26
1 APNIC Update PACNOG 3 Rarotonga, Cook Islands 17 June 2007

APNIC Status Report€¦ · 17/06/2007  · APNIC Surveys •Three surveys previously… –Members and other stakeholders –Conducted independently (KPMG) –Guaranteed confidentiality

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: APNIC Status Report€¦ · 17/06/2007  · APNIC Surveys •Three surveys previously… –Members and other stakeholders –Conducted independently (KPMG) –Guaranteed confidentiality

1

APNIC Update

PACNOG 3

Rarotonga, Cook Islands

17 June 2007

Page 2: APNIC Status Report€¦ · 17/06/2007  · APNIC Surveys •Three surveys previously… –Members and other stakeholders –Conducted independently (KPMG) –Guaranteed confidentiality

2

What is APNIC?

• Regional Internet Registry (RIR) for the Asia Pacific region– One of five RIRs currently operating around

the world– Non-profit, membership organisation– Responsible for distributing Internet resources

throughout the AP region

Page 3: APNIC Status Report€¦ · 17/06/2007  · APNIC Surveys •Three surveys previously… –Members and other stakeholders –Conducted independently (KPMG) –Guaranteed confidentiality

3

What is APNIC?

• Industry self-regulatory body– Established in 1993– Consensus-based, open, and transparent

decision-making and policy development– Non-profit, neutral, and independent

• Open membership-based structure– Open participation

• Democratic, bottom-up processes

Page 4: APNIC Status Report€¦ · 17/06/2007  · APNIC Surveys •Three surveys previously… –Members and other stakeholders –Conducted independently (KPMG) –Guaranteed confidentiality

4

APNIC Survey 2007

Page 5: APNIC Status Report€¦ · 17/06/2007  · APNIC Surveys •Three surveys previously… –Members and other stakeholders –Conducted independently (KPMG) –Guaranteed confidentiality

5

APNIC Surveys

• Three surveys previously…– Members and other stakeholders– Conducted independently (KPMG)

– Guaranteed confidentiality– Face-face, written and online response

• Analysis of past results (KPMG)– 90% of items actioned (39% completed)

• Fourth survey – 2007 – Launched November 2006

– Published March 2007

Page 6: APNIC Status Report€¦ · 17/06/2007  · APNIC Surveys •Three surveys previously… –Members and other stakeholders –Conducted independently (KPMG) –Guaranteed confidentiality

6

All surveys

0

50

100

150

200

250

300

350

1999 2001 2004 2007

0

5

10

15

20

25

30

35

Responses

Economies

Page 7: APNIC Status Report€¦ · 17/06/2007  · APNIC Surveys •Three surveys previously… –Members and other stakeholders –Conducted independently (KPMG) –Guaranteed confidentiality

7

Page 8: APNIC Status Report€¦ · 17/06/2007  · APNIC Surveys •Three surveys previously… –Members and other stakeholders –Conducted independently (KPMG) –Guaranteed confidentiality

8

Survey 2007 – Membership category

Associate

20

Very Small

44

Small

92Medium

66

Large

25

Very Large

9

Extra Large

9

Non-member

45

N/A5

Page 9: APNIC Status Report€¦ · 17/06/2007  · APNIC Surveys •Three surveys previously… –Members and other stakeholders –Conducted independently (KPMG) –Guaranteed confidentiality

9

Survey 2007 – Membership duration

23

0-1

59

1-5136

5-1082

10+16

Page 10: APNIC Status Report€¦ · 17/06/2007  · APNIC Surveys •Three surveys previously… –Members and other stakeholders –Conducted independently (KPMG) –Guaranteed confidentiality

10

Part 1 – Analysis of APNIC performance

6.066.19

6.356.756.786.806.826.86

6.99

7.067.077.147.187.19

7.337.367.367.377.39

7.467.477.477.517.537.567.577.60

7.717.767.797.877.917.917.917.947.957.988.058.068.098.17

8.278.45

7.03

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

1.341.3

1.401.111.51.21.6

1.121.291.311.9

1.181.4

1.271.301.191.261.251.201.7

1.281.391.131.141.171.351.331.371.231.421.431.221.161.361.1

1.211.8

1.321.411.151.101.381.241.44

Page 11: APNIC Status Report€¦ · 17/06/2007  · APNIC Surveys •Three surveys previously… –Members and other stakeholders –Conducted independently (KPMG) –Guaranteed confidentiality

11

Part 1 – Top 10

1. Support for DNS root server operations2. Statistics and other reports3. Support for Internet development4. Email is an effective and efficient way to contact APNIC 5. APNIC whois database quality, usability and reliability 6. APNIC servers and services maintenance and availability7. Technical content in APNIC Open Policy Meetings 8. The APNIC helpdesk service quality9. APNIC use of email and mailing lists10.Overall services provided are satisfactory

Page 12: APNIC Status Report€¦ · 17/06/2007  · APNIC Surveys •Three surveys previously… –Members and other stakeholders –Conducted independently (KPMG) –Guaranteed confidentiality

12

Part 1 – Low 10

1. Policy development process is fair and accessible 2. Policy documents are easy to access and understand 3. Phone (VoIP) is an effective way to contact APNIC 4. Obtaining IPv4, IPv6 or ASN is easy and straightforward 5. Value members get from APNIC justifies the cost 6. Online eLearning is readily available 7. Phone (PSTN) is an effective way to contact APNIC 8. The NRO and ASO are well understood 9. APNIC training is easy to attend 10.Open Policy Meetings are affordable and accessible to

attend in person

Page 13: APNIC Status Report€¦ · 17/06/2007  · APNIC Surveys •Three surveys previously… –Members and other stakeholders –Conducted independently (KPMG) –Guaranteed confidentiality

13

Part 2 – Allocation of resources

2.234

2.4682.873

11.842

12.329

17.20617.278

17.389

17.623

18.617

21.307

21.415

22.22222.962

23.801

24.085

26.959

17.785

0.000 5.000 10.000 15.000 20.000 25.000 30.000

2.3.62.2.6

2.1.6

2.2.2

2.1.52.3.4

2.1.2

2.3.2

2.2.32.3.3

2.3.5

2.1.4

2.2.12.1.1

2.2.5

2.2.4

2.1.32.3.1

Page 14: APNIC Status Report€¦ · 17/06/2007  · APNIC Surveys •Three surveys previously… –Members and other stakeholders –Conducted independently (KPMG) –Guaranteed confidentiality

14

Part 2 – Top 10

1. Technical research and development activities2. Streamline resource requests and allocation process 3. Increase accessibility of APNIC meetings and policy

processes 4. Represent the needs of the ISP community to

governments and regulators 5. Expand training activities in scope, geographical coverage

and online options. 6. Improve the APNIC website 7. Support ISP education in the AP region 8. Deploy more DNS root servers in the Asia Pacific region 9. Resource certification to support better routing security 10.Expand external communication and outreach activities

Page 15: APNIC Status Report€¦ · 17/06/2007  · APNIC Surveys •Three surveys previously… –Members and other stakeholders –Conducted independently (KPMG) –Guaranteed confidentiality

15

Average ratings by Member category

6

6.5

7

7.5

8

8.5

9

AssociateVery Small

SmallMedium

Large

Very LargeExtra LargeNon-member

N/A

Page 16: APNIC Status Report€¦ · 17/06/2007  · APNIC Surveys •Three surveys previously… –Members and other stakeholders –Conducted independently (KPMG) –Guaranteed confidentiality

16

Average Ratings by Member duration

6.6

6.8

7

7.2

7.4

7.6

7.8

8

8.2

0-1 1-5 5-10 10+

Page 17: APNIC Status Report€¦ · 17/06/2007  · APNIC Surveys •Three surveys previously… –Members and other stakeholders –Conducted independently (KPMG) –Guaranteed confidentiality

17

APNIC surveys

• For more informationhttp://www.apnic.net/survey

Page 18: APNIC Status Report€¦ · 17/06/2007  · APNIC Surveys •Three surveys previously… –Members and other stakeholders –Conducted independently (KPMG) –Guaranteed confidentiality

18

Other developments…

Page 19: APNIC Status Report€¦ · 17/06/2007  · APNIC Surveys •Three surveys previously… –Members and other stakeholders –Conducted independently (KPMG) –Guaranteed confidentiality

19

Other developments

• Resource certification R&D• MyAPNIC• Public statistics (O3)

• ICONS• ARMS• Content Management System

• Human Resources Information System

• … and much much more

Page 20: APNIC Status Report€¦ · 17/06/2007  · APNIC Surveys •Three surveys previously… –Members and other stakeholders –Conducted independently (KPMG) –Guaranteed confidentiality

20

Root Servers in Asia Pacific

Page 21: APNIC Status Report€¦ · 17/06/2007  · APNIC Surveys •Three surveys previously… –Members and other stakeholders –Conducted independently (KPMG) –Guaranteed confidentiality

21

APNIC meetings

• APNIC 24, SANOG 10– New Delhi, India– 29 August - 7 September 2007

• APNIC 24 / SANOG 10 fellowship programme– Deadline for submission 30 June 2007– https://submission.sanog.org/fellowship

• Participate remotely– Participate in discussions, ask questions to the

presenter, voice your opinion through:– Webcast, podcast, jabberchat, live transcripts

• Invitation letters available!– Come and speak to me

Page 22: APNIC Status Report€¦ · 17/06/2007  · APNIC Surveys •Three surveys previously… –Members and other stakeholders –Conducted independently (KPMG) –Guaranteed confidentiality

22

APNIC 24 highlights

• Interesting topics– IPv4 consumption proposals– Discussion on new membership fee structure

• All invited !!!– http://www.apnic.net/meetings/24/index.html

Page 23: APNIC Status Report€¦ · 17/06/2007  · APNIC Surveys •Three surveys previously… –Members and other stakeholders –Conducted independently (KPMG) –Guaranteed confidentiality

23

Finally, a word from our sponsors…

Page 24: APNIC Status Report€¦ · 17/06/2007  · APNIC Surveys •Three surveys previously… –Members and other stakeholders –Conducted independently (KPMG) –Guaranteed confidentiality

24

Page 25: APNIC Status Report€¦ · 17/06/2007  · APNIC Surveys •Three surveys previously… –Members and other stakeholders –Conducted independently (KPMG) –Guaranteed confidentiality

25

ecoAPNIC…

• A staff-driven project aimed at reducing the “ecological footprint” of APNIC operations

– Recycling

– Paper reduction

– Reduce energy consumption and waste

– Look at transportation and travel

– Monitoring and reporting

– http://www.apnic.net/ecoapnic

Page 26: APNIC Status Report€¦ · 17/06/2007  · APNIC Surveys •Three surveys previously… –Members and other stakeholders –Conducted independently (KPMG) –Guaranteed confidentiality

Thank You

This presentation brought to you by ecoAPNIC, using 100% recycled electrons.