Upload
others
View
3
Download
0
Embed Size (px)
Citation preview
Annunciation of the Blessed Virgin Mary
Catholic Church Roman Catholic Archdiocese of Indianapolis
19 North Alabama Street Brazil, IN 47834
Project No. 2015.004
Addendum No. 1 May 12, 2015
Prepared By ARCHITECT OF RECORD entheos ARCHITECTS
802 Lord Street, Ste. 200 Indianapolis, Indiana 46202 Ph (317) 951-9590 Fx (317) 951-9690 In Consultation with STRUCTURAL ENGINEER Arsee Engineers, Inc. 9715 Kincaid Drive, Suite 100 Fishers, IN 46037 Ph (317) 594-5152 Fx (317) 594-9590 MECHANICAL / ELECTRICAL ENGINEER Enverity Engineering 9229 Delegates Row Suite 150 Indianapolis IN 46240 Ph (317) 853-3636 Fx (317) 706-2026
Addendum No. 1 for
Annunciation of the Blessed Virgin Mary
Catholic Church Foundation & Basement Repairs/ Waterproofing,
New HVAC System, and New Restroom
Annunciation Catholic Church - Brazil, IN A D D E N D U M #1entheos ARCHITECTS Page 1 of 1
Acknowledge receipt of this Addendum by inserting its number on the Bid Form. Failure to do so may subject the Bidderto disqualification. This Addendum is a part of the Contract Documents.
GENERAL
1. The Pre-Bid Conference was held on Thursday, April 30, 2015. Attached please find the following:a. The Architect’s agenda for the Pre-Bid Conference, as presented and distributed to those in
attendance.b. A copy of the sign-in sheet listing those Bidding Contractors in attendance.
CHANGES TO THE PROJECT MANUAL
1. Section 004100- Bid Form
a. Under Section 004100, delete the Bid Form (3 pages) as included in the Project Manual. Replace withthe revised Bid Form (3pages) as included in this Addendum. Note that the revision to the Bid Formis the addition of a line for the Bidder’s price for Alternate No. 2 as described on the Bid Form.
END OF CHANGES TO THE PROJECT MANUAL (DIVISIONS 0 - 10)
CHANGES TO THE DRAWINGS
1. S-Series Drawings
a. Where Foundation Waterproofing is called for in these Drawings, provide and install thefollowing:
i. MasterSeal HLM 5000 Trowel Grade Cold-Applied Elastomeric Waterproofing System asmanufactured by BASF.
ii. Application should follow the manufacturer’s application guide and include the protectionboard as indicated in BASF’s instructions.
END OF CHANGES TO THE DRAWINGS
Refer to additional addendum items as attached regarding Structural and Mechanical / Electrical Work.
END OF ADDENDUM #1
Annunciation Catholic Church, Brazil, IN BID FORM (ADDENDUM NO. 1)entheos ARCHITECTS Section 004100 - Page 1 of 3
Project: ANNUNCIATION CATHOLIC CHURCH - BRAZIL, IN Foundation & Basement Repairs / Waterproofing, New HVAC system, and New Restroom
To: Annunciation Catholic Church, Brazil, INc/o entheos ARCHITECTS
802 Lord Street, Suite 200Indianapolis, IN 46202
From (Bidder):
Address:
Telephone: ( )
Date:
Contact Person:
BIDS DUE: 2:00 p.m. (local time), Tuesday, May 19, 2015.
The undersigned, having visited the Project site and having become familiar with conditions thereof and having examinedand become fully cognizant of the Drawings and Project Manual and all Addenda issued thereto, hereby agrees tofurnish all labor, materials, equipment, fixtures and incidentals required for construction of the Project in conformancewith the intent of the Contract Documents.
Pursuant to these requirements, the undersigned submits the following Base and Alternate Bids, which include allapplicable taxes, overhead and profit for General Contract Work.
Base Bid - Lump Sum: ______________________________________________________________________________
Dollars ($______________________________)
Alternate No. 1 (Add the preparation and painting of existing exterior perimeter limestone (as described in Elevation3/A402) - Lump Sum : ___________________________________________________________________________
Dollars ($______________________________)
Alternate No. 2 (Add the Work to restore the existing boilers as described on Sheet M200, Sheet Keynote #8) - Lump Sum:______________________________________________________________________ _______________
_______________________________________________________Dollars ($____________________________)
Update 02/11
Annunciation Catholic Church, Brazil, IN BID FORM (ADDENDUM NO. 1)entheos ARCHITECTS Section 004100 - Page 2 of 3
Time of Completion: calendar days from date of "Notice to Proceed." (Based on all Work required in Base Bid.)
If awarded this Project, our Project Manager will be:
our Field Superintendent will be:
Unit Prices: If Work is added or deleted during the construction period by written instructions prepared by theArchitect/Engineer, the undersigned agrees to accept the following unit prices for Work added or deleted. Unit pricesshall include overhead and profit. Work Unit Price
1. Earth Excavation (Hand) Cu. Yd. $
2. Earth Excavation (Machine) Cu. Yd. $
3. Concrete or Rock Excavation Cu. Yd. $
4. Engineered Compacted Fill Cu. Yd. $
5. Asphalt Surface Tons $
6. Brick Masonry Removal and Replacement - Interior Sq. Ft. $
7. Brick Masonry Full-DepthTuckpointing - Interior Sq. Ft. $
8. Repair to existing wood floor joist Each $
Supplemental Documents:
Non-Collusion Affidavit (Section 004519 of this Manual)
Subcontractors and Products List (Section 004333 of this Manual)
Addenda: Receipt of Addenda issued to the Drawings and Project Manual is hereby acknowledged:
Addenda Nos.
Update 02/11
Annunciation Catholic Church, Brazil, IN BID FORM (ADDENDUM NO. 1)entheos ARCHITECTS Section 004100 - Page 3 of 3
Individuals / Sole Proprietors complete below:
IN TESTIMONY WHEREOF, the Bidder (an Individual) has hereunto set his hand this
day of , 20 .
Individual Bidder:
Firms / Partnerships complete below:
IN TESTIMONY WHEREOF, the Bidder (a Firm) has hereunto set their hands this
day of , 20 .
Name of Firm:
By:
By:
Subscribed and sworn to before me by
This day of , 20 .
My commission expires:
Corporations complete below:
IN TESTIMONY WHEREOF, the Bidder (a Corporation) has caused this proposal to be signed by its President and
Secretary, and affixed its corporate seal this day of , 20 .
Name of Corporation:
President:
Secretary: (Seal)
END OF SECTION 004100
Update 02/11
AGENDA FOR PRE-BID CONFERENCE
Project: Annunciation Catholic Church, Brazil, IN2015.004 / 3.1.2
Date: April 30, 2015Prepared By: Mark Prange
1. Distribution of Sign-In Sheet.
2. Introductions:
a. Project Architect: Mark Prange / entheos ARCHITECTS
b. Owner’s Representative: Fr. John Hollowell
c. Structural Engineer: Al Pulley / Arsee Engineers
d. MEP Engineer: Ross Maue / Enverity Engineering
e. All questions should be directed in written form to Mark Prange at entheos ARCHITECTS. Thequestions will be forwarded to appropriate member(s) of the project team for response.
Phone: (317) 951-9590 Fax: (317) 951-9690Email: [email protected]
3. Bids will be received in sealed, plainly labeled envelopes with the Bidder’s name and return address, at thefollowing location:
entheos ARCHITECTS
802 Lord Street, Suite 200Indianapolis, IN 46202
4. Bids will be received until 2:00 p.m. (local time), Tuesday, May 19, 2015. Bids received after that time willbe returned unopened. Bids will be opened privately.
5. Work shall be performed under a Unified Contract. The following General Contractors have been invited tosubmit Bids on this Project:
a. Stenz Construction Corporation.b. Garmong Construction Services.c. CPM Construction.
Annunciation Catholic Church, Brazil, IN April 30, 2015Agenda for Pre-Bid Conference Page 2 of 3
6. The following Contracts / Contractors will be separate from the General Construction contract:
a. Asbestos removal / abatement (including, but not limited to, the existing vinyl tile throughout the Naveand the area of the new restroom.
7. Performance and Payment Bonds to be furnished by the General Contractor are indicated in the Notice toBidders as part of the Base Bid.
8. Subcontractors and Products List Requirements - refer to Section 00 4333 of the Project Manual for descriptionof Subs & Products List to be submitted as follows:a. Each General Contractor bidder is to submit with their bid one copy of the Prime Subcontractors and
Products List. b. Each bidder, shall furnish one copy of the Complete Subcontractors and Products List to the
Architect’s Office by 9:00 a.m. on the morning following the bid opening. (Fax or email submissionis acceptable.) The selected Contractors shall then submit a fully completed, typed list with allsubcontractors and products listed for inclusion with the contract.
9. Substitutions will be considered if written request is made at least 10 calendar days prior to the bid date andsubsequently approved by the Architect in an Addendum. a. These requests must be received by the Architect no later than the end of Friday, May 8, 2015.b. Utilize the substitution forms included in Division 0 Section “Project Forms.”
10. Requests for clarification or interpretation of the Bid Documents must be made in writing and be receivedby the Architect at least 10 calendar days prior to the bid date .a. Architect must receive such request not later than the end of Friday, M ay 8, 2015.
11. If there is a discrepancy between Drawings and Specifications not clarified before bidding, the better qualityor greater quantity of Work shall be provided per the Supplementary Conditions - Specification Section 00 7300.
12. Review Scope of the Work.
a. Work at the existing Church Building:i. Excavation at the north and east exterior faces of the Church Building to install new
waterproofing at the face of the foundation wall.ii. Installation of perimeter foundation drainage system at the excavated building faces.iii. Backfill of excavated areas with drainage fill.iv. Repair of bearing ends of existing wood floor joists beneath the Nave.v. Selective excavation and removal of soil within the crawlspace beneath the Nave floor
framing.vi. Installation of new vapor barrier across soil surface of the crawlspace.vii. New concrete footing beneath existing brick foundation wall below the Nave’s center aisle.viii. New forced-air HVAC system throughout the Basement and crawlspace to serve the
Basement, crawlspace, and the Nave above.ix. Construction of a new handicapped-accessible restroom at the northwest corner of the Nave,
and associated demolition and plumbing work.
Annunciation Catholic Church, Brazil, IN April 30, 2015Agenda for Pre-Bid Conference Page 3 of 3
x. New sheet linoleum flooring throughout the Nave and associated new underlayment.xi. Selective removal of the existing wood wainscot along the north interior wall of the Nave.xii. The General Contractor should anticipate that lead paint will be encountered in the
Church Building. (1) The General Contractor will be required to be or have under contract to them
an EPA-licensed renovator for lead paint as required by the requirements ofthe State of Indiana.
(2) The General Contractor should provide necessary testing to confirm thepresence and levels of lead in paints.
(3) The Bidder will not be allowed to exclude this Work.
(4) The intent regarding Lead Paint is as follows:(a) The General Contractor is to include within their bid any and all
testing for lead paint.
(b) The General Contractor is to assume the presence of lead paint andbe prepared within their bid amount to properly and legally deal withit.
13. Review of Alternates: Refer to Specification Section 01 2300 “Alternates” for a complete description.
a. Add Alternate No. 1: i. Add all labor and material required for the painting of the existing exterior perimeter
limestone at grade, as shown in Elevation 3/A402.
(1) Base Bid: No work at the existing exterior perimeter limestone.(2) Alternate: Add the proper preparation and painting of the existing exterior perimeter
limestone at grade (as described in Elevation 3/A402).
14. Contractor’s Use of Premises and Facilities.
a. The Parish will vacate the Church Building. i. The Parish is to be allowed access to the Sacristy and Balcony as their needs dictate.
b. The other buildings on the Parish’ site will continue to function throughout the entire period ofconstruction. The General Contractor will be required to coordinate and schedule all constructionactivities and deliveries so as not to conflict with the Parish’s PreSchool and other activities.
15. Questions / Tour of Existing Conditions.
Copies: All in attendanceFile
ADDENDUM NUMBER: 1
PROJECT NAME: Annunciation of the Blessed Virgin Mary Catholic Parish
PROJECT NO.: 13172
ISSUED FROM ISSUE DATE BID DATE
May 13, 2015
This Addendum No. 1 to the drawings and specification shall supplement, amend, and become a part of the bidding documents, plans, and specifications. All bids and construction contracts shall be based on these modifications to the original contract documents.
PART 1. DRAWINGS 1.01 Sheet M-200: Mechanical Floor Plans
A. Remove existing electrical wall heater in Vestibule 100 complete along with all associated controls, as clouded.
B. Add to Restroom 103, wall mounted exhaust fan (EF-1) within existing window opening, as clouded.
C. Revise return and outside air ductwork as clouded. 1.02 Sheet M-601: Detail and Schedules
A. Revised EWH-1 on Electric Unit Heater Schedule, as clouded. B. Revised Typical HVAC System Section, as clouded. C. Add Fan Schedule to include exhaust fan (EF-1), as clouded.
1.03 Sheet P-200: Plumbing Floor Plans A. Revise Keynote 5 to reference as follows: “Connect 4” sanitary to existing
sanitary sewer in alley. Information available indicates invert of sewer at connection point to be 651.1’. Aerial topography suggests alley elevation of 651.5’. Field verify location via excavation. Connect per Detail 1/P-501. Compact subgrade and patch alley pavement to match existing pavement section (unknown at this time).”
1.04 Sheet E-200: Electrical Floor Plans A. Remove all wiring and devices feeding existing electric unit heater in Vestibule
100. B. Revise wire size and circuit for EWH-1 in Vestibule 100, as clouded. C. Remove complete junction boxes and associated obsolete raceway complete in
Restroom 103, as clouded. D. Remove single wall switch, raceway and existing ceiling light. E. Add power for new wall mounted exhaust fan (EF-1). Fan is to be controlled via
wall switch located on wall below fan. Con Provide label on switch plate “Exhaust Fan”.
F. Revise location of existing electrical panel ‘A’ to actual location, as clouded. 1.05 Sheet E-501: Details
A. Revise panel schedule as clouded.
Page 2 of 2
ATTACHMENTS M-200 M-601 E-200 E-501 END OF ADDENDUM
1 2 3 4 5 6 7 8 9 10 11 12 14 15 1613
MECHANICAL
CRAWL SPACE
BASEMENT
BASEMENT
CRAWL SPACE
28 28
NAVE104
VESTIBULE100
STOR.102
STAIR101
SANCTUARY105
ALTAR
AMBO
ORGAN
SACRISTY106
CONFESSIONAL
103
RESTROOM
1 2 3 4 5 6 7 8 9 10 11 12 14 15 1613
28
28
28
28
28
Apr
il 27
, 201
5
1317
2
Rev
isio
n D
ate
Pro
duce
d
Pro
ject
No.
Pro
ject
Dat
e
P (317)951-9590 F (317)951-9690
www.entheosARCHITECTS.com
802 Lord Street, Suite 200
Indianapolis, Indiana 46202
The
se D
raw
ings
and
Spe
cific
atio
ns,
and
all
copi
es t
here
of,
are
and
shal
l rem
ain
the
prop
erty
and
cop
yrig
ht o
f th
e A
rchi
tect
. T
hey
shal
l
be u
sed
only
with
res
pect
to
this
Pro
ject
and
are
not
to
be u
sed
on
any
othe
r P
roje
ct o
r W
ork
with
out
prio
r w
ritte
n pe
rmis
sion
fro
m t
he
Arc
hite
ct.
An
nu
nci
atio
n o
f th
e
19 N
orth
Ala
bam
a S
tree
t
Bra
zil,
Indi
ana
478
34
Ble
ssed
Vir
gin
Mar
y C
ath
olic
Par
ish
9229 Delegates Row, Suite 150
Indianapolis, IN 46240
317.706.2075
www.enverityENG.com
Mec
han
ical
Flo
or
Pla
ns
M200
P:\2
013
\13
172
An
nun
cia
tio
n C
ath
olic
Parish\D
wg
s\M
ech
\M-2
00
.dw
g,
5/1
3/2
015
8:5
2:3
7 A
M
Apr
il 27
, 201
5
1317
2
Rev
isio
n D
ate
Pro
duce
d
Pro
ject
No.
Pro
ject
Dat
e
P (317)951-9590 F (317)951-9690
www.entheosARCHITECTS.com
802 Lord Street, Suite 200
Indianapolis, Indiana 46202
The
se D
raw
ings
and
Spe
cific
atio
ns,
and
all
copi
es t
here
of,
are
and
shal
l rem
ain
the
prop
erty
and
cop
yrig
ht o
f th
e A
rchi
tect
. T
hey
shal
l
be u
sed
only
with
res
pect
to
this
Pro
ject
and
are
not
to
be u
sed
on
any
othe
r P
roje
ct o
r W
ork
with
out
prio
r w
ritte
n pe
rmis
sion
fro
m t
he
Arc
hite
ct.
An
nu
nci
atio
n o
f th
e
19 N
orth
Ala
bam
a S
tree
t
Bra
zil,
Indi
ana
478
34
Ble
ssed
Vir
gin
Mar
y C
ath
olic
Par
ish
9229 Delegates Row, Suite 150
Indianapolis, IN 46240
317.706.2075
www.enverityENG.com
Mec
han
ical
Det
ails
an
d
Sch
edu
les
M601
P:\2
013
\13
172
An
nun
cia
tio
n C
ath
olic
Parish\D
wg
s\M
ech
\M-6
01
.dw
g,
5/1
3/2
015
8:5
5:1
1 A
M
1 2 3 4 5 6 7 8 9 10 11 12 14 15 1613
MECHANICAL
CRAWL SPACE
BASEMENT
BASEMENT
CRAWL SPACE
NAVE104
VESTIBULE100
STOR.102
STAIR101
SANCTUARY105
ALTAR
AMBO
ORGAN
SACRISTY106
CONFESSIONAL
103
RESTROOM
1 2 3 4 5 6 7 8 9 10 11 12 14 15 1613
Apr
il 27
, 201
5
1317
2
Rev
isio
n D
ate
Pro
duce
d
Pro
ject
No.
Pro
ject
Dat
e
P (317)951-9590 F (317)951-9690
www.entheosARCHITECTS.com
802 Lord Street, Suite 200
Indianapolis, Indiana 46202
The
se D
raw
ings
and
Spe
cific
atio
ns,
and
all
copi
es t
here
of,
are
and
shal
l rem
ain
the
prop
erty
and
cop
yrig
ht o
f th
e A
rchi
tect
. T
hey
shal
l
be u
sed
only
with
res
pect
to
this
Pro
ject
and
are
not
to
be u
sed
on
any
othe
r P
roje
ct o
r W
ork
with
out
prio
r w
ritte
n pe
rmis
sion
fro
m t
he
Arc
hite
ct.
An
nu
nci
atio
n o
f th
e
19 N
orth
Ala
bam
a S
tree
t
Bra
zil,
Indi
ana
478
34
Ble
ssed
Vir
gin
Mar
y C
ath
olic
Par
ish
9229 Delegates Row, Suite 150
Indianapolis, IN 46240
317.706.2075
www.enverityENG.com
Ele
ctri
cal F
loo
r P
lan
s
E200
P:\2
013
\13
172
An
nun
cia
tio
n C
ath
olic
Parish\D
wg
s\E
lec\E
-200
.dw
g,
5/1
3/2
015
8:5
8:3
0 A
M
RM
Ele
ctri
cal D
etai
ls
E-501
}
W
96
"
EXIT
96
"
48
"
48
"
72
"
48
"
36
"
20
"
20
"
20
"
NO
TE
2
20
"
20
"
96
"
96
"
72
"
96
"
48
"
20
"
48
"
48
"
84
"
WC
NOTES:
1. EQUIPMENT MOUNTING HEIGHTS SHALL BE INDICATED UNLESS OTHERWISE NOTED ON THE DRAWINGS OR IN THE SPECIFICATIONS.
2. CONCEAL RECEPTACLE BEHIND WATER COOLER. VERIFY EXACT MOUNTING HEIGHTS.
3. WHERE DEVICES ARE LOCATED IN MASONRY WALLS LOCATE DEVICE WITHIN COARSING SO THAT MOUNTING INDICATED HERE IN IS NOT EXCEEDED.
4. ALL RECEPTACLES ABOVE KITCHEN COUNTER AND NEAR BATH VANITIES SHALL BE INSTALLED HORIZONTALLY AT +44" AFF TO TOP OF THE BOX.
SYMBOLS:
FLOOR
CEILING
M
F
H
S
F S
J C S M
Apr
il 27
, 201
5
1317
2
Rev
isio
n D
ate
Pro
duce
d
Pro
ject
No.
Pro
ject
Dat
e
P (317)951-9590 F (317)951-9690
www.entheosARCHITECTS.com
802 Lord Street, Suite 200
Indianapolis, Indiana 46202
The
se D
raw
ings
and
Spe
cific
atio
ns,
and
all
copi
es t
here
of,
are
and
shal
l rem
ain
the
prop
erty
and
cop
yrig
ht o
f th
e A
rchi
tect
. T
hey
shal
l
be u
sed
only
with
res
pect
to
this
Pro
ject
and
are
not
to
be u
sed
on
any
othe
r P
roje
ct o
r W
ork
with
out
prio
r w
ritte
n pe
rmis
sion
fro
m t
he
Arc
hite
ct.
An
nu
nci
atio
n o
f th
e
19 N
orth
Ala
bam
a S
tree
t
Bra
zil,
Indi
ana
478
34
Ble
ssed
Vir
gin
Mar
y C
ath
olic
Par
ish
9229 Delegates Row, Suite 150
Indianapolis, IN 46240
317.706.2075
www.enverityENG.com