quality assurance (QA) inspection/repair management system API 510/570Documenting
reporting
Developing
Review
Correctiveaction
Establishing
approval
Ensuring
Training
Controlsnecessary
Organization and reporting structure for inspection personnel.
Documenting
inspection and Q procedures.
Documenting
reporting
inspection and test results.
documenting
Developing
inspection plans.
documenti
ng
Developi
ng
ris!"based assessments
documenting
Establishing
inspection intervals.
Correctiveaction
inspection and test results.
#nternal auditing for compliance with the Q inspection manual.
Review
approval
drawings$ design calculations$ engineering assessments$ andspeci%cations for repairs$ alterations$ and reratings.
Ensuring
&urisdictional requirements for pressure vessel inspection$repairs$ alterations$ and rerating are continuously met.
Reporting
to the inspector any process canges or other conditions thatcould a'ect pressure vessel integrity.
Training
re(uirements for inspection personnel regarding inspectiontools$ techni(ues$ and technical !nowledge base.
Controlsnecessary
quali!ed "elders and procedures are used for all repairs andalterations.
Controlsnecessary
all repairs and alterations are per#ormed in accordance withthis inspection code and applicable speci%cations.
Controlsnecessary
quali!ed $%& personnel and procedures are utilized.
Controlsnecessary
materials con#orming to the applicable construction code areutilized for repairs and alterations.
Controlsnecessary
inspection measurement$ $%&$ and testing e(uipment areproperly maintained and cali'rated.
Controlsnecessary
wor! of contract inspection or repair organizations meets tesame inspection requirements as the owner)user organization.
#nternal auditing re(uirements for the QC system for pressure"relieving devices.
Controlsnecessary
inspectors ave te visual acuity necessary to perform theirassigned inspection tas!s.