13
APPENDICES APPENDIX A3 2020 UPDATED CROSSINGS PLANS

APPENDIX A3 2020 UPDATED CROSSINGS PLANS Note: These …

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: APPENDIX A3 2020 UPDATED CROSSINGS PLANS Note: These …

❖ APPENDICES ❖

APPENDIX A3

2020 UPDATED CROSSINGS PLANS

bbreckenridge
Text Box
Note: These are predesign drawings and subject to modification during design.
Page 2: APPENDIX A3 2020 UPDATED CROSSINGS PLANS Note: These …

Co

un

ty

o

f O

ra

ng

e

DE

SIG

NE

D B

Y:

FILE

N

AM

E:

DR

AW

IN

G N

O:

PLO

T D

AT

E:

SC

ALE

:

CH

EC

KE

D B

Y:

DR

AW

N B

Y:

PR

EP

AR

ED

U

ND

ER

T

HE

R

ES

PO

NS

IB

LE

C

HA

RG

E O

F:

DA

TE

MA

RK

DE

SC

RIP

TIO

NA

PP

R.

DA

TE

OF

SHEET

COUN

TY ORANGEOF

CAL I FORN I A

Publ

icW

orks

320 G

odda

rd W

ay S

uite 2

00Irv

ine C

alifor

nia 92

618 U

SAT

1 94

9 648

5200

F 1

949 6

48 52

99W

www

.ghd.c

om

GHD

Inc.

Plot

Date:

Filen

ame:

10 A

pril 2

020 - 4

:30 P

MN:

\US\

Irvine

\Pro

jects\

561\1

1206

772\D

igital

_Des

ign\A

CAD

2018

\She

ets\C

ivil\1

1206

772-

C-10

1-Pe

dBrid

ge.dw

gPl

otted

By:M

yung

Cho

o

PR

EP

AR

ED

B

Y:

N

0 20'10'

----

SE

GM

EN

TS

O

, P

, Q

ST

A 1

0+

00

T

O S

TA

1

2+

50

1-P

ED

BR

ID

GE

C-101

15

----

----

----

C-1

01

11206772-C

-101-P

edB

ridge.dw

g

4/10/2020 4:30 P

M

1

AS

S

HO

WN

10+00 11+00 12+00

BP: 1

0+00

.00

PC: 1

2+22

.68

COYOTE CREEK TRAIL ℄

OC LOOP BIKEWAY ℄

PROPOSED PREFAB STEEL TRUSS BRIDGEPROPOSED CONCRETEBRIDGE ABUTMENT

PROPOSED CONCRETEBRIDGE ABUTMENT

12'8'

bbreckenridge
Text Box
Note: These are predesign drawings and subject to modification during design.
Page 3: APPENDIX A3 2020 UPDATED CROSSINGS PLANS Note: These …

392+00

393+00

394+00

395+00

396+0025+00

26+00

27+00

28+00

29+00

30+00

27+57.660.00' OFF.

28+57.950.00' L OFF.

-4.80%

-0.50%

4.89%

PVI STA = 27+07.66PVI EL = 45.75

K = 23.27L = 100.00'

BVCS

= 26

+57.6

6BV

CE =

48.15

EVCS

= 27

+57.6

6EV

CE =

45.50

PVI STA = 29+07.95PVI EL = 44.75

K = 18.55L = 100.00'

BVCS

= 28

+57.9

5BV

CE =

45.00

EVCS

= 29

+57.9

5EV

CE =

47.20

27+0

2.79

38.56

INV

27+2

3.29

39.05

INV

27+3

9.24

39.27

INV 28

+40.0

441

.20 IN

V

27+0

2.79

42.96 27

+23.2

943

.99

27+3

9.24

40.97

28+4

0.04

45.09

FS

28+0

2.81

56.20

28+1

2.81

56.15

27+5

7.66

59.73

28+5

7.95

59.8228

+02.8

160

.53 28+1

2.81

60.48

27+0

2.79

46.44

FS

29+0

0.00

(33.5

1 FL)

28+0

0.00

(33.4

3 FL)

27+2

3.29

45.93

FS

28+4

0.04

43.98

27+5

7.66

55.40

28+5

7.95

55.49

EX. 48" SD RCP

EX. 51" SD RCP

EX. 18" SD CMP EX. 30" SD RCP

28+0027+5027+0026+5026+00 28+50 29+00 29+50 30+00

EX. 48" SD RCP

EX. 51" SD RCP

EX. 18" SD CMP

COYOTE CREEK CHANNEL

VALLEY VIEW STREET

EX. 30" SD RCP

BOTTOM OF PCC BRIDGE BEAM

Co

un

ty

o

f O

ra

ng

e

DE

SIG

NE

D B

Y:

FIL

E N

AM

E:

DR

AW

IN

G N

O:

PL

OT

D

AT

E:

SC

AL

E:

CH

EC

KE

D B

Y:

DR

AW

N B

Y:

PR

EP

AR

ED

U

ND

ER

T

HE

R

ES

PO

NS

IB

LE

C

HA

RG

E O

F:

DA

TE

MA

RK

DE

SC

RIP

TIO

NA

PP

R.

DA

TE

OF

SHEET

COUN

TY ORANGE

OF

CAL I F ORN I A

Publ

icW

orks

320 G

odda

rd W

ay S

uite 2

00Irv

ine C

alifor

nia 92

618 U

SAT

1 94

9 648

5200

F 1

949 6

48 52

99W

www

.ghd.c

om

GHD

Inc.

Plot

Date:

Filen

ame:

7 Apr

il 202

0 - 1:

03 P

MN:

\US\

Irvine

\Pro

jects\

561\1

1206

772\D

igital

_Des

ign\A

CAD

2018

\Civi

l 3D\

1120

6772

-DC-

Corr-

Valle

yView

.dwg

Plott

ed B

y:Er

ika H

all

PR

EP

AR

ED

B

Y:

EX. TOP OF BRIDGE DECK

BRIDGE BARRIER RAILING

EX. SERVICE ROAD PROFILE

PROP. UNDER CROSSINGBIKE PATH PROFILE

N

0 40'20'10'

SCALE: 1" = 20'

3.48'COVER

1.94'COVER

FLOW DIRECTION

FLOW DIRECTION

EX. O.C. FLOOD CHANNEL PROFILEs = 0.00075

EX. O.C. FLOOD CHANNEL PROFILEs = 0.00075

1.11' COVER

bbreckenridge
Text Box
Note: These are predesign drawings and subject to modification during design.
Page 4: APPENDIX A3 2020 UPDATED CROSSINGS PLANS Note: These …

57+00

58+00

59+00

60+00

61+00 62+00

424+00

425+00

426+00427+00 428+00 429+00

CS: 4

26+4

0.65

ST: 4

27+1

5.65

407+85408+00

409+00

410+00

0.50%

0.26%

PVI STA = 58+43.00PVI EL = 52.94

K = 36.29L = 100.00'

BVCS

= 57

+93.0

0BV

CE =

52.81

EVCS

= 58

+93.0

0EV

CE =

51.69

HP S

TA =

58+0

2.48

HP E

L = 52

.82

PVI STA = 61+92.02PVI EL = 54.79

K = 29.84L = 100.00'

BVCS

= 61

+42.0

2BV

CE =

52.99

PVI STA = 59+43.00PVI EL = 50.44

K = 33.39L = 100.00'

BVCS

= 58

+93.0

0BV

CE =

51.69

EVCS

= 59

+93.0

0EV

CE =

50.69

LP S

TA =

59+7

6.30

LP E

L = 50

.65

PVI STA = 60+92.02PVI EL = 51.19

K = 32.29L = 100.00'

BVCS

= 60

+42.0

2BV

CE =

50.94

EVCS

= 61

+42.0

2EV

CE =

52.99

59+4

0.91

64.42

59+4

0.91

58.84

60+4

4.02

64.52

60+4

4.02

58.94

60+4

7.61

46.20

60+4

7.61

42.34

INV

60+4

7.61

50.96

59+3

9.00

49.70

58+00

Co

un

ty

o

f O

ra

ng

e

DE

SIG

NE

D B

Y:

FIL

E N

AM

E:

DR

AW

IN

G N

O:

PL

OT

D

AT

E:

SC

AL

E:

CH

EC

KE

D B

Y:

DR

AW

N B

Y:

PR

EP

AR

ED

U

ND

ER

T

HE

R

ES

PO

NS

IB

LE

C

HA

RG

E O

F:

DA

TE

MA

RK

DE

SC

RIP

TIO

NA

PP

R.

DA

TE

OF

SHEET

COUN

TY ORANGE

OF

CAL I F ORN I A

Publ

icW

orks

320 G

odda

rd W

ay S

uite 2

00Irv

ine C

alifor

nia 92

618 U

SAT

1 94

9 648

5200

F 1

949 6

48 52

99W

www

.ghd.c

om

GHD

Inc.

Plot

Date:

Filen

ame:

7 Apr

il 202

0 - 2:

32 P

MN:

\US\

Irvine

\Pro

jects\

561\1

1206

772\D

igital

_Des

ign\A

CAD

2018

\Civi

l 3D\

1120

6772

-DC-

Corr-

Artes

ia.dw

gPl

otted

By:

Myun

g Cho

o

PR

EP

AR

ED

B

Y:

N

0 40'20'10'

SCALE: 1" = 20'

FLOW DIRECTION

FLOW DIRECTION

59+00 60+00 61+00 62+0057+00

O.C. FLOOD CHANNEL

ARTESIA BLVD

EX. TOP OF BRIDGE DECK

EX. BOTTOM OF BRIDGE SOFFIT

EX. TOP OF CHANNEL WALL

EX. TOP OF CHANNEL WALL

EX. 42" SD RCP

EX. 42" SD RCP

EX. SERVICE ROAD PROFILE

EX. SERVICE ROAD ALIGNMENT

PROP. UNDER CROSSINGBIKE PATH ℄ ALIGNMENT

4.76' COVER

EX. TOE OF CHANNEL WALL

EX. FLOOD CHANNEL WALL

EX. FLOOD CHANNEL WALL

EX. BRIDGE ABUTMENT

PROP. UNDER CROSSINGBIKE PATH ℄ ALIGNMENT

EX. TOE OF CHANNEL WALL

EX. BOTTOM OF ABUTMENT

8' CLEAR

0.94'

8' CLEAR

bbreckenridge
Text Box
Note: These are predesign drawings and subject to modification during design.
Page 5: APPENDIX A3 2020 UPDATED CROSSINGS PLANS Note: These …

© 2020 Microsoft Corporation © 2019 DigitalGlobe ©CNES (2019) Distribution Airbus DS

TEMPORARY SHORING WALL (IF REQUIRED TO REMOVE EXISTING 18" & 42" SIDE DRAINS)CONSTRUCT MANHOLE OVEREXISTING 42" RCP & CONNECTEXIST. 18" STORM DRAIN

EXIST. 18" RCP STORM DRAIN

2:1

A-A

68+0069+00

70+00

71+0072+00

435+00436+00

437+00438+00

439+00

TS: 4

38+5

8.32

X X X X X X X X X X X X X X X X X X X X X

X X X

X X X X

X X X X X XX

XX

BC: 6

7+60

.00

PRC:

67+8

3.97

EC: 6

8+08

.88 BC: 7

0+40

.01

PRC:

70+5

7.97

EC: 7

0+76

.85

BC: 7

2+26

.38

EC: 7

2+35

.76

100' R.O.W.

PROTECT-IN-PLACE 16" KINDER-MORGAN FUEL LINE

14'

B-B

10'

12'

8'

CUT, CAP, AND REMOVE ABANDONED KINDER-MORGAN10" FUEL LINE ACROSS CHANNEL

PERM. C.I.P. REINFORCING WALL

EXIST. CHANNEL WALL

EXIST. 42" RCP STORM DRAIN

PERM. RETAINING WALL (W/OTIEBACKS OR ANCHORS)

PERM. C.I.P. REIN-FORCING WALL

EXIST. CHANNEL WALL

PROPOSED BIOSWALE

CUT, CAP, & REMOVE ABANDONED 8" NAVY FUEL LINE

PERM. RETAINING WALL

CONSTRUCT AREA DRAIN &INLET, AND OUTFALL IN SIDEOF EXIST. CHANNEL WALL

JACKING PIT(30'Lx20'Wx19'D)

COYOTE CREEK CHANNEL ℄

REMOVEABANDONED

SHORING

TEMPORARYSHORING WALL

PROTECT-IN-PLACE SPRINT FIBER OPTIC LINES

TEMPORARY SHORING WALL

PROPOSED OC LOOP ℄

REMOVE EXIST. 42" AND18" STORM DRAIN PIPES & CAP@ EXIST. CHANNEL WALL

CONSTRUCT HEADWALL & OUTFALLIN SIDE OF EXIST. CHANNEL WALL

14'8'

X X X X X X X X X X X X X X X X X X X X

CUT, CAP, & REMOVE ABANDONED 8" NAVY FUEL LINEJACK 120'L x 10'H X 12'W RCB

STA

= 71

+35.5

3EL

= 65

.75

-4.90%

0.50%

PVIS = 68+10.00PVIE = 56.50

K = 19.57L = 100.00'

BVCE

= 56

.39

EVCS

= 68

+60.0

0EV

CE =

54.05

HPS

= 67

+64.1

1HP

E =

56.40

PVIS = 70+26.85PVIE = 45.87

K = 18.52L = 100.00'

BVCS

= 69

+76.8

5BV

CE =

48.32

EVCS

= 70

+76.8

5EV

CE =

46.12

LPS

= 70

+67.5

9LP

E =

46.10

PVIS = 72+46.85PVIE = 46.97

K = 22.73L = 100.00'

BVCS

= 71

+96.8

5BV

CE =

46.72

BOTTOM OF CHANNEL WALL (8'-16' RT)(TOP/FOOTING)

TOP OF EXIST. CHANNEL WALL (8'-16' RT)

EX. TOP OF RAIL @ BIKEWAY ℄

JACKING PIT (30'Lx20'Wx19'D)

PROP. OC LOOP PROFILE @ BIKEWAY ℄JACK 120'L x 10'H X 12'W RCB

PROTECT-IN-PLACE SPRINT FIBER OPTIC LINESACROSS BRIDGE

PROTECT-IN-PLACE KINDER-MORGAN16" FUEL LINE ACROSS BRIDGE

EXIST. 42" RCP OUTFALL(TO BE REROUTED)

PROPOSED SIDE DRAIN

PROPOSED SIDE DRAIN

SHAFTS ARE SHOWN FOR PLANNING PURPOSES ONLY. SHAFT VOLUME SHOWNDOES NOT IMPLY THE AREA IS FREE OF UTILITIES. CONTRACTOR IS TO RELOCATE

OR PROTECT IN PLACE ALL CONFLICTING UTILITIES. CONTRACTOR IS TO SIZE,LOCATE, AND DESIGN SHAFT FOR THEIR CONSTRUCTION MEANS AND METHODS

AND IN COMPLIANCE WITH THE SPECIFICATIONS (TYPICAL)

EXTEND SHAFT SHORING SYSTEM ABOVE GROUNDTO PROTECT FROM INCIDENTAL RAINFALL

RUN-OFF & TO PROTECT WORKERS

Co

un

ty

o

f O

ra

ng

e

DE

SIG

NE

D B

Y:

FILE

N

AM

E:

DR

AW

IN

G N

O:

PLO

T D

AT

E:

SC

ALE

:

CH

EC

KE

D B

Y:

DR

AW

N B

Y:

PR

EP

AR

ED

U

ND

ER

T

HE

R

ES

PO

NS

IB

LE

C

HA

RG

E O

F:

DA

TE

MA

RK

DE

SC

RIP

TIO

NA

PP

R.

DA

TE

OF

SHEET

COUN

TY ORANGEOF

CAL I FORN I A

Publ

icW

orks

320 G

odda

rd W

ay S

uite 2

00Irv

ine C

alifor

nia 92

618 U

SAT

1 94

9 648

5200

F 1

949 6

48 52

99W

www

.ghd.c

om

GHD

Inc.

Plot

Date:

Filen

ame:

4 Apr

il 202

0 - 2:45

PM

N:\U

S\Irv

ine\P

rojec

ts\56

1\112

0677

2\Digi

tal_D

esign

\ACA

D 20

18\C

ivil 3

D\11

2067

72-D

C-Co

rr-UP

-Fire

stone

-I5.dw

gPl

otted

By:E

rika H

all

PR

EP

AR

ED

B

Y:

N

0 40'20'10'

OC

L

OO

P

SE

GM

EN

TS

O

, P

, Q

ST

A 6

8+

50

T

O S

TA

7

3+

50

UP

RR

B

OX

-J

AC

K

UN

DE

RC

RO

SS

IN

G

C-106

15

_ __

C-1

06

11206772-D

C-C

orr-U

P-F

irestone-I5.dw

g

####

6

AS

S

HO

WN

bbreckenridge
Text Box
Note: These are predesign drawings and subject to modification during design.
Page 6: APPENDIX A3 2020 UPDATED CROSSINGS PLANS Note: These …

EC: 6

2+15

.87

BC: 6

2+80

.78

EC: 6

3+02

.18

429+00 430+00 431+00 432+00 433+00

TS: 4

31+5

2.80

SC: 4

32+2

7.80

CS: 4

32+3

5.41

ST: 4

33+1

0.41

COYOTE CREEK CHANNEL ℄

62+00

63+00 64+00 65+00 66+00 67+00

EXIST. CHANNEL WALL

PROPOSED OC LOOP ℄

14'10'

PROPOSED MSERETAINING WALL

RIGHT-OF-WAY

10'14'

1.5:1

MAX

1.5:1

MAX

EL =

55.26

STA

= 62

+00.9

3

TOP OF EXIST. CHANNEL WALL

PROP. OC LOOP PROFILE @ BIKEWAY ℄

BOTTOM OF CHANNEL WALL(TOP/FOOTING)

4.90%

PROPOSED MSERETAINING WALL

Co

un

ty

o

f O

ra

ng

e

DE

SIG

NE

D B

Y:

FILE

N

AM

E:

DR

AW

IN

G N

O:

PLO

T D

AT

E:

SC

ALE

:

CH

EC

KE

D B

Y:

DR

AW

N B

Y:

PR

EP

AR

ED

U

ND

ER

T

HE

R

ES

PO

NS

IB

LE

C

HA

RG

E O

F:

DA

TE

MA

RK

DE

SC

RIP

TIO

NA

PP

R.

DA

TE

OF

SHEET

COUN

TY ORANGEOF

CAL I FORN I A

Publ

icW

orks

320 G

odda

rd W

ay S

uite 2

00Irv

ine C

alifor

nia 92

618 U

SAT

1 94

9 648

5200

F 1

949 6

48 52

99W

www

.ghd.c

om

GHD

Inc.

Plot

Date:

Filen

ame:

9 Sep

tembe

r 202

0 - 4:44

PM

N:\U

S\Irv

ine\P

rojec

ts\56

1\112

0677

2\Digi

tal_D

esign

\ACA

D 20

18\C

ivil 3

D\11

2067

72-D

C-Co

rr-UP

-Ove

rcros

sing.d

wgPl

otted

By:M

yung

Cho

o

PR

EP

AR

ED

B

Y:

N

0 40'20'10'

OC

L

OO

P

SE

GM

EN

TS

O

, P

, Q

ST

A 6

8+

50

T

O S

TA

7

3+

50

UP

RR

OV

ER

CR

OS

SIN

G

1 O

F 3

C-106A

15

_ __

C-1

06

11206772-D

C-C

orr-U

P-O

vercrossing.dw

g

####

6

AS

S

HO

WN

bbreckenridge
Text Box
Note: These are predesign drawings and subject to modification during design.
Page 7: APPENDIX A3 2020 UPDATED CROSSINGS PLANS Note: These …

434+00 435+00 436+00 437+00 438+00

ADJUST EXIST. OVERHEADPOWER LINES

12' 8'

67+00 68+00 69+00 70+00 71+00 72+00

COYOTE CREEK CHANNEL ℄

EXIST. CHANNEL WALL

PROPOSED OC LOOP ℄

PROPOSED MSERETAINING WALL

RIGHT-OF-WAY

10'14'

1.5:1

MAX

1.5:1

MAX

100' R.O.W.

10'14'

EX. TOP OF RAIL @ BIKEWAY ℄EL =65.76

PVIS = 70+72.46PVIE = 97.97

K = 10.23L = 150.00'G1 = 4.90%G2 = -9.76%

BVCS

= 69

+97.4

6BV

CE =

94.29

EVCS

= 71

+47.4

6EV

CE =

90.65

HPS

= 70

+47.6

1HP

E =

95.52

100' ROW

℄ U.P.R.R.

PREFAB. STEEL TRUSS BRIDGE

MIN.

CLE

ARAN

CE =

24'

9'

4.90% -9.74%

TOP OF EXIST. CHANNEL WALL

PROP. OC LOOP PROFILE @ BIKEWAY ℄

BOTTOM OF CHANNEL WALL(TOP/FOOTING)

PROPOSED MSERETAINING WALL PROPOSED MSE

RETAINING WALL

Co

un

ty

o

f O

ra

ng

e

DE

SIG

NE

D B

Y:

FILE

N

AM

E:

DR

AW

IN

G N

O:

PLO

T D

AT

E:

SC

ALE

:

CH

EC

KE

D B

Y:

DR

AW

N B

Y:

PR

EP

AR

ED

U

ND

ER

T

HE

R

ES

PO

NS

IB

LE

C

HA

RG

E O

F:

DA

TE

MA

RK

DE

SC

RIP

TIO

NA

PP

R.

DA

TE

OF

SHEET

COUN

TY ORANGEOF

CAL I FORN I A

Publ

icW

orks

320 G

odda

rd W

ay S

uite 2

00Irv

ine C

alifor

nia 92

618 U

SAT

1 94

9 648

5200

F 1

949 6

48 52

99W

www

.ghd.c

om

GHD

Inc.

Plot

Date:

Filen

ame:

9 Sep

tembe

r 202

0 - 5:04

PM

N:\U

S\Irv

ine\P

rojec

ts\56

1\112

0677

2\Digi

tal_D

esign

\ACA

D 20

18\C

ivil 3

D\11

2067

72-D

C-Co

rr-UP

-Ove

rcros

sing.d

wgPl

otted

By:M

yung

Cho

o

PR

EP

AR

ED

B

Y:

N

0 40'20'10'

OC

L

OO

P

SE

GM

EN

TS

O

, P

, Q

ST

A 6

8+

50

T

O S

TA

7

3+

50

UP

RR

OV

ER

CR

OS

SIN

G

2 O

F 3

C-106B

15

_ __

C-1

06

11206772-D

C-C

orr-U

P-O

vercrossing.dw

g

####

6

AS

S

HO

WN

bbreckenridge
Text Box
Note: These are predesign drawings and subject to modification during design.
Page 8: APPENDIX A3 2020 UPDATED CROSSINGS PLANS Note: These …

BC: 7

2+56

.72

EC: 7

2+67

.18

BC: 7

4+94

.58

PRC: 75+21.21

EC: 7

5+53

.09

BC: 7

5+77

.88

439+00 440+00441+00

442+00

TS: 4

38+5

8.32

SC: 4

39+9

5.82

CS: 4

41+3

7.52

ST: 4

41+8

7.52

PI: 4

42+2

6.84

OPEN CUT S. FIRESTONE BLVD.& INSTALL 76' - 9.5'H X 12'W RCB

EXIST. CHANNEL WALL

PERM.RETAINING WALL

(W/O TIEBACKSOR ANCHORS)

COYOTE CREEK CHANNEL ℄

S. FIRESTONE BLVD. ℄

PROPOSED OC LOOP ℄

72+00 73+00 74+00 75+0012'8'

PROPOSED MSERETAINING WALL

RIGHT-OF-WAY

8'12'

PVIS = 75+12.96PVIE = 54.99

K = 4.29L = 50.00'

G1 = -9.76%G2 = 1.91%

BVCS

= 74

+87.9

6BV

CE =

57.43

EVCS

= 75

+37.9

6EV

CE =

55.47

LPS

= 75

+29.7

7LP

E =

55.39

STA

= 75

+82.9

8TOP OF EXIST. CHANNEL WALL

BOTTOM OF CHANNEL WALL(TOP/FOOTING)

OPEN CUT S. FIRESTONE BLVD. &INSTALL 76' - 9.5'H X 12'W RCB

PROP. OC LOOP PROFILE @ BIKEWAY ℄

-9.74%

PROPOSED MSERETAINING WALL

Co

un

ty

o

f O

ra

ng

e

DE

SIG

NE

D B

Y:

FILE

N

AM

E:

DR

AW

IN

G N

O:

PLO

T D

AT

E:

SC

ALE

:

CH

EC

KE

D B

Y:

DR

AW

N B

Y:

PR

EP

AR

ED

U

ND

ER

T

HE

R

ES

PO

NS

IB

LE

C

HA

RG

E O

F:

DA

TE

MA

RK

DE

SC

RIP

TIO

NA

PP

R.

DA

TE

OF

SHEET

COUN

TY ORANGEOF

CAL I FORN I A

Publ

icW

orks

320 G

odda

rd W

ay S

uite 2

00Irv

ine C

alifor

nia 92

618 U

SAT

1 94

9 648

5200

F 1

949 6

48 52

99W

www

.ghd.c

om

GHD

Inc.

Plot

Date:

Filen

ame:

9 Sep

tembe

r 202

0 - 5:04

PM

N:\U

S\Irv

ine\P

rojec

ts\56

1\112

0677

2\Digi

tal_D

esign

\ACA

D 20

18\C

ivil 3

D\11

2067

72-D

C-Co

rr-UP

-Ove

rcros

sing.d

wgPl

otted

By:M

yung

Cho

o

PR

EP

AR

ED

B

Y:

N

0 40'20'10'

OC

L

OO

P

SE

GM

EN

TS

O

, P

, Q

ST

A 6

8+

50

T

O S

TA

7

3+

50

UP

RR

OV

ER

CR

OS

SIN

G

3 O

F 3

C-107

15

_ __

C-1

06

11206772-D

C-C

orr-U

P-O

vercrossing.dw

g

####

6

AS

S

HO

WN

bbreckenridge
Text Box
Note: These are predesign drawings and subject to modification during design.
bbreckenridge
Text Box
Note: This is C-107 with the alternative bridge design.
Page 9: APPENDIX A3 2020 UPDATED CROSSINGS PLANS Note: These …

© 2020 Microsoft Corporation © 2019 DigitalGlobe ©CNES (2019) Distribution Airbus DS

18+0

019

+00

18+0

0

19+0

0

1.5:1

1.5:1

2:1

2:1C-C

73+00 74+00 75+00

76+00

77+00

439+00440+00 441+00

442+00

443+00PI

: 442

+26.8

4

ST: 4

41+8

7.52

CS: 4

41+3

7.52

SC: 4

39+9

5.82

BC: 7

3+49

.12

PRC:

74+7

7.52

PRC: 75+17.89

EC: 7

5+57

.22

BC: 7

5+78

.73

EC: 7

5+96

.19

8'

PERM. RETAINING WALL(W/O TIEBACKS OR ANCHORS)

PERM. C.I.P. REINFORCING WALLC.I.P. RETAINING WALL

COYOTE CREEK CHANNEL ℄

S. FIRESTONE BLVD. ℄I-5 ℄

ABUTMENT #4

ABUTMENT #5

OPEN CUT S. FIRESTONE BLVD.& INSTALL 76' - 9'H X 12'W RCB

WINGWALL

EXIST. CHANNEL WALL

AC DIKE

12' 12'8'

I-5 ℄

1.5:1

4.90%

1.91%

PVIS = 73+61.79PVIE = 52.60

K = 33.47L = 100.00'

BVCS

= 73

+11.7

9BV

CE =

50.15

EVCS

= 74

+11.7

9EV

CE =

53.56

PVIS = 72+46.85PVIE = 46.97

K = 22.73L = 100.00'

EVCS

= 72

+96.8

5EV

CE =

49.42

STA

= 75

+84.7

8EL

= 65

.879'

MIN.

CLE

ARAN

CE

STA

= 75

+84.0

6EL

= 60

.50 STA

= 76

+51.5

3EL

= 62

.50

BOTTOM OF CHANNEL WALL (8'-30' RT)(TOP/FOOTING)

TOP OF CHANNEL WALL (8'-30' RT)

I-5 BRIDGE TOP OF DECK @ BIKEWAY ℄I-5 BRIDGE SOFFIT @ BIKEWAY ℄

I-5 BRIDGE ABUTMENT BOTTOM OF FOOTINGPROP. OC LOOP PROFILE @ BIKEWAY ℄

TOP OF 1.5:1 SLOPE @ ABUTMENT #4 (15.2' RT)TOP OF 1.5:1 SLOPE @ ABUTMENT #5 (15.7' LT)

OPEN CUT S. FIRESTONE BLVD& INSTALL 76' - 9'H X 12'W RCB

2.1'±

2.1'±

EXISTING ROADWAY 12" M

IN. C

OVER

Co

un

ty

o

f O

ra

ng

e

DE

SIG

NE

D B

Y:

FILE

N

AM

E:

DR

AW

IN

G N

O:

PLO

T D

AT

E:

SC

ALE

:

CH

EC

KE

D B

Y:

DR

AW

N B

Y:

PR

EP

AR

ED

U

ND

ER

T

HE

R

ES

PO

NS

IB

LE

C

HA

RG

E O

F:

DA

TE

MA

RK

DE

SC

RIP

TIO

NA

PP

R.

DA

TE

OF

SHEET

COUN

TY ORANGEOF

CAL I FORN I A

Publ

icW

orks

320 G

odda

rd W

ay S

uite 2

00Irv

ine C

alifor

nia 92

618 U

SAT

1 94

9 648

5200

F 1

949 6

48 52

99W

www

.ghd.c

om

GHD

Inc.

Plot

Date:

Filen

ame:

1 Apr

il 202

0 - 11:0

9 AM

N:\U

S\Irv

ine\P

rojec

ts\56

1\112

0677

2\Digi

tal_D

esign

\ACA

D 20

18\C

ivil 3

D\11

2067

72-D

C-Co

rr-UP

-Fire

stone

-I5.dw

gPl

otted

By:E

rika H

all

PR

EP

AR

ED

B

Y:

N

0 40'20'10'

OC

L

OO

P

SE

GM

EN

TS

O

, P

, Q

ST

A 7

3+

50

T

O S

TA

7

8+

00

S. F

IR

ES

TO

NE

&

I-5

UN

DE

RC

RO

SS

IN

G

C-107

15

_ __

C-1

07

11206772-D

C-C

orr-U

P-F

irestone-I5.dw

g

####

7

AS

S

HO

WN

bbreckenridge
Text Box
Note: These are predesign drawings and subject to modification during design.
Page 10: APPENDIX A3 2020 UPDATED CROSSINGS PLANS Note: These …

© 2020 Microsoft C

orporation © 2019 DigitalGlobe ©CNES (2019) Distribution Airbus DS

18+00

19+00

63+00

64+00

1.5:1

1.5:1

1.5:1

1.5:1

2:1 M

AX

VARI

ES

2:1 2:1

D-D

E-E

77+00

78+00

79+00

80+00

81+00

443+00

444+00

445+00

446+00

TS: 443+96.11

ST: 4

46+9

5.71

CS: 4

46+4

5.71

SC: 4

44+4

6.11

BC: 77+99.58

EC: 7

8+10

.95

BC: 7

8+49

.33

PRC: 78+84.57 EC: 7

9+83

.50

BC: 8

0+50

.48

I-5 ℄N. FIRESTONE BLVD. ℄

COYOTE CREEK CHANNEL ℄ABUTMENT #4

ABUTMENT #4

ABUTMENT #5

EXIST. 90" SDEXIST. 2-48" SD

EXIST. CRIMSON &CHEVRON PIPELINES

RECONSTRUCTACCESS DWY

EXIST. OUTFALLSTRUCTURE

EXIST. OUTFALLSTRUCTURE

CONSTRUCT INLET & CONNECT TOEXIST. OUTFALL STRUCTURE

ABUTMENT #4

ABUTMENT #5

AC DIKE

1.5:1

1.5:1

12'

8'

14'10

'

PROPOSEDBIOSWALE

10'

14'

SPLIT-FACE BLOCKWALLOR HIGH CONCRETE CURB

4.90%

-0.00%

PVIS = 80+26.28PVIE = 69.15

K = 20.41L = 100.00'

BVCS

= 79

+76.2

8BV

CE =

66.70

EVCS

= 80

+76.2

8EV

CE =

69.15

HPS

= 80

+76.2

7HP

E =

69.15

PVIS = 78+97.67PVIE = 62.85

K = 33.47L = 100.00'

BVCS

= 78

+47.6

7BV

CE =

61.89

EVCS

= 79

+47.6

7EV

CE =

65.30

STA

= 81

+00.0

0

STA

= 78

+46.8

2EL

= 70

.89

STA

= 77

+96.9

3EL

= 70

.06

1.5'±

9' MI

N. C

LEAR

ANCE

STA

= 77

+25.5

4EL

= 64

.50MIN. 36" DEPTH OFCOVER REQUIREDPER CFR 195.248

1.5'± 1.7

BOTTOM OF CHANNEL WALL (TOP/FOOTING)

TOP OF CHANNEL WALL (17'-50' RT)

N. FIRESTONE BRIDGESOFFIT @ BIKEWAY ℄

N. FIRESTONE BRIDGE TOPOF DECK @ BIKEWAY ℄

N. FIRESTONE BRIDGE ABUTMENT #4BOTTOM OF FOOTING

N. FIRESTONE BRIDGE ABUTMENT #5BOTTOM OF FOOTING (14.7' LT)

PROP. OC LOOP PROFILE @ CL

8" CRIMSON CRUDE PIPELINE8" CHEVRON PRODUCTS PIPELINE

6" CRIMSON DRY GAS PIPELINE(POTHOLE ALL PIPELINES TO VERIFY DEPTHOF COVER)

TOP OF 1.5:1 SLOPE @ ABUTMENT #4

TOP OF 1.5:1 SLOPE @ ABUTMENT #5 (14.7' LT)

EXIST. 90" SDAT BIKEWAY ℄ (POTHOLE TO VERIFY DEPTH OF COVER)

EXIST. 2-48" SDAT BIKEWAY ℄

I-5 BRIDGE TOP OF DECK @ BIKEWAY ℄

I-5 BRIDGE SOFFIT @ BIKEWAY ℄

TOP OF 1.5:1 SLOPE @ABUTMENT #4 (15.2' RT)

TOP OF 1.5:1 SLOPE @ABUTMENT #5 (15.7' LT)

I-5 BRIDGE ABUTMENTBOTTOM OF FOOTING

I-5 BRIDGE ABUTMENTBOTTOM OF FOOTING

Co

un

ty

o

f O

ra

ng

e

DE

SIG

NE

D B

Y:

FILE

N

AM

E:

DR

AW

IN

G N

O:

PLO

T D

AT

E:

SC

ALE

:

CH

EC

KE

D B

Y:

DR

AW

N B

Y:

PR

EP

AR

ED

U

ND

ER

T

HE

R

ES

PO

NS

IB

LE

C

HA

RG

E O

F:

DA

TE

MA

RK

DE

SC

RIP

TIO

NA

PP

R.

DA

TE

OF

SHEET

COUN

TY ORANGEOF

CAL I FORN I A

Publ

icW

orks

320 G

odda

rd W

ay S

uite 2

00Irv

ine C

alifor

nia 92

618 U

SAT

1 94

9 648

5200

F 1

949 6

48 52

99W

www

.ghd.c

om

GHD

Inc.

Plot

Date:

Filen

ame:

2 Apr

il 202

0 - 2:07

PM

N:\U

S\Irv

ine\P

rojec

ts\56

1\112

0677

2\Digi

tal_D

esign

\ACA

D 20

18\C

ivil 3

D\11

2067

72-D

C-Co

rr-UP

-Fire

stone

-I5.dw

gPl

otted

By:E

rika H

all

PR

EP

AR

ED

B

Y:

0 40'20'10'

OC

L

OO

P

SE

GM

EN

TS

O

, P

, Q

ST

A 7

8+

00

T

O S

TA

8

2+

00

I-5

&

N

. F

IR

ES

TO

NE

CR

OS

SIN

G

C-108

15

_ __

C-1

08

11206772-D

C-C

orr-U

P-F

irestone-I5.dw

g

####

8

AS

S

HO

WN

N

bbreckenridge
Text Box
Note: These are predesign drawings and subject to modification during design.
Page 11: APPENDIX A3 2020 UPDATED CROSSINGS PLANS Note: These …

Co

un

ty

o

f O

ra

ng

e

DE

SIG

NE

D B

Y:

FILE

N

AM

E:

DR

AW

IN

G N

O:

PLO

T D

AT

E:

SC

ALE

:

CH

EC

KE

D B

Y:

DR

AW

N B

Y:

PR

EP

AR

ED

U

ND

ER

T

HE

R

ES

PO

NS

IB

LE

C

HA

RG

E O

F:

DA

TE

MA

RK

DE

SC

RIP

TIO

NA

PP

R.

DA

TE

OF

SHEET

COUN

TY ORANGEOF

CAL I FORN I A

Publ

icW

orks

320 G

odda

rd W

ay S

uite 2

00Irv

ine C

alifor

nia 92

618 U

SAT

1 94

9 648

5200

F 1

949 6

48 52

99W

www

.ghd.c

om

GHD

Inc.

Plot

Date:

Filen

ame:

8 Apr

il 202

0 - 4:28

PM

N:\U

S\Irv

ine\P

rojec

ts\56

1\112

0677

2\Digi

tal_D

esign

\ACA

D 20

18\S

heets

\Civi

l\112

0677

2-C-

110-

BNSF

IndLe

ad.dw

gPl

otted

By:E

rika H

all

PR

EP

AR

ED

B

Y:

N

0 40'20'10'

----

SE

GM

EN

TS

O

, P

, Q

ST

A 9

5+

50

T

O S

TA

9

9+

00

BN

SF

IN

DU

ST

RIA

L

LE

AD

A

T-G

RA

DE

CR

OS

SIN

G

C-110

15

----

----

----

C-1

10

11206772-C

-110-B

NS

FIndLead.dw

g

----

10

AS

S

HO

WN

96+00

97+00

98+00 99+00

PC: 9

5+82

.41

Mid:

95+9

6.57

PT: 96+10.72

PC: 96+69.79 Mid:

96+8

3.57

PT: 9

6+97

.35

PC: 9

7+46

.31

Mid:

97+5

5.69

PT: 9

7+65

.06

PC: 9

7+94

.20

Mid:

98+4

4.61

PT: 98+95.03

462+00

463+00464+00

TS: 4

62+8

3.66

SC: 4

64+5

2.64

2.63% -1.30%

0.00%

EL =

68.00

STA

= 97

+13.1

8

PVI STA = 96+00.00PVI EL = 65.02

K = 50.93L = 100.00'

BVCE

= 64

.69

EVCS

= 96

+50.0

0EV

CE =

66.34

PVI STA = 99+00.00PVI EL = 66.00

K = 63.31L = 100.00'

BVCS

= 98

+50.0

0BV

CE =

66.65

bbreckenridge
Text Box
Note: These are predesign drawings and subject to modification during design.
Page 12: APPENDIX A3 2020 UPDATED CROSSINGS PLANS Note: These …

491+00

492+00

493+00

494+00 495+00

125+00

126+00

127+00

128+00 129+00

BC: 1

25+1

4.56

EC: 1

25+7

4.48

BC: 1

28+0

3.83

EC: 1

28+5

2.73

BC: 1

28+8

1.78

X X X X X

X X X

B-B

C-C

JACKING PIT (30'Lx20'Wx21'D)

REMOVE HEADWALL & CONSTRUCT AREA DRAIN

REMOVE EXIST. 36" SIDE DRAIN PIPE TOA POINT WHERE IT DOESN'T INTERFEREWITH BOX JACK & CAP WITH STEEL PLATE

CONTRACTOR MAY ENCOUNTERREMNANTS OF BURIED TRESTLE

PROTECT-IN-PLACE EXIST. AT&T DUCT BANK IN CONCRETE BOX GIRDERREMOVE HEADWALL& GRADE TO DRAIN

REMOVE EXIST. 24" SIDE DRAIN PIPE TOA POINT WHERE IT DOESN'T INTERFEREWITH BOX JACK & CAP WITH STEEL PLATE

PERM. RETAINING WALL(W/O TIEBACKS OR ANCHORS)CONSTRUCT HEADWALL & SIDE DRAIN

(OUTFALL INTO SIDE OF EXISTING CHANNEL WALL)

TEMPORARY SHORING WALL PERM. C.I.P. REINFORCING WALL

PERM. C.I.P. REINFORCING WALL

PERM. RETAINING WALL(W/O TIEBACKS OR ANCHORS)

PROPOSEDBIOSWALE

EXIST. CHANNEL WALL

EXIST. CHANNEL WALL

6' CHEVRON OILR.O.W.

100' R.O.W.

X X X X

CUT, CAP, & REMOVE ABAN.8" CHEVRON OIL PIPELINE

CUT, CAP, & REMOVEABANDONED 8" CHEVRON OIL PIPELINE

TEMPORARY SHORING WALLS (IF REQUIRED FOR REMOVAL OF EXISTING SIDE DRAINS)

CONSTRUCT AREA DRAIN, INLET & OUTFALLINTO SIDE OF EXISTING CHANNEL WALL

A-A

12'8'

14'10'

12'

8'

STA

= 12

6+54

.95EL

= 97

.28

STA

= 12

6+69

.77EL

= 97

.73

STA

= 12

6+85

.44EL

= 97

.53

-4.90%

0.50%

4.90%

PVI STA = 125+45.00PVI EL = 73.00

K = 18.52L = 100.00'

BVCS

= 12

4+95

.00BV

CE =

75.45

EVCS

= 12

5+95

.00EV

CE =

73.25

PVI STA = 127+94.00PVI EL = 74.25

K = 22.71L = 100.00'

BVCS

= 12

7+44

.00BV

CE =

74.00

EVCS

= 12

8+44

.00EV

CE =

76.70

STA

= 12

5+90

.74EL

= 73

.26 LP

1.7'±

BOTTOM OF CHANNEL WALL (8' RT)

TOP OF CHANNEL WALL (8' RT)

EG @ BIKEWAY ℄

EX. TOP OF RAIL@ BIKEWAY ℄

PROTECT-IN-PLACE EXIST. AT&T DUCT BANK IN CONCRETE BOX GIRDER

JACKING PIT (30'Lx20'Wx21'D)

PROP. OC LOOP PROFILE @ CL

JACK 144'L x 10'H x 12'W BOX

TOP OF CHANNEL WALL (10' RT)

CUP, CAP, & REMOVE ABANDONED8" CHEVRON OIL PIPELINE

PROTECT-IN-PLACEINACTIVE AT&T CABLES

BOTTOM OF CHANNEL WALL (10' RT)

REMOVE EXIST. 36" SIDE DRAINREMOVE EXIST. 24" SIDE DRAIN

PROPOSED SIDE DRAINPROPOSED SIDE DRAIN

SHAFTS ARE SHOWN FOR PLANNING PURPOSES ONLY. SHAFT VOLUME SHOWNDOES NOT IMPLY THE AREA IS FREE OF UTILITIES. CONTRACTOR IS TO RELOCATEOR PROTECT IN PLACE ALL CONFLICTING UTILITIES. CONTRACTOR IS TO SIZE,LOCATE, AND DESIGN SHAFT FOR THEIR CONSTRUCTION MEANS AND METHODSAND IN COMPLIANCE WITH THE SPECIFICATIONS (TYPICAL)

EXTEND SHAFT SHORING SYSTEM ABOVE GROUNDTO PROTECT FROM INCIDENTAL RAINFALLRUN-OFF & TO PROTECT WORKERS

Co

un

ty

o

f O

ra

ng

e

DE

SIG

NE

D B

Y:

FILE

N

AM

E:

DR

AW

IN

G N

O:

PLO

T D

AT

E:

SC

ALE

:

CH

EC

KE

D B

Y:

DR

AW

N B

Y:

PR

EP

AR

ED

U

ND

ER

T

HE

R

ES

PO

NS

IB

LE

C

HA

RG

E O

F:

DA

TE

MA

RK

DE

SC

RIP

TIO

NA

PP

R.

DA

TE

OF

SHEET

COUN

TY ORANGEOF

CAL I FORN I A

Publ

icW

orks

320 G

odda

rd W

ay S

uite 2

00Irv

ine C

alifor

nia 92

618 U

SAT

1 94

9 648

5200

F 1

949 6

48 52

99W

www

.ghd.c

om

GHD

Inc.

Plot

Date:

Filen

ame:

3 Apr

il 202

0 - 8:07

AM

N:\U

S\Irv

ine\P

rojec

ts\56

1\112

0677

2\Digi

tal_D

esign

\ACA

D 20

18\C

ivil 3

D\11

2067

72-D

C-Co

rr-BN

SF.dw

gPl

otted

By:E

rika H

all

PR

EP

AR

ED

B

Y:

N

0 40'20'10'

OC

L

OO

P

SE

GM

EN

TS

O

, P

, Q

ST

A 1

24

+5

0 T

O S

TA

1

29

+5

0

BN

SF

/M

ET

RO

LIN

K

BO

X-J

AC

K

UN

DE

RC

RO

SS

IN

G

C-111

15

_ __

C-1

11

11206772-D

C-C

orr-B

NS

F.dw

g

####

11

AS

S

HO

WN

bbreckenridge
Text Box
Note: These are predesign drawings and subject to modification during design.
Page 13: APPENDIX A3 2020 UPDATED CROSSINGS PLANS Note: These …

79+00

80+00

81+00

82+00

83+0084+00 85+00

86+00

87+00

88+00

89+0090+00

497+

0049

8+00

499+

00

90+00

91+00

92+00

93+0094+00

95+00

96+00

97+00

98+00 99+00

100+00

Co

un

ty

o

f O

ra

ng

e

DE

SIG

NE

D B

Y:

FILE

N

AM

E:

DR

AW

IN

G N

O:

PLO

T D

AT

E:

SC

ALE

:

CH

EC

KE

D B

Y:

DR

AW

N B

Y:

PR

EP

AR

ED

U

ND

ER

T

HE

R

ES

PO

NS

IB

LE

C

HA

RG

E O

F:

DA

TE

MA

RK

DE

SC

RIP

TIO

NA

PP

R.

DA

TE

OF

SHEET

COUN

TY ORANGEOF

CAL I FORN I A

Publ

icW

orks

320 G

odda

rd W

ay S

uite 2

00Irv

ine C

alifor

nia 92

618 U

SAT

1 94

9 648

5200

F 1

949 6

48 52

99W

www

.ghd.c

om

GHD

Inc.

Plot

Date:

Filen

ame:

2 Apr

il 202

0 - 11:2

6 AM

N:\U

S\Irv

ine\P

rojec

ts\56

1\112

0677

2\Digi

tal_D

esign

\ACA

D 20

18\F

igure

s\112

0677

2-Fig

-Stag

eRd-

Preli

m.dw

gPl

otted

By:M

yung

Cho

o

PR

EP

AR

ED

B

Y:

N

0 80'40'20'

OC

L

OO

P

SE

GM

EN

TS

O

, P

, Q

ST

AG

E R

D. C

RO

SS

IN

G

AL

TE

RN

AT

IV

E 2

2

2

----

----

----

C-1

13

11206772-F

ig-S

tageR

d-P

relim

.dw

g

####

2

AS

S

HO

WN

N

bbreckenridge
Text Box
Note: These are predesign drawings and subject to modification during design.