APPENDIX A AESO PLANNING STUDIES
Project 1381 807L Capacity Increase August 2016 Page i File No. RP-05-1381
This page is intentionally left blank
Project 1381 807L Capacity Increase August 2016 Page ii File No. RP-05-1381
Executive Summary The AESO performs system planning studies regularly to assess transmission system reliability in the near-term (5 years), and medium-term (10 years). The AESO’s planning studies had identified that the existing 138 kV transmission system supplying load in the northeast of the Fort Saskatchewan Planning Area (“Area 33”) will be subject to constraints under certain system conditions. This report presents detailed planning studies that have since been performed based on the AESO’s latest forecast to assess the transmission system constraints in this area, and propose a preferred transmission development option to address the identified constraints. The AESO 2016 Long-term Outlook (“2016 LTO”) was used for the planning studies.
The study area, which is a sub-area of the Fort Saskatchewan Planning Area, comprises four substations, Beamer 233S, Redwater 171S, Weasel Creek 947S, Abee 993S, and all the 138 kV transmission lines connected to these substation (the “Beamer Study Area”). The Beamer Study Area is a load centre, supplied through three existing 138 kV transmission lines, 708L (Lamoureux 71S – Beamer 233S), 807L (Josephburg 410S – 807AL t-tap – Beamer 233S), 808L (Deerland 13S – Redwater 171S). Planning studies has indicated thermal constraints to supply load in the Beamer Study Area. Therefore, studies were performed assuming summer conditions due to lower transmission line ratings as compared to winter conditions.
Planning study results demonstrate that the existing transmission network in the Beamer Study Area does not have sufficient capacity to reliably supply the forecast load growth in 2017 and is prone to overloading under a single contingency. Specifically, these studies indicated thermal overload on a section of the existing 807L from the Beamer 233S substation to the 807AL t-tap under single contingency events. Further, the planning study results indicate the identified thermal overload in the Beamer Area will aggravate following the assumed generation connections in the Fort Saskatchewan Planning Area, which affects the capacity requirements. Therefore, there is a need for transmission system development to enhance reliability of the power supply in the Beamer Study Area by mitigating thermal overload under certain system conditions. The studies also confirmed that the driver of the need for transmission system development in this area is the forecast load growth in the area and assumed generation connections in the Fort Saskatchewan Planning Area.
Based on the study results, the AESO recommends to increase the capacity of the existing 807L transmission line between the Beamer 233S substation and the 807AL t-tap to alleviate the identified thermal constraint. The 807L transmission line (Josephburg 410S – 807AL t-tap – Beamer 233S) is approximately 7 km long. The current summer/winter rating of 807L between the Beamer 233S substation and the 807AL t-tap is 85/90 MVA. The AESO is recommending to increase the capacity of this section of the line to 175/217 MVA summer/winter rating, consistent with the rating of the remaining sections of this line. System study results demonstrate the proposed transmission development will address the identified constraints in the Beamer Study Area for the 20-year planning horizon, and no new constraints arise as a result of the proposed transmission development. AltaLink Management Ltd. (“AltaLink”) is the transmission facility owner (“TFO”) in this area. AltaLink has advised the AESO that approximately 1 km of 807L between the Beamer 233S substation and the 807AL t-tap needs to be rebuild to increase the summer/winter rating to 175/217 MVA.
The AESO has not considered any other options given that the proposed transmission development option is the minimum development required to address the identified need in the 20-year planning horizon. The proposed transmission development is independent of any other transmission developments that are currently planned within the Alberta transmission system in this timeframe. Future generation additions in the Fort Saskatchewan Planning Area may rely on the 807L capacity increase for their constraint-free connection to the grid depending on their impact on the 807L loading. Additionally, load
Project 1381 807L Capacity Increase August 2016 Page iii File No. RP-05-1381
growth in the Beamer Study Area will rely on the proposed transmission development for reliable access to the grid.
Project 1381 807L Capacity Increase August 2016 Page iv File No. RP-05-1381
Table of Contents Executive Summary .................................................................................................................................... ii 1 Introduction ........................................................................................................................................... 1
1.1 Study Objectives ........................................................................................................................................ 3 1.2 Study Scope ............................................................................................................................................... 4
1.2.1 Studies not included in the Study Scope ........................................................................................ 4 1.3 Report Overview ........................................................................................................................................ 4
2 Reliability Standards, Criteria, and Study Assumptions .................................................................. 6 2.1 Transmission Reliability Standards and Criteria ......................................................................................... 6
2.1.1 Alberta Reliability Standards and Criteria ....................................................................................... 6 2.2 Load Forecast and Generation Assumptions ............................................................................................. 7 2.3 HVDC Assumptions ................................................................................................................................... 7 2.4 Transmission Facilities Assumptions ......................................................................................................... 7
2.4.1 Transmission System and Customer Connection Projects ............................................................. 7 2.4.2 Facility Ratings ............................................................................................................................... 8
3 Planning Methodology ......................................................................................................................... 9 3.1 Study Cases ............................................................................................................................................... 9 3.2 Power Flow Analysis ................................................................................................................................ 10 3.3 Short-circuit Analysis ................................................................................................................................ 10
4 Need Assessment ............................................................................................................................... 11 4.1 Power Flow Analysis ................................................................................................................................ 11
4.1.1 2017 Summer Peak (2017SP):17_1a ........................................................................................... 11 4.1.2 2020 Summer Peak (2020SP):20_1a ........................................................................................... 12 4.1.3 2020 Summer Peak Sensitivity (2020SP):20_1a_Sen.................................................................. 12 4.1.4 2025 Summer Peak (2025SP):25_1a ........................................................................................... 13
4.2 Summary of the Need Assessment .......................................................................................................... 14 5 Proposed Development ..................................................................................................................... 16
5.1 Technical Assessment of the Preferred Transmission Development Option ............................................ 17 5.1.1 Power Flow Analysis ..................................................................................................................... 17 5.1.2 Short-circuit Analysis .................................................................................................................... 17
5.2 Alignment with the AESO Long-term Plans .............................................................................................. 17 6 Transmission Interdependencies ..................................................................................................... 18 7 Conclusions and Recommendation ................................................................................................. 19
List of Tables
Table 2-1: Acceptable Range of Steady State Voltage ........................................................................................... 7 Table 2-2: List of Transmission System Projects ................................................................................................... 8 Table 2-3: List of Customer Connection Projects Applied for in Area 33 ............................................................... 8 Table 2-4: Summary of Ratings of Transmission Lines in the Study Area .............................................................. 8 Table 3-1: Summary of Study Scenarios ................................................................................................................ 9 Table 4-1: 2017SP, Category B (N-1) Thermal Loading ....................................................................................... 11 Table 4-2: 2020SP, Category B (N-1) Thermal Loading ....................................................................................... 12 Table 4-3: 2020SP Sensitivity, Category A (N-0) Thermal Loading ...................................................................... 12 Table 4-4: 2020SP_Sensitivity, Category B (N-1) Thermal Loading ..................................................................... 13 Table 4-5: 2025SP, Category A (N-0) Thermal Loading ....................................................................................... 14 Table 4-6: 2025SP, Category B (N-1) Thermal Loading ....................................................................................... 14
Project 1381 807L Capacity Increase August 2016 Page v File No. RP-05-1381
Attachments
Attachment A Summary of Generation Dispatch in the Study Area
Attachment B Need Assessment -2017SP Power Flow Diagrams
Attachment C Need Assessment -2020SP Power Flow Diagrams
Attachment D Need Assessment -2020SP Sensitivity Power Flow Diagrams
Attachment E Need Assessment -2025SP Power Flow Diagrams
Attachment F Proposed Transmission Development Assessment -Power Flow Diagrams
Attachment G Short-circuit Study Results
Project 1381 807L Capacity Increase
August 2016 Page 1 File No. RP-05-1381
1 Introduction
The AESO performs system planning studies regularly to assess transmission system reliability in the near-term (5 years), and medium-term (10 years). The AESO’s planning studies had identified that the existing 138 kV transmission system supplying load in the northeast of the Fort Saskatchewan Planning Area will be subject to constraints under certain system conditions. This report presents detailed planning studies that have since been performed based on the AESO’s latest forecast, i.e., 2016 LTO, to assess the transmission system constraints in this area, and propose a preferred transmission development option to address the identified constraints.
The Beamer Study Area, the focus of the studies described in this report, is located within the AESO’s Fort Saskatchewan Planning Area. For the purposes of the planning studies described in this report, the Beamer Study Area is defined as:
Beamer 233S substation,
Redwater 171S substation,
Weasel Creek 947S substation,
Abee 993S substation, and
All the 138 kV transmission lines that connect to the above mentioned substations.
Figure 1 illustrates the Beamer Study Area. There are three existing 138 kV transmission lines, 708L (Lamoureux 71S – Beamer 233S), 807L (Josephburg 410S – 807AL t-tap – Beamer 233S), 808L (Deerland 13S – Redwater 171S), supplying load in this area. Load in the Beamer Study Area is forecast to grow due to the industrial expansions. Abee 993S and Weasel Creek 947S substations were energized in 2013 to mainly serve pipeline load. In addition to the load growth in the area, there are several future generation additions in the vicinity of the Beamer Study Area, including 485 MW Heartland Generating Station connection to Josephburg 410S, that would increase power flow on the existing 138 kV transmission lines in this area. Study results indicate that the local network in the Beamer Study Area can experience thermal overload following a single contingency due to imminent load growth in the area. Additional load growth in the area as well as future generation connection in the Fort Saskatchewan Planning Area will exacerbate thermal overload in the Beamer Study Area. The existing transmission system in the Fort Saskatchewan Planning Area is depicted in Figure 2. The objectives of the planning studies in the Beamer Study Area and the scope of the studies are described below.
Project 1381 807L Capacity Increase
August 2016 Page 2 File No. RP-05-1381
Figure 1: Transmission system in the Beamer Study Area
807AL
BANNERMAN681S
942L
1061
L
HEARTLAND12S
1054L1061L
1061L943L
1061L1120L
807L
RedwaterCogen (TC02)
ABEE993S
AMELIA108S
BEAMER233S
DEERLAND13S
LAMOUREUX71S
SCOTFORD409S
REDWATER171S
RIVERSIDE388S
JOSEPHBURG410S
SHELL AOSP402S
WEASELCREEK 947S
708L
808L
807L
942L
1120
L735L
856L857L
7L43
77L
A80
8
1120
L94
3L
808
AL
1054L943L
942L997L
708AL
This diagram contains a simplifiedversion of the system configuration.Technical detail has been simplifiedfor illustration purposes. It does notindicate geographical locations of facilities.
Gas Generator
138 or 144 kV Substation
240 kV Substation
500 kV Substation
138/144 kV
138/144 kV Double Circuit
240 kV
240 kV Double Circuit
138/240 kV Triple Circuit
Currency Date: 2016-07-26
Shell ScotfordFacilities
Project 1381 807L Capacity Increase
August 2016 Page 3 File No. RP-05-1381
Figure 2: Fort Saskatchewan Planning Area existing transmission system
1.1 Study Objectives
The study objectives were as follows:
Determine the timing of the need for transmission system developments (“Need Year”) based on the forecast load growth.
Assess the performance of existing transmission system in the near-term (Need Year and 2020) and medium-term (2025) using Alberta Reliability Standards to identify any violations and system constraints under Category A system conditions (all transmission elements in service) and Category B contingencies (a single element out of service).
Determine transmission system development option(s) to address the identified need for transmission reinforcements.
Assess transmission system development options based on the Alberta Reliability Standards in the near-term, medium-term, and long-term (2035) planning horizon under Category A system conditions, and Category B contingencies.
Project 1381 807L Capacity Increase
August 2016 Page 4 File No. RP-05-1381
1.2 Study Scope
The following planning studies were performed in the study area to achieve the study objectives:
Power flow analyses were performed in various timeframes (Need Year, 2020 and 2025) to assess system performance prior to implementation of any system development in the Beamer Study Area under Category A system conditions and Category B contingencies. Such studies are referred to in this report as the Need Assessment, which establishes the need for transmission development in the Beamer Study Area through identification of system constraints.
Considering the Need Assessment study results, a transmission development option was planned to alleviate the identified constraints.
Power flow studies were performed following implementation of the identified transmission development option to assess its performance in various timeframes (Need Year, 2020, 2025, and 2035).
Short-circuit analyses were performed before and after transmission system developments in the near-term (Need Year).
1.2.1 Studies not included in the Study Scope
The following studies were not undertaken as part of the planning studies:
Voltage stability (PV) analyses were excluded given that there are significant reactive power supports in the vicinity of the Beamer Study Area, and therefore, voltage stability is not a concern.
Dynamic stability analyses were not performed as the Beamer Study Area is a load centre and there are no transient stability issues in this area.
Identification of any system constraints in the Fort Saskatchewan Planning Area, outside the Beamer Study Area, was excluded from the scope of the studies presented in this report.
The AESO may develop operational procedures and mitigation plans, including system reconfiguration or generation re-dispatch, to ensure reliable system operation until the proposed transmission developments are implemented. The investigation or the development of specific operational measures that could be applied in future by the AESO is beyond the scope of this planning report.
1.3 Report Overview
This planning report summarizes the studies conducted to assess system performance and capacity requirements in the Beamer Study Area. The transmission development option considered by the AESO to address the identified system constraints is evaluated and the study results are discussed. The report is structured as follows:
• The Executive Summary summarizes the report and its conclusions.
• Section 1 provides an introduction that includes the scope of the studies.
• Section 2 describes the reliability standards, criteria, and study assumptions.
• Section 3 presents the planning methodology.
• Section 4 discusses the Need Assessment.
Project 1381 807L Capacity Increase
August 2016 Page 5 File No. RP-05-1381
• Section 5 presents the development of the transmission development option to address the identified constraints and the technical assessment of this option.
• Section 6 discusses project interdependencies.
• Section 7 presents the summary and conclusions.
Project 1381 807L Capacity Increase
August 2016 Page 6 File No. RP-05-1381
2 Reliability Standards, Criteria, and Study Assumptions
This section discusses the applicable reliability standards, criteria, and study assumptions applied in the planning studies. Applicable information used to create the study cases, such as load and generation assumptions and system configuration, reflects the most current information available to the AESO.
2.1 Transmission Reliability Standards and Criteria
2.1.1 Alberta Reliability Standards1 and Criteria
When developing long-term plans, the AESO applies the Transmission Planning (TPL) standards, which are part of the Alberta Reliability Standards, to ensure the transmission system is planned to meet applicable performance requirements under a defined set of system conditions and contingencies. A brief description of each of the standards relevant to this study is given below. TPL-001-AB-0: System Performance under Normal Conditions Category A represents a normal system condition with all elements in service (N-0). All equipment must be within its applicable rating, voltages must be within their applicable ranges and the system must be stable with no cascading outages. Under Category A, electric supply to load cannot be interrupted and generating units cannot be removed from service. TPL-002-AB-0: System Performance Following Loss of a Single BES Element Category B events result in the loss of any single element (N-1) under specified fault conditions with normal clearing. The specified elements are a generating unit, a transmission circuit, a transformer or a single pole of a direct current transmission line. The acceptable impact on the system is the same as Category A, with the exception that radial customers or some local network customers, connected to or supplied by the faulted element or by the affected area, may occur in certain areas without impacting the overall reliability of the interconnected transmission systems. No cascading outages can occur. The TPL standards have referenced thermal and voltage limits within the applicable rating when specifying the required system performance. For the purpose of applying the TPL standards to the planning studies documented in this report, applicable ratings are defined as follows, in accordance with the AESO’s Transmission Planning Criteria – Basis and Assumptions:
• Applicable thermal limits are 100% of continuous summer rating.
• Applicable voltage limits are the normal minimum and maximum limits as specified in Table 2-1 for Category A conditions, while the extreme minimum and maximum limits are used to identify Category B and Category C system violations.
1 A complete description of these standards are available on the AESO website: http://www.aeso.ca/rulesprocedures/17004.html
Project 1381 807L Capacity Increase
August 2016 Page 7 File No. RP-05-1381
Table 2-1: Acceptable Range of Steady State Voltage
Nominal Voltage
(kV)
Extreme Minimum
(kV)
Normal Minimum
(kV)
Normal Maximum
(kV)
Extreme Maximum
(kV)
500 475 500 525 550
240 216 234 252 264
260 (Northeast & Northwest) 234 247 266 275
144 130 137 151 155
138 124 135 145 152
72 65 68.5 75.5 79
69 62 65.5 72.5 76
2.2 Load Forecast and Generation Assumptions
The system planning studies were conducted using the AESO 2016 LTO. Historically load in the Beamer Study Area peaks in winter. However, considering that the most limiting factor in the area is thermal constraints, only summer peak load were studied as summer ratings of the transmission lines are typically lower than their winter ratings.
Load in the Beamer Study Area is primarily industrial load and forecast to grow. In 2013 two new substations, Abee 993S and Weasel Creek 947S, were energized to mainly serve pipeline load. Additionally, in 2014 and 2015, FortisAlberta increased its DTS contract by 29 MW at the Redwater 171S substation in two phases. Detailed load and generation assumptions for each of the study cases are provided in Section 3.1 of this report.
Appendix B to the 138 kV Transmission Line 807L Capacity Increase Needs Identification Document contains further detail regarding the forecast information.
2.3 HVDC Assumptions
The Western Alberta Transmission Line (WATL) and Eastern Alberta Transmission Line (EATL) High-voltage Direct Current (HVDC) lines were dispatched economically in the study models to achieve minimum system losses under system normal conditions.
2.4 Transmission Facilities Assumptions
2.4.1 Transmission System and Customer Connection Projects
Table 2-2 outline system projects that were modeled in the study cases based on their estimated in-service date (“ISD”). Table 2-3 list the customer connection projects located in the Fort Saskatchewan area that have been included in the study models to represent future system topology in the corresponding years.
Project 1381 807L Capacity Increase
August 2016 Page 8 File No. RP-05-1381
Table 2-2: List of Transmission System Projects
Project No Project Name Planning
Area Estimated
ISD
1590 Fort McMurray West 500 kV line 25, 33 2019
- Fort McMurray East 500 kV line 25, 33 2025
Table 2-3: List of Customer Connection Projects Applied for in Area 33
Project No. Project Name Planning
Area Customer Requested ISD
1421 ATCO Power Heartland Generating Station 33 November 2019 energization & Q1 2020 commercial operation
1289 Maxim Power Deerland Peaking Station 33 December 2017 energization
1666 TransCanada Redwater ISD DTS Increase 33 July 2017
1647 Williams Strathcona Cogeneration 33 November 2017 energization & January 2018 commercial operation
2.4.2 Facility Ratings
Table 2-4 summarizes the facility ratings in the Beamer Study Area. The current summer/winter rating of 807L from the Beamer 233S substation to the 807AL t-tap is limited to 85/90 MVA although sections of this line that are on a common tower with the 240 kV transmission lines 942L/1061L is already upgraded using Hawk 477 MCM conductors with a higher summer/winter rating of 175/217 MVA. The remaining sections of this line, from Josephburg 410S to the 807AL t-tap, is also upgraded using Hawk 477 MCM conductors with a summer/winter rating of 175/217 MVA.
Table 2-4: Summary of Ratings of Transmission Lines in the Study Area
Line ID Line Description Voltage Class (kV)
Nominal Rating (MVA)
Summer Winter
807L Beamer 233S to 807AL Tap 138 85 90
807L Josephburg 410S to 807AL Tap 138 175 217
708L Lamoureux 71S to Beamer 233S 138 121 148
808L Deerland 13S to Redwater 171S 138 98 114
735L Beamer 233S to Redwater 171S 138 96 94
808AL/7LA808 808L to Weasel Creek 947S 138 121 150
437L Weasel Creek 947S to Abee 993S 138 121 150
Project 1381 807L Capacity Increase
August 2016 Page 9 File No. RP-05-1381
3 Planning Methodology
The planning process included the following: 1. Develop credible stressed study cases considering the load and generation forecast. Summer
peak load and high area generation dispatches were assumed in order to create stressed scenarios for the planning studies.
2. Perform Need Assessment studies in the near-term (Need Year and 2020) and medium-term (2025) to identify potential transmission system constraints in various timeframes.
3. Assess the sensitivity of study results and recommendations to uncertainty of key study assumptions, as required.
4. Develop transmission development option(s) to address the identified constraints. 5. Assess the transmission development option(s) to evaluate its performance and to ensure all
identified constraints in the 20-year planning horizon are addressed.
The selected study years, system conditions, and methodology used for the study are described below.
3.1 Study Cases
Study scenarios were developed using the system conditions listed in Table 3-1 to stress the study area. Based on the 2016 LTO, there is a significant load growth in 2017 in the Beamer Study Area. Therefore, studies included a 2017 scenario. As explained earlier in Section 2.2, only summer peak loading conditions are considered in these studies to represent stressed conditions in the area. Detailed generation assumptions in the Area 33 that was used for each study scenario is provided in Attachment A. One of the Mahkeses units was assumed off-line in 2017 study scenario to model N-G condition for N-G-1 power flow studies. Similarly, the Redwater ISD unit was assumed off-line in the 2020, 2025 and 2035 study scenarios for N-G-1 power flow studies. Given assumptions creates a stressed system condition by increasing power flow on the transmission lines in the Beamer Study Area.
Table 3-1: Summary of Study Scenarios
Case Year Season
Area 33
Load Beamer Area Load (MW) Generation Condition
17_1a 2017 Summer 659 109 High generation
20_1a 2020 Summer 737 110 Co-gen high, Peaking units low*
25_1a 2025 Summer 756 112 High generation
35_1a 2035 Summer 785 115 High generation
• A variation of generation condition, assuming Redwater ISD in-service, was also considered as detailed in Appendix A.
Project 1381 807L Capacity Increase
August 2016 Page 10 File No. RP-05-1381
3.2 Power Flow Analysis
Power flow analyses were performed under Category A system conditions with all transmission elements in service and Category B contingencies (N-1). These analyses were performed for all the study scenarios listed in Table 3-1 to identify any violation of the Reliability Standards, including thermal overloads and voltage issues in the Beamer Study Area. The contingency list included all the 138 kV and above transmission elements in the Fort Saskatchewan Planning Area to assess the impact on the Beamer Study Area.
3.3 Short-circuit Analysis
The objective of short-circuit analysis is to assess the impact of the proposed transmission development on the short-circuit levels by assessing the maximum fault currents before and after implementation of the proposed transmission development. To evaluate the maximum fault current under three-phase-to-ground faults and single-line-to-ground faults, all transmission elements were in service and all generators in and around the Fort Saskatchewan area were dispatched.
Project 1381 807L Capacity Increase
August 2016 Page 11 File No. RP-05-1381
4 Need Assessment
The main objective of the Need Assessment studies was to determine transmission system constraints in various timeframes: 2017, 2020 and 2025. It is important to study system constraints in different timeframes to investigate if the nature of the constraint remains unaffected by planned changes in the system as well as to gain an understanding of the system capacity requirements through observing how the severity of the constraints changes over the time. Further, the Need Assessment indicates when the constraints in the Beamer Study Area arise based on the given load and generation assumptions.
4.1 Power Flow Analysis
Power flow studies for Category A (N-0) and Category B (N-1) contingencies were performed to identify any thermal or voltage violations in the Beamer Study Area for all the study scenarios listed in Table 3-1. The study results are discussed below.
4.1.1 2017 Summer Peak (2017SP):17_1a
The Power flow diagrams for 2017SP are provided in Attachment B.
Category A (N-0) Conditions – 2017SP
No voltage or thermal criteria violations were observed in this scenario.
Category B (N-1) Conditions – 2017SP
No voltage criteria violations were observed in this scenario. The overload on 807L (233S Beamer to 807AL t-tap) occurs under the contingency of 708L (Beamer 233S to Lamoureux 71S) as presented in Table 4-1. Considering the study results, the need for transmission development in the Beamer Study Area arises in 2017 if forecast load materializes in this timeframe. However, the reported thermal overload is minor and as such will not arise if the actual load is lower than the forecast load in 2017. Therefore, the timing of the need for transmission development in the Beamer Study Area is dependent on when the area load reaches 109 MW.
Table 4-1: 2017SP, Category B (N-1) Thermal Loading
Contingency Overloaded Branch
Nominal Line
Rating (MVA)
17_1a
Power Flow
(MVA)
% Loading
708L (233S Beamer to 71S Lamoureux)
807L (Beamer 233S to 807AL t-tap) 85 87 101
Project 1381 807L Capacity Increase
August 2016 Page 12 File No. RP-05-1381
4.1.2 2020 Summer Peak (2020SP):20_1a
The power flow diagrams for 2020SP are provided in Attachment C.
Category A (N-0) Condition - 2020SP
No voltage or thermal criteria violations were observed in this scenario.
Category B (N-1) Condition - 2020SP
No voltage criteria violations were observed in this scenario. The overloads on 807L (Beamer 233S to 807AL t-tap) occur under the contingencies of 708L and 808L as indicated in Table 4-2.
Table 4-2: 2020SP, Category B (N-1) Thermal Loading
Contingency Overloaded Branch Nominal Line Rating (MVA)
20_1a
Power Flow
(MVA) %
Loading
808L (Redwater 171S to Deerland 13S)
807L (233S Beamer to 807AL (Shell) Tap) 85 92 106
708L (Beamer 233S to Lamoureux 71S)
807L (Beamer 233S to 807AL t-tap) 85 87 101
4.1.3 2020 Summer Peak Sensitivity (2020SP):20_1a_Sen
Sensitivity studies were performed to assess the impact of the future Heartland Generating Station on the Beamer Study Area. The customer’s requested ISD for generation connection is Q4 2019. The power flow diagrams for 2020SP sensitivity scenario are provided in Attachment D.
Category A (N-0) Condition – 2020SP_Sensitivity
Voltage criteria violations were not observed in this scenario. Due to load growth and the Heartland Generating Station connection, there is significantly higher power flow on the 138 kV transmission system in the Area 33. Specifically, overload on 807L line occurs under Category A conditions as presented in Table 4-3.
Table 4-3: 2020SP Sensitivity, Category A (N-0) Thermal Loading
System Condition Branch
Nominal Line
Rating (MVA)
20_1a_Sen
Power Flow
(MVA)
% Loading
All elements in-service (N-0) 807L (Beamer 233S to 807AL t-tap) 85 88 101
Project 1381 807L Capacity Increase
August 2016 Page 13 File No. RP-05-1381
Category B (N-1) Condition – 2020SP_Sensitivity
No voltage criteria violations were observed in this scenario. Due to load growth and the Heartland Generating Station connection, there is significantly higher power flow on 807L resulting in thermal overload under several Category B contingency events as presented in Table 4-4.
Table 4-4: 2020SP_Sensitivity, Category B (N-1) Thermal Loading
Contingency Branch
Nominal Line
Rating (MVA)
20_1a_Sen
Power Flow
(MVA) % Loading
706L (Josephburg 410S to Fort Saskatchewan 54S) 807L (Beamer 233S to 807AL t-tap) 85 97 112
808L (Redwater 171S to Deerland 13S) 807L (Beamer 233S to 807AL t-tap) 85 105 121
776L (Josephburg 410S to Albchem Beaverhill Creek 308S) 807L (Beamer 233S to 807AL t-tap) 85 96 110
773L (Bruderheim 127S to Albchem Beaverhill Creek 308S) 807L (Beamer 233S to 807AL t- tap) 85 96 110
997L (Lamoureux 71S to Josephburg 410S) 807L (Beamer 233S to 807AL t- tap) 85 133 153
943L (Deerland 13S to Amelia 108S) 807L (Beamer 233S to 807AL t- tap) 85 94 107
1120L (Josephburg 410S to Amelia 108S) 807L (Beamer 233S to 807AL t- tap) 85 98 112
4.1.4 2025 Summer Peak (2025SP):25_1a
The power flow diagrams for 2025SP are provided in Attachment E.
Category A (N-0) Condition - 2025SP
No voltage criteria violations were observed in this scenario. Due to load growth and the Heartland Generating Station connection, there is significantly higher power flow on the 138 kV transmission system in Area 33. Specifically, overload on 807L line occurs under Category A conditions as presented in Table 4-5.
Project 1381 807L Capacity Increase
August 2016 Page 14 File No. RP-05-1381
Table 4-5: 2025SP, Category A (N-0) Thermal Loading
Contingency Branch
Nominal Line
Rating (MVA)
25_1a
Power Flow
(MVA)
% Loading
Category A Thermal Violation 807L (Beamer 233S to 807AL t- tap) 85 93 106
Category B (N-1) Condition – 2025SP
No voltage criteria violations were observed in this scenario. The overload on 807L (Beamer 233S to 807AL t-tap) occurs under several contingencies as presented in Table 4-6.
Table 4-6: 2025SP, Category B (N-1) Thermal Loading
Contingency Branch
Nominal Line
Rating (MVA)
25_1a
Power Flow
(MVA)
% Loading
706L (Fort Saskatchewan 54S to Josephburg 410S) 807L (Beamer 233S to 807AL t- tap) 85 109 124
808L (Redwater 171S to Deerland 13S) 807L (Beamer 233S to 807AL t- tap) 85 129 148
EXI-01L (Scotford Upgrader 879S to Shell AOSP1 402S) 807L (Beamer 233S to 807AL t- tap) 85 87 100
997L (Lamoureux 71S to Josephburg 410S) 807L (Beamer 233S to 807AL t- tap) 85 145 166
621L (Deerland 13S to Deerland Peaking Station 109S) 807L (Beamer 233S to 807AL t- tap) 85 100 115
4.2 Summary of the Need Assessment
The Need Assessment included power flow studies in the near-term (2017 and 2020) and medium-term (2025) using the study scenarios described in Table 3-1 in Section 3.1 under Category A system conditions (N-0) and Category B (N-1) contingencies.
The study results demonstrated that the existing 138 kV 807L transmission line (Beamer 233S – 807AL t-tap) will experience thermal overload under Category B events in all studied timeframes due to load growth in the Beamer Study Area. Further, these studies indicated power flow on the existing transmission system in the Beamer Study Area will increase significantly due to the assumed generation additions in the Fort Saskatchewan Planning Area, resulting in thermal overloads on 807L to arise under N-0 system conditions. Additionally, such generation additions will significantly increase thermal
Project 1381 807L Capacity Increase
August 2016 Page 15 File No. RP-05-1381
overloads on 807L under N-1 contingency events. Therefore, there is a need for transmission system developments in the Beamer Study Area to alleviate the identified constraints. Additionally, different generation assumptions studied in different scenarios have an impact on the severity of the identified constraints and therefore, affect the capacity requirements. The driver of the need for transmission developments in this area is the forecast load growth in the area and assumed generation connections in the Fort Saskatchewan Planning Area.
Based on the study results, timing of the need will be dependent on the load growth in the Beamer Study Area reaching 109 MW and/or generation addition(s) in the Fort Saskatchewan Planning Area that would cause thermal overloads on the 807L transmission line. Considering the Need Assessment, Section 5 describes transmission development option that is required to address the identified constraint in the Beamer Study Area.
Project 1381 807L Capacity Increase
August 2016 Page 16 File No. RP-05-1381
5 Proposed Development
Based on the Need Assessment, the AESO proposes to increase the capacity of sections of the existing 807L transmission line between the Beamer 233S substation and the 807AL t-tap from 85/90 MVA to 175/217 MVA (summer/winter rating) to alleviate the identified thermal constraint. The proposed capacity is consistent with the current capacity of the remaining sections of the 807L line. AltaLink has advised the AESO that approximately 1 km of 807L between the Beamer 233S substation and the 807AL t-tap needs to be rebuild to increase the summer/winter rating of the line to 175/217 MVA. Figure 3 presents the proposed transmission development, which will not result in any changes to the existing transmission network configuration or any changes to the existing layout of the Beamer 233S substation.
The AESO did not consider any other transmission development options given that the proposed transmission system development option is the minimum development required to address the identified need.
The proposed transmission development option is assessed in near-term (2017, 2020), medium-term (2025), and long-term (2035) using study scenarios presented in Table 3-1. Study results are reported in the following sections.
Figure 3: 807L Capacity Increase
Project 1381 807L Capacity Increase
August 2016 Page 17 File No. RP-05-1381
5.1 Technical Assessment of the Preferred Transmission Development Option
5.1.1 Power Flow Analysis
The Power flow diagrams for the proposed transmission development for all study years are provided in Attachment F. Near-term (2017) Assessment No overloads or voltage violations were observed in 2017 under the Category A (N-0) condition and Category B events for all studied scenarios assuming the proposed transmission development option is implemented. Near-term (2020) Assessment No overloads or voltage violations were observed in 2020 under the Category A (N-0) condition and Category B events for all studied scenarios assuming the proposed transmission development option is implemented. Medium-term (2025) Assessment No overloads or voltage violations were observed in 2025 under the Category A (N-0) condition and Category B events for all studied scenarios assuming the proposed transmission development option is implemented. Long-term (2035) Assessment No overloads or voltage violations were observed in 2035 under the Category A (N-0) condition and Category B events for all studied scenarios assuming the proposed transmission development option is implemented.
5.1.2 Short-circuit Analysis
Short-circuit analysis was performed using the near-term (2017) study case to determine the maximum short-circuit fault levels in the Beamer Study Area before and after the proposed transmission development option. The proposed transmission development does not have any material impact on the short-circuit levels in the study area. Three-phase and single-phase (line-to-ground) fault currents were calculated. The results of the short-circuit studies revealed that all fault levels were below the individual circuit breaker capabilities. Short-circuit study results are provided in Attachment G.
5.2 Alignment with the AESO Long-term Plans
The AESO’s 2015 Long-term Transmission Plan (2015 LTP) was prepared using 2014 LTO forecast, and it includes increasing the capacity of 138 kV line between Beamer and Shell substations. Therefore, the proposed transmission development is aligned with the AESO’s 2015 LTP.
Project 1381 807L Capacity Increase
August 2016 Page 18 File No. RP-05-1381
6 Transmission Interdependencies
The proposed transmission development will alleviate the identified need in the 20-year planning horizon and is independent of any other transmission developments that are currently planned within the Alberta transmission system. Future generation additions in the Fort Saskatchewan Planning Area may rely on the 807L capacity increase for their constraint-free connection to the grid depending on their impact on the 807L loading. Additionally, future load growth in the Beamer Study Area will rely on the 807L capacity increase for reliable access to the grid.
Project 1381 807L Capacity Increase
August 2016 Page 19 File No. RP-05-1381
7 Conclusions and Recommendation
The AESO performs system planning studies regularly to assess transmission system reliability in the near-term (5 years), and medium-term (10 years). The AESO’s planning studies had identified that the existing 138 kV transmission system supplying load in the northeast of the Fort Saskatchewan Planning Area will be subject to constraints under certain system conditions.
Planning study results demonstrate that the existing transmission network in the Beamer Study Area does not have sufficient capacity to reliably supply the forecast load growth in 2017 and is prone to overloading under a single contingency. Specifically, these studies indicated thermal overload on a section of the existing 807L between Beamer 233S and 807AL t-tap under single contingency events. Further, the studies also confirmed that the assumed generation additions in the Fort Saskatchewan Planning Area will aggravate the identified thermal overloads. Therefore, there is a need for transmission development in the Beamer Study Area to alleviate the identified constraints. The driver of the need for transmission system development is the forecast load growth in the Beamer Study Area and major generation additions in the Fort Saskatchewan Planning area. Based on the study results, timing of the need will be dependent on the load growth in the Beamer Study Area reaching 109 MW and/or generation addition(s) in the Fort Saskatchewan Planning Area that would impact thermal overloads on the 807L transmission line.
Based on the study results, the AESO recommends to increase the capacity of sections of the existing 807L transmission line between the Beamer 233S substation and the 807AL t-tap from 85/90 MVA to 175/217 MVA (summer/winter rating) to alleviate the identified thermal constraint. The proposed capacity is consistent with the current capacity of the remaining sections of the 807L line. AltaLink has advised the AESO that approximately 1 km of 807L between the Beamer 233S substation and the 807AL t-tap needs to be rebuild to increase the summer/winter rating of the line to 175/217 MVA.
The AESO has not considered any other options given that the proposed transmission system development option is the minimum development required to address the identified need in the 20-year planning horizon.
The proposed transmission development will alleviate the identified need in the 20-year planning horizon and is independent of any other transmission developments that are currently planned within the Alberta transmission system. Future generation additions in the Fort Saskatchewan Planning Area may rely on the 807L capacity increase for their constraint-free connection to the grid depending on their impact on the 807L loading. Additionally, load growth in the Beamer Study Area will rely on the proposed transmission development for reliable access to the grid.
Attachment A Summary of Generation Dispatch in the Study Area
August 2016 P1381 807L Capacity Increase 1
File No. RP-05-1381
Table A-1: Summary of Generation Dispatch in the Study Area
Generator
2017SP Unit Net
Generation (MW)
2020SP Unit Net
Generation (MW)
2020SP Sensitivity
Unit Net Generation
(MW)
2025SP Unit Net
Generation (MW)
2035SP Unit Net
Generation (MW)
Scotford GT 70 70 70 70 70
Scotford ST 68 68 68 68 68
Air Liquide G1 68 68 68 68 68
Dow GTG 80 80 80 80 80
Dow STG 37 37 37 37 37
Dow Gen1 52 52 52 52 52
Dow Gen2 52 52 52 52 52
Redwater ISD 34 341 342 342 342
P1289 Deerland 0 0 0 163 163
P1421 Heartland 0 0 448 430 4303
P1647 William Strathcona
0 72 72 72 72
1. Redwater ISD was assumed off-line to model N-G condition. A variation of this scenario was alsostudied, which assumed Redwater ISD at 34 MW, as explained previously in Section 3.1.
2. Redwater ISD was assumed off-line to model N-G condition, as explained previously in Section3.1.
3. In addition to 430 MW dispatched generation, another 430 MW forecast generation was modelledat Josephburg 410S 240 kV in 2035SP scenario with the assumption of 942L terminated In&Outat Josephburg 410S 240 kV.
August 2016 P1381 807L Capacity Increase 2
File No. RP-05-1381
Attachment B 2017SP Power Flow Diagrams
August 2016 P1381 807L Capacity Increase 3
File No. RP-05-1381
Table B-1: 2017SP Contingency Lists
Figure # Scenario Condition
B-1 17_1a Base Case (N-0) B-2 17_1a 942L (N-1) 71S Lamoureux to 681S Bannerman B-3 17_1a 1061L (N-1) 681S Bannerman to 12S Heartland B-4 17_1a 997L (N-1) 71S Lamoureux to 410S Josephburg B-5 17_1a 1120L (N-1) 410S Josephburg to 108S Amelia B-6 17_1a 943L (N-1) 13S Deerland to 108S Amelia B-7 17_1a 1054L (N-1) 12S Heartland to 13S Deerland B-8 17_1a 9L960 (N-1) 13S Deerland to 825S Whitefish Lake B-9 17_1a 9L961 (N-1) 13S Deerland to 825S Whitefish Lake B-10 17_1a 920L (N-1) 71S Lamoureux to 557S Castle Downs B-11 17_1a 921L (N-1) 71S Lamoureux to 987S Clover Bar B-12 17_1a 708L (N-1) 233S Beamer to 71S Lamoureux B-13 17_1a 807L (N-1) 410S Josephburg to 233S Beamer B-14 17_1a 735L (N-1) 233S Beamer to 171S Redwater B-15 17_1a 808L (N-1) 171S Redwater to 13S Deerland B-16 17_1a 621L (N-1) 13S Deerland to 109S Skaro B-17 17_1a 815L (N-1) 13S Deerland to 127S Bruderheim B-18 17_1a 846L (N-1) 127S Bruderheim B-19 17_1a 773L (N-1) 127S Bruderheim to 308S Albchem Beaverhill Creek B-20 17_1a 776L (N-1) 410S Josephburg to 308S Albchem Beaverhill Creek B-21 17_1a 856L (N-1) 410S Josephburg to 409S Shell Scotford B-22 17_1a 857L (N-1) 410S Josephburg to 409S Shell Scotford B-23 17_1a ALCO2L (N-1) 879S Scotford Upgrader to 409S Shell Scotford B-24 17_1a EXI-01L (N-1) 879S Scotford Upgrader to 402S Scotford Expansion 1 B-25 17_1a ALC03L (N-1) 402S Scotford Expansion 1 to Air Liquide B-26 17_1a ALC01L (N-1) Air Liquide to 409S Shell Scotford B-27 17_1a 706L (N-1) 410S Josephburg to 54S Fort Saskatchewan B-28 17_1a 707L (N-1) 233S Beamer to 71S Lamoureux B-29 17_1a 787L (N-1) 71S Lamoureux to 166S Dow Chemical B-30 17_1a 862L (N-1) 166S Dow Chemical to 258S Dow HydroCarbons B-31 17_1a 861L (N-1) 71S Lamoureux to 258S Dow HydroCarbons B-32 17_1a 781L (N-1) 172S Sherritt to 71S Lamoureux B-33 17_1a 709L (N-1) 233S Beamer to 71S Lamoureux B-34 17_1a 694L (N-1) 54S Fort Saskatchewan to 422S Westwood B-35 17_1a 700L (N-1) 422S Westwood to 746S Sherwood Park
August 2016 P1381 807L Capacity Increase 4
File No. RP-05-1381
PROJECT 1381: SCENARIO 2017SP 1ABASE CASE (N-0)FIG B-1FRI, AUG 19 2016 15:32
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.8
443BANN_240
1.038249.2
109DEERLAN4
1.052252.4
771AMELIA1
1.039249.3
313JOSEPH1
1.032247.8
38.6-95.6
-38.6
57LAMOURE4
1.032247.6
-17.6-125.7
16.7
-8.2109.0
8.3-111.0
132.6
-132.2-61.9
-306.720.8
307.9-10.7
-99.3-47.6
99.445.3
125.8
94.3
57.8
3050REDW GT
1.03014.2
34.018.5R
2031DOWGTG 9
1.03014.2
79.6
-1.5
R
7185SCOTF ST
1.03514.3
68.140.2R
4185SCOTF GT
1.03514.3
70.237.9R
627AIR LIQC
1.03514.3
68.135.5R
10.7
10.75.2
5.2
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.032142.4
1.00
28
936808L_TAP
1.023141.1
67BRUDERH7
1.027141.8
23.721.8
15.420.0
314JOSEPH2
1.024141.3
0.99
826
-43.3-38.3
0.99
826
-43.5-38.4
391ALBCHEM7
1.027141.7
735SHELL TP
1.022141.0
952DIAM TAP
1.025141.4
43SCOT4_7
1.022141.0
18.3-11.9
-18.210.7
28.519.5
-17.5-16.4
-43.328.743.3
-42.228.8
-18.210.7-10.8
948808_BNDY
1.021140.9
59REDWATE7
1.014139.9
-9.9-1.3
-13.6
1420WEASEL1
1.019140.6
1.3-9.8-2.4
954ABEE_01
1.017140.4
-6.9-2.3
6.91.660
BEAMER 7
1.019140.7
734SHELL A1
1.022141.0
48DIAM SH7
1.025141.4
58FORT SA7
1.031142.3
185SCOT4_8
1.022141.1
628ALC SCOT
1.021140.9
394ASTOTIN
1.027141.8
821708ALTAP
1.023141.1
61DOW CHEM
1.034142.7
62SHERRIT7
1.031142.3
63LAMOURE7
1.033142.6
-8.2
-0.3-0.3
17.9
15.8
-55.2-18.7
26.0
0.30.1 -0.3
-28.9
48.4
-3.431.32.9
-17.1
-4.315.3
-91.
112
.691
.5
-26.
39.
5
26.3-9.5
38.4 0.99
053
41.127.5
0.99
053
30.2
-54.9
55.013.7
18.2
-0.3
-48.3
50RIVERSID
1.022141.1
1.6-1.3
-28.7
42.2
47.0
393DOW HYD7
1.033142.5
922ROSS TAP
1.034142.7
40.4 6.6
-40.
4-6
.773
.12.
5
13.2
14.8
-13.
5
-40.95.7
45ROSS CRK
1.034142.7
-32.
2
-13.7
25.4
-41.8-39.1
9.9
-14.8
28.9
9.7-11.6
-9.711.6
-28.821.4
-8.4
-12.
1
-15.3-20.5
-38.2
-31.1
-51.3
793SCORIA1
1.022141.1
21.511.1
-21.5-11.1
-22.2
2954ABEE_02
1.0174.2
6.92.0
18420WEASEL2
1.0344.3
2.90.7
10.75.2
2050GRANITE9
4.42.2
17.88.6
8.94.3
13.36.5
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.03014.8
51.5
454DOW GEN2
1.03014.8
51.5-2.2R
16.9R
2030DOWSTG 9
1.03015.1
37.4
6.8R
2836LAMONT_LV3
3836LAMONT_LV4
3835LAMONT_LV2
2835LAMONT_LV1
August 2016 P1381 807L Capacity Increase 5
File No. RP-05-1381
PROJECT 1381: SCENARIO 2017SP 1A942L (N-1)FIG B-2FRI, AUG 19 2016 15:32
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.060254.4
443BANN_240
1.057253.6
109DEERLAN4
1.053252.8
771AMELIA1
1.038249.1
313JOSEPH1
1.030247.2
-3.5-112.7
3.6
57LAMOURE4
1.028246.7
-39.1-80.937.7
34.1126.9
-33.9-128.3
32.9
-32.8-16.6
-361.7-1.6
363.417.5
80.9
111.6
8.3
3050REDW GT
1.03014.2
34.019.5R
2031DOWGTG 9
1.03014.2
79.6
0.6R
7185SCOTF ST
1.03514.3
68.141.1R
4185SCOTF GT
1.03514.3
70.238.8R
627AIR LIQC
1.03514.3
68.136.8R
10.7
10.75.2
5.2
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.032142.4
1.00
28
936808L_TAP
1.022141.1
67BRUDERH7
1.027141.8
27.922.5
20.821.9
314JOSEPH2
1.022141.1
0.99
826
-42.0-36.4
0.99
826
-42.2-36.6
391ALBCHEM7
1.027141.7
735SHELL TP
1.020140.7
952DIAM TAP
1.023141.2
43SCOT4_7
1.020140.8
12.8-13.8
-12.812.5
28.419.0
-14.5-15.8
-42.328.742.3
-41.328.7
-12.812.5-12.6
948808_BNDY
1.021140.9
59REDWATE7
1.013139.8
-9.9-1.3
-17.8
1420WEASEL1
1.018140.5
1.3-9.8-2.4
954ABEE_01
1.017140.3
-6.9-2.3
6.91.660
BEAMER 7
1.018140.4
734SHELL A1
1.020140.7
48DIAM SH7
1.023141.2
58FORT SA7
1.029142.0
185SCOT4_8
1.021140.9
628ALC SCOT
1.019140.6
394ASTOTIN
1.027141.8
821708ALTAP
1.021140.8
61DOW CHEM
1.032142.4
62SHERRIT7
1.029142.0
63LAMOURE7
1.031142.2
-8.4
-0.3-0.3
14.9
15.2
-55.2-20.0
25.3
0.30.1 -0.3
-28.0
44.4
-2.827.12.2
-17.4
-4.314.9
-89.
311
.689
.6
-22.
811
.2
22.8-11.2
31.4 0.99
053
33.522.9
0.99
053
28.3
-51.4
51.412.0
12.8
-0.3
-44.3
50RIVERSID
1.021140.8
1.5-0.5
-28.7
41.3
43.0
393DOW HYD7
1.030142.1
922ROSS TAP
1.031142.3
41.1 8.1
-41.
1-8
.274
.34.
9
11.8
15.5
-12.
0
-42.03.4
45ROSS CRK
1.031142.3
-32.
2
-12.0
21.0
-44.3-48.7
9.9
-15.5
28.0
9.6-10.9
-9.610.8
-28.721.4
-8.4
-11.
1
-20.8-22.3
-38.0
-27.0
-51.2
793SCORIA1
1.020140.8
21.511.1
-21.5-11.1
-22.8
2954ABEE_02
1.0174.2
6.92.0
18420WEASEL2
1.0344.3
2.90.7
10.75.2
2050GRANITE9
4.42.2
17.88.6
8.94.3
13.36.5
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.03014.8
51.5
454DOW GEN2
1.03014.8
51.5-1.3R
17.7R
2030DOWSTG 9
1.03015.1
37.4
8.2R
2836LAMONT_LV3
3836LAMONT_LV4
3835LAMONT_LV2
2835LAMONT_LV1
August 2016 P1381 807L Capacity Increase 6
File No. RP-05-1381
PROJECT 1381: SCENARIO 2017SP 1A1061L (N-1)FIG B-3FRI, AUG 19 2016 15:32
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.061254.5
443BANN_240
1.024245.8
109DEERLAN4
1.053252.7
771AMELIA1
1.037248.9
313JOSEPH1
1.029247.0
-17.3-115.8
17.3
57LAMOURE4
1.026246.3
-44.0-66.242.4
47.8130.3
-47.7-131.5
-379.5-5.2
381.323.2
32.913.2
-32.8-16.6
66.3
114.8
3050REDW GT
1.03014.2
34.019.9R
2031DOWGTG 9
1.03014.2
79.6
1.4R
7185SCOTF ST
1.03514.3
68.141.6R
4185SCOTF GT
1.03514.3
70.239.3R
627AIR LIQC
1.03514.3
68.137.4R
10.7
10.75.2
5.2
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.032142.4
1.00
28
936808L_TAP
1.022141.0
67BRUDERH7
1.027141.7
29.322.5
22.622.1
314JOSEPH2
1.021140.9
0.99
826
-41.6-35.6
0.99
826
-41.7-35.8
391ALBCHEM7
1.026141.6
735SHELL TP
1.019140.6
952DIAM TAP
1.022141.0
43SCOT4_7
1.019140.7
11.1-14.0
-11.112.8
28.418.7
-13.6-15.8
-41.828.741.8
-40.828.7
-11.012.7-12.9
948808_BNDY
1.020140.8
59REDWATE7
1.012139.7
-9.9-1.3
-19.1
1420WEASEL1
1.018140.5
1.3-9.8-2.4
954ABEE_01
1.016140.3
-6.9-2.3
6.91.660
BEAMER 7
1.017140.3
734SHELL A1
1.019140.6
48DIAM SH7
1.022141.0
58FORT SA7
1.028141.9
185SCOT4_8
1.020140.7
628ALC SCOT
1.018140.5
394ASTOTIN
1.027141.7
821708ALTAP
1.020140.7
61DOW CHEM
1.031142.3
62SHERRIT7
1.028141.8
63LAMOURE7
1.030142.1
-8.5
-0.3-0.3
14.0
15.3
-55.2-20.6
24.9
0.30.1 -0.3
-28.0
43.1
-2.925.72.3
-17.5
-4.314.7
-88.
711
.089
.0
-21.
611
.6
21.6-11.7
29.1 0.99
053
31.121.4
0.99
053
27.9
-50.2
50.311.5
11.0
-0.3
-43.1
50RIVERSID
1.020140.7
1.5-0.1
-28.7
40.7
41.7
393DOW HYD7
1.029142.0
922ROSS TAP
1.030142.2
41.3 8.7
-41.
3-8
.874
.65.
9
11.2
15.8
-11.
4
-42.42.4
45ROSS CRK
1.030142.2
-32.
2
-11.5
19.6
-44.6-51.8
9.9
-15.8
28.0
9.6-10.6
-9.610.5
-28.721.4
-8.4
-10.
5
-22.5-22.5
-37.9
-25.6
-51.2
793SCORIA1
1.019140.7
21.511.1
-21.5-11.1
-22.8
2954ABEE_02
1.0164.2
6.92.0
18420WEASEL2
1.0334.3
2.90.7
10.75.2
2050GRANITE9
4.42.2
17.88.6
8.94.3
13.36.5
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.03014.8
51.5
454DOW GEN2
1.03014.8
51.5-1.0R
18.0R
2030DOWSTG 9
1.03015.1
37.4
8.8R
2836LAMONT_LV3
3836LAMONT_LV4
3835LAMONT_LV2
2835LAMONT_LV1
August 2016 P1381 807L Capacity Increase 7
File No. RP-05-1381
PROJECT 1381: SCENARIO 2017SP 1A997L (N-1)FIG B-4FRI, AUG 19 2016 15:32
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.052252.6
443BANN_240
1.038249.1
109DEERLAN4
1.051252.2
771AMELIA1
1.038249.1
313JOSEPH1
1.032247.6
-21.0-89.2
21.0
57LAMOURE4
1.031247.5
51.5102.6
-51.4-104.5
98.6
-98.4-64.4
-359.827.3
361.5-11.4
-65.5-50.7
65.647.8
87.8
58.8
3050REDW GT
1.03014.2
34.018.8R
2031DOWGTG 9
1.03014.2
79.6
-1.8
R
7185SCOTF ST
1.03514.3
68.141.1R
4185SCOTF GT
1.03514.3
70.238.8R
627AIR LIQC
1.03514.3
68.136.8R
10.7
10.75.2
5.2
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.031142.2
1.00
28
936808L_TAP
1.021141.0
67BRUDERH7
1.026141.6
21.922.2
18.320.1
314JOSEPH2
1.022141.1
0.99
826
-10.4-43.8
0.99
826
-10.4-43.9
391ALBCHEM7
1.026141.5
735SHELL TP
1.020140.8
952DIAM TAP
1.023141.2
43SCOT4_7
1.020140.8
15.3-12.1
-15.310.8
16.821.1
-52.4-6.7
-43.220.543.1
-42.220.6
-15.210.8-10.9
948808_BNDY
1.020140.8
59REDWATE7
1.013139.8
-9.9-1.3
-11.9
1420WEASEL1
1.018140.4
1.3-9.8-2.4
954ABEE_01
1.016140.2
-6.9-2.3
6.91.660
BEAMER 7
1.018140.5
734SHELL A1
1.020140.7
48DIAM SH7
1.023141.2
58FORT SA7
1.032142.3
185SCOT4_8
1.021140.9
628ALC SCOT
1.019140.6
394ASTOTIN
1.026141.6
821708ALTAP
1.022141.0
61DOW CHEM
1.035142.8
62SHERRIT7
1.032142.4
63LAMOURE7
1.034142.7
-12.4
-0.3-0.3
53.1
6.9
-65.4-18.8
26.0
0.30.1 -0.3
-24.3
78.3
-3.033.02.5
-18.5
1.814.2
-102
.015
.710
2.4
-45.
613
.7
45.6-13.7
64.7 0.99
053
69.224.3
0.99
053
26.4
-74.2
74.39.7
15.2
-0.3
-78.2
50RIVERSID
1.022141.0
1.5-1.1
-20.4
42.2
77.2
393DOW HYD7
1.033142.5
922ROSS TAP
1.034142.7
36.2 7.4
-36.
2-7
.666
.43.
9
12.4
10.6
-12.
6
-34.14.4
45ROSS CRK
1.034142.7
-32.
2
-9.5
22.3
-42.3-40.3
9.9
-10.6
24.5
-6.7-9.1
6.79.1
-20.615.2
-8.4
-15.
0
-18.3-20.6
-10.0
-32.9
-41.1
793SCORIA1
1.022141.0
21.511.1
-21.5-11.1
-22.7
2954ABEE_02
1.0164.2
6.92.0
18420WEASEL2
1.0334.3
2.90.7
10.75.2
2050GRANITE9
4.42.2
17.88.6
8.94.3
13.36.5
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.03014.8
51.5
454DOW GEN2
1.03014.8
51.5-2.3R
16.8R
2030DOWSTG 9
1.03015.1
37.4
6.6R
2836LAMONT_LV3
3836LAMONT_LV4
3835LAMONT_LV2
2835LAMONT_LV1
August 2016 P1381 807L Capacity Increase 8
File No. RP-05-1381
PROJECT 1381: SCENARIO 2017SP 1A1120L (N-1)FIG B-5FRI, AUG 19 2016 15:32
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.059254.1
443BANN_240
1.038249.1
109DEERLAN4
1.066255.9
771AMELIA1
1.064255.5
313JOSEPH1
1.024245.8
57LAMOURE4
1.028246.7
43.7-97.7-44.8
30.313.2
-30.3-16.6
117.9
-117.5-92.3
-335.278.0
336.7-64.6
-84.5-77.8
84.775.7
97.7
88.3
3050REDW GT
1.03014.2
34.019.8R
2031DOWGTG 9
1.03014.2
79.6
0.9R
7185SCOTF ST
1.03514.3
68.142.1R
4185SCOTF GT
1.03514.3
70.239.8R
627AIR LIQC
1.03514.3
68.138.2R
10.7
10.75.2
5.2
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.037143.1
1.00
28
936808L_TAP
1.025141.5
67BRUDERH7
1.030142.1
21.431.7
9.234.7
314JOSEPH2
1.020140.7
0.99
826
-48.6-21.4
0.99
826
-48.8-21.5
391ALBCHEM7
1.029142.0
735SHELL TP
1.018140.5
952DIAM TAP
1.021140.9
43SCOT4_7
1.018140.5
24.6-26.1
-24.525.2
29.514.0
-16.2-20.3
-38.129.738.1
-37.229.7
-24.425.2-25.3
948808_BNDY
1.024141.3
59REDWATE7
1.014139.9
-9.9-1.3
-11.2
1420WEASEL1
1.021140.9
1.3-9.8-2.4
954ABEE_01
1.020140.7
-6.9-2.3
6.91.660
BEAMER 7
1.017140.3
734SHELL A1
1.018140.5
48DIAM SH7
1.021140.9
58FORT SA7
1.028141.9
185SCOT4_8
1.019140.6
628ALC SCOT
1.017140.4
394ASTOTIN
1.030142.1
821708ALTAP
1.020140.7
61DOW CHEM
1.031142.3
62SHERRIT7
1.028141.9
63LAMOURE7
1.030142.2
1.9
-0.3-0.3
16.6
19.8
-53.9-25.2
22.2
0.30.1 -0.3
-29.3
48.0
6.333.8-6.8
-13.9
-5.116.7
-91.
110
.391
.5
-25.
99.
3
26.0-9.4
39.0 0.99
053
41.723.7
0.99
053
29.4
-54.5
54.613.9
24.5
-0.3
-47.9
50RIVERSID
1.020140.7
1.5-0.1
-29.7
37.1
46.6
393DOW HYD7
1.030142.1
922ROSS TAP
1.031142.3
40.4 7.9
-40.
4-8
.073
.14.
6
12.0
14.8
-12.
2
-40.93.7
45ROSS CRK
1.031142.3
-32.
2
-13.8
21.8
-66.4-30.5
9.9
-14.8
29.4
11.6-16.2
-11.616.1
-29.722.1
-8.4
-9.8
-9.1-35.0
-41.1
-33.6
-52.5
793SCORIA1
1.020140.7
21.511.1
-21.5-11.1
-32.0
2954ABEE_02
1.0204.2
6.92.0
18420WEASEL2
1.0374.3
2.90.7
10.75.2
2050GRANITE9
4.42.2
17.88.6
8.94.3
13.36.5
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.03014.8
51.5
454DOW GEN2
1.03014.8
51.5-1.2R
17.8R
2030DOWSTG 9
1.03015.1
37.4
8.4R
2836LAMONT_LV3
3836LAMONT_LV4
3835LAMONT_LV2
2835LAMONT_LV1
August 2016 P1381 807L Capacity Increase 9
File No. RP-05-1381
PROJECT 1381: SCENARIO 2017SP 1A943L (N-1)FIG B-6FRI, AUG 19 2016 15:32
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.060254.3
443BANN_240
1.038249.0
109DEERLAN4
1.069256.6
771AMELIA1
1.021245.0
313JOSEPH1
1.022245.3
30.315.0
-30.3
57LAMOURE4
1.027246.4
53.5-118.0-54.3
128.8
-128.4-97.3
-317.185.3
318.4-73.7
-95.4-82.5
95.580.6
118.1
-16.8
94.0
3050REDW GT
1.03014.2
34.020.2R
2031DOWGTG 9
1.03014.2
79.6
1.5R
7185SCOTF ST
1.03514.3
68.142.6R
4185SCOTF GT
1.03514.3
70.240.3R
627AIR LIQC
1.03514.3
68.139.0R
10.7
10.75.2
5.2
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.038143.2
1.00
28
936808L_TAP
1.026141.6
67BRUDERH7
1.031142.2
25.032.6
14.436.8
314JOSEPH2
1.019140.6
0.99
826
-43.6-18.8
0.99
826
-43.8-18.9
391ALBCHEM7
1.029142.1
735SHELL TP
1.017140.4
952DIAM TAP
1.020140.7
43SCOT4_7
1.017140.4
19.4-28.2
-19.327.3
28.013.3
-17.4-20.7
-37.228.737.2
-36.328.7
-19.227.3-27.5
948808_BNDY
1.024141.4
59REDWATE7
1.014139.9
-9.9-1.3
-14.8
1420WEASEL1
1.022141.0
1.3-9.8-2.4
954ABEE_01
1.020140.8
-6.9-2.3
6.91.660
BEAMER 7
1.016140.2
734SHELL A1
1.017140.3
48DIAM SH7
1.020140.7
58FORT SA7
1.028141.8
185SCOT4_8
1.018140.4
628ALC SCOT
1.016140.2
394ASTOTIN
1.031142.2
821708ALTAP
1.019140.6
61DOW CHEM
1.031142.2
62SHERRIT7
1.028141.8
63LAMOURE7
1.030142.1
2.9
-0.3-0.3
17.8
20.3
-55.2-26.4
21.5
0.30.1 -0.3
-29.6
47.8
7.130.1-7.6
-13.6
-4.316.7
-91.
39.
891
.7
-26.
29.
4
26.2-9.5
38.3 0.99
053
41.023.0
0.99
053
29.3
-54.8
54.813.8
19.2
-0.3
-47.7
50RIVERSID
1.019140.6
1.50.2
-28.7
36.2
46.5
393DOW HYD7
1.029142.0
922ROSS TAP
1.030142.2
40.3 8.2
-40.
3-8
.473
.05.
2
11.6
14.7
-11.
8
-40.73.1
45ROSS CRK
1.030142.2
-32.
2
-13.8
21.1
-69.4-39.4
9.9
-14.7
29.6
9.7-16.5
-9.616.5
-28.721.4
-8.4
-9.2
-14.3-37.1
-37.6
-30.0
-51.2
793SCORIA1
1.019140.6
21.511.1
-21.5-11.1
-32.7
2954ABEE_02
1.0214.2
6.92.0
18420WEASEL2
1.0384.3
2.90.7
10.75.2
2050GRANITE9
4.42.2
17.88.6
8.94.3
13.36.5
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.03014.8
51.5
454DOW GEN2
1.03014.8
51.5-1.0R
18.0R
2030DOWSTG 9
1.03015.1
37.4
8.8R
2836LAMONT_LV3
3836LAMONT_LV4
3835LAMONT_LV2
2835LAMONT_LV1
August 2016 P1381 807L Capacity Increase 10
File No. RP-05-1381
PROJECT 1381: SCENARIO 2017SP 1A1054L (N-1)FIG B-7FRI, AUG 19 2016 15:32
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.051252.3
443BANN_240
1.034248.2
109DEERLAN4
1.046251.0
771AMELIA1
1.033247.9
313JOSEPH1
1.027246.5
259.3-102.4
-258.9
57LAMOURE4
1.028246.6
-19.6-340.5
25.8
-228.0126.9
228.6-122.5
296.4
-295.0-52.7
-261.5-31.5
262.236.1
341.1
105.8
62.7
3050REDW GT
1.03014.2
34.020.4R
2031DOWGTG 9
1.03014.2
79.6
0.9R
7185SCOTF ST
1.03514.3
68.142.6R
4185SCOTF GT
1.03514.3
70.240.3R
627AIR LIQC
1.03514.3
68.138.9R
10.7
10.75.2
5.2
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.023141.2
1.00
28
936808L_TAP
1.015140.1
67BRUDERH7
1.020140.7
1.326.8
-14.022.6
314JOSEPH2
1.019140.6
0.99
826
-40.4-37.3
0.99
826
-40.5-37.4
391ALBCHEM7
1.020140.7
735SHELL TP
1.017140.3
952DIAM TAP
1.020140.8
43SCOT4_7
1.017140.4
48.0-13.4
-47.713.1
25.617.7
-46.2-9.1
-40.226.840.2
-39.226.8
-47.613.2-13.2
948808_BNDY
1.014139.9
59REDWATE7
1.008139.1
-9.9-1.3
8.7
1420WEASEL1
1.011139.5
1.3-9.8-2.4
954ABEE_01
1.010139.3
-6.9-2.3
6.91.660
BEAMER 7
1.015140.1
734SHELL A1
1.017140.3
48DIAM SH7
1.020140.8
58FORT SA7
1.028141.9
185SCOT4_8
1.018140.5
628ALC SCOT
1.016140.2
394ASTOTIN
1.019140.7
821708ALTAP
1.019140.6
61DOW CHEM
1.031142.3
62SHERRIT7
1.028141.9
63LAMOURE7
1.030142.2
-7.4
-0.3-0.3
46.8
9.0
-57.6-22.7
23.8
0.30.1 -0.3
-25.4
77.9
1.553.9-1.5
-17.3
-2.914.5
-96.
812
.497
.3
-36.
112
.7
36.1-12.8
49.7 0.99
053
53.223.3
0.99
053
26.0
-64.7
64.810.5
47.6
-0.3
-77.8
50RIVERSID
1.019140.6
1.50.4
-26.8
39.2
76.8
393DOW HYD7
1.030142.1
922ROSS TAP
1.031142.3
38.2 8.7
-38.
1-8
.869
.65.
9
11.2
12.6
-11.
4
-37.32.4
45ROSS CRK
1.031142.3
-32.
2
-10.5
21.4
-49.312.7
9.9
-12.6
25.6
5.8-10.7
-5.810.6
-26.819.9
-8.4
-11.
8
14.1-23.0
-31.3
-53.5
-48.9
793SCORIA1
1.018140.5
21.511.1
-21.5-11.1
-27.2
2954ABEE_02
1.0104.2
6.92.0
18420WEASEL2
1.0274.3
2.90.7
10.75.2
2050GRANITE9
4.42.2
17.88.6
8.94.3
13.36.5
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.03014.8
51.5
454DOW GEN2
1.03014.8
51.5-1.2R
17.8R
2030DOWSTG 9
1.03015.1
37.4
8.5R
2836LAMONT_LV3
3836LAMONT_LV4
3835LAMONT_LV2
2835LAMONT_LV1
August 2016 P1381 807L Capacity Increase 11
File No. RP-05-1381
PROJECT 1381: SCENARIO 2017SP 1A9L960 (N-1)FIG B-8FRI, AUG 19 2016 15:32
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.046251.0
443BANN_240
1.032247.7
109DEERLAN4
1.040249.5
771AMELIA1
1.030247.2
313JOSEPH1
1.026246.1
21.0-65.8
-21.0
57LAMOURE4
1.026246.3
2.7-109.3
-3.8
9.478.4
-9.3-81.0
136.5
-136.1-55.4
-286.3-8.6
287.417.0
-103.2-41.0
103.338.7
109.3
64.3
51.5
3050REDW GT
1.03014.2
34.021.0R
2031DOWGTG 9
1.03014.2
79.6
2.2R
7185SCOTF ST
1.03514.3
68.143.0R
4185SCOTF GT
1.03514.3
70.240.7R
627AIR LIQC
1.03514.3
68.139.6R
10.7
10.75.2
5.2
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.023141.2
1.00
28
936808L_TAP
1.015140.0
67BRUDERH7
1.019140.7
24.817.7
17.515.2
314JOSEPH2
1.018140.5
0.99
826
-43.9-33.8
0.99
826
-44.1-33.9
391ALBCHEM7
1.019140.7
735SHELL TP
1.016140.2
952DIAM TAP
1.019140.7
43SCOT4_7
1.016140.3
16.1-7.2
-16.15.9
29.017.3
-15.4-20.9
-39.729.239.7
-38.729.2
-16.05.9-6.0
948808_BNDY
1.014139.9
59REDWATE7
1.007139.0
-9.9-1.3
-14.7
1420WEASEL1
1.011139.5
1.3-9.8-2.4
954ABEE_01
1.009139.3
-6.9-2.3
6.91.660
BEAMER 7
1.014139.9
734SHELL A1
1.016140.2
48DIAM SH7
1.019140.6
58FORT SA7
1.027141.7
185SCOT4_8
1.017140.3
628ALC SCOT
1.015140.1
394ASTOTIN
1.019140.7
821708ALTAP
1.017140.4
61DOW CHEM
1.030142.1
62SHERRIT7
1.027141.7
63LAMOURE7
1.029142.0
-7.2
-0.3-0.3
15.8
20.4
-54.6-23.3
23.4
0.30.1 -0.3
-34.1
46.0
-7.630.17.0
-17.4
-4.714.3
-91.
09.
191
.4
-25.
69.
4
25.6-9.5
39.2 0.99
053
41.924.4
0.99
053
33.1
-54.2
54.313.8
16.0
-0.3
-45.9
50RIVERSID
1.017140.4
1.50.9
-29.2
38.7
44.6
393DOW HYD7
1.028141.9
922ROSS TAP
1.030142.1
40.4 8.6
-40.
4-8
.773
.25.
8
11.2
14.8
-11.
5
-40.92.5
45ROSS CRK
1.030142.1
-32.
2
-13.8
22.4
-32.9-42.3
9.9
-14.8
34.1
10.6-10.3
-10.610.3
-29.221.7
-8.4
-8.6
-17.5-15.7
-39.4
-30.0
-51.8
793SCORIA1
1.017140.4
21.511.1
-21.5-11.1
-18.1
2954ABEE_02
1.0094.2
6.92.0
18420WEASEL2
1.0264.3
2.90.7
10.75.2
2050GRANITE9
4.42.2
17.88.6
8.94.3
13.36.5
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.03014.8
51.5
454DOW GEN2
1.03014.8
51.5-0.7R
18.3R
2030DOWSTG 9
1.03015.1
37.4
9.3R
2836LAMONT_LV3
3836LAMONT_LV4
3835LAMONT_LV2
2835LAMONT_LV1
August 2016 P1381 807L Capacity Increase 12
File No. RP-05-1381
PROJECT 1381: SCENARIO 2017SP 1A9L961 (N-1)FIG B-9FRI, AUG 19 2016 15:32
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.046251.0
443BANN_240
1.032247.7
109DEERLAN4
1.040249.5
771AMELIA1
1.030247.2
313JOSEPH1
1.026246.1
21.0-65.8
-21.0
57LAMOURE4
1.026246.3
2.7-109.3
-3.8
9.478.4
-9.3-81.0
136.5
-136.1-55.4
-286.3-8.6
287.417.0
-103.2-41.0
103.338.7
109.3
64.3
51.5
3050REDW GT
1.03014.2
34.021.0R
2031DOWGTG 9
1.03014.2
79.6
2.2R
7185SCOTF ST
1.03514.3
68.143.0R
4185SCOTF GT
1.03514.3
70.240.7R
627AIR LIQC
1.03514.3
68.139.6R
10.7
10.75.2
5.2
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.023141.2
1.00
28
936808L_TAP
1.015140.0
67BRUDERH7
1.019140.7
24.817.7
17.515.2
314JOSEPH2
1.018140.5
0.99
826
-43.9-33.8
0.99
826
-44.1-33.9
391ALBCHEM7
1.019140.7
735SHELL TP
1.016140.2
952DIAM TAP
1.019140.7
43SCOT4_7
1.016140.3
16.1-7.2
-16.15.9
29.017.3
-15.4-20.9
-39.729.239.7
-38.729.2
-16.05.9-6.0
948808_BNDY
1.014139.9
59REDWATE7
1.007139.0
-9.9-1.3
-14.7
1420WEASEL1
1.011139.5
1.3-9.8-2.4
954ABEE_01
1.009139.3
-6.9-2.3
6.91.660
BEAMER 7
1.014139.9
734SHELL A1
1.016140.2
48DIAM SH7
1.019140.6
58FORT SA7
1.027141.7
185SCOT4_8
1.017140.3
628ALC SCOT
1.015140.1
394ASTOTIN
1.019140.7
821708ALTAP
1.017140.4
61DOW CHEM
1.030142.1
62SHERRIT7
1.027141.7
63LAMOURE7
1.029142.0
-7.2
-0.3-0.3
15.8
20.4
-54.6-23.3
23.4
0.30.1 -0.3
-34.1
46.0
-7.630.17.0
-17.4
-4.714.3
-91.
09.
191
.4
-25.
69.
4
25.6-9.5
39.2 0.99
053
41.924.4
0.99
053
33.1
-54.2
54.313.8
16.0
-0.3
-45.9
50RIVERSID
1.017140.4
1.50.9
-29.2
38.7
44.6
393DOW HYD7
1.028141.9
922ROSS TAP
1.030142.1
40.4 8.6
-40.
4-8
.773
.25.
8
11.2
14.8
-11.
5
-40.92.5
45ROSS CRK
1.030142.1
-32.
2
-13.8
22.4
-32.9-42.3
9.9
-14.8
34.1
10.6-10.3
-10.610.3
-29.221.7
-8.4
-8.6
-17.5-15.7
-39.4
-30.0
-51.8
793SCORIA1
1.017140.4
21.511.1
-21.5-11.1
-18.1
2954ABEE_02
1.0094.2
6.92.0
18420WEASEL2
1.0264.3
2.90.7
10.75.2
2050GRANITE9
4.42.2
17.88.6
8.94.3
13.36.5
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.03014.8
51.5
454DOW GEN2
1.03014.8
51.5-0.7R
18.3R
2030DOWSTG 9
1.03015.1
37.4
9.3R
2836LAMONT_LV3
3836LAMONT_LV4
3835LAMONT_LV2
2835LAMONT_LV1
August 2016 P1381 807L Capacity Increase 13
File No. RP-05-1381
PROJECT 1381: SCENARIO 2017SP 1A920L (N-1)FIG B-10FRI, AUG 19 2016 15:32
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.052252.5
443BANN_240
1.037248.9
109DEERLAN4
1.051252.1
771AMELIA1
1.037248.9
313JOSEPH1
1.031247.4
36.7-97.2
-36.6
57LAMOURE4
1.030247.2
-21.6-122.4
20.7
-6.2110.7
6.3-112.7
134.8
-134.5-64.1
-307.720.1
308.9-9.9
-101.5-49.7
101.647.5
122.5
96.0
60.2
3050REDW GT
1.03014.2
34.019.1R
2031DOWGTG 9
1.03014.2
79.6
-0.6
R
7185SCOTF ST
1.03514.3
68.140.9R
4185SCOTF GT
1.03514.3
70.238.6R
627AIR LIQC
1.03514.3
68.136.4R
10.7
10.75.2
5.2
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.030142.2
1.00
28
936808L_TAP
1.021140.9
67BRUDERH7
1.026141.6
23.721.7
15.520.1
314JOSEPH2
1.023141.1
0.99
826
-42.7-37.1
0.99
826
-42.8-37.2
391ALBCHEM7
1.026141.6
735SHELL TP
1.020140.8
952DIAM TAP
1.024141.3
43SCOT4_7
1.021140.9
18.1-12.0
-18.110.8
28.319.0
-18.2-16.6
-42.528.642.5
-41.428.6
-18.110.7-10.9
948808_BNDY
1.020140.8
59REDWATE7
1.013139.8
-9.9-1.3
-13.7
1420WEASEL1
1.017140.4
1.3-9.8-2.4
954ABEE_01
1.016140.2
-6.9-2.3
6.91.660
BEAMER 7
1.018140.5
734SHELL A1
1.020140.8
48DIAM SH7
1.024141.2
58FORT SA7
1.030142.2
185SCOT4_8
1.021140.9
628ALC SCOT
1.020140.7
394ASTOTIN
1.026141.6
821708ALTAP
1.021140.9
61DOW CHEM
1.033142.6
62SHERRIT7
1.030142.2
63LAMOURE7
1.032142.4
-7.9
-0.3-0.3
18.6
16.0
-55.3-19.7
25.4
0.30.1 -0.3
-29.2
48.8
-3.531.23.0
-17.1
-4.215.1
-91.
112
.191
.4
-26.
110
.0
26.1-10.1
36.7 0.99
053
39.225.1
0.99
053
30.0
-54.7
54.713.1
18.1
-0.3
-48.7
50RIVERSID
1.021140.9
1.5-0.8
-28.6
41.4
47.5
393DOW HYD7
1.031142.3
922ROSS TAP
1.033142.5
40.4 7.2
-40.
4-7
.473
.23.
5
12.6
14.8
-12.
8
-40.94.7
45ROSS CRK
1.033142.5
-32.
2
-13.1
23.1
-41.7-39.3
9.9
-14.8
29.3
9.5-11.3
-9.511.3
-28.621.3
-8.4
-11.
6
-15.5-20.5
-37.7
-31.1
-51.1
793SCORIA1
1.021140.9
21.511.1
-21.5-11.1
-22.1
2954ABEE_02
1.0164.2
6.92.0
18420WEASEL2
1.0334.3
2.90.7
10.75.2
2050GRANITE9
4.42.2
17.88.6
8.94.3
13.36.5
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.03014.8
51.5
454DOW GEN2
1.03014.8
51.5-1.8R
17.2R
2030DOWSTG 9
1.03015.1
37.4
7.5R
2836LAMONT_LV3
3836LAMONT_LV4
3835LAMONT_LV2
2835LAMONT_LV1
August 2016 P1381 807L Capacity Increase 14
File No. RP-05-1381
PROJECT 1381: SCENARIO 2017SP 1A921L (N-1)FIG B-11FRI, AUG 19 2016 15:33
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.8
443BANN_240
1.039249.5
109DEERLAN4
1.052252.6
771AMELIA1
1.040249.5
313JOSEPH1
1.033248.0
25.6-92.2
-25.6
57LAMOURE4
1.033248.0
-10.5-105.9
9.3
4.9105.5
-4.8-107.6
150.2
-149.8-56.9
-317.724.0
319.1-12.8
-116.8-42.2
116.940.3
106.0
90.9
53.6
3050REDW GT
1.03014.2
34.018.3R
2031DOWGTG 9
1.03014.2
79.6
-1.8
R
7185SCOTF ST
1.03514.3
68.140.0R
4185SCOTF GT
1.03514.3
70.237.7R
627AIR LIQC
1.03514.3
68.135.1R
10.7
10.75.2
5.2
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.032142.5
1.00
28
936808L_TAP
1.023141.2
67BRUDERH7
1.028141.9
24.321.7
16.619.9
314JOSEPH2
1.024141.4
0.99
826
-40.0-40.3
0.99
826
-40.1-40.5
391ALBCHEM7
1.028141.8
735SHELL TP
1.022141.1
952DIAM TAP
1.025141.5
43SCOT4_7
1.023141.1
17.1-11.8
-17.010.6
27.720.1
-20.9-14.2
-43.928.143.9
-42.928.1
-17.010.5-10.7
948808_BNDY
1.022141.0
59REDWATE7
1.015140.0
-9.9-1.3
-14.2
1420WEASEL1
1.019140.7
1.3-9.8-2.4
954ABEE_01
1.018140.5
-6.9-2.3
6.91.660
BEAMER 7
1.020140.7
734SHELL A1
1.022141.0
48DIAM SH7
1.025141.5
58FORT SA7
1.032142.4
185SCOT4_8
1.023141.2
628ALC SCOT
1.021140.9
394ASTOTIN
1.028141.9
821708ALTAP
1.023141.2
61DOW CHEM
1.035142.8
62SHERRIT7
1.032142.4
63LAMOURE7
1.034142.7
-9.2
-0.3-0.3
21.3
13.7
-55.9-17.9
26.5
0.30.1 -0.3
-27.9
49.9
-3.530.73.0
-17.4
-3.915.2
-88.
812
.189
.2
-22.
38.
1
22.3-8.2
28.6 0.99
053
30.531.2
0.99
053
29.4
-50.9
51.015.0
17.0
-0.3
-49.9
50RIVERSID
1.023141.2
1.6-1.5
-28.1
42.8
48.6
393DOW HYD7
1.033142.5
922ROSS TAP
1.034142.7
41.3 6.1
-41.
2-6
.274
.61.
8
13.7
15.7
-13.
9
-42.36.5
45ROSS CRK
1.034142.7
-32.
2
-15.0
28.8
-41.5-40.8
9.9
-15.7
27.9
8.5-11.2
-8.511.2
-28.120.9
-8.4
-11.
6
-16.5-20.3
-36.0
-30.6
-50.5
793SCORIA1
1.023141.1
21.511.1
-21.5-11.1
-22.1
2954ABEE_02
1.0184.2
6.92.0
18420WEASEL2
1.0354.3
2.90.7
10.75.2
2050GRANITE9
4.42.2
17.88.6
8.94.3
13.36.5
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.03014.8
51.5
454DOW GEN2
1.03014.8
51.5-2.3R
16.8R
2030DOWSTG 9
1.03015.1
37.4
6.6R
2836LAMONT_LV3
3836LAMONT_LV4
3835LAMONT_LV2
2835LAMONT_LV1
August 2016 P1381 807L Capacity Increase 15
File No. RP-05-1381
PROJECT 1381: SCENARIO 2017SP 1A708L (N-1)FIG B-12FRI, AUG 19 2016 15:33
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.6
443BANN_240
1.038249.2
109DEERLAN4
1.050252.1
771AMELIA1
1.037249.0
313JOSEPH1
1.031247.5
38.8-95.4
-38.7
57LAMOURE4
1.032247.6
-1.6-146.5
1.1
-8.3108.9
8.4-110.9
130.7
-130.4-60.4
-311.817.6
313.0-7.0
-97.4-46.1
97.543.7
146.6
94.2
56.1
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-3.3
R
7185SCOTF ST
1.03514.3
68.142.1R
4185SCOTF GT
1.03514.3
70.239.8R
627AIR LIQC
1.03514.3
68.138.3R
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.029142.0
1.00
28
936808L_TAP
1.018140.4
67BRUDERH7
1.024141.4
30.125.4
15.520.4
314JOSEPH2
1.021140.8
0.99
826
-53.6-45.6
0.99
826
-53.8-45.7
391ALBCHEM7
1.024141.3
735SHELL TP
1.017140.4
952DIAM TAP
1.022141.1
43SCOT4_7
1.018140.5
18.2-12.3
-18.111.1
46.628.6
-39.0-22.2
-49.240.949.2
-47.940.8
-18.111.0-11.2
948808_BNDY
1.016140.3
59REDWATE7
1.007139.0
-9.9-1.3
-19.9
1420WEASEL1
1.014139.9
1.3-9.8-2.4
954ABEE_01
1.012139.7
-6.9-2.3
6.91.660
BEAMER 7
1.011139.5
734SHELL A1
1.017140.4
48DIAM SH7
1.022141.1
58FORT SA7
1.033142.5
185SCOT4_8
1.019140.6
628ALC SCOT
1.017140.3
394ASTOTIN
1.024141.3
821708ALTAP
1.023141.1
61DOW CHEM
1.036143.0
62SHERRIT7
1.033142.6
63LAMOURE7
1.036143.0
-33.8
-0.3-0.3
39.6
22.1
-40.1-11.6
30.4
0.30.1 -0.3
-0.224.9-0.5
-27.4
-13.48.4
-99.
311
.499
.7
-40.
93.
8
40.9-3.9
29.4 0.99
053
31.519.2
0.99
053
-69.5
69.619.5
18.1
-0.3
50RIVERSID
1.022141.1
-40.9
47.9
393DOW HYD7
1.035142.8
922ROSS TAP
1.036143.0
37.2 4.4
-37.
2-4
.568
.1-1
.0
15.4
11.7
-15.
6
-35.89.2
45ROSS CRK
1.036143.0
-32.
2
-19.3
17.5
-45.8-45.6
9.9
-11.7
33.95.6
-33.8-5.6
-40.830.5
-8.4
-10.
7
-15.5-20.8
-80.1
-24.8
-66.3
793SCORIA1
1.022141.1
-25.5
2954ABEE_02
1.0124.2
6.92.0
18420WEASEL2
1.0294.3
2.90.7
2050GRANITE9
4.42.2
17.88.6
8.94.3
13.36.5
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.03014.8
51.5
454DOW GEN2
1.03014.8
51.5-2.9R
16.2R
2030DOWSTG 9
1.03015.1
37.4
5.6R
2836LAMONT_LV3
3836LAMONT_LV4
3835LAMONT_LV2
2835LAMONT_LV1
August 2016 P1381 807L Capacity Increase 16
File No. RP-05-1381
PROJECT 1381: SCENARIO 2017SP 1A807L (N-1)FIG B-13FRI, AUG 19 2016 15:33
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.8
443BANN_240
1.039249.2
109DEERLAN4
1.052252.4
771AMELIA1
1.039249.4
313JOSEPH1
1.033247.9
43.3-94.1
-43.3
57LAMOURE4
1.032247.7
-22.9-112.4
21.8
-12.9107.6
13.0-109.6
132.5
-132.1-62.1
-306.121.1
307.3-11.1
-99.2-47.7
99.345.4
112.5
92.9
57.9
3050REDW GT
1.03014.2
34.020.5R
2031DOWGTG 9
1.03014.2
79.6
-1.0
R
7185SCOTF ST
1.03514.3
68.139.7R
4185SCOTF GT
1.03514.3
70.237.4R
627AIR LIQC
1.03514.3
68.134.8R
10.7
10.75.2
5.2
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.031142.3
1.00
28
936808L_TAP
1.021140.9
67BRUDERH7
1.028141.8
34.323.0
8.619.6
314JOSEPH2
1.025141.5
0.99
826
-34.4-35.3
0.99
826
-34.5-35.4
391ALBCHEM7
1.027141.8
735SHELL TP
1.022141.0
952DIAM TAP
1.026141.6
43SCOT4_7
1.023141.2
25.1-11.4
-25.010.3
-4.1-16.6
-49.923.849.9
-48.824.0
-25.010.3-10.4
948808_BNDY
1.019140.7
59REDWATE7
1.010139.4
-9.9-1.3
-24.1
1420WEASEL1
1.017140.3
1.3-9.8-2.4
954ABEE_01
1.015140.1
-6.9-2.3
6.91.660
BEAMER 7
1.014139.9
734SHELL A1
1.022141.1
48DIAM SH7
1.026141.6
58FORT SA7
1.031142.3
185SCOT4_8
1.024141.2
628ALC SCOT
1.022141.0
394ASTOTIN
1.028141.8
821708ALTAP
1.018140.5
61DOW CHEM
1.034142.6
62SHERRIT7
1.031142.3
63LAMOURE7
1.033142.5
-0.3-0.3
4.4
16.0
-61.2-10.5
31.0
0.30.1 -0.3
-36.1
76.1
-2.520.71.8
-24.4
-0.711.0
-86.
112
.286
.4
-17.
49.
9
17.5-9.9
43.7 0.99
053
46.830.1
0.99
053
36.7
-46.0
46.113.2
25.0
-0.3
-75.9
50RIVERSID
1.018140.5
1.50.5
-23.8
48.8
75.0
393DOW HYD7
1.032142.4
922ROSS TAP
1.033142.6
42.3 6.9
-42.
3-7
.176
.23.
1
12.9
16.8
-13.
1
-44.05.2
45ROSS CRK
1.033142.6
-32.
2
-13.3
27.8
-42.6-42.9
9.9
-16.8
36.4
-24.017.7
-8.4
-11.
8
-8.5-20.0
-20.7
-45.2
793SCORIA1
1.018140.5
21.511.1
-21.5-11.1
-23.2
2954ABEE_02
1.0154.2
6.92.0
18420WEASEL2
1.0324.3
2.90.7
10.75.2
2050GRANITE9
4.42.2
17.88.6
8.94.3
13.36.5
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.03014.8
51.5
454DOW GEN2
1.03014.8
51.5-2.0R
17.1R
2030DOWSTG 9
1.03015.1
37.4
7.2R
2836LAMONT_LV3
3836LAMONT_LV4
3835LAMONT_LV2
2835LAMONT_LV1
August 2016 P1381 807L Capacity Increase 17
File No. RP-05-1381
PROJECT 1381: SCENARIO 2017SP 1A735L (N-1)FIG B-14FRI, AUG 19 2016 15:33
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.6
443BANN_240
1.038249.2
109DEERLAN4
1.051252.2
771AMELIA1
1.038249.2
313JOSEPH1
1.032247.7
49.1-92.7
-49.0
57LAMOURE4
1.032247.6
-16.2-127.9
15.4
-18.6106.2
18.7-108.2
129.4
-129.0-61.2
-312.719.1
313.9-8.4
-96.1-46.9
96.244.5
128.0
91.5
56.9
3050REDW GT
1.03014.2
34.018.1R
2031DOWGTG 9
1.03014.2
79.6
-1.5
R
7185SCOTF ST
1.03514.3
68.140.2R
4185SCOTF GT
1.03514.3
70.237.9R
627AIR LIQC
1.03514.3
68.135.5R
10.7
10.75.2
5.2
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.029142.0
1.00
28
936808L_TAP
1.014140.0
67BRUDERH7
1.025141.5
55.426.8
1.219.6
314JOSEPH2
1.024141.3
0.99
826
-39.2-37.6
0.99
826
-39.3-37.7
391ALBCHEM7
1.025141.4
735SHELL TP
1.022141.0
952DIAM TAP
1.025141.4
43SCOT4_7
1.022141.0
32.6-11.2
-32.410.3
19.119.1
-17.6-16.7
-42.522.242.5
-41.622.3
-32.410.3-10.4
948808_BNDY
1.013139.8
59REDWATE7
1.000138.0
-9.9-1.3
-44.8
1420WEASEL1
1.010139.4
1.3-9.8-2.4
954ABEE_01
1.009139.2
-6.9-2.3
6.91.660
BEAMER 7
1.021140.8
734SHELL A1
1.022141.0
48DIAM SH7
1.025141.4
58FORT SA7
1.031142.3
185SCOT4_8
1.022141.1
628ALC SCOT
1.021140.9
394ASTOTIN
1.025141.4
821708ALTAP
1.023141.2
61DOW CHEM
1.034142.7
62SHERRIT7
1.031142.3
63LAMOURE7
1.033142.6
-6.6
-0.3-0.3
17.9
16.1
-63.3-19.6
25.5
0.30.1 -0.3
-27.6
39.5
-16.2
0.615.8
-91.
412
.691
.8
-26.
99.
4
26.9-9.4
35.5 0.99
053
38.026.8
0.99
053
29.0
-55.5
55.613.8
32.4
-0.3
-39.5
50RIVERSID
1.023141.2
1.6-1.7
-22.1
41.6
38.1
393DOW HYD7
1.033142.5
922ROSS TAP
1.034142.7
40.3 6.6
-40.
2-6
.772
.92.
5
13.3
14.7
-13.
5
-40.75.8
45ROSS CRK
1.034142.7
-32.
2
-13.8
24.7
-46.3-56.6
9.9
-14.7
27.5
-3.3-13.0
3.312.9
-22.316.5
-8.4
-12.
1
-1.1-20.1
-15.7
-43.2
793SCORIA1
1.023141.2
21.511.1
-21.5-11.1
-25.7
2954ABEE_02
1.0094.2
6.92.0
18420WEASEL2
1.0264.3
2.90.7
10.75.2
2050GRANITE9
4.42.2
17.88.6
8.94.3
13.36.5
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.03014.8
51.5
454DOW GEN2
1.03014.8
51.5-2.2R
16.9R
2030DOWSTG 9
1.03015.1
37.4
6.8R
2836LAMONT_LV3
3836LAMONT_LV4
3835LAMONT_LV2
2835LAMONT_LV1
August 2016 P1381 807L Capacity Increase 18
File No. RP-05-1381
PROJECT 1381: SCENARIO 2017SP 1A808L (N-1)FIG B-15FRI, AUG 19 2016 15:33
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.054253.0
443BANN_240
1.039249.3
109DEERLAN4
1.054252.8
771AMELIA1
1.040249.5
313JOSEPH1
1.033247.8
32.7-103.2
-32.6
57LAMOURE4
1.032247.7
-19.4-121.2
18.5
-2.2116.9
2.3-118.8
134.1
-133.7-64.2
-301.725.3
302.9-15.7
-100.8-49.9
100.947.6
121.3
102.1
60.2
3050REDW GT
1.03014.2
34.019.7R
2031DOWGTG 9
1.03014.2
79.6
-1.0
R
7185SCOTF ST
1.03514.3
68.140.6R
4185SCOTF GT
1.03514.3
70.238.3R
627AIR LIQC
1.03514.3
68.136.1R
10.7
10.75.2
5.2
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.039143.4
1.00
28
936808L_TAP
1.023141.1
67BRUDERH7
1.033142.5
26.428.5
314JOSEPH2
1.023141.2
0.99
826
-44.1-41.1
0.99
826
-44.2-41.3
391ALBCHEM7
1.032142.4
735SHELL TP
1.021140.8
952DIAM TAP
1.024141.4
43SCOT4_7
1.021140.9
7.3-20.3
-7.319.1
33.625.6
-16.4-16.8
-47.531.947.5
-46.431.9
-7.219.0-19.2
948808_BNDY
1.021140.9
59REDWATE7
1.002138.3
1420WEASEL1
1.019140.6
954ABEE_01
1.017140.4
60BEAMER 7
1.016140.2
734SHELL A1
1.021140.8
48DIAM SH7
1.024141.4
58FORT SA7
1.031142.3
185SCOT4_8
1.022141.0
628ALC SCOT
1.020140.8
394ASTOTIN
1.033142.5
821708ALTAP
1.020140.8
61DOW CHEM
1.034142.6
62SHERRIT7
1.031142.3
63LAMOURE7
1.033142.5
-23.6
-0.3-0.3
16.8
16.2
-51.2-13.5
29.2
0.30.1 -0.3
-36.3
51.0
-25.745.125.7
-22.9
-6.711.6
-90.
812
.491
.1
-25.
79.
8
25.7-9.9
39.3 0.99
053
42.029.8
0.99
053
36.8
-54.3
54.313.3
7.2
-0.3
-50.9
50RIVERSID
1.020140.8
1.5-0.3
-31.9
46.4
49.7
393DOW HYD7
1.032142.4
922ROSS TAP
1.033142.6
40.5 6.9
-40.
5-7
.073
.33.
0
12.9
15.0
-13.
1
-41.15.2
45ROSS CRK
1.033142.6
-32.
2
-13.3
27.4
-28.5-26.4
-15.0
36.4
16.1-2.1
-16.12.1
-31.923.8
-8.4
-11.
9
-26.3-28.8
-49.4
-44.8
-55.2
793SCORIA1
1.020140.7
21.511.1
-21.5-11.1
2954ABEE_02
1.0174.2
18420WEASEL2
1.0344.3
10.75.2
2050GRANITE9
4.42.2
17.88.6
8.94.3
13.36.5
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.03014.8
51.5
454DOW GEN2
1.03014.8
51.5-2.0R
17.1R
2030DOWSTG 9
1.03015.1
37.4
7.1R
2836LAMONT_LV3
3836LAMONT_LV4
3835LAMONT_LV2
2835LAMONT_LV1
August 2016 P1381 807L Capacity Increase 19
File No. RP-05-1381
PROJECT 1381: SCENARIO 2017SP 1A621L (N-1)FIG B-16FRI, AUG 19 2016 15:33
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.8
443BANN_240
1.038249.2
109DEERLAN4
1.052252.4
771AMELIA1
1.039249.3
313JOSEPH1
1.032247.8
38.6-95.6
-38.6
57LAMOURE4
1.032247.6
-17.6-125.7
16.7
-8.2109.0
8.3-111.0
132.6
-132.2-61.9
-306.720.8
307.9-10.7
-99.3-47.6
99.445.3
125.8
94.3
57.8
3050REDW GT
1.03014.2
34.018.5R
2031DOWGTG 9
1.03014.2
79.6
-1.5
R
7185SCOTF ST
1.03514.3
68.140.2R
4185SCOTF GT
1.03514.3
70.237.9R
627AIR LIQC
1.03514.3
68.135.5R
10.7
10.75.2
5.2
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.032142.4
1.00
28
936808L_TAP
1.023141.1
67BRUDERH7
1.027141.8
23.721.7
15.420.0
314JOSEPH2
1.024141.3
0.99
826
-43.3-38.3
0.99
826
-43.5-38.4
391ALBCHEM7
1.027141.7
735SHELL TP
1.022141.0
952DIAM TAP
1.025141.4
43SCOT4_7
1.022141.0
18.3-11.9
-18.210.7
28.519.5
-17.5-16.4
-43.328.743.3
-42.228.8
-18.210.7-10.8
948808_BNDY
1.021140.9
59REDWATE7
1.014139.9
-9.9-1.3
-13.6
1420WEASEL1
1.019140.6
1.3-9.8-2.4
954ABEE_01
1.017140.4
-6.9-2.3
6.91.660
BEAMER 7
1.019140.7
734SHELL A1
1.022141.0
48DIAM SH7
1.025141.4
58FORT SA7
1.031142.3
185SCOT4_8
1.022141.1
628ALC SCOT
1.021140.9
394ASTOTIN
1.027141.8
821708ALTAP
1.023141.1
61DOW CHEM
1.034142.7
62SHERRIT7
1.031142.3
63LAMOURE7
1.033142.6
-8.2
-0.3-0.3
17.9
15.8
-55.2-18.7
26.0
0.30.1 -0.3
-28.9
48.4
-3.531.32.9
-17.1
-4.315.3
-91.
112
.691
.5
-26.
39.
5
26.3-9.5
38.4 0.99
053
41.127.5
0.99
053
30.2
-54.9
55.013.7
18.2
-0.3
-48.3
50RIVERSID
1.022141.1
1.6-1.3
-28.7
42.2
47.0
393DOW HYD7
1.033142.5
922ROSS TAP
1.034142.7
40.4 6.6
-40.
4-6
.773
.12.
5
13.2
14.8
-13.
5
-40.95.7
45ROSS CRK
1.034142.7
-32.
2
-13.7
25.4
-41.8-39.1
9.9
-14.8
29.0
9.7-11.6
-9.711.6
-28.821.4
-8.4
-12.
1
-15.3-20.5
-38.2
-31.1
-51.3
793SCORIA1
1.022141.1
21.511.1
-21.5-11.1
-22.2
2954ABEE_02
1.0174.2
6.92.0
18420WEASEL2
1.0344.3
2.90.7
10.75.2
2050GRANITE9
4.42.2
17.88.6
8.94.3
13.36.5
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.03014.8
51.5
454DOW GEN2
1.03014.8
51.5-2.2R
16.9R
2030DOWSTG 9
1.03015.1
37.4
6.8R
2836LAMONT_LV3
3836LAMONT_LV4
3835LAMONT_LV2
2835LAMONT_LV1
August 2016 P1381 807L Capacity Increase 20
File No. RP-05-1381
PROJECT 1381: SCENARIO 2017SP 1A815L (N-1)FIG B-17FRI, AUG 19 2016 15:33
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.054252.9
443BANN_240
1.039249.3
109DEERLAN4
1.053252.8
771AMELIA1
1.039249.4
313JOSEPH1
1.032247.7
33.5-104.4
-33.4
57LAMOURE4
1.032247.6
-15.9-126.3
15.0
-3.0118.1
3.1-119.9
134.0
-133.6-64.2
-304.525.2
305.7-15.4
-100.7-49.9
100.847.6
126.4
103.2
60.2
3050REDW GT
1.03014.2
34.018.7R
2031DOWGTG 9
1.03014.2
79.6
-1.1
R
7185SCOTF ST
1.03514.3
68.141.0R
4185SCOTF GT
1.03514.3
70.238.7R
627AIR LIQC
1.03514.3
68.136.5R
10.7
10.75.2
5.2
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.039143.4
1.00
28
936808L_TAP
1.027141.8
67BRUDERH7
1.013139.7
31.027.6
314JOSEPH2
1.022141.1
0.99
826
-46.2-43.3
0.99
826
-46.4-43.5
391ALBCHEM7
1.014139.9
735SHELL TP
1.020140.8
952DIAM TAP
1.023141.2
43SCOT4_7
1.021140.8
33.79.0
-33.6-9.8
25.416.5
-20.0-18.8
-40.526.740.5
-39.626.8
-33.5-9.89.7
948808_BNDY
1.026141.6
59REDWATE7
1.016140.3
-9.9-1.3
-20.8
1420WEASEL1
1.024141.3
1.3-9.8-2.4
954ABEE_01
1.022141.1
-6.9-2.3
6.91.660
BEAMER 7
1.019140.6
734SHELL A1
1.020140.8
48DIAM SH7
1.023141.2
58FORT SA7
1.031142.3
185SCOT4_8
1.021140.9
628ALC SCOT
1.019140.7
394ASTOTIN
1.013139.7
821708ALTAP
1.022141.0
61DOW CHEM
1.034142.7
62SHERRIT7
1.031142.3
63LAMOURE7
1.033142.6
-2.1
-0.3-0.3
20.4
18.3
-57.7-22.1
24.0
0.30.1 -0.3
-29.4
48.2
2.124.0-2.8
-14.9
-2.816.4
-91.
911
.792
.3
-27.
68.
3
27.6-8.3
39.1 0.99
053
41.828.2
0.99
053
30.5
-56.2
56.314.9
33.6
-0.3
-48.2
50RIVERSID
1.022141.0
1.5-1.2
-26.7
39.5
46.9
393DOW HYD7
1.032142.4
922ROSS TAP
1.033142.6
40.1 6.5
-40.
1-6
.772
.72.
4
13.3
14.5
-13.
5
-40.45.9
45ROSS CRK
1.033142.6
-32.
2
-14.9
26.0
-27.6-31.0
9.9
-14.5
29.4
5.7-14.8
-5.714.8
-26.719.9
-8.4
-11.
1
-31.1
-23.9
-48.8
793SCORIA1
1.022141.0
21.511.1
-21.5-11.1
-27.7
2954ABEE_02
1.0224.3
6.92.0
18420WEASEL2
1.0394.3
2.90.7
10.75.2
2050GRANITE9
4.42.2
17.88.6
8.94.3
13.36.5
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.03014.8
51.5
454DOW GEN2
1.03014.8
51.5-2.0R
17.0R
2030DOWSTG 9
1.03015.1
37.4
7.1R
2836LAMONT_LV3
3836LAMONT_LV4
3835LAMONT_LV2
2835LAMONT_LV1
August 2016 P1381 807L Capacity Increase 21
File No. RP-05-1381
PROJECT 1381: SCENARIO 2017SP 1A846L (N-1)FIG B-18FRI, AUG 19 2016 15:33
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.8
443BANN_240
1.038249.2
109DEERLAN4
1.052252.4
771AMELIA1
1.039249.3
313JOSEPH1
1.032247.8
38.6-95.6
-38.6
57LAMOURE4
1.032247.7
-17.6-125.6
16.7
-8.1109.0
8.2-111.0
132.6
-132.2-62.0
-306.620.8
307.8-10.8
-99.3-47.6
99.445.3
125.7
94.4
57.8
3050REDW GT
1.03014.2
34.018.5R
2031DOWGTG 9
1.03014.2
79.6
-1.5
R
7185SCOTF ST
1.03514.3
68.140.2R
4185SCOTF GT
1.03514.3
70.237.9R
627AIR LIQC
1.03514.3
68.135.5R
10.7
10.75.2
5.2
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.032142.4
1.00
28
936808L_TAP
1.023141.1
67BRUDERH7
1.027141.8
23.821.8
15.220.0
314JOSEPH2
1.024141.3
0.99
826
-43.3-38.3
0.99
826
-43.4-38.4
391ALBCHEM7
1.027141.7
735SHELL TP
1.022141.0
952DIAM TAP
1.025141.4
43SCOT4_7
1.022141.0
18.1-12.0
-18.110.8
28.519.5
-17.4-16.4
-43.328.743.3
-42.328.8
-18.110.8-10.9
948808_BNDY
1.021140.9
59REDWATE7
1.014139.9
-9.9-1.3
-13.7
1420WEASEL1
1.019140.6
1.3-9.8-2.4
954ABEE_01
1.017140.4
-6.9-2.3
6.91.660
BEAMER 7
1.019140.7
734SHELL A1
1.022141.0
48DIAM SH7
1.025141.4
58FORT SA7
1.031142.3
185SCOT4_8
1.023141.1
628ALC SCOT
1.021140.9
394ASTOTIN
1.027141.8
821708ALTAP
1.023141.1
61DOW CHEM
1.034142.7
62SHERRIT7
1.031142.3
63LAMOURE7
1.033142.6
-8.2
-0.3-0.3
17.8
15.8
-55.2-18.7
26.1
-28.9
48.3
-3.431.22.9
-17.1
-4.315.3
-91.
112
.791
.5
-26.
39.
5
26.3-9.5
38.4 0.99
053
41.027.6
0.99
053
30.2
-54.9
55.013.7
18.1
-48.2
50RIVERSID
1.023141.1
1.6-1.3
-28.7
42.2
47.0
393DOW HYD7
1.033142.5
922ROSS TAP
1.034142.7
40.4 6.6
-40.
4-6
.773
.22.
5
13.2
14.8
-13.
5
-40.95.8
45ROSS CRK
1.034142.7
-32.
2
-13.7
25.4
-41.7-38.9
9.9
-14.8
28.9
9.7-11.6
-9.711.6
-28.821.4
-8.4
-12.
1
-15.1-20.4
-38.2
-31.1
-51.3
793SCORIA1
1.022141.1
21.511.1
-21.5-11.1
-22.2
2954ABEE_02
1.0174.2
6.92.0
18420WEASEL2
1.0344.3
2.90.7
10.75.2
2050GRANITE9
4.42.2
17.88.6
8.94.3
13.36.5
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.03014.8
51.5
454DOW GEN2
1.03014.8
51.5-2.2R
16.9R
2030DOWSTG 9
1.03015.1
37.4
6.8R
2836LAMONT_LV3
3836LAMONT_LV4
3835LAMONT_LV2
2835LAMONT_LV1
August 2016 P1381 807L Capacity Increase 22
File No. RP-05-1381
PROJECT 1381: SCENARIO 2017SP 1A773L (N-1)FIG B-19FRI, AUG 19 2016 15:33
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.8
443BANN_240
1.039249.2
109DEERLAN4
1.052252.5
771AMELIA1
1.039249.3
313JOSEPH1
1.032247.8
46.9-98.3
-46.8
57LAMOURE4
1.032247.6
-17.2-124.0
16.3
-16.4111.9
16.5-113.9
130.3
-130.0-62.7
-310.822.6
312.1-12.1
-97.1-48.4
97.246.1
124.1
97.2
58.5
3050REDW GT
1.03014.2
34.018.6R
2031DOWGTG 9
1.03014.2
79.6
-1.3
R
7185SCOTF ST
1.03514.3
68.140.4R
4185SCOTF GT
1.03514.3
70.238.1R
627AIR LIQC
1.03514.3
68.135.8R
10.7
10.75.2
5.2
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.034142.7
1.00
28
936808L_TAP
1.024141.3
67BRUDERH7
1.031142.3
18.427.0
33.69.4
314JOSEPH2
1.023141.2
0.99
826
-38.4-39.9
0.99
826
-38.5-40.0
391ALBCHEM7
1.024141.3
735SHELL TP
1.021140.9
952DIAM TAP
1.024141.4
43SCOT4_7
1.022141.0
0.0-1.3
-0.0-0.1
30.917.2
-15.1-18.2
-41.730.541.7
-40.630.5
948808_BNDY
1.023141.2
59REDWATE7
1.015140.0
-9.9-1.3
-8.2
1420WEASEL1
1.020140.8
1.3-9.8-2.4
954ABEE_01
1.019140.6
-6.9-2.3
6.91.660
BEAMER 7
1.019140.7
734SHELL A1
1.021140.9
48DIAM SH7
1.024141.4
58FORT SA7
1.031142.3
185SCOT4_8
1.022141.1
628ALC SCOT
1.020140.8
394ASTOTIN
1.031142.3
821708ALTAP
1.022141.1
61DOW CHEM
1.034142.7
62SHERRIT7
1.031142.3
63LAMOURE7
1.033142.6
-3.1
-0.3-0.3
15.5
17.7
-53.0-20.7
24.8
0.30.1 -0.3
-28.9
47.9
1.836.7-2.2
-15.4
-5.716.3
-90.
412
.090
.8
-25.
18.
6
25.1-8.6
37.6 0.99
053
40.227.9
0.99
053
30.1
-53.7
53.714.6
-0.3
-47.9
50RIVERSID
1.022141.1
1.6-1.3
-30.5
40.6
46.6
393DOW HYD7
1.032142.5
922ROSS TAP
1.034142.6
40.7 6.5
-40.
6-6
.673
.62.
3
13.4
15.1
-13.
6
-41.36.0
45ROSS CRK
1.034142.6
-32.
2
-14.6
25.7
-36.4-51.9
9.9
-15.1
28.9
13.2-14.3
-13.214.3
-30.522.7
-8.4
-11.
5
-33.5-9.8
-44.0
-36.5
-53.5
793SCORIA1
1.022141.1
21.511.1
-21.5-11.1
-27.4
2954ABEE_02
1.0194.2
6.92.0
18420WEASEL2
1.0364.3
2.90.7
10.75.2
2050GRANITE9
4.42.2
17.88.6
8.94.3
13.36.5
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.03014.8
51.5
454DOW GEN2
1.03014.8
51.5-2.1R
16.9R
2030DOWSTG 9
1.03015.1
37.4
6.9R
2836LAMONT_LV3
3836LAMONT_LV4
3835LAMONT_LV2
2835LAMONT_LV1
August 2016 P1381 807L Capacity Increase 23
File No. RP-05-1381
PROJECT 1381: SCENARIO 2017SP 1A776L (N-1)FIG B-20FRI, AUG 19 2016 15:33
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.8
443BANN_240
1.038249.2
109DEERLAN4
1.052252.5
771AMELIA1
1.039249.3
313JOSEPH1
1.032247.7
46.9-98.5
-46.8
57LAMOURE4
1.032247.6
-16.9-123.9
16.0
-16.4112.1
16.5-114.0
130.3
-130.0-62.7
-310.822.5
312.0-12.0
-97.0-48.5
97.246.1
124.0
97.3
58.5
3050REDW GT
1.03014.2
34.018.6R
2031DOWGTG 9
1.03014.2
79.6
-1.3
R
7185SCOTF ST
1.03514.3
68.140.5R
4185SCOTF GT
1.03514.3
70.238.2R
627AIR LIQC
1.03514.3
68.135.9R
10.7
10.75.2
5.2
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.034142.7
1.00
28
936808L_TAP
1.024141.3
67BRUDERH7
1.031142.2
18.427.1
33.69.4
314JOSEPH2
1.023141.2
0.99
826
-38.3-40.2
0.99
826
-38.5-40.3
391ALBCHEM7
1.031142.2
735SHELL TP
1.021140.9
952DIAM TAP
1.024141.3
43SCOT4_7
1.021141.0
30.917.0
-15.1-18.5
-41.530.541.5
-40.530.5
0.0-0.1-0.1
948808_BNDY
1.023141.1
59REDWATE7
1.015140.0
-9.9-1.3
-8.2
1420WEASEL1
1.020140.8
1.3-9.8-2.4
954ABEE_01
1.019140.6
-6.9-2.3
6.91.660
BEAMER 7
1.019140.6
734SHELL A1
1.021140.9
48DIAM SH7
1.024141.3
58FORT SA7
1.031142.3
185SCOT4_8
1.022141.0
628ALC SCOT
1.020140.8
394ASTOTIN
1.031142.2
821708ALTAP
1.022141.1
61DOW CHEM
1.034142.7
62SHERRIT7
1.031142.3
63LAMOURE7
1.033142.6
-2.9
-0.3-0.3
15.5
17.9
-53.0-21.0
24.7
0.30.1 -0.3
-29.1
47.9
1.836.7-2.3
-15.3
-5.716.3
-90.
411
.890
.8
-25.
18.
5
25.1-8.6
37.6 0.99
053
40.227.9
0.99
053
30.2
-53.7
53.714.7
-0.0
-0.3
-47.9
50RIVERSID
1.022141.1
1.6-1.2
-30.5
40.4
46.6
393DOW HYD7
1.032142.5
922ROSS TAP
1.034142.6
40.7 6.5
-40.
6-6
.673
.62.
4
13.3
15.1
-13.
6
-41.35.9
45ROSS CRK
1.034142.6
-32.
2
-14.7
25.7
-36.4-52.0
9.9
-15.1
29.1
13.2-14.4
-13.214.3
-30.522.7
-8.4
-11.
3
-33.6-9.7
-44.0
-36.5
-53.5
793SCORIA1
1.022141.0
21.511.1
-21.5-11.1
-27.5
2954ABEE_02
1.0194.2
6.92.0
18420WEASEL2
1.0364.3
2.90.7
10.75.2
2050GRANITE9
4.42.2
17.88.6
8.94.3
13.36.5
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.03014.8
51.5
454DOW GEN2
1.03014.8
51.5-2.1R
17.0R
2030DOWSTG 9
1.03015.1
37.4
7.0R
2836LAMONT_LV3
3836LAMONT_LV4
3835LAMONT_LV2
2835LAMONT_LV1
August 2016 P1381 807L Capacity Increase 24
File No. RP-05-1381
PROJECT 1381: SCENARIO 2017SP 1A856L (N-1)FIG B-21FRI, AUG 19 2016 15:33
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.8
443BANN_240
1.039249.3
109DEERLAN4
1.052252.4
771AMELIA1
1.039249.3
313JOSEPH1
1.033247.8
38.8-95.2
-38.7
57LAMOURE4
1.032247.7
-18.7-125.5
17.8
-8.3108.6
8.4-110.7
132.6
-132.2-61.9
-306.721.0
307.9-10.9
-99.3-47.6
99.445.3
125.5
94.0
57.8
3050REDW GT
1.03014.2
34.018.6R
2031DOWGTG 9
1.03014.2
79.6
-1.5
R
7185SCOTF ST
1.03514.3
68.140.7R
4185SCOTF GT
1.03514.3
70.238.4R
627AIR LIQC
1.03514.3
68.136.1R
10.7
10.75.2
5.2
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.032142.4
1.00
28
936808L_TAP
1.023141.1
67BRUDERH7
1.028141.8
24.122.1
15.119.7
314JOSEPH2
1.024141.4
0.99
826
-43.1-37.6
0.99
826
-43.3-37.7
391ALBCHEM7
1.027141.8
735SHELL TP
1.021140.9
952DIAM TAP
1.025141.5
43SCOT4_7
1.021140.9
18.6-11.6
-18.510.4
35.228.4
-16.9-15.7
-74.049.6
-18.510.4-10.5
948808_BNDY
1.021140.9
59REDWATE7
1.014139.9
-9.9-1.3
-14.0
1420WEASEL1
1.019140.6
1.3-9.8-2.4
954ABEE_01
1.017140.4
-6.9-2.3
6.91.660
BEAMER 7
1.019140.6
734SHELL A1
1.021140.9
48DIAM SH7
1.025141.5
58FORT SA7
1.031142.3
185SCOT4_8
1.022141.0
628ALC SCOT
1.020140.8
394ASTOTIN
1.028141.8
821708ALTAP
1.022141.1
61DOW CHEM
1.034142.7
62SHERRIT7
1.032142.4
63LAMOURE7
1.033142.6
-6.8
-0.3-0.3
17.3
15.2
-60.1-25.9
21.7
0.30.1 -0.3
-29.9
49.3
-3.130.92.6
-10.6
-1.319.1
-90.
912
.991
.2
-26.
09.
9
26.0-9.9
38.5 0.99
053
41.227.8
0.99
053
31.2
-54.6
54.613.3
18.5
-0.3
-49.2
50RIVERSID
1.022141.1
1.6-1.2
74.2
47.9
393DOW HYD7
1.033142.5
922ROSS TAP
1.034142.7
40.5 6.6
-40.
4-6
.873
.32.
6
13.2
14.9
-13.
4
-41.05.7
45ROSS CRK
1.034142.7
-32.
2
-13.3
25.6
-41.8-39.2
9.9
-14.9
30.0
1.8-21.8
-1.821.8
-49.518.4
-8.4
-12.
4
-15.1-20.2
-36.9
-30.7
-46.3
793SCORIA1
1.022141.0
21.511.1
-21.5-11.1
-22.5
2954ABEE_02
1.0174.2
6.92.0
18420WEASEL2
1.0344.3
2.90.7
10.75.2
2050GRANITE9
4.42.2
17.88.6
8.94.3
13.36.5
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.03014.8
51.5
454DOW GEN2
1.03014.8
51.5-2.2R
16.9R
2030DOWSTG 9
1.03015.1
37.4
6.8R
2836LAMONT_LV3
3836LAMONT_LV4
3835LAMONT_LV2
2835LAMONT_LV1
August 2016 P1381 807L Capacity Increase 25
File No. RP-05-1381
PROJECT 1381: SCENARIO 2017SP 1A857L (N-1)FIG B-22FRI, AUG 19 2016 15:33
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.8
443BANN_240
1.039249.3
109DEERLAN4
1.052252.4
771AMELIA1
1.039249.3
313JOSEPH1
1.033247.8
38.8-95.2
-38.7
57LAMOURE4
1.032247.7
-18.6-125.4
17.7
-8.3108.7
8.4-110.7
132.6
-132.2-61.9
-306.721.0
307.9-10.9
-99.3-47.6
99.445.3
125.5
94.0
57.8
3050REDW GT
1.03014.2
34.018.6R
2031DOWGTG 9
1.03014.2
79.6
-1.5
R
7185SCOTF ST
1.03514.3
68.140.7R
4185SCOTF GT
1.03514.3
70.238.4R
627AIR LIQC
1.03514.3
68.136.1R
10.7
10.75.2
5.2
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.032142.4
1.00
28
936808L_TAP
1.023141.1
67BRUDERH7
1.028141.8
24.122.1
15.119.7
314JOSEPH2
1.024141.4
0.99
826
-43.1-37.6
0.99
826
-43.3-37.7
391ALBCHEM7
1.027141.8
735SHELL TP
1.021140.9
952DIAM TAP
1.025141.5
43SCOT4_7
1.021140.9
18.6-11.6
-18.510.4
35.228.0
-16.9-15.7
-74.549.674.7
-18.510.4-10.5
948808_BNDY
1.021140.9
59REDWATE7
1.014139.9
-9.9-1.3
-14.0
1420WEASEL1
1.019140.6
1.3-9.8-2.4
954ABEE_01
1.017140.4
-6.9-2.3
6.91.660
BEAMER 7
1.019140.6
734SHELL A1
1.021140.9
48DIAM SH7
1.025141.5
58FORT SA7
1.031142.3
185SCOT4_8
1.022141.0
628ALC SCOT
1.020140.8
394ASTOTIN
1.028141.8
821708ALTAP
1.022141.1
61DOW CHEM
1.034142.7
62SHERRIT7
1.032142.3
63LAMOURE7
1.033142.6
-6.9
-0.3-0.3
17.3
15.2
-60.1-25.6
21.9
0.30.1 -0.3
-29.9
49.3
-3.130.92.6
-10.9
-1.318.9
-90.
912
.991
.2
-26.
09.
8
26.0-9.9
38.5 0.99
053
41.227.8
0.99
053
31.1
-54.6
54.613.3
18.5
-0.3
-49.2
50RIVERSID
1.022141.1
1.6-1.2
-49.5
47.9
393DOW HYD7
1.033142.5
922ROSS TAP
1.034142.7
40.5 6.6
-40.
4-6
.873
.32.
6
13.2
14.9
-13.
4
-41.05.7
45ROSS CRK
1.034142.7
-32.
2
-13.3
25.6
-41.8-39.2
9.9
-14.9
29.9
1.8-21.4
-1.821.3
18.4
-8.4
-12.
4
-15.1-20.2
-36.9
-30.8
-46.3
793SCORIA1
1.022141.0
21.511.1
-21.5-11.1
-22.5
2954ABEE_02
1.0174.2
6.92.0
18420WEASEL2
1.0344.3
2.90.7
10.75.2
2050GRANITE9
4.42.2
17.88.6
8.94.3
13.36.5
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.03014.8
51.5
454DOW GEN2
1.03014.8
51.5-2.2R
16.9R
2030DOWSTG 9
1.03015.1
37.4
6.8R
2836LAMONT_LV3
3836LAMONT_LV4
3835LAMONT_LV2
2835LAMONT_LV1
August 2016 P1381 807L Capacity Increase 26
File No. RP-05-1381
PROJECT 1381: SCENARIO 2017SP 1AALCO2L (N-1)FIG B-23FRI, AUG 19 2016 15:34
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.7
443BANN_240
1.038249.2
109DEERLAN4
1.051252.4
771AMELIA1
1.038249.2
313JOSEPH1
1.032247.7
38.2-96.0
-38.1
57LAMOURE4
1.032247.6
-16.2-127.0
15.4
-7.7109.4
7.8-111.4
132.5
-132.2-62.0
-306.720.5
308.0-10.4
-99.3-47.7
99.445.4
127.1
94.7
57.9
3050REDW GT
1.03014.2
34.018.5R
2031DOWGTG 9
1.03014.2
79.6
-1.3
R
7185SCOTF ST
1.03514.3
68.139.5R
4185SCOTF GT
1.03514.3
70.237.2R
627AIR LIQC
1.03514.3
68.135.6R
10.7
10.75.2
5.2
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.031142.3
1.00
28
936808L_TAP
1.022141.1
67BRUDERH7
1.027141.7
22.621.7
16.120.2
314JOSEPH2
1.023141.2
0.99
826
-44.2-39.1
0.99
826
-44.4-39.2
391ALBCHEM7
1.027141.7
735SHELL TP
1.022141.0
952DIAM TAP
1.024141.4
43SCOT4_7
1.021140.9
17.6-12.1
-17.510.9
6.913.5
-19.0-16.8
-47.541.647.5
-46.241.5
-17.510.9-11.0
948808_BNDY
1.021140.9
59REDWATE7
1.014139.9
-9.9-1.3
-12.5
1420WEASEL1
1.019140.6
1.3-9.8-2.4
954ABEE_01
1.017140.4
-6.9-2.3
6.91.660
BEAMER 7
1.020140.7
734SHELL A1
1.022141.0
48DIAM SH7
1.024141.4
58FORT SA7
1.031142.3
185SCOT4_8
1.024141.3
628ALC SCOT
1.021140.8
394ASTOTIN
1.027141.7
821708ALTAP
1.023141.1
61DOW CHEM
1.034142.7
62SHERRIT7
1.031142.3
63LAMOURE7
1.033142.6
-8.6
-0.3-0.3
19.4
16.3
15.5
0.30.1 -0.3
-28.6
45.5
-3.532.33.0
-33.8
25.225.7
-91.
712
.492
.0
-27.
39.
3
27.3-9.3
37.9 0.99
053
40.527.3
0.99
053
29.8
-55.9
55.913.9
17.5
-0.3
-45.5
50RIVERSID
1.023141.1
1.6-1.4
-41.6
46.3
44.2
393DOW HYD7
1.032142.5
922ROSS TAP
1.034142.6
40.2 6.6
-40.
1-6
.872
.82.
6
13.2
14.6
-13.
4
-40.55.7
45ROSS CRK
1.034142.6
-32.
2
-13.9
25.1
-41.9-38.7
9.9
-14.6
28.6
35.3-5.2
-35.35.2
-41.5-8.1
-8.4
-11.
9
-16.0-20.7
-42.1
-32.2
-106.4
793SCORIA1
1.022141.1
21.511.1
-21.5-11.1
-22.1
2954ABEE_02
1.0174.2
6.92.0
18420WEASEL2
1.0344.3
2.90.7
10.75.2
2050GRANITE9
4.42.2
17.88.6
8.94.3
13.36.5
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.03014.8
51.5
454DOW GEN2
1.03014.8
51.5-2.1R
16.9R
2030DOWSTG 9
1.03015.1
37.4
6.9R
2836LAMONT_LV3
3836LAMONT_LV4
3835LAMONT_LV2
2835LAMONT_LV1
August 2016 P1381 807L Capacity Increase 27
File No. RP-05-1381
PROJECT 1381: SCENARIO 2017SP 1AEXI-01L (N-1)FIG B-24FRI, AUG 19 2016 15:34
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.7
443BANN_240
1.038249.2
109DEERLAN4
1.052252.4
771AMELIA1
1.039249.3
313JOSEPH1
1.032247.8
39.1-95.5
-39.0
57LAMOURE4
1.032247.6
-17.8-124.4
16.9
-8.6108.9
8.7-111.0
132.5
-132.2-62.0
-306.620.7
307.8-10.7
-99.3-47.7
99.445.4
124.5
94.3
57.9
3050REDW GT
1.03014.2
34.018.8R
2031DOWGTG 9
1.03014.2
79.6
-1.3
R
7185SCOTF ST
1.03514.3
68.139.9R
4185SCOTF GT
1.03514.3
70.237.6R
627AIR LIQC
1.03514.3
68.135.8R
10.7
10.75.2
5.2
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.032142.4
1.00
28
936808L_TAP
1.022141.1
67BRUDERH7
1.027141.8
24.721.9
14.720.0
314JOSEPH2
1.024141.3
0.99
826
-42.5-38.2
0.99
826
-42.6-38.3
391ALBCHEM7
1.027141.7
735SHELL TP
1.021140.9
952DIAM TAP
1.025141.4
43SCOT4_7
1.022141.1
19.0-11.9
-18.910.7
48.725.5
-16.2-16.6
-40.216.740.1
-39.316.9
-18.910.7-10.8
948808_BNDY
1.021140.9
59REDWATE7
1.014139.9
-9.9-1.3
-14.6
1420WEASEL1
1.018140.5
1.3-9.8-2.4
954ABEE_01
1.017140.3
-6.9-2.3
6.91.660
BEAMER 7
1.019140.6
734SHELL A1
1.020140.8
48DIAM SH7
1.025141.4
58FORT SA7
1.031142.3
185SCOT4_8
1.023141.2
628ALC SCOT
1.020140.8
394ASTOTIN
1.027141.8
821708ALTAP
1.022141.0
61DOW CHEM
1.034142.7
62SHERRIT7
1.031142.3
63LAMOURE7
1.033142.6
-7.0
-0.3-0.3
16.6
16.0
-106.4-34.6
35.9
0.30.1 -0.3
-30.0
51.1
-3.330.22.8
-31.75.3
-90.
612
.591
.0
-25.
59.
5
25.5-9.6
38.9 0.99
053
41.627.8
0.99
053
31.1
-54.1
54.113.7
18.9
-0.3
-51.0
50RIVERSID
1.022141.0
1.5-1.1
-16.7
39.3
49.7
393DOW HYD7
1.032142.5
922ROSS TAP
1.034142.6
40.6 6.7
-40.
5-6
.873
.42.
6
13.2
15.0
-13.
4
-41.25.6
45ROSS CRK
1.034142.6
-32.
2
-13.7
25.6
-41.9-39.4
9.9
-15.0
30.0
-14.2-18.7
14.218.6
-16.948.8
-8.4
-12.
0
-14.7-20.5
-34.5
-30.1
793SCORIA1
1.022141.0
21.511.1
-21.5-11.1
-22.4
2954ABEE_02
1.0174.2
6.92.0
18420WEASEL2
1.0344.3
2.90.7
10.75.2
2050GRANITE9
4.42.2
17.88.6
8.94.3
13.36.5
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.03014.8
51.5
454DOW GEN2
1.03014.8
51.5-2.1R
16.9R
2030DOWSTG 9
1.03015.1
37.4
6.9R
2836LAMONT_LV3
3836LAMONT_LV4
3835LAMONT_LV2
2835LAMONT_LV1
August 2016 P1381 807L Capacity Increase 28
File No. RP-05-1381
PROJECT 1381: SCENARIO 2017SP 1AALC03L (N-1)FIG B-25FRI, AUG 19 2016 15:34
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.8
443BANN_240
1.038249.2
109DEERLAN4
1.052252.4
771AMELIA1
1.039249.3
313JOSEPH1
1.032247.8
38.7-95.7
-38.6
57LAMOURE4
1.032247.6
-17.2-125.6
16.3
-8.2109.1
8.3-111.2
132.6
-132.2-62.0
-306.720.7
307.9-10.7
-99.3-47.6
99.445.3
125.7
94.5
57.8
3050REDW GT
1.03014.2
34.018.5R
2031DOWGTG 9
1.03014.2
79.6
-1.5
R
7185SCOTF ST
1.03514.3
68.140.3R
4185SCOTF GT
1.03514.3
70.238.0R
627AIR LIQC
1.03514.3
68.136.1R
10.7
10.75.2
5.2
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.032142.4
1.00
28
936808L_TAP
1.023141.1
67BRUDERH7
1.027141.8
23.721.5
15.320.2
314JOSEPH2
1.024141.3
0.99
826
-43.3-38.5
0.99
826
-43.4-38.7
391ALBCHEM7
1.027141.7
735SHELL TP
1.022141.0
952DIAM TAP
1.025141.4
43SCOT4_7
1.022141.0
18.3-12.1
-18.310.9
29.615.0
-17.5-16.7
-46.028.146.0
-45.028.2
-18.210.9-11.0
948808_BNDY
1.021140.9
59REDWATE7
1.014140.0
-9.9-1.3
-13.6
1420WEASEL1
1.019140.6
1.3-9.8-2.4
954ABEE_01
1.017140.4
-6.9-2.3
6.91.660
BEAMER 7
1.019140.7
734SHELL A1
1.022141.0
48DIAM SH7
1.025141.4
58FORT SA7
1.031142.3
185SCOT4_8
1.022141.1
628ALC SCOT
1.020140.8
394ASTOTIN
1.027141.8
821708ALTAP
1.023141.1
61DOW CHEM
1.034142.7
62SHERRIT7
1.031142.3
63LAMOURE7
1.033142.6
-8.9
-0.3-0.3
17.9
16.2
-52.0-28.9
41.7
0.30.1 -0.3
-28.4
48.5
-3.731.23.1
-7.0
-91.
112
.591
.5
-26.
39.
3
26.3-9.3
38.5 0.99
053
41.127.4
0.99
053
29.7
-54.9
55.013.9
18.2
-0.3
-48.4
50RIVERSID
1.023141.1
1.6-1.4
-28.1
44.9
47.2
393DOW HYD7
1.033142.5
922ROSS TAP
1.034142.7
40.4 6.5
-40.
4-6
.773
.12.
5
13.3
14.8
-13.
5
-40.95.8
45ROSS CRK
1.034142.7
-32.
2
-13.9
25.3
-41.7-39.1
9.9
-14.8
28.4
8.5-6.4
-8.56.4
-28.217.1
-8.4
-12.
0
-15.3-20.6
-38.0
-31.1
-54.4
793SCORIA1
1.022141.1
21.511.1
-21.5-11.1
-22.0
2954ABEE_02
1.0174.2
6.92.0
18420WEASEL2
1.0344.3
2.90.7
10.75.2
2050GRANITE9
4.42.2
17.88.6
8.94.3
13.36.5
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.03014.8
51.5
454DOW GEN2
1.03014.8
51.5-2.2R
16.9R
2030DOWSTG 9
1.03015.1
37.4
6.8R
2836LAMONT_LV3
3836LAMONT_LV4
3835LAMONT_LV2
2835LAMONT_LV1
August 2016 P1381 807L Capacity Increase 29
File No. RP-05-1381
PROJECT 1381: SCENARIO 2017SP 1AALC01L (N-1)FIG B-26FRI, AUG 19 2016 15:34
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.8
443BANN_240
1.039249.3
109DEERLAN4
1.052252.4
771AMELIA1
1.039249.3
313JOSEPH1
1.033247.8
38.8-95.3
-38.7
57LAMOURE4
1.032247.7
-18.4-125.4
17.6
-8.3108.7
8.4-110.8
132.6
-132.2-61.9
-306.720.9
307.9-10.9
-99.3-47.6
99.445.3
125.5
94.1
57.8
3050REDW GT
1.03014.2
34.018.6R
2031DOWGTG 9
1.03014.2
79.6
-1.5
R
7185SCOTF ST
1.03514.3
68.140.1R
4185SCOTF GT
1.03514.3
70.237.8R
627AIR LIQC
1.03514.3
68.136.9R
10.7
10.75.2
5.2
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.032142.4
1.00
28
936808L_TAP
1.023141.1
67BRUDERH7
1.028141.8
24.122.0
15.119.8
314JOSEPH2
1.024141.3
0.99
826
-43.1-37.7
0.99
826
-43.3-37.9
391ALBCHEM7
1.027141.8
735SHELL TP
1.021140.9
952DIAM TAP
1.025141.5
43SCOT4_7
1.023141.1
18.5-11.7
-18.510.5
35.026.5
-17.0-15.9
-38.824.938.8
-37.925.0
-18.410.5-10.6
948808_BNDY
1.021140.9
59REDWATE7
1.014139.9
-9.9-1.3
-14.0
1420WEASEL1
1.019140.6
1.3-9.8-2.4
954ABEE_01
1.017140.4
-6.9-2.3
6.91.660
BEAMER 7
1.019140.6
734SHELL A1
1.021140.9
48DIAM SH7
1.025141.5
58FORT SA7
1.031142.3
185SCOT4_8
1.023141.1
628ALC SCOT
1.019140.6
394ASTOTIN
1.028141.8
821708ALTAP
1.022141.1
61DOW CHEM
1.034142.7
62SHERRIT7
1.032142.3
63LAMOURE7
1.033142.6
-7.1
-0.3-0.3
17.4
15.3
-41.4-1.4
0.30.1 -0.3
-29.7
49.2
-3.230.92.7
-34.1
17.140.3
-90.
912
.891
.3
-26.
09.
8
26.0-9.8
38.5 0.99
053
41.227.7
0.99
053
31.0
-54.6
54.613.4
18.5
-0.3
-49.2
50RIVERSID
1.022141.1
1.6-1.3
-24.9
37.9
47.9
393DOW HYD7
1.033142.5
922ROSS TAP
1.034142.7
40.5 6.6
-40.
4-6
.873
.32.
6
13.2
14.9
-13.
4
-41.05.7
45ROSS CRK
1.034142.7
-32.
2
-13.4
25.5
-41.8-39.2
9.9
-14.9
29.7
2.1-19.6
-2.119.6
-24.9
-8.4
-12.
3
-15.1-20.2
-37.0
-30.8
-65.0
793SCORIA1
1.022141.1
21.511.1
-21.5-11.1
-22.5
2954ABEE_02
1.0174.2
6.92.0
18420WEASEL2
1.0344.3
2.90.7
10.75.2
2050GRANITE9
4.42.2
17.88.6
8.94.3
13.36.5
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.03014.8
51.5
454DOW GEN2
1.03014.8
51.5-2.2R
16.9R
2030DOWSTG 9
1.03015.1
37.4
6.8R
2836LAMONT_LV3
3836LAMONT_LV4
3835LAMONT_LV2
2835LAMONT_LV1
August 2016 P1381 807L Capacity Increase 30
File No. RP-05-1381
PROJECT 1381: SCENARIO 2017SP 1A706L (N-1)FIG B-27FRI, AUG 19 2016 15:34
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.7
443BANN_240
1.038249.2
109DEERLAN4
1.051252.3
771AMELIA1
1.038249.1
313JOSEPH1
1.032247.6
37.9-96.4
-37.9
57LAMOURE4
1.032247.6
-9.3-133.9
8.6
-7.5109.9
7.6-111.9
132.0
-131.7-61.5
-308.319.4
309.5-9.1
-98.7-47.2
98.944.9
134.0
95.2
57.3
3050REDW GT
1.03014.2
34.018.8R
2031DOWGTG 9
1.03014.2
79.6
-2.6
R
7185SCOTF ST
1.03514.3
68.141.1R
4185SCOTF GT
1.03514.3
70.238.8R
627AIR LIQC
1.03514.3
68.136.8R
10.7
10.75.2
5.2
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.031142.2
1.00
28
936808L_TAP
1.022141.0
67BRUDERH7
1.026141.6
23.721.8
16.721.0
314JOSEPH2
1.022141.0
0.99
826
-47.8-42.5
0.99
826
-47.9-42.7
391ALBCHEM7
1.026141.5
735SHELL TP
1.020140.8
952DIAM TAP
1.025141.4
43SCOT4_7
1.020140.8
17.0-12.9
-16.911.7
25.417.3
-40.926.640.9
-40.026.7
-16.911.7-11.8
948808_BNDY
1.020140.8
59REDWATE7
1.013139.8
-9.9-1.3
-13.6
1420WEASEL1
1.018140.4
1.3-9.8-2.4
954ABEE_01
1.016140.2
-6.9-2.3
6.91.660
BEAMER 7
1.018140.5
734SHELL A1
1.020140.7
48DIAM SH7
1.025141.4
58FORT SA7
1.034142.6
185SCOT4_8
1.021140.9
628ALC SCOT
1.019140.6
394ASTOTIN
1.026141.6
821708ALTAP
1.022141.0
61DOW CHEM
1.035142.9
62SHERRIT7
1.033142.6
63LAMOURE7
1.034142.7
-4.1
-57.7-21.7
24.3
0.30.1 -0.3
-33.0
55.7
-3.531.32.9
-15.7
-2.815.9
-85.
218
.585
.6
-16.
418
.2
16.4-18.3
35.1 0.99
053
37.523.9
0.99
053
34.4
-45.0
45.04.9
16.9
-0.3
-55.6
50RIVERSID
1.022141.0
1.5-1.1
-26.6
39.9
54.4
393DOW HYD7
1.034142.6
922ROSS TAP
1.035142.8
42.7 7.8
-42.
6-8
.076
.84.
5
12.0
17.1
-12.
2
-44.53.8
45ROSS CRK
1.035142.8
-32.
2
-4.9
22.0
-42.7-40.4
9.9
-17.1
33.1
5.6-13.5
-5.613.5
-26.719.8
-8.4
-18.
1
-16.6-21.4
-30.8
-31.1
-48.7
793SCORIA1
1.022141.0
21.511.1
-21.5-11.1
-22.2
2954ABEE_02
1.0164.2
6.92.0
18420WEASEL2
1.0334.3
2.90.7
10.75.2
2050GRANITE9
4.42.2
17.88.6
8.94.3
13.36.5
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.03014.8
51.5
454DOW GEN2
1.03014.8
51.5-2.6R
16.5R
2030DOWSTG 9
1.03015.1
37.4
6.1R
2836LAMONT_LV3
3836LAMONT_LV4
3835LAMONT_LV2
2835LAMONT_LV1
August 2016 P1381 807L Capacity Increase 31
File No. RP-05-1381
PROJECT 1381: SCENARIO 2017SP 1A707L (N-1)FIG B-28FRI, AUG 19 2016 15:34
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.7
443BANN_240
1.038249.2
109DEERLAN4
1.051252.4
771AMELIA1
1.038249.2
313JOSEPH1
1.032247.7
38.4-95.8
-38.3
57LAMOURE4
1.032247.6
-17.5-132.4
16.8
-7.9109.3
8.0-111.3
131.7
-131.4-62.2
-307.620.7
308.8-10.6
-98.4-47.9
98.545.5
132.5
94.6
58.0
3050REDW GT
1.03014.2
34.018.7R
2031DOWGTG 9
1.03014.2
79.6
-1.7
R
7185SCOTF ST
1.03514.3
68.140.4R
4185SCOTF GT
1.03514.3
70.238.1R
627AIR LIQC
1.03514.3
68.135.8R
10.7
10.75.2
5.2
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.031142.3
1.00
28
936808L_TAP
1.022141.1
67BRUDERH7
1.027141.7
23.621.9
16.219.9
314JOSEPH2
1.024141.3
0.99
826
-46.8-38.3
0.99
826
-47.0-38.4
391ALBCHEM7
1.027141.7
735SHELL TP
1.021140.9
952DIAM TAP
1.024141.4
43SCOT4_7
1.022141.0
17.4-11.8
-17.410.6
26.220.2
-4.0-17.7
-43.527.143.5
-42.527.1
-17.310.6-10.7
948808_BNDY
1.021140.9
59REDWATE7
1.014139.9
-9.9-1.3
-13.5
1420WEASEL1
1.018140.5
1.3-9.8-2.4
954ABEE_01
1.017140.3
-6.9-2.3
6.91.660
BEAMER 7
1.019140.6
734SHELL A1
1.021140.9
48DIAM SH7
1.024141.3
58FORT SA7
1.030142.1
185SCOT4_8
1.022141.1
628ALC SCOT
1.020140.8
394ASTOTIN
1.027141.7
821708ALTAP
1.022141.1
61DOW CHEM
1.034142.8
62SHERRIT7
1.030142.2
63LAMOURE7
1.033142.5
-10.0
-0.3-0.3
4.4
17.1
-57.2-18.4
26.2
0.30.1 -0.3
-27.0
54.1
-3.431.42.8
-17.7
-3.114.9
-97.
520
.1
97.6-19.9
33.9 0.99
053
36.228.0
0.99
053
28.3
-126.2
126.54.2
17.3
-0.3
-54.0
50RIVERSID
1.022141.1
1.6-1.2
-27.1
42.5
52.8
393DOW HYD7
1.032142.5
922ROSS TAP
1.034142.7
75.5 1.8
-75.
4-1
.612
9.5
-5.4
18.6
49.8
-18.
6
-97.014.6
45ROSS CRK
1.034142.7
-32.
2
-3.4
25.8
-41.7-39.8
9.9
-49.8
27.0
6.4-10.5
-6.410.5
-27.120.2
-8.4
-16.2-20.4
-32.6
-31.3
-49.2
793SCORIA1
1.022141.0
21.511.1
-21.5-11.1
-22.3
2954ABEE_02
1.0174.2
6.92.0
18420WEASEL2
1.0344.3
2.90.7
10.75.2
2050GRANITE9
4.42.2
17.88.6
8.94.3
13.36.5
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.03014.8
51.5
454DOW GEN2
1.03014.8
51.5-2.3R
16.8R
2030DOWSTG 9
1.03015.1
37.4
6.7R
2836LAMONT_LV3
3836LAMONT_LV4
3835LAMONT_LV2
2835LAMONT_LV1
August 2016 P1381 807L Capacity Increase 32
File No. RP-05-1381
PROJECT 1381: SCENARIO 2017SP 1A787L (N-1)FIG B-29FRI, AUG 19 2016 15:34
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.054252.9
443BANN_240
1.039249.4
109DEERLAN4
1.052252.6
771AMELIA1
1.039249.5
313JOSEPH1
1.033248.0
41.8-95.2
-41.8
57LAMOURE4
1.033247.9
-16.4-121.1
15.5
-11.3108.6
11.4-110.6
130.3
-130.0-61.6
-303.820.4
305.0-10.7
-97.0-47.3
97.145.0
121.2
93.9
57.3
3050REDW GT
1.03014.2
34.018.1R
2031DOWGTG 9
1.03014.2
79.6
-3.9
R
7185SCOTF ST
1.03514.3
68.139.9R
4185SCOTF GT
1.03514.3
70.237.6R
627AIR LIQC
1.03514.3
68.135.0R
10.7
10.75.2
5.2
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.032142.5
1.00
28
936808L_TAP
1.023141.2
67BRUDERH7
1.028141.9
22.821.9
14.220.2
314JOSEPH2
1.025141.4
0.99
826
-39.4-38.8
0.99
826
-39.6-38.9
391ALBCHEM7
1.028141.8
735SHELL TP
1.022141.1
952DIAM TAP
1.026141.5
43SCOT4_7
1.023141.1
19.4-12.0
-19.410.9
28.419.4
-26.0-15.6
-43.528.643.5
-42.428.7
-19.310.8-11.0
948808_BNDY
1.022141.0
59REDWATE7
1.015140.0
-9.9-1.3
-12.8
1420WEASEL1
1.019140.7
1.3-9.8-2.4
954ABEE_01
1.018140.5
-6.9-2.3
6.91.660
BEAMER 7
1.020140.8
734SHELL A1
1.022141.1
48DIAM SH7
1.026141.5
58FORT SA7
1.033142.6
185SCOT4_8
1.023141.2
628ALC SCOT
1.022141.0
394ASTOTIN
1.028141.9
821708ALTAP
1.023141.2
61DOW CHEM
1.037143.1
62SHERRIT7
1.033142.5
63LAMOURE7
1.035142.8
-7.5
-0.3-0.3
26.5
15.2
-55.3-18.4
26.2
0.30.1 -0.3
-29.5
49.6
-3.332.12.8
-16.7
-4.215.6
-128
.717
.512
9.5
-2.8
6.1
2.8-6.2
33.2 0.99
053
35.526.5
0.99
053
31.2
-31.4
31.416.9
19.3
-0.3
-49.6
50RIVERSID
1.023141.2
1.6-1.7
-28.6
42.4
48.3
393DOW HYD7
1.035142.8
922ROSS TAP
1.034142.7
75.6 7.2
-75.
4-7
.0
13.2
49.9
-13.
2
45ROSS CRK
1.034142.7
-17.0
24.4
-42.0-37.1
9.9
-49.8
29.5
9.5-12.2
-9.512.2
-28.621.3
-16.
2
-14.2-20.6
-37.8
-32.0
-51.1
793SCORIA1
1.023141.2
21.511.1
-21.5-11.1
-22.4
2954ABEE_02
1.0184.2
6.92.0
18420WEASEL2
1.0354.3
2.90.7
10.75.2
2050GRANITE9
4.42.2
17.88.6
8.94.3
13.36.5
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.03014.8
51.5
454DOW GEN2
1.03014.8
51.5-3.2R
16.0R
2030DOWSTG 9
1.03015.1
37.4
5.2R
2836LAMONT_LV3
3836LAMONT_LV4
3835LAMONT_LV2
2835LAMONT_LV1
August 2016 P1381 807L Capacity Increase 33
File No. RP-05-1381
PROJECT 1381: SCENARIO 2017SP 1A862L (N-1)FIG B-30FRI, AUG 19 2016 15:34
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.7
443BANN_240
1.038249.2
109DEERLAN4
1.052252.4
771AMELIA1
1.038249.2
313JOSEPH1
1.032247.7
38.7-95.7
-38.6
57LAMOURE4
1.032247.6
-17.8-124.7
16.9
-8.2109.2
8.3-111.2
132.7
-132.3-62.2
-306.620.7
307.8-10.6
-99.4-47.8
99.545.5
124.8
94.5
58.1
3050REDW GT
1.03014.2
34.018.7R
2031DOWGTG 9
1.03014.2
79.6
-2.1
R
7185SCOTF ST
1.03514.3
68.140.3R
4185SCOTF GT
1.03514.3
70.238.0R
627AIR LIQC
1.03514.3
68.135.7R
10.7
10.75.2
5.2
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.031142.3
1.00
28
936808L_TAP
1.022141.1
67BRUDERH7
1.027141.7
23.721.8
15.220.1
314JOSEPH2
1.024141.3
0.99
826
-42.8-38.3
0.99
826
-43.0-38.4
391ALBCHEM7
1.027141.7
735SHELL TP
1.021141.0
952DIAM TAP
1.025141.4
43SCOT4_7
1.022141.0
18.4-12.0
-18.410.8
29.019.4
-19.7-16.1
-43.229.043.2
-42.229.1
-18.310.7-10.9
948808_BNDY
1.021140.9
59REDWATE7
1.014139.9
-9.9-1.3
-13.7
1420WEASEL1
1.018140.5
1.3-9.8-2.4
954ABEE_01
1.017140.3
-6.9-2.3
6.91.660
BEAMER 7
1.019140.6
734SHELL A1
1.021140.9
48DIAM SH7
1.025141.4
58FORT SA7
1.031142.3
185SCOT4_8
1.022141.1
628ALC SCOT
1.021140.8
394ASTOTIN
1.027141.7
821708ALTAP
1.022141.1
61DOW CHEM
1.035142.8
62SHERRIT7
1.031142.3
63LAMOURE7
1.033142.5
-8.3
-0.3-0.3
20.1
15.6
-54.8-18.8
26.0
0.30.1 -0.3
-28.8
47.3
-3.431.22.9
-17.1
-4.615.2
-106
.512
.310
7.0
-14.
110
.2
14.1-10.2
39.1 0.99
053
41.828.2
0.99
053
29.9
-42.7
42.812.9
18.4
-0.3
-47.3
50RIVERSID
1.022141.1
1.6-1.2
-29.0
42.1
46.0
393DOW HYD7
1.031142.2
922ROSS TAP
1.034142.7
98.0
6.9
20.0
-25.
5-2
0.2
-65.61.6
45ROSS CRK
1.034142.7
-32.
2
-13.0
26.0
-41.8-39.0
9.9
25.6
28.8
10.3-11.4
-10.311.4
-29.021.6
-8.4
-11.
5
-15.2-20.5
-39.2
-31.1
-51.6
793SCORIA1
1.022141.0
21.511.1
-21.5-11.1
-22.2
2954ABEE_02
1.0174.2
6.92.0
18420WEASEL2
1.0344.3
2.90.7
10.75.2
2050GRANITE9
4.42.2
17.88.6
8.94.3
13.36.5
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.03014.8
51.5
454DOW GEN2
1.03014.8
51.5-2.4R
16.6R
2030DOWSTG 9
1.03015.1
37.4
6.4R
2836LAMONT_LV3
3836LAMONT_LV4
3835LAMONT_LV2
2835LAMONT_LV1
August 2016 P1381 807L Capacity Increase 34
File No. RP-05-1381
PROJECT 1381: SCENARIO 2017SP 1A861L (N-1)FIG B-31FRI, AUG 19 2016 15:34
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.8
443BANN_240
1.039249.2
109DEERLAN4
1.052252.4
771AMELIA1
1.039249.3
313JOSEPH1
1.032247.8
38.7-95.5
-38.6
57LAMOURE4
1.032247.7
-17.3-125.3
16.4
-8.2109.0
8.3-111.0
132.6
-132.3-61.9
-306.720.8
307.9-10.7
-99.3-47.5
99.445.2
125.4
94.3
57.7
3050REDW GT
1.03014.2
34.018.5R
2031DOWGTG 9
1.03014.2
79.6
-1.1
R
7185SCOTF ST
1.03514.3
68.140.2R
4185SCOTF GT
1.03514.3
70.237.9R
627AIR LIQC
1.03514.3
68.135.5R
10.7
10.75.2
5.2
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.032142.4
1.00
28
936808L_TAP
1.023141.1
67BRUDERH7
1.027141.8
23.721.7
15.320.1
314JOSEPH2
1.024141.3
0.99
826
-43.1-38.4
0.99
826
-43.3-38.5
391ALBCHEM7
1.027141.7
735SHELL TP
1.022141.0
952DIAM TAP
1.025141.4
43SCOT4_7
1.022141.0
18.4-12.0
-18.310.8
28.719.3
-18.3-15.7
-43.228.843.2
-42.128.9
-18.310.7-10.9
948808_BNDY
1.021140.9
59REDWATE7
1.014139.9
-9.9-1.3
-13.6
1420WEASEL1
1.019140.6
1.3-9.8-2.4
954ABEE_01
1.017140.4
-6.9-2.3
6.91.660
BEAMER 7
1.019140.7
734SHELL A1
1.022141.0
48DIAM SH7
1.025141.4
58FORT SA7
1.031142.3
185SCOT4_8
1.022141.1
628ALC SCOT
1.021140.9
394ASTOTIN
1.027141.8
821708ALTAP
1.023141.1
61DOW CHEM
1.034142.7
62SHERRIT7
1.031142.3
63LAMOURE7
1.034142.6
-7.8
-0.3-0.3
18.7
15.1
-55.0-18.8
26.0
0.30.1 -0.3
-29.4
48.1
-3.531.32.9
-16.9
-4.415.4
-96.
317
.996
.7
-22.
25.
2
22.2-5.3
38.7 0.99
053
41.427.2
0.99
053
30.7
-50.8
50.917.9
18.3
-0.3
-48.0
50RIVERSID
1.023141.1
1.6-1.4
-28.8
42.1
46.7
393DOW HYD7
1.031142.3
922ROSS TAP
1.034142.6
25.6
20.0
-25.
5-2
0.2
82.7
-4.9
-50.413.3
45ROSS CRK
1.034142.6
-32.
2
-17.9
25.1
-41.8-39.0
9.929
.4
9.9-11.8
-9.911.8
-28.821.5
-8.4
-17.
3
-15.3-20.5
-38.5
-31.1
-51.4
793SCORIA1
1.022141.1
21.511.1
-21.5-11.1
-22.2
2954ABEE_02
1.0174.2
6.92.0
18420WEASEL2
1.0344.3
2.90.7
10.75.2
2050GRANITE9
4.42.2
17.88.6
8.94.3
13.36.5
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.03014.8
51.5
454DOW GEN2
1.03014.8
51.5-2.0R
17.0R
2030DOWSTG 9
1.03015.1
37.4
7.1R
2836LAMONT_LV3
3836LAMONT_LV4
3835LAMONT_LV2
2835LAMONT_LV1
August 2016 P1381 807L Capacity Increase 35
File No. RP-05-1381
PROJECT 1381: SCENARIO 2017SP 1A781L (N-1)FIG B-32FRI, AUG 19 2016 15:34
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.8
443BANN_240
1.039249.3
109DEERLAN4
1.052252.4
771AMELIA1
1.039249.3
313JOSEPH1
1.032247.8
38.4-95.6
-38.4
57LAMOURE4
1.032247.7
-15.2-131.4
14.4
-7.9109.0
8.0-111.1
131.9
-131.5-61.6
-307.520.6
308.7-10.5
-98.6-47.3
98.745.0
131.5
94.4
57.4
3050REDW GT
1.03014.2
34.018.4R
2031DOWGTG 9
1.03014.2
79.6
-1.1
R
7185SCOTF ST
1.03514.3
68.140.4R
4185SCOTF GT
1.03514.3
70.238.1R
627AIR LIQC
1.03514.3
68.135.7R
10.7
10.75.2
5.2
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.032142.4
1.00
28
936808L_TAP
1.023141.1
67BRUDERH7
1.027141.8
23.621.7
16.220.2
314JOSEPH2
1.024141.3
0.99
826
-46.3-39.3
0.99
826
-46.5-39.5
391ALBCHEM7
1.027141.7
735SHELL TP
1.021140.9
952DIAM TAP
1.024141.3
43SCOT4_7
1.022141.0
17.5-12.1
-17.410.9
26.319.2
-5.4-13.0
-42.927.242.9
-41.827.2
-17.410.8-11.0
948808_BNDY
1.021140.9
59REDWATE7
1.014139.9
-9.9-1.3
-13.5
1420WEASEL1
1.019140.6
1.3-9.8-2.4
954ABEE_01
1.017140.4
-6.9-2.3
6.91.660
BEAMER 7
1.019140.7
734SHELL A1
1.021140.9
48DIAM SH7
1.024141.3
58FORT SA7
1.028141.9
185SCOT4_8
1.022141.1
628ALC SCOT
1.021140.8
394ASTOTIN
1.027141.8
821708ALTAP
1.023141.1
61DOW CHEM
1.034142.6
62SHERRIT7
1.027141.7
63LAMOURE7
1.034142.7
-7.6
-0.3-0.3
5.7
12.3
-57.1-19.2
25.7
0.30.1 -0.3
-29.6
53.9
-3.531.43.0
-16.8
-3.215.4
-128
.13.
612
8.8
28.6
23.2
-28.6-23.2
34.6 0.99
053
37.025.6
0.99
053
31.1
17.4
-0.3
-53.8
50RIVERSID
1.023141.1
1.6-1.4
-27.1
41.8
52.6
393DOW HYD7
1.033142.5
922ROSS TAP
1.034142.6
26.1 3.2
-26.
1-3
.450
.1-2
.8
16.5
0.5
-16.
8
-17.910.9
45ROSS CRK
1.034142.6
-32.
2
23.6
-41.9-39.7
9.9
-0.5
29.6
6.6-12.0
-6.611.9
-27.220.2
-8.4
-2.3
-16.1-20.6
-32.8
-31.3
-49.3
793SCORIA1
1.022141.1
21.511.1
-21.5-11.1
-22.2
2954ABEE_02
1.0174.2
6.92.0
18420WEASEL2
1.0344.3
2.90.7
10.75.2
2050GRANITE9
4.42.2
17.88.6
8.94.3
13.36.5
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.03014.8
51.5
454DOW GEN2
1.03014.8
51.5-2.0R
17.0R
2030DOWSTG 9
1.03015.1
37.4
7.1R
2836LAMONT_LV3
3836LAMONT_LV4
3835LAMONT_LV2
2835LAMONT_LV1
August 2016 P1381 807L Capacity Increase 36
File No. RP-05-1381
PROJECT 1381: SCENARIO 2017SP 1A709L (N-1)FIG B-33FRI, AUG 19 2016 15:35
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.8
443BANN_240
1.038249.2
109DEERLAN4
1.052252.4
771AMELIA1
1.039249.3
313JOSEPH1
1.032247.8
38.5-95.6
-38.5
57LAMOURE4
1.032247.6
-18.0-128.7
17.2
-8.0109.0
8.2-111.0
132.2
-131.8-62.0
-307.120.9
308.3-10.8
-98.9-47.7
99.045.4
128.8
94.3
57.9
3050REDW GT
1.03014.2
34.018.5R
2031DOWGTG 9
1.03014.2
79.6
-1.5
R
7185SCOTF ST
1.03514.3
68.140.2R
4185SCOTF GT
1.03514.3
70.237.9R
627AIR LIQC
1.03514.3
68.135.5R
10.7
10.75.2
5.2
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.032142.4
1.00
28
936808L_TAP
1.023141.1
67BRUDERH7
1.027141.8
23.621.8
15.719.9
314JOSEPH2
1.024141.3
0.99
826
-44.9-38.0
0.99
826
-45.0-38.1
391ALBCHEM7
1.027141.7
735SHELL TP
1.022141.0
952DIAM TAP
1.025141.4
43SCOT4_7
1.022141.0
17.9-11.8
-17.910.6
27.620.0
-11.6-18.3
-43.628.043.6
-42.628.1
-17.810.6-10.7
948808_BNDY
1.021140.9
59REDWATE7
1.014139.9
-9.9-1.3
-13.6
1420WEASEL1
1.019140.6
1.3-9.8-2.4
954ABEE_01
1.017140.4
-6.9-2.3
6.91.660
BEAMER 7
1.019140.7
734SHELL A1
1.022141.0
48DIAM SH7
1.025141.4
58FORT SA7
1.031142.3
185SCOT4_8
1.023141.1
628ALC SCOT
1.021140.9
394ASTOTIN
1.027141.8
821708ALTAP
1.022141.1
61DOW CHEM
1.034142.7
62SHERRIT7
1.031142.3
63LAMOURE7
1.033142.6
-9.3
-0.3-0.3
12.0
17.7
-56.0-18.3
26.3
0.30.1 -0.3
-27.7
50.8
-3.431.32.9
-17.5
-3.815.1
-108
.819
.310
9.3
36.4 0.99
053
38.927.9
0.99
053
29.1
-28.6
28.623.1
17.8
-0.3
-50.8
50RIVERSID
1.022141.1
1.6-1.3
-28.0
42.6
49.5
393DOW HYD7
1.032142.5
922ROSS TAP
1.034142.7
33.6 9.0
-33.
5-9
.262
.26.
5
10.7
8.0
-11.
0
-29.91.7
45ROSS CRK
1.034142.7
-32.
2
-23.2
25.7
-41.7-39.4
9.9
-8.0
27.7
8.3-11.0
-8.310.9
-28.120.9
-8.4
-18.
4
-15.7-20.3
-35.8
-31.2
-50.4
793SCORIA1
1.022141.1
21.511.1
-21.5-11.1
-22.2
2954ABEE_02
1.0174.2
6.92.0
18420WEASEL2
1.0344.3
2.90.7
10.75.2
2050GRANITE9
4.42.2
17.88.6
8.94.3
13.36.5
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.03014.8
51.5
454DOW GEN2
1.03014.8
51.5-2.2R
16.9R
2030DOWSTG 9
1.03015.1
37.4
6.8R
2836LAMONT_LV3
3836LAMONT_LV4
3835LAMONT_LV2
2835LAMONT_LV1
August 2016 P1381 807L Capacity Increase 37
File No. RP-05-1381
PROJECT 1381: SCENARIO 2017SP 1A694L (N-1)FIG B-34FRI, AUG 19 2016 15:35
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.7
443BANN_240
1.038249.2
109DEERLAN4
1.052252.4
771AMELIA1
1.039249.3
313JOSEPH1
1.032247.7
41.6-95.8
-41.5
57LAMOURE4
1.032247.6
-16.6-119.2
15.7
-11.1109.2
11.2-111.2
130.1
-129.8-62.1
-302.620.1
303.7-10.5
-96.9-47.9
97.045.5
119.3
94.6
57.9
3050REDW GT
1.03014.2
34.018.6R
2031DOWGTG 9
1.03014.2
79.6
-1.5
R
7185SCOTF ST
1.03514.3
68.140.4R
4185SCOTF GT
1.03514.3
70.238.1R
627AIR LIQC
1.03514.3
68.135.7R
10.7
10.75.2
5.2
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.031142.3
1.00
28
936808L_TAP
1.022141.1
67BRUDERH7
1.027141.7
22.722.1
14.120.3
314JOSEPH2
1.024141.3
0.99
826
-38.6-39.0
0.99
826
-38.8-39.1
391ALBCHEM7
1.027141.7
735SHELL TP
1.021141.0
952DIAM TAP
1.025141.4
43SCOT4_7
1.022141.0
19.5-12.2
-19.511.0
28.119.4
-27.0-14.2
-43.128.443.1
-42.128.5
-19.410.9-11.1
948808_BNDY
1.021140.9
59REDWATE7
1.014139.9
-9.9-1.3
-12.6
1420WEASEL1
1.018140.5
1.3-9.8-2.4
954ABEE_01
1.017140.3
-6.9-2.3
6.91.660
BEAMER 7
1.019140.6
734SHELL A1
1.021140.9
48DIAM SH7
1.025141.4
58FORT SA7
1.032142.4
185SCOT4_8
1.022141.1
628ALC SCOT
1.021140.8
394ASTOTIN
1.027141.7
821708ALTAP
1.022141.1
61DOW CHEM
1.034142.7
62SHERRIT7
1.032142.4
63LAMOURE7
1.033142.6
-8.1
-0.3-0.3
27.5
13.8
-55.6-19.0
25.9
0.30.1 -0.3
-28.8
50.5
-3.132.32.6
-17.0
-4.115.3
-77.
710
.378
.0
-2.7
6.2
2.7-6.2
30.7 0.99
053
32.827.5
0.99
053
30.1
-31.3
31.316.9
19.4
-0.3
-50.4
50RIVERSID
1.022141.1
1.6-1.3
-28.4
42.0
49.2
393DOW HYD7
1.033142.5
922ROSS TAP
1.034142.7
45.6 5.8
-45.
5-5
.981
.51.
2
14.1
20.0
-14.
3
-49.17.2
45ROSS CRK
1.034142.7
-32.
2
-17.0
25.3
-42.3-36.8
9.9
-20.0
28.8
9.1-11.6
-9.111.6
-28.421.2
-8.4
-10.
0
-14.1-20.7
-37.1
-32.1
-50.9
793SCORIA1
1.022141.1
21.511.1
-21.5-11.1
-22.5
2954ABEE_02
1.0174.2
6.92.0
18420WEASEL2
1.0344.3
2.90.7
10.75.2
2050GRANITE9
4.42.2
17.88.6
8.94.3
13.36.5
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.03014.8
51.5
454DOW GEN2
1.03014.8
51.5-2.2R
16.9R
2030DOWSTG 9
1.03015.1
37.4
6.8R
2836LAMONT_LV3
3836LAMONT_LV4
3835LAMONT_LV2
2835LAMONT_LV1
August 2016 P1381 807L Capacity Increase 38
File No. RP-05-1381
PROJECT 1381: SCENARIO 2017SP 1A700L (N-1)FIG B-35FRI, AUG 19 2016 15:35
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.7
443BANN_240
1.038249.2
109DEERLAN4
1.052252.4
771AMELIA1
1.038249.2
313JOSEPH1
1.032247.7
40.7-95.9
-40.6
57LAMOURE4
1.032247.6
-16.4-121.4
15.5
-10.2109.4
10.3-111.4
130.9
-130.5-62.3
-303.920.0
305.1-10.3
-97.6-48.0
97.745.6
121.5
94.7
58.1
3050REDW GT
1.03014.2
34.018.7R
2031DOWGTG 9
1.03014.2
79.6
-1.1
R
7185SCOTF ST
1.03514.3
68.140.4R
4185SCOTF GT
1.03514.3
70.238.1R
627AIR LIQC
1.03514.3
68.135.8R
10.7
10.75.2
5.2
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.031142.3
1.00
28
936808L_TAP
1.022141.1
67BRUDERH7
1.027141.7
23.022.0
14.520.3
314JOSEPH2
1.023141.2
0.99
826
-40.2-39.1
0.99
826
-40.3-39.2
391ALBCHEM7
1.027141.7
735SHELL TP
1.021140.9
952DIAM TAP
1.024141.4
43SCOT4_7
1.022141.0
19.1-12.2
-19.111.0
28.219.4
-23.9-13.9
-43.028.543.0
-42.028.5
-19.011.0-11.1
948808_BNDY
1.021140.9
59REDWATE7
1.014139.9
-9.9-1.3
-12.9
1420WEASEL1
1.018140.5
1.3-9.8-2.4
954ABEE_01
1.017140.3
-6.9-2.3
6.91.660
BEAMER 7
1.019140.6
734SHELL A1
1.021140.9
48DIAM SH7
1.024141.4
58FORT SA7
1.031142.3
185SCOT4_8
1.022141.0
628ALC SCOT
1.020140.8
394ASTOTIN
1.027141.7
821708ALTAP
1.022141.1
61DOW CHEM
1.034142.7
62SHERRIT7
1.031142.3
63LAMOURE7
1.033142.5
-8.2
-0.3-0.3
24.3
13.4
-55.4-19.0
25.9
0.30.1 -0.3
-28.6
49.8
-3.231.92.7
-17.1
-4.215.2
-82.
29.
382
.5
-10.
54.
7
10.5-4.8
33.1 0.99
053
35.428.2
0.99
053
29.8
-39.0
39.118.4
19.0
-0.3
-49.8
50RIVERSID
1.022141.0
1.6-1.2
-28.5
42.0
48.5
393DOW HYD7
1.032142.4
922ROSS TAP
1.033142.6
43.9 5.7
-43.
8-5
.878
.71.
1
14.2
18.3
-14.
4
-46.47.3
45ROSS CRK
1.033142.6
-32.
2
-18.4
26.0
-42.3-37.6
9.9
-18.3
28.6
9.3-11.4
-9.311.4
-28.521.2
-8.4
-8.9
-14.5-20.7
-37.4
-31.8
-51.0
793SCORIA1
1.022141.0
21.511.1
-21.5-11.1
-22.5
2954ABEE_02
1.0174.2
6.92.0
18420WEASEL2
1.0344.3
2.90.7
10.75.2
2050GRANITE9
4.42.2
17.88.6
8.94.3
13.36.5
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.03014.8
51.5
454DOW GEN2
1.03014.8
51.5-2.0R
17.0R
2030DOWSTG 9
1.03015.1
37.4
7.1R
2836LAMONT_LV3
3836LAMONT_LV4
3835LAMONT_LV2
2835LAMONT_LV1
August 2016 P1381 807L Capacity Increase 39
File No. RP-05-1381
Attachment C 2020SP Power Flow Diagrams
August 2016 P1381 807L Capacity Increase 40
File No. RP-05-1381
Table C-1: 2020SP Contingency Lists
Figure # Scenario Condition
C-1 20_1a Base Case (N-0) C-2 20_1a 942L (N-1) 71S Lamoureux to 681S Bannerman C-3 20_1a 1061L (N-1) 681S Bannerman to 12S Heartland C-4 20_1a 997L (N-1) 71S Lamoureux to 410S Josephburg C-5 20_1a 1120L (N-1) 410S Josephburg to 108S Amelia C-6 20_1a 943L (N-1) 13S Deerland to 108S Amelia C-7 20_1a 1054L (N-1) 12S Heartland to 13S Deerland C-8 20_1a 9L960 (N-1) 13S Deerland to 825S Whitefish Lake C-9 20_1a 9L961 (N-1) 13S Deerland to 825S Whitefish Lake C-10 20_1a 920L (N-1) 71S Lamoureux to 557S Castle Downs C-11 20_1a 921L (N-1) 71S Lamoureux to 987S Clover Bar C-12 20_1a 708L (N-1) 233S Beamer to 71S Lamoureux C-13 20_1a 807L (N-1) 410S Josephburg to 233S Beamer C-14 20_1a 735L (N-1) 233S Beamer to 171S Redwater C-15 20_1a 808L (N-1) 171S Redwater to 13S Deerland C-16 20_1a 621L (N-1) 13S Deerland to 109S Skaro C-17 20_1a 815L (N-1) 13S Deerland to 127S Bruderheim C-18 20_1a 846L (N-1) 127S Bruderheim C-19 20_1a 773L (N-1) 127S Bruderheim to 308S Albchem Beaverhill Creek C-20 20_1a 776L (N-1) 410S Josephburg to 308S Albchem Beaverhill Creek C-21 20_1a 856L (N-1) 410S Josephburg to 409S Shell Scotford C-22 20_1a 857L (N-1) 410S Josephburg to 409S Shell Scotford C-23 20_1a ALCO2L (N-1) 879S Scotford Upgrader to 409S Shell Scotford C-24 20_1a EXI-01L (N-1) 879S Scotford Upgrader to 402S Scotford Expansion 1 C-25 20_1a ALC03L (N-1) 402S Scotford Expansion 1 to Air Liquide C-26 20_1a ALC01L (N-1) Air Liquide to 409S Shell Scotford C-27 20_1a 706L (N-1) 410S Josephburg to 54S Fort Saskatchewan C-28 20_1a 707L (N-1) 233S Beamer to 71S Lamoureux C-29 20_1a 787L (N-1) 71S Lamoureux to 166S Dow Chemical C-30 20_1a 862L (N-1) 166S Dow Chemical to 258S Dow HydroCarbons C-31 20_1a 861L (N-1) 71S Lamoureux to 258S Dow HydroCarbons C-32 20_1a 781L (N-1) 172S Sherritt to 71S Lamoureux C-33 20_1a 709L (N-1) 233S Beamer to 71S Lamoureux C-34 20_1a 694L (N-1) 54S Fort Saskatchewan to 422S Westwood C-35 20_1a 700L (N-1) 422S Westwood to 746S Sherwood Park
August 2016 P1381 807L Capacity Increase 41
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1ABASE CASE (N-0)FIG C-1FRI, AUG 19 2016 15:35
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.037249.0
443BANN_240
1.017244.0
109DEERLAN4
1.033247.9
771AMELIA1
1.014243.4
313JOSEPH1
1.005241.2
-7.5-129.8
7.6
57LAMOURE4
1.007241.7
21.1-67.8-22.6
44.9149.8
-44.6-150.2
157.6
-157.1-86.1
-272.9-0.5
273.97.9
-118.4-67.7
118.566.5
67.8
129.2
84.7
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-3.8
R
7185SCOTF ST
1.03014.2
68.132.9R
4185SCOTF GT
1.03014.2
70.230.4R
627AIR LIQC
1.03014.2
68.124.0R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.043143.9
0.97
5
936808L_TAP
1.033142.5
67BRUDERH7
1.038143.2
33.821.5
30.018.7
314JOSEPH2
1.036143.0
0.95
-73.0-83.2
0.95
-73.3-83.4
391ALBCHEM7
1.038143.2
735SHELL TP
1.032142.4
952DIAM TAP
1.036142.9
43SCOT4_7
1.033142.6
12.3-7.8
-12.36.5
43.435.6
2.97.1
-66.543.866.7
-64.943.8
-12.36.4-6.6
948808_BNDY
1.031142.3
59REDWATE7
1.023141.1
-9.9-1.0
-23.6
1420WEASEL1
1.029142.0
1.0-9.8-2.1
954ABEE_01
1.027141.8
-6.9-2.1
6.91.460
BEAMER 7
1.027141.7
734SHELL A1
1.032142.4
48DIAM SH7
1.036142.9
58FORT SA7
1.033142.6
185SCOT4_8
1.033142.6
628ALC SCOT
1.031142.3
394ASTOTIN
1.038143.2
821708ALTAP
1.028141.9
61DOW CHEM
1.037143.1
62SHERRIT7
1.034142.7
63LAMOURE7
1.038143.3
-27.3
-0.3-0.3
-2.6
-7.8
-44.22.4
42.1
0.40.1 -0.3
-9.1
14.6
-4.222.23.5
-22.6
-5.817.5
-91.
14.
691
.5
-30.
5-1
7.8
30.617.7
55.9 0.97
83
63.9103.3
0.94
161
27.8
-62.5
62.744.1
12.3
-0.4
-14.6
50RIVERSID
1.027141.8
-35.9-18.9
-43.7
65.0
50.8
393DOW HYD7
1.036143.0
922ROSS TAP
1.037143.1
39.0
-3.7
-38.
93.
673
.0-1
4.6
26.4
10.0
-26.
6
-35.124.7
45ROSS CRK
1.037143.1
-37.
8
-43.9
-26.6
-40.2-63.9
9.9
-9.9
8.9
19.6-8.2
-19.68.1
-43.831.3
-10.
1
-4.0
-30.0-19.0
-62.7
-22.1
-59.3
793SCORIA1
1.027141.8
23.912.3
-23.9-12.4
-22.1
2954ABEE_02
1.0294.3
996.91.9
18420WEASEL2
1.0454.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.8R
9.2R
2030DOWSTG 9
1.03015.1
37.4
5.2R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3
G4
2835LAMONT_LV1
3835LAMONT_LV2
71.528.8R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 42
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A942L (N-1)FIG C-2FRI, AUG 19 2016 15:35
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.047251.3
443BANN_240
1.043250.4
109DEERLAN4
1.035248.5
771AMELIA1
1.013243.1
313JOSEPH1
1.002240.5
-57.1-153.7
57.3
57LAMOURE4
1.001240.3
-10.0-14.8
8.2
94.7176.3
-94.3-174.8
38.5
-38.5-19.6
-338.8-34.3
340.348.5
14.8
153.8
11.6
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-0.9
R
7185SCOTF ST
1.03014.2
68.134.2R
4185SCOTF GT
1.03014.2
70.231.7R
627AIR LIQC
1.03014.2
68.125.9R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.043144.0
0.97
5
936808L_TAP
1.032142.4
67BRUDERH7
1.038143.2
39.323.0
37.021.6
314JOSEPH2
1.033142.6
0.95
-71.3-80.7
0.95
-71.6-80.9
391ALBCHEM7
1.037143.1
735SHELL TP
1.029142.1
952DIAM TAP
1.033142.5
43SCOT4_7
1.030142.2
5.4-10.7
-5.49.3
43.335.1
6.88.0
-65.243.765.4
-63.743.8
-5.39.3-9.4
948808_BNDY
1.031142.3
59REDWATE7
1.021140.9
-9.9-1.0
-29.0
1420WEASEL1
1.028141.9
1.0-9.8-2.1
954ABEE_01
1.027141.7
-6.9-2.1
6.91.460
BEAMER 7
1.024141.3
734SHELL A1
1.029142.1
48DIAM SH7
1.033142.5
58FORT SA7
1.030142.1
185SCOT4_8
1.031142.2
628ALC SCOT
1.029141.9
394ASTOTIN
1.038143.2
821708ALTAP
1.025141.4
61DOW CHEM
1.034142.6
62SHERRIT7
1.031142.2
63LAMOURE7
1.034142.8
-28.2
-0.3-0.3
-6.5
-8.7
-44.30.7
41.2
0.40.1 -0.3
-6.8
9.5
-2.916.82.2
-23.3
-5.816.7
-88.
83.
189
.2
-26.
0-1
5.1
26.015.0
47.2 0.97
83
54.295.7
0.94
161
25.4
-58.0
58.141.3
5.3
-0.4
-9.5
50RIVERSID
1.024141.4
-35.9-18.9
-43.7
63.8
45.6
393DOW HYD7
1.033142.5
922ROSS TAP
1.033142.6
39.9
-1.5
-39.
81.
374
.4-1
1.0
24.2
10.8
-24.
4
-36.521.1
45ROSS CRK
1.033142.6
-37.
8
-41.2
-32.2
-44.6-76.3
9.9
-10.8
6.6
19.5-6.8
-19.56.7
-43.731.3
-10.
1
-2.7
-36.9-21.9
-62.5
-16.7
-59.2
793SCORIA1
1.024141.3
23.912.3
-23.9-12.4
-23.3
2954ABEE_02
1.0284.3
996.91.9
18420WEASEL2
1.0444.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-8.6R
10.3R
2030DOWSTG 9
1.03015.1
37.4
7.2R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3
G4
2835LAMONT_LV1
3835LAMONT_LV2
71.530.5R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 43
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A1061L (N-1)FIG C-3FRI, AUG 19 2016 15:35
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.048251.6
443BANN_240
0.997239.2
109DEERLAN4
1.035248.4
771AMELIA1
1.012242.9
313JOSEPH1
1.001240.1
-73.0-157.6
73.1
57LAMOURE4
0.999239.9
-16.52.2
14.7
110.6181.0
-110.2-178.9
-359.5-39.5
361.256.2
38.516.5
-38.5-19.7
-2.2
157.9
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
0.2R
7185SCOTF ST
1.03014.2
68.134.8R
4185SCOTF GT
1.03014.2
70.232.2R
627AIR LIQC
1.03014.2
68.126.7R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.043143.9
0.97
5
936808L_TAP
1.031142.3
67BRUDERH7
1.037143.1
41.023.1
39.222.0
314JOSEPH2
1.032142.4
0.95
-70.8-79.8
0.95
-71.0-80.0
391ALBCHEM7
1.037143.0
735SHELL TP
1.028141.9
952DIAM TAP
1.032142.4
43SCOT4_7
1.029142.0
3.2-11.1
-3.29.7
43.234.9
7.98.0
-64.643.764.8
-63.143.8
-3.29.6-9.8
948808_BNDY
1.030142.2
59REDWATE7
1.020140.8
-9.9-1.0
-30.6
1420WEASEL1
1.028141.8
1.0-9.8-2.1
954ABEE_01
1.026141.6
-6.9-2.1
6.91.460
BEAMER 7
1.023141.2
734SHELL A1
1.028141.9
48DIAM SH7
1.032142.4
58FORT SA7
1.029141.9
185SCOT4_8
1.029142.1
628ALC SCOT
1.027141.8
394ASTOTIN
1.037143.1
821708ALTAP
1.024141.3
61DOW CHEM
1.032142.4
62SHERRIT7
1.029142.0
63LAMOURE7
1.033142.6
-28.6
-0.3-0.3
-7.6
-8.7
-44.3-0.1
40.7
0.40.1 -0.3
-6.5
8.0
-2.915.22.2
-23.5
-5.816.4
-88.
12.
488
.5
-24.
6-1
4.4
24.614.4
44.4 0.97
83
51.193.6
0.94
161
25.1
-56.6
56.740.6
3.2
-0.4
-8.0
50RIVERSID
1.023141.2
-35.9-18.9
-43.7
63.2
44.1
393DOW HYD7
1.031142.3
922ROSS TAP
1.032142.4
40.1
-0.7
-40.
10.
574
.9-9
.8
23.4
11.1
-23.
6
-37.019.8
45ROSS CRK
1.032142.4
-37.
8
-40.5
-33.6
-45.1-80.1
9.9
-11.1
6.3
19.4-6.2
-19.46.2
-43.731.3
-10.
1
-2.0
-39.1-22.2
-62.4
-15.1
-59.2
793SCORIA1
1.023141.2
23.912.3
-23.9-12.4
-23.3
2954ABEE_02
1.0284.3
996.91.9
18420WEASEL2
1.0444.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-8.1R
10.7R
2030DOWSTG 9
1.03015.1
37.4
8.0R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3
G4
2835LAMONT_LV1
3835LAMONT_LV2
71.531.3R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 44
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A997L (N-1)FIG C-4FRI, AUG 19 2016 15:35
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.037248.8
443BANN_240
1.018244.2
109DEERLAN4
1.030247.3
771AMELIA1
1.010242.5
313JOSEPH1
1.000240.1
-37.9-137.5
38.0
57LAMOURE4
1.009242.1
75.4158.6
-75.1-158.2
140.4
-139.9-80.3
-298.6-7.7
299.817.6
-101.3-62.5
101.460.6
137.1
77.6
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-4.2
R
7185SCOTF ST
1.03014.2
68.134.5R
4185SCOTF GT
1.03014.2
70.232.0R
627AIR LIQC
1.03014.2
68.126.3R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.040143.5
0.97
5
936808L_TAP
1.030142.1
67BRUDERH7
1.035142.8
32.821.3
31.619.2
314JOSEPH2
1.033142.5
0.95
-54.4-77.7
0.95
-54.6-78.0
391ALBCHEM7
1.035142.8
735SHELL TP
1.029142.0
952DIAM TAP
1.033142.5
43SCOT4_7
1.030142.1
10.7-8.3
-10.77.0
36.733.4
-17.25.0
-63.539.363.6
-62.039.4
-10.76.9-7.1
948808_BNDY
1.029142.0
59REDWATE7
1.020140.8
-9.9-1.0
-22.6
1420WEASEL1
1.026141.6
1.0-9.8-2.1
954ABEE_01
1.025141.4
-6.9-2.1
6.91.460
BEAMER 7
1.025141.4
734SHELL A1
1.029142.0
48DIAM SH7
1.033142.5
58FORT SA7
1.033142.6
185SCOT4_8
1.030142.1
628ALC SCOT
1.028141.9
394ASTOTIN
1.035142.8
821708ALTAP
1.026141.6
61DOW CHEM
1.037143.1
62SHERRIT7
1.035142.8
63LAMOURE7
1.039143.4
-24.1
-0.3-0.3
17.6
-5.6
-49.8-1.5
39.9
0.40.1 -0.3
-12.5
31.2
-4.423.23.8
-21.6
-2.417.7
-97.
44.
197
.8
-41.
5-1
9.6
41.519.6
70.3 0.97
83
79.9108.4
0.94
161
31.8
-73.5
73.746.0
10.7
-0.4
-31.2
50RIVERSID
1.026141.6
-35.9-18.9
-39.3
62.0
67.5
393DOW HYD7
1.037143.1
922ROSS TAP
1.037143.1
36.6
-4.3
-36.
54.
169
.1-1
5.5
26.9
7.6
-27.
1
-31.225.5
45ROSS CRK
1.037143.1
-37.
8
-45.7
-22.6
-40.4-64.4
9.9
-7.5
12.4
10.7-9.3
-10.69.3
-39.428.0
-10.
1
-3.4
-31.6-19.5
-47.2
-23.1
-53.7
793SCORIA1
1.026141.5
23.912.3
-23.9-12.4
-21.8
2954ABEE_02
1.0264.3
996.91.9
18420WEASEL2
1.0424.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.9R
9.1R
2030DOWSTG 9
1.03015.1
37.4
5.0R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3
G4
2835LAMONT_LV1
3835LAMONT_LV2
71.531.4R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 45
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A1120L (N-1)FIG C-5FRI, AUG 19 2016 15:35
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.046251.0
443BANN_240
1.016243.9
109DEERLAN4
1.055253.1
771AMELIA1
1.052252.5
313JOSEPH1
0.994238.5
57LAMOURE4
1.002240.4
98.1-70.1-98.9
37.117.5
-37.0-20.8
159.5
-158.8-127.0
-274.975.8
276.0-67.9
-120.0-107.6
120.3107.3
70.2
127.4
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-0.5
R
7185SCOTF ST
1.03014.2
68.135.6R
4185SCOTF GT
1.03014.2
70.233.1R
627AIR LIQC
1.03014.2
68.127.9R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.052145.1
0.97
5
936808L_TAP
1.037143.1
67BRUDERH7
1.043143.9
37.634.9
32.139.5
314JOSEPH2
1.030142.2
0.95
-70.4-60.1
0.95
-70.7-60.3
391ALBCHEM7
1.042143.7
735SHELL TP
1.027141.7
952DIAM TAP
1.030142.1
43SCOT4_7
1.028141.8
10.4-28.1
-10.327.1
41.928.7
2.42.1
-59.643.259.7
-58.143.2
-10.327.1-27.2
948808_BNDY
1.036143.0
59REDWATE7
1.023141.2
-9.9-1.0
-27.2
1420WEASEL1
1.034142.6
1.0-9.8-2.1
954ABEE_01
1.032142.5
-6.9-2.1
6.91.360
BEAMER 7
1.023141.2
734SHELL A1
1.027141.7
48DIAM SH7
1.030142.1
58FORT SA7
1.029142.0
185SCOT4_8
1.028141.8
628ALC SCOT
1.026141.6
394ASTOTIN
1.043143.9
821708ALTAP
1.024141.3
61DOW CHEM
1.033142.6
62SHERRIT7
1.030142.2
63LAMOURE7
1.034142.7
-15.0
-0.3-0.3
-2.1
-2.8
-45.0-6.3
37.0
0.40.1 -0.3
-8.5
13.8
8.718.6-9.4
-18.7
-5.319.1
-91.
51.
491
.8
-30.
5-1
7.7
30.517.7
55.5 0.97
83
63.497.8
0.94
161
27.2
-62.5
62.644.0
10.3
-0.4
-13.8
50RIVERSID
1.023141.2
-35.9-18.9
-43.1
58.2
50.0
393DOW HYD7
1.032142.5
922ROSS TAP
1.033142.6
38.8
-1.8
-38.
81.
772
.8-1
1.6
24.5
9.8
-24.
7
-34.921.6
45ROSS CRK
1.033142.6
-37.
8
-43.9
-30.4
-74.4-69.6
9.9
-9.8
8.3
18.3-13.6
-18.313.6
-43.130.9
-10.
1
-0.8
-31.9-39.7
-60.0
-18.6
-58.5
793SCORIA1
1.023141.2
23.912.3
-23.9-12.4
-34.9
2954ABEE_02
1.0344.3
996.91.9
18420WEASEL2
1.0504.4
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-8.5R
10.4R
2030DOWSTG 9
1.03015.1
37.4
7.5R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3
G4
2835LAMONT_LV1
3835LAMONT_LV2
71.535.1R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 46
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A943L (N-1)FIG C-6FRI, AUG 19 2016 15:35
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.047251.3
443BANN_240
1.016243.8
109DEERLAN4
1.058253.9
771AMELIA1
0.990237.6
313JOSEPH1
0.992238.0
37.119.5
-37.1
57LAMOURE4
1.000240.1
109.7-94.4
-110.0
172.4
-171.6-132.9
-254.085.5
254.9-79.2
-132.8-113.0
133.1113.3
94.5
-21.2
134.6
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
0.3R
7185SCOTF ST
1.03014.2
68.136.3R
4185SCOTF GT
1.03014.2
70.233.8R
627AIR LIQC
1.03014.2
68.128.9R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.053145.3
0.97
5
936808L_TAP
1.038143.3
67BRUDERH7
1.044144.1
42.236.1
38.742.4
314JOSEPH2
1.029142.0
0.95
-64.1-56.8
0.95
-64.3-57.0
391ALBCHEM7
1.042143.8
735SHELL TP
1.025141.5
952DIAM TAP
1.029142.0
43SCOT4_7
1.026141.6
3.9-30.9
-3.829.8
40.027.8
0.71.4
-58.441.958.5
-56.941.9
-3.729.8-30.0
948808_BNDY
1.037143.1
59REDWATE7
1.023141.2
-9.9-1.0
-31.7
1420WEASEL1
1.034142.8
1.0-9.8-2.1
954ABEE_01
1.033142.6
-6.9-2.1
6.91.360
BEAMER 7
1.022141.0
734SHELL A1
1.025141.5
48DIAM SH7
1.029141.9
58FORT SA7
1.028141.9
185SCOT4_8
1.026141.6
628ALC SCOT
1.024141.4
394ASTOTIN
1.044144.1
821708ALTAP
1.023141.1
61DOW CHEM
1.032142.4
62SHERRIT7
1.029142.0
63LAMOURE7
1.033142.6
-13.9
-0.3-0.3
-0.4
-2.2
-46.6-7.9
36.1
0.40.1 -0.3
-8.6
13.7
9.714.1
-10.4
-18.4
-4.419.1
-91.
70.
792
.1
-30.
9-1
7.6
30.917.5
54.7 0.97
83
62.696.7
0.94
161
27.3
-62.9
63.043.9
3.7
-0.4
-13.7
50RIVERSID
1.022141.1
-35.9-18.9
-41.9
57.0
49.9
393DOW HYD7
1.031142.3
922ROSS TAP
1.032142.4
38.7
-1.3
-38.
71.
272
.6-1
0.8
24.0
9.7
-24.
2
-34.720.8
45ROSS CRK
1.032142.4
-37.
8
-43.7
-31.0
-78.4-80.9
9.9
-9.7
8.4
15.8-13.9
-15.813.9
-41.929.9
-10.
1
-0.1
-38.5-42.4
-55.6
-14.1
-56.9
793SCORIA1
1.022141.1
23.912.3
-23.9-12.4
-35.9
2954ABEE_02
1.0354.3
996.91.9
18420WEASEL2
1.0514.4
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-8.1R
10.7R
2030DOWSTG 9
1.03015.1
37.4
8.0R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3
G4
2835LAMONT_LV1
3835LAMONT_LV2
71.536.4R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 47
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A1054L (N-1)FIG C-7FRI, AUG 19 2016 15:35
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.039249.3
443BANN_240
1.014243.4
109DEERLAN4
1.025246.1
771AMELIA1
1.009242.0
313JOSEPH1
1.001240.1
174.8-125.4
-174.6
57LAMOURE4
1.004240.9
25.2-245.0-22.6
-137.1149.6
137.5-147.9
297.8
-296.2-85.7
-257.1-60.8
257.766.0
245.4
126.9
97.7
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-1.8
R
7185SCOTF ST
1.03014.2
68.135.1R
4185SCOTF GT
1.03014.2
70.232.6R
627AIR LIQC
1.03014.2
68.127.2R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.034142.7
0.97
5
936808L_TAP
1.025141.5
67BRUDERH7
1.030142.2
13.824.8
3.919.3
314JOSEPH2
1.031142.3
0.95
-70.5-82.2
0.95
-70.7-82.5
391ALBCHEM7
1.030142.2
735SHELL TP
1.028141.8
952DIAM TAP
1.031142.3
43SCOT4_7
1.029142.0
38.5-7.9
-38.47.2
40.834.1
-22.512.3
-63.742.163.9
-62.242.2
-38.37.2-7.3
948808_BNDY
1.024141.3
59REDWATE7
1.017140.3
-9.9-1.1
-3.8
1420WEASEL1
1.021141.0
1.1-9.8-2.1
954ABEE_01
1.020140.8
-6.9-2.1
6.91.460
BEAMER 7
1.023141.1
734SHELL A1
1.028141.8
48DIAM SH7
1.031142.3
58FORT SA7
1.031142.2
185SCOT4_8
1.029142.0
628ALC SCOT
1.027141.7
394ASTOTIN
1.030142.2
821708ALTAP
1.024141.3
61DOW CHEM
1.035142.8
62SHERRIT7
1.032142.4
63LAMOURE7
1.036142.9
-27.1
-0.3-0.3
22.9
-12.
8
-46.3-1.2
40.1
0.40.1 -0.3
-6.2
40.6
-0.742.20.4
-23.0
-4.516.7
-96.
44.
396
.8
-39.
4-1
5.1
39.415.1
66.0 0.97
83
75.1100.1
0.94
161
25.8
-71.4
71.641.5
38.3
-0.4
-40.6
50RIVERSID
1.024141.3
-35.9-18.9
-42.1
62.3
77.0
393DOW HYD7
1.034142.7
922ROSS TAP
1.034142.8
37.0
-1.9
-36.
91.
869
.8-1
1.8
24.6
7.9
-24.
8
-31.921.8
45ROSS CRK
1.034142.8
-37.
8
-41.2
-28.8
-44.1-17.8
9.9
-7.9
6.1
16.2-7.0
-16.26.9
-42.130.1
-10.
1
-3.7
-3.9-19.8
-56.8
-42.0
-57.2
793SCORIA1
1.023141.2
23.912.3
-23.9-12.4
-25.6
2954ABEE_02
1.0214.2
996.91.9
18420WEASEL2
1.0374.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.0R
10.0R
2030DOWSTG 9
1.03015.1
37.4
6.6R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3
G4
2835LAMONT_LV1
3835LAMONT_LV2
71.531.3R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 48
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A9L960 (N-1)FIG C-8FRI, AUG 19 2016 15:35
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.030247.2
443BANN_240
1.011242.5
109DEERLAN4
1.021245.0
771AMELIA1
1.006241.3
313JOSEPH1
0.998239.6
-20.3-99.5
20.3
57LAMOURE4
1.002240.4
39.4-55.6-40.9
57.6118.4
-57.4-119.5
159.2
-158.6-79.8
-254.7-30.0
255.636.2
-119.9-61.4
120.160.1
55.6
98.4
78.5
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-0.1
R
7185SCOTF ST
1.03014.2
68.135.8R
4185SCOTF GT
1.03014.2
70.233.3R
627AIR LIQC
1.03014.2
68.128.2R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.034142.6
0.97
5
936808L_TAP
1.024141.4
67BRUDERH7
1.030142.1
34.417.6
31.613.8
314JOSEPH2
1.030142.1
0.95
-73.3-79.0
0.95
-73.6-79.2
391ALBCHEM7
1.030142.1
735SHELL TP
1.026141.6
952DIAM TAP
1.030142.1
43SCOT4_7
1.027141.8
10.7-2.9
-10.71.6
43.733.8
4.22.5
-63.144.163.2
-61.544.2
-10.71.5-1.7
948808_BNDY
1.023141.2
59REDWATE7
1.016140.2
-9.9-1.1
-24.3
1420WEASEL1
1.021140.9
1.1-9.8-2.1
954ABEE_01
1.019140.7
-6.9-2.1
6.91.460
BEAMER 7
1.021140.9
734SHELL A1
1.026141.6
48DIAM SH7
1.030142.1
58FORT SA7
1.029141.9
185SCOT4_8
1.027141.8
628ALC SCOT
1.025141.5
394ASTOTIN
1.030142.1
821708ALTAP
1.022141.1
61DOW CHEM
1.033142.5
62SHERRIT7
1.030142.1
63LAMOURE7
1.034142.6
-27.5
-0.3-0.3
-3.9
-3.2
-43.8-2.0
39.6
0.40.1 -0.3
-12.9
13.0
-8.221.67.5
-23.4
-6.116.2
-91.
31.
091
.7
-30.
2-1
7.6
30.217.5
56.4 0.97
83
64.499.9
0.94
161
31.7
-62.2
62.343.9
10.7
-0.4
-13.0
50RIVERSID
1.022141.0
-35.9-18.9
-44.1
61.6
49.2
393DOW HYD7
1.032142.4
922ROSS TAP
1.032142.5
38.9
-1.5
-38.
91.
472
.9-1
1.1
24.3
9.9
-24.
5
-35.021.2
45ROSS CRK
1.032142.5
-37.
8
-43.7
-28.5
-31.4-66.1
9.9
-9.9
12.7
20.3-6.1
-20.36.1
-44.131.6
-10.
1
-0.5
-31.6-14.1
-63.7
-21.5
-59.7
793SCORIA1
1.022141.0
23.912.3
-23.9-12.4
-18.1
2954ABEE_02
1.0204.2
996.91.9
18420WEASEL2
1.0364.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-8.3R
10.6R
2030DOWSTG 9
1.03015.1
37.4
7.8R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3
G4
2835LAMONT_LV1
3835LAMONT_LV2
71.532.5R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 49
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A9L961 (N-1)FIG C-9FRI, AUG 19 2016 15:36
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.030247.2
443BANN_240
1.011242.5
109DEERLAN4
1.021245.0
771AMELIA1
1.006241.3
313JOSEPH1
0.998239.6
-20.3-99.5
20.3
57LAMOURE4
1.002240.4
39.4-55.6-40.9
57.6118.4
-57.4-119.5
159.2
-158.6-79.8
-254.7-30.0
255.636.2
-119.9-61.4
120.160.1
55.6
98.4
78.5
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-0.1
R
7185SCOTF ST
1.03014.2
68.135.8R
4185SCOTF GT
1.03014.2
70.233.3R
627AIR LIQC
1.03014.2
68.128.2R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.034142.6
0.97
5
936808L_TAP
1.024141.4
67BRUDERH7
1.030142.1
34.417.6
31.613.8
314JOSEPH2
1.030142.1
0.95
-73.3-79.0
0.95
-73.6-79.2
391ALBCHEM7
1.030142.1
735SHELL TP
1.026141.6
952DIAM TAP
1.030142.1
43SCOT4_7
1.027141.8
10.7-2.9
-10.71.6
43.733.8
4.22.5
-63.144.163.2
-61.544.2
-10.71.5-1.7
948808_BNDY
1.023141.2
59REDWATE7
1.016140.2
-9.9-1.1
-24.3
1420WEASEL1
1.021140.9
1.1-9.8-2.1
954ABEE_01
1.019140.7
-6.9-2.1
6.91.460
BEAMER 7
1.021140.9
734SHELL A1
1.026141.6
48DIAM SH7
1.030142.1
58FORT SA7
1.029141.9
185SCOT4_8
1.027141.8
628ALC SCOT
1.025141.5
394ASTOTIN
1.030142.1
821708ALTAP
1.022141.1
61DOW CHEM
1.033142.5
62SHERRIT7
1.030142.1
63LAMOURE7
1.034142.6
-27.5
-0.3-0.3
-3.9
-3.2
-43.8-2.0
39.6
0.40.1 -0.3
-12.9
13.0
-8.221.67.5
-23.4
-6.116.2
-91.
31.
091
.7
-30.
2-1
7.6
30.217.5
56.4 0.97
83
64.499.9
0.94
161
31.7
-62.2
62.343.9
10.7
-0.4
-13.0
50RIVERSID
1.022141.0
-35.9-18.9
-44.1
61.6
49.2
393DOW HYD7
1.032142.4
922ROSS TAP
1.032142.5
38.9
-1.5
-38.
91.
472
.9-1
1.1
24.3
9.9
-24.
5
-35.021.2
45ROSS CRK
1.032142.5
-37.
8
-43.7
-28.5
-31.4-66.1
9.9
-9.9
12.7
20.3-6.1
-20.36.1
-44.131.6
-10.
1
-0.5
-31.6-14.1
-63.7
-21.5
-59.7
793SCORIA1
1.022141.0
23.912.3
-23.9-12.4
-18.1
2954ABEE_02
1.0204.2
996.91.9
18420WEASEL2
1.0364.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-8.3R
10.6R
2030DOWSTG 9
1.03015.1
37.4
7.8R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3
G4
2835LAMONT_LV1
3835LAMONT_LV2
71.532.5R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 50
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A920L (N-1)FIG C-10FRI, AUG 19 2016 15:36
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.036248.6
443BANN_240
1.014243.5
109DEERLAN4
1.031247.5
771AMELIA1
1.012242.9
313JOSEPH1
1.003240.7
-3.7-132.6
3.8
57LAMOURE4
1.004241.0
13.0-73.4-14.4
41.1152.8
-40.8-153.1
152.6
-152.1-90.3
-270.2-2.2
271.29.3
-113.4-72.0
113.670.7
73.4
132.0
88.8
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-2.7
R
7185SCOTF ST
1.03014.2
68.133.7R
4185SCOTF GT
1.03014.2
70.231.2R
627AIR LIQC
1.03014.2
68.125.2R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.041143.7
0.97
5
936808L_TAP
1.031142.3
67BRUDERH7
1.036143.0
33.621.6
29.618.8
314JOSEPH2
1.034142.7
0.95
-73.9-81.1
0.95
-74.2-81.3
391ALBCHEM7
1.036143.0
735SHELL TP
1.030142.2
952DIAM TAP
1.034142.7
43SCOT4_7
1.031142.3
12.7-7.9
-12.76.6
43.634.9
3.76.0
-65.444.065.6
-63.844.1
-12.76.6-6.7
948808_BNDY
1.030142.1
59REDWATE7
1.021140.9
-9.9-1.0
-23.4
1420WEASEL1
1.027141.7
1.0-9.8-2.1
954ABEE_01
1.026141.6
-6.9-2.1
6.91.460
BEAMER 7
1.025141.5
734SHELL A1
1.030142.2
48DIAM SH7
1.034142.7
58FORT SA7
1.032142.4
185SCOT4_8
1.032142.4
628ALC SCOT
1.030142.1
394ASTOTIN
1.036143.0
821708ALTAP
1.026141.6
61DOW CHEM
1.036142.9
62SHERRIT7
1.033142.5
63LAMOURE7
1.037143.1
-26.9
-0.3-0.3
-3.4
-6.7
-44.01.0
41.3
0.40.1 -0.3
-9.5
14.2
-4.222.43.5
-22.7
-6.017.2
-91.
53.
991
.8
-30.
9-1
6.9
30.916.9
58.9 0.97
83
67.398.9
0.94
161
28.2
-62.9
63.043.2
12.7
-0.4
-14.2
50RIVERSID
1.026141.6
-35.9-18.9
-44.0
63.9
50.3
393DOW HYD7
1.035142.8
922ROSS TAP
1.035142.9
38.8
-2.8
-38.
82.
772
.8-1
3.2
25.5
9.8
-25.
7
-34.923.3
45ROSS CRK
1.035142.9
-37.
8
-43.0
-30.0
-40.3-63.3
9.9
-9.8
9.3
20.0-7.9
-20.07.8
-44.031.5
-10.
1
-3.4
-29.6-19.2
-63.4
-22.3
-59.6
793SCORIA1
1.026141.5
23.912.3
-23.9-12.4
-22.1
2954ABEE_02
1.0274.3
996.91.9
18420WEASEL2
1.0434.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.3R
9.6R
2030DOWSTG 9
1.03015.1
37.4
6.0R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3
G4
2835LAMONT_LV1
3835LAMONT_LV2
71.530.0R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 51
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A921L (N-1)FIG C-11FRI, AUG 19 2016 15:36
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.036248.7
443BANN_240
1.015243.7
109DEERLAN4
1.032247.6
771AMELIA1
1.013243.1
313JOSEPH1
1.004240.9
-22.0-129.1
22.1
57LAMOURE4
1.006241.4
21.1-45.1-22.8
59.4149.3
-59.1-149.5
176.3
-175.6-85.2
-283.40.5
284.57.9
-136.9-66.2
137.165.5
45.1
128.5
85.1
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-2.9
R
7185SCOTF ST
1.03014.2
68.133.5R
4185SCOTF GT
1.03014.2
70.231.0R
627AIR LIQC
1.03014.2
68.124.9R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.042143.8
0.97
5
936808L_TAP
1.031142.3
67BRUDERH7
1.037143.1
34.521.4
31.518.6
314JOSEPH2
1.035142.8
0.95
-68.9-83.3
0.95
-69.2-83.6
391ALBCHEM7
1.037143.1
735SHELL TP
1.031142.3
952DIAM TAP
1.034142.8
43SCOT4_7
1.032142.4
10.9-7.8
-10.96.4
42.335.6
-1.38.4
-66.043.066.2
-64.443.1
-10.86.3-6.5
948808_BNDY
1.030142.2
59REDWATE7
1.022141.0
-9.9-1.0
-24.3
1420WEASEL1
1.028141.8
1.0-9.8-2.1
954ABEE_01
1.026141.6
-6.9-2.1
6.91.460
BEAMER 7
1.026141.6
734SHELL A1
1.031142.3
48DIAM SH7
1.034142.8
58FORT SA7
1.032142.5
185SCOT4_8
1.032142.4
628ALC SCOT
1.030142.1
394ASTOTIN
1.037143.1
821708ALTAP
1.027141.7
61DOW CHEM
1.036143.0
62SHERRIT7
1.033142.6
63LAMOURE7
1.037143.1
-28.1
-0.3-0.3
1.6
-9.1
-45.11.7
41.8
0.40.1 -0.3
-8.4
16.5
-4.321.53.6
-23.0
-5.317.1
-88.
53.
788
.9
-25.
8-1
7.6
25.817.6
44.7 0.97
83
51.4102.8
0.94
161
27.2
-57.8
57.943.8
10.8
-0.4
-16.5
50RIVERSID
1.026141.6
-35.9-18.9
-43.0
64.6
52.7
393DOW HYD7
1.035142.9
922ROSS TAP
1.036142.9
40.0
-3.2
-39.
93.
074
.6-1
3.8
25.9
11.0
-26.
1
-36.723.8
45ROSS CRK
1.036142.9
-37.
8
-43.7
-26.8
-40.0-66.0
9.9
-10.9
8.2
18.1-7.4
-18.17.3
-43.130.8
-10.
1
-3.2
-31.4-18.9
-60.2
-21.4
-58.4
793SCORIA1
1.026141.6
23.912.3
-23.9-12.4
-21.9
2954ABEE_02
1.0284.3
996.91.9
18420WEASEL2
1.0444.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.4R
9.5R
2030DOWSTG 9
1.03015.1
37.4
5.8R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3
G4
2835LAMONT_LV1
3835LAMONT_LV2
71.529.4R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 52
File No. RP-05-1381
100.0%Rate A
kV: <=25.000 <=69.000 <=138.000 <=240.000 <=500.000 >500.000
PROJECT 1381: SCENARIO 2020SP 1A 708L (N-1) -RW ISD unit on FIG C-12FRI, AUG 19 2016 15:36
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar
807L Capacity Upgrade P1381
341HEARTLAN
1.043250.2
443BANN_240
1.022245.3
109DEERLAN4
1.040249.6
771AMELIA1
1.022245.4
313JOSEPH1
1.014243.4
-4.1-121.3
4.2
57LAMOURE4
1.013243.1
-19.1-63.817.5
41.4140.7
-41.2-141.4
155.2
-154.7-84.5
-270.89.4
271.7-2.4
-116.1-66.2
116.264.8
63.8
120.5
82.7
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-5.8
R
7185SCOTF ST
1.03014.2
68.141.0R
4185SCOTF GT
1.03014.2
70.238.4R
627AIR LIQC
1.03014.2
68.135.8R
37
37
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.023141.1
1.00
28
936808L_TAP
1.013139.8
67BRUDERH7
1.019140.6
33.719.6
27.814.1
314JOSEPH2
1.020140.7
0.97
955
-69.4-57.5
0.97
955
-69.6-57.7
391ALBCHEM7
1.019140.6
735SHELL TP
1.016140.1
952DIAM TAP
1.021140.9
43SCOT4_7
1.017140.3
14.5-3.1
-14.51.8
49.635.1
-21.6-36.3
-60.548.360.6
-58.948.2
-14.51.8-1.9
948808_BNDY
1.012139.6
59REDWATE7
1.004138.5
-9.9-1.1
-23.5
1420WEASEL1
1.009139.3
1.1-9.8-2.1
954ABEE_01
1.008139.1
-6.9-2.1
6.91.460
BEAMER 7
1.009139.2
734SHELL A1
1.016140.2
48DIAM SH7
1.021140.9
58FORT SA7
1.034142.7
185SCOT4_8
1.017140.4
628ALC SCOT
1.015140.1
394ASTOTIN
1.019140.6
821708ALTAP
1.023141.2
61DOW CHEM
1.039143.4
62SHERRIT7
1.036143.0
63LAMOURE7
1.042143.8
-38.8
-0.3-0.3
22.1
36.2
-38.8-5.7
37.7
0.40.2 -0.3
-6.422.3
5.8
-28.9
-9.111.4
-100
.9-8
.710
1.3
-47.
4-4
4.8
47.544.8
48.7 0.97
83
55.9113.0
0.94
161
-79.5
79.771.5
14.5
-0.4
50RIVERSID
1.023141.2
-48.2
59.0
393DOW HYD7
1.039143.4
922ROSS TAP
1.039143.4
35.2
-10.
7-3
5.2
10.5
66.9
-25.
8
33.4
6.2
-33.
6
-29.035.9
45ROSS CRK
1.039143.4
-37.
8
-71.0
-19.4
-33.6-61.5
9.9
-6.2
28.3
4.2
-28.3
-4.3
-48.134.7
-10.
1
9.4
-27.8-14.4
-77.5
-22.3
-64.7
793SCORIA1
1.023141.2
-20.0
2954ABEE_02
1.0094.2
996.9
1.9
18420WEASEL2
1.0364.3
992.9
0.7
37
2050GRANITE9
314.5
2.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.6R
8.5R
2030DOWSTG 9
1.03015.1
37.4
3.9R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3
G4
2835LAMONT_LV1
3835LAMONT_LV2
71.5
23.6R70110COG19NEB
August 2016 P1381 807L Capacity Increase 53
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A807L (N-1)FIG C-13FRI, AUG 19 2016 15:36
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.037248.9
443BANN_240
1.016243.9
109DEERLAN4
1.033247.9
771AMELIA1
1.015243.5
313JOSEPH1
1.006241.4
0.0-126.2
0.1
57LAMOURE4
1.007241.6
8.0-47.1-9.7
37.3145.9
-37.1-146.4
157.4
-156.8-86.6
-272.0-0.3
273.07.6
-118.1-68.2
118.366.9
47.1
125.4
85.2
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-2.1
R
7185SCOTF ST
1.03014.2
68.131.6R
4185SCOTF GT
1.03014.2
70.229.0R
627AIR LIQC
1.03014.2
68.122.1R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.041143.7
0.97
5
936808L_TAP
1.027141.7
67BRUDERH7
1.038143.2
51.828.3
18.315.2
314JOSEPH2
1.039143.4
0.95
-58.9-75.5
0.95
-59.1-75.7
391ALBCHEM7
1.038143.2
735SHELL TP
1.032142.4
952DIAM TAP
1.038143.2
43SCOT4_7
1.036142.9
24.0-4.3
-24.03.1
26.011.5
-72.733.972.8
-71.134.2
-23.93.1-3.2
948808_BNDY
1.026141.5
59REDWATE7
1.013139.8
-9.9-1.0
-41.2
1420WEASEL1
1.023141.2
1.0-9.8-2.1
954ABEE_01
1.022141.0
-6.9-2.1
6.91.460
BEAMER 7
1.013139.8
734SHELL A1
1.035142.8
48DIAM SH7
1.038143.2
58FORT SA7
1.032142.4
185SCOT4_8
1.036142.9
628ALC SCOT
1.034142.7
394ASTOTIN
1.038143.2
821708ALTAP
1.016140.3
61DOW CHEM
1.035142.8
62SHERRIT7
1.032142.5
63LAMOURE7
1.036143.0
-0.3-0.3
-25.
6-1
2.0
-56.410.1
46.7
0.40.1 -0.3
-30.6
59.8
1.64.5
-2.4
-27.9
1.614.7
-82.
65.
182
.9
-15.
4-1
3.5
15.413.4
63.9 0.97
83
72.8110.3
0.94
161
51.8
-47.4
47.439.6
23.9
-0.4
-59.8
50RIVERSID
1.016140.2
-35.9-19.0
-33.8
71.2
96.6
393DOW HYD7
1.034142.7
922ROSS TAP
1.035142.8
42.3
-1.8
-42.
21.
778
.3-1
1.6
24.6
13.2
-24.
8
-40.421.7
45ROSS CRK
1.035142.8
-37.
8
-39.6
-20.3
-43.5-70.2
9.9
-13.2
30.7
-34.123.9
-10.
1
-4.7
-18.3-15.7
-4.5
-47.1
793SCORIA1
1.016140.2
23.912.3
-23.9-12.4
-27.9
2954ABEE_02
1.0234.3
996.91.9
18420WEASEL2
1.0394.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.1R
9.8R
2030DOWSTG 9
1.03015.1
37.4
6.4R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3
G4
2835LAMONT_LV1
3835LAMONT_LV2
71.528.3R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 54
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A735L (N-1)FIG C-14FRI, AUG 19 2016 15:36
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.037248.9
443BANN_240
1.016243.9
109DEERLAN4
1.032247.7
771AMELIA1
1.014243.3
313JOSEPH1
1.005241.2
-0.3-127.2
0.4
57LAMOURE4
1.007241.7
22.1-69.2-23.6
37.6147.0
-37.4-147.6
155.3
-154.8-85.4
-277.0-2.2
278.09.9
-116.1-67.1
116.365.8
69.2
126.5
83.8
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-3.9
R
7185SCOTF ST
1.03014.2
68.132.9R
4185SCOTF GT
1.03014.2
70.230.3R
627AIR LIQC
1.03014.2
68.124.0R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.040143.5
0.97
5
936808L_TAP
1.025141.5
67BRUDERH7
1.036143.0
56.527.0
19.717.4
314JOSEPH2
1.036143.0
0.95
-70.1-82.5
0.95
-70.3-82.8
391ALBCHEM7
1.036143.0
735SHELL TP
1.032142.4
952DIAM TAP
1.036142.9
43SCOT4_7
1.033142.6
22.7-6.5
-22.65.3
36.634.9
2.96.9
-65.739.165.8
-64.239.2
-22.65.3-5.4
948808_BNDY
1.024141.3
59REDWATE7
1.011139.6
-9.9-1.1
-45.8
1420WEASEL1
1.022141.0
1.1-9.8-2.1
954ABEE_01
1.020140.8
-6.9-2.1
6.91.460
BEAMER 7
1.028141.9
734SHELL A1
1.032142.4
48DIAM SH7
1.036142.9
58FORT SA7
1.033142.6
185SCOT4_8
1.033142.6
628ALC SCOT
1.031142.3
394ASTOTIN
1.036143.0
821708ALTAP
1.029142.0
61DOW CHEM
1.037143.1
62SHERRIT7
1.034142.7
63LAMOURE7
1.038143.3
-25.0
-0.3-0.3
-2.6
-7.6
-50.01.4
41.5
0.40.1 -0.3
-7.8
8.5
-21.6
-2.318.2
-91.
44.
691
.7
-31.
0-1
7.9
31.017.9
53.9 0.97
83
61.7102.7
0.94
161
26.4
-63.0
63.144.2
22.6
-0.4
-8.5
50RIVERSID
1.028141.9
-35.9-18.9
-39.1
64.3
44.6
393DOW HYD7
1.036143.0
922ROSS TAP
1.037143.1
38.9
-3.8
-38.
83.
672
.9-1
4.7
26.5
9.9
-26.
7
-34.924.8
45ROSS CRK
1.037143.1
-37.
8
-44.0
-27.2
-44.4-76.2
9.9
-9.8
7.6
10.3-9.9
-10.39.9
-39.227.8
-10.
1
-4.0
-19.7-17.9
-46.7
-53.5
793SCORIA1
1.028141.9
23.912.3
-23.9-12.4
-26.3
2954ABEE_02
1.0224.2
996.91.9
18420WEASEL2
1.0384.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.8R
9.2R
2030DOWSTG 9
1.03015.1
37.4
5.2R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3
G4
2835LAMONT_LV1
3835LAMONT_LV2
71.528.9R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 55
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A808L (N-1)FIG C-15FRI, AUG 19 2016 15:36
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.038249.2
443BANN_240
1.017244.0
109DEERLAN4
1.035248.3
771AMELIA1
1.015243.6
313JOSEPH1
1.005241.2
-16.6-137.9
16.7
57LAMOURE4
1.007241.6
19.6-62.9-21.1
54.0158.5
-53.7-158.5
160.1
-159.6-88.6
-266.23.9
267.22.8
-120.9-70.1
121.069.0
62.9
137.5
87.5
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-3.2
R
7185SCOTF ST
1.03014.2
68.133.5R
4185SCOTF GT
1.03014.2
70.230.9R
627AIR LIQC
1.03014.2
68.124.9R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.050144.9
0.97
5
936808L_TAP
1.033142.5
67BRUDERH7
1.043144.0
45.726.8
314JOSEPH2
1.035142.8
0.95
-75.1-86.3
0.95
-75.3-86.5
391ALBCHEM7
1.042143.9
735SHELL TP
1.031142.2
952DIAM TAP
1.035142.8
43SCOT4_7
1.032142.4
-3.3-15.7
3.314.3
51.541.8
4.06.6
-70.849.171.0
-69.149.1
3.314.3-14.5
948808_BNDY
1.031142.3
59REDWATE7
1.009139.2
1420WEASEL1
1.029142.0
954ABEE_01
1.027141.8
60BEAMER 7
1.023141.2
734SHELL A1
1.031142.2
48DIAM SH7
1.035142.8
58FORT SA7
1.033142.5
185SCOT4_8
1.032142.4
628ALC SCOT
1.030142.1
394ASTOTIN
1.043144.0
821708ALTAP
1.025141.4
61DOW CHEM
1.036143.0
62SHERRIT7
1.033142.6
63LAMOURE7
1.037143.2
-43.1
-0.3-0.3
-3.7
-7.3
-37.67.6
45.3
0.40.1 -0.3
-16.2
20.1
-26.346.126.4
-28.8
-9.813.6
-90.
74.
191
.1
-29.
7-1
7.3
29.717.3
57.7 0.97
83
65.9105.8
0.94
161
35.2
-61.7
61.843.6
-3.3
-0.4
-20.1
50RIVERSID
1.024141.4
-35.9-18.9
-49.1
69.2
56.3
393DOW HYD7
1.035142.9
922ROSS TAP
1.036143.0
39.1
-3.2
-39.
13.
173
.3-1
3.9
25.9
10.1
-26.
1
-35.423.9
45ROSS CRK
1.036143.0
-37.
8
-43.4
-24.4
-26.7-45.7
-10.1
16.0
30.21.9
-30.2-1.9
-49.135.3
-10.
1
-3.6
-45.6-26.9
-81.2
-45.8
-65.9
793SCORIA1
1.024141.3
23.912.3
-23.9-12.4
2954ABEE_02
1.0294.3
99
18420WEASEL2
1.0454.3
99
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.5R
9.5R
2030DOWSTG 9
1.03015.1
37.4
5.7R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3
G4
2835LAMONT_LV1
3835LAMONT_LV2
71.528.8R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 56
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A621L (N-1)FIG C-16FRI, AUG 19 2016 15:36
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.037249.0
443BANN_240
1.017244.0
109DEERLAN4
1.033247.9
771AMELIA1
1.014243.4
313JOSEPH1
1.005241.2
-7.5-129.8
7.6
57LAMOURE4
1.007241.7
21.1-67.8-22.6
44.9149.8
-44.6-150.2
157.6
-157.1-86.1
-272.9-0.6
273.97.9
-118.4-67.7
118.566.5
67.8
129.2
84.7
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-3.8
R
7185SCOTF ST
1.03014.2
68.132.9R
4185SCOTF GT
1.03014.2
70.230.4R
627AIR LIQC
1.03014.2
68.124.0R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.043143.9
0.97
5
936808L_TAP
1.032142.5
67BRUDERH7
1.038143.2
33.821.5
30.018.7
314JOSEPH2
1.036143.0
0.95
-73.0-83.2
0.95
-73.3-83.4
391ALBCHEM7
1.038143.2
735SHELL TP
1.032142.4
952DIAM TAP
1.036142.9
43SCOT4_7
1.033142.6
12.3-7.8
-12.36.5
43.435.6
2.97.1
-66.543.866.7
-64.943.8
-12.36.4-6.6
948808_BNDY
1.031142.3
59REDWATE7
1.023141.1
-9.9-1.0
-23.6
1420WEASEL1
1.029142.0
1.0-9.8-2.1
954ABEE_01
1.027141.8
-6.9-2.1
6.91.460
BEAMER 7
1.027141.7
734SHELL A1
1.032142.4
48DIAM SH7
1.036142.9
58FORT SA7
1.033142.6
185SCOT4_8
1.033142.6
628ALC SCOT
1.031142.3
394ASTOTIN
1.038143.2
821708ALTAP
1.028141.8
61DOW CHEM
1.037143.1
62SHERRIT7
1.034142.7
63LAMOURE7
1.038143.3
-27.3
-0.3-0.3
-2.6
-7.8
-44.22.4
42.1
0.40.1 -0.3
-9.1
14.6
-4.222.23.5
-22.6
-5.817.5
-91.
14.
691
.5
-30.
5-1
7.8
30.617.7
55.9 0.97
83
63.9103.3
0.94
161
27.8
-62.5
62.744.1
12.3
-0.4
-14.6
50RIVERSID
1.027141.8
-35.9-18.9
-43.7
65.0
50.8
393DOW HYD7
1.036143.0
922ROSS TAP
1.037143.1
39.0
-3.7
-38.
93.
673
.0-1
4.6
26.4
10.0
-26.
6
-35.124.7
45ROSS CRK
1.037143.1
-37.
8
-43.9
-26.6
-40.2-63.9
9.9
-9.9
8.9
19.6-8.2
-19.68.1
-43.831.3
-10.
1
-4.0
-30.0-19.0
-62.7
-22.1
-59.3
793SCORIA1
1.027141.8
23.912.3
-23.9-12.4
-22.1
2954ABEE_02
1.0294.3
996.91.9
18420WEASEL2
1.0454.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.8R
9.2R
2030DOWSTG 9
1.03015.1
37.4
5.2R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3
G4
2835LAMONT_LV1
3835LAMONT_LV2
71.528.8R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 57
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A815L (N-1)FIG C-17FRI, AUG 19 2016 15:36
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.038249.1
443BANN_240
1.017244.0
109DEERLAN4
1.034248.2
771AMELIA1
1.014243.5
313JOSEPH1
1.005241.1
-18.6-139.0
18.7
57LAMOURE4
1.007241.6
23.2-69.7-24.7
56.0159.6
-55.7-159.5
160.6
-160.1-88.6
-267.93.8
268.93.1
-121.4-70.0
121.668.9
69.8
138.5
87.4
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-3.4
R
7185SCOTF ST
1.03014.2
68.133.8R
4185SCOTF GT
1.03014.2
70.231.3R
627AIR LIQC
1.03014.2
68.125.3R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.050144.9
0.97
5
936808L_TAP
1.037143.2
67BRUDERH7
1.022141.0
46.425.9
314JOSEPH2
1.034142.7
0.95
-79.5-88.4
0.95
-79.8-88.7
391ALBCHEM7
1.023141.2
735SHELL TP
1.030142.2
952DIAM TAP
1.034142.7
43SCOT4_7
1.031142.3
42.512.2
-42.3-12.7
38.033.3
-1.75.0
-64.040.264.1
-62.540.3
-42.2-12.712.6
948808_BNDY
1.036143.0
59REDWATE7
1.025141.4
-9.9-1.0
-35.9
1420WEASEL1
1.034142.7
1.0-9.8-2.1
954ABEE_01
1.032142.5
-6.9-2.1
6.91.360
BEAMER 7
1.026141.6
734SHELL A1
1.030142.2
48DIAM SH7
1.034142.7
58FORT SA7
1.033142.5
185SCOT4_8
1.031142.3
628ALC SCOT
1.029142.1
394ASTOTIN
1.022141.0
821708ALTAP
1.027141.8
61DOW CHEM
1.036143.0
62SHERRIT7
1.034142.7
63LAMOURE7
1.038143.2
-22.8
-0.3-0.3
2.0
-5.7
-48.7-0.8
40.2
0.40.2 -0.3
-9.6
14.8
-0.49.8
-0.4
-21.0
-3.118.2
-92.
53.
692
.9
-32.
9-1
8.7
32.918.7
57.2 0.97
83
65.3103.9
0.94
161
28.4
-64.9
65.045.0
42.3
-0.4
-14.8
50RIVERSID
1.027141.7
-35.9-18.9
-40.1
62.5
50.9
393DOW HYD7
1.036142.9
922ROSS TAP
1.036143.0
38.4
-3.7
-38.
43.
572
.1-1
4.5
26.4
9.4
-26.
5
-34.224.6
45ROSS CRK
1.036143.0
-37.
8
-44.8
-26.0
-25.8-46.4
9.9
-9.4
9.4
12.4-10.5
-12.410.5
-40.228.6
-10.
1
-3.1
-50.3
-9.8
-54.8
793SCORIA1
1.027141.7
23.912.3
-23.9-12.4
-25.9
2954ABEE_02
1.0344.3
996.91.9
18420WEASEL2
1.0504.4
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.6R
9.4R
2030DOWSTG 9
1.03015.1
37.4
5.5R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3
G4
2835LAMONT_LV1
3835LAMONT_LV2
71.529.0R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 58
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A846L (N-1)FIG C-18FRI, AUG 19 2016 15:37
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.037249.0
443BANN_240
1.017244.0
109DEERLAN4
1.033247.9
771AMELIA1
1.014243.4
313JOSEPH1
1.005241.2
-7.5-129.9
7.6
57LAMOURE4
1.007241.7
21.0-67.7-22.5
44.9149.9
-44.7-150.2
157.6
-157.1-86.2
-272.9-0.5
273.97.9
-118.4-67.8
118.566.5
67.7
129.2
84.7
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-3.9
R
7185SCOTF ST
1.03014.2
68.132.9R
4185SCOTF GT
1.03014.2
70.230.4R
627AIR LIQC
1.03014.2
68.124.0R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.043143.9
0.97
5
936808L_TAP
1.033142.5
67BRUDERH7
1.038143.3
33.921.5
29.818.6
314JOSEPH2
1.036143.0
0.95
-73.0-83.1
0.95
-73.2-83.4
391ALBCHEM7
1.038143.2
735SHELL TP
1.032142.4
952DIAM TAP
1.036142.9
43SCOT4_7
1.033142.6
12.1-7.9
-12.16.5
43.435.6
3.07.1
-66.643.866.7
-65.043.8
-12.16.5-6.7
948808_BNDY
1.031142.3
59REDWATE7
1.023141.1
-9.9-1.0
-23.7
1420WEASEL1
1.029142.0
1.0-9.8-2.1
954ABEE_01
1.027141.8
-6.9-2.1
6.91.460
BEAMER 7
1.027141.7
734SHELL A1
1.032142.4
48DIAM SH7
1.036142.9
58FORT SA7
1.033142.6
185SCOT4_8
1.033142.6
628ALC SCOT
1.031142.3
394ASTOTIN
1.038143.2
821708ALTAP
1.028141.9
61DOW CHEM
1.037143.1
62SHERRIT7
1.034142.7
63LAMOURE7
1.038143.3
-27.3
-0.3-0.3
-2.7
-7.8
-44.22.4
42.1
-9.1
14.6
-4.222.13.5
-22.6
-5.817.5
-91.
14.
691
.5
-30.
5-1
7.8
30.517.7
55.9 0.97
83
63.9103.3
0.94
161
27.8
-62.5
62.644.1
12.1
-14.6
50RIVERSID
1.027141.8
-35.9-18.9
-43.7
65.1
50.7
393DOW HYD7
1.036143.0
922ROSS TAP
1.037143.1
39.0
-3.7
-38.
93.
673
.0-1
4.6
26.4
10.0
-26.
6
-35.124.7
45ROSS CRK
1.037143.1
-37.
8
-43.9
-26.6
-40.1-63.7
9.9
-9.9
8.8
19.6-8.2
-19.68.1
-43.831.3
-10.
1
-4.1
-29.8-18.9
-62.7
-22.1
-59.3
793SCORIA1
1.027141.8
23.912.3
-23.9-12.4
-22.1
2954ABEE_02
1.0294.3
996.91.9
18420WEASEL2
1.0454.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.8R
9.2R
2030DOWSTG 9
1.03015.1
37.4
5.2R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3
G4
2835LAMONT_LV1
3835LAMONT_LV2
71.528.8R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 59
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A773L (N-1)FIG C-19FRI, AUG 19 2016 15:37
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.037249.0
443BANN_240
1.017244.0
109DEERLAN4
1.033247.9
771AMELIA1
1.014243.4
313JOSEPH1
1.005241.2
-2.1-131.4
2.2
57LAMOURE4
1.007241.7
21.3-66.5-22.8
39.5151.4
-39.2-151.8
156.1
-155.6-86.6
-275.60.4
276.67.2
-116.9-68.2
117.166.9
66.6
130.8
85.1
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-3.8
R
7185SCOTF ST
1.03014.2
68.133.0R
4185SCOTF GT
1.03014.2
70.230.5R
627AIR LIQC
1.03014.2
68.124.2R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.044144.1
0.97
5
936808L_TAP
1.033142.6
67BRUDERH7
1.040143.5
30.124.7
42.312.4
314JOSEPH2
1.036142.9
0.95
-69.7-84.1
0.95
-69.9-84.4
391ALBCHEM7
1.036143.0
735SHELL TP
1.032142.4
952DIAM TAP
1.035142.9
43SCOT4_7
1.033142.5
0.0-1.3
-0.0-0.1
45.034.2
4.65.9
-65.645.065.7
-64.045.0
948808_BNDY
1.032142.4
59REDWATE7
1.023141.2
-9.9-1.0
-19.9
1420WEASEL1
1.030142.1
1.0-9.8-2.1
954ABEE_01
1.028141.9
-6.9-2.1
6.91.460
BEAMER 7
1.027141.7
734SHELL A1
1.032142.4
48DIAM SH7
1.035142.9
58FORT SA7
1.033142.6
185SCOT4_8
1.033142.5
628ALC SCOT
1.031142.3
394ASTOTIN
1.040143.5
821708ALTAP
1.028141.8
61DOW CHEM
1.037143.1
62SHERRIT7
1.034142.7
63LAMOURE7
1.038143.3
-24.2
-0.3-0.3
-4.3
-6.6
-42.71.2
41.4
0.40.1 -0.3
-9.0
14.4
-0.925.90.3
-21.6
-6.718.1
-90.
74.
191
.0
-29.
7-1
8.3
29.718.3
55.4 0.97
83
63.3103.6
0.94
161
27.7
-61.7
61.844.6
-0.4
-14.4
50RIVERSID
1.027141.8
-35.9-18.9
-44.9
64.1
50.5
393DOW HYD7
1.036143.0
922ROSS TAP
1.037143.1
39.2
-3.8
-39.
13.
673
.3-1
4.7
26.5
10.1
-26.
7
-35.424.8
45ROSS CRK
1.037143.1
-37.
8
-44.4
-26.4
-37.1-72.5
9.9
-10.1
8.8
22.0-9.8
-22.09.8
-45.032.2
-10.
1
-3.6
-42.2-12.6
-66.7
-25.8
-60.8
793SCORIA1
1.027141.7
23.912.3
-23.9-12.4
-25.3
2954ABEE_02
1.0304.3
996.91.9
18420WEASEL2
1.0464.4
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.8R
9.2R
2030DOWSTG 9
1.03015.1
37.4
5.3R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3
G4
2835LAMONT_LV1
3835LAMONT_LV2
71.528.8R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 60
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A776L (N-1)FIG C-20FRI, AUG 19 2016 15:37
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.037249.0
443BANN_240
1.016243.9
109DEERLAN4
1.033247.9
771AMELIA1
1.014243.4
313JOSEPH1
1.005241.2
-2.0-131.5
2.1
57LAMOURE4
1.007241.6
21.6-66.5-23.1
39.4151.6
-39.2-151.9
156.1
-155.6-86.6
-275.60.3
276.67.3
-116.9-68.3
117.067.0
66.5
130.9
85.2
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-3.7
R
7185SCOTF ST
1.03014.2
68.133.1R
4185SCOTF GT
1.03014.2
70.230.6R
627AIR LIQC
1.03014.2
68.124.3R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.044144.1
0.97
5
936808L_TAP
1.033142.6
67BRUDERH7
1.040143.5
30.124.8
42.412.3
314JOSEPH2
1.035142.9
0.95
-69.6-84.4
0.95
-69.9-84.7
391ALBCHEM7
1.040143.5
735SHELL TP
1.032142.4
952DIAM TAP
1.035142.9
43SCOT4_7
1.033142.5
45.034.0
4.55.7
-65.445.065.5
-63.845.0
0.0-0.1-0.1
948808_BNDY
1.032142.4
59REDWATE7
1.023141.2
-9.9-1.0
-20.0
1420WEASEL1
1.030142.1
1.0-9.8-2.1
954ABEE_01
1.028141.9
-6.9-2.1
6.91.460
BEAMER 7
1.027141.7
734SHELL A1
1.032142.4
48DIAM SH7
1.035142.9
58FORT SA7
1.033142.6
185SCOT4_8
1.033142.5
628ALC SCOT
1.031142.2
394ASTOTIN
1.040143.5
821708ALTAP
1.028141.8
61DOW CHEM
1.037143.1
62SHERRIT7
1.034142.7
63LAMOURE7
1.038143.3
-23.9
-0.3-0.3
-4.2
-6.4
-42.70.9
41.2
0.40.1 -0.3
-9.2
14.4
-0.925.90.2
-21.5
-6.718.1
-90.
74.
091
.0
-29.
7-1
8.4
29.718.4
55.4 0.97
83
63.3103.6
0.94
161
27.9
-61.7
61.844.7
-0.0
-0.4
-14.4
50RIVERSID
1.027141.8
-35.9-18.9
-44.9
63.9
50.5
393DOW HYD7
1.036143.0
922ROSS TAP
1.037143.1
39.1
-3.7
-39.
13.
673
.3-1
4.7
26.4
10.1
-26.
6
-35.424.7
45ROSS CRK
1.037143.1
-37.
8
-44.5
-26.4
-37.1-72.5
9.9
-10.1
9.0
22.0-9.9
-22.09.9
-45.032.2
-10.
1
-3.5
-42.3-12.5
-66.7
-25.8
-60.8
793SCORIA1
1.027141.7
23.912.3
-23.9-12.4
-25.4
2954ABEE_02
1.0304.3
996.91.9
18420WEASEL2
1.0464.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.7R
9.3R
2030DOWSTG 9
1.03015.1
37.4
5.3R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3
G4
2835LAMONT_LV1
3835LAMONT_LV2
71.528.9R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 61
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A856L (N-1)FIG C-21FRI, AUG 19 2016 15:37
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.037249.0
443BANN_240
1.017244.0
109DEERLAN4
1.033247.9
771AMELIA1
1.014243.5
313JOSEPH1
1.005241.3
-7.3-129.4
7.4
57LAMOURE4
1.007241.7
19.5-67.4-21.0
44.7149.3
-44.5-149.7
157.6
-157.1-86.1
-273.0-0.3
274.07.7
-118.4-67.7
118.566.4
67.4
128.7
84.6
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-3.9
R
7185SCOTF ST
1.03014.2
68.133.6R
4185SCOTF GT
1.03014.2
70.231.1R
627AIR LIQC
1.03014.2
68.125.0R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.043143.9
0.97
5
936808L_TAP
1.032142.5
67BRUDERH7
1.038143.3
34.422.1
29.618.2
314JOSEPH2
1.037143.0
0.95
-72.7-82.1
0.95
-73.0-82.4
391ALBCHEM7
1.038143.3
735SHELL TP
1.031142.3
952DIAM TAP
1.036143.0
43SCOT4_7
1.032142.3
12.7-7.3
-12.76.0
53.649.4
3.88.1
-113.775.6
-12.65.9-6.1
948808_BNDY
1.031142.3
59REDWATE7
1.022141.1
-9.9-1.0
-24.2
1420WEASEL1
1.029142.0
1.0-9.8-2.1
954ABEE_01
1.027141.8
-6.9-2.1
6.91.460
BEAMER 7
1.026141.6
734SHELL A1
1.031142.3
48DIAM SH7
1.036143.0
58FORT SA7
1.033142.6
185SCOT4_8
1.032142.4
628ALC SCOT
1.030142.1
394ASTOTIN
1.038143.3
821708ALTAP
1.028141.8
61DOW CHEM
1.037143.1
62SHERRIT7
1.034142.8
63LAMOURE7
1.038143.3
-25.3
-0.3-0.3
-3.5
-8.8
-51.8-8.7
35.4
0.40.1 -0.3
-10.5
16.0
-3.721.63.0
-12.8
-1.223.3
-90.
85.
091
.2
-30.
0-1
7.2
30.017.2
56.1 0.97
83
64.1103.7
0.94
161
29.3
-62.0
62.143.5
12.7
-0.4
-16.0
50RIVERSID
1.027141.7
-35.9-18.9
114.3
52.2
393DOW HYD7
1.036143.0
922ROSS TAP
1.037143.1
39.1
-3.6
-39.
13.
573
.2-1
4.5
26.3
10.1
-26.
5
-35.324.5
45ROSS CRK
1.037143.1
-37.
8
-43.3
-26.3
-40.2-64.1
9.9
-10.1
10.3
7.5-23.8
-7.523.8
-75.426.8
-10.
1
-4.5
-29.6-18.5
-60.8
-21.5
-51.7
793SCORIA1
1.027141.7
23.912.3
-23.9-12.4
-22.6
2954ABEE_02
1.0294.3
996.91.9
18420WEASEL2
1.0454.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.8R
9.2R
2030DOWSTG 9
1.03015.1
37.4
5.2R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3
G4
2835LAMONT_LV1
3835LAMONT_LV2
71.528.6R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 62
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A857L (N-1)FIG C-22FRI, AUG 19 2016 15:37
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.037249.0
443BANN_240
1.017244.0
109DEERLAN4
1.033247.9
771AMELIA1
1.014243.5
313JOSEPH1
1.005241.3
-7.3-129.4
7.4
57LAMOURE4
1.007241.7
19.6-67.4-21.1
44.7149.3
-44.5-149.7
157.6
-157.1-86.1
-273.0-0.3
274.07.7
-118.4-67.7
118.566.4
67.4
128.7
84.7
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-3.9
R
7185SCOTF ST
1.03014.2
68.133.6R
4185SCOTF GT
1.03014.2
70.231.0R
627AIR LIQC
1.03014.2
68.124.9R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.043143.9
0.97
5
936808L_TAP
1.032142.5
67BRUDERH7
1.038143.3
34.422.1
29.618.2
314JOSEPH2
1.037143.0
0.95
-72.7-82.2
0.95
-73.0-82.4
391ALBCHEM7
1.038143.3
735SHELL TP
1.031142.3
952DIAM TAP
1.036143.0
43SCOT4_7
1.032142.4
12.7-7.4
-12.76.0
53.648.8
3.88.1
-114.575.5115.1
-12.66.0-6.1
948808_BNDY
1.031142.3
59REDWATE7
1.022141.1
-9.9-1.0
-24.2
1420WEASEL1
1.029142.0
1.0-9.8-2.1
954ABEE_01
1.027141.8
-6.9-2.1
6.91.460
BEAMER 7
1.026141.6
734SHELL A1
1.031142.3
48DIAM SH7
1.036143.0
58FORT SA7
1.033142.6
185SCOT4_8
1.032142.4
628ALC SCOT
1.030142.1
394ASTOTIN
1.038143.3
821708ALTAP
1.028141.8
61DOW CHEM
1.037143.1
62SHERRIT7
1.034142.8
63LAMOURE7
1.038143.3
-25.4
-0.3-0.3
-3.5
-8.8
-51.8-8.2
35.7
0.40.1 -0.3
-10.5
16.0
-3.721.63.0
-13.2
-1.223.1
-90.
84.
991
.2
-30.
0-1
7.2
30.017.2
56.1 0.97
83
64.1103.7
0.94
161
29.2
-62.0
62.143.5
12.6
-0.4
-16.0
50RIVERSID
1.027141.7
-35.9-18.9
-75.4
52.2
393DOW HYD7
1.036143.0
922ROSS TAP
1.037143.1
39.1
-3.6
-39.
13.
573
.2-1
4.5
26.3
10.1
-26.
5
-35.324.5
45ROSS CRK
1.037143.1
-37.
8
-43.3
-26.3
-40.2-64.1
9.9
-10.1
10.3
7.5-23.1
-7.523.1
26.8
-10.
1
-4.4
-29.6-18.5
-60.8
-21.5
-51.8
793SCORIA1
1.027141.7
23.912.3
-23.9-12.4
-22.6
2954ABEE_02
1.0294.3
996.91.9
18420WEASEL2
1.0454.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.8R
9.2R
2030DOWSTG 9
1.03015.1
37.4
5.2R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3
G4
2835LAMONT_LV1
3835LAMONT_LV2
71.528.6R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 63
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1AALCO2L (N-1)FIG C-23FRI, AUG 19 2016 15:37
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.037248.9
443BANN_240
1.016244.0
109DEERLAN4
1.033247.9
771AMELIA1
1.014243.4
313JOSEPH1
1.005241.2
-7.9-129.9
8.0
57LAMOURE4
1.007241.7
21.4-68.9-22.9
45.2149.9
-45.0-150.2
157.6
-157.1-86.2
-273.0-0.6
274.08.0
-118.4-67.8
118.566.5
68.9
129.2
84.8
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-3.8
R
7185SCOTF ST
1.03014.2
68.132.8R
4185SCOTF GT
1.03014.2
70.230.3R
627AIR LIQC
1.03014.2
68.124.1R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.043143.9
0.97
5
936808L_TAP
1.032142.5
67BRUDERH7
1.038143.2
33.021.7
30.618.6
314JOSEPH2
1.036142.9
0.95
-73.8-83.3
0.95
-74.0-83.6
391ALBCHEM7
1.038143.2
735SHELL TP
1.032142.4
952DIAM TAP
1.035142.9
43SCOT4_7
1.033142.5
11.8-7.7
-11.86.4
26.237.3
1.97.3
-65.854.065.9
-64.053.9
-11.76.3-6.5
948808_BNDY
1.031142.3
59REDWATE7
1.023141.1
-9.9-1.0
-22.8
1420WEASEL1
1.029142.0
1.0-9.8-2.1
954ABEE_01
1.027141.8
-6.9-2.1
6.91.460
BEAMER 7
1.027141.7
734SHELL A1
1.032142.4
48DIAM SH7
1.035142.9
58FORT SA7
1.033142.6
185SCOT4_8
1.033142.6
628ALC SCOT
1.031142.3
394ASTOTIN
1.038143.2
821708ALTAP
1.028141.8
61DOW CHEM
1.037143.1
62SHERRIT7
1.034142.7
63LAMOURE7
1.038143.3
-26.6
-0.3-0.3
-1.6
-8.0
42.8
0.40.1 -0.3
-9.5
12.4
-4.023.03.3
-19.5
18.116.7
-91.
54.
691
.9
-31.
2-1
7.6
31.217.6
55.5 0.97
83
63.4103.3
0.94
161
28.2
-63.2
63.343.9
11.7
-0.4
-12.4
50RIVERSID
1.027141.8
-35.9-18.9
-54.0
64.2
48.6
393DOW HYD7
1.036143.0
922ROSS TAP
1.037143.1
38.8
-3.6
-38.
83.
572
.8-1
4.5
26.3
9.8
-26.
5
-34.924.5
45ROSS CRK
1.037143.1
-37.
8
-43.7
-26.7
-40.3-63.6
9.9
-9.8
9.3
39.8-10.6
-39.810.5
-53.97.4
-10.
1
-4.1
-30.5-18.9
-65.8
-22.9
-103.5
793SCORIA1
1.027141.8
23.912.3
-23.9-12.4
-22.3
2954ABEE_02
1.0294.3
996.91.9
18420WEASEL2
1.0454.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.8R
9.2R
2030DOWSTG 9
1.03015.1
37.4
5.3R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3
G4
2835LAMONT_LV1
3835LAMONT_LV2
71.528.8R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 64
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1AEXI-01L (N-1)FIG C-24FRI, AUG 19 2016 15:37
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.037248.9
443BANN_240
1.016243.9
109DEERLAN4
1.033247.9
771AMELIA1
1.014243.4
313JOSEPH1
1.005241.2
-7.0-129.8
7.1
57LAMOURE4
1.007241.6
20.7-66.3-22.3
44.3149.7
-44.1-150.1
157.6
-157.0-86.2
-272.9-0.7
273.98.0
-118.3-67.8
118.566.6
66.3
129.1
84.8
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-3.7
R
7185SCOTF ST
1.03014.2
68.132.6R
4185SCOTF GT
1.03014.2
70.230.0R
627AIR LIQC
1.03014.2
68.124.4R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.042143.9
0.97
5
936808L_TAP
1.032142.4
67BRUDERH7
1.038143.2
35.021.8
29.318.6
314JOSEPH2
1.036143.0
0.95
-72.0-83.0
0.95
-72.3-83.3
391ALBCHEM7
1.038143.2
735SHELL TP
1.031142.2
952DIAM TAP
1.036142.9
43SCOT4_7
1.033142.6
13.1-7.8
-13.16.4
66.843.8
4.46.9
-62.329.962.4
-60.930.1
-13.06.4-6.5
948808_BNDY
1.031142.3
59REDWATE7
1.022141.0
-9.9-1.0
-24.8
1420WEASEL1
1.028141.9
1.0-9.8-2.1
954ABEE_01
1.027141.7
-6.9-2.1
6.91.460
BEAMER 7
1.026141.6
734SHELL A1
1.031142.2
48DIAM SH7
1.036142.9
58FORT SA7
1.033142.6
185SCOT4_8
1.034142.7
628ALC SCOT
1.031142.2
394ASTOTIN
1.038143.2
821708ALTAP
1.027141.7
61DOW CHEM
1.037143.1
62SHERRIT7
1.034142.7
63LAMOURE7
1.038143.3
-25.9
-0.3-0.3
-4.1
-7.6
-103.5-18.9
55.2
0.40.1 -0.3
-10.2
17.8
-3.921.03.2
-37.44.3
-90.
64.
490
.9
-29.
6-1
7.7
29.617.7
56.5 0.97
83
64.6103.7
0.94
161
29.1
-61.6
61.744.0
13.0
-0.4
-17.7
50RIVERSID
1.027141.7
-35.9-18.9
-29.8
61.0
53.9
393DOW HYD7
1.036143.0
922ROSS TAP
1.037143.1
39.2
-3.6
-39.
23.
473
.3-1
4.4
26.3
10.2
-26.
5
-35.424.5
45ROSS CRK
1.037143.1
-37.
8
-43.8
-26.3
-40.4-64.3
9.9
-10.1
10.0
-8.1-17.6
8.117.6
-30.163.0
-10.
1
-3.9
-29.2-19.0
-58.4
-20.9
793SCORIA1
1.026141.7
23.912.3
-23.9-12.4
-22.3
2954ABEE_02
1.0284.3
996.91.9
18420WEASEL2
1.0444.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.7R
9.3R
2030DOWSTG 9
1.03015.1
37.4
5.4R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3
G4
2835LAMONT_LV1
3835LAMONT_LV2
71.528.8R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 65
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1AALC03L (N-1)FIG C-25FRI, AUG 19 2016 15:37
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.037249.0
443BANN_240
1.016244.0
109DEERLAN4
1.033247.9
771AMELIA1
1.014243.4
313JOSEPH1
1.005241.2
-7.4-130.0
7.5
57LAMOURE4
1.007241.7
21.5-67.6-23.0
44.8150.0
-44.6-150.3
157.6
-157.1-86.2
-272.9-0.6
273.98.0
-118.4-67.8
118.566.5
67.7
129.3
84.8
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-3.8
R
7185SCOTF ST
1.03014.2
68.133.0R
4185SCOTF GT
1.03014.2
70.230.4R
627AIR LIQC
1.03014.2
68.124.7R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.043143.9
0.97
5
936808L_TAP
1.033142.5
67BRUDERH7
1.038143.2
33.921.3
30.018.9
314JOSEPH2
1.036142.9
0.95
-72.9-83.4
0.95
-73.2-83.7
391ALBCHEM7
1.038143.2
735SHELL TP
1.032142.5
952DIAM TAP
1.036142.9
43SCOT4_7
1.033142.5
12.3-8.0
-12.36.7
44.930.5
2.96.7
-69.742.969.8
-68.043.0
-12.36.6-6.8
948808_BNDY
1.031142.3
59REDWATE7
1.023141.2
-9.9-1.0
-23.7
1420WEASEL1
1.029142.0
1.0-9.8-2.1
954ABEE_01
1.027141.8
-6.9-2.1
6.91.460
BEAMER 7
1.027141.7
734SHELL A1
1.032142.5
48DIAM SH7
1.036142.9
58FORT SA7
1.033142.6
185SCOT4_8
1.033142.6
628ALC SCOT
1.030142.2
394ASTOTIN
1.038143.2
821708ALTAP
1.028141.9
61DOW CHEM
1.037143.1
62SHERRIT7
1.034142.7
63LAMOURE7
1.038143.3
-28.2
-0.3-0.3
-2.6
-7.4
-40.1-9.2
59.9
0.40.1 -0.3
-8.4
14.8
-4.422.13.7
-11.1
-91.
14.
491
.5
-30.
5-1
8.0
30.518.0
56.0 0.97
83
64.0103.2
0.94
161
27.2
-62.5
62.644.3
12.3
-0.4
-14.8
50RIVERSID
1.028141.8
-35.9-18.9
-42.9
68.1
51.0
393DOW HYD7
1.036143.0
922ROSS TAP
1.037143.1
39.0
-3.8
-38.
93.
673
.0-1
4.7
26.5
10.0
-26.
6
-35.124.7
45ROSS CRK
1.037143.1
-37.
8
-44.1
-26.8
-40.1-63.9
9.9
-9.9
8.2
17.9-2.2
-17.92.2
-43.025.5
-10.
1
-3.9
-30.0-19.2
-62.5
-22.1
-63.4
793SCORIA1
1.027141.8
23.912.3
-23.9-12.4
-21.8
2954ABEE_02
1.0294.3
996.91.9
18420WEASEL2
1.0454.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.8R
9.2R
2030DOWSTG 9
1.03015.1
37.4
5.2R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3
G4
2835LAMONT_LV1
3835LAMONT_LV2
71.528.8R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 66
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1AALC01L (N-1)FIG C-26FRI, AUG 19 2016 15:37
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.037249.0
443BANN_240
1.017244.0
109DEERLAN4
1.033247.9
771AMELIA1
1.014243.5
313JOSEPH1
1.005241.3
-7.3-129.4
7.4
57LAMOURE4
1.007241.7
19.8-67.4-21.3
44.7149.4
-44.5-149.8
157.6
-157.1-86.1
-273.0-0.3
274.07.7
-118.4-67.7
118.566.4
67.4
128.8
84.7
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-3.9
R
7185SCOTF ST
1.03014.2
68.132.8R
4185SCOTF GT
1.03014.2
70.230.2R
627AIR LIQC
1.03014.2
68.126.2R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.043143.9
0.97
5
936808L_TAP
1.032142.5
67BRUDERH7
1.038143.3
34.422.0
29.718.3
314JOSEPH2
1.036143.0
0.95
-72.7-82.3
0.95
-73.0-82.6
391ALBCHEM7
1.038143.3
735SHELL TP
1.031142.3
952DIAM TAP
1.036143.0
43SCOT4_7
1.034142.7
12.7-7.4
-12.76.1
52.947.0
3.77.9
-59.338.159.4
-57.938.2
-12.66.0-6.2
948808_BNDY
1.031142.3
59REDWATE7
1.023141.1
-9.9-1.0
-24.2
1420WEASEL1
1.029142.0
1.0-9.8-2.1
954ABEE_01
1.027141.8
-6.9-2.1
6.91.460
BEAMER 7
1.026141.7
734SHELL A1
1.031142.3
48DIAM SH7
1.036143.0
58FORT SA7
1.033142.6
185SCOT4_8
1.033142.6
628ALC SCOT
1.028141.9
394ASTOTIN
1.038143.3
821708ALTAP
1.028141.8
61DOW CHEM
1.037143.1
62SHERRIT7
1.034142.7
63LAMOURE7
1.038143.3
-25.7
-0.3-0.3
-3.4
-8.6
-24.130.3
0.40.1 -0.3
-10.3
15.9
-3.821.63.1
-50.1
25.557.9
-90.
84.
991
.2
-30.
0-1
7.3
30.117.3
56.1 0.97
83
64.1103.7
0.94
161
29.0
-62.1
62.243.6
12.6
-0.4
-15.9
50RIVERSID
1.027141.7
-35.9-18.9
-38.1
58.0
52.1
393DOW HYD7
1.036143.0
922ROSS TAP
1.037143.1
39.1
-3.6
-39.
13.
573
.2-1
4.5
26.3
10.1
-26.
5
-35.324.6
45ROSS CRK
1.037143.1
-37.
8
-43.4
-26.4
-40.2-64.1
9.9
-10.0
10.1
8.3-21.1
-8.321.0
-38.2
-10.
1
-4.4
-29.6-18.6
-60.9
-21.6
-79.4
793SCORIA1
1.027141.7
23.912.3
-23.9-12.4
-22.5
2954ABEE_02
1.0294.3
996.91.9
18420WEASEL2
1.0454.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.8R
9.2R
2030DOWSTG 9
1.03015.1
37.4
5.2R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3
G4
2835LAMONT_LV1
3835LAMONT_LV2
71.528.6R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 67
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A706L (N-1)FIG C-27FRI, AUG 19 2016 15:38
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.037249.0
443BANN_240
1.017244.0
109DEERLAN4
1.033247.9
771AMELIA1
1.014243.4
313JOSEPH1
1.005241.3
-7.4-129.6
7.5
57LAMOURE4
1.007241.7
17.8-66.7-19.3
44.7149.6
-44.5-149.9
157.6
-157.1-86.4
-272.70.0
273.77.3
-118.4-68.0
118.666.7
66.7
128.9
85.0
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-3.3
R
7185SCOTF ST
1.03014.2
68.132.6R
4185SCOTF GT
1.03014.2
70.230.1R
627AIR LIQC
1.03014.2
68.123.6R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.043143.9
0.97
5
936808L_TAP
1.033142.5
67BRUDERH7
1.038143.3
33.821.6
29.818.2
314JOSEPH2
1.037143.1
0.95
-72.4-81.4
0.95
-72.6-81.7
391ALBCHEM7
1.038143.3
735SHELL TP
1.033142.5
952DIAM TAP
1.036142.9
43SCOT4_7
1.034142.7
12.5-7.4
-12.56.0
44.136.7
-67.644.267.7
-66.044.2
-12.56.0-6.2
948808_BNDY
1.032142.4
59REDWATE7
1.023141.2
-9.9-1.0
-23.6
1420WEASEL1
1.029142.0
1.0-9.8-2.1
954ABEE_01
1.028141.8
-6.9-2.1
6.91.460
BEAMER 7
1.027141.8
734SHELL A1
1.033142.5
48DIAM SH7
1.036142.9
58FORT SA7
1.032142.5
185SCOT4_8
1.034142.7
628ALC SCOT
1.032142.4
394ASTOTIN
1.038143.3
821708ALTAP
1.028141.9
61DOW CHEM
1.036143.0
62SHERRIT7
1.034142.6
63LAMOURE7
1.038143.2
-29.5
-43.73.7
42.9
0.40.1 -0.3
-6.9
13.2
-4.222.23.5
-23.3
-6.117.1
-92.
01.
792
.4
-31.
9-2
2.0
32.021.9
56.2 0.97
83
64.3105.0
0.94
161
25.5
-64.0
64.148.3
12.5
-0.4
-13.2
50RIVERSID
1.028141.8
-35.9-18.9
-44.1
66.1
49.3
393DOW HYD7
1.036142.9
922ROSS TAP
1.036143.0
38.6
-4.3
-38.
64.
272
.4-1
5.6
27.0
9.6
-27.
2
-34.525.6
45ROSS CRK
1.036143.0
-37.
8
-48.1
-25.2
-39.7-63.6
9.9
-9.6
6.7
20.4-7.1
-20.47.1
-44.231.6
-10.
1
-1.1
-29.7-18.6
-64.2
-22.1
-59.8
793SCORIA1
1.027141.8
23.912.3
-23.9-12.4
-22.1
2954ABEE_02
1.0294.3
996.91.9
18420WEASEL2
1.0454.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.6R
9.4R
2030DOWSTG 9
1.03015.1
37.4
5.6R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3
G4
2835LAMONT_LV1
3835LAMONT_LV2
71.528.6R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 68
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A707L (N-1)FIG C-28FRI, AUG 19 2016 15:38
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.037248.9
443BANN_240
1.016243.9
109DEERLAN4
1.032247.8
771AMELIA1
1.014243.3
313JOSEPH1
1.005241.1
-7.8-130.1
7.9
57LAMOURE4
1.007241.6
21.6-74.5-23.0
45.2150.2
-44.9-150.5
156.7
-156.2-86.4
-273.8-0.8
274.88.2
-117.5-68.0
117.766.7
74.5
129.5
84.9
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-4.5
R
7185SCOTF ST
1.03014.2
68.133.2R
4185SCOTF GT
1.03014.2
70.230.7R
627AIR LIQC
1.03014.2
68.124.4R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.042143.8
0.97
5
936808L_TAP
1.032142.4
67BRUDERH7
1.038143.2
33.721.7
30.918.7
314JOSEPH2
1.035142.9
0.95
-76.5-83.5
0.95
-76.7-83.7
391ALBCHEM7
1.037143.2
735SHELL TP
1.031142.3
952DIAM TAP
1.035142.8
43SCOT4_7
1.033142.5
11.4-7.8
-11.46.5
41.036.1
16.57.1
-66.642.166.7
-65.042.2
-11.46.4-6.6
948808_BNDY
1.031142.3
59REDWATE7
1.022141.1
-9.9-1.0
-23.5
1420WEASEL1
1.028141.9
1.0-9.8-2.1
954ABEE_01
1.027141.7
-6.9-2.1
6.91.460
BEAMER 7
1.026141.6
734SHELL A1
1.031142.3
48DIAM SH7
1.035142.8
58FORT SA7
1.031142.3
185SCOT4_8
1.033142.5
628ALC SCOT
1.031142.2
394ASTOTIN
1.037143.2
821708ALTAP
1.027141.8
61DOW CHEM
1.038143.2
62SHERRIT7
1.033142.5
63LAMOURE7
1.038143.2
-28.8
-0.3-0.3
-16.
2-7
.8
-46.32.4
42.2
0.40.1 -0.3
-7.4
20.5
-4.122.33.4
-23.2
-4.617.1
-101
.7-1
3.3
101.913.5
51.5 0.97
83
59.0103.6
0.94
161
26.3
-133.8
134.240.7
11.4
-0.4
-20.5
50RIVERSID
1.027141.7
-35.9-18.9
-42.1
65.1
56.7
393DOW HYD7
1.036143.0
922ROSS TAP
1.037143.2
74.1
-5.8
-74.
06.
012
9.4
-18.
2
29.0
45.0
-29.
0
-91.329.1
45ROSS CRK
1.037143.2
-37.
8
-39.7
-26.3
-40.3-64.6
9.9
-44.9
7.2
16.3-7.2
-16.37.2
-42.230.1
-10.
1
-30.9-19.0
-57.0
-22.2
-57.2
793SCORIA1
1.027141.7
23.912.3
-23.9-12.4
-22.2
2954ABEE_02
1.0284.3
996.91.9
18420WEASEL2
1.0444.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.0R
9.0R
2030DOWSTG 9
1.03015.1
37.4
4.8R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3
G4
2835LAMONT_LV1
3835LAMONT_LV2
71.529.0R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 69
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A787L (N-1)FIG C-29FRI, AUG 19 2016 15:38
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.038249.2
443BANN_240
1.018244.3
109DEERLAN4
1.034248.1
771AMELIA1
1.015243.7
313JOSEPH1
1.006241.5
-3.7-129.3
3.8
57LAMOURE4
1.008242.0
23.3-62.7-24.9
41.1149.2
-40.9-149.7
154.9
-154.4-85.4
-269.7-0.7
270.67.8
-115.7-67.1
115.965.7
62.7
128.7
83.8
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-5.9
R
7185SCOTF ST
1.03014.2
68.132.3R
4185SCOTF GT
1.03014.2
70.229.8R
627AIR LIQC
1.03014.2
68.123.2R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.044144.0
0.97
5
936808L_TAP
1.034142.7
67BRUDERH7
1.039143.4
32.821.6
28.718.8
314JOSEPH2
1.037143.1
0.95
-68.6-83.9
0.95
-68.8-84.1
391ALBCHEM7
1.039143.4
735SHELL TP
1.033142.6
952DIAM TAP
1.037143.1
43SCOT4_7
1.034142.7
13.6-8.0
-13.66.6
43.035.3
-6.28.7
-66.743.566.9
-65.143.6
-13.56.6-6.8
948808_BNDY
1.032142.5
59REDWATE7
1.024141.3
-9.9-1.0
-22.6
1420WEASEL1
1.030142.1
1.0-9.8-2.1
954ABEE_01
1.029142.0
-6.9-2.1
6.91.460
BEAMER 7
1.028141.9
734SHELL A1
1.033142.6
48DIAM SH7
1.037143.1
58FORT SA7
1.035142.9
185SCOT4_8
1.034142.7
628ALC SCOT
1.032142.5
394ASTOTIN
1.039143.4
821708ALTAP
1.030142.1
61DOW CHEM
1.039143.4
62SHERRIT7
1.036143.0
63LAMOURE7
1.041143.6
-25.5
-0.3-0.3
6.5
-9.4
-44.62.7
42.3
0.40.1 -0.3
-10.8
16.7
-4.123.23.4
-21.8
-5.618.2
-128
.417
.312
9.1
-8.4
-27.
9
8.427.8
49.8 0.97
83
57.1101.1
0.94
161
29.6
-40.4
40.554.0
13.5
-0.4
-16.7
50RIVERSID
1.029142.0
-35.9-18.9
-43.5
65.2
52.9
393DOW HYD7
1.039143.3
922ROSS TAP
1.037143.1
74.3
-11.
4-7
4.2
11.6
34.7
45.2
-34.
7
45ROSS CRK
1.037143.1
-53.9
-29.0
-40.3-61.5
9.9
-45.1
10.6
19.0-9.6
-19.09.6
-43.531.1
-16.
0
-28.7-19.2
-61.8
-23.2
-58.9
793SCORIA1
1.029142.0
23.912.3
-23.9-12.4
-22.1
2954ABEE_02
1.0304.3
996.91.9
18420WEASEL2
1.0464.4
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.6R
8.5R
2030DOWSTG 9
1.03015.1
37.4
3.8R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3
G4
2835LAMONT_LV1
3835LAMONT_LV2
71.528.1R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 70
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A862L (N-1)FIG C-30FRI, AUG 19 2016 15:38
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.037248.9
443BANN_240
1.016243.9
109DEERLAN4
1.033247.9
771AMELIA1
1.014243.4
313JOSEPH1
1.005241.2
-7.5-129.9
7.5
57LAMOURE4
1.007241.6
21.0-66.8-22.6
44.8149.9
-44.6-150.3
157.7
-157.2-86.3
-272.8-0.6
273.88.0
-118.5-67.8
118.766.6
66.8
129.3
84.9
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-4.1
R
7185SCOTF ST
1.03014.2
68.133.0R
4185SCOTF GT
1.03014.2
70.230.5R
627AIR LIQC
1.03014.2
68.124.2R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.043143.9
0.97
5
936808L_TAP
1.032142.5
67BRUDERH7
1.038143.2
33.921.6
29.918.7
314JOSEPH2
1.036142.9
0.95
-72.5-83.2
0.95
-72.7-83.5
391ALBCHEM7
1.038143.2
735SHELL TP
1.032142.4
952DIAM TAP
1.035142.9
43SCOT4_7
1.033142.5
12.4-7.9
-12.46.5
43.835.5
0.87.7
-66.444.066.5
-64.844.1
-12.46.5-6.6
948808_BNDY
1.031142.3
59REDWATE7
1.023141.1
-9.9-1.0
-23.7
1420WEASEL1
1.029142.0
1.0-9.8-2.1
954ABEE_01
1.027141.8
-6.9-2.1
6.91.460
BEAMER 7
1.027141.7
734SHELL A1
1.032142.4
48DIAM SH7
1.035142.9
58FORT SA7
1.033142.6
185SCOT4_8
1.033142.6
628ALC SCOT
1.031142.3
394ASTOTIN
1.038143.2
821708ALTAP
1.028141.8
61DOW CHEM
1.037143.1
62SHERRIT7
1.034142.7
63LAMOURE7
1.038143.3
-27.2
-0.3-0.3
-0.5
-8.4
-43.92.2
42.0
0.40.1 -0.3
-9.2
13.7
-4.222.13.5
-22.6
-6.017.5
-105
.77.
610
6.2
-19.
0-2
0.0
19.019.9
56.6 0.97
83
64.7103.6
0.94
161
27.9
-51.0
51.146.2
12.4
-0.4
-13.7
50RIVERSID
1.027141.8
-35.9-18.9
-44.0
64.9
49.8
393DOW HYD7
1.036142.9
922ROSS TAP
1.037143.1
97.3
-16.
1
22.9
-29.
0-2
3.0
-59.326.4
45ROSS CRK
1.037143.1
-37.
8
-46.1
-26.4
-40.2-63.8
9.9
29.0
9.0
20.1-8.2
-20.18.1
-44.131.5
-10.
1
-6.9
-29.8-19.1
-63.7
-22.1
-59.6
793SCORIA1
1.027141.7
23.912.3
-23.9-12.4
-22.1
2954ABEE_02
1.0294.3
996.91.9
18420WEASEL2
1.0454.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.9R
9.1R
2030DOWSTG 9
1.03015.1
37.4
5.1R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3
G4
2835LAMONT_LV1
3835LAMONT_LV2
71.528.8R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 71
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A861L (N-1)FIG C-31FRI, AUG 19 2016 15:38
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.037249.0
443BANN_240
1.017244.0
109DEERLAN4
1.033247.9
771AMELIA1
1.014243.4
313JOSEPH1
1.005241.2
-7.5-129.7
7.6
57LAMOURE4
1.007241.7
21.8-67.4-23.3
44.9149.7
-44.6-150.1
157.7
-157.1-85.9
-272.9-0.5
273.97.9
-118.4-67.5
118.666.3
67.5
129.1
84.5
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-3.0
R
7185SCOTF ST
1.03014.2
68.132.9R
4185SCOTF GT
1.03014.2
70.230.3R
627AIR LIQC
1.03014.2
68.123.9R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.043143.9
0.97
5
936808L_TAP
1.033142.5
67BRUDERH7
1.038143.3
33.821.5
30.018.7
314JOSEPH2
1.036143.0
0.95
-72.8-83.4
0.95
-73.1-83.7
391ALBCHEM7
1.038143.2
735SHELL TP
1.032142.4
952DIAM TAP
1.036142.9
43SCOT4_7
1.033142.6
12.3-7.9
-12.36.5
43.435.3
2.58.3
-66.443.866.5
-64.843.9
-12.36.5-6.6
948808_BNDY
1.031142.3
59REDWATE7
1.023141.2
-9.9-1.0
-23.6
1420WEASEL1
1.029142.0
1.0-9.8-2.1
954ABEE_01
1.028141.8
-6.9-2.1
6.91.460
BEAMER 7
1.027141.7
734SHELL A1
1.032142.4
48DIAM SH7
1.036142.9
58FORT SA7
1.033142.6
185SCOT4_8
1.033142.6
628ALC SCOT
1.031142.3
394ASTOTIN
1.038143.3
821708ALTAP
1.028141.9
61DOW CHEM
1.036143.0
62SHERRIT7
1.034142.7
63LAMOURE7
1.039143.4
-26.5
-0.3-0.3
-2.1
-9.0
-44.22.2
42.0
0.40.1 -0.3
-10.0
14.6
-4.222.23.6
-22.3
-5.817.7
-94.
214
.194
.5
-28.
2-2
5.6
28.225.6
56.2 0.97
83
64.2102.5
0.94
161
28.7
-60.2
60.351.9
12.3
-0.4
-14.5
50RIVERSID
1.028141.8
-35.9-18.9
-43.8
64.9
50.7
393DOW HYD7
1.033142.6
922ROSS TAP
1.036143.0
29.0
22.9
-29.
0-2
3.1
79.9
-29.
6
-42.039.8
45ROSS CRK
1.036143.0
-37.
8
-51.7
-27.5
-40.2-63.8
9.99.
8
19.7-8.7
-19.78.7
-43.831.4
-10.
1
-13.
5
-30.0-19.1
-62.8
-22.1
-59.3
793SCORIA1
1.028141.8
23.912.3
-23.9-12.4
-22.0
2954ABEE_02
1.0294.3
996.91.9
18420WEASEL2
1.0454.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.4R
9.5R
2030DOWSTG 9
1.03015.1
37.4
5.8R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3
G4
2835LAMONT_LV1
3835LAMONT_LV2
71.528.7R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 72
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A781L (N-1)FIG C-32FRI, AUG 19 2016 15:38
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.037249.0
443BANN_240
1.017244.0
109DEERLAN4
1.033247.9
771AMELIA1
1.014243.4
313JOSEPH1
1.005241.2
-7.8-129.9
7.9
57LAMOURE4
1.007241.8
26.7-73.8-28.1
45.1149.9
-44.9-150.2
156.9
-156.4-85.3
-273.8-1.0
274.88.5
-117.7-66.9
117.965.6
73.8
129.2
83.8
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-3.1
R
7185SCOTF ST
1.03014.2
68.133.2R
4185SCOTF GT
1.03014.2
70.230.7R
627AIR LIQC
1.03014.2
68.124.5R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.043143.9
0.97
5
936808L_TAP
1.032142.5
67BRUDERH7
1.038143.2
33.621.4
31.019.2
314JOSEPH2
1.035142.9
0.95
-76.1-85.7
0.95
-76.4-86.0
391ALBCHEM7
1.037143.2
735SHELL TP
1.031142.3
952DIAM TAP
1.034142.7
43SCOT4_7
1.032142.5
11.4-8.4
-11.47.0
40.634.0
16.717.3
-65.141.965.2
-63.542.0
-11.37.0-7.1
948808_BNDY
1.031142.3
59REDWATE7
1.023141.1
-9.9-1.0
-23.4
1420WEASEL1
1.029142.0
1.0-9.8-2.1
954ABEE_01
1.027141.8
-6.9-2.1
6.91.460
BEAMER 7
1.027141.7
734SHELL A1
1.031142.3
48DIAM SH7
1.034142.7
58FORT SA7
1.028141.8
185SCOT4_8
1.033142.5
628ALC SCOT
1.031142.2
394ASTOTIN
1.038143.2
821708ALTAP
1.028141.9
61DOW CHEM
1.036143.0
62SHERRIT7
1.026141.6
63LAMOURE7
1.040143.5
-23.9
-0.3-0.3
-16.
3-1
7.8
-46.50.6
41.0
0.40.1 -0.3
-12.7
21.4
-4.322.43.7
-21.3
-4.418.2
-133
.4-2
5.0
134.
2
32.0
26.1
-32.0-26.2
52.1 0.97
83
59.798.7
0.94
161
31.6
11.3
-0.4
-21.3
50RIVERSID
1.028141.9
-35.9-18.9
-41.9
63.6
57.6
393DOW HYD7
1.037143.1
922ROSS TAP
1.036143.0
22.6
-14.
8-2
2.6
14.5
46.7
-32.
2
37.4
-6.4
-37.
6
-8.842.2
45ROSS CRK
1.036143.0
-37.
8
-30.9
-40.5-64.6
9.9
6.4
12.5
15.9-10.1
-15.910.1
-42.029.9
-10.
1
26.5
-30.9-19.6
-56.2
-22.3
-57.0
793SCORIA1
1.028141.8
23.912.3
-23.9-12.4
-21.9
2954ABEE_02
1.0294.3
996.91.9
18420WEASEL2
1.0454.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.5R
9.5R
2030DOWSTG 9
1.03015.1
37.4
5.7R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3
G4
2835LAMONT_LV1
3835LAMONT_LV2
71.528.8R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 73
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A709L (N-1)FIG C-33FRI, AUG 19 2016 15:38
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.037249.0
443BANN_240
1.017244.0
109DEERLAN4
1.033247.9
771AMELIA1
1.014243.4
313JOSEPH1
1.005241.2
-7.6-129.8
7.7
57LAMOURE4
1.007241.7
23.4-70.8-24.9
45.0149.8
-44.8-150.2
157.2
-156.7-85.8
-273.3-0.7
274.38.2
-118.0-67.4
118.266.1
70.8
129.2
84.3
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-3.6
R
7185SCOTF ST
1.03014.2
68.133.0R
4185SCOTF GT
1.03014.2
70.230.5R
627AIR LIQC
1.03014.2
68.124.2R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.043143.9
0.97
5
936808L_TAP
1.032142.5
67BRUDERH7
1.038143.2
33.721.5
30.518.9
314JOSEPH2
1.036142.9
0.95
-74.6-84.2
0.95
-74.8-84.5
391ALBCHEM7
1.038143.2
735SHELL TP
1.032142.4
952DIAM TAP
1.035142.8
43SCOT4_7
1.033142.5
11.9-8.0
-11.86.7
42.035.0
9.611.2
-66.042.966.1
-64.442.9
-11.86.6-6.8
948808_BNDY
1.031142.3
59REDWATE7
1.023141.1
-9.9-1.0
-23.5
1420WEASEL1
1.029142.0
1.0-9.8-2.1
954ABEE_01
1.027141.8
-6.9-2.1
6.91.460
BEAMER 7
1.027141.7
734SHELL A1
1.032142.4
48DIAM SH7
1.035142.8
58FORT SA7
1.031142.3
185SCOT4_8
1.033142.5
628ALC SCOT
1.031142.3
394ASTOTIN
1.038143.2
821708ALTAP
1.028141.9
61DOW CHEM
1.037143.0
62SHERRIT7
1.037143.1
63LAMOURE7
1.039143.4
-25.9
-0.3-0.3
-9.3
-11.
9
-45.31.7
41.7
0.40.1 -0.3
-10.5
17.9
-4.322.33.6
-22.1
-5.117.8
-111
.8-7
.411
2.3
54.0 0.97
83
61.8101.3
0.94
161
29.3
-32.0
32.026.0
11.8
-0.4
-17.9
50RIVERSID
1.028141.8
-35.9-18.9
-42.8
64.5
54.1
393DOW HYD7
1.037143.1
922ROSS TAP
1.037143.1
31.0
-8.2
-31.
08.
060
.2-2
1.8
30.9
2.0
-31.
0
-22.331.7
45ROSS CRK
1.037143.1
-37.
8
-26.1
-28.5
-40.3-64.2
9.9
-2.0
10.3
17.8-9.0
-17.88.9
-42.930.7
-10.
1
8.3
-30.4-19.2
-59.6
-22.2
-58.2
793SCORIA1
1.027141.8
23.912.3
-23.9-12.4
-22.0
2954ABEE_02
1.0294.3
996.91.9
18420WEASEL2
1.0454.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.7R
9.3R
2030DOWSTG 9
1.03015.1
37.4
5.4R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3
G4
2835LAMONT_LV1
3835LAMONT_LV2
71.528.8R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 74
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A694L (N-1)FIG C-34FRI, AUG 19 2016 15:38
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.037248.9
443BANN_240
1.016243.9
109DEERLAN4
1.033247.9
771AMELIA1
1.014243.4
313JOSEPH1
1.005241.2
-3.8-130.1
3.9
57LAMOURE4
1.007241.7
21.9-60.3-23.5
41.2150.1
-41.0-150.5
154.8
-154.2-86.4
-268.3-1.2
269.38.1
-115.6-68.1
115.766.7
60.4
129.5
84.8
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-3.9
R
7185SCOTF ST
1.03014.2
68.133.1R
4185SCOTF GT
1.03014.2
70.230.5R
627AIR LIQC
1.03014.2
68.124.2R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.042143.8
0.97
5
936808L_TAP
1.032142.4
67BRUDERH7
1.038143.2
32.621.9
28.619.0
314JOSEPH2
1.036142.9
0.95
-67.5-83.9
0.95
-67.7-84.2
391ALBCHEM7
1.037143.2
735SHELL TP
1.032142.4
952DIAM TAP
1.035142.9
43SCOT4_7
1.033142.5
13.8-8.1
-13.86.8
42.935.5
-8.39.5
-66.343.466.5
-64.743.5
-13.76.7-6.9
948808_BNDY
1.031142.3
59REDWATE7
1.023141.1
-9.9-1.0
-22.4
1420WEASEL1
1.029141.9
1.0-9.8-2.1
954ABEE_01
1.027141.7
-6.9-2.1
6.91.460
BEAMER 7
1.027141.7
734SHELL A1
1.032142.4
48DIAM SH7
1.035142.9
58FORT SA7
1.034142.7
185SCOT4_8
1.033142.5
628ALC SCOT
1.031142.3
394ASTOTIN
1.038143.2
821708ALTAP
1.028141.8
61DOW CHEM
1.037143.1
62SHERRIT7
1.035142.8
63LAMOURE7
1.038143.3
-27.2
-0.3-0.3
8.7
-10.
2
-44.72.1
42.0
0.40.1 -0.3
-8.8
17.1
-3.823.43.1
-22.6
-5.517.5
-75.
42.
075
.6
-2.8
-21.
4
2.821.3
47.1 0.97
83
54.1103.1
0.94
161
27.6
-34.8
34.847.4
13.7
-0.4
-17.1
50RIVERSID
1.027141.8
-35.9-18.9
-43.4
64.8
53.3
393DOW HYD7
1.036143.0
922ROSS TAP
1.037143.1
45.1
-4.6
-45.
04.
582
.8-1
6.1
27.4
16.0
-27.
5
-44.826.2
45ROSS CRK
1.037143.1
-37.
8
-47.4
-26.8
-40.8-61.2
9.9
-16.0
8.6
18.8-8.2
-18.88.1
-43.431.1
-10.
1
-1.8
-28.5-19.3
-61.5
-23.3
-58.8
793SCORIA1
1.027141.7
23.912.3
-23.9-12.4
-22.4
2954ABEE_02
1.0294.3
996.91.9
18420WEASEL2
1.0444.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.8R
9.2R
2030DOWSTG 9
1.03015.1
37.4
5.2R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3
G4
2835LAMONT_LV1
3835LAMONT_LV2
71.528.8R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 75
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A700L (N-1)FIG C-35FRI, AUG 19 2016 15:38
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.037248.9
443BANN_240
1.016243.9
109DEERLAN4
1.033247.8
771AMELIA1
1.014243.3
313JOSEPH1
1.005241.1
-4.9-130.3
5.0
57LAMOURE4
1.007241.6
22.2-62.7-23.8
42.3150.3
-42.1-150.6
155.5
-155.0-86.5
-269.7-1.3
270.78.4
-116.3-68.1
116.566.8
62.8
129.6
85.0
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-3.5
R
7185SCOTF ST
1.03014.2
68.133.2R
4185SCOTF GT
1.03014.2
70.230.6R
627AIR LIQC
1.03014.2
68.124.4R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.042143.8
0.97
5
936808L_TAP
1.032142.4
67BRUDERH7
1.038143.2
33.021.9
29.019.0
314JOSEPH2
1.035142.9
0.95
-69.2-84.1
0.95
-69.4-84.4
391ALBCHEM7
1.037143.2
735SHELL TP
1.032142.4
952DIAM TAP
1.035142.9
43SCOT4_7
1.033142.5
13.3-8.1
-13.36.8
43.035.5
-4.89.9
-66.343.566.4
-64.743.6
-13.36.7-6.9
948808_BNDY
1.031142.3
59REDWATE7
1.022141.1
-9.9-1.0
-22.8
1420WEASEL1
1.028141.9
1.0-9.8-2.1
954ABEE_01
1.027141.7
-6.9-2.1
6.91.460
BEAMER 7
1.026141.7
734SHELL A1
1.032142.3
48DIAM SH7
1.035142.9
58FORT SA7
1.033142.6
185SCOT4_8
1.033142.5
628ALC SCOT
1.031142.2
394ASTOTIN
1.037143.2
821708ALTAP
1.027141.8
61DOW CHEM
1.037143.0
62SHERRIT7
1.034142.7
63LAMOURE7
1.038143.2
-27.4
-0.3-0.3
5.1
-10.
6
-44.62.1
41.9
0.40.1 -0.3
-8.6
16.4
-3.823.03.1
-22.7
-5.617.4
-80.
40.
880
.7
-11.
5-2
3.1
11.523.0
49.7 0.97
83
57.0104.0
0.94
161
27.4
-43.5
43.549.2
13.3
-0.4
-16.4
50RIVERSID
1.027141.7
-35.9-18.9
-43.5
64.8
52.6
393DOW HYD7
1.036143.0
922ROSS TAP
1.036143.0
43.1
-4.7
-43.
14.
679
.7-1
6.3
27.5
14.1
-27.
7
-41.726.4
45ROSS CRK
1.036143.0
-37.
8
-49.2
-26.0
-40.8-62.0
9.9
-14.1
8.4
19.0-8.0
-19.07.9
-43.531.1
-10.
1
-0.5
-29.0-19.3
-61.8
-22.9
-59.0
793SCORIA1
1.027141.7
23.912.3
-23.9-12.4
-22.4
2954ABEE_02
1.0284.3
996.91.9
18420WEASEL2
1.0444.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.6R
9.3R
2030DOWSTG 9
1.03015.1
37.4
5.5R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3
G4
2835LAMONT_LV1
3835LAMONT_LV2
71.528.9R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 76
File No. RP-05-1381
Attachment D 2020SP Sensitivity Power Flow Diagrams
August 2016 P1381 807L Capacity Increase 77
File No. RP-05-1381
Table D-1: 2020SP Sensitivity Contingency Lists
Figure # Scenario Condition
D-1 20_1a_Sen Base Case (N-0) D-2 20_1a_Sen 942L (N-1) 71S Lamoureux to 681S Bannerman D-3 20_1a_Sen 1061L (N-1) 681S Bannerman to 12S Heartland D-4 20_1a_Sen 997L (N-1) 71S Lamoureux to 410S Josephburg D-5 20_1a_Sen 1120L (N-1) 410S Josephburg to 108S Amelia D-6 20_1a_Sen 943L (N-1) 13S Deerland to 108S Amelia D-7 20_1a_Sen 1054L (N-1) 12S Heartland to 13S Deerland D-8 20_1a_Sen 9L960 (N-1) 13S Deerland to 825S Whitefish Lake D-9 20_1a_Sen 9L961 (N-1) 13S Deerland to 825S Whitefish Lake D-10 20_1a_Sen 920L (N-1) 71S Lamoureux to 557S Castle Downs D-11 20_1a_Sen 921L (N-1) 71S Lamoureux to 987S Clover Bar D-12 20_1a_Sen 708L (N-1) 233S Beamer to 71S Lamoureux D-13 20_1a_Sen 807L (N-1) 410S Josephburg to 233S Beamer D-14 20_1a_Sen 735L (N-1) 233S Beamer to 171S Redwater D-15 20_1a_Sen 808L (N-1) 171S Redwater to 13S Deerland D-16 20_1a_Sen 621L (N-1) 13S Deerland to 109S Skaro D-17 20_1a_Sen 815L (N-1) 13S Deerland to 127S Bruderheim D-18 20_1a_Sen 846L (N-1) 127S Bruderheim D-19 20_1a_Sen 773L (N-1) 127S Bruderheim to 308S Albchem Beaverhill Creek D-20 20_1a_Sen 776L (N-1) 410S Josephburg to 308S Albchem Beaverhill Creek D-21 20_1a_Sen 856L (N-1) 410S Josephburg to 409S Shell Scotford D-22 20_1a_Sen 857L (N-1) 410S Josephburg to 409S Shell Scotford D-23 20_1a_Sen ALCO2L (N-1) 879S Scotford Upgrader to 409S Shell Scotford D-24 20_1a_Sen EXI-01L (N-1) 879S Scotford Upgrader to 402S Scotford Expansion 1 D-25 20_1a_Sen ALC03L (N-1) 402S Scotford Expansion 1 to Air Liquide D-26 20_1a_Sen ALC01L (N-1) Air Liquide to 409S Shell Scotford D-27 20_1a_Sen 706L (N-1) 410S Josephburg to 54S Fort Saskatchewan D-28 20_1a_Sen 707L (N-1) 233S Beamer to 71S Lamoureux D-29 20_1a_Sen 787L (N-1) 71S Lamoureux to 166S Dow Chemical D-30 20_1a_Sen 862L (N-1) 166S Dow Chemical to 258S Dow HydroCarbons D-31 20_1a_Sen 861L (N-1) 71S Lamoureux to 258S Dow HydroCarbons D-32 20_1a_Sen 781L (N-1) 172S Sherritt to 71S Lamoureux D-33 20_1a_Sen 709L (N-1) 233S Beamer to 71S Lamoureux D-34 20_1a_Sen 694L (N-1) 54S Fort Saskatchewan to 422S Westwood D-35 20_1a_Sen 700L (N-1) 422S Westwood to 746S Sherwood Park
August 2016 P1381 807L Capacity Increase 78
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A SENSITIVITYBASE CASE (N-0)FIG D-1FRI, AUG 19 2016 15:39
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.7
443BANN_240
1.032247.6
109DEERLAN4
1.051252.3
771AMELIA1
1.035248.4
313JOSEPH1
1.027246.5
104.0-121.3
-103.9
57LAMOURE4
1.021245.1
-64.9200.566.1
-66.6141.4
66.9-142.0
106.2
-105.9-96.0
-182.24.4
182.7-4.5
-67.3-78.8
67.476.4
-200.3
121.1
91.8
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-5.8
R
7185SCOTF ST
1.03014.2
68.134.5R
4185SCOTF GT
1.03014.2
70.232.0R
627AIR LIQC
1.03014.2
68.126.3R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.035142.8
1.00
28
936808L_TAP
1.026141.6
67BRUDERH7
1.031142.3
28.817.4
19.315.2
314JOSEPH2
1.032142.5
0.97
955
-103.9-59.3
0.97
955
-104.3-59.5
391ALBCHEM7
1.031142.3
735SHELL TP
1.029142.0
952DIAM TAP
1.033142.5
43SCOT4_7
1.030142.1
23.1-4.3
-23.03.1
53.626.9
28.9-22.0
-59.851.459.9
-58.251.2
-23.03.1-3.2
948808_BNDY
1.025141.5
59REDWATE7
1.018140.5
-9.9-1.1
-18.7
1420WEASEL1
1.023141.1
1.1-9.8-2.1
954ABEE_01
1.021140.9
-6.9-2.1
6.91.460
BEAMER 7
1.025141.4
734SHELL A1
1.029142.0
48DIAM SH7
1.033142.5
58FORT SA7
1.035142.9
185SCOT4_8
1.030142.1
628ALC SCOT
1.028141.9
394ASTOTIN
1.031142.3
821708ALTAP
1.027141.7
61DOW CHEM
1.039143.4
62SHERRIT7
1.037143.0
63LAMOURE7
1.041143.7
-9.6
-0.3-0.3
-28.
421
.6
-34.9-6.1
37.1
0.40.1 -0.3
-30.9
-5.4
-8.127.27.5
-16.9
-11.420.5
-89.
1-0
.189
.4
-27.
0-2
9.2
27.029.1
62.4 0.97
83
71.2146.3
0.94
161
49.6
-59.0
59.255.5
23.0
-0.4
5.4
50RIVERSID
1.026141.6
-35.9-18.9
-51.3
58.3
30.8
393DOW HYD7
1.039143.4
922ROSS TAP
1.039143.4
39.8
-7.4
-39.
77.
274
.3-2
0.5
30.1
10.7
-30.
2
-36.430.5
45ROSS CRK
1.039143.4
-37.
8
-55.3
8.5
-32.6-48.1
9.9
-10.7
30.7
34.5-16.8
-34.516.8
-51.237.0
-10.
1
0.6
-19.3-15.7
-87.8
-27.1
-68.6
793SCORIA1
1.026141.6
23.912.3
-23.9-12.4
-18.1
2954ABEE_02
1.0234.3
996.91.9
18420WEASEL2
1.0394.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.6R
8.5R
2030DOWSTG 9
1.03015.1
37.4
3.9R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3248.070.9R
G4200.051.1R
2835LAMONT_LV1
3835LAMONT_LV2
71.516.0R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 79
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A SENSITIVITY942L (N-1)FIG D-2FRI, AUG 19 2016 15:39
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.064255.3
443BANN_240
1.060254.4
109DEERLAN4
1.055253.2
771AMELIA1
1.035248.4
313JOSEPH1
1.025246.0
75.6-149.3
-75.5
57LAMOURE4
1.016243.9
-102.5230.6105.1
-38.1170.2
38.4-170.2
38.5
-38.5-19.6
-220.6-33.8
221.236.3
-230.2
149.2
11.3
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-3.5
R
7185SCOTF ST
1.03014.2
68.135.4R
4185SCOTF GT
1.03014.2
70.232.8R
627AIR LIQC
1.03014.2
68.127.5R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.036143.0
1.00
28
936808L_TAP
1.027141.7
67BRUDERH7
1.032142.4
32.119.6
23.218.6
314JOSEPH2
1.031142.2
0.97
955
-103.1-57.8
0.97
955
-103.4-58.0
391ALBCHEM7
1.032142.4
735SHELL TP
1.027141.8
952DIAM TAP
1.031142.3
43SCOT4_7
1.028141.9
19.2-7.7
-19.16.5
53.526.7
31.4-20.0
-59.151.359.2
-57.551.2
-19.16.4-6.6
948808_BNDY
1.025141.5
59REDWATE7
1.018140.4
-9.9-1.0
-22.0
1420WEASEL1
1.023141.2
1.0-9.8-2.1
954ABEE_01
1.022141.0
-6.9-2.1
6.91.460
BEAMER 7
1.023141.1
734SHELL A1
1.027141.8
48DIAM SH7
1.031142.3
58FORT SA7
1.033142.5
185SCOT4_8
1.028141.9
628ALC SCOT
1.026141.6
394ASTOTIN
1.032142.4
821708ALTAP
1.025141.4
61DOW CHEM
1.037143.0
62SHERRIT7
1.034142.7
63LAMOURE7
1.038143.3
-10.5
-0.3-0.3
-30.
919
.6
-35.0-7.1
36.5
0.40.1 -0.3
-27.8
-8.4
-6.123.95.4
-17.5
-11.419.9
-87.
7-0
.688
.1
-24.
3-2
6.0
24.326.0
57.4 0.97
83
65.6137.9
0.94
161
46.5
-56.3
56.452.3
19.1
-0.4
8.4
50RIVERSID
1.024141.3
-35.9-18.9
-51.3
57.6
27.7
393DOW HYD7
1.036143.0
922ROSS TAP
1.037143.0
40.3
-5.3
-40.
35.
275
.1-1
7.3
28.1
11.3
-28.
3
-37.227.3
45ROSS CRK
1.037143.0
-37.
8
-52.1
2.2
-38.2-55.3
9.9
-11.3
27.6
34.4-15.7
-34.415.7
-51.136.9
-10.
1
1.1
-23.1-19.0
-87.5
-23.8
-68.5
793SCORIA1
1.024141.3
23.912.3
-23.9-12.4
-20.2
2954ABEE_02
1.0234.3
996.91.9
18420WEASEL2
1.0394.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.7R
9.3R
2030DOWSTG 9
1.03015.1
37.4
5.5R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3248.075.1R
G4200.054.1R
2835LAMONT_LV1
3835LAMONT_LV2
71.517.2R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 80
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A SENSITIVITY1061L (N-1)FIG D-3FRI, AUG 19 2016 15:39
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.065255.7
443BANN_240
1.012242.9
109DEERLAN4
1.055253.2
771AMELIA1
1.035248.3
313JOSEPH1
1.024245.8
59.6-153.2
-59.5
57LAMOURE4
1.015243.6
-109.8247.5113.1
-22.2174.2
22.4-174.1
-241.2-38.5
242.042.7
38.516.3
-38.5-19.7
-247.1
153.2
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-2.7
R
7185SCOTF ST
1.03014.2
68.135.7R
4185SCOTF GT
1.03014.2
70.233.2R
627AIR LIQC
1.03014.2
68.128.1R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.036143.0
1.00
28
936808L_TAP
1.026141.6
67BRUDERH7
1.032142.4
33.719.7
25.319.0
314JOSEPH2
1.030142.1
0.97
955
-102.6-57.4
0.97
955
-103.0-57.6
391ALBCHEM7
1.031142.3
735SHELL TP
1.027141.7
952DIAM TAP
1.030142.2
43SCOT4_7
1.027141.8
17.1-8.1
-17.16.8
53.526.7
32.5-19.7
-58.751.358.9
-57.251.2
-17.06.8-6.9
948808_BNDY
1.025141.5
59REDWATE7
1.017140.4
-9.9-1.1
-23.5
1420WEASEL1
1.023141.1
1.1-9.8-2.1
954ABEE_01
1.021140.9
-6.9-2.1
6.91.460
BEAMER 7
1.022141.0
734SHELL A1
1.027141.7
48DIAM SH7
1.030142.2
58FORT SA7
1.032142.4
185SCOT4_8
1.028141.8
628ALC SCOT
1.026141.5
394ASTOTIN
1.032142.4
821708ALTAP
1.024141.3
61DOW CHEM
1.036142.9
62SHERRIT7
1.033142.5
63LAMOURE7
1.037143.1
-11.0
-0.3-0.3
-32.
019
.4
-35.0-7.5
36.3
0.40.1 -0.3
-27.3
-10.
0
-6.022.35.4
-17.7
-11.419.7
-87.
0-1
.187
.3
-22.
9-2
5.4
22.925.3
54.6 0.97
83
62.5136.0
0.94
161
46.0
-54.9
55.051.7
17.0
-0.4
10.0
50RIVERSID
1.023141.2
-35.9-18.9
-51.3
57.3
26.1
393DOW HYD7
1.035142.8
922ROSS TAP
1.036142.9
40.6
-4.8
-40.
54.
675
.6-1
6.3
27.5
11.6
-27.
7
-37.726.4
45ROSS CRK
1.036142.9
-37.
8
-51.5
0.8
-38.7-59.0
9.9
-11.5
27.1
34.4-15.2
-34.415.2
-51.136.9
-10.
1
1.5
-25.2-19.4
-87.5
-22.2
-68.5
793SCORIA1
1.023141.2
23.912.3
-23.9-12.4
-20.3
2954ABEE_02
1.0234.3
996.91.9
18420WEASEL2
1.0394.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.3R
9.6R
2030DOWSTG 9
1.03015.1
37.4
6.0R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3248.076.8R
G4200.055.3R
2835LAMONT_LV1
3835LAMONT_LV2
71.517.7R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 81
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A SENSITIVITY997L (N-1)FIG D-4FRI, AUG 19 2016 15:39
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.052252.4
443BANN_240
1.026246.2
109DEERLAN4
1.054252.8
771AMELIA1
1.040249.6
313JOSEPH1
1.034248.1
197.0-103.4
-196.7
57LAMOURE4
1.013243.2
-159.3126.9
159.7-125.6
157.7
-157.1-110.5
-103.517.9
103.7-21.6
-118.4-91.8
118.690.9
104.7
109.8
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-2.1
R
7185SCOTF ST
1.03014.2
68.132.6R
4185SCOTF GT
1.03014.2
70.230.1R
627AIR LIQC
1.03014.2
68.123.6R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.037143.2
1.00
28
936808L_TAP
1.029141.9
67BRUDERH7
1.034142.7
31.817.8
14.714.1
314JOSEPH2
1.037143.1
0.97
955
-157.6-67.0
0.97
955
-158.1-67.2
391ALBCHEM7
1.035142.8
735SHELL TP
1.033142.5
952DIAM TAP
1.036143.0
43SCOT4_7
1.034142.7
27.7-3.1
-27.62.0
72.730.3
86.6-20.7
-64.664.564.8
-62.864.2
-27.62.0-2.1
948808_BNDY
1.027141.8
59REDWATE7
1.020140.8
-9.9-1.0
-21.6
1420WEASEL1
1.025141.4
1.0-9.8-2.1
954ABEE_01
1.023141.2
-6.9-2.1
6.91.460
BEAMER 7
1.026141.5
734SHELL A1
1.033142.5
48DIAM SH7
1.036143.0
58FORT SA7
1.032142.4
185SCOT4_8
1.034142.7
628ALC SCOT
1.032142.4
394ASTOTIN
1.034142.7
821708ALTAP
1.026141.6
61DOW CHEM
1.035142.8
62SHERRIT7
1.032142.5
63LAMOURE7
1.036143.0
-15.2
-0.3-0.3
-85.
322
.3
-18.7-0.2
40.6
0.40.1 -0.3
-24.8
-53.
0
-7.824.27.2
-19.3
-21.319.5
-71.
6-2
.571
.9
4.3
-26.
1
-4.326.0
21.1 0.97
83
25.2133.3
0.94
161
43.5
-27.7
27.852.2
27.6
-0.4
53.0
50RIVERSID
1.026141.6
-35.9-18.9
-64.4
62.9
-16.9
393DOW HYD7
1.034142.7
922ROSS TAP
1.035142.8
46.5
-4.7
-46.
54.
685
.1-1
6.2
27.5
17.5
-27.
6
-47.226.4
45ROSS CRK
1.035142.8
-37.
8
-52.2
-1.2
-31.9-46.5
9.9
-17.5
24.9
60.6-13.5
-60.613.5
-64.146.8
-10.
1
2.7
-14.7-14.6
-132.5
-24.1
-84.8
793SCORIA1
1.026141.6
23.912.3
-23.9-12.4
-18.5
2954ABEE_02
1.0254.3
996.91.9
18420WEASEL2
1.0414.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.1R
9.8R
2030DOWSTG 9
1.03015.1
37.4
6.4R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3248.057.3R
G4200.041.5R
2835LAMONT_LV1
3835LAMONT_LV2
71.512.2R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 82
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A SENSITIVITY1120L (N-1)FIG D-5FRI, AUG 19 2016 15:39
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.061254.6
443BANN_240
1.033247.9
109DEERLAN4
1.070256.9
771AMELIA1
1.068256.3
313JOSEPH1
1.020244.9
57LAMOURE4
1.019244.4
-2.6272.5
5.9
37.117.3
-37.0-20.7
68.4
-68.0-131.8
-249.877.6
250.7-72.3
-29.4-114.2
29.5112.2
-272.1
127.7
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-4.3
R
7185SCOTF ST
1.03014.2
68.135.7R
4185SCOTF GT
1.03014.2
70.233.1R
627AIR LIQC
1.03014.2
68.127.9R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.042143.8
1.00
28
936808L_TAP
1.031142.2
67BRUDERH7
1.036142.9
19.731.0
1.933.4
314JOSEPH2
1.030142.1
0.97
955
-119.9-41.2
0.97
955
-120.3-41.4
391ALBCHEM7
1.035142.8
735SHELL TP
1.027141.7
952DIAM TAP
1.030142.2
43SCOT4_7
1.027141.8
40.7-21.6
-40.521.1
57.521.1
33.3-25.7
-55.154.455.2
-53.654.2
-40.421.2-21.2
948808_BNDY
1.029142.0
59REDWATE7
1.020140.7
-9.9-1.0
-9.5
1420WEASEL1
1.027141.7
1.0-9.8-2.1
954ABEE_01
1.025141.5
-6.9-2.1
6.91.460
BEAMER 7
1.023141.2
734SHELL A1
1.027141.7
48DIAM SH7
1.030142.2
58FORT SA7
1.033142.6
185SCOT4_8
1.028141.8
628ALC SCOT
1.026141.6
394ASTOTIN
1.036142.9
821708ALTAP
1.025141.5
61DOW CHEM
1.037143.2
62SHERRIT7
1.035142.8
63LAMOURE7
1.039143.4
2.3
-0.3-0.3
-32.
725
.5
-31.1-12.0
33.6
0.40.1 -0.3
-29.5
-6.0
5.336.4-5.7
-13.1
-13.722.5
-88.
7-1
.889
.0
-26.
0-2
9.5
26.129.4
64.2 0.97
83
73.1142.3
0.94
161
48.2
-58.1
58.255.8
40.4
-0.4
6.1
50RIVERSID
1.025141.4
-35.9-18.9
-54.4
53.7
30.1
393DOW HYD7
1.037143.1
922ROSS TAP
1.037143.2
39.9
-6.5
-39.
96.
474
.5-1
9.2
29.3
10.9
-29.
4
-36.629.2
45ROSS CRK
1.037143.2
-37.
8
-55.6
5.7
-64.4-21.6
9.9
-10.9
29.3
40.6-22.7
-40.622.7
-54.239.3
-10.
1
2.3
-1.9-33.8
-97.7
-36.2
-72.4
793SCORIA1
1.025141.4
23.912.3
-23.9-12.4
-31.5
2954ABEE_02
1.0274.3
996.91.9
18420WEASEL2
1.0434.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.0R
9.0R
2030DOWSTG 9
1.03015.1
37.4
4.9R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3248.084.9R
G4200.061.0R
2835LAMONT_LV1
3835LAMONT_LV2
71.519.9R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 83
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A SENSITIVITY943L (N-1)FIG D-6FRI, AUG 19 2016 15:39
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.063255.0
443BANN_240
1.033247.9
109DEERLAN4
1.074257.8
771AMELIA1
1.018244.2
313JOSEPH1
1.019244.6
37.119.3
-37.1
57LAMOURE4
1.018244.3
5.7247.6
-3.3
81.5
-81.1-137.1
-228.487.6
229.2-83.7
-42.4-119.2
42.6117.5
-247.3
-21.0
133.7
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-4.0
R
7185SCOTF ST
1.03014.2
68.135.9R
4185SCOTF GT
1.03014.2
70.233.4R
627AIR LIQC
1.03014.2
68.128.4R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.044144.1
1.00
28
936808L_TAP
1.032142.4
67BRUDERH7
1.037143.1
24.132.0
8.235.9
314JOSEPH2
1.029142.0
0.97
955
-113.8-39.0
0.97
955
-114.2-39.1
391ALBCHEM7
1.036143.0
735SHELL TP
1.026141.6
952DIAM TAP
1.030142.1
43SCOT4_7
1.027141.7
34.4-24.3
-34.223.6
55.720.6
31.7-25.9
-54.553.254.6
-52.953.0
-34.123.6-23.7
948808_BNDY
1.031142.3
59REDWATE7
1.020140.8
-9.9-1.0
-13.9
1420WEASEL1
1.028141.9
1.0-9.8-2.1
954ABEE_01
1.027141.7
-6.9-2.1
6.91.460
BEAMER 7
1.023141.1
734SHELL A1
1.026141.6
48DIAM SH7
1.030142.1
58FORT SA7
1.033142.5
185SCOT4_8
1.027141.7
628ALC SCOT
1.025141.5
394ASTOTIN
1.037143.1
821708ALTAP
1.025141.4
61DOW CHEM
1.037143.1
62SHERRIT7
1.034142.7
63LAMOURE7
1.039143.4
3.1
-0.3-0.3
-31.
225
.6
-32.7-12.8
33.1
0.40.1 -0.3
-29.3
-6.2
6.232.0-6.7
-12.8
-12.822.6
-88.
9-2
.089
.2
-26.
3-2
9.4
26.429.3
63.4 0.97
83
72.3141.8
0.94
161
48.0
-58.4
58.555.7
34.1
-0.4
6.2
50RIVERSID
1.024141.4
-35.9-18.9
-53.2
53.0
30.0
393DOW HYD7
1.037143.1
922ROSS TAP
1.037143.1
39.9
-6.4
-39.
86.
274
.4-1
8.9
29.1
10.8
-29.
3
-36.528.9
45ROSS CRK
1.037143.1
-37.
8
-55.5
5.3
-67.9-32.3
9.9
-10.8
29.1
38.1-23.1
-38.123.1
-52.938.3
-10.
1
2.5
-8.1-36.2
-93.4
-31.9
-70.8
793SCORIA1
1.024141.3
23.912.3
-23.9-12.4
-32.5
2954ABEE_02
1.0284.3
996.91.9
18420WEASEL2
1.0444.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.8R
9.2R
2030DOWSTG 9
1.03015.1
37.4
5.1R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3248.087.5R
G4200.062.8R
2835LAMONT_LV1
3835LAMONT_LV2
71.520.7R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 84
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A SENSITIVITY1054L (N-1)FIG D-7FRI, AUG 19 2016 15:39
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.7
443BANN_240
1.031247.4
109DEERLAN4
1.048251.6
771AMELIA1
1.033247.9
313JOSEPH1
1.026246.2
227.5-118.2
-227.2
57LAMOURE4
1.020244.9
-68.980.767.8
-189.6144.8
190.2-141.7
199.6
-198.8-90.6
-160.0-70.9
160.371.0
-80.6
120.8
92.0
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-5.4
R
7185SCOTF ST
1.03014.2
68.135.3R
4185SCOTF GT
1.03014.2
70.232.7R
627AIR LIQC
1.03014.2
68.127.5R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.031142.2
1.00
28
936808L_TAP
1.023141.2
67BRUDERH7
1.028141.8
16.019.8
2.616.1
314JOSEPH2
1.031142.3
0.97
955
-102.1-59.9
0.97
955
-102.4-60.1
391ALBCHEM7
1.028141.9
735SHELL TP
1.027141.8
952DIAM TAP
1.031142.3
43SCOT4_7
1.028141.9
39.9-4.6
-39.83.9
51.926.4
12.4-18.1
-58.850.258.9
-57.250.1
-39.73.9-4.0
948808_BNDY
1.022141.0
59REDWATE7
1.016140.2
-9.9-1.1
-6.0
1420WEASEL1
1.019140.7
1.1-9.8-2.1
954ABEE_01
1.018140.5
-6.9-2.1
6.91.460
BEAMER 7
1.023141.2
734SHELL A1
1.027141.8
48DIAM SH7
1.031142.3
58FORT SA7
1.035142.8
185SCOT4_8
1.028141.9
628ALC SCOT
1.027141.7
394ASTOTIN
1.028141.8
821708ALTAP
1.026141.5
61DOW CHEM
1.039143.3
62SHERRIT7
1.036143.0
63LAMOURE7
1.041143.6
-9.6
-0.3-0.3
-12.
017
.5
-36.3-7.4
36.3
0.40.1 -0.3
-28.6
11.5
-5.640.05.2
-17.1
-10.620.2
-92.
30.
592
.7
-32.
7-2
7.4
32.727.4
68.8 0.97
83
78.3144.6
0.94
161
47.6
-64.7
64.953.8
39.7
-0.4
-11.4
50RIVERSID
1.025141.5
-35.9-18.9
-50.2
57.3
47.7
393DOW HYD7
1.038143.3
922ROSS TAP
1.039143.3
38.5
-6.7
-38.
56.
572
.3-1
9.4
29.4
9.5
-29.
6
-34.329.4
45ROSS CRK
1.039143.3
-37.
8
-53.5
7.3
-35.9-18.5
9.9
-9.5
28.4
32.3-16.4
-32.216.4
-50.136.1
-10.
1
-0.0
-2.5-16.6
-83.8
-39.8
-67.2
793SCORIA1
1.025141.4
23.912.3
-23.9-12.4
-20.7
2954ABEE_02
1.0194.2
996.91.9
18420WEASEL2
1.0354.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.4R
8.7R
2030DOWSTG 9
1.03015.1
37.4
4.2R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3248.073.9R
G4200.053.3R
2835LAMONT_LV1
3835LAMONT_LV2
71.516.9R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 85
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A SENSITIVITY9L960 (N-1)FIG D-8FRI, AUG 19 2016 15:40
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.047251.3
443BANN_240
1.027246.5
109DEERLAN4
1.041249.9
771AMELIA1
1.029246.9
313JOSEPH1
1.023245.5
87.7-89.8
-87.6
57LAMOURE4
1.018244.2
-53.7215.655.2
-50.4108.3
50.6-109.9
108.3
-108.0-89.1
-161.5-22.2
161.821.3
-69.4-71.9
69.569.5
-215.3
89.0
84.8
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-3.2
R
7185SCOTF ST
1.03014.2
68.136.5R
4185SCOTF GT
1.03014.2
70.233.9R
627AIR LIQC
1.03014.2
68.129.2R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.028141.9
1.00
28
936808L_TAP
1.020140.8
67BRUDERH7
1.025141.5
29.813.9
21.310.6
314JOSEPH2
1.028141.9
0.97
955
-104.5-57.4
0.97
955
-104.9-57.6
391ALBCHEM7
1.026141.5
735SHELL TP
1.025141.5
952DIAM TAP
1.029142.0
43SCOT4_7
1.026141.6
21.10.3
-21.0-1.5
54.125.9
30.9-25.3
-57.751.857.8
-56.151.6
-21.0-1.51.4
948808_BNDY
1.019140.6
59REDWATE7
1.013139.8
-9.9-1.1
-19.7
1420WEASEL1
1.017140.3
1.1-9.8-2.1
954ABEE_01
1.015140.1
-6.9-2.1
6.91.460
BEAMER 7
1.020140.8
734SHELL A1
1.025141.4
48DIAM SH7
1.029142.0
58FORT SA7
1.032142.4
185SCOT4_8
1.026141.6
628ALC SCOT
1.024141.3
394ASTOTIN
1.025141.5
821708ALTAP
1.023141.1
61DOW CHEM
1.036143.0
62SHERRIT7
1.033142.6
63LAMOURE7
1.038143.2
-10.4
-0.3-0.3
-30.
425
.0
-34.4-8.9
35.5
0.40.1 -0.3
-33.8
-7.6
-11.826.211.2
-17.7
-11.719.5
-89.
1-2
.689
.4
-26.
5-2
9.0
26.529.0
62.9 0.97
83
71.8143.7
0.94
161
52.6
-58.5
58.655.4
21.0
-0.4
7.6
50RIVERSID
1.022141.1
-35.9-18.9
-51.7
56.2
28.6
393DOW HYD7
1.036142.9
922ROSS TAP
1.036143.0
39.8
-5.8
-39.
75.
774
.3-1
8.0
28.5
10.8
-28.
7
-36.428.1
45ROSS CRK
1.036143.0
-37.
8
-55.1
7.1
-24.5-51.1
9.9
-10.7
33.6
35.3-15.0
-35.315.0
-51.637.3
-10.
1
3.1
-21.3-11.1
-89.0
-26.0
-69.1
793SCORIA1
1.022141.1
23.912.3
-23.9-12.4
-14.5
2954ABEE_02
1.0164.2
996.91.9
18420WEASEL2
1.0324.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.5R
9.5R
2030DOWSTG 9
1.03015.1
37.4
5.7R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3248.079.9R
G4200.057.5R
2835LAMONT_LV1
3835LAMONT_LV2
71.518.6R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 86
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A SENSITIVITY9L961 (N-1)FIG D-9FRI, AUG 19 2016 15:40
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.047251.3
443BANN_240
1.027246.5
109DEERLAN4
1.041249.9
771AMELIA1
1.029246.9
313JOSEPH1
1.023245.5
87.7-89.8
-87.6
57LAMOURE4
1.018244.2
-53.7215.655.2
-50.4108.3
50.6-109.9
108.3
-108.0-89.1
-161.5-22.2
161.821.3
-69.4-71.9
69.569.5
-215.3
89.0
84.8
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-3.2
R
7185SCOTF ST
1.03014.2
68.136.5R
4185SCOTF GT
1.03014.2
70.233.9R
627AIR LIQC
1.03014.2
68.129.2R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.028141.9
1.00
28
936808L_TAP
1.020140.8
67BRUDERH7
1.025141.5
29.813.9
21.310.6
314JOSEPH2
1.028141.9
0.97
955
-104.5-57.4
0.97
955
-104.9-57.6
391ALBCHEM7
1.026141.5
735SHELL TP
1.025141.5
952DIAM TAP
1.029142.0
43SCOT4_7
1.026141.6
21.10.3
-21.0-1.5
54.125.9
30.9-25.3
-57.751.857.8
-56.151.6
-21.0-1.51.4
948808_BNDY
1.019140.6
59REDWATE7
1.013139.8
-9.9-1.1
-19.7
1420WEASEL1
1.017140.3
1.1-9.8-2.1
954ABEE_01
1.015140.1
-6.9-2.1
6.91.460
BEAMER 7
1.020140.8
734SHELL A1
1.025141.4
48DIAM SH7
1.029142.0
58FORT SA7
1.032142.4
185SCOT4_8
1.026141.6
628ALC SCOT
1.024141.3
394ASTOTIN
1.025141.5
821708ALTAP
1.023141.1
61DOW CHEM
1.036143.0
62SHERRIT7
1.033142.6
63LAMOURE7
1.038143.2
-10.4
-0.3-0.3
-30.
425
.0
-34.4-8.9
35.5
0.40.1 -0.3
-33.8
-7.6
-11.826.211.2
-17.7
-11.719.5
-89.
1-2
.689
.4
-26.
5-2
9.0
26.529.0
62.9 0.97
83
71.8143.7
0.94
161
52.6
-58.5
58.655.4
21.0
-0.4
7.6
50RIVERSID
1.022141.1
-35.9-18.9
-51.7
56.2
28.6
393DOW HYD7
1.036142.9
922ROSS TAP
1.036143.0
39.8
-5.8
-39.
75.
774
.3-1
8.0
28.5
10.8
-28.
7
-36.428.1
45ROSS CRK
1.036143.0
-37.
8
-55.1
7.1
-24.5-51.1
9.9
-10.7
33.6
35.3-15.0
-35.315.0
-51.637.3
-10.
1
3.1
-21.3-11.1
-89.0
-26.0
-69.1
793SCORIA1
1.022141.1
23.912.3
-23.9-12.4
-14.5
2954ABEE_02
1.0164.2
996.91.9
18420WEASEL2
1.0324.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.5R
9.5R
2030DOWSTG 9
1.03015.1
37.4
5.7R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3248.079.9R
G4200.057.5R
2835LAMONT_LV1
3835LAMONT_LV2
71.518.6R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 87
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A SENSITIVITY920L (N-1)FIG D-10FRI, AUG 19 2016 15:40
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.052252.6
443BANN_240
1.031247.4
109DEERLAN4
1.051252.2
771AMELIA1
1.034248.2
313JOSEPH1
1.026246.3
117.5-122.6
-117.3
57LAMOURE4
1.020244.8
-72.0179.472.7
-80.0143.3
80.3-143.6
89.7
-89.4-99.1
-173.73.2
174.1-3.7
-50.8-82.0
50.979.4
-179.2
122.7
94.3
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-5.4
R
7185SCOTF ST
1.03014.2
68.134.8R
4185SCOTF GT
1.03014.2
70.232.2R
627AIR LIQC
1.03014.2
68.126.7R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.034142.7
1.00
28
936808L_TAP
1.026141.6
67BRUDERH7
1.031142.2
28.317.5
18.115.3
314JOSEPH2
1.032142.4
0.97
955
-107.7-58.0
0.97
955
-108.1-58.2
391ALBCHEM7
1.031142.3
735SHELL TP
1.029141.9
952DIAM TAP
1.032142.5
43SCOT4_7
1.029142.0
24.3-4.3
-24.33.2
54.726.4
32.5-23.3
-59.452.259.5
-57.852.0
-24.23.1-3.3
948808_BNDY
1.025141.4
59REDWATE7
1.018140.5
-9.9-1.1
-18.2
1420WEASEL1
1.022141.0
1.1-9.8-2.1
954ABEE_01
1.021140.8
-6.9-2.1
6.91.460
BEAMER 7
1.024141.3
734SHELL A1
1.028141.9
48DIAM SH7
1.032142.5
58FORT SA7
1.035142.8
185SCOT4_8
1.030142.1
628ALC SCOT
1.028141.8
394ASTOTIN
1.031142.2
821708ALTAP
1.026141.6
61DOW CHEM
1.039143.3
62SHERRIT7
1.036143.0
63LAMOURE7
1.041143.6
-9.0
-0.3-0.3
-32.
023
.0
-33.9-6.7
36.8
0.40.1 -0.3
-31.4
-7.6
-8.127.77.5
-16.8
-12.120.5
-89.
9-0
.390
.3
-28.
4-2
8.8
28.528.8
73.6 0.97
83
83.6144.0
0.94
161
50.2
-60.5
60.655.1
24.2
-0.4
7.6
50RIVERSID
1.026141.5
-35.9-18.9
-52.1
57.9
28.6
393DOW HYD7
1.038143.3
922ROSS TAP
1.039143.3
39.5
-7.0
-39.
46.
973
.7-1
9.9
29.7
10.4
-29.
9
-35.830.0
45ROSS CRK
1.039143.3
-37.
8
-54.9
6.8
-32.8-46.3
9.9
-10.4
31.2
36.2-16.9
-36.216.9
-52.037.6
-10.
1
0.8
-18.0-15.8
-90.5
-27.6
-69.6
793SCORIA1
1.026141.5
23.912.3
-23.9-12.4
-18.2
2954ABEE_02
1.0224.3
996.91.9
18420WEASEL2
1.0384.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.4R
8.6R
2030DOWSTG 9
1.03015.1
37.4
4.2R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3248.072.5R
G4200.052.3R
2835LAMONT_LV1
3835LAMONT_LV2
71.516.5R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 88
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A SENSITIVITY921L (N-1)FIG D-11FRI, AUG 19 2016 15:40
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.8
443BANN_240
1.032247.7
109DEERLAN4
1.052252.4
771AMELIA1
1.036248.5
313JOSEPH1
1.028246.7
107.6-120.5
-107.5
57LAMOURE4
1.022245.3
-61.4194.862.4
-70.2140.7
70.4-141.2
101.7
-101.4-94.6
-179.84.9
180.2-5.1
-62.8-77.5
62.975.0
-194.6
120.3
90.1
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-6.1
R
7185SCOTF ST
1.03014.2
68.134.3R
4185SCOTF GT
1.03014.2
70.231.7R
627AIR LIQC
1.03014.2
68.126.0R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.035142.9
1.00
28
936808L_TAP
1.027141.7
67BRUDERH7
1.032142.4
28.717.4
19.015.2
314JOSEPH2
1.033142.5
0.97
955
-105.0-59.7
0.97
955
-105.4-59.9
391ALBCHEM7
1.032142.4
735SHELL TP
1.030142.1
952DIAM TAP
1.033142.6
43SCOT4_7
1.030142.2
23.4-4.2
-23.33.1
53.927.0
30.1-22.0
-60.151.660.2
-58.551.4
-23.33.0-3.2
948808_BNDY
1.026141.5
59REDWATE7
1.019140.6
-9.9-1.0
-18.6
1420WEASEL1
1.023141.2
1.0-9.8-2.1
954ABEE_01
1.022141.0
-6.9-2.1
6.91.460
BEAMER 7
1.025141.4
734SHELL A1
1.029142.1
48DIAM SH7
1.033142.6
58FORT SA7
1.036142.9
185SCOT4_8
1.030142.2
628ALC SCOT
1.029141.9
394ASTOTIN
1.032142.4
821708ALTAP
1.027141.8
61DOW CHEM
1.040143.5
62SHERRIT7
1.037143.1
63LAMOURE7
1.042143.8
-9.5
-0.3-0.3
-29.
621
.6
-34.7-5.8
37.3
0.40.1 -0.3
-30.9
-5.9
-8.127.37.5
-16.9
-11.620.6
-89.
8-0
.290
.1
-28.
3-2
9.8
28.329.8
65.4 0.97
83
74.5148.1
0.94
161
49.7
-60.3
60.456.2
23.3
-0.4
5.9
50RIVERSID
1.027141.7
-35.9-18.9
-51.5
58.6
30.2
393DOW HYD7
1.039143.4
922ROSS TAP
1.040143.5
39.5
-7.7
-39.
57.
573
.8-2
1.0
30.4
10.5
-30.
6
-35.931.0
45ROSS CRK
1.040143.5
-37.
8
-55.9
9.9
-32.6-47.6
9.9
-10.5
30.8
34.9-17.0
-34.917.0
-51.437.1
-10.
1
0.7
-18.9-15.6
-88.4
-27.2
-68.9
793SCORIA1
1.027141.7
23.912.3
-23.9-12.4
-18.1
2954ABEE_02
1.0234.3
996.91.9
18420WEASEL2
1.0394.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.7R
8.4R
2030DOWSTG 9
1.03015.1
37.4
3.7R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3248.069.8R
G4200.050.3R
2835LAMONT_LV1
3835LAMONT_LV2
71.515.7R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 89
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A SENSITIVITY708L (N-1)FIG D-12FRI, AUG 19 2016 15:40
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.054252.9
443BANN_240
1.033248.0
109DEERLAN4
1.052252.4
771AMELIA1
1.036248.6
313JOSEPH1
1.028246.7
107.7-120.0
-107.5
57LAMOURE4
1.023245.6
-48.5206.049.7
-70.2140.2
70.5-140.8
103.7
-103.4-93.3
-178.81.5
179.2-1.8
-64.8-76.2
64.973.7
-205.8
119.8
88.8
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-9.7
R
7185SCOTF ST
1.03014.2
68.135.1R
4185SCOTF GT
1.03014.2
70.232.5R
627AIR LIQC
1.03014.2
68.127.2R
37
37
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.034142.7
1.00
28
936808L_TAP
1.024141.4
67BRUDERH7
1.030142.2
27.621.4
18.115.1
314JOSEPH2
1.032142.4
0.97
955
-99.4-65.5
0.97
955
-99.7-65.7
391ALBCHEM7
1.031142.2
735SHELL TP
1.027141.8
952DIAM TAP
1.033142.5
43SCOT4_7
1.029142.0
24.3-4.2
-24.23.0
52.337.9
22.7-35.2
-67.049.967.1
-65.349.9
-24.23.0-3.1
948808_BNDY
1.023141.2
59REDWATE7
1.015140.1
-9.9-1.1
-17.5
1420WEASEL1
1.021140.9
1.1-9.8-2.1
954ABEE_01
1.019140.7
-6.9-2.1
6.91.460
BEAMER 7
1.021140.8
734SHELL A1
1.027141.8
48DIAM SH7
1.033142.5
58FORT SA7
1.039143.4
185SCOT4_8
1.029142.0
628ALC SCOT
1.027141.7
394ASTOTIN
1.030142.2
821708ALTAP
1.027141.7
61DOW CHEM
1.044144.0
62SHERRIT7
1.041143.7
63LAMOURE7
1.047144.4
-36.6
-0.3-0.3
-22.
234
.9
-36.72.8
42.5
0.40.1 -0.3
-4.328.43.7
-26.9
-10.414.3
-92.
4-2
.792
.8
-33.
4-4
0.7
33.440.7
56.7 0.97
83
64.9135.2
0.94
161
-65.4
65.667.1
24.2
-0.4
50RIVERSID
1.026141.6
-49.9
65.4
393DOW HYD7
1.044144.1
922ROSS TAP
1.044144.1
38.5
-12.
1-3
8.4
11.9
72.2
-28.
1
34.8
9.5
-35.
0
-34.338.2
45ROSS CRK
1.044144.1
-37.
8
-66.8
-1.9
-36.5-45.7
9.9
-9.4
31.7-0.7
-31.70.7
-49.835.9
-10.
1
3.3
-18.0-15.6
-83.6
-28.3
-66.8
793SCORIA1
1.026141.6
-22.0
2954ABEE_02
1.0204.2
996.91.9
18420WEASEL2
1.0364.3
992.90.7
37
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-12.2R
7.0R
2030DOWSTG 9
1.03015.1
37.4
1.2R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3248.069.3R
G4200.050.0R
2835LAMONT_LV1
3835LAMONT_LV2
71.515.6R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 90
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A SENSITIVITY807L (N-1)FIG D-13FRI, AUG 19 2016 15:40
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.6
443BANN_240
1.031247.5
109DEERLAN4
1.051252.2
771AMELIA1
1.035248.4
313JOSEPH1
1.027246.6
114.9-119.1
-114.8
57LAMOURE4
1.021245.0
-73.1231.775.3
-77.5139.5
77.7-140.0
106.1
-105.7-96.7
-180.64.5
181.0-4.6
-67.1-79.4
67.277.0
-231.3
119.1
92.5
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-4.3
R
7185SCOTF ST
1.03014.2
68.133.8R
4185SCOTF GT
1.03014.2
70.231.3R
627AIR LIQC
1.03014.2
68.125.3R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.034142.7
1.00
28
936808L_TAP
1.022141.0
67BRUDERH7
1.031142.3
52.919.1
3.815.3
314JOSEPH2
1.034142.7
0.97
955
-83.0-54.4
0.97
955
-83.3-54.5
391ALBCHEM7
1.031142.3
735SHELL TP
1.029142.0
952DIAM TAP
1.034142.7
43SCOT4_7
1.031142.3
38.6-3.9
-38.53.2
59.6-24.3
-69.233.969.3
-67.734.1
-38.43.2-3.3
948808_BNDY
1.021140.9
59REDWATE7
1.010139.4
-9.9-1.1
-42.4
1420WEASEL1
1.018140.5
1.1-9.8-2.1
954ABEE_01
1.017140.3
-6.9-2.1
6.91.460
BEAMER 7
1.013139.8
734SHELL A1
1.030142.2
48DIAM SH7
1.034142.7
58FORT SA7
1.034142.7
185SCOT4_8
1.031142.3
628ALC SCOT
1.029142.1
394ASTOTIN
1.031142.3
821708ALTAP
1.017140.4
61DOW CHEM
1.037143.2
62SHERRIT7
1.035142.8
63LAMOURE7
1.039143.4
-0.3-0.3
-58.
724
.8
-56.45.7
44.2
0.40.1 -0.3
-39.8
58.7
-7.63.46.8
-27.6
1.614.3
-77.
8-2
.378
.1
-6.9
-29.
6
6.929.5
74.7 0.97
83
84.9151.5
0.94
161
61.2
-38.9
39.055.8
38.4
-0.4
-58.6
50RIVERSID
1.017140.3
-35.9-19.0
-33.8
67.8
95.5
393DOW HYD7
1.037143.1
922ROSS TAP
1.037143.2
44.1
-6.6
-44.
16.
581
.3-1
9.3
29.4
15.1
-29.
5
-43.329.5
45ROSS CRK
1.037143.2
-37.
8
-55.7
13.4
-34.3-56.8
9.9
-15.1
39.9
-34.124.0
-10.
1
2.6
-3.8-15.8
-3.4
-47.1
793SCORIA1
1.017140.3
23.912.3
-23.9-12.4
-18.7
2954ABEE_02
1.0184.2
996.91.9
18420WEASEL2
1.0344.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.0R
9.1R
2030DOWSTG 9
1.03015.1
37.4
4.9R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3248.070.4R
G4200.050.8R
2835LAMONT_LV1
3835LAMONT_LV2
71.515.9R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 91
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A SENSITIVITY735L (N-1)FIG D-14FRI, AUG 19 2016 15:40
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.052252.6
443BANN_240
1.031247.5
109DEERLAN4
1.050252.1
771AMELIA1
1.035248.3
313JOSEPH1
1.027246.5
112.7-116.9
-112.6
57LAMOURE4
1.021245.1
-63.7198.864.8
-75.3137.1
75.6-137.7
103.5
-103.2-94.8
-187.21.8
187.7-1.5
-64.6-77.6
64.775.2
-198.5
116.8
90.4
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-6.0
R
7185SCOTF ST
1.03014.2
68.134.3R
4185SCOTF GT
1.03014.2
70.231.8R
627AIR LIQC
1.03014.2
68.126.1R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.031142.2
1.00
28
936808L_TAP
1.016140.2
67BRUDERH7
1.028141.9
56.527.2
6.512.5
314JOSEPH2
1.033142.5
0.97
955
-100.4-58.3
0.97
955
-100.8-58.5
391ALBCHEM7
1.029142.0
735SHELL TP
1.030142.1
952DIAM TAP
1.033142.6
43SCOT4_7
1.030142.2
35.9-1.2
-35.80.4
45.225.0
28.8-22.2
-58.245.658.3
-56.745.6
-35.70.4-0.5
948808_BNDY
1.015140.0
59REDWATE7
1.002138.2
-9.9-1.1
-45.8
1420WEASEL1
1.012139.7
1.1-9.8-2.1
954ABEE_01
1.011139.5
-6.9-2.1
6.91.460
BEAMER 7
1.026141.6
734SHELL A1
1.029142.1
48DIAM SH7
1.033142.5
58FORT SA7
1.036142.9
185SCOT4_8
1.030142.2
628ALC SCOT
1.028141.9
394ASTOTIN
1.028141.9
821708ALTAP
1.028141.9
61DOW CHEM
1.039143.4
62SHERRIT7
1.037143.1
63LAMOURE7
1.042143.7
-4.5
-0.3-0.3
-28.
421
.8
-42.0-8.0
35.9
0.40.1 -0.3
-28.4
-13.
0
-14.8
-7.221.9
-89.
4-0
.089
.7
-27.
6-2
9.4
27.629.4
60.0 0.97
83
68.5145.2
0.94
161
47.0
-59.6
59.755.7
35.7
-0.4
13.0
50RIVERSID
1.028141.8
-35.9-18.9
-45.6
56.8
23.1
393DOW HYD7
1.039143.4
922ROSS TAP
1.039143.5
39.7
-7.5
-39.
67.
474
.1-2
0.7
30.2
10.6
-30.
4
-36.230.8
45ROSS CRK
1.039143.5
-37.
8
-55.5
7.6
-39.7-63.0
9.9
-10.6
28.2
23.2-20.4
-23.220.4
-45.632.7
-10.
1
0.5
-6.5-13.0
-68.2
-61.5
793SCORIA1
1.028141.8
23.912.3
-23.9-12.4
-26.4
2954ABEE_02
1.0124.2
996.91.9
18420WEASEL2
1.0284.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.7R
8.4R
2030DOWSTG 9
1.03015.1
37.4
3.7R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3248.071.2R
G4200.051.3R
2835LAMONT_LV1
3835LAMONT_LV2
71.516.1R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 92
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A SENSITIVITY808L (N-1)FIG D-15FRI, AUG 19 2016 15:40
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.054252.9
443BANN_240
1.032247.6
109DEERLAN4
1.053252.6
771AMELIA1
1.036248.5
313JOSEPH1
1.027246.5
96.5-128.0
-96.4
57LAMOURE4
1.021245.1
-66.1205.267.4
-59.1148.3
59.3-148.7
108.3
-108.0-98.0
-176.18.2
176.5-8.6
-69.4-80.7
69.578.4
-205.0
127.8
93.9
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-5.3
R
7185SCOTF ST
1.03014.2
68.135.0R
4185SCOTF GT
1.03014.2
70.232.4R
627AIR LIQC
1.03014.2
68.127.0R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.041143.7
1.00
28
936808L_TAP
1.026141.6
67BRUDERH7
1.036142.9
32.321.6
314JOSEPH2
1.032142.4
0.97
955
-105.3-61.9
0.97
955
-105.7-62.1
391ALBCHEM7
1.035142.9
735SHELL TP
1.028141.8
952DIAM TAP
1.032142.4
43SCOT4_7
1.029142.0
10.0-10.7
-10.09.3
60.131.9
29.9-22.5
-63.355.663.5
-61.655.4
-10.09.3-9.4
948808_BNDY
1.025141.5
59REDWATE7
1.007139.0
1420WEASEL1
1.023141.1
954ABEE_01
1.021140.9
60BEAMER 7
1.021141.0
734SHELL A1
1.028141.8
48DIAM SH7
1.032142.4
58FORT SA7
1.035142.8
185SCOT4_8
1.029142.0
628ALC SCOT
1.027141.7
394ASTOTIN
1.036142.9
821708ALTAP
1.024141.3
61DOW CHEM
1.039143.3
62SHERRIT7
1.036143.0
63LAMOURE7
1.041143.6
-22.6
-0.3-0.3
-29.
422
.1
-29.6-1.8
39.7
0.40.1 -0.3
-36.7
-1.1
-26.446.126.4
-22.0
-14.617.2
-88.
7-0
.589
.1
-26.
3-2
8.8
26.328.8
63.9 0.97
83
72.8148.3
0.94
161
55.8
-58.3
58.455.1
10.0
-0.4
1.1
50RIVERSID
1.024141.3
-35.9-18.9
-55.6
61.7
35.1
393DOW HYD7
1.038143.3
922ROSS TAP
1.039143.3
39.9
-7.0
-39.
96.
874
.5-1
9.8
29.7
10.9
-29.
9
-36.629.9
45ROSS CRK
1.039143.3
-37.
8
-54.9
10.4
-21.5-32.3
-10.9
36.6
43.0-8.5
-43.08.5
-55.440.2
-10.
1
0.9
-32.3-21.9
-102.5
-45.8
-73.9
793SCORIA1
1.024141.2
23.912.3
-23.9-12.4
2954ABEE_02
1.0234.3
99
18420WEASEL2
1.0394.3
99
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.4R
8.7R
2030DOWSTG 9
1.03015.1
37.4
4.3R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3248.070.9R
G4200.051.1R
2835LAMONT_LV1
3835LAMONT_LV2
71.516.0R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 93
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A SENSITIVITY621L (N-1)FIG D-16FRI, AUG 19 2016 15:40
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.7
443BANN_240
1.032247.6
109DEERLAN4
1.051252.3
771AMELIA1
1.035248.4
313JOSEPH1
1.027246.5
104.0-121.2
-103.9
57LAMOURE4
1.021245.1
-64.9200.566.1
-66.6141.4
66.9-142.0
106.2
-105.9-96.0
-182.24.4
182.7-4.4
-67.3-78.8
67.476.4
-200.3
121.0
91.8
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-5.8
R
7185SCOTF ST
1.03014.2
68.134.5R
4185SCOTF GT
1.03014.2
70.232.0R
627AIR LIQC
1.03014.2
68.126.3R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.035142.8
1.00
28
936808L_TAP
1.026141.6
67BRUDERH7
1.031142.3
28.817.4
19.315.2
314JOSEPH2
1.032142.5
0.97
955
-103.9-59.3
0.97
955
-104.3-59.5
391ALBCHEM7
1.031142.3
735SHELL TP
1.029142.0
952DIAM TAP
1.033142.5
43SCOT4_7
1.030142.1
23.1-4.3
-23.03.1
53.626.9
28.9-22.0
-59.851.459.9
-58.251.2
-23.03.0-3.2
948808_BNDY
1.025141.5
59REDWATE7
1.018140.5
-9.9-1.1
-18.7
1420WEASEL1
1.023141.1
1.1-9.8-2.1
954ABEE_01
1.021140.9
-6.9-2.1
6.91.460
BEAMER 7
1.025141.4
734SHELL A1
1.029142.0
48DIAM SH7
1.033142.5
58FORT SA7
1.035142.9
185SCOT4_8
1.030142.1
628ALC SCOT
1.028141.9
394ASTOTIN
1.031142.3
821708ALTAP
1.027141.7
61DOW CHEM
1.039143.4
62SHERRIT7
1.037143.0
63LAMOURE7
1.041143.7
-9.6
-0.3-0.3
-28.
421
.6
-34.9-6.1
37.1
0.40.1 -0.3
-30.9
-5.4
-8.127.27.5
-16.9
-11.420.5
-89.
1-0
.189
.4
-27.
0-2
9.2
27.029.1
62.4 0.97
83
71.2146.3
0.94
161
49.6
-59.0
59.255.5
23.0
-0.4
5.4
50RIVERSID
1.026141.6
-35.9-18.9
-51.3
58.3
30.8
393DOW HYD7
1.039143.4
922ROSS TAP
1.039143.4
39.8
-7.3
-39.
77.
274
.3-2
0.5
30.1
10.7
-30.
2
-36.430.5
45ROSS CRK
1.039143.4
-37.
8
-55.3
8.5
-32.7-48.1
9.9
-10.7
30.7
34.5-16.8
-34.516.8
-51.237.0
-10.
1
0.6
-19.3-15.7
-87.8
-27.1
-68.6
793SCORIA1
1.026141.6
23.912.3
-23.9-12.4
-18.1
2954ABEE_02
1.0234.3
996.91.9
18420WEASEL2
1.0384.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.6R
8.5R
2030DOWSTG 9
1.03015.1
37.4
3.9R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3248.070.9R
G4200.051.1R
2835LAMONT_LV1
3835LAMONT_LV2
71.516.0R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 94
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A SENSITIVITY815L (N-1)FIG D-17FRI, AUG 19 2016 15:41
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.054252.9
443BANN_240
1.032247.6
109DEERLAN4
1.053252.6
771AMELIA1
1.035248.5
313JOSEPH1
1.027246.5
97.2-128.4
-97.0
57LAMOURE4
1.021245.1
-63.7199.464.8
-59.8148.7
60.0-149.1
108.2
-107.8-97.8
-179.08.1
179.4-8.3
-69.2-80.5
69.378.2
-199.2
128.2
93.7
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-5.6
R
7185SCOTF ST
1.03014.2
68.135.1R
4185SCOTF GT
1.03014.2
70.232.6R
627AIR LIQC
1.03014.2
68.127.2R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.041143.6
1.00
28
936808L_TAP
1.030142.2
67BRUDERH7
1.019140.6
37.121.3
314JOSEPH2
1.031142.3
0.97
955
-107.9-63.6
0.97
955
-108.3-63.8
391ALBCHEM7
1.020140.8
735SHELL TP
1.028141.9
952DIAM TAP
1.032142.4
43SCOT4_7
1.029141.9
42.512.2
-42.3-12.7
50.024.8
25.8-23.7
-57.749.057.8
-56.248.9
-42.2-12.712.6
948808_BNDY
1.029142.0
59REDWATE7
1.020140.8
-9.9-1.0
-26.9
1420WEASEL1
1.027141.7
1.0-9.8-2.1
954ABEE_01
1.025141.5
-6.9-2.1
6.91.460
BEAMER 7
1.024141.3
734SHELL A1
1.028141.8
48DIAM SH7
1.032142.3
58FORT SA7
1.035142.8
185SCOT4_8
1.029142.0
628ALC SCOT
1.027141.7
394ASTOTIN
1.019140.6
821708ALTAP
1.026141.6
61DOW CHEM
1.039143.4
62SHERRIT7
1.036143.0
63LAMOURE7
1.041143.7
-5.5
-0.3-0.3
-25.
323
.4
-37.8-8.7
35.5
0.40.2 -0.3
-31.2
-5.3
-4.618.93.9
-15.5
-9.721.2
-90.
0-0
.890
.4
-28.
6-3
0.0
28.629.9
63.3 0.97
83
72.2146.8
0.94
161
50.0
-60.6
60.756.3
42.3
-0.4
5.3
50RIVERSID
1.026141.6
-35.9-18.9
-49.0
56.3
30.8
393DOW HYD7
1.039143.3
922ROSS TAP
1.039143.4
39.4
-7.4
-39.
47.
273
.7-2
0.5
30.1
10.4
-30.
3
-35.830.6
45ROSS CRK
1.039143.4
-37.
8
-56.1
9.1
-21.2-37.1
9.9
-10.4
31.1
29.8-19.0
-29.819.0
-48.835.2
-10.
1
1.3
-79.5
-18.9
-65.7
793SCORIA1
1.026141.5
23.912.3
-23.9-12.4
-21.7
2954ABEE_02
1.0274.3
996.91.9
18420WEASEL2
1.0434.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.5R
8.6R
2030DOWSTG 9
1.03015.1
37.4
4.1R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3248.071.4R
G4200.051.4R
2835LAMONT_LV1
3835LAMONT_LV2
71.516.2R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 95
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A SENSITIVITY846L (N-1)FIG D-18FRI, AUG 19 2016 15:41
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.7
443BANN_240
1.032247.6
109DEERLAN4
1.051252.3
771AMELIA1
1.035248.4
313JOSEPH1
1.027246.5
104.0-121.3
-103.9
57LAMOURE4
1.021245.1
-64.9200.766.1
-66.6141.4
66.8-142.0
106.2
-105.9-96.0
-182.24.5
182.6-4.5
-67.3-78.8
67.476.4
-200.4
121.1
91.8
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-5.8
R
7185SCOTF ST
1.03014.2
68.134.5R
4185SCOTF GT
1.03014.2
70.231.9R
627AIR LIQC
1.03014.2
68.126.3R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.035142.8
1.00
28
936808L_TAP
1.026141.6
67BRUDERH7
1.031142.3
28.917.5
19.115.1
314JOSEPH2
1.033142.5
0.97
955
-103.8-59.3
0.97
955
-104.2-59.5
391ALBCHEM7
1.032142.4
735SHELL TP
1.029142.0
952DIAM TAP
1.033142.5
43SCOT4_7
1.030142.1
22.9-4.3
-22.93.2
53.626.9
28.9-22.0
-59.851.459.9
-58.251.2
-22.83.1-3.3
948808_BNDY
1.025141.5
59REDWATE7
1.019140.6
-9.9-1.1
-18.8
1420WEASEL1
1.023141.1
1.1-9.8-2.1
954ABEE_01
1.021140.9
-6.9-2.1
6.91.460
BEAMER 7
1.025141.4
734SHELL A1
1.029142.0
48DIAM SH7
1.033142.5
58FORT SA7
1.035142.9
185SCOT4_8
1.030142.1
628ALC SCOT
1.028141.9
394ASTOTIN
1.031142.3
821708ALTAP
1.027141.7
61DOW CHEM
1.039143.4
62SHERRIT7
1.037143.0
63LAMOURE7
1.041143.7
-9.6
-0.3-0.3
-28.
521
.6
-34.9-6.1
37.1
-30.9
-5.4
-8.127.17.5
-16.9
-11.420.5
-89.
1-0
.189
.4
-27.
0-2
9.2
27.029.1
62.4 0.97
83
71.2146.3
0.94
161
49.6
-59.0
59.155.5
22.8
5.5
50RIVERSID
1.026141.6
-35.9-18.9
-51.3
58.3
30.7
393DOW HYD7
1.039143.4
922ROSS TAP
1.039143.4
39.8
-7.4
-39.
77.
274
.3-2
0.5
30.1
10.8
-30.
3
-36.430.6
45ROSS CRK
1.039143.4
-37.
8
-55.3
8.5
-32.6-47.9
9.9
-10.7
30.7
34.5-16.8
-34.516.8
-51.237.0
-10.
1
0.6
-19.0-15.6
-87.8
-27.0
-68.6
793SCORIA1
1.026141.6
23.912.3
-23.9-12.4
-18.2
2954ABEE_02
1.0234.3
996.91.9
18420WEASEL2
1.0394.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.6R
8.5R
2030DOWSTG 9
1.03015.1
37.4
3.9R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3248.070.9R
G4200.051.1R
2835LAMONT_LV1
3835LAMONT_LV2
71.516.0R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 96
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A SENSITIVITY773L (N-1)FIG D-19FRI, AUG 19 2016 15:41
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.7
443BANN_240
1.032247.6
109DEERLAN4
1.051252.3
771AMELIA1
1.035248.4
313JOSEPH1
1.027246.5
113.7-120.6
-113.5
57LAMOURE4
1.021245.1
-65.0202.566.3
-76.2141.0
76.5-141.4
103.6
-103.3-95.9
-186.94.3
187.3-4.0
-64.7-78.7
64.876.3
-202.3
120.5
91.6
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-5.8
R
7185SCOTF ST
1.03014.2
68.134.4R
4185SCOTF GT
1.03014.2
70.231.9R
627AIR LIQC
1.03014.2
68.126.2R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.034142.8
1.00
28
936808L_TAP
1.026141.6
67BRUDERH7
1.030142.2
21.020.3
42.312.4
314JOSEPH2
1.033142.5
0.97
955
-98.1-59.2
0.97
955
-98.5-59.4
391ALBCHEM7
1.033142.5
735SHELL TP
1.029142.0
952DIAM TAP
1.033142.5
43SCOT4_7
1.030142.1
0.0-1.3
-0.0-0.1
57.025.7
32.1-22.9
-59.253.859.4
-57.653.6
948808_BNDY
1.025141.4
59REDWATE7
1.018140.5
-9.9-1.1
-10.9
1420WEASEL1
1.022141.1
1.1-9.8-2.1
954ABEE_01
1.021140.9
-6.9-2.1
6.91.460
BEAMER 7
1.025141.4
734SHELL A1
1.029142.0
48DIAM SH7
1.033142.5
58FORT SA7
1.035142.9
185SCOT4_8
1.030142.2
628ALC SCOT
1.028141.9
394ASTOTIN
1.030142.2
821708ALTAP
1.027141.7
61DOW CHEM
1.039143.4
62SHERRIT7
1.037143.0
63LAMOURE7
1.041143.7
-6.9
-0.3-0.3
-31.
622
.6
-31.9-6.8
36.6
0.40.1 -0.3
-30.7
-5.7
-5.235.04.7
-16.1
-13.321.0
-88.
2-0
.488
.5
-25.
4-2
9.6
25.429.6
61.5 0.97
83
70.1146.4
0.94
161
49.5
-57.4
57.555.9
-0.4
5.8
50RIVERSID
1.026141.6
-35.9-18.9
-53.8
57.7
30.4
393DOW HYD7
1.039143.4
922ROSS TAP
1.039143.4
40.1
-7.4
-40.
17.
374
.9-2
0.6
30.2
11.1
-30.
3
-36.930.7
45ROSS CRK
1.039143.4
-37.
8
-55.7
8.6
-32.7-63.3
9.9
-11.1
30.5
39.4-18.2
-39.418.2
-53.638.8
-10.
1
0.9
-42.2-12.6
-95.9
-34.8
-71.6
793SCORIA1
1.026141.6
23.912.3
-23.9-12.4
-21.1
2954ABEE_02
1.0224.3
996.91.9
18420WEASEL2
1.0384.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.6R
8.5R
2030DOWSTG 9
1.03015.1
37.4
3.9R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3248.070.9R
G4200.051.1R
2835LAMONT_LV1
3835LAMONT_LV2
71.516.0R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 97
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A SENSITIVITY776L (N-1)FIG D-20FRI, AUG 19 2016 15:41
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.7
443BANN_240
1.031247.6
109DEERLAN4
1.051252.2
771AMELIA1
1.035248.4
313JOSEPH1
1.027246.5
113.7-120.7
-113.5
57LAMOURE4
1.021245.1
-64.8202.666.0
-76.3141.1
76.5-141.6
103.6
-103.3-96.0
-186.94.2
187.3-4.0
-64.7-78.8
64.876.4
-202.3
120.6
91.6
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-5.7
R
7185SCOTF ST
1.03014.2
68.134.5R
4185SCOTF GT
1.03014.2
70.232.0R
627AIR LIQC
1.03014.2
68.126.3R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.034142.7
1.00
28
936808L_TAP
1.026141.6
67BRUDERH7
1.030142.2
21.020.4
42.412.3
314JOSEPH2
1.032142.5
0.97
955
-98.1-59.5
0.97
955
-98.4-59.7
391ALBCHEM7
1.030142.2
735SHELL TP
1.029142.0
952DIAM TAP
1.033142.5
43SCOT4_7
1.030142.1
57.025.6
32.1-23.1
-59.153.859.2
-57.553.6
0.0-0.1-0.1
948808_BNDY
1.025141.4
59REDWATE7
1.018140.5
-9.9-1.1
-10.9
1420WEASEL1
1.022141.1
1.1-9.8-2.1
954ABEE_01
1.021140.9
-6.9-2.1
6.91.460
BEAMER 7
1.024141.4
734SHELL A1
1.029142.0
48DIAM SH7
1.033142.5
58FORT SA7
1.035142.8
185SCOT4_8
1.030142.1
628ALC SCOT
1.028141.9
394ASTOTIN
1.030142.2
821708ALTAP
1.027141.7
61DOW CHEM
1.039143.4
62SHERRIT7
1.036143.0
63LAMOURE7
1.041143.7
-6.7
-0.3-0.3
-31.
622
.8
-31.9-7.0
36.5
0.40.1 -0.3
-30.8
-5.7
-5.135.04.6
-16.0
-13.321.0
-88.
2-0
.588
.5
-25.
4-2
9.7
25.429.7
61.5 0.97
83
70.1146.4
0.94
161
49.6
-57.4
57.556.0
-0.0
-0.4
5.7
50RIVERSID
1.026141.6
-35.9-18.9
-53.8
57.6
30.4
393DOW HYD7
1.039143.4
922ROSS TAP
1.039143.4
40.1
-7.4
-40.
17.
374
.8-2
0.6
30.1
11.1
-30.
3
-36.930.6
45ROSS CRK
1.039143.4
-37.
8
-55.8
8.7
-32.7-63.3
9.9
-11.1
30.7
39.4-18.3
-39.418.2
-53.638.8
-10.
1
1.0
-42.3-12.6
-95.9
-34.8
-71.6
793SCORIA1
1.026141.6
23.912.3
-23.9-12.4
-21.2
2954ABEE_02
1.0224.3
996.91.9
18420WEASEL2
1.0384.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.5R
8.5R
2030DOWSTG 9
1.03015.1
37.4
4.0R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3248.071.1R
G4200.051.2R
2835LAMONT_LV1
3835LAMONT_LV2
71.516.1R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 98
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A SENSITIVITY856L (N-1)FIG D-21FRI, AUG 19 2016 15:41
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.7
443BANN_240
1.032247.6
109DEERLAN4
1.051252.3
771AMELIA1
1.035248.4
313JOSEPH1
1.027246.6
104.3-120.9
-104.1
57LAMOURE4
1.021245.2
-66.0201.167.2
-66.9141.0
67.1-141.6
106.2
-105.9-96.0
-182.24.6
182.7-4.6
-67.3-78.7
67.476.3
-200.9
120.7
91.7
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-5.9
R
7185SCOTF ST
1.03014.2
68.135.2R
4185SCOTF GT
1.03014.2
70.232.6R
627AIR LIQC
1.03014.2
68.127.2R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.035142.8
1.00
28
936808L_TAP
1.026141.6
67BRUDERH7
1.031142.3
29.517.9
18.814.8
314JOSEPH2
1.033142.5
0.97
955
-103.5-58.3
0.97
955
-103.9-58.5
391ALBCHEM7
1.032142.4
735SHELL TP
1.028141.9
952DIAM TAP
1.033142.6
43SCOT4_7
1.028141.9
23.5-3.9
-23.52.7
65.439.1
29.8-21.2
-102.188.6
-23.42.6-2.8
948808_BNDY
1.025141.5
59REDWATE7
1.018140.5
-9.9-1.1
-19.3
1420WEASEL1
1.023141.1
1.1-9.8-2.1
954ABEE_01
1.021140.9
-6.9-2.1
6.91.460
BEAMER 7
1.024141.3
734SHELL A1
1.028141.9
48DIAM SH7
1.033142.6
58FORT SA7
1.035142.9
185SCOT4_8
1.029142.0
628ALC SCOT
1.027141.7
394ASTOTIN
1.031142.3
821708ALTAP
1.026141.6
61DOW CHEM
1.039143.4
62SHERRIT7
1.037143.1
63LAMOURE7
1.041143.7
-7.8
-0.3-0.3
-29.
420
.8
-43.6-16.1
31.1
0.40.1 -0.3
-32.2
-3.8
-7.726.57.1
-8.2
-6.225.6
-88.
70.
289
.1
-26.
4-2
8.7
26.428.6
62.7 0.97
83
71.5146.6
0.94
161
51.0
-58.4
58.655.0
23.4
-0.4
3.8
50RIVERSID
1.026141.6
-35.9-18.9
102.7
32.4
393DOW HYD7
1.039143.4
922ROSS TAP
1.039143.4
39.9
-7.3
-39.
97.
174
.5-2
0.3
30.0
10.9
-30.
2
-36.630.4
45ROSS CRK
1.039143.4
-37.
8
-54.8
8.8
-32.7-48.3
9.9
-10.9
32.0
20.6-30.7
-20.530.7
-88.531.7
-10.
1
0.2
-18.8-15.3
-85.5
-26.4
-59.9
793SCORIA1
1.026141.5
23.912.3
-23.9-12.4
-18.6
2954ABEE_02
1.0224.3
996.91.9
18420WEASEL2
1.0384.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.6R
8.5R
2030DOWSTG 9
1.03015.1
37.4
3.8R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3248.070.5R
G4200.050.8R
2835LAMONT_LV1
3835LAMONT_LV2
71.515.9R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 99
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A SENSITIVITY857L (N-1)FIG D-22FRI, AUG 19 2016 15:41
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.7
443BANN_240
1.032247.6
109DEERLAN4
1.051252.3
771AMELIA1
1.035248.4
313JOSEPH1
1.027246.6
104.3-120.9
-104.1
57LAMOURE4
1.021245.2
-65.9201.167.1
-66.9141.0
67.1-141.7
106.2
-105.9-96.0
-182.24.6
182.7-4.6
-67.3-78.7
67.476.3
-200.9
120.7
91.7
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-5.9
R
7185SCOTF ST
1.03014.2
68.135.2R
4185SCOTF GT
1.03014.2
70.232.6R
627AIR LIQC
1.03014.2
68.127.2R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.035142.8
1.00
28
936808L_TAP
1.026141.6
67BRUDERH7
1.031142.3
29.417.9
18.814.8
314JOSEPH2
1.033142.5
0.97
955
-103.5-58.4
0.97
955
-103.9-58.5
391ALBCHEM7
1.032142.4
735SHELL TP
1.028141.9
952DIAM TAP
1.033142.6
43SCOT4_7
1.028141.9
23.5-3.9
-23.52.7
65.338.5
29.8-21.2
-102.888.7103.4
-23.42.7-2.8
948808_BNDY
1.025141.5
59REDWATE7
1.018140.5
-9.9-1.1
-19.3
1420WEASEL1
1.023141.1
1.1-9.8-2.1
954ABEE_01
1.021140.9
-6.9-2.1
6.91.460
BEAMER 7
1.024141.3
734SHELL A1
1.028141.9
48DIAM SH7
1.033142.6
58FORT SA7
1.035142.9
185SCOT4_8
1.029142.0
628ALC SCOT
1.027141.7
394ASTOTIN
1.031142.3
821708ALTAP
1.026141.6
61DOW CHEM
1.039143.4
62SHERRIT7
1.037143.1
63LAMOURE7
1.041143.7
-7.9
-0.3-0.3
-29.
320
.9
-43.6-15.6
31.4
0.40.1 -0.3
-32.1
-3.8
-7.726.57.1
-8.6
-6.225.4
-88.
70.
289
.1
-26.
4-2
8.7
26.528.7
62.7 0.97
83
71.5146.6
0.94
161
50.9
-58.4
58.655.0
23.4
-0.4
3.8
50RIVERSID
1.026141.6
-35.9-18.9
-88.6
32.4
393DOW HYD7
1.039143.4
922ROSS TAP
1.039143.4
39.9
-7.3
-39.
97.
174
.5-2
0.3
30.0
10.9
-30.
2
-36.630.4
45ROSS CRK
1.039143.4
-37.
8
-54.8
8.8
-32.7-48.3
9.9
-10.9
31.9
20.7-30.0
-20.630.0
31.7
-10.
1
0.3
-18.8-15.3
-85.5
-26.4
-60.0
793SCORIA1
1.026141.5
23.912.3
-23.9-12.4
-18.6
2954ABEE_02
1.0224.3
996.91.9
18420WEASEL2
1.0384.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.6R
8.5R
2030DOWSTG 9
1.03015.1
37.4
3.9R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3248.070.5R
G4200.050.9R
2835LAMONT_LV1
3835LAMONT_LV2
71.515.9R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 100
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A SENSITIVITYALCO2L (N-1)FIG D-23FRI, AUG 19 2016 15:41
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.7
443BANN_240
1.032247.6
109DEERLAN4
1.051252.3
771AMELIA1
1.035248.4
313JOSEPH1
1.027246.5
103.7-121.4
-103.6
57LAMOURE4
1.021245.1
-64.5199.765.6
-66.3141.5
66.6-142.1
106.2
-105.9-96.0
-182.34.3
182.7-4.3
-67.3-78.8
67.476.4
-199.5
121.2
91.8
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-5.8
R
7185SCOTF ST
1.03014.2
68.134.2R
4185SCOTF GT
1.03014.2
70.231.6R
627AIR LIQC
1.03014.2
68.126.3R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.035142.8
1.00
28
936808L_TAP
1.026141.6
67BRUDERH7
1.031142.3
28.117.5
19.715.3
314JOSEPH2
1.032142.5
0.97
955
-104.5-59.8
0.97
955
-104.8-59.9
391ALBCHEM7
1.031142.3
735SHELL TP
1.029142.0
952DIAM TAP
1.033142.5
43SCOT4_7
1.029142.1
22.7-4.3
-22.63.1
39.925.3
28.0-22.1
-61.159.561.3
-59.459.2
-22.63.1-3.3
948808_BNDY
1.025141.5
59REDWATE7
1.019140.6
-9.9-1.1
-18.0
1420WEASEL1
1.023141.1
1.1-9.8-2.1
954ABEE_01
1.021140.9
-6.9-2.1
6.91.460
BEAMER 7
1.025141.4
734SHELL A1
1.029142.0
48DIAM SH7
1.033142.5
58FORT SA7
1.035142.9
185SCOT4_8
1.031142.2
628ALC SCOT
1.028141.9
394ASTOTIN
1.031142.3
821708ALTAP
1.027141.7
61DOW CHEM
1.039143.4
62SHERRIT7
1.037143.0
63LAMOURE7
1.041143.7
-9.5
-0.3-0.3
-27.
521
.7
33.5
0.40.1 -0.3
-30.9
-7.2
-8.127.87.5
-21.9
7.324.0
-89.
4-0
.189
.8
-27.
6-2
9.2
27.629.1
62.1 0.97
83
70.9146.2
0.94
161
49.6
-59.6
59.755.5
22.6
-0.4
7.2
50RIVERSID
1.026141.6
-35.9-18.9
-59.5
59.6
29.0
393DOW HYD7
1.039143.4
922ROSS TAP
1.039143.4
39.6
-7.3
-39.
67.
274
.1-2
0.4
30.0
10.6
-30.
2
-36.230.5
45ROSS CRK
1.039143.4
-37.
8
-55.3
8.5
-32.7-47.8
9.9
-10.6
30.7
50.6-15.3
-50.615.3
-59.218.2
-10.
1
0.6
-19.7-15.7
-90.2
-27.7
-103.5
793SCORIA1
1.026141.6
23.912.3
-23.9-12.4
-18.2
2954ABEE_02
1.0224.3
996.91.9
18420WEASEL2
1.0384.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.6R
8.5R
2030DOWSTG 9
1.03015.1
37.4
3.9R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3248.071.1R
G4200.051.3R
2835LAMONT_LV1
3835LAMONT_LV2
71.516.1R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 101
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A SENSITIVITYEXI-01L (N-1)FIG D-24FRI, AUG 19 2016 15:42
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.7
443BANN_240
1.031247.6
109DEERLAN4
1.051252.3
771AMELIA1
1.035248.4
313JOSEPH1
1.027246.5
104.7-121.2
-104.5
57LAMOURE4
1.021245.1
-65.2202.366.4
-67.2141.3
67.5-141.9
106.2
-105.9-96.1
-182.14.4
182.6-4.4
-67.3-78.8
67.476.4
-202.0
121.0
91.8
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-5.7
R
7185SCOTF ST
1.03014.2
68.134.2R
4185SCOTF GT
1.03014.2
70.231.7R
627AIR LIQC
1.03014.2
68.126.7R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.035142.8
1.00
28
936808L_TAP
1.026141.6
67BRUDERH7
1.031142.3
30.217.6
18.415.3
314JOSEPH2
1.032142.5
0.97
955
-102.7-59.3
0.97
955
-103.1-59.5
391ALBCHEM7
1.031142.3
735SHELL TP
1.028141.9
952DIAM TAP
1.033142.5
43SCOT4_7
1.030142.1
24.0-4.3
-23.93.1
80.632.8
30.5-22.3
-56.935.357.0
-55.635.4
-23.83.1-3.3
948808_BNDY
1.025141.4
59REDWATE7
1.018140.5
-9.9-1.1
-20.0
1420WEASEL1
1.022141.1
1.1-9.8-2.1
954ABEE_01
1.021140.9
-6.9-2.1
6.91.460
BEAMER 7
1.024141.3
734SHELL A1
1.028141.8
48DIAM SH7
1.033142.5
58FORT SA7
1.035142.8
185SCOT4_8
1.031142.2
628ALC SCOT
1.028141.8
394ASTOTIN
1.031142.3
821708ALTAP
1.026141.6
61DOW CHEM
1.039143.4
62SHERRIT7
1.036143.0
63LAMOURE7
1.041143.7
-8.6
-0.3-0.3
-30.
122
.0
-103.5-21.9
47.3
0.40.1 -0.3
-31.7
-1.8
-8.025.87.4
-48.210.2
-88.
5-0
.388
.8
-25.
9-2
9.2
25.929.2
63.1 0.97
83
72.0146.6
0.94
161
50.6
-57.9
58.055.5
23.9
-0.4
1.8
50RIVERSID
1.026141.5
-35.9-18.9
-35.3
55.6
34.4
393DOW HYD7
1.039143.3
922ROSS TAP
1.039143.4
40.0
-7.3
-40.
07.
174
.7-2
0.3
30.0
11.0
-30.
2
-36.730.4
45ROSS CRK
1.039143.4
-37.
8
-55.3
8.9
-32.8-48.6
9.9
-11.0
31.5
2.7-23.5
-2.723.5
-35.473.8
-10.
1
0.8
-18.4-15.7
-82.8
-25.7
793SCORIA1
1.025141.5
23.912.3
-23.9-12.4
-18.3
2954ABEE_02
1.0224.3
996.91.9
18420WEASEL2
1.0384.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.5R
8.5R
2030DOWSTG 9
1.03015.1
37.4
4.0R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3248.071.0R
G4200.051.2R
2835LAMONT_LV1
3835LAMONT_LV2
71.516.1R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 102
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A SENSITIVITYALC03L (N-1)FIG D-25FRI, AUG 19 2016 15:42
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.7
443BANN_240
1.032247.6
109DEERLAN4
1.051252.3
771AMELIA1
1.035248.4
313JOSEPH1
1.027246.5
104.1-121.4
-104.0
57LAMOURE4
1.021245.1
-64.5200.865.7
-66.7141.5
66.9-142.1
106.2
-105.9-96.0
-182.24.4
182.6-4.4
-67.3-78.8
67.476.4
-200.6
121.2
91.8
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-5.8
R
7185SCOTF ST
1.03014.2
68.134.5R
4185SCOTF GT
1.03014.2
70.232.0R
627AIR LIQC
1.03014.2
68.127.0R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.035142.8
1.00
28
936808L_TAP
1.026141.7
67BRUDERH7
1.031142.3
28.917.1
19.215.4
314JOSEPH2
1.032142.5
0.97
955
-103.7-59.6
0.97
955
-104.1-59.8
391ALBCHEM7
1.031142.3
735SHELL TP
1.029142.1
952DIAM TAP
1.033142.5
43SCOT4_7
1.030142.1
23.1-4.5
-23.13.3
56.720.8
29.0-22.4
-63.549.563.6
-61.849.5
-23.03.3-3.4
948808_BNDY
1.025141.5
59REDWATE7
1.019140.6
-9.9-1.0
-18.8
1420WEASEL1
1.023141.1
1.0-9.8-2.1
954ABEE_01
1.021141.0
-6.9-2.1
6.91.460
BEAMER 7
1.025141.4
734SHELL A1
1.029142.1
48DIAM SH7
1.033142.5
58FORT SA7
1.035142.9
185SCOT4_8
1.030142.1
628ALC SCOT
1.027141.7
394ASTOTIN
1.031142.3
821708ALTAP
1.027141.7
61DOW CHEM
1.039143.4
62SHERRIT7
1.037143.0
63LAMOURE7
1.041143.7
-10.6
-0.3-0.3
-28.
522
.1
-27.0-19.5
57.8
0.40.1 -0.3
-30.1
-5.0
-8.427.17.8
-3.5
-89.
1-0
.289
.4
-27.
0-2
9.4
27.029.4
62.6 0.97
83
71.4146.2
0.94
161
48.9
-59.0
59.155.8
23.0
-0.4
5.0
50RIVERSID
1.026141.7
-35.9-18.9
-49.5
62.0
31.2
393DOW HYD7
1.039143.4
922ROSS TAP
1.039143.4
39.8
-7.4
-39.
87.
374
.3-2
0.6
30.1
10.8
-30.
3
-36.430.7
45ROSS CRK
1.039143.4
-37.
8
-55.5
8.4
-32.5-48.1
9.9
-10.7
29.9
31.0-9.7
-31.09.7
-49.425.5
-10.
1
0.7
-19.2-15.9
-87.3
-26.9
-76.5
793SCORIA1
1.026141.6
23.912.3
-23.9-12.4
-17.8
2954ABEE_02
1.0234.3
996.91.9
18420WEASEL2
1.0394.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.6R
8.5R
2030DOWSTG 9
1.03015.1
37.4
3.9R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3248.071.0R
G4200.051.2R
2835LAMONT_LV1
3835LAMONT_LV2
71.516.1R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 103
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A SENSITIVITYALC01L (N-1)FIG D-26FRI, AUG 19 2016 15:43
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.7
443BANN_240
1.032247.6
109DEERLAN4
1.051252.3
771AMELIA1
1.035248.4
313JOSEPH1
1.027246.6
104.3-121.0
-104.1
57LAMOURE4
1.021245.2
-65.8201.167.0
-66.8141.1
67.1-141.7
106.2
-105.9-96.0
-182.24.6
182.7-4.6
-67.3-78.7
67.476.3
-200.9
120.8
91.7
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-5.9
R
7185SCOTF ST
1.03014.2
68.134.4R
4185SCOTF GT
1.03014.2
70.231.8R
627AIR LIQC
1.03014.2
68.128.3R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.035142.8
1.00
28
936808L_TAP
1.026141.6
67BRUDERH7
1.031142.3
29.417.8
18.914.9
314JOSEPH2
1.033142.5
0.97
955
-103.5-58.5
0.97
955
-103.9-58.7
391ALBCHEM7
1.032142.4
735SHELL TP
1.028141.9
952DIAM TAP
1.033142.6
43SCOT4_7
1.030142.2
23.5-3.9
-23.42.8
64.736.8
29.7-21.3
-53.544.853.6
-52.144.7
-23.42.7-2.9
948808_BNDY
1.025141.5
59REDWATE7
1.018140.5
-9.9-1.1
-19.3
1420WEASEL1
1.023141.1
1.1-9.8-2.1
954ABEE_01
1.021140.9
-6.9-2.1
6.91.460
BEAMER 7
1.024141.3
734SHELL A1
1.028141.9
48DIAM SH7
1.033142.6
58FORT SA7
1.035142.9
185SCOT4_8
1.030142.2
628ALC SCOT
1.025141.5
394ASTOTIN
1.031142.3
821708ALTAP
1.026141.6
61DOW CHEM
1.039143.4
62SHERRIT7
1.037143.1
63LAMOURE7
1.041143.7
-8.2
-0.3-0.3
-29.
321
.0
-11.018.5
0.40.1 -0.3
-31.9
-3.9
-7.826.67.2
-41.2
25.555.9
-88.
80.
189
.1
-26.
5-2
8.8
26.528.7
62.7 0.97
83
71.5146.6
0.94
161
50.7
-58.5
58.655.1
23.4
-0.4
3.9
50RIVERSID
1.026141.6
-35.9-18.9
-44.8
52.1
32.3
393DOW HYD7
1.039143.4
922ROSS TAP
1.039143.4
39.9
-7.3
-39.
97.
174
.5-2
0.4
30.0
10.9
-30.
2
-36.630.4
45ROSS CRK
1.039143.4
-37.
8
-54.9
8.8
-32.7-48.3
9.9
-10.9
31.7
21.4-28.0
-21.428.0
-44.7
-10.
1
0.3
-18.9-15.4
-85.7
-26.5
-92.5
793SCORIA1
1.026141.5
23.912.3
-23.9-12.4
-18.5
2954ABEE_02
1.0224.3
996.91.9
18420WEASEL2
1.0384.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.6R
8.5R
2030DOWSTG 9
1.03015.1
37.4
3.9R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3248.070.6R
G4200.050.9R
2835LAMONT_LV1
3835LAMONT_LV2
71.515.9R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 104
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A SENSITIVITY706L (N-1)FIG D-27FRI, AUG 19 2016 15:43
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.7
443BANN_240
1.031247.6
109DEERLAN4
1.051252.2
771AMELIA1
1.035248.3
313JOSEPH1
1.027246.4
105.8-121.7
-105.6
57LAMOURE4
1.021245.1
-57.4216.259.0
-68.4141.9
68.6-142.5
107.1
-106.8-95.5
-179.12.8
179.6-3.0
-68.2-78.3
68.375.9
-215.9
121.5
91.3
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-6.8
R
7185SCOTF ST
1.03014.2
68.135.3R
4185SCOTF GT
1.03014.2
70.232.7R
627AIR LIQC
1.03014.2
68.127.4R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.034142.7
1.00
28
936808L_TAP
1.025141.5
67BRUDERH7
1.030142.1
28.717.5
17.316.7
314JOSEPH2
1.031142.3
0.97
955
-95.2-64.2
0.97
955
-95.6-64.5
391ALBCHEM7
1.030142.2
735SHELL TP
1.028141.8
952DIAM TAP
1.033142.5
43SCOT4_7
1.028141.9
25.1-5.7
-25.04.6
57.422.7
-56.554.256.7
-55.054.0
-25.04.6-4.7
948808_BNDY
1.024141.3
59REDWATE7
1.017140.4
-9.9-1.1
-18.7
1420WEASEL1
1.022141.0
1.1-9.8-2.1
954ABEE_01
1.020140.8
-6.9-2.1
6.91.460
BEAMER 7
1.024141.2
734SHELL A1
1.028141.8
48DIAM SH7
1.033142.5
58FORT SA7
1.037143.1
185SCOT4_8
1.028141.9
628ALC SCOT
1.027141.7
394ASTOTIN
1.030142.1
821708ALTAP
1.026141.6
61DOW CHEM
1.040143.6
62SHERRIT7
1.038143.2
63LAMOURE7
1.042143.8
-1.0
-31.4-10.2
34.6
0.40.1 -0.3
-39.4
-14.
7
-8.127.27.5
-14.2
-13.622.0
-98.
17.
898
.5
-43.
4-1
7.6
43.417.6
68.9 0.97
83
78.4143.0
0.94
161
58.4
-75.4
75.544.0
25.0
-0.4
14.7
50RIVERSID
1.026141.6
-35.9-18.9
-54.2
55.1
21.5
393DOW HYD7
1.040143.5
922ROSS TAP
1.040143.6
36.3
-5.3
-36.
25.
268
.7-1
7.2
28.0
7.3
-28.
2
-30.827.2
45ROSS CRK
1.040143.6
-37.
8
-43.7
5.6
-34.2-46.0
9.9
-7.2
39.3
40.2-21.0
-40.221.0
-54.039.1
-10.
1
-7.2
-17.2-17.2
-97.1
-27.1
-72.1
793SCORIA1
1.026141.5
23.912.3
-23.9-12.4
-18.2
2954ABEE_02
1.0214.2
996.91.9
18420WEASEL2
1.0374.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-11.0R
8.1R
2030DOWSTG 9
1.03015.1
37.4
3.2R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3248.071.9R
G4200.051.8R
2835LAMONT_LV1
3835LAMONT_LV2
71.516.3R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 105
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A SENSITIVITY707L (N-1)FIG D-28FRI, AUG 19 2016 15:43
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.7
443BANN_240
1.031247.5
109DEERLAN4
1.051252.3
771AMELIA1
1.035248.3
313JOSEPH1
1.027246.5
103.8-121.4
-103.6
57LAMOURE4
1.021245.1
-64.7194.065.7
-66.4141.6
66.6-142.2
105.4
-105.1-96.2
-183.14.3
183.5-4.2
-66.5-78.9
66.676.5
-193.8
121.2
91.9
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-6.8
R
7185SCOTF ST
1.03014.2
68.134.8R
4185SCOTF GT
1.03014.2
70.232.2R
627AIR LIQC
1.03014.2
68.126.7R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.035142.8
1.00
28
936808L_TAP
1.026141.6
67BRUDERH7
1.031142.3
28.717.6
20.215.3
314JOSEPH2
1.032142.4
0.97
955
-107.3-60.0
0.97
955
-107.6-60.2
391ALBCHEM7
1.031142.3
735SHELL TP
1.029141.9
952DIAM TAP
1.032142.4
43SCOT4_7
1.029142.0
22.2-4.3
-22.13.1
51.327.3
42.1-21.0
-59.849.759.9
-58.249.6
-22.13.1-3.2
948808_BNDY
1.025141.4
59REDWATE7
1.018140.5
-9.9-1.1
-18.6
1420WEASEL1
1.022141.1
1.1-9.8-2.1
954ABEE_01
1.021140.9
-6.9-2.1
6.91.460
BEAMER 7
1.024141.3
734SHELL A1
1.028141.9
48DIAM SH7
1.032142.4
58FORT SA7
1.033142.5
185SCOT4_8
1.029142.1
628ALC SCOT
1.028141.8
394ASTOTIN
1.031142.3
821708ALTAP
1.026141.6
61DOW CHEM
1.040143.6
62SHERRIT7
1.035142.8
63LAMOURE7
1.041143.6
-10.9
-0.3-0.3
-41.
520
.9
-36.9-6.1
37.1
0.40.1 -0.3
-29.4
0.3
-8.027.37.4
-17.4
-10.220.2
-96.
6-2
8.2
96.728.4
58.2 0.97
83
66.5146.5
0.94
161
48.3
-128.7
129.155.6
22.1
-0.4
-0.3
50RIVERSID
1.026141.6
-35.9-18.9
-49.7
58.3
36.5
393DOW HYD7
1.039143.4
922ROSS TAP
1.040143.5
74.1
-7.9
-74.
08.
112
9.4
-21.
6
31.1
45.0
-31.
2
-91.232.5
45ROSS CRK
1.040143.5
-37.
8
-54.6
8.8
-32.8-48.8
9.9
-44.9
29.3
31.3-16.0
-31.316.0
-49.635.8
-10.
1
-20.1-15.7
-82.2
-27.2
-66.6
793SCORIA1
1.026141.5
23.912.3
-23.9-12.4
-18.3
2954ABEE_02
1.0224.3
996.91.9
18420WEASEL2
1.0384.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-11.0R
8.1R
2030DOWSTG 9
1.03015.1
37.4
3.2R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3248.071.5R
G4200.051.6R
2835LAMONT_LV1
3835LAMONT_LV2
71.516.2R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 106
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A SENSITIVITY787L (N-1)FIG D-29FRI, AUG 19 2016 15:43
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.054252.9
443BANN_240
1.032247.8
109DEERLAN4
1.052252.5
771AMELIA1
1.036248.6
313JOSEPH1
1.028246.7
107.8-121.0
-107.7
57LAMOURE4
1.022245.4
-61.4205.762.6
-70.4141.2
70.6-141.8
103.5
-103.2-95.3
-178.94.1
179.3-4.3
-64.6-78.1
64.775.7
-205.4
120.8
90.9
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-7.3
R
7185SCOTF ST
1.03014.2
68.134.1R
4185SCOTF GT
1.03014.2
70.231.6R
627AIR LIQC
1.03014.2
68.125.7R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.036142.9
1.00
28
936808L_TAP
1.027141.8
67BRUDERH7
1.032142.4
27.717.4
18.015.4
314JOSEPH2
1.033142.6
0.97
955
-99.5-59.6
0.97
955
-99.8-59.8
391ALBCHEM7
1.032142.4
735SHELL TP
1.030142.1
952DIAM TAP
1.034142.7
43SCOT4_7
1.031142.2
24.4-4.4
-24.33.3
53.226.3
19.7-20.4
-59.751.159.8
-58.151.0
-24.23.2-3.4
948808_BNDY
1.026141.6
59REDWATE7
1.019140.7
-9.9-1.0
-17.6
1420WEASEL1
1.024141.2
1.0-9.8-2.1
954ABEE_01
1.022141.0
-6.9-2.1
6.91.460
BEAMER 7
1.026141.5
734SHELL A1
1.030142.1
48DIAM SH7
1.034142.6
58FORT SA7
1.037143.1
185SCOT4_8
1.031142.3
628ALC SCOT
1.029142.0
394ASTOTIN
1.032142.4
821708ALTAP
1.028141.9
61DOW CHEM
1.041143.7
62SHERRIT7
1.038143.3
63LAMOURE7
1.043144.0
-7.5
-0.3-0.3
-19.
319
.9
-35.2-6.2
37.0
0.40.1 -0.3
-32.9
-3.4
-8.128.27.5
-16.1
-11.221.1
-126
.814
.912
7.5
-4.5
-41.
2
4.541.2
56.4 0.97
83
64.5143.5
0.94
161
51.8
-36.5
36.667.5
24.3
-0.4
3.4
50RIVERSID
1.028141.8
-35.9-18.9
-51.1
58.2
32.8
393DOW HYD7
1.041143.6
922ROSS TAP
1.039143.4
75.9
-17.
3-7
5.8
17.6
40.7
46.8
-40.
6
45ROSS CRK
1.039143.4
-67.3
5.8
-32.8-45.7
9.9
-46.7
32.8
34.0-18.3
-34.018.3
-50.936.8
-13.
7
-18.0-15.8
-86.8
-28.1
-68.3
793SCORIA1
1.027141.8
23.912.3
-23.9-12.4
-18.2
2954ABEE_02
1.0234.3
996.91.9
18420WEASEL2
1.0394.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-11.2R
7.9R
2030DOWSTG 9
1.03015.1
37.4
2.8R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3248.069.3R
G4200.050.0R
2835LAMONT_LV1
3835LAMONT_LV2
71.515.6R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 107
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A SENSITIVITY862L (N-1)FIG D-30FRI, AUG 19 2016 15:43
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.7
443BANN_240
1.032247.6
109DEERLAN4
1.051252.3
771AMELIA1
1.035248.4
313JOSEPH1
1.027246.5
104.1-121.3
-103.9
57LAMOURE4
1.021245.1
-64.9201.666.1
-66.7141.4
66.9-142.0
106.4
-106.1-96.1
-182.14.4
182.5-4.4
-67.4-78.8
67.576.4
-201.4
121.1
91.8
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-6.0
R
7185SCOTF ST
1.03014.2
68.134.6R
4185SCOTF GT
1.03014.2
70.232.0R
627AIR LIQC
1.03014.2
68.126.4R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.035142.8
1.00
28
936808L_TAP
1.026141.6
67BRUDERH7
1.031142.3
28.817.5
19.115.3
314JOSEPH2
1.032142.5
0.97
955
-103.4-59.5
0.97
955
-103.7-59.7
391ALBCHEM7
1.031142.3
735SHELL TP
1.029142.0
952DIAM TAP
1.033142.5
43SCOT4_7
1.030142.1
23.2-4.3
-23.23.2
54.026.7
26.7-21.2
-59.751.659.8
-58.151.5
-23.13.1-3.3
948808_BNDY
1.025141.5
59REDWATE7
1.018140.5
-9.9-1.1
-18.7
1420WEASEL1
1.023141.1
1.1-9.8-2.1
954ABEE_01
1.021140.9
-6.9-2.1
6.91.460
BEAMER 7
1.024141.4
734SHELL A1
1.029142.0
48DIAM SH7
1.033142.5
58FORT SA7
1.035142.9
185SCOT4_8
1.030142.1
628ALC SCOT
1.028141.9
394ASTOTIN
1.031142.3
821708ALTAP
1.027141.7
61DOW CHEM
1.039143.4
62SHERRIT7
1.036143.0
63LAMOURE7
1.041143.7
-9.3
-0.3-0.3
-26.
320
.8
-34.6-6.3
37.0
0.40.1 -0.3
-31.1
-6.3
-8.127.17.5
-16.9
-11.720.5
-103
.94.
310
4.3
-15.
4-3
2.4
15.432.4
63.2 0.97
83
72.1146.4
0.94
161
49.9
-47.4
47.558.7
23.1
-0.4
6.3
50RIVERSID
1.026141.6
-35.9-18.9
-51.6
58.2
29.8
393DOW HYD7
1.039143.3
922ROSS TAP
1.039143.4
99.1
-24.
1
22.9
-29.
0-2
3.0
-61.134.4
45ROSS CRK
1.039143.4
-37.
8
-58.5
8.7
-32.7-48.0
9.9
29.0
30.9
35.1-16.9
-35.116.9
-51.537.2
-10.
1
-3.6
-19.1-15.7
-88.7
-27.0
-68.9
793SCORIA1
1.026141.6
23.912.3
-23.9-12.4
-18.2
2954ABEE_02
1.0224.3
996.91.9
18420WEASEL2
1.0384.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.7R
8.4R
2030DOWSTG 9
1.03015.1
37.4
3.8R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3248.071.1R
G4200.051.2R
2835LAMONT_LV1
3835LAMONT_LV2
71.516.1R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 108
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A SENSITIVITY861L (N-1)FIG D-31FRI, AUG 19 2016 15:43
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.8
443BANN_240
1.032247.6
109DEERLAN4
1.051252.3
771AMELIA1
1.035248.4
313JOSEPH1
1.027246.6
104.0-121.2
-103.9
57LAMOURE4
1.022245.2
-63.9201.065.1
-66.6141.3
66.8-141.9
106.3
-106.0-95.8
-182.24.4
182.6-4.4
-67.4-78.5
67.576.1
-200.7
121.0
91.5
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-4.8
R
7185SCOTF ST
1.03014.2
68.134.5R
4185SCOTF GT
1.03014.2
70.231.9R
627AIR LIQC
1.03014.2
68.126.2R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.035142.8
1.00
28
936808L_TAP
1.027141.7
67BRUDERH7
1.031142.3
28.817.4
19.215.3
314JOSEPH2
1.033142.5
0.97
955
-103.7-59.6
0.97
955
-104.1-59.7
391ALBCHEM7
1.032142.4
735SHELL TP
1.029142.0
952DIAM TAP
1.033142.5
43SCOT4_7
1.030142.1
23.1-4.3
-23.13.2
53.626.5
28.3-20.7
-59.651.459.7
-58.051.3
-23.03.1-3.3
948808_BNDY
1.025141.5
59REDWATE7
1.019140.6
-9.9-1.0
-18.7
1420WEASEL1
1.023141.2
1.0-9.8-2.1
954ABEE_01
1.021141.0
-6.9-2.1
6.91.460
BEAMER 7
1.025141.4
734SHELL A1
1.029142.0
48DIAM SH7
1.033142.5
58FORT SA7
1.035142.8
185SCOT4_8
1.030142.2
628ALC SCOT
1.028141.9
394ASTOTIN
1.031142.3
821708ALTAP
1.027141.7
61DOW CHEM
1.038143.3
62SHERRIT7
1.037143.0
63LAMOURE7
1.042143.8
-8.6
-0.3-0.3
-27.
920
.3
-34.8-6.4
36.9
0.40.1 -0.3
-31.9
-5.5
-8.227.27.6
-16.6
-11.520.7
-92.
310
.792
.7
-24.
6-3
8.1
24.638.0
62.8 0.97
83
71.6145.3
0.94
161
50.7
-56.6
56.764.4
23.0
-0.4
5.5
50RIVERSID
1.027141.7
-35.9-18.9
-51.4
58.1
30.7
393DOW HYD7
1.035142.9
922ROSS TAP
1.038143.3
29.0
22.9
-29.
0-2
3.1
81.8
-37.
5
-43.847.8
45ROSS CRK
1.038143.3
-37.
8
-64.2
7.6
-32.6-48.0
9.931
.7
34.6-17.4
-34.617.4
-51.237.0
-10.
1
-10.
2
-19.2-15.7
-87.9
-27.1
-68.7
793SCORIA1
1.026141.6
23.912.3
-23.9-12.4
-18.1
2954ABEE_02
1.0234.3
996.91.9
18420WEASEL2
1.0394.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.2R
8.8R
2030DOWSTG 9
1.03015.1
37.4
4.6R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3248.070.6R
G4200.050.9R
2835LAMONT_LV1
3835LAMONT_LV2
71.516.0R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 109
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A SENSITIVITY781L (N-1)FIG D-32FRI, AUG 19 2016 15:43
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.8
443BANN_240
1.032247.7
109DEERLAN4
1.051252.3
771AMELIA1
1.035248.4
313JOSEPH1
1.027246.5
103.8-121.3
-103.6
57LAMOURE4
1.022245.3
-58.3195.259.3
-66.4141.4
66.6-142.0
105.6
-105.3-95.0
-183.03.8
183.4-3.8
-66.7-77.8
66.875.3
-195.0
121.1
90.6
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-5.0
R
7185SCOTF ST
1.03014.2
68.134.9R
4185SCOTF GT
1.03014.2
70.232.3R
627AIR LIQC
1.03014.2
68.126.8R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.035142.8
1.00
28
936808L_TAP
1.026141.6
67BRUDERH7
1.031142.3
28.617.2
20.215.9
314JOSEPH2
1.032142.4
0.97
955
-106.7-62.5
0.97
955
-107.0-62.7
391ALBCHEM7
1.031142.3
735SHELL TP
1.028141.9
952DIAM TAP
1.031142.3
43SCOT4_7
1.029142.0
22.2-5.0
-22.13.8
50.924.8
41.6-9.2
-57.949.658.0
-56.449.5
-22.13.8-3.9
948808_BNDY
1.025141.5
59REDWATE7
1.018140.5
-9.9-1.1
-18.5
1420WEASEL1
1.023141.1
1.1-9.8-2.1
954ABEE_01
1.021140.9
-6.9-2.1
6.91.460
BEAMER 7
1.025141.4
734SHELL A1
1.028141.9
48DIAM SH7
1.031142.3
58FORT SA7
1.029142.0
185SCOT4_8
1.029142.0
628ALC SCOT
1.027141.8
394ASTOTIN
1.031142.3
821708ALTAP
1.027141.8
61DOW CHEM
1.038143.3
62SHERRIT7
1.028141.8
63LAMOURE7
1.043144.0
-5.0
-0.3-0.3
-41.
19.
0
-37.1-8.4
35.7
0.40.1 -0.3
-35.6
1.0
-8.327.37.7
-15.3
-10.121.4
-129
.1-3
7.4
129.
8
32.0
26.1
-32.0-26.2
59.1 0.97
83
67.5140.8
0.94
161
54.7
22.1
-0.4
-1.0
50RIVERSID
1.027141.7
-35.9-18.9
-49.6
56.5
37.2
393DOW HYD7
1.040143.5
922ROSS TAP
1.039143.3
24.3
-21.
3-2
4.3
21.1
49.3
-42.
7
44.0
-4.7
-44.
1
-11.452.8
45ROSS CRK
1.039143.3
-37.
8
3.4
-33.1-48.8
9.9
4.8
35.5
31.0-19.4
-31.019.4
-49.435.7
-10.
1
38.8
-20.1-16.4
-81.5
-27.2
-66.4
793SCORIA1
1.027141.7
23.912.3
-23.9-12.4
-17.9
2954ABEE_02
1.0224.3
996.91.9
18420WEASEL2
1.0384.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.3R
8.8R
2030DOWSTG 9
1.03015.1
37.4
4.4R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3248.070.9R
G4200.051.1R
2835LAMONT_LV1
3835LAMONT_LV2
71.516.0R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 110
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A SENSITIVITY709L (N-1)FIG D-33FRI, AUG 19 2016 15:43
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.7
443BANN_240
1.032247.6
109DEERLAN4
1.051252.3
771AMELIA1
1.035248.4
313JOSEPH1
1.027246.5
103.9-121.3
-103.8
57LAMOURE4
1.022245.2
-61.4198.262.5
-66.5141.4
66.7-142.0
106.0
-105.7-95.4
-182.64.1
183.0-4.1
-67.0-78.2
67.175.8
-198.0
121.1
91.2
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-5.4
R
7185SCOTF ST
1.03014.2
68.134.7R
4185SCOTF GT
1.03014.2
70.232.1R
627AIR LIQC
1.03014.2
68.126.5R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.035142.8
1.00
28
936808L_TAP
1.026141.6
67BRUDERH7
1.031142.3
28.717.3
19.715.6
314JOSEPH2
1.032142.4
0.97
955
-105.1-60.9
0.97
955
-105.5-61.1
391ALBCHEM7
1.031142.3
735SHELL TP
1.029142.0
952DIAM TAP
1.032142.4
43SCOT4_7
1.029142.1
22.7-4.6
-22.63.5
52.325.7
34.7-15.3
-58.850.558.9
-57.350.4
-22.63.4-3.6
948808_BNDY
1.025141.5
59REDWATE7
1.018140.6
-9.9-1.1
-18.6
1420WEASEL1
1.023141.1
1.1-9.8-2.1
954ABEE_01
1.021140.9
-6.9-2.1
6.91.460
BEAMER 7
1.025141.4
734SHELL A1
1.029142.0
48DIAM SH7
1.032142.4
58FORT SA7
1.032142.4
185SCOT4_8
1.030142.1
628ALC SCOT
1.028141.8
394ASTOTIN
1.031142.3
821708ALTAP
1.027141.7
61DOW CHEM
1.039143.4
62SHERRIT7
1.040143.5
63LAMOURE7
1.042143.9
-7.1
-0.3-0.3
-34.
215
.0
-35.9-7.3
36.4
0.40.1 -0.3
-33.5
-2.4
-8.227.37.7
-16.0
-10.821.0
-107
.4-1
9.8
107.
9
61.0 0.97
83
69.6143.4
0.94
161
52.4
-32.0
32.026.0
22.6
-0.4
2.4
50RIVERSID
1.027141.7
-35.9-18.9
-50.5
57.4
33.8
393DOW HYD7
1.039143.4
922ROSS TAP
1.039143.4
32.7
-14.
7-3
2.7
14.6
62.9
-32.
3
37.4
3.7
-37.
6
-24.942.3
45ROSS CRK
1.039143.4
-37.
8
-26.1
5.9
-32.9-48.4
9.9
-3.6
33.3
32.9-18.2
-32.918.2
-50.436.4
-10.
1
20.7
-19.7-16.0
-84.9
-27.1
-67.6
793SCORIA1
1.026141.6
23.912.3
-23.9-12.4
-18.0
2954ABEE_02
1.0224.3
996.91.9
18420WEASEL2
1.0384.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.4R
8.6R
2030DOWSTG 9
1.03015.1
37.4
4.1R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3248.070.8R
G4200.051.1R
2835LAMONT_LV1
3835LAMONT_LV2
71.516.0R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 111
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A SENSITIVITY694L (N-1)FIG D-34FRI, AUG 19 2016 15:44
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.7
443BANN_240
1.031247.5
109DEERLAN4
1.051252.2
771AMELIA1
1.035248.3
313JOSEPH1
1.027246.4
109.3-121.6
-109.1
57LAMOURE4
1.021245.1
-63.1210.664.6
-71.8141.9
72.1-142.4
102.1
-101.8-96.5
-175.73.2
176.1-3.6
-63.2-79.3
63.376.9
-210.3
121.5
92.1
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-5.3
R
7185SCOTF ST
1.03014.2
68.134.9R
4185SCOTF GT
1.03014.2
70.232.3R
627AIR LIQC
1.03014.2
68.126.8R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.034142.7
1.00
28
936808L_TAP
1.026141.5
67BRUDERH7
1.030142.2
27.118.1
17.315.8
314JOSEPH2
1.032142.4
0.97
955
-96.3-61.2
0.97
955
-96.6-61.4
391ALBCHEM7
1.031142.2
735SHELL TP
1.028141.9
952DIAM TAP
1.032142.4
43SCOT4_7
1.029142.0
25.1-4.8
-25.03.6
52.826.7
13.5-16.8
-59.450.859.5
-57.850.7
-25.03.6-3.7
948808_BNDY
1.024141.4
59REDWATE7
1.018140.4
-9.9-1.1
-17.1
1420WEASEL1
1.022141.0
1.1-9.8-2.1
954ABEE_01
1.021140.8
-6.9-2.1
6.91.460
BEAMER 7
1.024141.3
734SHELL A1
1.028141.9
48DIAM SH7
1.032142.4
58FORT SA7
1.035142.8
185SCOT4_8
1.029142.0
628ALC SCOT
1.027141.8
394ASTOTIN
1.030142.2
821708ALTAP
1.026141.6
61DOW CHEM
1.039143.3
62SHERRIT7
1.036143.0
63LAMOURE7
1.041143.6
-9.8
-0.3-0.3
-13.
116
.2
-35.6-6.6
36.8
0.40.1 -0.3
-30.0
-1.9
-7.528.86.9
-17.1
-11.020.3
-67.
5-6
.967
.7
11.2
-38.
8
-11.238.7
49.9 0.97
83
57.3147.3
0.94
161
48.8
-20.8
20.965.0
25.0
-0.4
1.9
50RIVERSID
1.026141.5
-35.9-18.9
-50.8
57.9
34.3
393DOW HYD7
1.038143.3
922ROSS TAP
1.039143.3
48.1
-9.3
-48.
09.
287
.6-2
3.7
32.1
19.1
-32.
3
-49.733.9
45ROSS CRK
1.039143.3
-37.
8
-64.9
9.5
-33.8-44.5
9.9
-19.0
29.8
33.5-16.5
-33.516.5
-50.736.6
-10.
1
7.0
-17.3-16.2
-85.9
-28.7
-67.9
793SCORIA1
1.025141.5
23.912.3
-23.9-12.4
-18.8
2954ABEE_02
1.0224.3
996.91.9
18420WEASEL2
1.0384.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.4R
8.7R
2030DOWSTG 9
1.03015.1
37.4
4.2R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3248.071.6R
G4200.051.6R
2835LAMONT_LV1
3835LAMONT_LV2
71.516.2R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 112
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A SENSITIVITY700L (N-1)FIG D-35FRI, AUG 19 2016 15:44
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.053252.7
443BANN_240
1.031247.5
109DEERLAN4
1.051252.2
771AMELIA1
1.035248.3
313JOSEPH1
1.027246.4
108.2-121.7
-108.0
57LAMOURE4
1.021245.1
-62.9208.264.3
-70.8142.0
71.0-142.5
103.0
-102.7-96.6
-177.13.1
177.5-3.4
-64.0-79.4
64.177.0
-208.0
121.6
92.2
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-4.9
R
7185SCOTF ST
1.03014.2
68.134.9R
4185SCOTF GT
1.03014.2
70.232.4R
627AIR LIQC
1.03014.2
68.126.9R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.034142.7
1.00
28
936808L_TAP
1.026141.5
67BRUDERH7
1.030142.2
27.518.1
17.815.8
314JOSEPH2
1.032142.4
0.97
955
-98.0-61.4
0.97
955
-98.3-61.6
391ALBCHEM7
1.031142.2
735SHELL TP
1.028141.9
952DIAM TAP
1.032142.4
43SCOT4_7
1.029142.0
24.6-4.8
-24.53.6
53.026.8
17.1-16.3
-59.450.959.5
-57.850.8
-24.53.6-3.8
948808_BNDY
1.024141.4
59REDWATE7
1.018140.4
-9.9-1.1
-17.4
1420WEASEL1
1.022141.0
1.1-9.8-2.1
954ABEE_01
1.020140.8
-6.9-2.1
6.91.460
BEAMER 7
1.024141.3
734SHELL A1
1.028141.9
48DIAM SH7
1.032142.4
58FORT SA7
1.034142.7
185SCOT4_8
1.029142.0
628ALC SCOT
1.027141.8
394ASTOTIN
1.030142.2
821708ALTAP
1.026141.6
61DOW CHEM
1.038143.3
62SHERRIT7
1.035142.9
63LAMOURE7
1.040143.6
-10.0
-0.3-0.3
-16.
715
.7
-35.4-6.7
36.8
0.40.1 -0.3
-29.8
-2.6
-7.528.46.9
-17.2
-11.120.2
-72.
6-8
.072
.8
2.5
-40.
5
-2.540.5
52.5 0.97
83
60.2148.2
0.94
161
48.6
-29.5
29.666.8
24.5
-0.4
2.6
50RIVERSID
1.025141.5
-35.9-18.9
-50.9
57.9
33.6
393DOW HYD7
1.038143.2
922ROSS TAP
1.038143.3
46.2
-9.5
-46.
19.
484
.5-2
3.9
32.3
17.1
-32.
4
-46.634.1
45ROSS CRK
1.038143.3
-37.
8
-66.6
10.4
-33.8-45.3
9.9
-17.1
29.7
33.7-16.3
-33.716.3
-50.836.7
-10.
1
8.3
-17.7-16.2
-86.2
-28.3
-68.1
793SCORIA1
1.025141.5
23.912.3
-23.9-12.4
-18.8
2954ABEE_02
1.0224.3
996.91.9
18420WEASEL2
1.0384.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.2R
8.8R
2030DOWSTG 9
1.03015.1
37.4
4.5R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3248.071.7R
G4200.051.7R
2835LAMONT_LV1
3835LAMONT_LV2
71.516.3R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 113
File No. RP-05-1381
Attachment E 2025SP Power Flow Diagrams
August 2016 P1381 807L Capacity Increase 114
File No. RP-05-1381
Table E-1: 2025SP Contingency Lists
Figure # Scenario Condition
E-1 25_1a Base Case (N-0) E-2 25_1a 942L (N-1) 71S Lamoureux to 681S Bannerman E-3 25_1a 1061L (N-1) 681S Bannerman to 12S Heartland E-4 25_1a 997L (N-1) 71S Lamoureux to 410S Josephburg E-5 25_1a 1120L (N-1) 410S Josephburg to 108S Amelia E-6 25_1a 943L (N-1) 13S Deerland to 108S Amelia E-7 25_1a 1054L (N-1) 12S Heartland to 13S Deerland E-8 25_1a 9L960 (N-1) 13S Deerland to 825S Whitefish Lake E-9 25_1a 9L961 (N-1) 13S Deerland to 825S Whitefish Lake E-10 25_1a 920L (N-1) 71S Lamoureux to 557S Castle Downs E-11 25_1a 921L (N-1) 71S Lamoureux to 987S Clover Bar E-12 25_1a 708L (N-1) 233S Beamer to 71S Lamoureux E-13 25_1a 807L (N-1) 410S Josephburg to 233S Beamer E-14 25_1a 735L (N-1) 233S Beamer to 171S Redwater E-15 25_1a 808L (N-1) 171S Redwater to 13S Deerland E-16 25_1a 621L (N-1) 13S Deerland to 109S Skaro E-17 25_1a 815L (N-1) 13S Deerland to 127S Bruderheim E-18 25_1a 846L (N-1) 127S Bruderheim E-19 25_1a 773L (N-1) 127S Bruderheim to 308S Albchem Beaverhill Creek E-20 25_1a 776L (N-1) 410S Josephburg to 308S Albchem Beaverhill Creek E-21 25_1a 856L (N-1) 410S Josephburg to 409S Shell Scotford E-22 25_1a 857L (N-1) 410S Josephburg to 409S Shell Scotford E-23 25_1a ALCO2L (N-1) 879S Scotford Upgrader to 409S Shell Scotford E-24 25_1a EXI-01L (N-1) 879S Scotford Upgrader to 402S Scotford Expansion 1 E-25 25_1a ALC03L (N-1) 402S Scotford Expansion 1 to Air Liquide E-26 25_1a ALC01L (N-1) Air Liquide to 409S Shell Scotford E-27 25_1a 706L (N-1) 410S Josephburg to 54S Fort Saskatchewan E-28 25_1a 707L (N-1) 233S Beamer to 71S Lamoureux E-29 25_1a 787L (N-1) 71S Lamoureux to 166S Dow Chemical E-30 25_1a 862L (N-1) 166S Dow Chemical to 258S Dow HydroCarbons E-31 25_1a 861L (N-1) 71S Lamoureux to 258S Dow HydroCarbons E-32 25_1a 781L (N-1) 172S Sherritt to 71S Lamoureux E-33 25_1a 709L (N-1) 233S Beamer to 71S Lamoureux E-34 25_1a 694L (N-1) 54S Fort Saskatchewan to 422S Westwood E-35 25_1a 700L (N-1) 422S Westwood to 746S Sherwood Park
August 2016 P1381 807L Capacity Increase 115
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1ABASE CASE (N-0)FIG E-1FRI, AUG 19 2016 15:44
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.058253.8
443BANN_240
1.037248.9
109DEERLAN4
1.058254.0
771AMELIA1
1.041249.8
313JOSEPH1
1.032247.7
85.6-130.7
-85.5
57LAMOURE4
1.027246.5
-50.3240.252.5
-47.0151.6
47.2-152.2
121.4
-121.0-90.8
-175.618.0
176.0-18.4
-84.8-74.7
84.972.5
-239.9
130.4
87.0
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-4.3
R
7185SCOTF ST
1.03514.3
68.139.7R
4185SCOTF GT
1.03514.3
70.237.3R
627AIR LIQC
1.03514.3
68.126.9R
3712.9
3712.9
6.3
6.3
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.040143.5
1.01
5
936808L_TAP
1.030142.2
67BRUDERH7
1.036142.9
60.18.7
65.16.2
314JOSEPH2
1.037143.1
0.97
955
-85.8-64.0
0.97
955
-86.1-64.2
391ALBCHEM7
1.036143.0
735SHELL TP
1.033142.5
952DIAM TAP
1.036143.0
43SCOT4_7
1.034142.7
-20.26.2
20.3-7.4
49.731.0
54.6-19.0
-55.644.055.7
-54.243.9
20.3-7.47.3
948808_BNDY
1.029142.0
59REDWATE7
1.021140.9
-9.9-1.3
-49.5
1420WEASEL1
1.026141.6
1.3-9.8-2.4
954ABEE_01
1.025141.4
-6.9-2.3
6.91.660
BEAMER 7
1.027141.7
734SHELL A1
1.033142.6
48DIAM SH7
1.036143.0
58FORT SA7
1.035142.8
185SCOT4_8
1.034142.8
628ALC SCOT
1.032142.5
394ASTOTIN
1.036142.9
821708ALTAP
1.027141.8
61DOW CHEM
1.037143.2
62SHERRIT7
1.035142.9
63LAMOURE7
1.038143.2
-30.8
-0.3-0.2
-53.
919
.2
-38.7-8.1
37.3
0.40.1 -0.3
-20.7
-34.
5
-19.3-2.318.6
-26.5
-13.213.8
-88.
316
.588
.6
-26.
11.
7
26.1-1.7
59.8 0.97
83
64.039.6
0.97
83
40.9
-56.1
56.122.7
-20.3
-0.4
34.5
50RIVERSID
1.027141.7
-38.9-20.6
-44.0
54.3
4.5
393DOW HYD7
1.036143.0
922ROSS TAP
1.037143.1
39.9 0.0
-39.
9-0
.175
.9-7
.5
21.2
12.7
-21.
4
-38.017.6
45ROSS CRK
1.037143.1
-37.
8
-22.6
36.6
-7.037.1
9.9
-12.7
20.6
38.20.3
-38.2-0.3
-43.932.5
-10.
1
-16.
0
-64.9-6.0
-87.4
2.3
-67.6
793SCORIA1
1.027141.7
25.913.4
-25.9-13.5
-7.9
2954ABEE_02
1.0254.3
996.92.0
18420WEASEL2
1.0424.3
992.90.7
3712.9
6.3
2050GRANITE9
314.72.3
9918.8
9.1
319.44.5
9914.1
6.8
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.0R
9.0R
2030DOWSTG 9
1.03015.1
37.4
4.9R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3262.063.1R
G4179.345.5R
2835LAMONT_LV1
3835LAMONT_LV2
71.513.2R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 116
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1A942L (N-1)FIG E-2FRI, AUG 19 2016 15:44
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.068256.3
443BANN_240
1.064255.4
109DEERLAN4
1.062254.8
771AMELIA1
1.041249.7
313JOSEPH1
1.030247.2
49.6-157.0
-49.4
57LAMOURE4
1.022245.3
-86.0278.290.1
-10.8178.8
11.1-178.6
36.1
-36.1-18.3
-222.7-17.8
223.320.2
-277.7
156.9
9.9
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-1.9
R
7185SCOTF ST
1.03514.3
68.140.6R
4185SCOTF GT
1.03514.3
70.238.2R
627AIR LIQC
1.03514.3
68.128.3R
3712.9
3712.9
6.3
6.3
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.041143.6
1.01
5
936808L_TAP
1.030142.1
67BRUDERH7
1.036143.0
64.010.5
69.89.1
314JOSEPH2
1.035142.8
0.97
955
-84.8-62.6
0.97
955
-85.1-62.8
391ALBCHEM7
1.036142.9
735SHELL TP
1.031142.3
952DIAM TAP
1.034142.8
43SCOT4_7
1.032142.5
-24.83.4
24.9-4.6
49.630.9
57.4-17.3
-54.943.954.9
-53.443.9
25.0-4.64.5
948808_BNDY
1.029142.0
59REDWATE7
1.020140.8
-9.9-1.3
-53.2
1420WEASEL1
1.026141.6
1.3-9.8-2.4
954ABEE_01
1.025141.4
-6.9-2.3
6.91.660
BEAMER 7
1.025141.4
734SHELL A1
1.031142.3
48DIAM SH7
1.034142.8
58FORT SA7
1.032142.5
185SCOT4_8
1.033142.5
628ALC SCOT
1.031142.2
394ASTOTIN
1.036143.0
821708ALTAP
1.025141.5
61DOW CHEM
1.035142.8
62SHERRIT7
1.033142.5
63LAMOURE7
1.035142.8
-31.9
-0.3-0.2
-56.
717
.6
-38.7-9.1
36.7
0.40.1 -0.3
-18.1
-38.
0
-17.8-6.017.1
-27.1
-13.213.2
-86.
615
.787
.0
-22.
94.
4
22.9-4.5
53.5 0.97
83
57.332.8
0.97
83
38.2
-52.8
52.919.9
-25.0
-0.4
38.1
50RIVERSID
1.025141.4
-38.9-20.7
-43.9
53.5
1.0
393DOW HYD7
1.033142.6
922ROSS TAP
1.034142.7
40.6 1.9
-40.
5-2
.176
.9-4
.4
19.2
13.4
-19.
4
-39.114.5
45ROSS CRK
1.034142.7
-37.
8
-19.9
30.3
-12.928.6
9.9
-13.3
18.0
38.11.5
-38.1-1.5
-43.832.5
-10.
1
-15.
3
-69.6-8.8
-87.3
6.0
-67.5
793SCORIA1
1.024141.4
25.913.4
-25.9-13.5
-9.5
2954ABEE_02
1.0254.3
996.92.0
18420WEASEL2
1.0424.3
992.90.7
3712.9
6.3
2050GRANITE9
314.72.3
9918.8
9.1
319.44.5
9914.1
6.8
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.1R
9.9R
2030DOWSTG 9
1.03015.1
37.4
6.5R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3262.067.5R
G4179.348.6R
2835LAMONT_LV1
3835LAMONT_LV2
71.514.4R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 117
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1A1061L (N-1)FIG E-3FRI, AUG 19 2016 15:44
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.069256.6
443BANN_240
1.018244.4
109DEERLAN4
1.062254.8
771AMELIA1
1.040249.6
313JOSEPH1
1.029247.0
34.5-160.5
-34.3
57LAMOURE4
1.021245.0
-92.7294.297.4
4.2182.4
-4.0-182.1
-241.8-21.9
242.625.7
36.115.0
-36.1-18.4
-293.6
160.3
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-1.1
R
7185SCOTF ST
1.03514.3
68.140.9R
4185SCOTF GT
1.03514.3
70.238.6R
627AIR LIQC
1.03514.3
68.128.8R
3712.9
3712.9
6.3
6.3
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.041143.6
1.01
5
936808L_TAP
1.030142.1
67BRUDERH7
1.036142.9
65.510.6
71.79.6
314JOSEPH2
1.034142.7
0.97
955
-84.4-62.2
0.97
955
-84.7-62.4
391ALBCHEM7
1.036142.9
735SHELL TP
1.030142.2
952DIAM TAP
1.034142.7
43SCOT4_7
1.032142.4
-26.83.1
26.9-4.2
49.530.8
58.4-17.2
-54.543.954.6
-53.143.9
26.9-4.24.1
948808_BNDY
1.028141.9
59REDWATE7
1.020140.7
-9.9-1.3
-54.7
1420WEASEL1
1.026141.6
1.3-9.8-2.4
954ABEE_01
1.024141.4
-6.9-2.3
6.91.660
BEAMER 7
1.024141.3
734SHELL A1
1.031142.2
48DIAM SH7
1.034142.7
58FORT SA7
1.031142.3
185SCOT4_8
1.032142.4
628ALC SCOT
1.030142.1
394ASTOTIN
1.036142.9
821708ALTAP
1.024141.4
61DOW CHEM
1.034142.7
62SHERRIT7
1.032142.4
63LAMOURE7
1.034142.7
-32.2
-0.3-0.2
-57.
717
.5
-38.7-9.5
36.5
0.40.1 -0.3
-17.7
-39.
4
-17.8-7.417.0
-27.3
-13.213.0
-86.
015
.386
.3
-21.
65.
0
21.6-5.0
50.9 0.97
83
54.531.3
0.97
83
37.8
-51.5
51.619.4
-26.9
-0.4
39.5
50RIVERSID
1.024141.3
-38.9-20.7
-43.9
53.2
-0.4
393DOW HYD7
1.033142.5
922ROSS TAP
1.034142.6
40.8 2.5
-40.
8-2
.677
.3-3
.6
18.7
13.6
-18.
9
-39.513.6
45ROSS CRK
1.034142.6
-37.
8
-19.4
28.9
-13.425.2
9.9
-13.6
17.6
38.12.0
-38.1-2.0
-43.832.5
-10.
1
-14.
8
-71.5-9.2
-87.2
7.5
-67.5
793SCORIA1
1.024141.3
25.913.4
-25.9-13.5
-9.5
2954ABEE_02
1.0254.3
996.92.0
18420WEASEL2
1.0424.3
992.90.7
3712.9
6.3
2050GRANITE9
314.72.3
9918.8
9.1
319.44.5
9914.1
6.8
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-8.8R
10.2R
2030DOWSTG 9
1.03015.1
37.4
7.1R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3262.069.2R
G4179.349.8R
2835LAMONT_LV1
3835LAMONT_LV2
71.514.9R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 118
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1A997L (N-1)FIG E-4FRI, AUG 19 2016 15:44
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.056253.4
443BANN_240
1.031247.5
109DEERLAN4
1.060254.3
771AMELIA1
1.045250.7
313JOSEPH1
1.038249.0
197.8-116.2
-197.5
57LAMOURE4
1.020244.7
-158.9141.0
159.3-139.4
184.1
-183.4-102.1
-80.927.0
81.0-31.3
-147.0-84.0
147.383.8
117.7
102.7
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-0.3
R
7185SCOTF ST
1.03514.3
68.138.0R
4185SCOTF GT
1.03514.3
70.235.7R
627AIR LIQC
1.03514.3
68.124.5R
3712.9
3712.9
6.3
6.3
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.041143.7
1.01
5
936808L_TAP
1.031142.3
67BRUDERH7
1.038143.2
63.48.5
59.44.3
314JOSEPH2
1.040143.6
0.97
955
-149.6-68.6
0.97
955
-150.1-68.8
391ALBCHEM7
1.038143.3
735SHELL TP
1.036143.0
952DIAM TAP
1.039143.4
43SCOT4_7
1.038143.2
-14.67.8
14.6-9.1
72.433.3
122.9-21.8
-59.759.759.8
-58.059.4
14.7-9.29.0
948808_BNDY
1.030142.1
59REDWATE7
1.022141.0
-9.9-1.3
-52.7
1420WEASEL1
1.027141.8
1.3-9.8-2.4
954ABEE_01
1.026141.6
-6.9-2.3
6.91.660
BEAMER 7
1.027141.7
734SHELL A1
1.036143.0
48DIAM SH7
1.039143.4
58FORT SA7
1.031142.3
185SCOT4_8
1.038143.2
628ALC SCOT
1.036142.9
394ASTOTIN
1.038143.2
821708ALTAP
1.026141.7
61DOW CHEM
1.033142.5
62SHERRIT7
1.031142.2
63LAMOURE7
1.033142.5
-34.3
-0.3-0.2
-120
.625
.6
-19.3-3.2
40.3
0.40.1 -0.3
-17.5
-90.
8
-19.7-5.419.0
-28.4
-24.913.1
-67.
712
.167
.9
10.8
1.9
-10.8-2.0
10.0 0.97
83
10.731.8
0.97
83
38.8
-19.2
19.222.2
-14.7
-0.4
91.0
50RIVERSID
1.026141.6
-38.9-20.6
-59.6
58.1
-51.6
393DOW HYD7
1.031142.3
922ROSS TAP
1.033142.5
47.9 2.2
-47.
8-2
.388
.6-4
.1
19.1
20.7
-19.
3
-50.814.3
45ROSS CRK
1.033142.5
-37.
8
-22.4
29.3
-6.939.5
9.9
-20.6
17.9
69.32.9
-69.3-2.9
-59.344.3
-10.
1
-11.
9
-59.3-4.3
-140.7
5.5
-87.0
793SCORIA1
1.026141.6
25.913.4
-25.9-13.5
-7.6
2954ABEE_02
1.0264.3
996.92.0
18420WEASEL2
1.0434.3
992.90.7
3712.9
6.3
2050GRANITE9
314.72.3
9918.8
9.1
319.44.5
9914.1
6.8
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-8.4R
10.5R
2030DOWSTG 9
1.03015.1
37.4
7.6R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3262.051.9R
G4179.337.6R
2835LAMONT_LV1
3835LAMONT_LV2
71.510.0R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 119
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1A1120L (N-1)FIG E-5FRI, AUG 19 2016 15:44
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.066255.8
443BANN_240
1.038249.1
109DEERLAN4
1.079258.9
771AMELIA1
1.076258.2
313JOSEPH1
1.025245.9
57LAMOURE4
1.024245.7
16.3299.5-12.0
38.318.1
-38.3-21.5
90.3
-89.9-129.0
-231.395.0
232.1-90.9
-53.7-112.5
53.8110.6
-299.0
125.3
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-2.4
R
7185SCOTF ST
1.03514.3
68.141.1R
4185SCOTF GT
1.03514.3
70.238.8R
627AIR LIQC
1.03514.3
68.129.1R
3712.9
3712.9
6.3
6.3
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.046144.3
1.01
5
936808L_TAP
1.033142.6
67BRUDERH7
1.039143.4
52.520.7
50.322.6
314JOSEPH2
1.033142.6
0.97
955
-98.9-45.4
0.97
955
-99.2-45.6
391ALBCHEM7
1.039143.3
735SHELL TP
1.030142.2
952DIAM TAP
1.033142.6
43SCOT4_7
1.031142.3
-5.5-10.7
5.59.3
52.825.1
58.0-23.2
-50.546.550.6
-49.246.3
5.59.2-9.4
948808_BNDY
1.032142.4
59REDWATE7
1.022141.0
-9.9-1.3
-42.0
1420WEASEL1
1.030142.1
1.3-9.8-2.3
954ABEE_01
1.028141.9
-6.9-2.3
6.91.660
BEAMER 7
1.024141.4
734SHELL A1
1.030142.2
48DIAM SH7
1.033142.6
58FORT SA7
1.033142.5
185SCOT4_8
1.031142.3
628ALC SCOT
1.030142.1
394ASTOTIN
1.039143.4
821708ALTAP
1.025141.5
61DOW CHEM
1.035142.9
62SHERRIT7
1.033142.6
63LAMOURE7
1.036142.9
-19.1
-0.3-0.2
-57.
223
.6
-35.6-14.5
33.5
0.40.1 -0.3
-20.0
-35.
0
-7.05.26.2
-22.7
-15.115.7
-88.
014
.488
.4
-25.
31.
2
25.3-1.3
61.2 0.97
83
65.536.2
0.97
83
40.1
-55.3
55.423.1
-5.5
-0.4
35.0
50RIVERSID
1.025141.4
-38.9-20.7
-46.5
49.2
4.0
393DOW HYD7
1.034142.7
922ROSS TAP
1.035142.8
40.0 1.0
-40.
0-1
.176
.0-6
.0
20.2
12.8
-20.
4
-38.216.0
45ROSS CRK
1.035142.8
-37.
8
-23.1
33.4
-42.959.6
9.9
-12.8
19.9
43.1-5.3
-43.15.3
-46.334.4
-10.
1
-13.
9
-50.1-22.7
-95.4
-5.2
-70.6
793SCORIA1
1.024141.4
25.913.4
-25.9-13.5
-20.3
2954ABEE_02
1.0284.3
996.92.0
18420WEASEL2
1.0454.3
992.90.7
3712.9
6.3
2050GRANITE9
314.72.3
9918.8
9.1
319.44.5
9914.1
6.8
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.2R
9.7R
2030DOWSTG 9
1.03015.1
37.4
6.2R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3262.078.8R
G4179.356.6R
2835LAMONT_LV1
3835LAMONT_LV2
71.517.6R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 120
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1A943L (N-1)FIG E-6FRI, AUG 19 2016 15:45
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.067256.2
443BANN_240
1.038249.2
109DEERLAN4
1.082259.7
771AMELIA1
1.021245.1
313JOSEPH1
1.023245.5
38.320.1
-38.3
57LAMOURE4
1.023245.6
25.0273.6-21.7
104.0
-103.6-134.3
-209.2105.1
209.9-102.2
-67.3-117.4
67.5115.9
-273.2
-21.9
131.4
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-1.9
R
7185SCOTF ST
1.03514.3
68.141.6R
4185SCOTF GT
1.03514.3
70.239.2R
627AIR LIQC
1.03514.3
68.129.7R
3712.9
3712.9
6.3
6.3
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.047144.5
1.01
5
936808L_TAP
1.034142.7
67BRUDERH7
1.040143.6
56.921.5
56.624.7
314JOSEPH2
1.032142.5
0.97
955
-92.7-43.3
0.97
955
-93.0-43.5
391ALBCHEM7
1.039143.4
735SHELL TP
1.029142.0
952DIAM TAP
1.032142.5
43SCOT4_7
1.030142.2
-11.8-12.6
11.811.3
50.924.6
56.2-23.6
-49.845.349.9
-48.545.1
11.911.2-11.4
948808_BNDY
1.033142.6
59REDWATE7
1.022141.0
-9.9-1.3
-46.2
1420WEASEL1
1.030142.2
1.3-9.8-2.3
954ABEE_01
1.029142.0
-6.9-2.3
6.91.660
BEAMER 7
1.024141.3
734SHELL A1
1.029142.1
48DIAM SH7
1.032142.5
58FORT SA7
1.032142.4
185SCOT4_8
1.031142.2
628ALC SCOT
1.029142.0
394ASTOTIN
1.040143.5
821708ALTAP
1.025141.4
61DOW CHEM
1.035142.8
62SHERRIT7
1.032142.5
63LAMOURE7
1.035142.8
-18.5
-0.3-0.2
-55.
523
.9
-37.1-15.4
33.0
0.40.1 -0.3
-20.1
-35.
0
-6.50.95.7
-22.5
-14.115.7
-88.
314
.088
.6
-25.
71.
3
25.7-1.4
60.5 0.97
83
64.735.7
0.97
83
40.2
-55.6
55.723.1
-11.8
-0.4
35.0
50RIVERSID
1.024141.3
-38.9-20.7
-45.2
48.5
4.0
393DOW HYD7
1.034142.6
922ROSS TAP
1.034142.8
39.9 1.2
-39.
9-1
.475
.9-5
.6
19.9
12.7
-20.
1
-38.015.6
45ROSS CRK
1.034142.8
-37.
8
-23.0
33.0
-47.948.9
9.9
-12.7
20.0
40.6-5.5
-40.65.5
-45.133.5
-10.
1
-13.
5
-56.5-24.6
-91.2
-0.9
-69.1
793SCORIA1
1.024141.3
25.913.4
-25.9-13.5
-20.8
2954ABEE_02
1.0294.3
996.92.0
18420WEASEL2
1.0464.4
992.90.7
3712.9
6.3
2050GRANITE9
314.72.3
9918.8
9.1
319.44.5
9914.1
6.8
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.1R
9.9R
2030DOWSTG 9
1.03015.1
37.4
6.5R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3262.081.8R
G4179.358.7R
2835LAMONT_LV1
3835LAMONT_LV2
71.518.4R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 121
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1A1054L (N-1)FIG E-7FRI, AUG 19 2016 15:45
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.055253.3
443BANN_240
1.035248.5
109DEERLAN4
1.058253.9
771AMELIA1
1.040249.6
313JOSEPH1
1.032247.6
202.5-138.3
-202.2
57LAMOURE4
1.026246.3
-62.5126.862.0
-163.5164.7
163.9-162.1
209.1
-208.3-78.6
-171.9-60.0
172.260.3
-126.7
140.4
80.3
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-4.1
R
7185SCOTF ST
1.03514.3
68.140.0R
4185SCOTF GT
1.03514.3
70.237.7R
627AIR LIQC
1.03514.3
68.127.4R
3712.9
3712.9
6.3
6.3
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.038143.3
1.01
5
936808L_TAP
1.029142.0
67BRUDERH7
1.034142.7
48.312.0
49.48.4
314JOSEPH2
1.036143.0
0.97
955
-84.0-64.3
0.97
955
-84.3-64.5
391ALBCHEM7
1.035142.8
735SHELL TP
1.032142.5
952DIAM TAP
1.036142.9
43SCOT4_7
1.034142.6
-4.73.4
4.7-4.9
48.030.7
39.5-14.2
-55.142.855.1
-53.742.8
4.7-4.94.7
948808_BNDY
1.028141.8
59REDWATE7
1.020140.8
-9.9-1.3
-38.0
1420WEASEL1
1.025141.5
1.3-9.8-2.4
954ABEE_01
1.024141.2
-6.9-2.3
6.91.660
BEAMER 7
1.026141.6
734SHELL A1
1.032142.5
48DIAM SH7
1.036142.9
58FORT SA7
1.035142.8
185SCOT4_8
1.034142.7
628ALC SCOT
1.032142.4
394ASTOTIN
1.034142.7
821708ALTAP
1.027141.7
61DOW CHEM
1.037143.1
62SHERRIT7
1.035142.9
63LAMOURE7
1.038143.2
-30.4
-0.3-0.2
-39.
014
.0
-40.1-8.8
36.9
0.40.1 -0.3
-17.3
-19.
0
-15.59.3
14.7
-26.4
-12.313.8
-91.
217
.691
.6
-31.
33.
7
31.3-3.7
65.7 0.97
83
70.337.7
0.97
83
37.4
-61.3
61.420.7
-4.7
-0.4
19.0
50RIVERSID
1.026141.7
-38.9-20.6
-42.8
53.7
20.0
393DOW HYD7
1.036143.0
922ROSS TAP
1.037143.1
38.8 0.5
-38.
8-0
.774
.0-6
.7
20.6
11.6
-20.
8
-36.216.7
45ROSS CRK
1.037143.1
-37.
8
-20.7
34.8
-10.264.6
9.9
-11.6
17.1
35.90.1
-35.9-0.2
-42.831.7
-10.
1
-17.
1
-49.3-8.5
-83.5
-9.2
-66.2
793SCORIA1
1.026141.6
25.913.4
-25.9-13.5
-11.8
2954ABEE_02
1.0244.3
996.92.0
18420WEASEL2
1.0414.3
992.90.7
3712.9
6.3
2050GRANITE9
314.72.3
9918.8
9.1
319.44.5
9914.1
6.8
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.0R
9.1R
2030DOWSTG 9
1.03015.1
37.4
5.0R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3262.064.3R
G4179.346.4R
2835LAMONT_LV1
3835LAMONT_LV2
71.513.5R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 122
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1A9L960 (N-1)FIG E-8FRI, AUG 19 2016 15:45
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.052252.5
443BANN_240
1.033247.8
109DEERLAN4
1.048251.6
771AMELIA1
1.034248.3
313JOSEPH1
1.028246.7
66.4-99.0
-66.3
57LAMOURE4
1.024245.7
-39.4258.242.2
-27.9118.2
28.0-119.8
122.8
-122.5-84.0
-149.1-9.1
149.47.3
-86.3-67.8
86.465.6
-257.8
98.1
80.1
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-1.9
R
7185SCOTF ST
1.03514.3
68.141.4R
4185SCOTF GT
1.03514.3
70.239.1R
627AIR LIQC
1.03514.3
68.129.5R
3712.9
3712.9
6.3
6.3
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.035142.8
1.01
5
936808L_TAP
1.025141.5
67BRUDERH7
1.031142.3
61.96.4
67.83.5
314JOSEPH2
1.033142.6
0.97
955
-86.4-61.3
0.97
955
-86.7-61.5
391ALBCHEM7
1.031142.3
735SHELL TP
1.029142.1
952DIAM TAP
1.033142.5
43SCOT4_7
1.031142.2
-22.99.0
22.9-10.2
50.129.9
57.3-22.1
-53.644.453.7
-52.244.3
23.0-10.210.0
948808_BNDY
1.024141.3
59REDWATE7
1.017140.3
-9.9-1.3
-51.2
1420WEASEL1
1.022141.0
1.3-9.8-2.4
954ABEE_01
1.020140.8
-6.9-2.3
6.91.660
BEAMER 7
1.023141.2
734SHELL A1
1.030142.1
48DIAM SH7
1.033142.5
58FORT SA7
1.032142.4
185SCOT4_8
1.031142.3
628ALC SCOT
1.029142.0
394ASTOTIN
1.031142.3
821708ALTAP
1.024141.3
61DOW CHEM
1.035142.8
62SHERRIT7
1.032142.5
63LAMOURE7
1.035142.8
-30.9
-0.3-0.2
-56.
522
.5
-38.2-10.7
35.8
0.40.1 -0.3
-23.2
-37.
3
-21.9-4.021.2
-27.0
-13.513.0
-88.
114
.288
.5
-25.
41.
7
25.4-1.8
60.2 0.97
83
64.437.6
0.97
83
43.4
-55.4
55.422.7
-23.0
-0.4
37.3
50RIVERSID
1.023141.2
-38.9-20.7
-44.3
52.2
1.7
393DOW HYD7
1.034142.6
922ROSS TAP
1.034142.7
40.0 1.4
-40.
0-1
.576
.0-5
.4
19.8
12.8
-20.
0
-38.115.4
45ROSS CRK
1.034142.7
-37.
8
-22.6
34.8
4.632.6
9.9
-12.8
23.1
38.91.5
-38.9-1.6
-44.232.8
-10.
1
-13.
7
-67.6-3.3
-88.6
4.0
-68.0
793SCORIA1
1.023141.2
25.913.4
-25.9-13.5
-5.5
2954ABEE_02
1.0204.2
996.92.0
18420WEASEL2
1.0374.3
992.90.7
3712.9
6.3
2050GRANITE9
314.72.3
9918.8
9.1
319.44.5
9914.1
6.8
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.0R
9.9R
2030DOWSTG 9
1.03015.1
37.4
6.6R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3262.071.6R
G4179.351.5R
2835LAMONT_LV1
3835LAMONT_LV2
71.515.6R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 123
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1A9L961 (N-1)FIG E-9FRI, AUG 19 2016 15:45
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.052252.5
443BANN_240
1.033247.8
109DEERLAN4
1.048251.6
771AMELIA1
1.034248.3
313JOSEPH1
1.028246.7
66.4-99.0
-66.3
57LAMOURE4
1.024245.7
-39.4258.242.2
-27.9118.2
28.0-119.8
122.8
-122.5-84.0
-149.1-9.1
149.47.3
-86.3-67.8
86.465.6
-257.8
98.1
80.1
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-1.9
R
7185SCOTF ST
1.03514.3
68.141.4R
4185SCOTF GT
1.03514.3
70.239.1R
627AIR LIQC
1.03514.3
68.129.5R
3712.9
3712.9
6.3
6.3
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.035142.8
1.01
5
936808L_TAP
1.025141.5
67BRUDERH7
1.031142.3
61.96.4
67.83.5
314JOSEPH2
1.033142.6
0.97
955
-86.4-61.3
0.97
955
-86.7-61.5
391ALBCHEM7
1.031142.3
735SHELL TP
1.029142.1
952DIAM TAP
1.033142.5
43SCOT4_7
1.031142.2
-22.99.0
22.9-10.2
50.129.9
57.3-22.1
-53.644.453.7
-52.244.3
23.0-10.210.0
948808_BNDY
1.024141.3
59REDWATE7
1.017140.3
-9.9-1.3
-51.2
1420WEASEL1
1.022141.0
1.3-9.8-2.4
954ABEE_01
1.020140.8
-6.9-2.3
6.91.660
BEAMER 7
1.023141.2
734SHELL A1
1.030142.1
48DIAM SH7
1.033142.5
58FORT SA7
1.032142.4
185SCOT4_8
1.031142.3
628ALC SCOT
1.029142.0
394ASTOTIN
1.031142.3
821708ALTAP
1.024141.3
61DOW CHEM
1.035142.8
62SHERRIT7
1.032142.5
63LAMOURE7
1.035142.8
-30.9
-0.3-0.2
-56.
522
.5
-38.2-10.7
35.8
0.40.1 -0.3
-23.2
-37.
3
-21.9-4.021.2
-27.0
-13.513.0
-88.
114
.288
.5
-25.
41.
7
25.4-1.8
60.2 0.97
83
64.437.6
0.97
83
43.4
-55.4
55.422.7
-23.0
-0.4
37.3
50RIVERSID
1.023141.2
-38.9-20.7
-44.3
52.2
1.7
393DOW HYD7
1.034142.6
922ROSS TAP
1.034142.7
40.0 1.4
-40.
0-1
.576
.0-5
.4
19.8
12.8
-20.
0
-38.115.4
45ROSS CRK
1.034142.7
-37.
8
-22.6
34.8
4.632.6
9.9
-12.8
23.1
38.91.5
-38.9-1.6
-44.232.8
-10.
1
-13.
7
-67.6-3.3
-88.6
4.0
-68.0
793SCORIA1
1.023141.2
25.913.4
-25.9-13.5
-5.5
2954ABEE_02
1.0204.2
996.92.0
18420WEASEL2
1.0374.3
992.90.7
3712.9
6.3
2050GRANITE9
314.72.3
9918.8
9.1
319.44.5
9914.1
6.8
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.0R
9.9R
2030DOWSTG 9
1.03015.1
37.4
6.6R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3262.071.6R
G4179.351.5R
2835LAMONT_LV1
3835LAMONT_LV2
71.515.6R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 124
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1A920L (N-1)FIG E-10FRI, AUG 19 2016 15:45
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.057253.8
443BANN_240
1.037248.9
109DEERLAN4
1.058254.0
771AMELIA1
1.041249.8
313JOSEPH1
1.032247.8
104.2-131.1
-104.0
57LAMOURE4
1.027246.6
-52.1210.653.4
-65.5152.4
65.8-152.7
98.5
-98.2-92.0
-164.017.0
164.4-18.1
-62.1-76.2
62.173.7
-210.3
131.0
87.2
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-4.3
R
7185SCOTF ST
1.03514.3
68.139.5R
4185SCOTF GT
1.03514.3
70.237.2R
627AIR LIQC
1.03514.3
68.126.7R
3712.9
3712.9
6.3
6.3
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.040143.5
1.01
5
936808L_TAP
1.030142.2
67BRUDERH7
1.036143.0
59.58.7
63.56.1
314JOSEPH2
1.037143.1
0.97
955
-91.3-63.2
0.97
955
-91.6-63.4
391ALBCHEM7
1.036143.0
735SHELL TP
1.033142.6
952DIAM TAP
1.037143.1
43SCOT4_7
1.034142.8
-18.66.1
18.6-7.4
51.330.8
60.0-20.3
-55.745.155.8
-54.245.1
18.7-7.47.3
948808_BNDY
1.029142.0
59REDWATE7
1.021140.9
-9.9-1.3
-48.8
1420WEASEL1
1.026141.6
1.3-9.8-2.4
954ABEE_01
1.025141.4
-6.9-2.3
6.91.660
BEAMER 7
1.027141.7
734SHELL A1
1.033142.6
48DIAM SH7
1.037143.1
58FORT SA7
1.035142.8
185SCOT4_8
1.035142.8
628ALC SCOT
1.033142.5
394ASTOTIN
1.036142.9
821708ALTAP
1.028141.8
61DOW CHEM
1.037143.2
62SHERRIT7
1.035142.9
63LAMOURE7
1.038143.2
-30.1
-0.3-0.2
-59.
220
.7
-37.2-8.1
37.4
0.40.1 -0.3
-21.3
-37.
7
-19.2-1.618.5
-26.3
-14.114.0
-89.
316
.589
.7
-28.
01.
5
28.0-1.6
75.6 0.97
83
80.940.2
0.97
83
41.5
-57.9
58.022.9
-18.7
-0.4
37.8
50RIVERSID
1.027141.7
-38.9-20.6
-45.1
54.3
1.2
393DOW HYD7
1.036143.0
922ROSS TAP
1.037143.1
39.5
-0.1
-39.
5-0
.175
.2-7
.6
21.2
12.3
-21.
4
-37.417.6
45ROSS CRK
1.037143.1
-37.
8
-22.8
37.2
-7.039.4
9.9
-12.3
21.2
40.5-0.1
-40.50.1
-45.033.4
-10.
1
-16.
0
-63.3-6.0
-91.4
1.7
-69.0
793SCORIA1
1.027141.7
25.913.4
-25.9-13.5
-8.0
2954ABEE_02
1.0254.3
996.92.0
18420WEASEL2
1.0424.3
992.90.7
3712.9
6.3
2050GRANITE9
314.72.3
9918.8
9.1
319.44.5
9914.1
6.8
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.0R
9.0R
2030DOWSTG 9
1.03015.1
37.4
4.9R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3262.062.8R
G4179.345.3R
2835LAMONT_LV1
3835LAMONT_LV2
71.513.1R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 125
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1A921L (N-1)FIG E-11FRI, AUG 19 2016 15:45
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.059254.1
443BANN_240
1.040249.6
109DEERLAN4
1.060254.4
771AMELIA1
1.043250.3
313JOSEPH1
1.035248.4
92.3-126.8
-92.1
57LAMOURE4
1.031247.5
-32.0228.933.7
-53.6147.6
53.9-148.2
113.1
-112.8-83.8
-171.419.6
171.8-20.4
-76.6-68.0
76.765.5
-228.6
126.5
79.3
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-5.8
R
7185SCOTF ST
1.03514.3
68.138.6R
4185SCOTF GT
1.03514.3
70.236.3R
627AIR LIQC
1.03514.3
68.125.4R
3712.9
3712.9
6.3
6.3
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.041143.7
1.01
5
936808L_TAP
1.032142.4
67BRUDERH7
1.037143.2
59.88.2
64.55.4
314JOSEPH2
1.039143.4
0.97
955
-88.1-66.2
0.97
955
-88.4-66.4
391ALBCHEM7
1.038143.2
735SHELL TP
1.035142.8
952DIAM TAP
1.039143.3
43SCOT4_7
1.036143.0
-19.67.0
19.7-8.2
50.331.7
57.2-18.6
-56.944.457.0
-55.544.3
19.7-8.28.1
948808_BNDY
1.031142.2
59REDWATE7
1.023141.2
-9.9-1.3
-49.2
1420WEASEL1
1.028141.9
1.3-9.8-2.4
954ABEE_01
1.026141.7
-6.9-2.3
6.91.660
BEAMER 7
1.029141.9
734SHELL A1
1.035142.9
48DIAM SH7
1.039143.3
58FORT SA7
1.037143.1
185SCOT4_8
1.037143.0
628ALC SCOT
1.035142.8
394ASTOTIN
1.037143.2
821708ALTAP
1.029142.1
61DOW CHEM
1.039143.4
62SHERRIT7
1.037143.1
63LAMOURE7
1.040143.5
-30.8
-0.3-0.2
-56.
418
.9
-38.2-6.5
38.3
0.40.1 -0.3
-21.2
-35.
6
-19.8-2.019.1
-26.3
-13.514.3
-89.
616
.490
.0
-28.
7-1
.2
28.71.1
65.8 0.97
83
70.446.6
0.97
83
41.3
-58.6
58.725.5
-19.7
-0.4
35.7
50RIVERSID
1.029142.0
-38.9-20.6
-44.4
55.5
3.4
393DOW HYD7
1.038143.3
922ROSS TAP
1.039143.4
39.4
-1.5
-39.
41.
375
.0-9
.9
22.7
12.2
-22.
9
-37.219.9
45ROSS CRK
1.039143.4
-37.
8
-25.5
43.1
-7.638.0
9.9
-12.2
21.1
39.0-0.4
-39.00.4
-44.332.9
-10.
1
-15.
9
-64.3-5.2
-88.9
2.0
-68.1
793SCORIA1
1.029142.0
25.913.4
-25.9-13.4
-7.5
2954ABEE_02
1.0274.3
996.92.0
18420WEASEL2
1.0444.3
992.90.7
3712.9
6.3
2050GRANITE9
314.72.3
9918.8
9.1
319.44.5
9914.1
6.8
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.6R
8.5R
2030DOWSTG 9
1.03015.1
37.4
3.9R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3262.057.6R
G4179.341.7R
2835LAMONT_LV1
3835LAMONT_LV2
71.511.6R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 126
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1A708L (N-1)FIG E-12FRI, AUG 19 2016 15:45
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.058254.0
443BANN_240
1.038249.2
109DEERLAN4
1.059254.2
771AMELIA1
1.042250.0
313JOSEPH1
1.033248.0
89.4-129.7
-89.3
57LAMOURE4
1.029246.9
-39.3258.642.1
-50.8150.5
51.0-151.1
119.8
-119.5-88.8
-168.816.2
169.2-17.1
-83.3-72.7
83.470.4
-258.2
129.4
84.7
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-7.4
R
7185SCOTF ST
1.03514.3
68.139.5R
4185SCOTF GT
1.03514.3
70.237.2R
627AIR LIQC
1.03514.3
68.126.8R
37
37
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.040143.5
1.01
5
936808L_TAP
1.030142.1
67BRUDERH7
1.036143.0
55.011.2
63.75.8
314JOSEPH2
1.037143.1
0.97
955
-74.7-67.0
0.97
955
-75.0-67.2
391ALBCHEM7
1.036143.0
735SHELL TP
1.033142.5
952DIAM TAP
1.037143.1
43SCOT4_7
1.034142.8
-18.86.5
18.9-7.7
37.539.0
60.6-31.1
-60.635.160.7
-59.235.3
18.9-7.87.6
948808_BNDY
1.029142.0
59REDWATE7
1.021140.9
-9.9-1.3
-44.5
1420WEASEL1
1.026141.6
1.3-9.8-2.4
954ABEE_01
1.025141.4
-6.9-2.3
6.91.660
BEAMER 7
1.026141.6
734SHELL A1
1.033142.6
48DIAM SH7
1.037143.1
58FORT SA7
1.038143.3
185SCOT4_8
1.035142.8
628ALC SCOT
1.033142.5
394ASTOTIN
1.036142.9
821708ALTAP
1.027141.8
61DOW CHEM
1.041143.7
62SHERRIT7
1.039143.4
63LAMOURE7
1.042143.8
-48.7
-0.3-0.2
-59.
731
.7
-49.6-1.9
41.1
0.40.1 -0.3
-16.62.7
15.8
-32.6
-6.610.2
-87.
213
.687
.5
-24.
5-8
.5
24.58.5
59.2 0.97
83
63.431.4
0.97
83
-54.4
54.532.9
-18.9
-0.4
50RIVERSID
1.027141.7
-35.1
59.3
393DOW HYD7
1.040143.6
922ROSS TAP
1.041143.6
40.4
-4.0
-40.
33.
976
.6-1
4.0
25.2
13.2
-25.
4
-38.724.0
45ROSS CRK
1.041143.6
-37.
8
-32.9
29.0
-9.043.7
9.9
-13.1
20.710.0
-20.7-10.0
-35.226.0
-10.
1
-13.
2
-63.5-5.7
-58.0
-2.7
-56.7
793SCORIA1
1.027141.7
-10.7
2954ABEE_02
1.0254.3
996.92.0
18420WEASEL2
1.0424.3
992.90.7
37
2050GRANITE9
314.72.3
9918.8
9.1
319.44.5
9914.1
6.8
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-11.3R
7.9R
2030DOWSTG 9
1.03015.1
37.4
2.8R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3262.061.0R
G4179.344.0R
2835LAMONT_LV1
3835LAMONT_LV2
71.512.6R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 127
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1A807L (N-1)FIG E-13FRI, AUG 19 2016 15:46
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.057253.7
443BANN_240
1.037248.8
109DEERLAN4
1.058253.9
771AMELIA1
1.041249.9
313JOSEPH1
1.033247.9
96.3-127.2
-96.1
57LAMOURE4
1.027246.4
-64.5269.867.9
-57.6148.1
57.8-148.7
121.1
-120.8-91.7
-174.218.5
174.6-19.0
-84.6-75.5
84.773.3
-269.4
126.9
87.8
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-2.1
R
7185SCOTF ST
1.03514.3
68.137.9R
4185SCOTF GT
1.03514.3
70.235.6R
627AIR LIQC
1.03514.3
68.124.4R
3712.9
3712.9
6.3
6.3
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.038143.3
1.01
5
936808L_TAP
1.023141.2
67BRUDERH7
1.036142.9
84.817.2
49.22.9
314JOSEPH2
1.040143.5
0.97
955
-65.8-54.4
0.97
955
-66.0-54.5
391ALBCHEM7
1.036143.0
735SHELL TP
1.033142.5
952DIAM TAP
1.039143.4
43SCOT4_7
1.038143.2
-4.58.9
4.5-10.3
86.6-14.8
-58.024.758.0
-56.725.0
4.5-10.410.2
948808_BNDY
1.022141.0
59REDWATE7
1.009139.2
-9.9-1.3
-73.3
1420WEASEL1
1.019140.7
1.3-9.8-2.4
954ABEE_01
1.018140.5
-6.9-2.3
6.91.660
BEAMER 7
1.009139.3
734SHELL A1
1.037143.1
48DIAM SH7
1.039143.4
58FORT SA7
1.033142.6
185SCOT4_8
1.038143.2
628ALC SCOT
1.036143.0
394ASTOTIN
1.036142.9
821708ALTAP
1.013139.8
61DOW CHEM
1.035142.8
62SHERRIT7
1.033142.6
63LAMOURE7
1.035142.8
-0.3-0.2
-85.
316
.3
-62.5-5.0
39.2
0.40.1 -0.3
-45.4
29.3
-13.0-26.012.4
-26.7
1.214.3
-76.
616
.276
.9
-5.3
5.6
5.3-5.7
71.5 0.97
83
76.547.7
0.97
83
67.6
-35.2
35.318.6
-4.5
-0.4
-29.3
50RIVERSID
1.013139.8
-38.9-20.7
-24.7
56.8
68.8
393DOW HYD7
1.034142.6
922ROSS TAP
1.035142.8
44.4 2.0
-44.
4-2
.183
.1-4
.3
19.2
17.2
-19.
4
-45.314.4
45ROSS CRK
1.035142.8
-37.
8
-18.7
44.2
-10.328.3
9.9
-17.2
45.4
-24.918.1
-10.
1
-15.
9
-49.1-3.1
26.1
-43.8
793SCORIA1
1.012139.7
25.913.5
-25.9-13.5
-14.4
2954ABEE_02
1.0184.2
996.92.0
18420WEASEL2
1.0354.3
992.90.7
3712.9
6.3
2050GRANITE9
314.72.3
9918.8
9.1
319.44.5
9914.1
6.8
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.1R
9.8R
2030DOWSTG 9
1.03015.1
37.4
6.4R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3262.061.8R
G4179.344.6R
2835LAMONT_LV1
3835LAMONT_LV2
71.512.8R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 128
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1A735L (N-1)FIG E-14FRI, AUG 19 2016 15:46
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.057253.8
443BANN_240
1.037248.9
109DEERLAN4
1.058253.8
771AMELIA1
1.041249.7
313JOSEPH1
1.032247.8
84.3-126.1
-84.2
57LAMOURE4
1.027246.6
-49.6240.251.8
-45.6146.7
45.9-147.4
121.8
-121.4-89.3
-174.815.3
175.2-15.8
-85.2-73.2
85.371.0
-239.9
125.7
85.5
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-4.8
R
7185SCOTF ST
1.03514.3
68.139.2R
4185SCOTF GT
1.03514.3
70.236.8R
627AIR LIQC
1.03514.3
68.126.2R
3712.9
3712.9
6.3
6.3
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.036143.0
1.01
5
936808L_TAP
1.021140.9
67BRUDERH7
1.033142.6
58.028.5
65.2-0.6
314JOSEPH2
1.037143.2
0.97
955
-86.4-61.7
0.97
955
-86.7-61.9
391ALBCHEM7
1.034142.6
735SHELL TP
1.034142.7
952DIAM TAP
1.037143.1
43SCOT4_7
1.035142.8
-20.313.0
20.4-14.2
50.025.7
54.6-18.6
-52.444.552.4
-51.044.4
20.4-14.214.1
948808_BNDY
1.020140.7
59REDWATE7
1.006138.8
-9.9-1.3
-47.2
1420WEASEL1
1.017140.3
1.3-9.8-2.4
954ABEE_01
1.015140.1
-6.9-2.3
6.91.660
BEAMER 7
1.029142.0
734SHELL A1
1.034142.7
48DIAM SH7
1.037143.1
58FORT SA7
1.036142.9
185SCOT4_8
1.035142.9
628ALC SCOT
1.034142.6
394ASTOTIN
1.033142.6
821708ALTAP
1.029142.1
61DOW CHEM
1.038143.3
62SHERRIT7
1.036143.0
63LAMOURE7
1.039143.3
-17.5
-0.3-0.2
-53.
918
.9
-38.1-12.1
34.9
0.40.1 -0.3
-15.4
-33.
5
-21.6
-13.617.0
-88.
216
.888
.6
-26.
11.
3
26.1-1.3
60.2 0.97
83
64.438.1
0.97
83
35.4
-56.1
56.123.1
-20.4
-0.4
33.5
50RIVERSID
1.029142.0
-38.9-20.6
-44.5
51.0
5.4
393DOW HYD7
1.037143.1
922ROSS TAP
1.038143.2
40.0
-0.4
-39.
90.
375
.9-8
.2
21.6
12.7
-21.
8
-38.118.2
45ROSS CRK
1.038143.2
-37.
8
-23.0
35.2
-15.039.2
9.9
-12.7
15.2
39.2-7.8
-39.27.8
-44.332.9
-10.
1
-16.
4
-65.00.7
-88.8
-68.2
793SCORIA1
1.029142.0
25.913.4
-25.9-13.4
-27.4
2954ABEE_02
1.0154.2
996.92.0
18420WEASEL2
1.0324.3
992.90.7
3712.9
6.3
2050GRANITE9
314.72.3
9918.8
9.1
319.44.5
9914.1
6.8
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.2R
8.8R
2030DOWSTG 9
1.03015.1
37.4
4.6R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3262.062.7R
G4179.345.2R
2835LAMONT_LV1
3835LAMONT_LV2
71.513.1R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 129
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1A808L (N-1)FIG E-15FRI, AUG 19 2016 15:46
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.058253.8
443BANN_240
1.037248.8
109DEERLAN4
1.059254.1
771AMELIA1
1.041249.7
313JOSEPH1
1.032247.6
67.3-134.2
-67.2
57LAMOURE4
1.027246.4
-50.1246.752.5
-28.7154.8
28.9-155.5
126.8
-126.4-92.0
-163.318.8
163.6-19.9
-90.2-75.7
90.373.6
-246.4
133.7
88.4
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-3.5
R
7185SCOTF ST
1.03514.3
68.140.3R
4185SCOTF GT
1.03514.3
70.238.0R
627AIR LIQC
1.03514.3
68.128.0R
3712.9
3712.9
6.3
6.3
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.042143.9
1.01
5
936808L_TAP
1.030142.2
67BRUDERH7
1.037143.1
91.35.8
314JOSEPH2
1.035142.9
0.97
955
-91.7-66.3
0.97
955
-92.0-66.5
391ALBCHEM7
1.037143.1
735SHELL TP
1.031142.3
952DIAM TAP
1.035142.9
43SCOT4_7
1.033142.5
-46.08.1
46.2-8.6
65.132.3
55.3-20.0
-56.854.757.0
-55.354.5
46.3-8.58.5
948808_BNDY
1.029142.0
59REDWATE7
1.008139.1
1420WEASEL1
1.026141.6
954ABEE_01
1.025141.4
60BEAMER 7
1.023141.2
734SHELL A1
1.032142.4
48DIAM SH7
1.035142.9
58FORT SA7
1.034142.7
185SCOT4_8
1.033142.6
628ALC SCOT
1.031142.3
394ASTOTIN
1.037143.1
821708ALTAP
1.024141.4
61DOW CHEM
1.037143.0
62SHERRIT7
1.034142.8
63LAMOURE7
1.037143.1
-35.5
-0.3-0.2
-54.
520
.3
-25.4-6.7
38.2
0.40.1 -0.3
-24.9
-21.
0
-27.447.627.5
-29.0
-21.212.1
-87.
715
.788
.0
-24.
91.
6
24.9-1.7
64.3 0.97
83
68.841.1
0.97
83
45.2
-54.9
55.022.7
-46.3
-0.4
21.0
50RIVERSID
1.024141.3
-38.9-20.7
-54.7
55.4
18.0
393DOW HYD7
1.035142.9
922ROSS TAP
1.036143.0
40.2 0.4
-40.
1-0
.676
.2-6
.9
20.7
12.9
-20.
9
-38.416.9
45ROSS CRK
1.036143.0
-37.
8
-22.7
38.0
-1.271.1
-12.9
24.8
59.54.5
-59.5-4.5
-54.440.6
-10.
1
-15.
2
-90.9-4.9
-123.8
-47.2
-80.8
793SCORIA1
1.024141.3
25.913.4
-25.9-13.5
2954ABEE_02
1.0254.3
99
18420WEASEL2
1.0424.3
99
3712.9
6.3
2050GRANITE9
314.72.3
9918.8
9.1
319.44.5
9914.1
6.8
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.7R
9.3R
2030DOWSTG 9
1.03015.1
37.4
5.5R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3262.064.1R
G4179.346.2R
2835LAMONT_LV1
3835LAMONT_LV2
71.513.5R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 130
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1A621L (N-1)FIG E-16FRI, AUG 19 2016 15:46
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.055253.2
443BANN_240
1.035248.4
109DEERLAN4
1.055253.1
771AMELIA1
1.038249.1
313JOSEPH1
1.030247.3
106.4-122.3
-106.3
57LAMOURE4
1.025246.1
-51.2182.951.7
-67.7143.4
68.0-143.9
119.6
-119.2-88.4
-219.215.2
219.8-12.8
-83.0-72.3
83.170.1
-182.7
122.2
84.5
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-3.4
R
7185SCOTF ST
1.03514.3
68.140.6R
4185SCOTF GT
1.03514.3
70.238.3R
627AIR LIQC
1.03514.3
68.128.4R
3712.9
3712.9
6.3
6.3
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.030142.2
1.01
5
936808L_TAP
1.023141.2
67BRUDERH7
1.028141.9
27.313.7
18.96.8
314JOSEPH2
1.035142.8
0.97
955
-104.0-63.2
0.97
955
-104.4-63.4
391ALBCHEM7
1.029142.0
735SHELL TP
1.031142.3
952DIAM TAP
1.035142.8
43SCOT4_7
1.032142.4
25.95.0
-25.8-6.1
53.229.3
36.3-14.2
-53.946.653.9
-52.446.4
-25.8-6.26.0
948808_BNDY
1.022141.0
59REDWATE7
1.016140.3
-9.9-1.3
-17.3
1420WEASEL1
1.019140.6
1.3-9.8-2.4
954ABEE_01
1.018140.4
-6.9-2.3
6.91.660
BEAMER 7
1.024141.4
734SHELL A1
1.031142.3
48DIAM SH7
1.034142.8
58FORT SA7
1.034142.7
185SCOT4_8
1.032142.5
628ALC SCOT
1.031142.2
394ASTOTIN
1.028141.9
821708ALTAP
1.025141.5
61DOW CHEM
1.036143.0
62SHERRIT7
1.034142.7
63LAMOURE7
1.037143.1
-28.3
-0.3-0.2
-35.
813
.9
-35.5-10.3
36.0
0.40.1 -0.3
-17.2
-10.
8
-13.130.012.6
-26.0
-15.113.9
-91.
316
.991
.7
-31.
43.
8
31.4-3.8
65.7 0.97
83
70.337.7
0.97
83
37.4
-61.3
61.420.6
25.8
-0.4
10.8
50RIVERSID
1.025141.4
-38.9-20.7
-46.5
52.5
28.2
393DOW HYD7
1.035142.9
922ROSS TAP
1.036143.0
38.8 1.0
-38.
7-1
.174
.0-6
.0
20.2
11.5
-20.
4
-36.116.0
45ROSS CRK
1.036143.0
-37.
8
-20.6
34.9
-20.5-46.2
9.9
-11.5
17.0
43.3-0.3
-43.30.3
-46.434.5
-10.
1
-16.
4
-18.8-7.3
-96.0
-29.9
-70.8
793SCORIA1
1.025141.4
25.913.4
-25.9-13.5
-14.2
2954ABEE_02
1.0184.2
996.92.0
18420WEASEL2
1.0354.3
992.90.7
3712.9
6.3
2050GRANITE9
314.72.3
9918.8
9.1
319.44.5
9914.1
6.8
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.7R
9.3R
2030DOWSTG 9
1.03015.1
37.4
5.5R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3262.067.2R
G4179.348.4R
2835LAMONT_LV1
3835LAMONT_LV2
71.514.3R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 131
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1A815L (N-1)FIG E-17FRI, AUG 19 2016 15:46
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.058253.8
443BANN_240
1.037248.8
109DEERLAN4
1.059254.1
771AMELIA1
1.040249.7
313JOSEPH1
1.031247.5
59.2-134.8
-59.0
57LAMOURE4
1.027246.4
-47.9234.849.9
-20.5155.4
20.8-156.1
128.7
-128.3-91.8
-163.018.7
163.3-19.8
-92.0-75.5
92.273.5
-234.5
134.3
88.4
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-3.7
R
7185SCOTF ST
1.03514.3
68.140.6R
4185SCOTF GT
1.03514.3
70.238.3R
627AIR LIQC
1.03514.3
68.128.4R
3712.9
3712.9
6.3
6.3
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.043143.9
1.01
5
936808L_TAP
1.031142.3
67BRUDERH7
1.022141.0
83.44.5
314JOSEPH2
1.035142.8
0.97
955
-101.7-67.9
0.97
955
-102.0-68.2
391ALBCHEM7
1.023141.2
735SHELL TP
1.031142.3
952DIAM TAP
1.035142.8
43SCOT4_7
1.032142.4
44.913.1
-44.7-13.6
39.732.4
44.9-18.9
-55.437.055.4
-54.037.1
-44.6-13.513.5
948808_BNDY
1.030142.1
59REDWATE7
1.021140.9
-9.9-1.3
-72.0
1420WEASEL1
1.028141.8
1.3-9.8-2.4
954ABEE_01
1.026141.6
-6.9-2.3
6.91.660
BEAMER 7
1.025141.5
734SHELL A1
1.031142.3
48DIAM SH7
1.035142.8
58FORT SA7
1.034142.7
185SCOT4_8
1.032142.5
628ALC SCOT
1.031142.2
394ASTOTIN
1.022141.0
821708ALTAP
1.026141.6
61DOW CHEM
1.037143.1
62SHERRIT7
1.035142.8
63LAMOURE7
1.037143.1
-35.1
-0.3-0.2
-44.
318
.8
-47.3-8.4
37.1
0.40.1 -0.3
-22.5
-33.
3
-25.1-24.624.7
-27.9
-8.012.7
-91.
116
.391
.4
-30.
92.
1
30.9-2.2
62.8 0.97
83
67.139.8
0.97
83
42.7
-60.9
61.022.3
44.6
-0.4
33.3
50RIVERSID
1.026141.5
-38.9-20.7
-37.0
54.1
5.7
393DOW HYD7
1.036142.9
922ROSS TAP
1.037143.0
38.9 0.4
-38.
8-0
.674
.1-6
.9
20.7
11.6
-20.
9
-36.316.9
45ROSS CRK
1.037143.0
-37.
8
-22.2
36.8
-0.379.0
9.9
-11.6
22.4
24.42.8
-24.4-2.9
-37.027.4
-10.
1
-15.
8
-63.9
24.8
-59.0
793SCORIA1
1.025141.5
25.913.4
-25.9-13.5
-2.1
2954ABEE_02
1.0264.3
996.92.0
18420WEASEL2
1.0434.3
992.90.7
3712.9
6.3
2050GRANITE9
314.72.3
9918.8
9.1
319.44.5
9914.1
6.8
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.8R
9.2R
2030DOWSTG 9
1.03015.1
37.4
5.3R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3262.064.7R
G4179.346.6R
2835LAMONT_LV1
3835LAMONT_LV2
71.513.6R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 132
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1A846L (N-1)FIG E-18FRI, AUG 19 2016 15:46
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.058253.8
443BANN_240
1.037248.9
109DEERLAN4
1.058254.0
771AMELIA1
1.041249.8
313JOSEPH1
1.032247.7
85.6-130.8
-85.5
57LAMOURE4
1.027246.5
-50.3240.352.6
-46.9151.6
47.2-152.2
121.4
-121.0-90.8
-175.518.0
175.9-18.5
-84.8-74.7
84.972.5
-240.0
130.5
87.0
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-4.3
R
7185SCOTF ST
1.03514.3
68.139.6R
4185SCOTF GT
1.03514.3
70.237.3R
627AIR LIQC
1.03514.3
68.126.9R
3712.9
3712.9
6.3
6.3
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.040143.5
1.01
5
936808L_TAP
1.030142.2
67BRUDERH7
1.036142.9
60.28.7
64.96.1
314JOSEPH2
1.037143.1
0.97
955
-85.8-64.0
0.97
955
-86.1-64.2
391ALBCHEM7
1.036143.0
735SHELL TP
1.033142.6
952DIAM TAP
1.036143.0
43SCOT4_7
1.034142.7
-20.46.1
20.4-7.3
49.731.0
54.6-19.0
-55.644.055.7
-54.243.9
20.5-7.47.2
948808_BNDY
1.029142.0
59REDWATE7
1.021140.9
-9.9-1.3
-49.5
1420WEASEL1
1.026141.6
1.3-9.8-2.4
954ABEE_01
1.025141.4
-6.9-2.3
6.91.660
BEAMER 7
1.027141.7
734SHELL A1
1.033142.6
48DIAM SH7
1.036143.0
58FORT SA7
1.035142.8
185SCOT4_8
1.034142.8
628ALC SCOT
1.033142.5
394ASTOTIN
1.036142.9
821708ALTAP
1.027141.8
61DOW CHEM
1.037143.2
62SHERRIT7
1.035142.9
63LAMOURE7
1.038143.2
-30.8
-0.3-0.2
-53.
919
.2
-38.7-8.1
37.3
-20.7
-34.
5
-19.3-2.318.6
-26.5
-13.213.8
-88.
316
.588
.6
-26.
11.
7
26.1-1.7
59.8 0.97
83
64.039.6
0.97
83
40.9
-56.1
56.122.7
-20.5
34.6
50RIVERSID
1.027141.7
-38.9-20.6
-44.0
54.3
4.5
393DOW HYD7
1.036143.0
922ROSS TAP
1.037143.1
39.9
-0.0
-39.
9-0
.175
.9-7
.5
21.2
12.7
-21.
4
-38.017.6
45ROSS CRK
1.037143.1
-37.
8
-22.6
36.6
-6.937.3
9.9
-12.7
20.6
38.20.3
-38.2-0.3
-43.932.5
-10.
1
-16.
0
-64.7-5.9
-87.4
2.4
-67.6
793SCORIA1
1.027141.7
25.913.4
-25.9-13.5
-7.9
2954ABEE_02
1.0254.3
996.92.0
18420WEASEL2
1.0424.3
992.90.7
3712.9
6.3
2050GRANITE9
314.72.3
9918.8
9.1
319.44.5
9914.1
6.8
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.0R
9.0R
2030DOWSTG 9
1.03015.1
37.4
4.9R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3262.063.1R
G4179.345.5R
2835LAMONT_LV1
3835LAMONT_LV2
71.513.2R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 133
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1A773L (N-1)FIG E-19FRI, AUG 19 2016 15:46
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.057253.8
443BANN_240
1.037248.9
109DEERLAN4
1.058254.0
771AMELIA1
1.041249.8
313JOSEPH1
1.032247.7
76.9-129.4
-76.7
57LAMOURE4
1.027246.5
-50.4238.352.6
-38.2150.0
38.4-150.7
123.8
-123.4-90.4
-171.417.1
171.8-17.8
-87.2-74.2
87.372.0
-237.9
129.0
86.6
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-4.4
R
7185SCOTF ST
1.03514.3
68.139.6R
4185SCOTF GT
1.03514.3
70.237.3R
627AIR LIQC
1.03514.3
68.126.8R
3712.9
3712.9
6.3
6.3
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.039143.4
1.01
5
936808L_TAP
1.029142.1
67BRUDERH7
1.034142.8
66.74.9
44.713.3
314JOSEPH2
1.037143.1
0.97
955
-91.1-63.1
0.97
955
-91.4-63.3
391ALBCHEM7
1.037143.1
735SHELL TP
1.033142.6
952DIAM TAP
1.037143.1
43SCOT4_7
1.034142.7
0.0-1.3
-0.0-0.1
46.932.8
51.8-17.6
-56.841.956.9
-55.441.9
948808_BNDY
1.028141.9
59REDWATE7
1.021140.9
-9.9-1.3
-55.9
1420WEASEL1
1.026141.5
1.3-9.8-2.4
954ABEE_01
1.024141.3
-6.9-2.3
6.91.660
BEAMER 7
1.027141.7
734SHELL A1
1.033142.6
48DIAM SH7
1.037143.1
58FORT SA7
1.035142.9
185SCOT4_8
1.035142.8
628ALC SCOT
1.033142.5
394ASTOTIN
1.034142.8
821708ALTAP
1.027141.8
61DOW CHEM
1.038143.2
62SHERRIT7
1.036142.9
63LAMOURE7
1.038143.3
-34.9
-0.3-0.2
-51.
217
.7
-41.2-6.6
38.2
0.40.1 -0.3
-20.9
-34.
1
-23.5-8.722.8
-27.8
-11.713.0
-89.
017
.189
.4
-27.
52.
4
27.5-2.5
60.7 0.97
83
64.939.3
0.97
83
41.0
-57.5
57.522.0
-0.4
34.1
50RIVERSID
1.027141.7
-38.9-20.6
-41.9
55.5
4.9
393DOW HYD7
1.037143.0
922ROSS TAP
1.037143.2
39.6 0.1
-39.
6-0
.375
.4-7
.4
21.0
12.4
-21.
3
-37.617.4
45ROSS CRK
1.037143.2
-37.
8
-21.9
36.4
-9.150.9
9.9
-12.4
20.8
34.22.4
-34.2-2.5
-41.931.0
-10.
1
-16.
6
-44.6-13.5
-80.6
8.8
-65.1
793SCORIA1
1.027141.7
25.913.4
-25.9-13.5
-3.8
2954ABEE_02
1.0244.3
996.92.0
18420WEASEL2
1.0414.3
992.90.7
3712.9
6.3
2050GRANITE9
314.72.3
9918.8
9.1
319.44.5
9914.1
6.8
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.1R
9.0R
2030DOWSTG 9
1.03015.1
37.4
4.9R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3262.063.0R
G4179.345.5R
2835LAMONT_LV1
3835LAMONT_LV2
71.513.2R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 134
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1A776L (N-1)FIG E-20FRI, AUG 19 2016 15:47
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.057253.8
443BANN_240
1.037248.9
109DEERLAN4
1.058253.9
771AMELIA1
1.041249.8
313JOSEPH1
1.032247.7
76.9-129.6
-76.8
57LAMOURE4
1.027246.5
-50.2238.352.4
-38.3150.2
38.5-150.9
123.8
-123.4-90.5
-171.417.0
171.8-17.7
-87.2-74.3
87.372.1
-238.0
129.1
86.7
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-4.3
R
7185SCOTF ST
1.03514.3
68.139.6R
4185SCOTF GT
1.03514.3
70.237.3R
627AIR LIQC
1.03514.3
68.126.9R
3712.9
3712.9
6.3
6.3
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.039143.4
1.01
5
936808L_TAP
1.029142.0
67BRUDERH7
1.034142.8
66.85.0
44.713.2
314JOSEPH2
1.037143.1
0.97
955
-91.1-63.4
0.97
955
-91.4-63.6
391ALBCHEM7
1.034142.8
735SHELL TP
1.033142.5
952DIAM TAP
1.036143.0
43SCOT4_7
1.034142.7
46.832.7
51.8-17.8
-56.741.956.7
-55.241.9
0.0-0.1-0.1
948808_BNDY
1.028141.9
59REDWATE7
1.021140.8
-9.9-1.3
-55.9
1420WEASEL1
1.025141.5
1.3-9.8-2.4
954ABEE_01
1.024141.3
-6.9-2.3
6.91.660
BEAMER 7
1.026141.6
734SHELL A1
1.033142.6
48DIAM SH7
1.036143.0
58FORT SA7
1.035142.9
185SCOT4_8
1.034142.8
628ALC SCOT
1.032142.5
394ASTOTIN
1.034142.8
821708ALTAP
1.027141.8
61DOW CHEM
1.037143.2
62SHERRIT7
1.035142.9
63LAMOURE7
1.038143.2
-34.6
-0.3-0.2
-51.
117
.9
-41.2-6.8
38.1
0.40.1 -0.3
-21.0
-34.
0
-23.4-8.722.7
-27.8
-11.713.1
-89.
116
.989
.4
-27.
52.
3
27.5-2.4
60.7 0.97
83
64.939.4
0.97
83
41.2
-57.5
57.522.0
-0.0
-0.4
34.1
50RIVERSID
1.027141.7
-38.9-20.6
-41.9
55.3
4.9
393DOW HYD7
1.036143.0
922ROSS TAP
1.037143.1
39.6 0.1
-39.
6-0
.375
.4-7
.3
21.0
12.4
-21.
2
-37.517.3
45ROSS CRK
1.037143.1
-37.
8
-22.0
36.4
-9.050.9
9.9
-12.4
20.9
34.22.4
-34.1-2.4
-41.931.0
-10.
1
-16.
4
-44.6-13.4
-80.6
8.8
-65.1
793SCORIA1
1.027141.7
25.913.4
-25.9-13.5
-3.9
2954ABEE_02
1.0244.3
996.92.0
18420WEASEL2
1.0414.3
992.90.7
3712.9
6.3
2050GRANITE9
314.72.3
9918.8
9.1
319.44.5
9914.1
6.8
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.0R
9.0R
2030DOWSTG 9
1.03015.1
37.4
4.9R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3262.063.2R
G4179.345.6R
2835LAMONT_LV1
3835LAMONT_LV2
71.513.2R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 135
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1A856L (N-1)FIG E-21FRI, AUG 19 2016 15:47
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.058253.8
443BANN_240
1.037248.9
109DEERLAN4
1.058254.0
771AMELIA1
1.041249.8
313JOSEPH1
1.032247.8
85.8-130.4
-85.7
57LAMOURE4
1.027246.5
-51.3240.753.6
-47.1151.2
47.4-151.8
121.4
-121.1-90.8
-175.618.1
176.0-18.6
-84.8-74.6
85.072.4
-240.3
130.1
86.9
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-4.3
R
7185SCOTF ST
1.03514.3
68.140.3R
4185SCOTF GT
1.03514.3
70.238.0R
627AIR LIQC
1.03514.3
68.127.8R
3712.9
3712.9
6.3
6.3
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.040143.5
1.01
5
936808L_TAP
1.030142.1
67BRUDERH7
1.036143.0
60.79.1
64.75.8
314JOSEPH2
1.037143.1
0.97
955
-85.5-63.0
0.97
955
-85.8-63.2
391ALBCHEM7
1.036143.0
735SHELL TP
1.032142.4
952DIAM TAP
1.037143.1
43SCOT4_7
1.033142.5
-19.86.6
19.9-7.8
59.842.5
55.4-18.2
-95.075.9
19.9-7.97.7
948808_BNDY
1.029142.0
59REDWATE7
1.021140.9
-9.9-1.3
-50.0
1420WEASEL1
1.026141.6
1.3-9.8-2.4
954ABEE_01
1.025141.4
-6.9-2.3
6.91.660
BEAMER 7
1.026141.6
734SHELL A1
1.032142.4
48DIAM SH7
1.037143.1
58FORT SA7
1.035142.9
185SCOT4_8
1.033142.6
628ALC SCOT
1.031142.3
394ASTOTIN
1.036143.0
821708ALTAP
1.027141.7
61DOW CHEM
1.037143.2
62SHERRIT7
1.035142.9
63LAMOURE7
1.038143.2
-29.1
-0.3-0.2
-54.
718
.4
-46.2-17.4
31.7
0.40.1 -0.3
-22.0
-33.
1
-18.9-2.818.2
-18.3
-8.718.6
-88.
016
.888
.3
-25.
62.
1
25.6-2.2
60.0 0.97
83
64.239.9
0.97
83
42.1
-55.5
55.622.2
-19.9
-0.4
33.1
50RIVERSID
1.026141.7
-38.9-20.6
95.4
5.9
393DOW HYD7
1.036143.0
922ROSS TAP
1.037143.1
40.1 0.1
-40.
0-0
.276
.1-7
.4
21.1
12.8
-21.
3
-38.217.4
45ROSS CRK
1.037143.1
-37.
8
-22.2
36.9
-7.136.9
9.9
-12.8
21.8
26.2-12.7
-26.212.7
-75.828.0
-10.
1
-16.
3
-64.5-5.6
-85.5
2.9
-60.1
793SCORIA1
1.026141.6
25.913.4
-25.9-13.5
-8.4
2954ABEE_02
1.0254.3
996.92.0
18420WEASEL2
1.0424.3
992.90.7
3712.9
6.3
2050GRANITE9
314.72.3
9918.8
9.1
319.44.5
9914.1
6.8
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.0R
9.0R
2030DOWSTG 9
1.03015.1
37.4
4.9R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3262.062.8R
G4179.345.3R
2835LAMONT_LV1
3835LAMONT_LV2
71.513.1R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 136
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1A857L (N-1)FIG E-22FRI, AUG 19 2016 15:47
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.058253.8
443BANN_240
1.037248.9
109DEERLAN4
1.058254.0
771AMELIA1
1.041249.8
313JOSEPH1
1.032247.8
85.8-130.4
-85.7
57LAMOURE4
1.027246.5
-51.3240.753.5
-47.1151.3
47.4-151.9
121.4
-121.1-90.8
-175.618.1
176.0-18.6
-84.8-74.6
84.972.4
-240.3
130.1
86.9
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-4.3
R
7185SCOTF ST
1.03514.3
68.140.3R
4185SCOTF GT
1.03514.3
70.237.9R
627AIR LIQC
1.03514.3
68.127.8R
3712.9
3712.9
6.3
6.3
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.040143.5
1.01
5
936808L_TAP
1.030142.1
67BRUDERH7
1.036143.0
60.79.1
64.75.8
314JOSEPH2
1.037143.1
0.97
955
-85.5-63.1
0.97
955
-85.8-63.3
391ALBCHEM7
1.036143.0
735SHELL TP
1.032142.4
952DIAM TAP
1.037143.1
43SCOT4_7
1.033142.5
-19.86.6
19.9-7.8
59.741.9
55.4-18.2
-95.776.096.1
19.9-7.87.7
948808_BNDY
1.029142.0
59REDWATE7
1.021140.9
-9.9-1.3
-50.0
1420WEASEL1
1.026141.6
1.3-9.8-2.4
954ABEE_01
1.025141.4
-6.9-2.3
6.91.660
BEAMER 7
1.026141.6
734SHELL A1
1.032142.4
48DIAM SH7
1.037143.1
58FORT SA7
1.035142.9
185SCOT4_8
1.033142.6
628ALC SCOT
1.031142.3
394ASTOTIN
1.036143.0
821708ALTAP
1.027141.7
61DOW CHEM
1.037143.2
62SHERRIT7
1.035142.9
63LAMOURE7
1.038143.2
-29.2
-0.3-0.2
-54.
718
.5
-46.1-17.0
32.0
0.40.1 -0.3
-21.9
-33.
1
-19.0-2.818.2
-18.7
-8.718.4
-88.
016
.888
.3
-25.
62.
1
25.6-2.2
60.0 0.97
83
64.239.9
0.97
83
42.1
-55.6
55.622.2
-19.9
-0.4
33.1
50RIVERSID
1.026141.7
-38.9-20.6
-75.9
5.9
393DOW HYD7
1.036143.0
922ROSS TAP
1.037143.1
40.1 0.1
-40.
0-0
.276
.1-7
.4
21.1
12.8
-21.
3
-38.217.4
45ROSS CRK
1.037143.1
-37.
8
-22.2
36.9
-7.136.9
9.9
-12.8
21.8
26.2-12.1
-26.212.0
28.0
-10.
1
-16.
3
-64.5-5.6
-85.5
2.9
-60.1
793SCORIA1
1.026141.6
25.913.4
-25.9-13.5
-8.3
2954ABEE_02
1.0254.3
996.92.0
18420WEASEL2
1.0424.3
992.90.7
3712.9
6.3
2050GRANITE9
314.72.3
9918.8
9.1
319.44.5
9914.1
6.8
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.0R
9.0R
2030DOWSTG 9
1.03015.1
37.4
4.9R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3262.062.8R
G4179.345.3R
2835LAMONT_LV1
3835LAMONT_LV2
71.513.1R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 137
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1AALCO2L (N-1)FIG E-23FRI, AUG 19 2016 15:47
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.057253.8
443BANN_240
1.037248.9
109DEERLAN4
1.058254.0
771AMELIA1
1.041249.8
313JOSEPH1
1.032247.7
85.3-130.9
-85.2
57LAMOURE4
1.027246.5
-49.8239.352.0
-46.6151.7
46.9-152.3
121.4
-121.0-90.9
-175.617.9
176.0-18.3
-84.8-74.7
84.972.5
-238.9
130.6
87.0
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-4.2
R
7185SCOTF ST
1.03514.3
68.139.2R
4185SCOTF GT
1.03514.3
70.236.9R
627AIR LIQC
1.03514.3
68.127.0R
3712.9
3712.9
6.3
6.3
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.040143.5
1.01
5
936808L_TAP
1.030142.2
67BRUDERH7
1.036142.9
59.48.7
65.66.3
314JOSEPH2
1.036143.0
0.97
955
-86.4-64.5
0.97
955
-86.7-64.7
391ALBCHEM7
1.036142.9
735SHELL TP
1.033142.6
952DIAM TAP
1.036143.0
43SCOT4_7
1.034142.7
-20.76.1
20.7-7.3
34.528.7
53.6-19.1
-57.453.057.5
-55.852.8
20.8-7.37.2
948808_BNDY
1.029142.0
59REDWATE7
1.021140.9
-9.9-1.3
-48.8
1420WEASEL1
1.026141.6
1.3-9.8-2.4
954ABEE_01
1.025141.4
-6.9-2.3
6.91.660
BEAMER 7
1.027141.7
734SHELL A1
1.033142.6
48DIAM SH7
1.036143.0
58FORT SA7
1.035142.8
185SCOT4_8
1.035142.9
628ALC SCOT
1.032142.5
394ASTOTIN
1.036142.9
821708ALTAP
1.027141.8
61DOW CHEM
1.037143.2
62SHERRIT7
1.035142.9
63LAMOURE7
1.038143.2
-30.8
-0.3-0.2
-52.
919
.3
32.7
0.40.1 -0.3
-20.7
-36.
4
-19.3-1.618.5
-33.3
7.618.4
-88.
616
.589
.0
-26.
71.
6
26.7-1.7
59.4 0.97
83
63.639.5
0.97
83
40.8
-56.7
56.822.7
-20.8
-0.4
36.5
50RIVERSID
1.027141.7
-38.9-20.6
-53.0
55.9
2.5
393DOW HYD7
1.036143.0
922ROSS TAP
1.037143.1
39.8 0.0
-39.
8-0
.275
.7-7
.5
21.1
12.6
-21.
3
-37.817.5
45ROSS CRK
1.037143.1
-37.
8
-22.7
36.5
-7.037.4
9.9
-12.6
20.5
56.12.5
-56.0-2.5
-52.811.8
-10.
1
-16.
0
-65.4-6.1
-90.1
1.6
-106.2
793SCORIA1
1.027141.7
25.913.4
-25.9-13.5
-8.0
2954ABEE_02
1.0254.3
996.92.0
18420WEASEL2
1.0424.3
992.90.7
3712.9
6.3
2050GRANITE9
314.72.3
9918.8
9.1
319.44.5
9914.1
6.8
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.0R
9.0R
2030DOWSTG 9
1.03015.1
37.4
5.0R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3262.063.3R
G4179.345.7R
2835LAMONT_LV1
3835LAMONT_LV2
71.513.2R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 138
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1AEXI-01L (N-1)FIG E-24FRI, AUG 19 2016 15:47
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.057253.8
443BANN_240
1.037248.9
109DEERLAN4
1.058254.0
771AMELIA1
1.041249.8
313JOSEPH1
1.032247.7
86.2-130.7
-86.1
57LAMOURE4
1.027246.5
-50.8241.953.1
-47.6151.5
47.8-152.1
121.4
-121.0-90.9
-175.517.9
175.9-18.4
-84.8-74.8
84.972.6
-241.5
130.4
87.1
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-4.1
R
7185SCOTF ST
1.03514.3
68.139.2R
4185SCOTF GT
1.03514.3
70.236.9R
627AIR LIQC
1.03514.3
68.127.4R
3712.9
3712.9
6.3
6.3
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.040143.5
1.01
5
936808L_TAP
1.030142.1
67BRUDERH7
1.036142.9
61.59.1
64.26.2
314JOSEPH2
1.037143.1
0.97
955
-84.7-63.8
0.97
955
-85.0-64.0
391ALBCHEM7
1.036142.9
735SHELL TP
1.032142.4
952DIAM TAP
1.036143.0
43SCOT4_7
1.034142.8
-19.46.1
19.4-7.4
76.340.7
56.3-19.1
-50.628.150.6
-49.528.3
19.4-7.47.3
948808_BNDY
1.028141.9
59REDWATE7
1.020140.8
-9.9-1.3
-50.8
1420WEASEL1
1.026141.6
1.3-9.8-2.4
954ABEE_01
1.024141.4
-6.9-2.3
6.91.660
BEAMER 7
1.026141.5
734SHELL A1
1.032142.3
48DIAM SH7
1.036143.0
58FORT SA7
1.035142.8
185SCOT4_8
1.035142.9
628ALC SCOT
1.032142.4
394ASTOTIN
1.036142.9
821708ALTAP
1.027141.7
61DOW CHEM
1.037143.1
62SHERRIT7
1.035142.9
63LAMOURE7
1.038143.2
-29.1
-0.3-0.2
-55.
519
.3
-106.2-33.2
52.6
0.40.1 -0.3
-22.1
-30.
9
-19.0-3.618.3
-49.2-1.5
-87.
716
.488
.0
-25.
01.
8
25.0-1.8
60.5 0.97
83
64.740.1
0.97
83
42.3
-54.9
55.022.6
-19.4
-0.4
30.9
50RIVERSID
1.026141.6
-38.9-20.6
-28.1
49.5
8.1
393DOW HYD7
1.036143.0
922ROSS TAP
1.037143.1
40.2 0.1
-40.
1-0
.376
.3-7
.4
21.0
13.0
-21.
3
-38.417.4
45ROSS CRK
1.037143.1
-37.
8
-22.6
37.0
-7.236.6
9.9
-13.0
22.0
6.6-10.8
-6.610.8
-28.268.6
-10.
1
-15.
9
-64.0-6.0
-82.5
3.7
793SCORIA1
1.026141.6
25.913.4
-25.9-13.5
-8.3
2954ABEE_02
1.0254.3
996.92.0
18420WEASEL2
1.0414.3
992.90.7
3712.9
6.3
2050GRANITE9
314.72.3
9918.8
9.1
319.44.5
9914.1
6.8
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.9R
9.1R
2030DOWSTG 9
1.03015.1
37.4
5.1R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3262.063.2R
G4179.345.6R
2835LAMONT_LV1
3835LAMONT_LV2
71.513.2R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 139
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1AALC03L (N-1)FIG E-25FRI, AUG 19 2016 15:47
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.058253.8
443BANN_240
1.037248.9
109DEERLAN4
1.058254.0
771AMELIA1
1.041249.8
313JOSEPH1
1.032247.7
85.7-130.8
-85.6
57LAMOURE4
1.027246.5
-50.0240.552.3
-47.0151.7
47.3-152.3
121.4
-121.0-90.8
-175.617.9
176.0-18.4
-84.8-74.7
84.972.5
-240.1
130.5
87.0
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-4.2
R
7185SCOTF ST
1.03514.3
68.139.7R
4185SCOTF GT
1.03514.3
70.237.4R
627AIR LIQC
1.03514.3
68.127.4R
3712.9
3712.9
6.3
6.3
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.040143.5
1.01
5
936808L_TAP
1.030142.2
67BRUDERH7
1.036142.9
60.38.5
65.06.4
314JOSEPH2
1.037143.0
0.97
955
-85.6-64.3
0.97
955
-85.9-64.5
391ALBCHEM7
1.036142.9
735SHELL TP
1.033142.6
952DIAM TAP
1.036143.0
43SCOT4_7
1.034142.7
-20.16.0
20.2-7.2
53.326.9
54.7-19.3
-58.241.858.3
-56.841.8
20.2-7.37.1
948808_BNDY
1.029142.0
59REDWATE7
1.021140.9
-9.9-1.3
-49.6
1420WEASEL1
1.026141.6
1.3-9.8-2.4
954ABEE_01
1.025141.4
-6.9-2.3
6.91.660
BEAMER 7
1.027141.7
734SHELL A1
1.033142.6
48DIAM SH7
1.036143.0
58FORT SA7
1.035142.8
185SCOT4_8
1.034142.7
628ALC SCOT
1.032142.4
394ASTOTIN
1.036142.9
821708ALTAP
1.027141.8
61DOW CHEM
1.037143.2
62SHERRIT7
1.035142.9
63LAMOURE7
1.038143.2
-31.5
-0.3-0.2
-54.
019
.6
-29.7-17.2
51.6
0.40.1 -0.3
-20.2
-34.
0
-19.5-2.418.8
-17.5
-88.
216
.488
.6
-26.
01.
5
26.0-1.5
59.9 0.97
83
64.139.5
0.97
83
40.4
-56.0
56.022.9
-20.2
-0.4
34.0
50RIVERSID
1.027141.7
-38.9-20.6
-41.8
56.9
5.0
393DOW HYD7
1.036143.0
922ROSS TAP
1.037143.1
40.0
-0.0
-39.
9-0
.175
.9-7
.6
21.2
12.7
-21.
4
-38.117.6
45ROSS CRK
1.037143.1
-37.
8
-22.9
36.6
-6.937.0
9.9
-12.7
20.1
33.95.1
-33.9-5.1
-41.819.3
-10.
1
-15.
9
-64.8-6.2
-86.8
2.5
-76.5
793SCORIA1
1.027141.7
25.913.4
-25.9-13.5
-7.7
2954ABEE_02
1.0254.3
996.92.0
18420WEASEL2
1.0424.3
992.90.7
3712.9
6.3
2050GRANITE9
314.72.3
9918.8
9.1
319.44.5
9914.1
6.8
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.0R
9.0R
2030DOWSTG 9
1.03015.1
37.4
5.0R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3262.063.2R
G4179.345.6R
2835LAMONT_LV1
3835LAMONT_LV2
71.513.2R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 140
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1AALC01L (N-1)FIG E-26FRI, AUG 19 2016 15:47
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.058253.8
443BANN_240
1.037248.9
109DEERLAN4
1.058254.0
771AMELIA1
1.041249.8
313JOSEPH1
1.032247.8
85.8-130.5
-85.7
57LAMOURE4
1.027246.5
-51.2240.753.5
-47.1151.3
47.4-151.9
121.4
-121.1-90.8
-175.618.1
176.0-18.6
-84.8-74.6
84.972.4
-240.3
130.2
86.9
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-4.3
R
7185SCOTF ST
1.03514.3
68.139.5R
4185SCOTF GT
1.03514.3
70.237.2R
627AIR LIQC
1.03514.3
68.129.0R
3712.9
3712.9
6.3
6.3
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.040143.5
1.01
5
936808L_TAP
1.030142.1
67BRUDERH7
1.036143.0
60.79.1
64.85.8
314JOSEPH2
1.037143.1
0.97
955
-85.5-63.2
0.97
955
-85.8-63.4
391ALBCHEM7
1.036143.0
735SHELL TP
1.032142.5
952DIAM TAP
1.037143.1
43SCOT4_7
1.035142.8
-19.96.5
19.9-7.8
59.541.0
55.4-18.3
-49.238.249.3
-48.038.1
20.0-7.87.6
948808_BNDY
1.029142.0
59REDWATE7
1.021140.9
-9.9-1.3
-50.0
1420WEASEL1
1.026141.6
1.3-9.8-2.4
954ABEE_01
1.025141.4
-6.9-2.3
6.91.660
BEAMER 7
1.026141.6
734SHELL A1
1.032142.5
48DIAM SH7
1.037143.1
58FORT SA7
1.035142.9
185SCOT4_8
1.035142.8
628ALC SCOT
1.030142.1
394ASTOTIN
1.036143.0
821708ALTAP
1.027141.7
61DOW CHEM
1.037143.2
62SHERRIT7
1.035142.9
63LAMOURE7
1.038143.2
-29.4
-0.3-0.2
-54.
718
.5
-17.716.6
0.40.1 -0.3
-21.8
-33.
1
-19.0-2.818.3
-50.8
19.449.5
-88.
016
.788
.3
-25.
62.
1
25.6-2.1
60.0 0.97
83
64.239.9
0.97
83
42.0
-55.6
55.622.3
-19.9
-0.4
33.2
50RIVERSID
1.026141.7
-38.9-20.6
-38.2
48.0
5.9
393DOW HYD7
1.036143.0
922ROSS TAP
1.037143.1
40.0 0.1
-40.
0-0
.276
.1-7
.4
21.1
12.8
-21.
3
-38.217.4
45ROSS CRK
1.037143.1
-37.
8
-22.2
36.9
-7.136.9
9.9
-12.8
21.7
26.6-11.0
-26.611.0
-38.1
-10.
1
-16.
3
-64.6-5.6
-85.6
2.8
-88.5
793SCORIA1
1.026141.6
25.913.4
-25.9-13.5
-8.3
2954ABEE_02
1.0254.3
996.92.0
18420WEASEL2
1.0424.3
992.90.7
3712.9
6.3
2050GRANITE9
314.72.3
9918.8
9.1
319.44.5
9914.1
6.8
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.0R
9.0R
2030DOWSTG 9
1.03015.1
37.4
4.9R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3262.062.8R
G4179.345.3R
2835LAMONT_LV1
3835LAMONT_LV2
71.513.1R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 141
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1A706L (N-1)FIG E-27FRI, AUG 19 2016 15:48
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.057253.8
443BANN_240
1.037248.8
109DEERLAN4
1.058253.9
771AMELIA1
1.040249.7
313JOSEPH1
1.032247.7
88.7-131.2
-88.6
57LAMOURE4
1.027246.5
-45.0268.648.2
-50.1152.1
50.3-152.6
123.0
-122.7-90.7
-170.016.7
170.4-17.4
-86.4-74.5
86.672.3
-268.2
130.9
86.9
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-4.7
R
7185SCOTF ST
1.03514.3
68.140.1R
4185SCOTF GT
1.03514.3
70.237.8R
627AIR LIQC
1.03514.3
68.127.6R
3712.9
3712.9
6.3
6.3
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.039143.4
1.01
5
936808L_TAP
1.029142.1
67BRUDERH7
1.035142.8
60.18.9
61.27.7
314JOSEPH2
1.036142.9
0.97
955
-70.1-67.5
0.97
955
-70.3-67.7
391ALBCHEM7
1.035142.8
735SHELL TP
1.032142.4
952DIAM TAP
1.036143.0
43SCOT4_7
1.033142.6
-16.34.5
16.4-5.8
57.526.7
-52.749.752.8
-51.249.5
16.4-5.85.6
948808_BNDY
1.028141.9
59REDWATE7
1.020140.8
-9.9-1.3
-49.5
1420WEASEL1
1.026141.5
1.3-9.8-2.4
954ABEE_01
1.024141.3
-6.9-2.3
6.91.660
BEAMER 7
1.026141.5
734SHELL A1
1.032142.4
48DIAM SH7
1.036143.0
58FORT SA7
1.036142.9
185SCOT4_8
1.033142.6
628ALC SCOT
1.032142.4
394ASTOTIN
1.035142.8
821708ALTAP
1.027141.7
61DOW CHEM
1.038143.2
62SHERRIT7
1.036143.0
63LAMOURE7
1.038143.3
-21.5
-31.6-11.8
35.1
0.40.1 -0.3
-29.7
-53.
4
-19.1-2.318.4
-23.6
-17.515.5
-105
.523
.410
6.0
-56.
812
.0
56.8-11.9
71.6 0.97
83
76.637.7
0.97
83
50.3
-86.8
86.912.7
-16.4
-0.4
53.5
50RIVERSID
1.026141.6
-38.9-20.6
-49.7
51.3
-14.4
393DOW HYD7
1.037143.1
922ROSS TAP
1.038143.2
33.2 2.1
-33.
2-2
.365
.2-4
.2
19.0
6.0
-19.
3
-27.314.1
45ROSS CRK
1.038143.2
-37.
8
-12.4
34.8
-7.941.1
9.9
-6.0
29.8
49.5-4.3
-49.54.2
-49.536.8
-10.
1
-22.
6
-61.0-7.6
-106.5
2.3
-74.6
793SCORIA1
1.026141.6
25.913.4
-25.9-13.5
-8.2
2954ABEE_02
1.0244.3
996.92.0
18420WEASEL2
1.0414.3
992.90.7
3712.9
6.3
2050GRANITE9
314.72.3
9918.8
9.1
319.44.5
9914.1
6.8
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.2R
8.9R
2030DOWSTG 9
1.03015.1
37.4
4.6R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3262.063.8R
G4179.346.0R
2835LAMONT_LV1
3835LAMONT_LV2
71.513.4R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 142
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1A707L (N-1)FIG E-28FRI, AUG 19 2016 15:48
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.057253.8
443BANN_240
1.037248.8
109DEERLAN4
1.058254.0
771AMELIA1
1.041249.7
313JOSEPH1
1.032247.7
85.3-130.9
-85.2
57LAMOURE4
1.027246.5
-51.0233.653.0
-46.7151.7
46.9-152.3
120.6
-120.2-91.0
-176.518.0
176.9-18.4
-84.0-74.9
84.172.7
-233.3
130.6
87.1
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-4.3
R
7185SCOTF ST
1.03514.3
68.139.8R
4185SCOTF GT
1.03514.3
70.237.4R
627AIR LIQC
1.03514.3
68.127.1R
3712.9
3712.9
6.3
6.3
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.040143.5
1.01
5
936808L_TAP
1.030142.1
67BRUDERH7
1.036142.9
60.08.8
66.06.1
314JOSEPH2
1.036143.0
0.97
955
-89.2-64.0
0.97
955
-89.5-64.2
391ALBCHEM7
1.036142.9
735SHELL TP
1.033142.5
952DIAM TAP
1.036143.0
43SCOT4_7
1.034142.7
-21.16.3
21.1-7.5
47.431.8
67.8-20.7
-56.042.456.1
-54.642.3
21.2-7.57.4
948808_BNDY
1.029142.0
59REDWATE7
1.021140.9
-9.9-1.3
-49.4
1420WEASEL1
1.026141.6
1.3-9.8-2.4
954ABEE_01
1.025141.4
-6.9-2.3
6.91.660
BEAMER 7
1.026141.6
734SHELL A1
1.033142.5
48DIAM SH7
1.036143.0
58FORT SA7
1.034142.7
185SCOT4_8
1.034142.7
628ALC SCOT
1.032142.5
394ASTOTIN
1.036142.9
821708ALTAP
1.027141.7
61DOW CHEM
1.037143.2
62SHERRIT7
1.035142.8
63LAMOURE7
1.038143.2
-32.7
-0.3-0.2
-66.
921
.4
-40.7-7.6
37.6
0.40.1 -0.3
-18.6
-28.
9
-19.2-2.218.5
-27.1
-12.013.4
-95.
115
.1
95.2-14.9
55.4 0.97
83
59.340.2
0.97
83
38.7
-125.2
125.510.3
-21.2
-0.4
28.9
50RIVERSID
1.027141.7
-38.9-20.6
-42.3
54.6
10.1
393DOW HYD7
1.036143.0
922ROSS TAP
1.037143.1
74.0
-6.1
-73.
86.
313
0.5
-17.
6
27.8
46.7
-27.
8
-92.428.5
45ROSS CRK
1.037143.1
-37.
8
-9.5
37.2
-6.936.4
9.9
-46.6
18.5
35.01.4
-35.0-1.4
-42.331.3
-10.
1
-65.8-5.9
-82.0
2.2
-65.6
793SCORIA1
1.026141.6
25.913.4
-25.9-13.5
-8.1
2954ABEE_02
1.0254.3
996.92.0
18420WEASEL2
1.0424.3
992.90.7
3712.9
6.3
2050GRANITE9
314.72.3
9918.8
9.1
319.44.5
9914.1
6.8
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.0R
9.0R
2030DOWSTG 9
1.03015.1
37.4
4.9R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3262.063.4R
G4179.345.7R
2835LAMONT_LV1
3835LAMONT_LV2
71.513.3R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 143
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1A787L (N-1)FIG E-29FRI, AUG 19 2016 15:48
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.058253.9
443BANN_240
1.038249.0
109DEERLAN4
1.059254.1
771AMELIA1
1.041249.9
313JOSEPH1
1.033247.9
89.3-130.4
-89.2
57LAMOURE4
1.028246.7
-47.5245.449.8
-50.7151.3
50.9-151.9
118.7
-118.3-90.3
-172.217.5
172.6-18.2
-82.1-74.2
82.271.9
-245.1
130.1
86.3
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-6.3
R
7185SCOTF ST
1.03514.3
68.139.3R
4185SCOTF GT
1.03514.3
70.237.0R
627AIR LIQC
1.03514.3
68.126.5R
3712.9
3712.9
6.3
6.3
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.040143.6
1.01
5
936808L_TAP
1.031142.2
67BRUDERH7
1.036143.0
59.18.6
63.86.1
314JOSEPH2
1.037143.1
0.97
955
-81.3-64.2
0.97
955
-81.6-64.4
391ALBCHEM7
1.036143.0
735SHELL TP
1.034142.6
952DIAM TAP
1.037143.1
43SCOT4_7
1.035142.8
-18.96.2
19.0-7.4
49.330.6
45.2-18.0
-55.643.755.7
-54.143.7
19.0-7.57.3
948808_BNDY
1.029142.0
59REDWATE7
1.022141.0
-9.9-1.3
-48.4
1420WEASEL1
1.027141.7
1.3-9.8-2.4
954ABEE_01
1.025141.5
-6.9-2.3
6.91.660
BEAMER 7
1.027141.8
734SHELL A1
1.034142.7
48DIAM SH7
1.037143.1
58FORT SA7
1.037143.1
185SCOT4_8
1.035142.8
628ALC SCOT
1.033142.6
394ASTOTIN
1.036143.0
821708ALTAP
1.028141.9
61DOW CHEM
1.040143.5
62SHERRIT7
1.037143.1
63LAMOURE7
1.039143.4
-29.3
-0.3-0.2
-44.
618
.0
-38.9-8.2
37.3
0.40.1 -0.3
-22.2
-32.
6
-19.4-1.218.6
-25.9
-13.014.3
-127
.226
.012
8.0
-2.6
-5.6
2.65.5
53.6 0.97
83
57.437.4
0.97
83
42.4
-32.6
32.629.8
-19.0
-0.4
32.6
50RIVERSID
1.028141.8
-38.9-20.6
-43.7
54.2
6.4
393DOW HYD7
1.038143.3
922ROSS TAP
1.037143.1
76.5
-4.0
-76.
34.
2
25.7
49.2
-25.
7
45ROSS CRK
1.037143.1
-29.9
34.5
-7.339.5
9.9
-49.1
22.1
37.7-0.8
-37.70.8
-43.732.4
-24.
6
-63.6-6.0
-86.6
1.3
-67.3
793SCORIA1
1.028141.8
25.913.4
-25.9-13.5
-7.9
2954ABEE_02
1.0264.3
996.92.0
18420WEASEL2
1.0424.3
992.90.7
3712.9
6.3
2050GRANITE9
314.72.3
9918.8
9.1
319.44.5
9914.1
6.8
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.8R
8.3R
2030DOWSTG 9
1.03015.1
37.4
3.5R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3262.061.9R
G4179.344.6R
2835LAMONT_LV1
3835LAMONT_LV2
71.512.8R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 144
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1A862L (N-1)FIG E-30FRI, AUG 19 2016 15:48
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.057253.8
443BANN_240
1.037248.9
109DEERLAN4
1.058254.0
771AMELIA1
1.041249.8
313JOSEPH1
1.032247.7
85.6-130.8
-85.5
57LAMOURE4
1.027246.5
-50.6241.252.9
-47.0151.7
47.2-152.3
121.5
-121.2-91.0
-175.517.9
175.9-18.4
-85.0-74.8
85.172.6
-240.9
130.5
87.1
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-4.7
R
7185SCOTF ST
1.03514.3
68.139.7R
4185SCOTF GT
1.03514.3
70.237.4R
627AIR LIQC
1.03514.3
68.127.0R
3712.9
3712.9
6.3
6.3
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.040143.5
1.01
5
936808L_TAP
1.030142.1
67BRUDERH7
1.036142.9
60.28.8
65.06.3
314JOSEPH2
1.037143.0
0.97
955
-85.3-64.1
0.97
955
-85.6-64.3
391ALBCHEM7
1.036142.9
735SHELL TP
1.033142.5
952DIAM TAP
1.036143.0
43SCOT4_7
1.034142.7
-20.16.1
20.1-7.3
50.131.0
52.4-18.5
-55.644.355.7
-54.144.2
20.2-7.37.2
948808_BNDY
1.029142.0
59REDWATE7
1.021140.9
-9.9-1.3
-49.5
1420WEASEL1
1.026141.6
1.3-9.8-2.4
954ABEE_01
1.025141.4
-6.9-2.3
6.91.660
BEAMER 7
1.026141.6
734SHELL A1
1.033142.5
48DIAM SH7
1.036143.0
58FORT SA7
1.035142.8
185SCOT4_8
1.034142.7
628ALC SCOT
1.032142.5
394ASTOTIN
1.036142.9
821708ALTAP
1.027141.7
61DOW CHEM
1.038143.2
62SHERRIT7
1.035142.9
63LAMOURE7
1.038143.2
-30.8
-0.3-0.2
-51.
718
.6
-38.3-8.2
37.3
0.40.1 -0.3
-20.7
-35.
5
-19.3-2.318.5
-26.5
-13.413.8
-103
.318
.410
3.8
-14.
20.
5
14.2-0.6
60.5 0.97
83
64.740.0
0.97
83
40.8
-44.2
44.223.8
-20.2
-0.4
35.5
50RIVERSID
1.027141.7
-38.9-20.6
-44.2
54.2
3.5
393DOW HYD7
1.035142.9
922ROSS TAP
1.038143.2
100.
6-6
.9
21.4
-27.
2-2
1.5
-62.717.2
45ROSS CRK
1.038143.2
-37.
8
-23.8
37.0
-7.037.2
9.9
27.2
20.6
38.80.3
-38.8-0.4
-44.232.8
-10.
1
-17.
7
-64.8-6.1
-88.4
2.4
-67.9
793SCORIA1
1.026141.6
25.913.4
-25.9-13.5
-8.0
2954ABEE_02
1.0254.3
996.92.0
18420WEASEL2
1.0424.3
992.90.7
3712.9
6.3
2050GRANITE9
314.72.3
9918.8
9.1
319.44.5
9914.1
6.8
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.2R
8.9R
2030DOWSTG 9
1.03015.1
37.4
4.7R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3262.063.3R
G4179.345.7R
2835LAMONT_LV1
3835LAMONT_LV2
71.513.2R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 145
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1A861L (N-1)FIG E-31FRI, AUG 19 2016 15:49
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.058253.8
443BANN_240
1.037248.9
109DEERLAN4
1.058254.0
771AMELIA1
1.041249.8
313JOSEPH1
1.032247.7
85.6-130.7
-85.5
57LAMOURE4
1.027246.5
-49.6240.651.9
-47.0151.5
47.2-152.1
121.5
-121.1-90.7
-175.618.0
176.0-18.4
-84.9-74.5
85.072.3
-240.3
130.4
86.8
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-3.6
R
7185SCOTF ST
1.03514.3
68.139.6R
4185SCOTF GT
1.03514.3
70.237.3R
627AIR LIQC
1.03514.3
68.126.9R
3712.9
3712.9
6.3
6.3
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.040143.5
1.01
5
936808L_TAP
1.030142.2
67BRUDERH7
1.036142.9
60.18.6
65.16.2
314JOSEPH2
1.037143.1
0.97
955
-85.6-64.2
0.97
955
-85.9-64.4
391ALBCHEM7
1.036143.0
735SHELL TP
1.033142.6
952DIAM TAP
1.036143.0
43SCOT4_7
1.034142.7
-20.26.1
20.2-7.4
49.730.7
53.9-18.0
-55.544.055.6
-54.044.0
20.3-7.47.2
948808_BNDY
1.029142.0
59REDWATE7
1.021140.9
-9.9-1.3
-49.5
1420WEASEL1
1.026141.6
1.3-9.8-2.4
954ABEE_01
1.025141.4
-6.9-2.3
6.91.660
BEAMER 7
1.027141.7
734SHELL A1
1.033142.6
48DIAM SH7
1.036143.0
58FORT SA7
1.035142.8
185SCOT4_8
1.034142.8
628ALC SCOT
1.033142.5
394ASTOTIN
1.036142.9
821708ALTAP
1.028141.8
61DOW CHEM
1.037143.1
62SHERRIT7
1.035142.9
63LAMOURE7
1.038143.3
-30.1
-0.3-0.2
-53.
218
.2
-38.6-8.3
37.2
0.40.1 -0.3
-21.4
-34.
7
-19.4-2.318.7
-26.3
-13.314.0
-92.
524
.492
.9
-22.
8-4
.8
22.84.7
60.1 0.97
83
64.338.9
0.97
83
41.6
-52.8
52.929.1
-20.3
-0.4
34.7
50RIVERSID
1.027141.7
-38.9-20.6
-44.0
54.1
4.3
393DOW HYD7
1.034142.7
922ROSS TAP
1.037143.1
27.2
21.3
-27.
2-2
1.5
84.4
-19.
5
-46.529.6
45ROSS CRK
1.037143.1
-37.
8
-29.1
36.0
-7.037.2
9.921
.3
38.3-0.1
-38.30.1
-44.032.6
-10.
1
-23.
8
-64.9-6.1
-87.6
2.3
-67.7
793SCORIA1
1.027141.7
25.913.4
-25.9-13.5
-7.9
2954ABEE_02
1.0254.3
996.92.0
18420WEASEL2
1.0424.3
992.90.7
3712.9
6.3
2050GRANITE9
314.72.3
9918.8
9.1
319.44.5
9914.1
6.8
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.7R
9.3R
2030DOWSTG 9
1.03015.1
37.4
5.4R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3262.063.0R
G4179.345.4R
2835LAMONT_LV1
3835LAMONT_LV2
71.513.1R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 146
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1A781L (N-1)FIG E-32FRI, AUG 19 2016 15:49
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.058253.8
443BANN_240
1.037248.9
109DEERLAN4
1.058254.0
771AMELIA1
1.041249.8
313JOSEPH1
1.032247.7
85.3-130.8
-85.2
57LAMOURE4
1.027246.6
-47.1234.649.2
-46.7151.7
46.9-152.2
120.7
-120.4-90.3
-176.417.7
176.8-18.1
-84.2-74.2
84.372.0
-234.3
130.5
86.4
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-3.7
R
7185SCOTF ST
1.03514.3
68.139.8R
4185SCOTF GT
1.03514.3
70.237.5R
627AIR LIQC
1.03514.3
68.127.2R
3712.9
3712.9
6.3
6.3
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.040143.5
1.01
5
936808L_TAP
1.030142.1
67BRUDERH7
1.036142.9
60.08.6
65.96.5
314JOSEPH2
1.036143.0
0.97
955
-88.7-65.5
0.97
955
-89.0-65.8
391ALBCHEM7
1.036142.9
735SHELL TP
1.033142.5
952DIAM TAP
1.036142.9
43SCOT4_7
1.034142.7
-21.05.8
21.1-7.1
47.330.3
66.9-13.2
-54.942.454.9
-53.542.3
21.1-7.17.0
948808_BNDY
1.029142.0
59REDWATE7
1.021140.9
-9.9-1.3
-49.3
1420WEASEL1
1.026141.6
1.3-9.8-2.4
954ABEE_01
1.025141.4
-6.9-2.3
6.91.660
BEAMER 7
1.027141.7
734SHELL A1
1.033142.5
48DIAM SH7
1.036142.9
58FORT SA7
1.031142.3
185SCOT4_8
1.034142.7
628ALC SCOT
1.032142.4
394ASTOTIN
1.036142.9
821708ALTAP
1.028141.8
61DOW CHEM
1.037143.1
62SHERRIT7
1.030142.2
63LAMOURE7
1.039143.4
-29.2
-0.3-0.2
-66.
013
.9
-40.7-9.1
36.8
0.40.1 -0.3
-22.4
-28.
7
-19.4-2.118.7
-25.9
-12.014.2
-126
.11.
212
6.8
30.0
24.4
-30.0-24.4
56.1 0.97
83
60.036.9
0.97
83
42.6
-21.1
-0.4
28.8
50RIVERSID
1.027141.7
-38.9-20.6
-42.3
53.5
10.3
393DOW HYD7
1.037143.1
922ROSS TAP
1.037143.1
25.3
-5.7
-25.
35.
552
.3-1
6.6
26.8
-1.9
-27.
0
-14.526.5
45ROSS CRK
1.037143.1
-37.
8
34.1
-7.236.4
9.9
1.9
22.2
35.0-0.7
-35.00.6
-42.331.3
-10.
1
-0.0
-65.7-6.3
-81.9
2.2
-65.6
793SCORIA1
1.027141.7
25.913.4
-25.9-13.5
-7.9
2954ABEE_02
1.0254.3
996.92.0
18420WEASEL2
1.0424.3
992.90.7
3712.9
6.3
2050GRANITE9
314.72.3
9918.8
9.1
319.44.5
9914.1
6.8
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.8R
9.2R
2030DOWSTG 9
1.03015.1
37.4
5.3R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3262.063.1R
G4179.345.5R
2835LAMONT_LV1
3835LAMONT_LV2
71.513.2R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 147
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1A709L (N-1)FIG E-33FRI, AUG 19 2016 15:49
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.058253.8
443BANN_240
1.037248.9
109DEERLAN4
1.058254.0
771AMELIA1
1.041249.8
313JOSEPH1
1.032247.7
85.5-130.8
-85.3
57LAMOURE4
1.027246.5
-50.1237.452.2
-46.8151.6
47.1-152.2
121.0
-120.7-90.8
-176.018.0
176.4-18.4
-84.5-74.6
84.672.4
-237.0
130.4
86.9
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-4.2
R
7185SCOTF ST
1.03514.3
68.139.7R
4185SCOTF GT
1.03514.3
70.237.4R
627AIR LIQC
1.03514.3
68.127.0R
3712.9
3712.9
6.3
6.3
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.040143.5
1.01
5
936808L_TAP
1.030142.2
67BRUDERH7
1.036142.9
60.18.7
65.56.2
314JOSEPH2
1.037143.0
0.97
955
-87.3-64.1
0.97
955
-87.6-64.3
391ALBCHEM7
1.036143.0
735SHELL TP
1.033142.5
952DIAM TAP
1.036143.0
43SCOT4_7
1.034142.7
-20.66.2
20.6-7.4
48.631.2
60.4-19.1
-55.743.255.8
-54.343.2
20.7-7.57.3
948808_BNDY
1.029142.0
59REDWATE7
1.021140.9
-9.9-1.3
-49.4
1420WEASEL1
1.026141.6
1.3-9.8-2.4
954ABEE_01
1.025141.4
-6.9-2.3
6.91.660
BEAMER 7
1.027141.7
734SHELL A1
1.033142.6
48DIAM SH7
1.036143.0
58FORT SA7
1.034142.7
185SCOT4_8
1.034142.7
628ALC SCOT
1.032142.5
394ASTOTIN
1.036142.9
821708ALTAP
1.027141.8
61DOW CHEM
1.037143.1
62SHERRIT7
1.036143.0
63LAMOURE7
1.038143.3
-31.2
-0.3-0.2
-59.
619
.5
-39.6-8.0
37.4
0.40.1 -0.3
-20.3
-31.
9
-19.3-2.218.6
-26.6
-12.713.8
-105
.817
.810
6.3
57.9 0.97
83
61.939.3
0.97
83
40.4
-30.0
30.024.3
-20.7
-0.4
32.0
50RIVERSID
1.027141.7
-38.9-20.6
-43.2
54.3
7.1
393DOW HYD7
1.036143.0
922ROSS TAP
1.037143.1
33.1 0.4
-33.
1-0
.665
.0-6
.8
20.7
5.9
-20.
9
-27.216.7
45ROSS CRK
1.037143.1
-37.
8
-24.4
36.4
-7.036.8
9.9
-5.9
20.2
36.80.5
-36.7-0.5
-43.232.0
-10.
1
-17.
0
-65.3-6.0
-85.0
2.3
-66.7
793SCORIA1
1.027141.7
25.913.4
-25.9-13.5
-8.0
2954ABEE_02
1.0254.3
996.92.0
18420WEASEL2
1.0424.3
992.90.7
3712.9
6.3
2050GRANITE9
314.72.3
9918.8
9.1
319.44.5
9914.1
6.8
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.0R
9.1R
2030DOWSTG 9
1.03015.1
37.4
5.0R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3262.063.1R
G4179.345.5R
2835LAMONT_LV1
3835LAMONT_LV2
71.513.2R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 148
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1A694L (N-1)FIG E-34FRI, AUG 19 2016 15:49
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.057253.7
443BANN_240
1.037248.8
109DEERLAN4
1.058253.9
771AMELIA1
1.040249.7
313JOSEPH1
1.032247.7
91.9-131.0
-91.8
57LAMOURE4
1.027246.5
-49.4252.752.1
-53.2152.0
53.5-152.5
116.6
-116.3-91.2
-167.917.1
168.2-18.0
-80.1-75.1
80.272.9
-252.4
130.7
87.1
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-4.3
R
7185SCOTF ST
1.03514.3
68.139.9R
4185SCOTF GT
1.03514.3
70.237.6R
627AIR LIQC
1.03514.3
68.127.3R
3712.9
3712.9
6.3
6.3
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.039143.4
1.01
5
936808L_TAP
1.030142.1
67BRUDERH7
1.035142.9
58.19.3
62.76.7
314JOSEPH2
1.036143.0
0.97
955
-76.4-65.2
0.97
955
-76.7-65.4
391ALBCHEM7
1.035142.9
735SHELL TP
1.033142.5
952DIAM TAP
1.036143.0
43SCOT4_7
1.034142.7
-17.85.5
17.9-6.8
48.730.8
35.6-15.1
-55.343.355.4
-53.943.3
17.9-6.86.7
948808_BNDY
1.028141.9
59REDWATE7
1.021140.9
-9.9-1.3
-47.5
1420WEASEL1
1.026141.6
1.3-9.8-2.4
954ABEE_01
1.024141.4
-6.9-2.3
6.91.660
BEAMER 7
1.026141.6
734SHELL A1
1.033142.5
48DIAM SH7
1.036143.0
58FORT SA7
1.036143.0
185SCOT4_8
1.034142.7
628ALC SCOT
1.032142.4
394ASTOTIN
1.035142.9
821708ALTAP
1.027141.7
61DOW CHEM
1.037143.2
62SHERRIT7
1.036142.9
63LAMOURE7
1.038143.2
-30.7
-0.3-0.2
-35.
114
.8
-39.5-8.5
37.1
0.40.1 -0.3
-20.1
-30.
3
-18.6-0.317.9
-26.5
-12.713.8
-61.
912
.562
.0
20.5
-3.8
-20.53.7
44.7 0.97
83
47.839.2
0.97
83
40.2
-9.5
9.528.0
-17.9
-0.4
30.3
50RIVERSID
1.027141.7
-38.9-20.6
-43.3
53.9
8.7
393DOW HYD7
1.036143.0
922ROSS TAP
1.037143.1
50.1
-1.4
-50.
11.
392
.3-9
.8
22.7
22.9
-22.
8
-54.420.0
45ROSS CRK
1.037143.1
-37.
8
-28.1
36.2
-7.541.6
9.9
-22.9
20.0
36.90.3
-36.9-0.3
-43.332.1
-10.
1
-12.
4
-62.5-6.6
-85.2
0.3
-66.8
793SCORIA1
1.026141.6
25.913.4
-25.9-13.5
-8.7
2954ABEE_02
1.0254.3
996.92.0
18420WEASEL2
1.0424.3
992.90.7
3712.9
6.3
2050GRANITE9
314.72.3
9918.8
9.1
319.44.5
9914.1
6.8
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-10.0R
9.0R
2030DOWSTG 9
1.03015.1
37.4
4.9R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3262.063.6R
G4179.345.9R
2835LAMONT_LV1
3835LAMONT_LV2
71.513.3R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 149
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1A700L (N-1)FIG E-35FRI, AUG 19 2016 15:50
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.057253.8
443BANN_240
1.037248.8
109DEERLAN4
1.058253.9
771AMELIA1
1.040249.7
313JOSEPH1
1.032247.7
90.4-131.2
-90.3
57LAMOURE4
1.027246.4
-49.1249.551.6
-51.8152.1
52.0-152.7
117.7
-117.4-91.3
-169.717.0
170.1-17.8
-81.1-75.2
81.273.0
-249.2
130.9
87.3
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-3.8
R
7185SCOTF ST
1.03514.3
68.140.0R
4185SCOTF GT
1.03514.3
70.237.7R
627AIR LIQC
1.03514.3
68.127.4R
3712.9
3712.9
6.3
6.3
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.039143.4
1.01
5
936808L_TAP
1.030142.1
67BRUDERH7
1.035142.9
58.69.3
63.36.8
314JOSEPH2
1.036143.0
0.97
955
-78.7-65.5
0.97
955
-79.0-65.7
391ALBCHEM7
1.035142.9
735SHELL TP
1.032142.5
952DIAM TAP
1.036142.9
43SCOT4_7
1.034142.6
-18.45.5
18.5-6.7
48.930.9
40.4-14.4
-55.343.555.3
-53.943.4
18.5-6.86.6
948808_BNDY
1.028141.9
59REDWATE7
1.021140.8
-9.9-1.3
-48.0
1420WEASEL1
1.026141.5
1.3-9.8-2.4
954ABEE_01
1.024141.3
-6.9-2.3
6.91.660
BEAMER 7
1.026141.6
734SHELL A1
1.032142.5
48DIAM SH7
1.036142.9
58FORT SA7
1.035142.8
185SCOT4_8
1.034142.7
628ALC SCOT
1.032142.4
394ASTOTIN
1.035142.9
821708ALTAP
1.027141.7
61DOW CHEM
1.037143.1
62SHERRIT7
1.035142.8
63LAMOURE7
1.037143.2
-30.9
-0.3-0.2
-39.
814
.1
-39.3-8.5
37.1
0.40.1 -0.3
-19.8
-31.
3
-18.6-0.817.9
-26.6
-12.813.7
-68.
610
.768
.8
8.8
-6.5
-8.86.4
48.2 0.97
83
51.540.4
0.97
83
40.0
-21.2
21.230.7
-18.5
-0.4
31.3
50RIVERSID
1.026141.6
-38.9-20.6
-43.4
53.9
7.7
393DOW HYD7
1.036143.0
922ROSS TAP
1.037143.1
47.5
-1.7
-47.
51.
688
.1-1
0.3
22.9
20.3
-23.
1
-50.220.4
45ROSS CRK
1.037143.1
-37.
8
-30.8
37.4
-7.640.4
9.9
-20.3
19.7
37.20.5
-37.2-0.6
-43.432.2
-10.
1
-10.
5
-63.1-6.7
-85.7
0.9
-66.9
793SCORIA1
1.026141.6
25.913.4
-25.9-13.5
-8.7
2954ABEE_02
1.0244.3
996.92.0
18420WEASEL2
1.0414.3
992.90.7
3712.9
6.3
2050GRANITE9
314.72.3
9918.8
9.1
319.44.5
9914.1
6.8
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.8R
9.2R
2030DOWSTG 9
1.03015.1
37.4
5.3R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3262.063.8R
G4179.346.0R
2835LAMONT_LV1
3835LAMONT_LV2
71.513.4R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 150
File No. RP-05-1381
Attachment F Proposed Transmission Development Assessment
August 2016 P1381 807L Capacity Increase 151
File No. RP-05-1381
Table F-1: Worst Contingency Lists for Proposed Transmission Development Assessment
Figure # Scenario Condition
F-1 17_1a 708L (N-1) 233S Beamer to 71S Lamoureux F-2 20_1a 808L (N-1) 171S Redwater to 13S Deerland F-3 20_1a_Sen 997L (N-1) 71S Lamoureux to 410S Josephburg F-4 25_1a 997L (N-1) 71S Lamoureux to 410S Josephburg F-5 35_1a 808L (N-1) 171S Redwater to 13S Deerland
August 2016 P1381 807L Capacity Increase 152
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A808L (N-1)FIG F-2FRI, AUG 19 2016 16:29
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.038249.2
443BANN_240
1.017244.0
109DEERLAN4
1.035248.3
771AMELIA1
1.015243.6
313JOSEPH1
1.005241.2
-16.6-137.9
16.7
57LAMOURE4
1.007241.6
19.6-62.9-21.1
54.0158.5
-53.7-158.5
160.1
-159.6-88.6
-266.23.9
267.22.8
-120.9-70.1
121.069.0
62.9
137.5
87.5
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-3.2
R
7185SCOTF ST
1.03014.2
68.133.5R
4185SCOTF GT
1.03014.2
70.230.9R
627AIR LIQC
1.03014.2
68.124.9R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.050144.9
0.97
5
936808L_TAP
1.033142.5
67BRUDERH7
1.043144.0
45.726.8
314JOSEPH2
1.035142.8
0.95
-75.1-86.3
0.95
-75.3-86.5
391ALBCHEM7
1.042143.9
735SHELL TP
1.031142.2
952DIAM TAP
1.035142.8
43SCOT4_7
1.032142.4
-3.3-15.7
3.314.3
51.541.8
4.06.6
-70.849.171.0
-69.149.1
3.314.3-14.5
948808_BNDY
1.031142.3
59REDWATE7
1.009139.2
1420WEASEL1
1.029142.0
954ABEE_01
1.027141.8
60BEAMER 7
1.023141.2
734SHELL A1
1.031142.2
48DIAM SH7
1.035142.8
58FORT SA7
1.033142.5
185SCOT4_8
1.032142.4
628ALC SCOT
1.030142.1
394ASTOTIN
1.043144.0
821708ALTAP
1.025141.4
61DOW CHEM
1.036143.0
62SHERRIT7
1.033142.6
63LAMOURE7
1.037143.2
-43.1
-0.3-0.3
-3.7
-7.3
-37.67.6
45.3
0.40.1 -0.3
-16.2
20.1
-26.346.126.4
-28.8
-9.813.6
-90.
74.
191
.1
-29.
7-1
7.3
29.717.3
57.7 0.97
83
65.9105.8
0.94
161
35.2
-61.7
61.843.6
-3.3
-0.4
-20.1
50RIVERSID
1.024141.4
-35.9-18.9
-49.1
69.2
56.3
393DOW HYD7
1.035142.9
922ROSS TAP
1.036143.0
39.1
-3.2
-39.
13.
173
.3-1
3.9
25.9
10.1
-26.
1
-35.423.9
45ROSS CRK
1.036143.0
-37.
8
-43.4
-24.4
-26.7-45.7
-10.1
16.0
30.21.9
-30.2-1.9
-49.135.3
-10.
1
-3.6
-45.6-26.9
-81.2
-45.8
-65.9
793SCORIA1
1.024141.3
23.912.3
-23.9-12.4
2954ABEE_02
1.0294.3
99
18420WEASEL2
1.0454.3
99
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.5R
9.5R
2030DOWSTG 9
1.03015.1
37.4
5.7R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3
G4
2835LAMONT_LV1
3835LAMONT_LV2
71.528.8R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 153
File No. RP-05-1381
PROJECT 1381: SCENARIO 2020SP 1A SENSITIVITY997L (N-1)FIG F-3FRI, AUG 19 2016 16:29
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.052252.4
443BANN_240
1.026246.2
109DEERLAN4
1.054252.8
771AMELIA1
1.040249.6
313JOSEPH1
1.034248.1
197.0-103.4
-196.7
57LAMOURE4
1.013243.2
-159.3126.9
159.7-125.6
157.7
-157.1-110.5
-103.517.9
103.7-21.6
-118.4-91.8
118.690.9
104.7
109.8
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-2.1
R
7185SCOTF ST
1.03014.2
68.132.6R
4185SCOTF GT
1.03014.2
70.230.1R
627AIR LIQC
1.03014.2
68.123.6R
3711.9
3711.9
5.8
5.8
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.037143.2
1.00
28
936808L_TAP
1.029141.9
67BRUDERH7
1.034142.7
31.817.8
14.714.1
314JOSEPH2
1.037143.1
0.97
955
-157.6-67.0
0.97
955
-158.1-67.2
391ALBCHEM7
1.035142.8
735SHELL TP
1.033142.5
952DIAM TAP
1.036143.0
43SCOT4_7
1.034142.7
27.7-3.1
-27.62.0
72.730.3
86.6-20.7
-64.664.564.8
-62.864.2
-27.62.0-2.1
948808_BNDY
1.027141.8
59REDWATE7
1.020140.8
-9.9-1.0
-21.6
1420WEASEL1
1.025141.4
1.0-9.8-2.1
954ABEE_01
1.023141.2
-6.9-2.1
6.91.460
BEAMER 7
1.026141.5
734SHELL A1
1.033142.5
48DIAM SH7
1.036143.0
58FORT SA7
1.032142.4
185SCOT4_8
1.034142.7
628ALC SCOT
1.032142.4
394ASTOTIN
1.034142.7
821708ALTAP
1.026141.6
61DOW CHEM
1.035142.8
62SHERRIT7
1.032142.5
63LAMOURE7
1.036143.0
-15.2
-0.3-0.3
-85.
322
.3
-18.7-0.2
40.6
0.40.1 -0.3
-24.8
-53.
0
-7.824.27.2
-19.3
-21.319.5
-71.
6-2
.571
.9
4.3
-26.
1
-4.326.0
21.1 0.97
83
25.2133.3
0.94
161
43.5
-27.7
27.852.2
27.6
-0.4
53.0
50RIVERSID
1.026141.6
-35.9-18.9
-64.4
62.9
-16.9
393DOW HYD7
1.034142.7
922ROSS TAP
1.035142.8
46.5
-4.7
-46.
54.
685
.1-1
6.2
27.5
17.5
-27.
6
-47.226.4
45ROSS CRK
1.035142.8
-37.
8
-52.2
-1.2
-31.9-46.5
9.9
-17.5
24.9
60.6-13.5
-60.613.5
-64.146.8
-10.
1
2.7
-14.7-14.6
-132.5
-24.1
-84.8
793SCORIA1
1.026141.6
23.912.3
-23.9-12.4
-18.5
2954ABEE_02
1.0254.3
996.91.9
18420WEASEL2
1.0414.3
992.90.7
3711.9
5.8
2050GRANITE9
314.52.2
9918.2
8.8
319.14.4
9913.6
6.6
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-9.1R
9.8R
2030DOWSTG 9
1.03015.1
37.4
6.4R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3248.057.3R
G4200.041.5R
2835LAMONT_LV1
3835LAMONT_LV2
71.512.2R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 154
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1A997L (N-1)FIG F-4FRI, AUG 19 2016 16:29
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.056253.4
443BANN_240
1.031247.5
109DEERLAN4
1.060254.3
771AMELIA1
1.045250.7
313JOSEPH1
1.038249.0
197.8-116.2
-197.5
57LAMOURE4
1.020244.7
-158.9141.0
159.3-139.4
184.1
-183.4-102.1
-80.927.0
81.0-31.3
-147.0-84.0
147.383.8
117.7
102.7
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
-0.3
R
7185SCOTF ST
1.03514.3
68.138.0R
4185SCOTF GT
1.03514.3
70.235.7R
627AIR LIQC
1.03514.3
68.124.5R
3712.9
3712.9
6.3
6.3
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.041143.7
1.01
5
936808L_TAP
1.031142.3
67BRUDERH7
1.038143.2
63.48.5
59.44.3
314JOSEPH2
1.040143.6
0.97
955
-149.6-68.6
0.97
955
-150.1-68.8
391ALBCHEM7
1.038143.3
735SHELL TP
1.036143.0
952DIAM TAP
1.039143.4
43SCOT4_7
1.038143.2
-14.67.8
14.6-9.1
72.433.3
122.9-21.8
-59.759.759.8
-58.059.4
14.7-9.29.0
948808_BNDY
1.030142.1
59REDWATE7
1.022141.0
-9.9-1.3
-52.7
1420WEASEL1
1.027141.8
1.3-9.8-2.4
954ABEE_01
1.026141.6
-6.9-2.3
6.91.660
BEAMER 7
1.027141.7
734SHELL A1
1.036143.0
48DIAM SH7
1.039143.4
58FORT SA7
1.031142.3
185SCOT4_8
1.038143.2
628ALC SCOT
1.036142.9
394ASTOTIN
1.038143.2
821708ALTAP
1.026141.7
61DOW CHEM
1.033142.5
62SHERRIT7
1.031142.2
63LAMOURE7
1.033142.5
-34.3
-0.3-0.2
-120
.625
.6
-19.3-3.2
40.3
0.40.1 -0.3
-17.5
-90.
8
-19.7-5.419.0
-28.4
-24.913.1
-67.
712
.167
.9
10.8
1.9
-10.8-2.0
10.0 0.97
83
10.731.8
0.97
83
38.8
-19.2
19.222.2
-14.7
-0.4
91.0
50RIVERSID
1.026141.6
-38.9-20.6
-59.6
58.1
-51.6
393DOW HYD7
1.031142.3
922ROSS TAP
1.033142.5
47.9 2.2
-47.
8-2
.388
.6-4
.1
19.1
20.7
-19.
3
-50.814.3
45ROSS CRK
1.033142.5
-37.
8
-22.4
29.3
-6.939.5
9.9
-20.6
17.9
69.32.9
-69.3-2.9
-59.344.3
-10.
1
-11.
9
-59.3-4.3
-140.7
5.5
-87.0
793SCORIA1
1.026141.6
25.913.4
-25.9-13.5
-7.6
2954ABEE_02
1.0264.3
996.92.0
18420WEASEL2
1.0434.3
992.90.7
3712.9
6.3
2050GRANITE9
314.72.3
9918.8
9.1
319.44.5
9914.1
6.8
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-8.4R
10.5R
2030DOWSTG 9
1.03015.1
37.4
7.6R
2836LAMONT_LV3
3836LAMONT_LV4
G1
G2 G3262.051.9R
G4179.337.6R
2835LAMONT_LV1
3835LAMONT_LV2
71.510.0R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 155
File No. RP-05-1381
PROJECT 1381: SCENARIO 2025SP 1A808L (N-1)FIG F-5FRI, AUG 19 2016 16:29
807L Capacity Upgrade P1381
Bus - Voltage (kV/pu)Branch - MW/MvarEquipment - MW/Mvar100.0%Rate A
kV: >0.000 <=25.000 <=69.000 <=138.000 <=240.000 <=500.000
341HEARTLAN
1.020244.7
443BANN_240
1.013243.1
109DEERLAN4
1.030247.1
771AMELIA1
1.018244.2
313JOSEPH1
1.012243.0
-30.2-73.7
30.2
57LAMOURE4
1.003240.6
-94.6405.5105.4
68.692.5
-68.5-94.1
142.5
-142.1-21.7
-156.067.4
156.4-67.6
-404.5
72.3
18.2
-106.0-4.3
106.03.3
-404.8-96.3
405.7107.1
3050REDW GT
1.03014.2
2031DOWGTG 9
1.03014.2
79.6
12.2
R
7185SCOTF ST
1.03114.2
68.146.3H
4185SCOTF GT
1.03514.3
70.246.0R
627AIR LIQC
1.03514.3
68.139.8R
3713.9
3713.9
6.7
6.7
3793SCORIA3
2793SCORIA2
106DEERLAN7
1.033142.5
1
936808L_TAP
1.017140.3
67BRUDERH7
1.026141.5
117.09.8
314JOSEPH2
1.019140.6
0.97
955
-122.7-50.7
0.97
955
-123.1-50.9
391ALBCHEM7
1.025141.4
735SHELL TP
1.015140.1
952DIAM TAP
1.018140.5
43SCOT4_7
1.017140.3
-71.06.7
71.6-5.7
81.028.0
104.1-30.1
-49.266.149.3
-47.665.6
71.7-5.55.6
948808_BNDY
1.016140.2
59REDWATE7
0.988136.4
1420WEASEL1
1.013139.8
954ABEE_01
1.012139.6
60BEAMER 7
1.005138.6
734SHELL A1
1.015140.1
48DIAM SH7
1.018140.5
58FORT SA7
1.015140.0
185SCOT4_8
1.017140.3
628ALC SCOT
1.015140.1
394ASTOTIN
1.026141.5
821708ALTAP
1.005138.7
61DOW CHEM
1.018140.5
62SHERRIT7
1.015140.0
63LAMOURE7
1.017140.3
-36.5
-0.3-0.2
-102
.333
.0
-11.4-16.1
31.9
0.40.1 -0.3
-26.1
-55.
7
-29.350.629.6
-31.5
-29.77.9
-91.
14.
791
.4
-28.
38.
6
28.3-8.6
100.9 0.97
83
107.926.6
0.97
83
48.5
-58.3
58.315.9
-71.6
-0.4
55.8
50RIVERSID
1.005138.7
-41.8-22.4
-66.1
47.7
-13.7
393DOW HYD7
1.016140.2
922ROSS TAP
1.018140.4
38.8
10.7
-38.
8-1
0.9
74.2
9.7
10.5
11.6
-10.
7
-36.30.4
45ROSS CRK
1.018140.4
-37.
8
-15.8
24.5
7.545.4
-11.6
26.2
81.911.3
-81.9-11.3
-65.649.1
-10.
2
-4.1
-116.3-8.0
-161.6
-50.1
-94.8
793SCORIA1
1.005138.6
27.814.5
-27.8-14.6
2954ABEE_02
1.0114.2
99
18420WEASEL2
1.0404.3
99
3713.9
6.7
2050GRANITE9
315.02.4
9919.9
9.6
3110.0
4.8
9914.9
7.2
3059REDWATA9
4059REDWATE9
54DOW GEN1
1.01014.5
51.5
454DOW GEN2
1.01014.5
51.5-3.3R
15.1R
2030DOWSTG 9
1.03015.1
37.4
16.2
R
2836LAMONT_LV3
3836LAMONT_LV4
G1262.0
104.1R
G2179.374.6R
G3262.0104.1R
G4179.374.6R
2835LAMONT_LV1
3835LAMONT_LV2
71.524.6R
70110COG19NEB
August 2016 P1381 807L Capacity Increase 156
File No. RP-05-1381
Attachment G Short-circuit Study Results
August 2016 P1381 807L Capacity Increase 157
File No. RP-05-1381
Short-circuit Analysis
Short-circuit analysis was performed based on system data2 available to the AESO for the Fort Saskatchewan Planning Area. Listed below are the basic assumptions adopted in the short-circuit analysis:
Study Years
2017: System model consists of facilities assumed to be in service as of 2017
Study Cases Used: 2017SP 4. Generation dispatch: All generators in and around Fort Saskatchewan Area
dispatched 5. All transmission elements: In service 6. Series capacitors: In service 7. HVDC: Blocked 8. PSS/E Version used: Version 33
Three-phase faults and single line-to-ground faults were applied at the 240 kV and 138 kV substations for the aforementioned study years and system conditions. The tables below present the computed three-phase and single-phase fault currents as well as the associated positive sequence and zero sequence impedances at these substations for before and after the 807L Upgrades project. The proposed transmission development does not have any material impact on the short-circuit levels in the study area.
It should be noted that the short-circuit levels change as new facilities are added to the system and are sensitive to any generation additions or retirements in the area of interest. The short-circuit levels provided in this study are not intended to be used as the sole source of information for electrical equipment specification or the design of public safety or worker safety grounding systems.
2 Short-circuit current calculation is based on modeling information provided to the AESO by third parties. Short-circuit estimation is subject to change.
August 2016 P1381 807L Capacity Increase 158
File No. RP-05-1381
Table G-1: Short-circuit Current Levels – Pre & Post 807L Increase (Year 2017)
Substation Name
Base Voltage
(kV)
Pre-Fault Voltage
(p.u.)
3-Φ Fault
(kA)
1- Φ Fault
(kA)
Positive Sequence Impedance
(R1 + j X1)
(p.u.)
Zero Sequence Impedance
(R0 + j X0)
(p.u.)
Josephburg 410S 240 1.042 16.9965 14.7919 0.002503+j0.014531 0.003154+j0.021179
Josephburg 410S 138 1.032 25.8449 23.6074 0.003269+j0.016377 0.002856+j0.021388
Lamoureux 71S 240 1.043 20.0133 17.6761 0.002294+j0.012325 0.002615+j0.017371
Lamoureux 71S 138 1.035 27.7503 26.0133 0.003247+j0.015267 0.002507+j0.018661
Deerland 13S 240 1.059 14.1763 11.6665 0.002789+j0.017754 0.004395+j0.029334
Deerland 13S 138 1.042 12.6743 12.8017 0.006553+j0.033753 0.003293+j0.033385
Beamer 233S 138 1.026 20.1309 15.7586 0.005292+j0.020647 0.007615+j0.038459
Redwater ISD 138 1.028 17.4343 13.8008 0.005814+j0.023964 0.008029+j0.043606
Redwater 171S 138 1.022 10.5030 7.4522 0.013433+j0.038416 0.025456+j0.087190
August 2016 P1381 807L Capacity Increase 159
File No. RP-05-1381