Halton Region Public Information Centre
Trafalgar Road Class EA Study – Steeles Avenue to Highway 7 Summary Report
MMM Group June 2015 Page 10
APPENDIX C
PIC COMMENTS
(June 17, 2015)
1
Stefan Sirianni
From: RALLY Architects [mailto:[email protected]] Sent: July-02-15 8:40 AM
To: Katherine Jim
Cc: Neil Ahmed; 'Sam Ganni' Subject: FW: 11410 Trafalgar Rd
11410 Trafalgar Rd + 12995 17 Sideraod Stewarttown Gas Bar
Good morning Kathrine I wish you had a good holiday and Happy Canada Day I like to coordinate the site plan drawing of our proposed project (Gas Station & Convenience Store) on the Lot at address above. I checked the info on the website , but didn’t manage to download clear PDF. See attachment I need your help: I PDF or basic CAD file for the option of Trafalgar Road alternation, at the intersection of Trafalgar and Maple Ave. I will use that to locate my dwgs on the proposed study. The Study had killed our Project. I need to submit a report to Halton Region to explain the damage that all related options (to this intersection) will cause to our project. This beautiful dream for my client is over. Please also respond to my email below, (before 2 weeks), or direct it to the right person Thank you Rafid Kustou – OAA Architect and Project Manager
1
Stefan Sirianni
On 2015-07-02, at 6:59 AM, > wrote:
Good morning Mr. Reid,
I have been trying to find the diagram(s) of the three alternatives for the Trafalgar Rd at Maple alternatives, as
discussed in the Independent by Lisa Tallyn, but they appear are unavailable in the website. Could you please let
me know how to see them, because the diagrams in the paper are not clear enough.
Many thanks,
1
Stefan Sirianni
From: Reid, Jeffrey <[email protected]>
Sent: June-23-15 1:18 PM
To:
Cc: Katherine Jim; Stefan Sirianni; Monaghan, Patrick
Subject: RE: Trafalgar Road EA
Categories: Print and File / Update Comment Sheet
Ms. ,
Thank-you for your email regarding the Trafalgar Road Class Environmental Assessment (EA) Study from Steeles Avenue
to Highway 7, within the Town of Halton Hills.
You will now be included on the Trafalgar Road mailing list and will automatically receive direct notification for any
upcoming public meetings or notices.
The deadline for submitting comments is Friday, July 3, regarding the information presented as last week’s
meeting. Please find below, the link to the project page and all information is available.
http://www.halton.ca/cms/One.aspx?portalId=8310&pageId=116135
I encourage you to submit comments, where you can email myself directly. Lastly, the Trafalgar Road Project Team has
indicated that our preferred alternative is Alternative 1 (widening along existing Trafalgar Road). We are now going to
focus our efforts along existing Trafalgar Road and will not be pursuing either By-Pass Options (Alternatives 2 or 3).
I hope this helps and please do not hesitate to contact me if you have any additional comments.
Thanks,
Jeff
Jeffrey Reid, C.E.T. | 905.825.6000 x 7920
Acting Supervisor – Transportation Planning | Infrastructure Planning & Policy
From:
Sent: Monday, June 22, 2015 9:42 AM
To: Reid, Jeffrey
Subject: Trafalgar Road EA
I am the President of the Georgetown Soccer Club and would like to join the mailing list for updates on the Trafalgar Road
EA.
I do have concerns about Option 2 and 3 as both would impact soccer fields and our clubhouse at Devereaux House. Is
there a deadline for submiting to the EA and is there a preferred way to go about submitting concerns?
Have a great day