Appendix D: Construction i Fiscal Year 2018-2019 Appendix D: Construction Table of Contents Implementation of Construction General Permit ........................................................ 1 Construction Enforcement Actions Response ........................................................... 1 Construction Self-Audit Compliance Monitoring ....................................................... 7 Combined Review Results ......................................................................................... 7 Administrative Findings .............................................................................................. 8 Field BMP Findings .................................................................................................... 9 BMP Findings of Field BMP Types and Trends ....................................................... 11 Tables 1 Table D-1: Construction Program – SWPPP Implementation July 1, 2018 to June 30, 2019 ................................................................................................................ 1 Table D-2: Summary of Response to Enforcement Actions July 1, 2018 to June 30, 2019 ................................................................................................................ 3 Table D-3: Summary of Findings July 1, 2018 to June 30, 2019 ..................................... 8 Table D-4: Summary of Administrative Findings ............................................................. 9 Table D-5: Summary of Field BMP Findings ................................................................. 10 Table D-6: Findings of Field BMP Types July 1, 2018 to June 30, 2019 ....................... 11 Figures Figure D-1: Combined Findings (All Projects), July 1, 2018 to June 30, 2019 ................ 7 Figure D-2: Administrative Findings (All Projects), July 1, 2018 to June 30, 2019 .......... 9 Figure D-3: Field BMP Findings, July 1, 2018 to June 30, 2019 ................................... 11 Figure D-4: Number of Findings by Field BMP Type ..................................................... 12 1 Dashes (-) in this appendix’s tables indicate that data is not available or not applicable.

Appendix D: Construction · Appendix D: Construction 1 Fiscal Year 2018-2019 Implementation of Construction General Permit Table D-1 shows the total number of active construction

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Appendix D: Construction · Appendix D: Construction 1 Fiscal Year 2018-2019 Implementation of Construction General Permit Table D-1 shows the total number of active construction

Appendix D: Construction i Fiscal Year 2018-2019

Appendix D: Construction Table of Contents

Implementation of Construction General Permit ........................................................ 1

Construction Enforcement Actions Response ........................................................... 1

Construction Self-Audit Compliance Monitoring ....................................................... 7 Combined Review Results ......................................................................................... 7 Administrative Findings .............................................................................................. 8 Field BMP Findings .................................................................................................... 9 BMP Findings of Field BMP Types and Trends ....................................................... 11

Tables1

Table D-1: Construction Program – SWPPP Implementation July 1, 2018 to June 30, 2019 ................................................................................................................ 1

Table D-2: Summary of Response to Enforcement Actions July 1, 2018 to June 30, 2019 ................................................................................................................ 3

Table D-3: Summary of Findings July 1, 2018 to June 30, 2019 ..................................... 8 Table D-4: Summary of Administrative Findings ............................................................. 9 Table D-5: Summary of Field BMP Findings ................................................................. 10 Table D-6: Findings of Field BMP Types July 1, 2018 to June 30, 2019 ....................... 11

Figures

Figure D-1: Combined Findings (All Projects), July 1, 2018 to June 30, 2019 ................ 7 Figure D-2: Administrative Findings (All Projects), July 1, 2018 to June 30, 2019 .......... 9 Figure D-3: Field BMP Findings, July 1, 2018 to June 30, 2019 ................................... 11 Figure D-4: Number of Findings by Field BMP Type ..................................................... 12

1 Dashes (-) in this appendix’s tables indicate that data is not available or not applicable.

Page 2: Appendix D: Construction · Appendix D: Construction 1 Fiscal Year 2018-2019 Implementation of Construction General Permit Table D-1 shows the total number of active construction

Appendix D: Construction ii Fiscal Year 2018-2019

This page was intentionally left blank.

Page 3: Appendix D: Construction · Appendix D: Construction 1 Fiscal Year 2018-2019 Implementation of Construction General Permit Table D-1 shows the total number of active construction

Appendix D: Construction 1 Fiscal Year 2018-2019

Implementation of Construction General Permit

Table D-1 shows the total number of active construction sites and, of those, the total number requiring a SWPPP, and the total number with a SWPPP. It also shows the number of active construction sites requiring a Water Pollution Control Program (WPCP), and the number with a WPCP.

Table D-1: Construction Program – SWPPP Implementation July 1, 2018 to June 30, 2019

District Total # of Active Construction Sites

Total # of Active Construction Sites Requiring a SWPPP

Total # of Active Construction Sites with a SWPPP

Total # of Active Construction Sites Requiring a WPCP

Total # of Active Construction Sites with a WPCP

1 54 13 13 41 41 2 72 30 30 42 42 3 100 21 21 79 79 4 185 54 54 131 131 5 68 19 19 49 49 6 103 27 27 76 76 7 184 62 62 122 122 8 94 36 36 58 58 9 33 5 5 28 28 10 78 10 10 68 68 11 73 34 34 39 39 12 70 21 21 49 49

Total 1114 332 332 782 782

Construction Enforcement Actions Response

Table D-2 summarizes how enforcement actions related to construction activities were addressed during the 2018-2019 fiscal year. This aspect of the Construction Program is discussed in Section 6 of the Annual Report.

Page 4: Appendix D: Construction · Appendix D: Construction 1 Fiscal Year 2018-2019 Implementation of Construction General Permit Table D-1 shows the total number of active construction

Appendix D: Construction 2 Fiscal Year 2018-2019

This page was intentionally left blank.

Page 5: Appendix D: Construction · Appendix D: Construction 1 Fiscal Year 2018-2019 Implementation of Construction General Permit Table D-1 shows the total number of active construction

Appendix D: Construction 3 Fiscal Year 2018-2019

Table D-2: Summary of Response to Enforcement Actions July 1, 2018 to June 30, 2019

District Enforcement Action Type

Project Name and/or Identification Number Incident Date Incident Summary Caltrans Response

Required Incident Resolution Date

Status

1 None - - - - - - 2 SEL Susanville Pavement

Rehabilitation, LAS-36-22.4/29.4

9/13/18 Missing a current SWPPP/WPCP on-site and multiple BMP deficiencies.

A copy of the SWPPP/WPCP was placed onsite and the BMP deficiencies were corrected.

10/2/18 Resolved - Caltrans made corrections and responded to the SEL.

2 SEL Lower Antelope Curve, LAS-36-6.2/7.3

9/13/18 Multiple BMP deficiencies on-site.

BMP deficiencies were corrected.

10/2/18 Resolved - Caltrans made corrections and responded to the SEL.

3 Notice of Violation (Jan 3, 2019)

Smartsville - 03-2F5904

11/26/18 & 11/29/18

Failure to fully install and maintain sediment and erosion controls

Response letter 1/25/19 1/25/2019 Resolved by placing straw and blanket throughout the 20+ acre project site.

3 NOV 2F5904 Route 20 Curve Realignment and Shoulder Widening

1/3/19 Failure to meet Turbidity standards due to lack of effective erosion and sediment controls during the storm on 11/29/2018 and two inspections on 11/26/2018 and 11/29/2018.

- - -

3 SEL 3C3804 Y to Trout Creek, 03-ED-Lake Tahoe Blvd.-75.4/77.3

7/20/18 Incident resulted from a follow up inspection after the initial enforcement action on 5/16/18. SEL issued for unknown reason. No Supporting documentation was available.

General tracking, sediment and erosion control BMPs need to be installed and maintained at a higher standard. Follow-up inspection is needed.

- -

4 NNC Rte 580 and 205 Roadway Rehabilitation, ALA-580, SJ-205

9/26/18 Failure to submit annual report.

- - -

Page 6: Appendix D: Construction · Appendix D: Construction 1 Fiscal Year 2018-2019 Implementation of Construction General Permit Table D-1 shows the total number of active construction

Appendix D: Construction 4 Fiscal Year 2018-2019

District Enforcement Action Type

Project Name and/or Identification Number Incident Date Incident Summary Caltrans Response

Required Incident Resolution Date

Status

4 NNC Rte 580 and 205 Roadway Rehabilitation, ALA-580, SJ-205

11/9/18 Failure to submit annual report. Caltrans must submit annual report by December 7, 2018 to avoid enforcement action, including civil monetary penalties up to $10,000 for each day of violation from the original due date.

- - -

4 SEL Pigeon Point Storm Damage Repair

8/16/18 SEL issued for unknown reason. No supporting documentation was found. Violation for late report 05/31/18.

- - -

4 NOV Pigeon Point Storm Damage Repair

1/2/19 NOV issued for unknown reason. No supporting documentation was found.

- - -

4 NOV Hecker Pass Safety Improvement Project

9/10/18 NOV issued for failure to submit a 2018 annual report by the due date, 5/31/2018.

- - -

5 None - - - - - - 6 None - - - - - - 7 ACL Route 105 Dewatering

Project, LA-105-14.1/14.6

1/28/19 ACL Settlement Offer of $45,000 for EPL issued below. Effluent limitations were exceeded on 15 occasions between July 2017 and June 2018.

Caltrans is on a constant basis of monitoring and treating the exceeded area.

The exceedance is ongoing. The issue is being constantly monitored and treated from an abandon industrial factory.

Caltrans ongoing process of monitoring and maintain the Treatment System.

Page 7: Appendix D: Construction · Appendix D: Construction 1 Fiscal Year 2018-2019 Implementation of Construction General Permit Table D-1 shows the total number of active construction

Appendix D: Construction 5 Fiscal Year 2018-2019

District Enforcement Action Type

Project Name and/or Identification Number Incident Date Incident Summary Caltrans Response

Required Incident Resolution Date

Status

7 EPL Route 105 Dewatering Project, LA-105-14.1/14.6

10/23/18 EPL, Caltrans received EPL No. R4-2018-0104.

Caltrans is on a constant basis of monitoring and treating the exceeded area.

The exceedance is ongoing. The issue is being constantly monitored and treated from an abandon industrial factory.

Caltrans ongoing process of monitoring and maintain the Treatment System.

8 NOV 1K520 74 243 Emergency Repair Project, 08-Riv-74/243

6/18/19 NOV for equipment/vehicle storage BMP deficiencies, unavailable inspection records/REAPs/rain gauge readings, and failure to perform inspections and observations during storms. Caltrans to provide report with corrective actions by 7/5/2019.

- - -

9 None - - - - - - 10 None - - - - - - 11 SEL Descanso

Maintenance Station 2171 Japatul, Descanso, CA 91916

8/8/18 Semi-Annual and Annual Monitoring Report for the Descanso Maintenance Facility

Caltrans respond to San Diego RWQCB explained the location of monitoring, dated 9/13/18. San Diego RWQCB sent a letter and dismissed the SEL, dated 10/16/18

10/16/18 Resolved

11 NOV EA 425701 11-SD-5, Del Mar Heights (Major Permit Project)

1/8/19 Failed to pay $442 for Annual Construction General Permit Fee

Sent a check and paid the fee to State Water Resource Control Board

2/6/19 Resolved

11 13267 Letter Investigative Order No. R9-2019-0014. District 11 is listed as one of the numerous responsible parties.

6/12/19 13267 Letter regarding Investigative Order R9-2019-0014

Requires the submittal of technical and monitoring reports.

Ongoing Ongoing

Page 8: Appendix D: Construction · Appendix D: Construction 1 Fiscal Year 2018-2019 Implementation of Construction General Permit Table D-1 shows the total number of active construction

Appendix D: Construction 6 Fiscal Year 2018-2019

District Enforcement Action Type

Project Name and/or Identification Number Incident Date Incident Summary Caltrans Response

Required Incident Resolution Date

Status

12 1/31/2019 0M3504 - Extend SB 5 Aux. Lane

1/28/19 Failure to fully install sediment controls

Follow up letter stating this was sent to Regional Board on 1/31/19.

1/31/19 Resolved – Installed sediment controls

Page 9: Appendix D: Construction · Appendix D: Construction 1 Fiscal Year 2018-2019 Implementation of Construction General Permit Table D-1 shows the total number of active construction

Appendix D: Construction 7 Fiscal Year 2018-2019

Construction Self-Audit Compliance Monitoring

Combined Review Results

Figure D-1 and Table D-3 present a summary of the total numbers of Independent Quality Assurance (IQA) review findings. The total numbers are further divided into totals of administrative and field BMP findings. Some districts were visited more than others because of the number of projects and the project ranking process. Items of note in the following table are as follows:

• 201 IQA Reviews were conducted in the reporting period • Construction projects were visited in all districts • Very few administrative findings were noted during the IQA review. • Total findings (Administrative and Field BMPs) averaged approximately 12 per

IQA review which is an increase from approximately 9 BMP findings per IQA review during the 2018-2019 reporting period.

0

100

200

300

400

500

600

700

800

1 2 3 4 5 6 7 8 9 10 11 12

Num

ber o

f Fin

ding

s

District

Combined Findings (All Projects),July 1, 2018 to June 30, 2019

Total

Administrative

Field BMPs

Figure D-1: Combined Findings (All Projects), July 1, 2018 to June 30, 2019

Page 10: Appendix D: Construction · Appendix D: Construction 1 Fiscal Year 2018-2019 Implementation of Construction General Permit Table D-1 shows the total number of active construction

Appendix D: Construction 8 Fiscal Year 2018-2019

Table D-3: Summary of Findings July 1, 2018 to June 30, 2019

District Number of Sites Reviewed

Total Number of Findings

Total Number of Administrative

Total Number of Field BMPs

1 17 38 3 35 2 20 47 15 32 3 14 271 11 260 4 28 587 23 564 5 10 181 13 168 6 17 141 24 117 7 42 738 22 716 8 12 92 2 90 9 3 43 3 40

10 6 116 5 111 11 25 168 13 155 12 7 13 4 9

Total 201 2,435 138 2,297

Administrative Findings

Table D-4 and Figure D-2 present the summary of administrative findings separated into several categories. The definitions of each category are as follows:

• Plans and Permits: Whether the SWPPP is located on site and was it developed by a Qualified Stormwater Developer (QSD).

• Training: Whether the Water Pollution Control Manager (WPCM) is certified as a QSD (or Qualified Stormwater Practitioner (QSP) for Water Pollution Control Program (WPCP) construction projects) and is the contractor conducting regular training with adequate documentation.

• SMARTS: Whether appropriate annual reporting is uploaded into SMARTS. • Active Treatment System (ATS): For construction projects that employ an ATS,

are all the required procedures of the ATS followed. • Construction Site Monitoring: Whether all the site monitoring has been

completed, and if an NAL has been exceeded, has a report been developed and reported to the SWRCB.

• Tahoe Permit: Questions regarding the following: o 1) For projects within the Tahoe Permit, has a Restoration Monitoring Plan

been developed? o 2) Are there waste prohibition exemptions on file (100 year floodplain)? o 3) Have all analytical information been uploaded into SMARTS within 5

Items of note in the following table are as follows:

• Administrative findings were encountered during 85 IQA Reviews (42.3%) of the construction projects (multiple Administrative findings were encountered during 33 IQA Reviews).

• No findings were encountered for administrative categories related to the Tahoe Permit or ATS.

Page 11: Appendix D: Construction · Appendix D: Construction 1 Fiscal Year 2018-2019 Implementation of Construction General Permit Table D-1 shows the total number of active construction

Appendix D: Construction 9 Fiscal Year 2018-2019

• Findings in the Training category were encountered most frequently of all administrative categories.

Table D-4: Summary of Administrative Findings

District Number of Sites Reviews

Total Findings

Plans and Permits

Training SMARTs Active Treatment Systems

Construction Site Monitoring

Tahoe Permit

1 17 3 0 3 0 0 0 0 2 20 15 0 11 0 0 4 0 3 14 11 1 8 0 0 2 0 4 28 23 2 13 0 0 8 0 5 10 13 0 4 1 0 8 0 6 17 24 0 9 0 0 15 0 7 42 22 0 9 1 0 12 0 8 12 2 1 0 0 0 1 0 9 3 3 0 1 0 0 2 0 10 6 5 0 5 0 0 0 0 11 25 13 1 5 0 0 7 0 12 7 4 0 2 0 0 2 0

Total 201 138 5 70 2 0 61 0

12

1 1

3

11

8

13

4

9 9

1

5 5

21 1

4

2

8 8

15

12

12

7

2

0

2

4

6

8

10

12

14

16

1 2 3 4 5 6 7 8 9 10 11 12

Num

ber o

f Pro

ject

s

Districts

Administrative FindingsJuly 1, 2018 to June 30, 2019

Plans and Permits

Training

SMARTS

Active Treatment System

Construction Site Monitoring

Tahoe Permit

Figure D-2: Administrative Findings (All Projects), July 1, 2018 to June 30, 2019

Field BMP Findings

Table D-5 and Figure D-3 presents a summary of the field BMP findings separated into the six standard field BMP categories as follows:

• Soil Stabilization: Includes temporary cover of DSAs, temporary run-on and run-through control.

Page 12: Appendix D: Construction · Appendix D: Construction 1 Fiscal Year 2018-2019 Implementation of Construction General Permit Table D-1 shows the total number of active construction

Appendix D: Construction 10 Fiscal Year 2018-2019

• Sediment Control: Includes temporary perimeter control, temporary face of slope controls, temporary check dams and temporary drain inlet protection.

• Tracking Control: Includes stabilized construction entrances and construction roadways.

• Wind Erosion Control: Includes the control of dust throughout the construction site.

• Non-Stormwater Control: Includes dewatering, paving and sawcutting operations, equipment cleaning, fueling, and maintenance, pile driving operations, concrete finishing activities, and working near and over water.

• Materials and Waste Management Control: Includes material storage and use, stockpile management, spill prevention and control, and waste management including solid, hazardous, contaminated soil, concrete, sanitary, and liquid wastes.

Items of note in the following table are as follows:

• The field BMP category of Materials and Waste Management Control constituted 50.3% of the total findings.

• The field BMP category of Sediment Control constituted 28.1% of the total findings.

• The remaining, combined field BMP categories of Soil Stabilization, Tracking Control, Wind Erosion Control, and Non-Stormwater Control constituted 21.5% of the total findings.

Table D-5: Summary of Field BMP Findings

District Number of Sites Reviews

Total Findings

Soil Stabilization

Sediment Control

Tracking Control

Wind Erosion Control

Non-Stormwater Control

Material & Waste Management

1 17 35 2 8 0 1 3 21 2 20 32 2 14 1 0 2 13 3 14 260 36 77 27 1 7 112 4 28 564 55 152 40 3 45 269 5 10 168 23 42 10 0 12 81 6 17 117 9 7 3 3 5 90 7 42 716 40 230 67 4 28 347 8 12 90 1 20 3 1 5 60 9 3 40 0 9 0 0 1 30 10 6 111 16 23 9 1 3 59 11 25 155 9 58 6 0 10 72 12 7 9 0 6 0 0 1 2

Total 201 2,297 193 646 166 14 122 1,156

Page 13: Appendix D: Construction · Appendix D: Construction 1 Fiscal Year 2018-2019 Implementation of Construction General Permit Table D-1 shows the total number of active construction

Appendix D: Construction 11 Fiscal Year 2018-2019

2 2

3655

239

40

116 98 14

77

152

42

7

230

209

23

58

61

2740

10 3

67

3 9 61 1 3 3 4 1 13 2 7

45

125

28

5 1 310 1

21 13

112

269

8190

347

60

30

59 72

20

50

100

150

200

250

300

350

400

1 2 3 4 5 6 7 8 9 10 11 12

Num

ber o

f Pro

ject

s

Districts

Field BMP Findings,July 1, 2018 to June 30, 2019

Soil Stabilization

Sediment Control

Tracking Control

Wind Erosion Control

Non-Stormwater Control

Materials & WasteManagement

Figure D-3: Field BMP Findings, July 1, 2018 to June 30, 2019

BMP Findings of Field BMP Types and Trends

Table D-6 presents a summary of the field BMP findings by field BMP type and specific IQA reviewer observations.

Each field BMP type has standards that regulate the correct application (e.g., is the BMP implemented or implemented as intended?), the correct installation or placement, utilizing the correct materials, and the proper maintenance. The following table indicates the number of findings for each field BMP type that did not meet one of these listed standards.

Table D-6: Findings of Field BMP Types July 1, 2018 to June 30, 2019

BMP Type BMP Name Number of Findings SS-3 Hydraulic Mulch 103 SS-4 Hydroseeding 5 SS-5 Soil Binder 3 SS-6 Straw Mulch 2 SS-7 Geotextiles, Mats, Plastic Covers and Erosion Control Blankets 56 SS-9 Earth Dikes/Drainage Swales and Lined Ditches 11 SS-10 Outlet Protection/Velocity Dissipation Devices 0 SS-11 Slope Drains 0 SC-1 Silt Fence 118 SC-2 Sediment Basin 0 SC-4 Check Dams 30 SC-5 Fiber Rolls 256 SC-6 Gravel Bag Berm 24 SC-7 Street Sweeping and Vacuuming 123 SC-9 Temporary Straw Bale Barrier 1 SC-10 Storm Drain Inlet Protection 94 TC-1 Stabilized Construction Entrance 165 TC-2 Stabilized Construction Roadway 1

Page 14: Appendix D: Construction · Appendix D: Construction 1 Fiscal Year 2018-2019 Implementation of Construction General Permit Table D-1 shows the total number of active construction

Appendix D: Construction 12 Fiscal Year 2018-2019

BMP Type BMP Name Number of Findings WE-1 Wind Erosion Control 14 NS-1 Water Conservation Practices 9 NS-2 Dewatering Operations 2 NS-3 Paving and Grinding Operations 56 NS-6 Illicit Connection/Illegal Discharge 7 NS-8 Vehicle and Equipment Cleaning 0 NS-9 Vehicle and Equipment Fueling 6 NS-10 Vehicle and Equipment Maintenance 23 NS-11 Pile Driving Operations 0 NS-12 Concrete Curing 0 NS-13 Materials and Equipment Use Over Water 4 NS-14 Concrete Finishing 15 NS-15 Structure Demolition Adjacent to Water 0 WM-1 Material Delivery & Storage 190 WM-2 Material Use 8 WM-3 Stockpile Management 235 WM-4 Spill Prevention and Control 55 WM-5 Solid Waste Management 490 WM-6 Hazardous Waste Management 4 WM-7 Contaminated Soil Management 0 WM-8 Concrete Waste Management 155 WM-9 Sanitary/Septic Waste Management 19 WM-10 Liquid Waste Management 0

Figure D-4: Number of Findings by Field BMP Type

The top ten BMPs with the most findings total 1,929 which constituted 84% of total findings. Although the order has changed slightly, all field BMP types (from 201 IQA Reviews) in fiscal year 2018-2019 were in the top 10 BMP types in fiscal year 2017-2018 (from 180 IQA Reviews), in fiscal year 2016-2017 (from 242 IQA Reviews), and in fiscal year 2015-2016 (from 236 IQA Reviews). The top 10 field BMP types are ranked highest to lowest below and with the total number reviewed for each type as follows:

• WM-5, Solid Waste Management: 490 • SC-5, Fiber Rolls: 256 • WM-3, Stockpile Management: 235 • WM-1, Material Delivery and Storage: 190

Page 15: Appendix D: Construction · Appendix D: Construction 1 Fiscal Year 2018-2019 Implementation of Construction General Permit Table D-1 shows the total number of active construction

Appendix D: Construction 13 Fiscal Year 2018-2019

• TC-1, Stabilized Construction Entrance: 165 • WM-8, Concrete Waste Management: 155 • SC-7, Street Sweeping and Vacuuming: 123 • SC-1, Silt Fence: 118 • SS-3, Hydraulic Mulch: 103 • SC-10, Storm Drain Inlet Protection: 94

Page 16: Appendix D: Construction · Appendix D: Construction 1 Fiscal Year 2018-2019 Implementation of Construction General Permit Table D-1 shows the total number of active construction

Appendix D: Construction 14 Fiscal Year 2018-2019

This page was intentionally left blank.