SPECIALIST CONSULTANT STUDIES 5 - 231 ALKANE RESOURCES LTD Part 5: Cultural Heritage Assessment Tomingley Gold Project Report No. 616/06 OzArk Environmental and Heritage Management Pty Ltd. Appendix 3 Log of Aboriginal Community Consultation _____________________________________ (No. of pages including blank pages = 29) Note: A copy of Appendix 3 is provided on the Project CD

Appendix 3 Log of Aboriginal Community Consultation€¦ · the letter was sent to Date reply required ALL LETTERS POSTED 21.04.09 DECC 21.04.09 Attn: Mr Paul Houston DECC PO Box

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Appendix 3 Log of Aboriginal Community Consultation€¦ · the letter was sent to Date reply required ALL LETTERS POSTED 21.04.09 DECC 21.04.09 Attn: Mr Paul Houston DECC PO Box

SPECIALIST CONSULTANT STUDIES 5 - 231 ALKANE RESOURCES LTD Part 5: Cultural Heritage Assessment Tomingley Gold Project Report No. 616/06

OzArk Environmental and Heritage Management Pty Ltd.

Appendix 3

Log of Aboriginal Community Consultation _____________________________________

(No. of pages including blank pages = 29)

Note: A copy of Appendix 3 is provided on the Project CD

Page 2: Appendix 3 Log of Aboriginal Community Consultation€¦ · the letter was sent to Date reply required ALL LETTERS POSTED 21.04.09 DECC 21.04.09 Attn: Mr Paul Houston DECC PO Box

ALKANE RESOURCES LTD 5 - 232 SPECIALIST CONSULTANT STUDIES Tomingley Gold Project Part 5: Cultural Heritage Assessment Report No. 616/06

OzArk Environmental and Heritage Management Pty Ltd.

This page has intentionally been left blank

Page 3: Appendix 3 Log of Aboriginal Community Consultation€¦ · the letter was sent to Date reply required ALL LETTERS POSTED 21.04.09 DECC 21.04.09 Attn: Mr Paul Houston DECC PO Box

SPECIALIST CONSULTANT STUDIES 5- 233 ALKANE RESOURCES LTD Part 5: Cultural Heritage Assessment Tomingley Gold Project Report No. 616/06

OzArk Environmental and Heritage Management Pty Ltd.

Tomingley Gold Project - RWC JOB # 355

ICCR - YES 0439 061 293

STAGE 1, NOTIFICATION & REGISTRATION

AD FOR LOCAL PRESS DATE AD WRITTEN

DATE AD APPEARING DATE CLOSURE EOI

Parkes Champion Post 16.04.09 22.04.09 06.05.09 Emailed draft advert to RWC c/- Mitchell Bland. Advised by Mitchell 20.04.09 EOI advert fine to run. In relation to Stage 1 letters re-word to following - 'incorporating the Wyoming 1, Wyoming 3 and Caloma deposits (see attached Figure 1)' and use map as described which shows location of deposits in relation to Dubbo/Narromine/Peak Hill.

Narromine News 16.04.09 22.04.09 06.05.09 Emailed draft advert to RWC c/- Mitchell Bland. Advised by Mitchell 20.04.09 EOI advert fine to run.

LETTERS SENT STAGE 1

Date sent Contact details of who the letter was sent to

Date reply required

ALL LETTERS POSTED 21.04.09

DECC 21.04.09 Attn: Mr Paul Houston DECC PO Box 2111 Dubbo NSW 2830

06.05.09 07.05.09 Received copy of letter from Paul Houston via email. DECC have listed the following Aboriginal parties to be contacted *Peak Hill LALC * Warramunga Community Advancement Co-operative Society LTD * Bogan River Peak Hill Wiradjuri Ab Corp * Little Burning Mountain Ab Corp * Narromine LALC * Bulgandramine Youth Developmetn Ab Corp * WDD * Central West CMA * WCE * Peter Peckham * Trevor Robinson * Neville Williams.

NTSCORP 21.04.09 Administration / Notification Team NTSCORP PO Box 2105 Strawberry Hills NSW 2012

06.05.09

Page 4: Appendix 3 Log of Aboriginal Community Consultation€¦ · the letter was sent to Date reply required ALL LETTERS POSTED 21.04.09 DECC 21.04.09 Attn: Mr Paul Houston DECC PO Box

ALKANE RESOURCES LTD 5 - 234 SPECIALIST CONSULTANT STUDIES Tomingley Gold Project Part 5: Cultural Heritage Assessment Report No. 616/06

OzArk Environmental and Heritage Management Pty Ltd.

Register of Aboriginal Owners 21.04.09 Megan Mebberson Office of the Registrar, ALRA Tranby Aboriginal College 11 - 13 Mansfield Street Glebe NSW 2037 E: [email protected]

06.05.09

Narromine Shire Council 21.04.09 General Manager Narromine Shire Council PO Box 115 Narromine NSW 2821

06.05.09

Parkes Shire Council 21.04.09 General Manager Parkes Shire Council PO Box 337 Parkes NSW 2870

06.05.09

Narromine LALC 21.04.09 Members: Narromine LALC C/- Judy McMillan 13 Burraway Street Narromine NSW 2821

06.05.09 27.04.09 Received formal letter from Judy McMillan (CEO) of Narromine LALC who advised that NLALC would like to register an EOI and be part of the registered stakeholder group for the portion of the survey area which falls within their boundary. 06.05.09 Judy McMillan phoned and spoke to HK to ensure that OzArk had received letter advising of NLALC EOI. She received a letter from NTSCORP asking NLALC to express interest.

Peak Hill LALC 24.03.09 Members: Peak Hill LALC Attn: Cherie Keed 88 Caswell Street Peak Hill NSW 2869

06.05.09 Cherie Keed (CEO PHLALC) phoned 22.04.09 in response to the EOI advert in the Champion Post. I advised that PHLALC would be receiving a formal letter inviting them to register as stakeholders and that it would have more details. Cherie advised that PHLALC would like express interest and be part of the registered stakeholder group.

Page 5: Appendix 3 Log of Aboriginal Community Consultation€¦ · the letter was sent to Date reply required ALL LETTERS POSTED 21.04.09 DECC 21.04.09 Attn: Mr Paul Houston DECC PO Box

SPECIALIST CONSULTANT STUDIES 5- 235 ALKANE RESOURCES LTD Part 5: Cultural Heritage Assessment Tomingley Gold Project Report No. 616/06

OzArk Environmental and Heritage Management Pty Ltd.

STAGE 1 ROUND 2

Bogan River Peak Hill Wiradjuri Aboriginal Corporation

07.05.09 Attn: Chairperson Bogan River Peak Hill Wiradjuri Aboriginal Corporation PO Box 42 Peak Hill NSW 2869

26.05.09 27.07.09 Notified by Mike Sutherland (Alkane) that this organisation would like to register their interest in the project. BRPHWAC now Registered Stakeholders. Although no repsonse from written correspondence was verbally confirmed at a community meeting.

Bulgandramine Youth Development Aboriginal Corporation

07.05.09 Attn: Chairperson Bulgandramine Youth Development Aboriginal Corporation PO Box 119 Peak Hill NSW 2869

26.05.09 27.07.09 Notified by Mike Sutherland (Alkane) that this organisation would like to register their interest in the project. BYDAC now Registered Stakeholders. Although no repsonse from written correspondence was verbally confirmed at a community meeting.

Little Burning Mountain Aboriginal Corporation

07.05.09 Attn: Chairperson Little Burning Mountain Aboriginal Corporation PO Box 152 Peak Hill NSW 2869 ph: 6869 1599

26.05.09 22.05.09 Trevor Robinson phoned on behalf of his uncle, Ken Robinson (Chairperson LBMAC) whose organisation would like to express interest in being part of the Registered Stakeholder group. (CB).

Aboriginal Reference Group Central West CMA

07.05.09 Aboriginal Reference Group Central West CMA PO Box 227 Wellington NSW 2820

26.05.09

Neville Williams 07.05.09 Mr N Williams PO Box 70 Cowra NSW 2794

26.05.09 22.05.09 Neville phoned to express interest on behalf of Mooka TOC and also *Shawn Williams *Wayne Williams *Sharon Williams *Esther Cutmore. Neville will forward a written response upon his return to Cowra.

Peter Peckham 07.05.09 Mr P Peckham 27 Jennings Road Geurie NSW 2831 ph: 0427 781 021

26.05.09 26.05.09 Peter Peckham phoned to register his expression of interest in the project. (PJC)

Page 6: Appendix 3 Log of Aboriginal Community Consultation€¦ · the letter was sent to Date reply required ALL LETTERS POSTED 21.04.09 DECC 21.04.09 Attn: Mr Paul Houston DECC PO Box

ALKANE RESOURCES LTD 5 - 236 SPECIALIST CONSULTANT STUDIES Tomingley Gold Project Part 5: Cultural Heritage Assessment Report No. 616/06

OzArk Environmental and Heritage Management Pty Ltd.

Trevor Robinson 07.05.09 Mr T Robinson 41 Euchie Street Peak Hill NSW 2869 Ph: 0439 061 293

26.05.09 21.05.09 Trevor Robinson phoned to register his expression of interest in the project. (CB)

Warramunga Community Advancement Co-operative Society Ltd

07.05.09 Attn: Chairperson Warramunga Community Advancement Co-operative Society Ltd 79 Caswell Street Peak Hill NSW 2869

26.05.09

Wiradjuri Council of Elders 07.05.09 Members: Wiradjuri Council of Elders c/- Robert Clegg 3 Loretta Place Glendenning NSW 2761

26.05.09 Cheryl The Wiradjuri Council of Elders wish to become an interested party to the Aboriginal Heritage Assessment for the Tomingley Gold Project south west of Dubbo and would like to have a representative from the Wiradjuri Council Elders on the Consultation group. Yours in Unity Robert Clegg Wiradjuri Council of Elders received via email 17.05.09

Wirrimbah Direct Descendants 07.05.09 Members: Wirrimbah Direct Descendants c/- Stephen Ryan PO Box 2070 Dubbo NSW 2830

26.05.09

Page 7: Appendix 3 Log of Aboriginal Community Consultation€¦ · the letter was sent to Date reply required ALL LETTERS POSTED 21.04.09 DECC 21.04.09 Attn: Mr Paul Houston DECC PO Box

SPECIALIST CONSULTANT STUDIES 5- 237 ALKANE RESOURCES LTD Part 5: Cultural Heritage Assessment Tomingley Gold Project Report No. 616/06

OzArk Environmental and Heritage Management Pty Ltd.

STAGE 2, Methodology Letter Comments

LETTERS SENT TO THE FOLLOWING REGISTERED STAKEHOLDERS

Date sent Contact details of who the letter was sent to

Date reply required

Narromine LALC 05.06.09 Members: Narromine LALC C/- Judy McMillan 13 Burraway Street Narromine NSW 2821

Paul Brydon phoned to advise that NLALC would have a rep available on the dates nominated. He will forward the Certificate of Currency, or Judy will next week. Paul is most likely going to be the rep for NLALC and has done training as part of the ARG/CMA programme. Contact # 0417 697 293 or home 6889 4427 (fx/ph). Advised Paul I would be in touch closer to the date regarding meeting time and place for the survey dates. 15.06.09 Paul phoned to check that we had received the w/comp Certificate from the office, advised also that he has all PPE gear (does contract work at times for DCC) and will await further advise on meeting / times etc..

Peak Hill LALC 05.06.09 Members: Peak Hill LALC Attn: Cherie Keed 88 Caswell Street Peak Hill NSW 2869

Email sent from OzArk 29.06.09 and a message left with Steven asking Cherie to forward Certificate of Currency as the one we have has recently expired. Cherie left a message on answerphone advising she had arranged for Tom to do FW on Wednesday/Thursday and he will meet at arranged area. If we have any problems please contact Valda as Cherie is away all week in Hay. Contacted Valda (30.06.09) requesting Certificate of Currency however she advised office is locked and no-one has access to it until Cherie returns.

Little Burning Mountain Aboriginal Corporation

05.06.09 Attn: Chairperson Little Burning Mountain Aboriginal Corporation PO Box 152 Peak Hill NSW 2869 ph: 6869 1599

Page 8: Appendix 3 Log of Aboriginal Community Consultation€¦ · the letter was sent to Date reply required ALL LETTERS POSTED 21.04.09 DECC 21.04.09 Attn: Mr Paul Houston DECC PO Box

ALKANE RESOURCES LTD 5 - 238 SPECIALIST CONSULTANT STUDIES Tomingley Gold Project Part 5: Cultural Heritage Assessment Report No. 616/06

OzArk Environmental and Heritage Management Pty Ltd.

Neville Williams 05.06.09 Mr N Williams PO Box 70 Cowra NSW 2794

12.06.09 Received faxed correspondence from Neville expressing his concerns regarding the methodology. 23.06.09 OzArk sent reply to Neville addressing these concerns and included a copy of the • Alkane TGP community presentation – hardcopy printout of presentation.

Peter Peckham 05.06.09 Mr P Peckham 27 Jennings Road Geurie NSW 2831 ph: 0427 781 021

Trevor Robinson 05.06.09 Mr T Robinson 41 Euchie Street Peak Hill NSW 2869 Ph: 0439 061 293

Wiradjuri Council of Elders 05.06.09 Members: Wiradjuri Council of Elders c/- Robert Clegg 3 Loretta Place Glendenning NSW 2761

Page 9: Appendix 3 Log of Aboriginal Community Consultation€¦ · the letter was sent to Date reply required ALL LETTERS POSTED 21.04.09 DECC 21.04.09 Attn: Mr Paul Houston DECC PO Box

SPECIALIST CONSULTANT STUDIES 5- 239 ALKANE RESOURCES LTD Part 5: Cultural Heritage Assessment Tomingley Gold Project Report No. 616/06

OzArk Environmental and Heritage Management Pty Ltd.

FIELDWORK Water Pipeline JULY 09

DATE Contact details COMMENT

Narromine LALC 01&02.07.09 Mr Paul Brydon ('Midnight") 0417 697 293 or home 6889 4427 (fx/ph)

Peak Hill LALC 01&02.07.09 Tom Peckham

Stage 2 FW for MLA & ETL DATE Contact details COMMENT

Peak Hill LALC 07.07.09 Members: Peak Hill LALC Attn: Cherie Keed 88 Caswell Street Peak Hill NSW 2869

letter sent inviting one Sites Officer to participate in FW for ETL on Thursday 30th July & MLA 3rd - 7th August.

Little Burning Mountain Aboriginal Corporation

07.07.09 Attn: Chairperson Little Burning Mountain Aboriginal Corporation PO Box 152 Peak Hill NSW 2869 ph: 6869 1599

letter sent inviting one Sites Officer to participate in FW for ETL on Thursday 30th July & MLA 3rd - 7th August.

Neville Williams 07.07.09 Mr N Williams PO Box 70 Cowra NSW 2794

letter sent inviting one Sites Officer to participate in FW for MLA 3rd - 7th August. Advised that PHLALC & Little Burning Mountain would be participating in FW for ETL.

Peter Peckham 07.07.09 Mr P Peckham 27 Jennings Road Geurie NSW 2831 ph: 0427 781 021

sent letter advising that PHLALC & Little Burning Mountain will be participating in ETL fw 30th July & PHLALC, Little Burning Mountain, WCE, Mooka TOC will be participating in MLA FW 3rd-7th August.

Trevor Robinson 07.07.09 Mr T Robinson 41 Euchie Street Peak Hill NSW 2869 Ph: 0439 061 293

sent letter advising that PHLALC & Little Burning Mountain will be participating in ETL fw 30th July & PHLALC, Little Burning Mountain, WCE, Mooka TOC will be participating in MLA FW 3rd-7th August.

Wiradjuri Council of Elders 07.07.09 Members: Wiradjuri Council of Elders c/- Robert Clegg 3 Loretta Place Glendenning NSW 2761

letter sent inviting one Sites Officer to participate in FW for MLA 3rd - 7th August. Advised that PHLALC & Little Burning Mountain would be participating in FW for ETL.

Page 10: Appendix 3 Log of Aboriginal Community Consultation€¦ · the letter was sent to Date reply required ALL LETTERS POSTED 21.04.09 DECC 21.04.09 Attn: Mr Paul Houston DECC PO Box

ALKANE RESOURCES LTD 5 - 240 SPECIALIST CONSULTANT STUDIES Tomingley Gold Project Part 5: Cultural Heritage Assessment Report No. 616/06

OzArk Environmental and Heritage Management Pty Ltd.

INCIDENTAL CONVERSATIONS

DATE Contact details COMMENT

Narromine LALC 24.06.09 Paul Brydon Ph; 0417 697 293

CB spoke with Mr Brydon and confirmed the meeting date, Wednesday 1st July at 8.45am at Tomingley pub. Paul advised he will be there on the day for the field work

Peak Hill LALC 24.06.09 6869-1726 Steven PHLALC

CB 8.46 am - left message for Cherie to phone, advised she will be in office after 9.30am and I suggested I would call back. Spoke to Cherie later in the morning and confirmed that she had received the letter, she has been out of the office last week and had not actually read it. I advised the date & meeting time and she hope to have Ken Robinson as a rep for the PHLALC.

Mooka TOC 13.07.09 Neville Williams CB Neville phoned to advise that he was unable to attend the MLA survey work which is scheduled for 3rd-7th August, he has other commitments in Sydney @ that time. He requested that he be kept up to date in relation to the project and that draft reports be sent to his Cowra PO Box.

Wiradjuri Council of Elders 13.07.09 Rob Clegg JB At an unrelated meeting Rob Clegg had opportunity to advise Jodie he would be participating in the MLA survey, he asked permission from Valda Keed (PHLALC chairperson). Rob acknowleged that he accepted the terms & conditions as notified in the Stage 2 methodology letter

Wiradjuri Council of Elders 20.07.09 Rob Clegg CB Rob phonedthe office to confirm that he would be participating as a WCE representative in the forthcoming fieldwork for the MLA

Page 11: Appendix 3 Log of Aboriginal Community Consultation€¦ · the letter was sent to Date reply required ALL LETTERS POSTED 21.04.09 DECC 21.04.09 Attn: Mr Paul Houston DECC PO Box

SPECIALIST CONSULTANT STUDIES 5- 241 ALKANE RESOURCES LTD Part 5: Cultural Heritage Assessment Tomingley Gold Project Report No. 616/06

OzArk Environmental and Heritage Management Pty Ltd.

Little Burning Mountain Aboriginal Corporation

20.07.09 Trevor Robinson ph: 6851 4429

CB / PJC Trevor phoned on behalf of Little Burning Mountain advising they would like to participate in the FW on 30th July and again the next week after that. He spoke with PJC concerning the W/Comp certificate and advised he would check the dates it covered and the actual form of cover that it offered. Trevor also questioned who the consultant was(RW Corkery) and was given their number and contact name. He indicated he actually wanted to speak to Mike Sutherland (Alkane) as he was aware they were the developers of the project. Trevor was given the Alkane Dubbo office number as per white pages.

Peak Hill LALC 21.07.09 Cherie Keed ph: 6869-1726

CB Cherie phoned Jodie (unavailable) and then the office. CB returned call and Cherie expressed her concern that the project was becoming very political and that they were having difficulty with the other organisation (Little Burning Mountain) At this stage she is still organising the w/comp however is now reluctant to provide representatives as it is becoming difficult. Cherie requested that Jodie perhaps phone Valda when she returns to office on Monday. If Cherie is unable to organise a sites officer for Thursday (hopefully Tom Peckham) she will try to organise two sites officers from PHLALC for the MLA survey the following week. Cherie is hoping that the situation 'cools off' as she expressed she doesnt wish to have to deal with the issues/harassment.

Peak Hill LALC 28.07.09 Steven ph: 6869-1726

CB phoned to speak to Cherie to advise that the FW this Thursday has been postponed, after trying her mobile numbers to no avail left a message with Steven to let Cherie know, very important. Will phone back tomorrow when she is back in the office.

Page 12: Appendix 3 Log of Aboriginal Community Consultation€¦ · the letter was sent to Date reply required ALL LETTERS POSTED 21.04.09 DECC 21.04.09 Attn: Mr Paul Houston DECC PO Box

ALKANE RESOURCES LTD 5 - 242 SPECIALIST CONSULTANT STUDIES Tomingley Gold Project Part 5: Cultural Heritage Assessment Report No. 616/06

OzArk Environmental and Heritage Management Pty Ltd.

Wiradjuri Council of Elders 28.07.09 Rob Clegg Mobile: 0450 530 920

CB phoned Rob to advise there is potential that the FW next week may be postponed, let him know that I would call him towards the end of the week and confirm the start date. 31.07.09 called Rob to advise that the start date for the FW has been pushed back to Wednesday. He was okay with that and will meet @ the pub 8.30am

Little Burning Mountain Aboriginal Corporation

31.07.09 Trevor Robinson ph: 6851 4429

CB phoned Trevor to confirm if the sites officers were organised and to request a copy of LBM's Certificate of Currency. Apparantly their w/comp expires Monday 3/8 however Trevor indicated he would send a receipt that recognised payment and I also advised that he send the Certificate of Currency for the previous year as it is valid for a slight period after expiry and this would be evidence that they actually held a policy. Trevor advised he would be organising sites officers over the weekend and if they could arrange for 6? then he would contact Rob Clegg and advise him it was unnecessary for him to participate.

Peak Hill LALC 03.08.09 Cherie Keed ph: 6869-1726

CB Cherie phoned to advise that unfortunatly PHLALC are unable to provide any sites officers for the survey. She has been unable to reach Tom Peckham, Sharni Hando will not be able to participate due to other work commitments and Ken Robinson had informed Cherie he would be participating on behalf of Little Burning Mountain. OzArk did however receive a copy of PHLALC Workers Compensation Certificate of Currency which expires March 2010.

Page 13: Appendix 3 Log of Aboriginal Community Consultation€¦ · the letter was sent to Date reply required ALL LETTERS POSTED 21.04.09 DECC 21.04.09 Attn: Mr Paul Houston DECC PO Box

SPECIALIST CONSULTANT STUDIES 5- 243 ALKANE RESOURCES LTD Part 5: Cultural Heritage Assessment Tomingley Gold Project Report No. 616/06

OzArk Environmental and Heritage Management Pty Ltd.

Little Burning Mountain Aboriginal Corporation

03.08.09 Trevor Robinson ph: 0439 061 293

CB phoned Trevor who advised he was in the process of organising the sites officers for Wednesday. He advised that he would send through a copy of the Certificate of Currency for LBM which expires on Wednesday. Lloyd Walker (their insurance co.) is closed for bank holiday today and Trevor also said he would send through a copy of the receipt of payment when the new policy was paid. When queried as to why he was organising more than the allocated four people he said it was just a number and at the meeting it was decided so as not to aggravate people that 6 representatives would undertake the survey. As OzArk have only been authorised to take four people (incl. Rob Clegg) I did attempt to phone Trevor back to advise that he would need authorisation to organise more, left msg to phone back on his mobile.

Little Burning Mountain Aboriginal Corporation

03.08.09 Trevor Robinson ph: 0439 061 293

CB Trevor phoned to advise that he had organised 5 sites officers for the survey. I said he would need authorisation for the 5th one as we were only authorised to take four, and as we are not paying the invoice it would be best if he authorised this. I also said that the four that we were taking included Robert Clegg so it was necessary that he make the call to advise Rob positions had been filled by other organisations. I also said that it was great that the numbers were organised however we would need to see the Certificate of Currency before anyone could participate. Trevor said he would fax their most recent one to OzArk wthin the hour (he phoned @ 2.02pm- OzArk mobile 0400 041 999)

Little Burning Mountain Aboriginal Corporation

03.08.09 Trevor Robinson

JB Trevor faxed through his insurance docuemtns. OzArk note - I am not sure this is the right kind of isurance and we will need to talk with Lloyd Walker (insurer) tomorrow to confim.

Page 14: Appendix 3 Log of Aboriginal Community Consultation€¦ · the letter was sent to Date reply required ALL LETTERS POSTED 21.04.09 DECC 21.04.09 Attn: Mr Paul Houston DECC PO Box

ALKANE RESOURCES LTD 5 - 244 SPECIALIST CONSULTANT STUDIES Tomingley Gold Project Part 5: Cultural Heritage Assessment Report No. 616/06

OzArk Environmental and Heritage Management Pty Ltd.

Little Burning Mountain Aboriginal Corporation

03.08.09 Trevor Robinson

JB Trevor called to note he had 5 reps coming. I asked him if he had confirmed it with Mike Sutherland that the additional number was ok as I was not authorized to up the number. He noted he head spoken to Mike S about additional number but that Mike had advised that TR needed to discuss that issue directly with OzArk who are the consultants running the heritage assessment. I then said that OzArk are only authorised to take 4 fieldworkers and that one position was already filled by the WCE rep. Trevor was very unhappy about that situation and believes that the WCE rep has no right to operate within PH TO boundaries. I noted to Trevor that I was not able to discriminate based on that and that as a registered stakeholder WCE had been offered a position and I didn’t think it appropriate that OzArk retract that offer. I noted that if Indigenous community reps / groups have issues with each others rights to speak for country that conversation has to happen directly between them and not through OzArk and that my need as a consultant is to remain impartial and follow the DECC ICCR process and as clearly and transparently as possible. Unfortunately my mobile battery went flat before the conversation ended and although I had noted it may, Trevor did not call back on the OzArk landline as I had advised him to.

Lloyd Walker Insurance Brokers 04.08.09 ph: 6884 9800 Bill Critchley

CB spoke to Lloyd Walker insurance who advised that the insurance that LBM have covers them for income protection, if they injure themselves, and they are employed, their income will be covered for the period they are off work. Apparantly Frances Robinson had been in the other day and it was confirmed that LBM do not earn over $7,500 p.a. and therefore are not legally required to have a workers compensation policy in any instance!

Page 15: Appendix 3 Log of Aboriginal Community Consultation€¦ · the letter was sent to Date reply required ALL LETTERS POSTED 21.04.09 DECC 21.04.09 Attn: Mr Paul Houston DECC PO Box

SPECIALIST CONSULTANT STUDIES 5- 245 ALKANE RESOURCES LTD Part 5: Cultural Heritage Assessment Tomingley Gold Project Report No. 616/06

OzArk Environmental and Heritage Management Pty Ltd.

Little Burning Mountain Aboriginal Corporation

04.08.09 Trevor Robinson ph: 0439 061 293

CB spoke with Trevor and confirmed that LBM do not earn over $7,500 which was the reason, apparantly, Lloyd Walker suggested the Personal Income Insurance. I re-iterated to Trevor that we only required three reps and that if he problems with WCE's inclusion he would need to deal with Rob. Trevor was still not very happy with the numbers and suggested, very vaguely, the Community will be speaking with Jodie in relation to this issue.

Little Burning Mountain Aboriginal Corporation

04.08.09 Trevor Robinson ph: 6851 4429 e:'[email protected]

CB Trevor phoned to ask if he could have a copy of the methodology letter as the one he has does not include it. Emailed it through to his work address and advised it had been sent to Ken Robinson on the 7th July. As noted in this log Trevor, as an individual expressing interest in the project, was also sent a copy of this correspondence on the same date.

FIELDWORK MLA

Little Burning Mountain Aboriginal Corporation

05.08.09 Ken Robinson/Sharni Hando/John Robinson/Anthony wilson

upon arrival @ Tomingley pub Rob Clegg was under verbal attack from members of the Indigenous Community unhappy that WCE had expressed an interest in an area to which they did not belong. Trevor Robinson was present with a video camera to record the incident and demand that Rob Clegg not participate in the survey. Attempting to hold OzArk responsible and reason that we should have told Rob he could not participate Jodie explained our position and indicated that as part of the ICCR process OzArk must remain a neutral party. Subsequent to all the ill will Rob Clegg left and did not participate in the survey. LBM had four reps available.

Page 16: Appendix 3 Log of Aboriginal Community Consultation€¦ · the letter was sent to Date reply required ALL LETTERS POSTED 21.04.09 DECC 21.04.09 Attn: Mr Paul Houston DECC PO Box

ALKANE RESOURCES LTD 5 - 246 SPECIALIST CONSULTANT STUDIES Tomingley Gold Project Part 5: Cultural Heritage Assessment Report No. 616/06

OzArk Environmental and Heritage Management Pty Ltd.

Wiradjuri Council of Elders 05.08.09 Rob Clegg

Bogan River Peak Hill Wiradjuri Aboriginal Corporation

12.08.09 Russell Read 0420727449

CB Phoned Russell to advise that the FW for the ETL was set for Thursday 27th August. Russell advised address details and I said we would send out a letter confirming dates and times which would also include a map. Requested that BRPHWAC send two reps and that they send a letter on their letterhead which acknowledges that they are under the $7500 threshold for w/comp.

Bogan River Peak Hill Wiradjuri Aboriginal Corporation

13.08.09 Members: Bogan River Peak Hill Wiradjuri Aboriginal Corporation c/- Russell Read, Chairperson 125 Derribong Street Peak Hill NSW 2869

CB mailed out letter of offer and also a sample letter re: workers comp.

Bogan River Peak Hill Wiradjuri Aboriginal Corporation

17.08.09 Russell Read 0420727449

CB phoned Russell and advised that the date for FW was now Wednesday 26th (apparantly Peak Hill show day). Russell confirmed that he would have two reps available and that he would also complete the letter re: workers comp exemption. Confirmed meeting time & place was still the same

Bogan River Peak Hill Wiradjuri Aboriginal Corporation

21.08.09 Russell Read 0420727449

CB spoke to Russell to confirm that two reps were coming from BRPHWAC. He queried time and meeting place and said that they would be there @ 8.30am. Russell also confirmed that the paperwork was being handled regarding w/comp letter and that reps would bring this on the day. He said that they did not both have 'sites officers' certificates however I advised that we did not require these, it was often an internal requirement. Russell said the reps had recent experience on a survey associated with a gas line.

Page 17: Appendix 3 Log of Aboriginal Community Consultation€¦ · the letter was sent to Date reply required ALL LETTERS POSTED 21.04.09 DECC 21.04.09 Attn: Mr Paul Houston DECC PO Box

SPECIALIST CONSULTANT STUDIES 5- 247 ALKANE RESOURCES LTD Part 5: Cultural Heritage Assessment Tomingley Gold Project Report No. 616/06

OzArk Environmental and Heritage Management Pty Ltd.

FIELDWORK - WEDNESDAY 26.08.09 - ETL

Bogan River Peak Hill Wiradjuri Aboriginal Corporation

26.08.09

Peak Hill LALC 26.08.09 Members: Peak Hill LALC Attn: Cherie Keed 88 Caswell Street Peak Hill NSW 2869

04.09.09 letter sent/emailed advising meeting to be Wednesday 9th Sept re: management of sites recorded during current survey

Little Burning Mountain Aboriginal Corporation

26.08.09 Attn: Members / Little Burning Mountain Aboriginal Corporation c/- Ken Robinson - Chairperson PO Box 152 Peak Hill NSW 2869

04.09.09 letter given personally to Frances Robinson to give to Ken advising meeting to be Wednesday 9th Sept re: management of sites recorded during current survey (Frances in office confirming w/comp)

Neville Williams 26.08.09 members: Mooka TOC Mr N Williams PO Box 70 Cowra NSW 2794

04.09.09 letter sent advising meeting to be Wednesday 9th Sept re: management of sites recorded during current survey. Neville phoned to advise he would attend the meeting & would bring another member of Mooka TOC, phoned back 9/9/09 advising he was unable to attend the meeting as he would be in Sydney

Peter Peckham 26.08.09 Mr P Peckham 27 Jennings Road Geurie NSW 2831

04.09.09 letter sent advising meeting to be Wednesday 9th Sept re: management of sites recorded during current survey

Trevor Robinson 26.08.09 Mr T Robinson 41 Euchie Street Peak Hill NSW 2869

04.09.09 letter sent/emailed advising meeting to be Wednesday 9th Sept re: management of sites recorded during current survey

Wiradjuri Council of Elders 26.08.09 Members: Wiradjuri Council of Elders c/- Robert Clegg 3 Loretta Place Glendenning NSW 2761

04.09.09 letter sent/emailed advising meeting to be Wednesday 9th Sept re: management of sites recorded during current survey. 26.08.09 Rob Clegg emailed advising he would not be attending the meeting as he did not feel it would be wise and he recognises he is not welcome.

Page 18: Appendix 3 Log of Aboriginal Community Consultation€¦ · the letter was sent to Date reply required ALL LETTERS POSTED 21.04.09 DECC 21.04.09 Attn: Mr Paul Houston DECC PO Box

ALKANE RESOURCES LTD 5 - 248 SPECIALIST CONSULTANT STUDIES Tomingley Gold Project Part 5: Cultural Heritage Assessment Report No. 616/06

OzArk Environmental and Heritage Management Pty Ltd.

Bogan River Peak Hill Wiradjuri Aboriginal Corporation

26.08.09 Members: Bogan River Peak Hill Wiradjuri Aboriginal Corporation c/- Russell Read, Chairperson 125 Derribong Street Peak Hill NSW 2869

04.09.09 letter sent advising meeting to be Wednesday 9th Sept re: management of sites recorded during current survey

Bulgandramine Youth Development Aboriginal Corporation

26.08.09 Attn: Chairperson Bulgandramine Youth Development Aboriginal Corporation PO Box 119 Peak Hill NSW 2869

04.09.09 letter sent advising meeting to be Wednesday 9th Sept re: management of sites recorded during current survey

Registered Stakeholder meeting held 9th September, 6.00 @ Peak Hill Ex-Services Club. See attached list for attendees and minutes also attached. Result of this meeting - another Indigenous Community meeting to be held Monday 14 Sept to discuss issue of carved tree.

Peak Hill LALC 14.09.09 Members: Peak Hill LALC Attn: Cherie Keed 88 Caswell Street Peak Hill NSW 2869

sent package of information which was handed out at the meeting and also a summary of the meeting for their records

Neville Williams 14.09.09 members: Mooka TOC Mr N Williams PO Box 70 Cowra NSW 2794

sent package of information which was handed out at the meeting and also a summary of the meeting for their records

Peak Hill LALC 14.09.09 Members: Peak Hill LALC Attn: Valda Keed 6 Ween Street Peak Hill NSW 2869

sent package of information which was handed out at the meeting and also a summary of the meeting for their records

Wiradjuri Council of Elders 14.09.09 Members: Wiradjuri Council of Elders c/- Robert Clegg 3 Loretta Place Glendenning NSW 2761

sent package of information which was handed out at the meeting and also a summary of the meeting for their records

Peter Peckham 14.09.09 Mr P Peckham 27 Jennings Road Geurie NSW 2831

sent package of information which was handed out at the meeting and also a summary of the meeting for their records

Page 19: Appendix 3 Log of Aboriginal Community Consultation€¦ · the letter was sent to Date reply required ALL LETTERS POSTED 21.04.09 DECC 21.04.09 Attn: Mr Paul Houston DECC PO Box

SPECIALIST CONSULTANT STUDIES 5- 249 ALKANE RESOURCES LTD Part 5: Cultural Heritage Assessment Tomingley Gold Project Report No. 616/06

OzArk Environmental and Heritage Management Pty Ltd.

Little Burning Mountain Aboriginal Corporation

15.09.09 Attn: Members / Little Burning Mountain Aboriginal Corporation c/- Ken Robinson - Chairperson PO Box 152 Peak Hill NSW 2869

sent a copy of the minutes of the meeting for their records

Bogan River Peak Hill Wiradjuri Aboriginal Corporation

15.09.09 Members: Bogan River Peak Hill Wiradjuri Aboriginal Corporation c/- Russell Read, Chairperson 125 Derribong Street Peak Hill NSW 2869

sent a copy of the minutes of the meeting for their records

Bulgandramine Youth Development Aboriginal Corporation

15.09.09 Attn: Chairperson Bulgandramine Youth Development Aboriginal Corporation PO Box 119 Peak Hill NSW 2869

sent a copy of the minutes of the meeting for their records

Trevor Robinson 17.09.09 Mr T Robinson '[email protected]'

emailed a copy of the minutes of the meeting for their records

The Peak Hill Wiradjuri Reference Group

15.06.10 Peak Hill LALC, LBMAC, Bogan River PH Wiradjuri Aboriginal Corp, BYDAC

Community Engagement Protocol (CEP) between Alkane and the Peak Hill Wiradjuri Reference Group signed.

Registered Stakeholders 17.09.10 meeting was held between the TGP Registered Stakeholders and Alkane on the 17th of September 2010 to discuss the establishment of a Peak Hill Wiradjuri Reference Group.

Page 20: Appendix 3 Log of Aboriginal Community Consultation€¦ · the letter was sent to Date reply required ALL LETTERS POSTED 21.04.09 DECC 21.04.09 Attn: Mr Paul Houston DECC PO Box

ALKANE RESOURCES LTD 5 - 250 SPECIALIST CONSULTANT STUDIES Tomingley Gold Project Part 5: Cultural Heritage Assessment Report No. 616/06

OzArk Environmental and Heritage Management Pty Ltd.

Dorothy & Diane Stewart (direct descendents of Michael Mickey at Bulgandramine) via Mike Sutherland

27.09.10 Dorothy Stewart / 260 Myall St Dubbo ph: 0403 656 156 / 5806 0048 (h) Diane Stewart / 3 Flinders Close Dubbo ph: 0431 359 188

Jodie, as I mentioned last week I had a visit from Dorothy and Diane Stewart who are direct descendents of Michael Mickey who was born in 1851 at Bulgandramine. He was a labourer and station hand (and boxer according to Dot). He died and was buried in Wellington cemetery in 1925. Michael Mickey waqs married to Mary Ann Peck who was born in 1842 in Tomingley. Mary Ann Peck was buried in Wellington in 1943 (lived for 90 years). These two descendents wish to be included in all cultural heritage consultations regarding the Tomingley Gold Projected. Cheers Mike (attached to email death certificates of Michael Mickey and Mary Ann Peck and list of descendents plus a photo or Michael Mickey)

Peak Hill Wiradjuri Community 13.10.10 Peak Hill Ex-Services Club at 6pm

Convened by Alkane Resources Ltd

Mike Sutherland posted this to the 11 people who requested that they be mailed notices in addition info. signs for display to Peak Hill Local Aboriginal Lands Council, Peak Hill Country Crafts,. Peak Hill Post Office • Tomingley Gold Project update • Community Engagement Protocol • EOIs in Tomingley Cultural Heritage • Sharing the responsibilities for carriage of community development projects o TGP Cultural Heritage Plan o Keeping Place negotiations/consultations o Cultural Awareness Training delivery o Open Cut Experience tour development

Little Burning Mountain Aboriginal Corporation

30.11.10 Ken Robinson

MS - Alkane 30th November a 1/2 day sites survey east of Wilkies (Tomingley) with

Page 21: Appendix 3 Log of Aboriginal Community Consultation€¦ · the letter was sent to Date reply required ALL LETTERS POSTED 21.04.09 DECC 21.04.09 Attn: Mr Paul Houston DECC PO Box

SPECIALIST CONSULTANT STUDIES 5- 251 ALKANE RESOURCES LTD Part 5: Cultural Heritage Assessment Tomingley Gold Project Report No. 616/06

OzArk Environmental and Heritage Management Pty Ltd.

TGP Community Meeting 31.01.11 Convened by Alkane Resources Ltd

The purpose of this meeting was to inform the Tomingley, Peak Hill, Narromine and Parkes communities of the findings in the Project Environmental Assessment. Peak Hill and Dubbo-based Wiradjuri people attended this meeting. Attendees were encouraged to participate in follow up consultations by registering on the night.

Narromine LALC Paul 'Midnite' Brydon

01.02.11 02.02.11

Narromine LALC invited to participate in test pitting programme, requiring 4 site officers for the team. Paul Brydon as an individual registered stakeholder also participated in the two day programme.

archaeological dig on the proposed water supply pipeline route along the “Woodlands”

Dorothy Stewart 22.2.11 Dorothy Stewart Called to introduce herself to me. We talked about the carved tree and its possible management. She noted her descendents and being a TO. I noted when we next undertake any consultations she will be included and advised her to get on the list of interested parties held by DECCW.

Peak Hill LALC 25.02.11 Cherie Keed

MS - Alkane email.

sent copy of the CEP which was signed by representatives of the six registered Aboriginal organisations in Peak Hill. 'I am hoping that when the Draft TGP Cultural Heritage Report and is distributed to those six groups (plus the registered stakeholders and the Stewarts) then we might be able to meet in Peak Hill and discuss management of cultural heritage. I also look forward to discussing further opportunities to advance some of the community development projects that have been discussed at earlier forums.'

Draft Report Sent out

Narromine LALC 8.4.11 C/ - Mr P Thompson 13 Burroway Street, Narromine 2821

hard copy of report sent out, comments invited by Monday 2nd May 2011.

Page 22: Appendix 3 Log of Aboriginal Community Consultation€¦ · the letter was sent to Date reply required ALL LETTERS POSTED 21.04.09 DECC 21.04.09 Attn: Mr Paul Houston DECC PO Box

ALKANE RESOURCES LTD 5 - 252 SPECIALIST CONSULTANT STUDIES Tomingley Gold Project Part 5: Cultural Heritage Assessment Report No. 616/06

OzArk Environmental and Heritage Management Pty Ltd.

Little Burning Mountain 8.4.11 Attn: Chairperson / Ken Robinson

Little Burning Mountain Aboriginal Corporation PO Box 152 Peak Hill NSW 2869

hard copy of report sent out, comments invited by Monday 2nd May 2011.

BYDAC 8.4.11 Attn: Priscilla Sharah Bulgandramine Youth Development Aboriginal Corporation (BYDAC) PO Box 119 Peak Hill NSW 2869

hard copy of report sent out, comments invited by Monday 2nd May 2011.

Peak Hill LALC 8.4.11 Members: Peak Hill LALC Attn: CEO - Cherie Keed 88 Caswell Street Peak Hill NSW 2869

hard copy of report sent out, comments invited by Monday 2nd May 2011.

Bogan River Peak Hill Wiradjuri Aboriginal Corporation

8.4.11 Attn: Chairperson / Russell Read Bogan River Peak Hill Wiradjuri Aboriginal Corporation PO Box 42 Peak Hill NSW 2869 125 Derribong Street Peak Hill)

hard copy of report sent out, comments invited by Monday 2nd May 2011.

Paul (Midnight) Brydon 8.4.11 166 Minore Street Narromine

hard copy of report sent out, comments invited by Monday 2nd May 2011.

Wiradjuri Council of Elders 8.4.11 Members: Wiradjuri Council of Elders c/- Robert Clegg 3 Loretta Place Glendenning NSW 2761 e: '[email protected]'

notice sent to advise draft report was available, contact OzArk office should stakeholder wish to have a hard or electronic copy. Noted that 2nd May was closure date.

Page 23: Appendix 3 Log of Aboriginal Community Consultation€¦ · the letter was sent to Date reply required ALL LETTERS POSTED 21.04.09 DECC 21.04.09 Attn: Mr Paul Houston DECC PO Box

SPECIALIST CONSULTANT STUDIES 5- 253 ALKANE RESOURCES LTD Part 5: Cultural Heritage Assessment Tomingley Gold Project Report No. 616/06

OzArk Environmental and Heritage Management Pty Ltd.

Neville Williams 8.4.11 Mr N Williams PO Box 70 Cowra NSW 2794

notice sent to advise draft report was available, contact OzArk office should stakeholder wish to have a hard or electronic copy. Noted that 2nd May was closure date.

Peter Peckham 8.4.11 Mr P Peckham 27 Jennings Road Geurie NSW 2831 ph: 0427 781 021

notice sent to advise draft report was available, contact OzArk office should stakeholder wish to have a hard or electronic copy. Noted that 2nd May was closure date.

Trevor Robinson 8.4.11 Mr T Robinson 41 Euchie Street Peak Hill NSW 2869 e: '[email protected]'

notice sent to advise draft report was available, contact OzArk office should stakeholder wish to have a hard or electronic copy. Noted that 2nd May was closure date.

Dot Stewart 8.4.11 hard copy of report dropped in, comments invited by Monday 2nd May 2011.

Diane Stewart 8.4.11 hard copy of report sent out, comments invited by Monday 2nd May 2011.

Comments Received

Trevor Robinson 11.4.11 Phone call

Trevor requested hard copy of report be sent out, subsequently this was mailed to the advised address, comments invited by Monday 2nd May 2011.

Trevor Robinson 12.4.11 Mr T Robinson 41 Euchie Street Peak Hill NSW 2869

Hard copy of report sent out.

Peter Peckham 12.4.11 27 Jennings Road Geurie NSW 2831

Peter requested hard copy of report be sent out, subsequently this was mailed to the advised address, comments invited by Monday 2nd May 2011.

2.5.11 No comments or calls received in relation to draft report sent out.

Page 24: Appendix 3 Log of Aboriginal Community Consultation€¦ · the letter was sent to Date reply required ALL LETTERS POSTED 21.04.09 DECC 21.04.09 Attn: Mr Paul Houston DECC PO Box

ALKANE RESOURCES LTD 5 - 254 SPECIALIST CONSULTANT STUDIES Tomingley Gold Project Part 5: Cultural Heritage Assessment Report No. 616/06

OzArk Environmental and Heritage Management Pty Ltd.

Christine Peckham 02.05.11 c/- Peak Hill Aboriginal Medical Service 51 Caswell Street Peak Hill NSW 2869

Mike Sutherland advised that he had spoken to Christine and that a copy of the report should be sent for her records. This report was sent on CD as a word and pdf version

Bogan River Peak Hill Wiradjuri Aboriginal Corporation

19.09.11 Attn: Chairperson / Russell Read Bogan River Peak Hill Wiradjuri Aboriginal Corporation PO Box 42 Peak Hill NSW 2869 125 Derribong Street

mailed copy of draft Cultural Heritage Management Plan (CHMP) and invitation to meeting Wednesday 28 September in Peak Hill. Comments requested by COB 10 October 2011.

BYDAC Bulgandramine Youth Development Aboriginal Corporation (BYDAC)

19.09.11 Attn: Priscilla Sharah PO Box 119 Peak Hill NSW 2869

mailed copy of draft Cultural Heritage Management Plan (CHMP) and invitation to meeting Wednesday 28 September in Peak Hill. Comments requested by COB 10 October 2011.

Dorothy Stewart 19.09.11 260 Myall Street Dubbo 2830

mailed copy of draft Cultural Heritage Management Plan (CHMP). Comments requested by COB 10 October 2011.

Diane Stewart 19.09.11 3 Flinders Close Dubbo 2830

mailed copy of draft Cultural Heritage Management Plan (CHMP). Comments requested by COB 10 October 2011.

Little Burning Mountain 19.09.11 Attn: Chairperson / Ken Robinson Little Burning Mountain Aboriginal Corporation PO Box 152 Peak Hill NSW 2869

mailed copy of draft Cultural Heritage Management Plan (CHMP) and invitation to meeting Wednesday 28 September in Peak Hill. Comments requested by COB 10 October 2011.

Mooka TOC 19.09.11 c/ - Mr Neville Williams PO Box 70 Cowra NSW 2794

mailed copy of draft Cultural Heritage Management Plan (CHMP) and invitation to meeting Wednesday 28 September in Peak Hill. Comments requested by COB 10 October 2011. Also included copy of TGP report on CD.

Narromine LALC 19.09.11 C/ - Mr Phil Thompson 13 Burroway Street, Narromine 2821

mailed copy of draft Cultural Heritage Management Plan (CHMP) and invitation to meeting Wednesday 28 September in Peak Hill. Comments requested by COB 10 October 2011.

Peak Hill LALC 19.09.11 c/- Cherie Keed 88 Caswell Street Peak Hill NSW 2869

mailed copy of draft Cultural Heritage Management Plan (CHMP) and invitation to meeting Wednesday 28 September in Peak Hill. Comments requested by COB 10 October 2011.

Page 25: Appendix 3 Log of Aboriginal Community Consultation€¦ · the letter was sent to Date reply required ALL LETTERS POSTED 21.04.09 DECC 21.04.09 Attn: Mr Paul Houston DECC PO Box

SPECIALIST CONSULTANT STUDIES 5- 255 ALKANE RESOURCES LTD Part 5: Cultural Heritage Assessment Tomingley Gold Project Report No. 616/06

OzArk Environmental and Heritage Management Pty Ltd.

Peter Peckham 19.09.11 27 Jennings Street Geurie 2831

mailed copy of draft Cultural Heritage Management Plan (CHMP) and invitation to meeting Wednesday 28 September in Peak Hill. Comments requested by COB 10 October 2011.

Wiradjuri Council of Elders 19.09.11 c/- Robert Clegg 3 Loretta Place Glendenning NSW 2761

mailed copy of draft Cultural Heritage Management Plan (CHMP) and invitation to meeting Wednesday 28 September in Peak Hill. Comments requested by COB 10 October 2011. Also included copy of TGP report on CD.

Trevor Robinson 19.09.11 Mr T Robinson 41 Euchie Street Peak Hill NSW 2869

mailed copy of draft Cultural Heritage Management Plan (CHMP) and invitation to meeting Wednesday 28 September in Peak Hill. Comments requested by COB 10 October 2011.

Paul Brydon 19.09.11 166 Minore Street Narromine

mailed copy of draft Cultural Heritage Management Plan (CHMP) and invitation to meeting Wednesday 28 September in Peak Hill. Comments requested by COB 10 October 2011.

Paul Brydon 21.09.11 166 Minore St e: '[email protected]

Dawn phoned on behalf of Midnight to advise he would attend the meeting, requested the agenda be emailed & also directions to the AIF hall

Peter Peckham 26.09.11 Peter phoned the office to advise he would attend the meeting, also rsvp'd on behalf of Trevor Robinson who works in the same office.

Trevor Robinson 26.09.11

Trevor phoned and requested another copy of the agenda be faxed to # 6881 4601, agenda faxed to number advised.

MEETING 28 SEPTEMBER - PEAK HILL AIF HALL 6PM. ATTENDEE LISTED IN MINUTES AS PER CONSULTATION LOG

Page 26: Appendix 3 Log of Aboriginal Community Consultation€¦ · the letter was sent to Date reply required ALL LETTERS POSTED 21.04.09 DECC 21.04.09 Attn: Mr Paul Houston DECC PO Box

ALKANE RESOURCES LTD 5 - 256 SPECIALIST CONSULTANT STUDIES Tomingley Gold Project Part 5: Cultural Heritage Assessment Report No. 616/06

OzArk Environmental and Heritage Management Pty Ltd.

Dot Stewart 04.10.11 Per Mike Sutherland email from Mike Sutherland –

Jodie, I met with Dot Stewart today and explained what was discussed at the Peak Hill Heritage consultation last week. Dot had some strong views on Gaynor Macdonald’s work on the Bogan River Wiradjuri Anthropological Report (Federal Court NG 6001 of 1995) - Claimant and genealogical information. The Stewart family barely rates a mention and yet the Stewart sisters are direct descendents of Michael Mitchell Mickey (born 1851 Tomingley died Montefiores 1925) and Mary Ann Peck (born 1842 in Tomingley died in 1932 in Wellington). Dot told me today that she believes that she will be able to get back the breast plate that Michael Mickey (Labourer, stationhand, occasional boxer) wore. I wildly speculate that if he went by the name Mitchell that perhaps Thomas Mitchell may have used his services when exploring the Bogan and gave him the breast plate. Dot does not have any stories of Bulgandramine or Tomingley as she was raised on the mission in Wellington and stolen to Fairbridge Farm (Molong) where she remained with her sister Diane until the early 1970s. Dot does want to be involved in future archaeological work around TGP because of her strong connection to her ancestors land. Dot has a new mobile number 0435 843 324.’

Page 27: Appendix 3 Log of Aboriginal Community Consultation€¦ · the letter was sent to Date reply required ALL LETTERS POSTED 21.04.09 DECC 21.04.09 Attn: Mr Paul Houston DECC PO Box

SPECIALIST CONSULTANT STUDIES 5- 257 ALKANE RESOURCES LTD Part 5: Cultural Heritage Assessment Tomingley Gold Project Report No. 616/06

OzArk Environmental and Heritage Management Pty Ltd.

Ken Robinson 05.10.11 Per Mike Sutherland 'Jodie, I spoke with Ken Robinson last night. He

does not want to touch the tree (superstitious?) but was quite relaxed about the bark removal. He does not know anybody who could do the job but thought that Uranai’s grave tree (Molong?) was touched up recently. Someone in OEH surely must be able to assist? Cheers Mike'

21st October – mailed minutes of meeting to ALL

stakeholders, emailed to Trevor Robinson.

31st October – mailed pdf version on CD of water

pipeline final report site TNWP-OS1 with PAD to all Stakeholders.

Page 28: Appendix 3 Log of Aboriginal Community Consultation€¦ · the letter was sent to Date reply required ALL LETTERS POSTED 21.04.09 DECC 21.04.09 Attn: Mr Paul Houston DECC PO Box

ALKANE RESOURCES LTD 5 - 258 SPECIALIST CONSULTANT STUDIES Tomingley Gold Project Part 5: Cultural Heritage Assessment Report No. 616/06

OzArk Environmental and Heritage Management Pty Ltd.

TEST EXCAVATION CONSULTATION LOG

DATE ORGANISATION CONTACT COMMENT METHOD

17.12.10 Narromine LALC Members: Narromine LALC c/- Judy McMillan 13 Burraway Street Narromine NSW 2821

letter posted advising NLALC of upcoming test pitting programme @ Woodlands, proposed dates 1st/2nd Feb.

CB - mail

20.12.10 Midnight (Paul) Brydon

e: '[email protected]'

emailed written correspondence to Midnight advising of test pitting programme dates.

cb - email

Dec-10 Narromine LALC Phil - (new CEO) ph: 6889 2340

spoke to Phil who is new CEO at LALC, confirmed he had received correspondence and thus was aware of impending dig

cb - phone

12.01.11 Midnight (Paul) Brydon

ph: 0417 697 293 Midnight phoned to confirm the dates of the test pitting programme and check if we had received his insurances. Advised he is not necessarily associated with NLALC and is working & billing as an individual registered stakeholder

21.01.11 Narromine LALC Phil ph: 6889 2340 E: '[email protected]

left message with Kristy @ reception and advised I will email Phil and follow up next week re: NLALC staff for dig

cb - phone

24.01.11 Narromine LALC Phil Thompson Phil emailed after verbal conversation to confirm names of the reps participating in the programme, also sent through insurances.

cb - phone/email

25.01.11 Narromine LALC Phil ph: 6889 2340 E: '[email protected]

emailed Phil with written requirements for staff whilst participating in the test pitting programme.

cb - email

31.01.11 Narromine LALC Phil ph: 6889 2340 E: '[email protected]

emailed map of how to get to the site. cb - email

Page 29: Appendix 3 Log of Aboriginal Community Consultation€¦ · the letter was sent to Date reply required ALL LETTERS POSTED 21.04.09 DECC 21.04.09 Attn: Mr Paul Houston DECC PO Box

SPECIALIST CONSULTANT STUDIES 5- 259 ALKANE RESOURCES LTD Part 5: Cultural Heritage Assessment Tomingley Gold Project Report No. 616/06

OzArk Environmental and Heritage Management Pty Ltd.

DATE ORGANISATION CONTACT COMMENT METHOD

EXCAVATION TUESDAY 1ST FEBRUARY WEDNESDAY 2ND FEBRUARY

1. Tom Peckham 2. Damien Cooney 3. Kirsty Kelly 4. Dot Edwards (all Narromine LALC). 5. Paul Brydon

13.05.11 Narromine LALC Members: Narromine LALC c/- Phil Thompson 13 Burraway Street Narromine NSW 2821

send pdf version of draft report on CD to Narromine LALC c/- Phil for comments. Comment invited by 3 June 2011. - no comments received by this date.

13.05.11 Midnight (Paul) Brydon

166 Minore Street Narromine 2821

send pdf version of draft report on CD to Midnight for comments. Comment invited by 3 June 2011.no comments received by this date.

Page 30: Appendix 3 Log of Aboriginal Community Consultation€¦ · the letter was sent to Date reply required ALL LETTERS POSTED 21.04.09 DECC 21.04.09 Attn: Mr Paul Houston DECC PO Box

SPECIALIST CONSULTANT STUDIES 5- 260 ALKANE RESOURCES LTD Part 5: Cultural Heritage Assessment Tomingley Gold Project Report No. 616/06

OzArk Environmental and Heritage Management Pty Ltd.

This page has intentionally been left blank