23
KOÇ HOLDİNG – CNH TÜRK TRAKTÖR VE ZİRAAT MAKİNELERİ CO. Construction Maintenance Engineer – Ankara 01.12.2011 - …….. 01.12.2011 – ……….. Construction Maintenance Engineer

A.ÖZGÜR MISIRLIOĞLU TANITIM

Embed Size (px)

Citation preview

Page 1: A.ÖZGÜR MISIRLIOĞLU TANITIM

KOÇ HOLDİNG – CNH

TÜRK TRAKTÖR VE ZİRAAT MAKİNELERİ CO.

Construction Maintenance Engineer – Ankara

01.12.2011 - ……..

01.12.2011 – ……….. Construction Maintenance Engineer

Page 2: A.ÖZGÜR MISIRLIOĞLU TANITIM

DUTIES

• Responsible for all construction works in the

- Ankara factory where 80 000 m2 covered and 275 000 m2

open space area

- Akyurt Spare Parts Storage Area

- Kazan Tire Storage and Preparation Area

• Preparation of investment budgets, projects and specifications for

the new year.

• Planning and determination of the all maintenance and repair

activities for existing structures

2

Page 3: A.ÖZGÜR MISIRLIOĞLU TANITIM

3

• Making and maintenance activities for

- Concrete driveways

- Asphalt roads

- Infrastructures (Sewage and rain )

- Sandwich pannel roof

- Epoxy endustrial ground covering

- Building reinforcement

Page 4: A.ÖZGÜR MISIRLIOĞLU TANITIM

4

- Insulation to buildings within the scope of ISO 50001

Energy Management

- Suspended ceilings with rockwool panels and gypsum

panel

• Development of specifications,

• According to the requirements, preparation of new projects

• Implementation of integrated management systems, internal

controls

Page 5: A.ÖZGÜR MISIRLIOĞLU TANITIM

5

Application Photos

1. R-D Tier 4 Test Project

Page 6: A.ÖZGÜR MISIRLIOĞLU TANITIM

6

2. R-D Cold Test Building Reinforcement

Page 7: A.ÖZGÜR MISIRLIOĞLU TANITIM

7

2. New R-D Workshop Building Reinforcement

Page 8: A.ÖZGÜR MISIRLIOĞLU TANITIM

8

3. Constructing Infrastructure

Page 9: A.ÖZGÜR MISIRLIOĞLU TANITIM

9

4. Constructing New Ofices

Page 10: A.ÖZGÜR MISIRLIOĞLU TANITIM

10

5. Machinery Foundation Construction

Page 11: A.ÖZGÜR MISIRLIOĞLU TANITIM

11

6. Roof Maintenance Works

Page 12: A.ÖZGÜR MISIRLIOĞLU TANITIM

12

Page 13: A.ÖZGÜR MISIRLIOĞLU TANITIM

13

7. Concrete and Epoxy Endustrial Ground Covering Works

Page 14: A.ÖZGÜR MISIRLIOĞLU TANITIM

14

ARTVIN – ERZURUM STATE HIGHWAY FIRST PART CONSTRUCTION PROJECT

ANKARA 28.06.2010 – 14.06.2011 Claims and Final Accounts Engineer

• Preaparation of Final Cost Documents for Tunnel Flut Structures , Bridges and Culverts• Preparation of As-Built Documents

Page 15: A.ÖZGÜR MISIRLIOĞLU TANITIM

15İSTANBUL 17.12.2009 – 08.06.2010 Technical Office Engineer / Site Manager

AMBATOVY MARINE OUTFALL PIPELINE PROJECT ,INDIAN OCEAN,MADAGASCAR

Page 16: A.ÖZGÜR MISIRLIOĞLU TANITIM

16İSTANBUL 17.12.2009 – 08.06.2010 Technical Office Engineer / Site Manager

AMBATOVY MARINE OUTFALL PIPELINE PROJECT ,INDIAN OCEAN,MADAGASCAR

• Preparation of Work Method Statement Documents• Preparation of calculation of Sheet Piling System• Calculation of Wave Force in Indian Ocean• Design and Calculation of Concrete Weight Blocks • During one month I have worked as a Site Manager.

Page 17: A.ÖZGÜR MISIRLIOĞLU TANITIM

17İSTANBUL 17.12.2009 – 08.06.2010 Technical Office Engineer

AKSA ACRYLIC PLANT Ø1600 COOLING WATER PIPELINE MARINE OUTFALL PROJECT, YALOVAAksa Acrylic Chemistry Co.

• Lowering pipeline to the sea bed on side• Preparation of As-Built Documents

Page 18: A.ÖZGÜR MISIRLIOĞLU TANITIM

18İSTANBUL 17.12.2009 – 08.06.2010 Technical Office Engineer

MARDIN-KIZILTEPE DRINKING WATER ESTABLISHMENT AND TRANSPORT LINE PROJECT

• Preparation of As-Built Documents

AKSA ACRYLIC PLANT Ø1600 COOLING WATER PIPELINE MARINE OUTFALL PROJECT, YALOVAAksa Acrylic Chemistry Co.

• Lowering pipeline to the sea bed on side• Preparation of As-Built Documents

405 HECTARES INFRASTRUCTURE PROJECT ,BADER, LIBIA

• Preparation of Cost Estimation Documents

GARABHOLI COMPLEX HANGAR REHABILITATION PROJECT,BADER,LIBIA

• Preparation of projects and calculations for new railway and renovation of crain system • Preparation of Cost Estimation Documents

BENNINA-AL KUWFYA TO AL AGURYA WATER SUPPLY PROJECT,LIBIA• Preparation of Cost Estimation Document for in various sizes ductile pipeline

Page 19: A.ÖZGÜR MISIRLIOĞLU TANITIM

19AZERBAIJAN 25.07.2007 – 13.10.2009

OGUZ-GABALA-BAKU WATER PIPELINE PROJECT , AZERBAIJAN 250 km. ( GRP – STEEL 2m DIAMETER PIPELINE )

Field Civil Team Leader

Page 20: A.ÖZGÜR MISIRLIOĞLU TANITIM

20

• Checking Air Release Valve , Drainage Station , Concrete Sleeve , Water Distribution Chamber , Chlorination Building , Pressure Break Chamber , Pressure Control Chamber , Workshop & Storage Building , Administration Building Projects , coordination with Ankara main office and site crews.• Coordination and application of Water Distribution Chamber , Chlorination Building , Pressure Break Chamber , Pressure Control Chamber , Workshop & Storage Building, Administration Buildings.• Coordination and application of Steel Material Storage Building • Preparation of Work Method Statement, Plan , Profile and Concrete Sleeve Reinforcement and Formwork Projects for nine Road Crossings.• Preparation of Work Method Statement, Plan , Profile and Detail Projects for nine River Crossings• Preparation of Deep Valley Crossings Plan , Profil and Detail Projects• Preparation of Building Material Certificates for Employer’s Approval• Preparation of Work Method Statement, Crossing Plan , Profile and Detail Projects for fourteen Natural Gas Pipeline and three Crude Oil Pipeline Crossings.• Preparation of Cost Estimating Documents

AZERBAIJAN 25.07.2007 – 13.10.2009

OGUZ-GABALA-BAKU WATER PIPELINE PROJECT , AZERBAIJAN 250 km. ( GRP – STEEL 2m DIAMETER PIPELINE )

Field Civil Team Leader

Page 21: A.ÖZGÜR MISIRLIOĞLU TANITIM

21

• Total Sewage ( 187 km ) , Storm water ( 57 km ) Application Project• Preparation of Bursa ,Gemlik Sewage (152 km) and Stormwater ( 48 km )• Preparation of Bursa , Nilüferköy Sewage ( 26 km ) and Stormwater ( 9 km )• Preparation of Bursa , Şükriyeköy Sewage ( 9 km ) Projects with mskanal Software• Preparation of Ayvalı River ( 4 km ) Rehabilitation Projects• Preparation of Ayafatma River ( 4 km ) Rehabilitation Projects• Preparation of Gemlik Çarşı River (0.35 km) Rehabilitation Projects

BURSA 06.01.2006 – 20.07.2007

GREATER MUNICIPALITY OF BURSA, BURKAY4 APPLICATION PROJECT

Project Engineer

Page 22: A.ÖZGÜR MISIRLIOĞLU TANITIM

22

• Preparation of Pipeline Completion Documents• Preparation of As-Built Projects of River , Road and NGPL Crossings • Preparation of Culvert Projects for Access Road of Ball Valve Stations • Preparation of Drainage Projects for Ball Valve Stations

ERZİNCAN 14.06.2015 – 06.01.2006

BTC ( Baku-Tbilisi-Ceyhan )CRUDE OIL PIPELINE PROJECT LOT B (Erzurum–Erzincan– Sivas) 460 Km

Engineering Department / Civil Engineer

Page 23: A.ÖZGÜR MISIRLIOĞLU TANITIM

23

BTC ( Baku-Tbilisi-Ceyhan )CRUDE OIL PIPELINE PROJECT LOT B (Erzurum–Erzincan– Sivas) 460 Km

ERZİNCAN 27.08.2013 – 26.12.2014 Engineering Department / Civil Engineer

• Preparation of River , Road , NGPL Crossing Work Method Statements and Procedures• Preparation of all the drawings , details and maps of construction• Coordination with the site construction super intendent• Field engineering• Preparation of access roads • Visiting the site for preparation of ditch breakers-slope breakers drawings• Detailed drawings of Road and River Crossings • Civil drawings for Block Valve Stations foundations