Design Review

April 17, 2009Team Members:

Snehapriya RaoEdward BudrissEdward WolfAlex ScarangellaAnna Cheung

Faculty Guide: Dr. Margaret Bailey

Page 2: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

Table of Contents

ANSYS Models....................................................................................................................3

Cooling Loop Calculations & Specifications.....................................................................9

Installation/ Test Cell.......................................................................................................12

Final List of Sensors.........................................................................................................17

Sensor Installation...........................................................................................................18

Test Plan – Usability Testing...........................................................................................22

Prior to First Run.............................................................................................................23

Miscellaneous Room Preparations..................................................................................25

During First Run..............................................................................................................25

Removal and Re-install of Parts......................................................................................27

Vibrations Lab..................................................................................................................28

Thermo Fluids Lab...........................................................................................................30

Safety Document...............................................................................................................32

Bill of Materials...............................................................................................................41

Scope of Supply................................................................................................................42

Page 3: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

ANSYS Models

Test CellThe test cell and surrounding rooms were modeled using SolidWorks. Dimensions

of the test cell and surrounding rooms were calculated using an AutoCAD file of building 9, provided by Facilities Management. This model was then imported into ANSYS to perform structural and modal analysis. The model was constrained at the top of the walls as well as basement walls. Using the built in ANSYS material list, the building was defined to be construction grade concrete. The weight of the compressor was then applied over the footprint of the skid on which it sits. The mesh was refined several times in the areas of concern to make sure the model was accurately capturing true deformation and stress values. After two iterations both stress and deformation plateau at values shown. Results as followed:

Figure 1: Deformation due to static load of compressor (top view) (MAX = .00402in)

Page 4: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

Initial testing of the static load showed that there was a larger then acceptable stress and deflection in the supporting surface. Working with our senior design team’s PE it was recommended that two I-beams be inserted under the final location of the compressor.

Figure 2: Excerpt from PE report

Page 5: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

I-beams were then modeled in solid works to the specifications laid out in the PE’s report. The material was defined as structural steel and imported into ANSYS. The I-beams were constrained as shown above and static loading simulations were recompiled.

Figure 3: Deformation due to static load of compressor with I-beams under skid extremes

With the addition of the two I-beams the deflection of the floor decreased dramatically to below one thousandth of an inch. To determine if there could be any improvements by moving the I-beams more centrally towards the highest deflection and stress areas, the ANSYS models were rerun with the beams moving inwardly in steps of one-foot increments. Results as follows:

Figure 4: Deformation due to static load of compressor, I-beams inboard 1 foot

Page 6: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

Figure 5: Deformation due to static load of compressor, I-beams inboard 2 feet

Figure 6: Deformation due to static load of compressor, I-beams inboard 3 feet

Page 7: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

Compressor SkidUsing the documents provided by Dresser Rand, the skid was modeled in

SolidWorks and then imported into ANSYS. The skid was constructed from the material IS 2062. The skid’s I-beams are of the type ISBM 150. For purposes of analysis, the skid was constrained at each of its mounting locations, ten in total. The forces due to reciprocation were then applied to the model at compressor mounting locations. The mesh was refined several times in the areas of concern to ensure the model was accurately capturing true deformation and stress values. It was refined again after three iterations; all plateau values are stated. Results as followed:

Figure 7: Total deformation of skid due to moment created by primary forces (MAX=.0054464 inch)

Page 8: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

Figure 8: Stress due to forces generated from compressor.

Yield strength for material of skid (IS 2062) is 36,259psi providing a factor of safety present in the skid of 4.56.

Page 9: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

Cooling Loop Calculations & SpecificationsSome of the heat of compression is transferred through the cylinder wall into four water jacket channels. Each of these channels are identical. For the theoretical analysis of this transfer, these channels were approximated as being round. The exact dimensions of theses channels and other relevant geometries are unknown so approximate values were used and may be changed as more precise information becomes available. The following is a list of assumed dimensions and other parameters.

delta t in compressor 116.6667 KCyl. wall thickness 0.5 inchjacket width 2 inchcircum 21.9911 inchnumber of jackets 2 #K steel 43 W/m*KK water 0.58 W/m*KWater flow 150 GPHDensity of water 999.8395 kg/m^3assumed hydraulic D 1.1284 inMass flow rate 0.1577 kg/sViscosity of water 0.0003 Pa*sCp water 4181.3 KJ/Kg-K

Relevant Parameters

Heat transfer (conduction + convection)

Heating fluid in round channel

Reynolds number equation

Heat transfer coefficient

Page 10: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

Results:Re 5560.1048 #prandtl number water 7.0000 #nusselt number 49.6402 #h forced convection 57.5826 BTU/ft^2*hr*F

Q 234.2986 WQ*4 channels 937.1943 3198.6441 W BTU/Hrdelta t of water 8.731621881 oF

From these results we are able to find a heat exchanger that will be able to handle the required thermal load. The following components are suggested to make up the cooling system.

Pump: Shurflo Industrial Pump — 198 GPH, 115 Volt, 1/2in., Model# 2088-594-154http://www.northerntool.com/webapp/wcs/stores/servlet/product_6970_200249074_200249074

Page 11: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

Heat exchanger:Brazed Flat Plate Heat Exchanger, Model LA14-10 3/4 NPT inch connection - 8 long by 3 1/4 wide by 2 1/4 incheshttp://www.houseneeds.com/shop/HeatingProducts/HydronicHeating/heatexchangers/mischeatexchangers/heatexchangerbuyage.asp

Coolant Tank:5 Gallon Flat Bottom Poly Storage Tank, 22" L x 10" W x 8" Hhttp://www.plastic-mart.com/class.php?item=2465

Heater: Screw Plug Immersion Heater, 400W, 5/8" diameter, 1/2 NPT Model # EMH-060-120Vhttp://www.omega.com/ppt/pptsc.asp?ref=EMH_Heater&Nav=heaf01

Page 12: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

Installation/ Test Cell

Needs and Specifications:

Need Specification Units Range

1 TimelineList of end arrival date and schedule on room preparation activities. List n/a

2

Safety is ensured throughout the installation processes.

Injuries due to installation are minimized and none of the parties involved are liable.

number of

injuries 0

3

Ample amount of room space available to operate machine.

Provide expected room layout of the test cell and the final compressor destination. List n/a

4Reduce impact from sound and vibrations.

Consider the effects the machine will have to its surroundings and evaluate efforts that can be taken during installation to minimize. List n/a

5

Accessibility of the machine for maintenance and use in future projects.

Select the proper compressor position within the room that gives ample room to service the machine safely. Binary Yes

6

RIT maintenance capabilities to provide adequate service.

List current capabilities RIT and the senior design teams have for servicing the machine. These include tools, methods of lifting equipment, mechanical and electrical supplies, storage space for parts, and safety equipment. List n/a

7Provide sufficient support for compressor operation.

Account for the weight and other forces exerted by the compressor. lbs

7500-10000

Timeline: Incorporated into Senior Design II Timeline and Installation Procedure

Safety: Use of Rigging Company that has substantial experience moving heavy equipment.

Space: Layout of room with clear path ways around machine for maintenance and operation in Test Cell. Ensured obstructions such as overhead lights, exhaust systems, and doors are not threats.

Vibrations: Vibration dampening is not necessary due to the configuration of the compressor and the building. Current Test Cell has sufficient acoustic capabilities.

Accessibility: Position of compressor was selected to allow for sufficient maintenance space on each side of the machine and room for Auxiliary Unit installation.

Page 13: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

Maintenance: Tools will be ordered to service machine as well as proper storage space for parts and materials. Lifting requirements are suitable with current shop supplies for parts that may need to be removed. Electrical and mechanical supplies necessary were verified and are accessible to machine. Proper safety equipment and placement of clearly visible signs have been planned for.

Structural: Analysis of floor was performed to determine effects of static load. Structural consultants have been used to verify analysis. I-beam reinforcement is required.

Installation Procedure:- Formula Team and other projects has vacated room:

o Engine Dyno will be removed from the back 4 feet of the room by beginning of 1st week of fall quarter to allow for housekeeping in room.

o All tools and other supplies not pertaining to compressor will be removedo Need to have clear access to floor and surrounding walls of test cell.

- Senior Design Team will prepare for the compressor’s arrival:o Manage the logistics of the contracted work

Work with general contractor to locate ideal placement of I-beams Install I-beams

Figure 1: Basement view of Test Cell, Reinforcement and Mounting Detail Provided by Structural Engineer

Page 14: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

o Order and purchase all items for the installation, interface, and education materials needed

Storage racks Tools Safety Equipment Mounting hardware and plates Sensors DAQ and mounting equipment

o Provide necessary information to Boulter: Schedule and route for transportation. Materials necessary for install. Structural concerns and requirements.

Provide structural engineer’s analysis and suggestions.

Willis BoulterCell Phone: 585-261-3102Boulter Industrial Contractors, Inc.610 Salt RoadWebster, NY 14580Phone: (585) 265-3260Fax: (585) 265-0605E-mail: [email protected]

o Prepare the room for compressor: Clean up and create a sustainable work environment. Ensure unrestricted access to all areas of the room and input

supplies. Mark and drill the required holes needed for mount installation

when compressor is placed in final position. Identify and mark the location of the control panel and emergency

stop. Room must be vacated of all materials to give sufficient room to

rigging company. Ensure that path to the room is clear of any obstructions.

- Preparations by Boulter for relocation: o Transport machine from Dresser-Rand to Boulter Rigging Company

Provide sufficient time for Boulter to define needs for transportation.

Verify that the correct equipment is used and available.o Transport machine from Boulter Rigging Company to RIT machine shop

loading bay.o Upon arrival to RIT:

Unload from truck with fork lift.

Page 15: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

Fork lift will place machine on skates in new addition of shop. Use bar stock to find C.O.G and secure firmly.

o Use skates to transport machine across the machine shop Use no less than 4 carts to ensure sufficient load distribution Locate the carts underneath machine with proper access.

o Place machine in final location with mounts over bolt holes in floor. Place machine as precisely as possible with limited loads being seen

by floor.

Figure 2: Building 09 Transport Route

- 45 feet of transportation across floor with basement underneath.- Loading bay area has foundation and can use fork lift up to the entrance to the old

machine shop.- Load of the compressor must be applied over 60ft2 to prevent damaging of structure

Page 16: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

Figure 3: Top View of Test Cell with Components and Locations

- After Installationo Coordinate with FMS to manage the logistics for the completion of

contracted work Electrical hookups Ventilation Chilled water loop

o Install and hook up cooling system Coolant tank, heat exchanger, heater, valves and piping

o Assemble and install storage rack and work bench in test cell Placement of these items should follow the Test Cell Layout. Upon completion, these items will be used for storage of equipment.

o Place computer, DAQ, tools, spare parts, etc. in proper locationso Provide all safety material in the test cell.

Post signs and stickers Place necessary safety equipment in the room (see safety document)

o Install and hook up sensors and data acquisition unit See sensor document for specifications and locations.

Page 17: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

Final List of Sensors

Page 18: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

Sensor InstallationThere are numerous sensors that will be installed onto the compressor. The scope of this project is to allow for flexibility in the location and configuration of all sensors. As laboratory experiments evolve, it may become necessary to add or move additional sensors to different locations. The following information is manufacturers’ preferred installation methods for the sensors to be used in the DAQ system.

Source: http://www.pcb.com/techsupport/tech_accel.php

Adhesive MountAdhesive mounting bases are recommended to prevent an adhesive from damaging the sensor base or clogging the mounting threads. Below is a table of PCB’s suggested mounting adhesives.

Magnetic MountMagnetic mounts are to be used for temporary sensors on a magnetic surface. A thin layer of silicone grease should be applied between the sensor and magnetic base, as well as between the magnetic base and the structure.

Page 19: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

Stud MountingThis type of installation is to be used for the permanent installation of sensors. First, grind or machine on the test object a smooth, flat area at least the size of the sensor base, according to the manufacturer's specifications. Then, prepare a tapped hole in accordance with the supplied installation drawing, ensuring that the hole is perpendicular to the mounting surface. Install accelerometers with the mounting stud and make certain that the stud does not bottom in either the mounting surface or accelerometer base. A thread-locking compound may be applied to the threads of the mounting stud to guard against loosening.

Page 20: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

Screw MountingLike a stud mount installation, screw mount installations are to be used on thin-walled surfaces. A cap screw passing through a hole of sufficient diameter is an acceptable means for securing the accelerometer to the structure. A thin layer of silicone grease at the mounting interface ensures high-frequency transmissibility.

Page 21: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

Test Plan – Usability Testing

6-8 student test subjects, with 2nd to 3rd year engineering/computer abilities. 1-2 faculty test subjects. 5-10 minute overview of the project and compressor.

Tasks to be completed by each test subject:o Start up Compressor Interfaceo Turn program ono View Graphs Screen and see if they can easily interpret information on the

screeno Turn program offo Close out Compressor Interfaceo Access excel file

Assessment Factors:o Thought process of subject as they are performing actionso Frequency of help requestso Number of errors made in execution of instructions (ie Laboratory)o Time to complete task o Intuitiveness/Navigation/Aesthetics/comments

Other situations to test: Run program with the previous data file open while the new instance is set

to save to the same file name Run program with previous data file open while the new instance is set to

save to a different file name

Page 22: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

Prior to First Run

E-Stop

1) Ensure power is connected to the control unit by using a voltmeter to check power

supply to the control unit.

2) Press the E-Stop button located in the front of the room.

3) Ensure that the control unit has lost power.

4) Reset the circuit breaker.

5) Press the E-Stop button located in the back of the room.

6) Ensure that the control unit has lost power.

7) Reset the circuit breaker.

8) Press the E-Stop button located outside of the room.

9) Check that the control unit has lost power.

10) Reset the circuit breaker.

Lock-Out Tag-Out for Control Panel

1) Pull down the power lever to shut down the main circuit breakers.

2) Use the lock-out tag-out lock to ensure the lock-out lever is restricted from moving.

3) Turn on the control panel.

4) Use a multi-meter to check that the control panel is not receiving power.

5) Turn off the control panel.

6) Un-lock the lock-out lever.

7) Pull the power lever up to return power to the main circuit breakers.

Measure and Adjust Machine Level

1) Check that the compressor is fully installed on the vibe-prevention mounts.

2) Place a level on the base of the compressor.

3) Check that the compressor is level. If it is leveled, no further adjustments are

necessary.

Page 23: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

4) If it is not, determine the appropriate mount for adjustment.

5) Lift the compressor off of the adjustable mount.

6) Use a wrench to adjust the mount.

7) Return the compressor into the mount.

8) Check that the compressor is level. If it is leveled, no further adjustments are

necessary.

9) If it is not level, repeat steps 5-8.

Vibration Trip-Switch

1) Mount the Vibe Trip-Switch to the Vibration Shaker in 09-2100 “Vibrations Lab”.

2) Use LabVIEW to create a customized adjustment program.

3) Adjust the shaker to the desired vibration levels.

4) Connect a multi-meter to the Vibe Trip-Switch to test for an open or closed circuit.

5) Turn on the Vibration Shaker.

6) As Vibration Shaker escalates, ensure the Vibe Trip-Switch trips at desired vibration

level.

7) Disconnect the apparatus.

Air Flow Results1) Obtain the test results for the air circulation from Dave Hathaway.

2) Ensure that the room air will be fully circulated at least every 15 minutes.

Gravity Inlet1) Open the gravity inlet valve.

2) Close the room doors.

3) Use a barometer to measure the air pressure in the room (baseline).

4) Turn on the exhaust fan.

5) Continue measuring and recording the air pressure every minute for 10 minutes.

6) If the air pressure levels remain constant, then the gravity inlet valve is sufficient.

7) If the air pressure levels decline, then the gravity inlet valve is not supplying enough

air.

Page 24: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

Miscellaneous Room Preparations

1) Use a simple lamp, or any other safe electronic device, to test the room’s wall outlets.

2) Use a laptop and spare Ethernet cable to test the internet connectivity of the CAT-5

connection outlet located in the front of the room.

During First Run

E-Stops1) Start the compressor.

2) Press the E-Stop button located in the front of the room.

3) Ensure that the compressor has lost power.

4) Reset the circuit breaker.

5) Start the compressor.

6) Press the E-Stop button located in the back of the room.

7) Ensure that the compressor has lost power.

8) Reset the circuit breaker.

9) Start the compressor

10) Press the E-Stop button located outside of the room.

11) Check that the compressor has lost power.

12) Reset the circuit breaker.

Visual Safety and Maintenance Checks1) Refer to the official “Maintenance Manual” for important details and tests that should

be conducted during the first time the compressor is run after installation.

2) Record all noticeable areas of moving parts that are potential safety hazards or pinch

points.

3) Record any unexpected noises that occur.

Page 25: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

Lock-Out Tag-Out for Compressor1) Pull down the power lever to shut down the main circuit breakers.

2) Use the lock-out tag-out lock to ensure the lock-out lever is restricted from moving.

3) Turn on the compressor.

4) Use a multi-meter to check that the compressor is not receiving power.

5) Turn off the compressor.

6) Un-lock the lock-out lever.

7) Pull the power lever up to return power to the main circuit breakers.

Room Sound Levels1) Obtain a Sound Level Meter from the Ergonomics Lab in the IE Department.

2) Record a sound measurement at a distance of 1m from the compressor.

3) Record a sound measurement at a distance of 1m from room 09-2329 with opened

doors.

4) Record a sound measurement at a distance of 10m from room 09-2329 with closed

doors.

5) Ensure all readings are within the safety requirements.

Room Temperature1) Obtain a type K thermocouple attachment and a multi-meter from John Wellin or a

Thermo-fluids lab.

2) Obtain a temperature reading from 10m outside of room 09-2329 as a baseline ambient

temperature value.

3) Stand in the center of the front half of room 09-2329, and record the ambient

temperature value every minute for 12 minutes (to provide 3 cycles of the air exhaust

system).

4) Stand in the center of the back half of room 09-2329, and record the ambient

temperature value every minute for 12 minutes (to provide 3 cycles of the air exhaust

system).

Page 26: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

Vibrations1) Move outside the Test Cell (09-2329), shutting the door on way out.

2) Face the door to the Test Cell (one meter away from center) and make observations on

any vibrations felt.

3) If vibrations can be felt through floor (step 4), move back from Test Cell one meter at a

time until vibrations are no longer felt.

4) Repeat step 3 for all directions (right and left) and record values to create circle of

influence.

5) Make final observations about effects from vibrations of the compressor.

Removal and Re-install of Parts

Lock-Out Tag-Out for Compressor1) Pull down the power lever to shut down the main circuit breakers.

2) Use the lock-out tag-out lock to ensure the lock-out lever is restricted from moving.

3) Turn on the compressor.

4) Use a multi-meter to check that the compressor is not receiving power.

5) Turn off the compressor.

6) Conduct any necessary part removals and re-installs.

7) Un-lock the lock-out lever.

8) Pull the power lever up to return power to the main circuit breakers.

Lifting Capabilities1) Bring the lift crane into the test cell room with the compressor.

2) Ensure that the lift crane can fully access the compressor.

3) Check that manual lifting is possible for any areas that are not accessible by the lift

crane.

Page 27: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

Vibrations Lab

Investigation: Damping provided by Skid

This investigation looks at how much damping the skid is providing to the singe cylinder

system. ANSYS was used to develop a theoretical model of the skid and the forces applied

to it. Using the documents provided by Dresser Rand, the skid was modeled in SolidWorks

and then imported into ANSYS. The skid was constructed from the material IS 2062. The

skid’s I beams are of the type ISBM 150. For purposes of analysis, the skid was

constrained at each of its mounting locations, 10 in total. The forces due to reciprocation

were then applied to the model at compressor mounting locations. The max deformation

was found to be 0054464 inch.

Page 28: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

Assignment

Before starting the compressor, make yourself aware of all startup procedures and take all

the necessary safety precautions. Before recording any data, be sure to run the compressor

for a minimum of 5 minutes to ensure that the compressor has had time to reach steady

state. Using the Labview interface, locate the vibration tab and begin logging

accelerometer data by pressing “Log Data” and saving the values in a .txt file format. The

log data feature will automatically log data for a limited amount of time due to the large

number of samples per second.

Create a formal report section comparing experimental data with theoretical predictions,

following the guidelines and specific topics below.

Create a theoretical model using vibration analysis

Calculate the maximum deflection on the compressor

Then using the data logged from the accelerometer attached to the skid measure the

deflection on the skid.

Compare the theoretical and experimental data. Include the ANSYS analysis.

Page 29: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

Thermo Fluids Lab

Investigation: Compressor P-V Diagrams

This investigation explores the concepts of adiabatic compression in a Dresser-Rand single

piston, double acting, reciprocating compressor. Utilizing a high sample rate pressure

transducer located in the bore of the cylinder and a crank position sensor, we are able to

generate real-time plots of Pressure vs. Volume. This can be compared with the theoretical

Pressure vs. Volume diagram. Assuming adiabatic compression and negligible pressure

drop through the valves, a theoretical P-V diagram can be generated.

Assignment

Before starting the compressor, make yourself aware of all startup procedures and take all

the necessary safety precautions. Before recording any data, be sure to run the compressor

for a minimum of 5 minutes to ensure that the compressor has had time to reach steady

state. Using the Labview interface, locate the thermal fluids lab 1 tab and begin logging

pressure and volume data by pressing “Log Data” and saving the values in a .txt file

format. The log data feature will automatically log data for a limited amount of time due to

Page 30: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

the large number of samples per second. These values can be imported into excel and

plotted to create the experimental p-v diagram.

Create a formal report section comparing experimental data with theoretical predictions,

following the guidelines and specific topics below.

Fully documented calculations for theoretical values. We will assume that the air

entering the cylinder is at atmospheric pressure when the piston is at bottom dead

center. Compute enough values to produce a nice smooth curve. When performing

calculations, make sure that valve opening pressure is identical to the experimental

outlet pressure. The pressure in the cylinder should also be constant after the valve

is opened.

Be sure to incorporate the clearance volume in your calculations. State all

assumptions.

Generate one chart with both theoretical and experimental plots.

Discuss the general agreement between the measured pressure curve, and the theoretical

predictions. Do they agree within the experimental errors? If not, what else might account

for the discrepancies (other than simple human error)? Compute average error in pressure

over one cycle. Were our assumptions valid? Explain.

Page 31: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

Safety Document

Page 32: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

Observe All Hazard and Warning Labels

PERSONAL PROTECTITIVE EQUIPMENT

Always Wear the Appropriate Safety Gear

Steel toe shoes

Safety glasses or goggles

Gloves

Hard hat

Ear protection

Page 33: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

TORQUING SAFETY POINTS

These Are Unsafe Tool Uses! Never torque any fasteners or flanges on a unit that is running or pressurized

Use correct torquing procedures

Use correct size / range torque wrench

Do not use cheater bars or pipes on wrenches

Use thick wall sockets, no chrome sockets

Make sure you have good support to back up hydraulic wrenches and torque

multipliers

Page 34: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

LIFTING SAFETYUse Your Legs, Spare Your Back

Know the weight of the item you are lifting

Bend at the knees (not your waist) and lift using your legs

Ask a co-worker to help with the load

Use a crane, hoist, fork truck etc. if in doubt

Proper Crane and Sling Use

Inspect all lifting straps and chains for

cuts or other damage before using

Verify lifting capacity of cranes or chain

falls

Check lifting eye bolts for bent or

damaged thread section

Use Proper Swivel Eye Bolts

Page 35: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

LOCKOUT, TAG-OUT ELECTRICAL POWER

Before performing any work on the unit ensure

that the electrical power has been de-energized

and locked out at the breaker panel to prevent

accidental electrical shock or start up of the unit

Page 36: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

Normal Daily Operating Procedures

• Check the oil level

• Check discharge pressure is zero

• Turn on the cooling water

• Start the compressor unloaded

• Select the compressor load: 50% or 100%

• Do this within 10 minutes to prevent overheating

• Compressor discharge pressure will rise to the setting of the backpressure valve (typically around 35 psi).

Normal Operation

Page 37: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

Depressurize Before Valve Cover Removal

Be careful where you place your hands and finger when tightening the piston rod jam-nut with hammer wrench

Page 38: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

Typical Reciprocating Compressor Cylinder Assembly

Cylinder Pinch-Points

Running Gear Pinch-Points

Page 39: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

Pinch-Point Electric Motor Drive Belts Pressurized Valve Cover

Hot Discharge Temperatures: Compressor Cylinder & Discharge Bottle Electric Motor Shock Hazard

Page 40: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

Bill of Materials

Page 41: ANSYS Models - Rochester Institute of Technologyedge.rit.edu/edge/P09452/public/Design Review 4 - 17.doc · Web viewRemoval and Re-install of Parts 27 Vibrations Lab 28 Thermo Fluids

Scope of SupplyA scope of supply list was created based off the hazard analysis findings.

With the ability to customize portions of the compressor, the scope of supply will communicate RIT’s specific needs to Dresser Rand.

- Relief Valve repositioned - Kill Switches: Incorporate into control panel

o Kill switch activated by vibrationo Kill switch activated by pressureo Kill switch activated by over heating

- E-stop o Incorporate into control panel

- Bore Holeso Need placemento Characteristicso Number

- Weld Handles to access panels

- Piston access panels made of Lexan

- 5 gallon tank