52
Appendix 1: Damaged Mirrors from previous experiments

Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

Appendix 1: Damaged Mirrors from previous experiments

Page 2: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

Appendix 2: Gantt chart

Page 3: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

Appendix 3: CAD Drawings of Chamber

Page 4: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,
Page 5: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,
Page 6: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,
Page 7: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

Appendix 4: Initial ideas

Idea 1

Idea 2

Page 8: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

Idea 3

Idea 4

Page 9: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

Idea 5

Page 10: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

Idea 6

Page 11: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

Idea 7

Page 12: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

Idea 8

Idea 9

Page 13: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

Idea 10

Idea 11

Page 14: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

Idea 12

Idea 13

Page 15: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

Idea 14

Page 16: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

Idea 15

Idea 16

Page 17: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

Idea 17

Idea 18

Idea 19

Idea 17

Page 18: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

Idea 19

Page 19: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

Idea 20

Page 20: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

Appendix 5: Value Analysis Initial

Designs (Refer to

appendix)

Maintenance Ease of

Manufacturing

Cost Difficulty of

Adjustment

Degree of

Accuracy

Suitability

for a

Vacuum

1 1 9 1 0 8 10

2 8 4 9 2 9 6

3 4 5 5 2 7 10

4 8 6 9 2 2 6

5 7 6 9 3 10 8

6 5 8 5 2 9 9

7 4 8 4 4 5 9

8 3 5 3 5 4 8

9 4 6 3 5 4 7

10 3 7 4 6 5 8

11 5 4 9 2 9 8

12 3 6 5 2 8 9

13 5 4 9 1 9 8

14 3 5 6 3 7 8

15 1 9 2 1 4 9

16 4 7 5 3 7 8

17 3 7 6 3 9 8

18 5 6 8 3 6 8

19 1 9 2 2 4 9

20 3 5 8 2 9 10

We decided to develop designs 5, 15 and 20 further as they scored the best in the table

Page 21: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

Appendix 6: Photos from site visit

Page 22: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,
Page 23: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,
Page 24: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

Appendix 7: Development of Ideas

Appendix 8: Developed Idea

Page 25: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,
Page 26: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,
Page 27: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,
Page 28: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,
Page 29: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,
Page 30: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

Appendix 8: Model and CAD drawings of Model

Page 31: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

Appendix 9: CAD Drawings

Page 32: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,
Page 33: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

Appendix 10: Testing

Appendix 11: Bench Laser Risk Assessment

Practical Name: Using Laser

Year Group: Sixth form

HAZARDS: Damage to retina if a laser beam falls on the pupil of the eye

* FOLLOW LASER GUIDELINES ON THE SCREEN* People at Risk: Pupils, Staff, Technicians CONTROL: Must be set up on a side bench in such a position that the beam does not fall on the students. Students should be prevented from looking directly into the beam. Screen must be placed between laser and students to protect eyes.

Page 34: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

Appendix 12: Final CAD Drawings

Page 35: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,
Page 36: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,
Page 37: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

Appendix 13: Time Plan for the RAL lasers

Page 38: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

Appendix 14: Minutes

Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October, 2011

Present: Farran Elvidge , Sophie Atkins, Amber Farrow, Isobel Powell, Vanessa Leung, Steve, Darren, Mrs Charlesworth Apologies: 0

1. To check whether there are free rooms in DT block around 12.30 on Wednesdays. Action: IP, SA, AF, FE, VL

2. Write up design specification which template will be sent soon.

Action: IP, SA, AF, FE, VL

3. Write project brief which template will be sent soon. It should include an outline of what to do, approximately 2-3 paragraphs long. Action: IP, SA, AF, FE, VL

4. Mind map ideas

Note: Bearings, materials, how to put it together and how to replace the shield when it gets dirty. Action: IP, SA, AF, FE, VL

5. Arrange a tour. Give a date during 1st of November, preferably during Thursday T.P. Action: Darren

Meeting finished at 1.30pm. Date of next meeting: TBC

Contents: - 12

th October 2011

- 17th

October 2011

- 19th

October 2011

- 21st

October 2011

- 2nd

November 2011

- 4th

November 2011

- 7th

November 2011

- 9th

November 2011

- 11th

November 2011

- 15th

November 2011

- 16th

November 2011

- 22nd

November 2011

- 23rd

November 2011

- 24th

November 2011

- 30th

November 2011

- 2nd

December 2011

- 11th

January 2012

-

- 18th

January 2012

- 25th

January 2012

- 1st

February 2012

- 3rd

February 2012

- 29th

February 2012

- 7th

March 2012

- 14th

March 2012

- 16th

March 2012

- -19th

March 2012

- 21st

March 2012

Page 39: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

Minutes of the meeting of the Engineering Education Scheme 7.30pm on 17th October 2011

Present: Farran Elvidge , Sophie Atkins, Amber Farrow, Isobel Powell, Vanessa Leung Apologies: 0

1. Mind map ideas during Wednesday night meeting Action: FE, SA, AF, IP, VL

2. To research bearings for ideas by Wednesday Action: IP, VL

3. To research debries for ideas by Wednesday Action: SA

4. To research materials suitable in a vacuum environment for ideas by Wednesday Action: FE, AF

5. Type up specification and project brief Action: AF

Meeting finished at 8.00pm Date of next meeting: 12.30pm on 19th October 2011.

Minutes of the meeting of the Engineering Education Scheme 12.30pm on 19th October 2011

Present: Farran Elvidge , Sophie Atkins, Amber Farrow, Isobel Powell, Vanessa Leung Apologies: 0

1. Previous minutes were approved; however project brief must be longer, 2-3 paragraphs

long.

2. We discussed ideas for the design and wrote it on a mind map. Each of us will need to

think of 2 ideas by Friday.

Action: FE, SA, AF, IP, VL

3. We discussed about the heat of the laser beam and how it would affect the shield. We

may need to ask Steve about the heat of the laser beam.

Action: FE, SA, AF, IP, VL

Meeting finished at 1.20pm Date of next meeting: 7.30pm on Friday 21st October 2011

Page 40: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

Minutes of the meeting of the Engineering Education Scheme 9.30pm on 21st October 2011

Present: Farran Elvidge , Sophie Atkins, Amber Farrow, Isobel Powell, Vanessa Leung Apologies: 0

1. Previous minutes were approved; we drew our 2 ideas and talked about it. Later throughout the meeting, we chose 2 ideas that we thought were the best.

2. We discussed what needs to be included in the project brief, such as what needs doing and how to solve it.

3. We discussed that particles in a mass spectrometry acts quite similarly to particles in the vacuum of the plasma mirror. To research more about mass spectrometry and materials used in mass spectrometry. Action: FE, SA, AF,IP, VL

4. We discussed the diagram of the plasma mirror and were not sure of the ‘twisty’ things for the wires. We will be asking about it next meeting. Action: FE, SA, AF,IP, VL

5. Amber to email the specification and email any new changes made to it to everybody. Action: AF

Aims for next meeting: - To develop ideas - To test magnets - To draw manual idea

Meeting finished at: 10.05pm Date of next meeting: 12.30pm on Wednesday 2nd November 2011

Minutes of the meeting of the Engineering Education Scheme 12.35pm on 2nd November 2011

Present: Farran Elvidge , Sophie Atkins, Amber Farrow, Isobel Powell, Vanessa Leung, Mrs. Charlesworth, Steve, Darren Apologies: 0

1. We discussed our ideas with Steve and Darren. We will be drawing these ideas on A4 paper, separately, instead of drawing it on the A3 paper. We would then further develop our own ideas. Action: FE, SA, AF, IP, VL

2. We asked questions from previous minutes such as the ‘twisty’ things, laser beam heat, dimensions of the shield and about the vacuum. Darren will give us a book about vacuum and will give us the dimensions of the shield and cut out hole next meeting. Action: DN

Page 41: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

3. We went through the project brief and specification. We will be changing the format to. The format layout will be: - Brief - Introduction to the design - Problem - Talk about materials, what vacuum is, what material to use etc. - Specification We should also set it under aesthetics(which is functional) and environmental(the vacuum pressure is 1.0 × 10-6 millibar). Action: FE, SA, AF, IP, VL

4. To know more, we should go on the STFC website, then central laser facility to research about Astra Gemini. The Gemini target area is where the mirror would be. (Here’s the link: http://www.stfc.ac.uk/) Action: FE, SA, AF, IP, VL

5. We talked about the maintenance of the shield. We thought of using a plastic cover on the shield and to peel it off and replace it when it gets dirty.

Meeting finished at: 1.30pm Date of next meeting: 12.30pm on 9th November 2011 where we will be having the tour.

Minutes of the meeting of the Engineering Education Scheme 8.05pm on 4th November 2011

Present: Farran Elvidge , Sophie Atkins, Amber Farrow, Isobel Powell, Vanessa Leung Apologies: 0

1. Started writing up the time plan, but we still need to fill in the blocks next meeting.

Action: FE, SA, AF, IP, VL

2. We talked about the project brief, we will need to finish it next meeting.

Action: FE, SA, AF, IP, VL

3. We also talked about our ideas. We will need to draw it on a separate piece of paper, neatly.

Farran has the original drawings of the ideas.

Action: FE, SA, AF, IP, VL Meeting finished at: 8.30pm Date of next meeting: 7.30pm on Tuesday 15th November 2011

Page 42: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

Minutes of the meeting of the Engineering Education Scheme 7.40pm on 7th November 2011

Present: Farran Elvidge , Sophie Atkins, Amber Farrow, Vanessa Leung Apologies: Isobel Powell

1. We discussed everyone’s design ideas and further developed it. We went through and discussed the design brief. As for the time plan, the weeks/blocks needs to be filled in. We still need to further develop our ideas and combine ideas together. Action: FE, SA, AF

2. As Issy was not in the meeting, please could you type up 2 paragraphs of what a laser is, what it does and what it will be used. The second paragraph about what a shield will do, what our shield will do and achieve. Action: IP

Meeting finished at: 8.15pm Date of next meeting: 12.00pm 9th November 2011

Minutes of the meeting of the Engineering Education Scheme 1.00pm on 9th November 2011

Present: Farran Elvidge , Sophie Atkins, Amber Farrow, Isobel Powell, Vanessa Leung, Mrs. Charlesworth, Steve, Darren Apologies: 0

1. We visited the lab today. The parabolic mirrors are focused by the beam. A slight adjustment will cause the beam to produce a cloud of rubbish and each time there has to be a clean, clear surfaced mirror for the beam to focus on. The shield will rarely move inside the vacuum chamber. It is adjusted outside before placing it in the chamber. So we have to rethink our designs and combine ideas together. We have to draw new ideas before next meeting. Action: FE, SA, AF, IP, VL

2. We also visited the target area. It would be better not to attach anything on the walls or on top while designing the shield as the pressure in vacuum chamber would cause changes to the walls so it would affect anything attached to walls. There is also a small lense which is similar to a CCTV on one corner of the chamber.

3. We got the book about vacuum and the dimensions of the mirror. It will be very useful when designing the shield. Bring the book to the next meeting while discussing our ideas. Action: FE, SA, AF, IP, VL

Meeting finished at: 2.15pm Date of next meeting: 7.30pm on 11th November 2011

Page 43: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

Minutes of the meeting of the Engineering Education Scheme 7.40pm on 11th November 2011

Present: Farran Elvidge, Sophie Atkins, Amber Farrow, Isobel Powell, Vanessa Leung, Apologies: 0

1. We thought of new ideas as our old ideas were designed to move inside the vacuum chamber. We thought of using screws and the shield should be manually adjustable, such as using screws. The adjusters of the shield should be closest to the window as it will be easy to reach for it and not be in an awkward position. By next meeting, we should research 2 ways of manually adjustments and come up designs which can be adjusted outside the vacuum chamber. Action: FA, SA, AF, IP, VL

Meeting finished at: 8.15pm Date of next meeting: 7.30pm on 15th November 2011

Minutes of the meeting of the Engineering Education Scheme 8.20pm on 15th November 2011

Present: Farran Elvidge, Sophie Atkins, Amber Farrow, Isobel Powell, Vanessa Leung, Apologies: 0

1. We corrected and finished the brief and specification. We still need to know the movements of the mirror and shield in the chamber once it’s closed. Will it be moving sideways, upwards or tilting?

2. We need to draw at least one design by tomorrow meeting. Think about adjustments of the shield outside the chamber and screws needed etc. Action: FE, SA, AF, IP, VL

Meeting finished at: 8.45pm Date of next meeting: 12.30pm on 16th November 2011

Minutes of the meeting of the Engineering Education Scheme 12.53pm on 16th November 2011

Present: Farran Elvidge, Sophie Atkins, Amber Farrow, Isobel Powell, Vanessa Leung, Darren, Mrs Charlesworth Apologies: Steve

1. We have to design ideas and finish the agenda by next meeting so we can develop two ideas on the meeting. And on Wednesday’s meeting, we will finalize one idea. Action: FE, SA, AF, IP, VL

2. Amber discussed her idea, which includes a pointer on the mirror, it can prevent scratching between the shield and mirror. There should be 2-4 point of contact.

3. We asked about the dimensions of mirror and the degree that the mirror will tilt. Action: Darren

Meeting finished at: 1.15pm Date of next meeting: 7.30pm on Tuesday 16th November 2011

Page 44: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

Minutes of the meeting of the Engineering Education Scheme 9.20pm on 22nd November 2011

Present: Farran Elvidge, Sophie Atkins, Amber Farrow, Isobel Powell, Vanessa Leung 1. We discussed our designed ideas and proposed 2 ideas by Farran and Sophie/Amber which

we thought were the best. We will choose a final idea at tomorrow’s meeting.

2. We also completed the agenda.

Meeting finished at: 9.40pm Date of next meeting: 12.30pm on 23rd November 2011

Minutes of the meeting of the Engineering Education Scheme 12.35pm on 23rd November 2011

Present: Farran Elvidge, Sophie Atkins, Amber Farrow, Isobel Powell, Vanessa Leung, Steve, Darren, Mrs Charlesworth

1. We discussed the developed ideas and decided to combine all three concepts if

necessary. We thought contact points may not be necessary as the shield will rest on the

mirror and may not scratch the main part of the mirror. We could use Sophie’s idea as a

prototype and Amber’s idea as a development idea. Also, if we have any questions, we

can Skype with Peta and ask her.

2. We should check the delivery dates for parts/materials required as they take about 6

weeks to be delivered. As for Farran’s design, could she research about threads.

Action: FE, AF, SA, IP, VL 3. As for the time plan, some dates should be changed as there are some errors and to

include some more tasks. Also, tasks should be broken down to: Start, Middle, End.

Action: FE, IP, SA, AF, VL

4. We should draw up 2D drawings/sketches by the meeting on Wednesday with top, side

and front view.

Action: FE, AF, SA, IP, VL

5. Steve will send the dimensions of mirror, drawing of the holder and check debris.

Action: Steve

Meeting finished at: 1.15pm Date of next meeting: TBC

Page 45: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

Minutes of the meeting of the Engineering Education Scheme 7.38pm on 24th November 2011

Present: Farran Elvidge, Sophie Atkins, Amber Farrow, Vanessa Leung Apologies: Isobel Powell

1. Farran brought a simple model of the design. We still have to think about the shield tilting as

the current model can only go forward/backwards and up/down. We looked at Amber’s

gear, which can go 360 degrees and can be useful. We will draw the dimensional drawings of

the ideas on A3 paper next meeting (Tuesday).

Action: FE, AF, SA, IP, VL Meeting finished at: 8.10pm Date of next meeting: Tuesday 29th November 2011

Minutes of the meeting of the Engineering Education Scheme 12.42pm on 30th November 2011

Present: Farran Elvidge, Sophie Atkins, Amber Farrow, Isobel Powell, Vanessa Leung, Mrs Charlesworth, Steve, Darren Apologies: 0

1. Issy: Ondrives website would be a better website to find gears.

2. We discussed Sophie and Amber’s ideas. We would need to draw an orthographic drawing

of the design and produce a cutting list as soon possible before the workshop. We also need

to write a flowchart.

Action: SA, AF, FE, IP, VL

3. We need to think of a way to measure the degree when the shield tilts, and know the exact

dimensions of the gear. The ball and socket idea is an alternative idea.

Action: SA, AF, FE, IP, VL

4. We need to discuss workshop details on 8.30am on Saturday with Mrs Charlesworth.

Meeting finished at: 1.15pm Date of next meeting: 7.30pm Friday 2nd December 2011

Minutes of the meeting of the Engineering Education Scheme 7.40pm on 2nd December 2011

Present: Farran Elvidge, Sophie Atkins, Amber Farrow, Isobel Powell, Vanessa Leung Apologies: 0

1. We decided not to use the gear as it takes too long to be delivered. It takes approximately 3

months to be delivered and it is too complicated.

2. We designed a simple mechanism to tilt the shield and measure it at the same time. It is

similar to a ball and socket, which can be tightened and adjusted easily. There are 2 rings

which are connected to the stick and can be adjusted when loosened. We have drawn out

the basic idea of the design, with basic dimensions. We still need to produce a cutting list

and flowchart.

Page 46: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

Action: SA, AF, IP, FE, VL

3. We are not sure of the angle of the shield and need to ask Peta about it.

Action: VL

4. Issy would be scanning our initial ideas which will be drawn with pen over it and to be put in

the file.

Action: IP

Meeting finished at: 8.30pm Date of next meeting: TBC

Minutes of the meeting of the Engineering Education Scheme 12.45pm on 11th January 2012

Present: Farran Elvidge, Sophie Atkins, Amber Farrow, Isobel Powell, Vanessa Leung, Steve, Darren, Mrs Charlesworth Apologies: 0

1. Farran and Sophie to transfer CAD drawings.

Action: FE, SA

2. As for the connector, the drawing of the design must be finished in 2 weeks to be tested

mechanically and inside the chamber on 1st Feb and 6th Feb in RAF.

Action: SA, AF

3. Amber to send the specification to Farran to be included in the report.

Action: AF

4. We must collect all information together and email everything to Steve, including the

logbook.

Action: FE, IP, AF, SA, VL

5. The Design Process in the report should include analysed ideas which include time,

complexity, time and why we did it. Initial ideas should be included in the report as well. In

the report, we have to include ‘How to test it’ where we suggest ideas such as alignment

lasers. We should start thinking about the finance, such as the hours of the technician and

materials etc.

6. On 21st March, we should practice presenting our presentation which should be 15 minutes

long. We could include videos.

Meeting finished at: 1.15pm Date of next meeting: TBC

Page 47: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

Minutes of the meeting of the Engineering Education Scheme 12.35pm on 18th January 2012

Present: Farran Elvidge, Sophie Atkins, Amber Farrow, Isobel Powell, Vanessa Leung, Steve, Darren, Mrs Charlesworth Apologies: 0

1. Amber to send specification to Farran by Monday and Issy to send the appendix to Amber.

Action: AF, IP

2. On Monday meeting, we should start writing the design evolution (processes) which can be

written as a score chart. We should also alter anything on the time plan if necessary. We

should discuss about how to test ideas. The minutes should also be included in the appendix.

There will be memory sticks to collect all information.

Action: AF, IP, FE, SA, VL

3. Steve to send costings to Amber.

Action: Steve

4. We should include a working instruction for the design. For example how to use and do it. It

can be made into a video which can be then embedded into the presentation.

5. On the 21st of March, we will be practicing our presentation as we will be working on our

presentation for the last 3 weeks of the term. We will hopefully finish everything by half

term in February (in 3 weeks), it includes the design, testing and the report as this will leave

us time to change anything if necessary.

6. The schedule (deadlines) which will be sent by Steve should be included in the presentation.

Action: Steve

Meeting finished at: 1.00pm Date of next meeting: Monday 23rd January 2012

Minutes of the meeting of the Engineering Education Scheme 12.40pm on 25th January 2012

Present: Farran Elvidge, Sophie Atkins, Amber Farrow, Isobel Powell, Vanessa Leung, Steve, Darren, Mrs Charlesworth Apologies: 0

1. We have to make sure there is a school logo and engineering logo on each slide of the

presentation. We may have to think of a project name and find pictures to include in the

report.

2. Amber to type out costings on a spreadsheet and email it to Issy.

Action: AF

3. We have to finish the final design before half term (in 2 weeks). And when the design is

completed, Steve will come up with the pieces.

Action: SA, Steve

Page 48: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

4. As for the Design Evolution, we have to evaluate each step such as the idea’s function,

achievement, ease of use etc. and give a score. We must reference each design. Issy will

organize all the ideas/designs.

Action: AF, SA, FE, IP, VL

5. When all the parts of the design are assembled, we will then have to making the working

instruction.

6. We should send the report and time plan to Mrs Charlesworth and Steve to see if there are

any mistakes and alterations needed to make.

Action: FE, AF, SA, IP, VL Meeting finished at: 1pm Date of next meeting: 9pm Friday 27th January 2012

Minutes of the meeting of the Engineering Education Scheme 12.45pm on 1st February 2012

Present: Farran Elvidge, Sophie Atkins, Amber Farrow, Isobel Powell, Vanessa Leung, Steve, Darren, Mrs Charlesworth Apologies: 0

1. Sophie to send the final 3D design in correct format and the orthographic drawing.

Action: SA

2. We need to send pictures in to Farran to be added to the report. Also, Farran to send report

and costings to both Mrs Charlesworth and Steve.

Action: FE, VL, SA, AF

3. As for the meeting of Friday, remember to bring USB stick to do the presentation. We will

write up a method statement for testing, which includes how to achieve it and a plan of

what to do. The testing will be part of the evaluation. We also have to discuss what to have

in the display, which includes props. We will also be discussing the evaluation analyses and

progression(where to go next).

4. Steve to send in the logo.

Action: Steve

Meeting finished at: 1pm Date of next meeting: 8pm 3rd February 2012

Page 49: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

Minutes of the meeting of the Engineering Education Scheme 9.05pm on 3rd February 2012

Present: Farran Elvidge, Sophie Atkins, Amber Farrow, Isobel Powell, Vanessa Leung Apologies: 0

1. We discussed the testing of the design. Using a laser to show the holes are aligned and using

different distances to test it. There will be a screw at the back to hold everything together.

We will soon make a dummies video guide.

2. Sophie’s design is deleted. We also decided that in the presentation, Farran would read out

the research part as she quite a lot of work in it and Issy would read out the introduction

part.

Meeting finished at: 9.20pm Date of next meeting: Wednesday 8th February 2012

Minutes of the meeting of the Engineering Education Scheme 12.40pm on 29th February 2012

Present: Farran Elvidge, Sophie Atkins, Amber Farrow, Isobel Powell, Vanessa Leung, Steve, Darren, Mrs Charlesworth Apologies: 0

1. Farran to email the report to Sophie and Amber for the design and we have to add

orthographic drawings in the report as well. We may have to print 12 copies of the report

when it is completed.

Action: FE

2. At the moment, we are still meeting the evaluation, design, appendixes and bibliography in

the report. We also have to add modification (detailed) in a separate section. Also, when

the criteria of the design is completed, it should be sent to everyone else. We should include

problems such as finishing before the end of term rather than the final date and delay dates

for the design.

Action: FE, AF, SA, IP, VL

3. For next week, Issy should complete a risk assessment for the test and we should pass the

reports around and comment on it, and start working on the presentation.

Action: FE, AF, SA, IP, VL

Meeting finished at: 1.05pm Date of next meeting: TBC

Page 50: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

Minutes of the meeting of the Engineering Education Scheme 12.44pm on 7th March 2012

Present: Farran Elvidge, Sophie Atkins, Amber Farrow, Isobel Powell, Vanessa Leung, Darren, Mrs Charlesworth, Jonathan (adviser of the product) Apologies: Steve

1. We should include what the mirror does and the reason for it in the report/presentation.

Also, the laser scientists control the laser and install it.

2. By next Wednesday, the report should be completed (except testing and evaluation). There

are still some sentences that need rephrasing and words that need to be defined. We also

need to include problems that might come with the design, such as the design has limited

movement and the shield may crash into the mirror. As for modification of the design, we

can include Amber’s previous design with gears and development + improvement of

Sophie’s design.

Action: FE, AF, SA, IP, VL

3. We will be testing in the optics room next Thursday (15th March) at 12pm.

4. Steve to re-send drawings to Sophie and we still need brackets from Steve and Darren.

Action: Steve, Darren Meeting finished at: 1.20pm Date of next meeting: TBC

Minutes of the meeting of the Engineering Education Scheme 9.15pm on 19th March 2012

Present: Farran Elvidge, Sophie Atkins, Amber Farrow, Isobel Powell, Vanessa Leung, Apologies: 0

1. We went through the report and wrote out the conclusion and scanned the

calculations for the appendices. Afterwards, we went through the

presentation and decided which slides we will be talking about. We still need

a picture of the final design to be inserted in the presentation.

Sophie – slides 2,11,13,17,19 Issy – slides 3,7,18 Amber – slides 4,8,12,15,20 Vanessa- slides 5,10,14,22 Farran – slides 6,9,16,21

Slide Name Title of slide

1 Introduction

2 Sophie STFC

3 Issy Astra Gemini

4 Amber Brief

5 Vanessa Specification

6 Farran Brainstorming

7 Issy Research – Mirror system

8 Amber Research – Why under vacuum

9 Farran Research – Vacuum

10 Vanessa Research – High vacuum

11 Sophie Research – Gas flow in vacuum

Page 51: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

Meeting finished at: 9.40pm Date of next meeting: 12.15pm on 21st March 2012

Minutes of the meeting of the Engineering Education Scheme 12.46pm on 21st March 2012

Present: Farran Elvidge, Sophie Atkins, Amber Farrow, Isobel Powell, Vanessa Leung, Steve, Darren, Mrs Charlesworth Apologies: 0

1. We did the presentation and it was around 15 minutes and received some

feedback.

- We need to speak slower

- We only need notes and not read it out from the paper

- Make sure what we are saying matches the slide from the powerpoint

- We should give more examples, especially for initial and final design

- We will need to add more about the design itself and less on research,

emphasizing how important the design was. Also, we need to include a slide

for manufacturing along with the design.

- We have to explain more clearly about the aim of our design and explain

what RAL is.

- We were not clear enough about the design and the testing. Also, we will

need to describe what our test was and how to test it etc.

- Abbreviate PEEK and find out what its structure is.

- We will need to add another slide after conclusion for acknowledgments and

give an ending.

- We need include project planning in the time plan.

- We may have to change/delete some slides to make sure the presentation fits

in 15 minutes.

- All props out for the presentation.

Action: FE, IP, SA, AF, VL

2. We have decided to put the slide ‘STFC’ and ‘Astra Gemini’ together, take away

the research slide about ‘high vacuum’ and ‘gas flow in vacuum’. ‘Initial ideas’

should be more detailed and should be placed before ‘materials under vacuum’.

We have to add manufacturing with the final design slide.

12 Amber Research – Materials in vacuum

13 Sophie Initial ideas

14 Vanessa Lab visit

15 Amber Development

16 Farran Residential

17 Sophie CAD drawings

18 Issy Final drawing and testing

19 Sophie Modification

20 Amber Further development

21 Farran Application to brief

22 Vanessa Conclusion

Page 52: Appendix 1: Damaged Mirrors from previous experiments · 2015-12-03 · Appendix 14: Minutes th Minutes of the meeting of the Engineering Education Scheme 12.30pm on 12th October,

3. We have to decide what to put in our 1 meter stand.

Action: FE, IP, SA, AF, VL

4. We will need to finish and hand in the report latest by Monday.

Action: FE, IP, SA, AF, VL Meeting finished at: 1.10pm Date of next meeting: TBC