr

elim

inar

y pl

anni

ng p

roce

sses

are

un

derw

ay.

Engi

neer

ing

Serv

ices

2.8.

1.1

Impr

ove

com

mun

ity e

duca

tion

initi

ativ

es a

nd

part

icip

atio

nQ

uart

erly

%10

010

010

010

0Th

e sc

hool

pos

ter c

ompe

titio

n is

no

long

er b

eing

run.

Co

unci

l is

coor

dina

ting

with

the

Sout

hern

Was

te

Stra

tegy

Aut

horit

y to

dis

trib

ute

info

rmat

ion

on

recy

clin

g an

d w

aste

man

agem

ent t

hrou

gh th

e Ki

ngbo

roug

h an

d KW

S w

eb p

ages

.2.

8.1.

2 Ex

pand

ker

bsid

e ga

rbag

e an

d re

cycl

ing

serv

ices

Qua

rter

ly%

100

100

100

100

The

expa

nsio

n of

ker

b si

de s

ervi

ces

is m

anag

ed o

n a

case

by

case

bas

is.

The

stra

tegi

c ro

ll ou

t of n

ew

serv

ices

is b

eing

con

side

red

with

wor

k be

ing

unde

rtak

en in

the

GIS

fiel

d to

det

erm

ine

area

s th

at c

an

be s

ervi

ced

with

min

imal

ope

ratio

nal i

mpa

ct to

the

curr

ent s

ervi

ces.

2.8.

1.3

Enco

urag

e in

crea

sed

reco

urce

reco

very

at w

aste

tran

sfer

st

atio

ns a

nd fu

rthe

r dev

elop

reso

urce

reco

very

Qua

rter

ly%

100

100

100

100

Coun

cil,

thro

ugh

King

boro

ugh

Was

te S

ervi

ces

(KW

S)

as th

e m

anag

ers

of th

e Ba

rret

ta W

aste

Man

agem

ent

Faci

lity,

are

pro

activ

ely

seek

ing

impr

ovem

ents

in

reco

very

and

reus

e op

port

uniti

es to

min

imis

e op

erat

iona

l cos

ts a

nd to

redu

ce v

olum

es to

land

fill.

KWS

thro

ugh

oper

atio

nal e

ffici

ency

hav

e ex

ceed

ed

the

intia

l tar

get r

esou

rce

reco

very

leve

ls in

itial

ly s

et fo

r th

e si

te, a

nd h

ave

a co

ntin

uing

man

date

to im

prov

e th

is a

s ne

w o

ppor

tuni

ties

or te

chno

logi

es a

rriv

e.

4.6.

3.1

Dev

elop

a s

trat

egic

infr

astr

uctu

re p

lann

ing

fram

ewor

k th

at in

clud

es s

tand

ard

infr

astr

uctu

re g

uide

lines

, a s

take

hold

er

refe

renc

e gr

oup

and

an in

tern

al g

roup

to id

entif

y an

d an

alys

e

Qua

rter

ly%

100

100

100

100

The

leve

l of c

oord

inat

ion

with

Tas

Wat

er a

nd N

BN

cont

ract

ors

has

been

impr

oved

with

hig

her l

evel

ag

reem

ents

in p

lace

for w

orks

with

in C

ounc

il's

road

ne

twor

k an

d im

prov

ed s

harin

g of

cap

ital w

orks

pr

ogra

mm

ing.

64

ww

w.k

ingb

orou

gh.ta

s.gov

.au

Pag

e 14

of 3

2

Goo

d

Des

crip

tion

Freq

.U

OM

Targ

etA

ctua

lSt

atus

Targ

etA

ctua

lSt

atus

Com

men

t

Str

ateg

ic A

ctio

n Re

port

King

boro

ugh

Coun

cil

Att

enti

on R

equi

red

On

Targ

et

For t

he y

ear e

ndin

g 30

/06/

2013

Resu

ltYT

D R

esul

t

4.6.

4.1

Iden

tify

pote

ntia

l eco

nom

ic g

row

th lo

catio

ns in

the

first

in

stan

ce a

nd th

en fo

cus

Coun

cil's

cap

ital w

orks

pro

gram

on

thei

r fu

ture

impr

ovem

ent.

Qua

rter

ly%

100

100

100

100

Coun

cil's

cap

ital w

orks

pro

gram

is n

ow s

tron

gly

focu

ssed

aro

und

asse

t ren

ewal

and

repl

acem

ent.

The

co

nstr

uctio

n of

new

ass

ets

form

s a

min

or c

ompo

nent

of

the

prog

ram

and

ther

efor

e th

e nu

mbe

r of p

roje

cts

that

can

be

cons

ider

ed in

low

.

In a

reas

of g

row

th th

at is

a re

sult

of n

ew d

evel

opm

ent,

the

asse

ts a

re g

ener

ally

cre

ated

by

the

deve

lope

r and

ve

sted

to C

ounc

il at

the

end

of th

e co

nstr

uctio

n lia

bilit

y pe

riod.

Whe

re a

sset

s ar

e to

be

cont

ribut

ed to

by

Cou

ncil,

ther

e is

gen

eral

ly a

bud

get a

lloca

tion

iden

tifie

d as

par

t of t

he d

evel

opm

ent a

sses

smen

t pr

oces

s.

In a

reas

of e

xist

ing

deve

lopm

ent w

here

ther

e is

an

infr

astr

uctu

re c

apac

ity is

sue

iden

tifie

d, th

ere

are

exis

ting

proc

esse

s in

pla

ce th

roug

h Co

unci

l's a

sset

m

anag

emen

t sys

tem

s to

iden

tify

proj

ects

for i

nclu

sion

in

the

annu

al c

apita

l wor

ks p

rogr

am a

nd 5

yea

r cap

ital

wor

ks p

rogr

am.

Thes

e sy

stem

s ar

e co

ntin

ually

und

er

revi

ew fo

r pro

cess

and

for a

ugm

enta

tion

with

new

in

form

atio

n.

5.1.

2.1

Test

tran

spor

t ini

tiativ

es a

gain

st a

mul

ti-cr

iteria

fr

amew

ork

to e

nsur

e th

ey m

eet c

omm

unity

exp

ecta

tion

in

resp

ect t

o hi

gh a

cces

sibi

lity,

sus

tain

abili

ty, s

afer

tran

spor

t and

be

havi

oura

l cha

nge

Qua

rter

ly%

100

100

100

100

Regu

lar d

iscu

ssio

ns a

re b

eing

hel

d w

ith D

IER'

s pa

ssen

ger t

rans

port

sec

tion,

Met

ro a

nd C

ounc

il co

mm

ittee

s fo

r acc

ess

and

road

saf

ety

to id

entif

y cr

itica

l iss

ues

that

rela

te to

Cou

ncil'

s in

fras

truc

ture

. A

ctio

ns a

re th

en id

entif

ied

for o

pera

tiona

l m

aint

enan

ce o

r cap

ital e

xpen

ditu

re o

r to

be re

solv

ed

thro

ugh

bett

er c

oord

inat

ion

with

the

rele

vant

au

thor

ities

. Pol

icy

and

proc

edur

al c

hang

e is

als

o co

nsid

ered

.

AN

NU

AL REPO

RT 2012/13

65

Pag

e 15

of 3

2

Goo

d

Des

crip

tion

Freq

.U

OM

Targ

etA

ctua

lSt

atus

Targ

etA

ctua

lSt

atus

Com

men

t

Str

ateg

ic A

ctio

n Re

port

King

boro

ugh

Coun

cil

Att

enti

on R

equi

red

On

Targ

et

For t

he y

ear e

ndin

g 30

/06/

2013

Resu

ltYT

D R

esul

t

5.2.

1.2

Faci

litat

e th

e de

sign

and

, whe

re a

ppro

pria

te, t

he

cons

truc

tion

of c

ritic

al in

fras

truc

ture

in c

onju

nctio

n w

ith s

ervi

ce

prov

ider

s an

d St

ate

Gov

ernm

ent.

Qua

rter

ly%

100

100

100

100

Coun

cil h

as b

een

proa

ctiv

ely

invo

lved

in a

num

ber o

f St

ate

Gov

ernm

ent p

roje

cts.

Cou

ncil'

s ro

le h

as b

een

varie

d an

d in

clud

es th

e pr

ovis

ion

of a

dvic

e, d

esig

n,

proj

ect m

anag

emen

t, te

nder

ing

and

cons

truc

tion.

W

here

app

ropr

iate

, Cou

ncil

will

con

tinue

to

coor

dina

te w

ith D

IER

to d

eliv

er p

roje

cts

for t

he

mun

icip

ality

.

5.2.

3.2

Dev

elop

an

impl

emen

tatio

n pl

an fo

r the

des

ign

and

cons

truc

tion

of p

ark

and

ride

faci

litie

s to

be

used

as

a pl

anni

ng

and

deci

sion

tool

for c

apita

l inv

estm

ent.

Qua

rter

ly%

100

100

100

100

Regu

lar d

iscu

ssio

ns a

re b

eing

hel

d w

ith D

IER

and

Met

ro to

iden

tify

site

s w

here

par

k an

d rid

e fa

cilit

ies

are

be

st s

uite

d to

coo

rdin

ate

with

Met

ro p

asse

nger

se

rvic

es.

Whe

re p

ossi

ble

Coun

cil p

rovi

des

supp

ort i

n de

sign

, pro

ject

man

agem

ent a

nd c

onst

ruct

ion.

The

plan

ning

is g

ener

ally

man

aged

by

DIE

R/M

etro

as

the

loca

tions

mus

t cor

rela

te w

ith h

igh

dem

and

rout

es

and

the

rout

ing

of e

xist

ing

serv

ices

.5.

4.2.

2 Im

prov

e pa

rk a

nd ri

de fa

cilit

ies.

Qua

rter

ly%

100

100

100

100

Regu

lar d

iscu

ssio

ns a

re b

eing

hel

d w

ith D

IER'

s pa

ssen

ger t

rans

port

sec

tion,

Met

ro a

nd C

ounc

il co

mm

ittee

s fo

r acc

ess

and

road

saf

ety

to id

entif

y cr

itica

l iss

ues

that

rela

te to

Cou

ncil'

s in

fras

truc

ture

.3.

2.6.

2 Fa

cilit

ate

the

oper

atio

ns o

f a D

isab

ility

Acc

ess

Adv

isor

y Co

mm

ittee

.Q

uart

erly

%10

010

010

010

0M

eetin

gs fa

cilit

ated

and

act

ions

und

erta

ken

as

requ

ired.

Ite

ms

have

bee

n in

clud

ed in

cap

ital p

rogr

am

as a

resu

lt of

com

mitt

ee re

com

men

datio

ns.

Info

rmat

ion

Serv

ices

1.1.

2.1

Mon

itor a

nd e

valu

ate

Coun

cil's

ser

vice

sta

ndar

ds

incl

udin

g th

e m

anag

emen

t of c

usto

mer

requ

ests

in c

onju

nctio

n w

ith A

ctio

n 1.

2.

Qua

rter

ly%

100

100

100

100

This

is a

n on

goin

g ac

tion

whi

ch m

onito

rs th

e pe

rfor

man

ce o

f var

ious

bus

ines

s un

its a

gain

st a

gree

d se

rvic

e le

vels

def

ined

in th

e Cu

stom

er S

ervi

ce C

hart

er

and

actio

ns d

efin

ed in

the

Stra

tegi

c D

eliv

ery

Plan

. Sy

stem

s an

d pr

oces

ses

are

unde

r con

stan

t rev

iew

with

th

e em

phas

is b

eing

on

cont

inua

l im

prov

emen

t.

66

ww

w.k

ingb

orou

gh.ta

s.gov

.au

Pag

e 16

of 3

2

Goo

d

Des

crip

tion

Freq

.U

OM

Targ

etA

ctua

lSt

atus

Targ

etA

ctua

lSt

atus

Com

men

t

Str

ateg

ic A

ctio

n Re

port

King

boro

ugh

Coun

cil

Att

enti

on R

equi

red

On

Targ

et

For t

he y

ear e

ndin

g 30

/06/

2013

Resu

ltYT

D R

esul

t

1.1.

2.2

Regu

larly

revi

ew C

ounc

il in

form

atio

n an

d cu

stom

er

serv

ice

stra

tegi

es to

ens

ure

thos

e w

ith s

peci

al n

eeds

are

abl

e to

ac

cess

an

reas

onab

le le

vel o

f ser

vice

.

Qua

rter

ly%

100

100

100

100

Mul

tiple

info

rmat

ion

chan

nels

are

em

ploy

ed to

pr

ovid

e in

form

atio

n to

the

com

mun

ity. T

hese

incl

ude

inte

rnet

, pub

licat

ions

, new

s m

edia

, soc

ial m

edia

and

th

e N

atio

nal R

elay

Ser

vice

. Th

e im

plem

enta

tion

of

high

def

initi

on v

ideo

con

fere

ncin

g fa

cilit

ies

has

begu

n an

d w

ill b

e us

ed to

impr

ove

acce

ssib

ility

to a

num

ber

of e

xist

ing

serv

ices

incl

udin

g fo

od p

repa

ratio

n an

d ha

ndlin

g tr

aini

ng a

nd p

ublic

con

sulta

tion

wor

ksho

ps.

1.5.

1.1

Dev

elop

sys

tem

s w

hich

faci

litat

e co

ntin

uous

im

prov

emen

t in

Coun

cil o

pera

tions

and

ser

vice

del

iver

y, w

ith a

pa

rtic

ular

focu

s on

the

deve

lopm

ent o

f ris

k m

anag

emen

t

Qua

rter

ly%

100

100

100

100

A n

umbe

r of s

yste

m im

prov

emen

ts h

ave

been

im

plem

ente

d ov

er th

e fin

anci

al y

ear.

The

se in

clud

e th

e in

trod

uctio

n of

hig

h sp

eed

scan

ning

har

dwar

e an

d im

age

capt

ure

soft

war

e to

str

eam

line

wor

k pr

oces

s an

d im

prov

e ef

ficie

ncie

s in

the

dist

ribut

ion

and

stor

age

of e

lect

roni

c re

cord

s. Th

e co

nver

sion

of

phys

ical

bui

ldin

g ap

plic

atio

n an

d pa

yrol

l/per

sonn

el

docu

men

ts in

to e

lect

roni

c fo

rmat

to im

prov

e m

anag

emen

t and

acc

essi

bilit

y an

d re

duce

risk

of l

oss.

Coun

cil h

as in

stal

led

a N

etw

ork

Base

Sta

tion

at th

e Ci

vic

Cent

re.

The

equi

pmen

t, w

hich

pro

vide

s el

ectr

onic

fixe

d su

rvey

refe

renc

e po

int,

grea

tly

impr

oves

the

accu

racy

and

rang

e of

ope

ratio

n of

sa

telli

te s

urve

y eq

uipm

ent u

sed

in th

e Ki

ngbo

roug

h m

unic

ipal

ity.

Org

anis

atio

nal D

evel

opm

ent

3.5.

4.2

Ensu

re re

leva

nt C

ounc

il st

aff h

ave

unde

rtak

en c

ultu

ral

dive

rsity

and

aw

aren

ess

trai

ning

Qua

rter

ly%

100

100

100

100

Coun

cil c

urre

ntly

has

pol

icie

s fo

r Ant

i-Dis

crim

inat

ion

and

Har

assm

ent a

nd W

orkp

lace

Div

ersi

ty a

nd E

quity

. In

July

201

2, a

ll st

aff u

nder

took

refr

eshe

r ant

i di

scrim

inat

ion

trai

ning

with

trai

ners

from

the

Offi

ce o

f th

e A

nti-D

iscr

imin

atio

n Co

mm

issi

oner

.

AN

NU

AL REPO

RT 2012/13

67

APPENDIX III: Nature of Complaints

NATURE OF COMPLAINT RESPONSIBLE DEPARTMENT RECEIVED

Waste removal contractor leaving rubbish on road Customer Services July 2012

Concern about the poor state of Kingston Beach public toilets Works July 2012

Concern regarding treatement received from Council officer Compliance July 2012

Complaint regarding the non-upgrade of Mountain Road Engineering Services July 2012

Lack of action regarding removal of dangerous trees General Manager August 2012

Compliant regarding non-payment of dog registration, staff manner Compliance September 2012

Child minding service at Kingborough Sports Centre Community Services September 2012

Lack of payment methods and misinformation communicated Compliance September 2012

Complaint regarding Code for Tenders and Contracts General Manager September 2012

Renaming of section of Oakleigh Avenue and how Council had dealt with the matter Deputy General Manager October 2012

Withholding payment of rates - dissatisfied with road infrastructure and dealings with staff Engineering Services October 2012

Lack of regular mowing and maintenance in Council reserve Works November 2012

Problem with garden bed replacement after Willowbend footpath replacement Engineering Services November 2012

Request for reply to numerous request for meeting regarding trees Natural Resource Management November 2012

Rubbish collection in Tahune Crescent Customer Services November 2012

Request for reply to previous request to have dangerous road conditions reviewed Engineering Services November 2012

Complaint about treatment from kerbside collection driver Engineering Services December 2012

Complaint regarding Council handling of private information Information Services December 2012

Complaint about staff members reaction to dog on Kingston Beach Works January 2013

Complaint about driving manner of Waste Collection Contractor Engineering Services January 2013

Complaint regarding conduct of inspector Development Services February 2013

Application to withdraw infringement and complaint about treatment by a Compliance Officer Environmental Services April 2013

Works at Old Station Road General Manager April 2013

Animal control matter Environmental Services May 2013

Noise due to early collection time of refuse/recycling Engineering Services June 2013

Public Open Space contribution General Manager June 2013

Kingborough Council15 Channel Highway