48
APPENDIX E-1: Full Stakeholder Database

APPENDIX E-1: Full Stakeholder · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

Embed Size (px)

Citation preview

Page 1: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

APPENDIX E-1: Full Stakeholder Database

Page 2: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

Contacts-BAR

Title First Name Last Name Company Address City Code Fax Phone Mobile Phone Email Address

Dr. Mathys Vosloo Zitholele Consulting PO Box 4546The Reeds Johannesburg 1685 0866746121 0112072079 0847483018 [email protected]

Mr. James MacKenzie Prime Africa (082) 927 3362 [email protected]

Mr/Ms Mmabatho Nkoa 3Q - Env. Officer (071) 441-3011

Ms Lerato Mokoma ABB- Env. Officer (074) 331-7334 [email protected]

Mr Gert Smith Agri Mpumalanga PO Box 677 WITBANK 1035 (013) 636-8996 (082) 388-3387

Ms Cindy Smith Anglo American Private Bag X9 LERAATSFONTEIN 1035 (013) 691-5405 (013) 691-5117 (083) 659-2194 [email protected]

Ms Elise Tempelhoff Beeld PO Box 333 AUCKLAND PARK 2006 (011) 713-9956 (011) 713-9182 (083) 309-1192 [email protected]

Ms Annemie Duvenage Bronkhorstspruit and Wilge River Conservation AssociationPO Box 691 BRONKHORSTSPRUIT 1020 (086) 524-2489 (082) 466-2384 [email protected]

Mr Emmanuel Nzuma Cathoros (076) 224- 4803 [email protected]

Mr Ephrone Montlebi CBR - Env. Officer (071) 345-1583

Ms Doreen Sithole DAFF PO Box 8806 Nelspruit 1200 (013) 754 0732 (013) 754 0701 [email protected]

Mr Ndivhuho Mudau DEA-EMI (012) 399-9433 (073) 455-5809 [email protected]

Ms Wilma Lutsch Department of Environmental Affairs PRETORIA 0001 (012) 320-7026 (012) 310-3694 (082) 657-2322 [email protected]

Ms Mokgadi Maloba Department of Water and Sanitation Private Bag X10580 Bronkhorstspriut 1020 (078) 822-6061 [email protected]

Mr Danie Otto Digbywells (082) 399-9315 [email protected]

Ms Lasantha Naidoo DWS 185 Francis Baard Street Pretoria 0001 (012) 336-8870 (082) 893-2450 [email protected]

Ms Busisiwe Hadebe ECO (083) 717-0425 [email protected]

Mr Emmanuel Manyane ECO (074) 425-6720 [email protected]

Mr Mthombeni Ndlangisa ECO (062) 067-0197 [email protected]

Mr Erald Nkabinde Emalahleni Local Municipality PO Box 3 WITBANK 1035 (086) 698 7468 (013) 690 6350 (072) 596 4904 [email protected]

Mr Stanley Jacobs Ematayereni (079) 917-8884

Mr C Voight ENC Municipality (072) 909-6514

Ms Dheneshree Lalla Engineer (073) 153-1360 [email protected]

Mr/Ms Kbomotso Shakwane Env. Management Inspector (082) 597-9758 [email protected]

Ms Aletia Chapman Env. Manager (083) 633-4487 [email protected]

Mr/Ms Mushayi Mudzielwana Env. Manager (082) 879-6150 [email protected]

Mr Johnson Matidle Env. Officer (076) 631-5673 [email protected]

Mr Gary Ainsworth Env. Scientist (078) 438-8877 [email protected]

Mr Thinus Oosthuizen Eskom (086) 695 0399 (083) 301-8002 [email protected]

Mr Tobile Bokwe Eskom Holdings SOC Ltd PO Box 1091 JOHANNESBURG 2000 (086) 663-2051 (011) 800-2303 (082) 828-1777 [email protected]

Mr/Ms Thivhusiwi Netshidongololwe Eskom Holdings SOC Ltd (011) 800-2985 (082) 683-7751 [email protected]

Ms Mari Kotze Eskom Holdings SOC Ltd - Kusile Power StationPO Box 1091 JOHANNESBURG 2000 (013) 699-7724 (072) 109-6634 [email protected]

Mr Hardus Kotze Eskom Holdings SOC Ltd - Kusile Power StationPO Box 12346 LERAATSFONTEIN 1038 (013) 699-7730 (079) 873-7737 [email protected]

Mr Mike Elliot Eyethu Coal, Klipfontein Colliery (086) 660-1327 (082) 573 2793 [email protected]

Mr Juan Richter Eyethu Coal, Klipfontein Colliery (079) 171 2339 [email protected]

Mr & Mrs D and H Sharp Farm: Kortfontein (Sharp Farming) PO Box 355 BRONKHORSTSPRUIT 1020 (086) 675-1068 (013) 932-7500 (082) 777-5175 [email protected]

Mr & Mrs Barry & SandriaLensley Farm: Spitskop 502JR, Ptn 19 (079) 850 5918 [email protected]

Ms Mariette Liefferink Federation for a Sustainable EnvironmentPostnet Suite 87 RIVONIA 2128 (086) 464 1509 (011) 465-6910 (073) 231-4893 [email protected]

Mr Ian Dennis GE - Env. Officer (076) 774-7986

Mr Jaco Pieterse Gijima (082) 323-1009

Mr/Ms Lungile Sibeko Gijima (079) 770-0910

Mr/Ms Robin de Witt Gouwsberg Irrigation Board PO Box 1867 BRONKHORSTSPRUIT 1020 (013) 963-7077 (082) 771-4333 [email protected]

Ms AM Milner Gouwsberg Irrigation Board PO Box 699 BRONKHORSTSPRUIT 1020 (013) 652-9710 (013) 652-9710 (082) 333-7078

Mr Andre van Staden Gouwsberg Irrigation Board PO Box 1867 BRONKHORSTSPRUIT 1020 (086) 655-2217 (082) 388-3087 [email protected]

Mr Bongani A Mkhari GW (072) 120-0200 [email protected]

Mr/Ms Lesiba Kgobe Gx Env. Manager (078) 903-9211 [email protected]

Mr Patrick Jacobs HEjn (073) 109-1273

Ms Amanada Austin JG Africa - Senior Aquaic Scientist (082) 352-7524 [email protected]

Mr Hannes de Bruyn Kendal Poultry Farm (072) 694-5745 [email protected]

Mr Patrick Mdluli KET-Senior Env Advisor (072) 263-5177 [email protected]

Ms Mary Lewis Klipkop Land Owner's Association PO Box 76 WELBEKEND 1517 (086) 677-8099 (011) 964-1900 (076) 979-9139 [email protected]

Mr Hugh Patrickson Klipkop Land Owner's Association Private Bag X10 LYNNWOOD RIDGE 0040 (086) 606-6567 (011) 748-2800 (082) 783-6658 [email protected]

Mr James Johnson KLW - Env. Officer (079) 887-0542

Ms Krista Mothapo Kusile Env. Officer (079) 335-1699 [email protected]

Mr Doug Robless Kusile KET Site Manager (072) 598-9117 [email protected]

Mr Tselane Moloi Kusile Power Station (076) 391-0012

Mr Hennie Laas Mpumalanga Agriculture Union PO Box 619 ERMELO 2350 (017) 819-1297 (017) 819-1295 [email protected]

Ms Mapule Kgwale MRMS (078) 431-9106 [email protected]

Page 1

Page 3: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

Contacts-BAR

Ms Lerato Gambu Nkangala District Municipality PO Box 437 MIDDELBURG 1050 (013) 249-2165 [email protected]

Ms Anele Ngcobetsha Nkangala District Municipalty (013) 249-2018 [email protected]

Mr Vusi Mahlangu Nkangala Distrtict Municipality MIDDELBURG 1050 (013) 282-6723 (013) 249-2000 (082) 414-2905 [email protected]

Mnr Joerné Buys Plaas: Bossemanskraal Posbus 1892 NEWLANDS 0049 (012) 811-0820 (012) 811-0820 (082) 411-4560 [email protected]

Mnr Bielie Geldenhuys Plaas: Bossemanskraal BRONKHORSTSPRUIT 1020 (082) 882-5146 [email protected]

Mnr Hennie Terblanche Plaas: Bossemanskraal Posbus 427 GROBLERSDAL 0470 (013) 262-5369 (013) 262-5369 (082) 469-2234 [email protected]

Mnr Johann Kotzé Plaas: Bossemanskraal & Kortfontein Posbus 36899 MENLO PARK 0102 (011) 647-8331 (083) 257-8270 [email protected]

Mnr JP Joubert Plaas: Nooitgedacht & Witpoort (JJH Boerdery)Posbus 55 BRONKHORSTSPRUIT 1020 (082) 388-2592 [email protected]

Mnr Hans Jansen van Rensburg Plase: Bossemanskraal & Witklip (Hans van Rensburg Boerdery)Posbus 273 BRONKHORSTSPRUIT 1020 (013) 932-2056 (013) 932-1379 (082) 492-0632 [email protected]

Mnr Christie Truter Plase: Dwaalfontein, Klipfontein & Vlakvarkfontein (Truter Boerdery Trust)Posbus 621 OGIES 2230 (013) 648-8911 [email protected]

Mr Kyle Harris Prime Africa (012) 348-0317 (082) 463-5921 [email protected]

Mr Joseph Mulders Prime Africa Consultants 53 Woodpecker Avenue Pretoria (072) 754 2603 [email protected]

Ms Dineo Maila Prime Africa Consultants 53 Woodpecker Avenue Pretoria (076) 238 1631 [email protected]

Ms Daphney Modise Rotek Waste (076) 462-4755 [email protected]

Mr Siphiwe Mahlangu Senior Env Advisor (013) 699-7096 [email protected]

Ms Florence Radebe Senior Env Advisor (011) 800-4989 (082) 389-2233 [email protected]

Ms Miranda Moahlodi SHE Manager (083) 664-7627 [email protected]

Mr Sivuyisiwe Zani SSBR JV (087) 809-2063 [email protected]

Dr James Meyer Topigs SA (Pty) Ltd PO Box 2312 FAERIE GLEN 0043 (083) 569-3167 [email protected]

Mr Stefan Vermaak Topigs SA (Pty) Ltd PO Box 35492 MENLO PARK 0102 (012) 348-8474 (012) 348-3676 [email protected]

Mnr Barend Vorster Topigs SA (Pty) Ltd PO Box 35492 MENLO PARK 0102 (012) 348-3676 (082) 494-4403 [email protected]

Mr Mosa Legwase Turbular-Env. Officer (072) 019-2781 [email protected]

Ms Busi Mdluli Victor Khanye Local Municipality PO Box 6 DELMAS 2210 (013) 665-6000 [email protected]

Ms Catharina Venter Wetland Specialist (083) 370-0850 [email protected]

Mr Sonnyboy Bapela Member: Kusile EMC (012) 310-3098 (012) 322-2602 [email protected]

Mr/Ms [email protected] Member: Kusile EMC [email protected]

Mr/Ms [email protected] Member: Kusile EMC [email protected]

Mr/Ms [email protected] Member: Kusile EMC [email protected]

Mr/Ms [email protected] Member: Kusile EMC [email protected]

Mr/Ms [email protected] Member: Kusile EMC [email protected]

Mr/Ms [email protected] Member: Kusile EMC [email protected]

Mr/Ms [email protected] Member: Kusile EMC [email protected]

Mr/Ms [email protected] Member: Kusile EMC [email protected]

Mr/Ms [email protected] Member: Kusile EMC [email protected]

Mr/Ms Ayanda Ngcobo Member: Kusile EMC [email protected]

Mr/Ms [email protected] Member: Kusile EMC [email protected]

Ms Michelle Govender DEA [email protected]

Mr/Ms [email protected] Member: Kusile EMC [email protected]

Mr/Ms [email protected] Member: Kusile EMC [email protected]

Mr Lucky Mkhonto Member: Kusile EMC [email protected]

Mr Stanley Tshitwamulomoni DEA (012) 399 9587 [email protected]

Ms Zamalanga Langa DEA (012) 399 9389 [email protected]

Ms Nyiko Nkosi DEA (012) 399 9392 [email protected]

Mr Andre Beetge DEA (084) 240 2264 [email protected]

Dr Piet-Louis Grundling DEA (072) 793 8248 [email protected]

Mr Ian Pearson Prime Africa (082) 453 7246 [email protected]

Mr Danie Smith DEA (012) 399 9394 [email protected]

Mr Vincent Chauke DEA (012) 399 9399 [email protected]

Cllr. Tebogo Malomane Councillor: Ward 3, Victor Khanye LM (013) 665 2913 (078) 156 1101 [email protected]

Mr Jacob Mahlangu Municipal Manager: Victor Khanye LM (013) 665 2913 (013) 665 6005 (072) 945 3540 [email protected]

Ms Palesa PA to MM: Victor Khanye LM (013) 665 2913 (013) 665 6005 [email protected]

Ms Sentebaleng Masemola Head of Communications: Victor Khanye LM (013) 665 2913 (013) 665 6006 (081) 036 7540 [email protected]

Ms Maggie Skosana Municipal Manager: Nkangala DM PO Box 437 Middelburg 1050 (013) 249 2114 (013) 249 2000 (082)949 8620 [email protected]

Ms Naomi Nkosi PA to MM: Nkangala DM PO Box 437 Middelburg 1050 (013) 249 2114 (013) 249 2000 [email protected]

Mr David Masombuka Head of Communications: Nkangala DM PO Box 437 Middelburg 1050 (013) 249 2114 (013) 249 2051 (082) 663 4225 [email protected]

Ms Sylvia Masoka DARDLEA: Acting Director: Nkangala District (013) 947 2551 [email protected]

Ms Dorothy Makaringe Mpumalanga Tourism and Parks Agency Private Bag X11338 Nelspruit 1200 (013)759 3928 (013) 759 5334 [email protected]

Ms Dorothy Makaringe Mpumalanga Tourism and Parks Agency Private Bag X11338 Nelspruit 1200 (013)759 3928 (013) 759 5334 [email protected]

Page 2

Page 4: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

APPENDIX E-2: Proof of Announcement notification

Page 5: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

1

Mathys Vosloo

From: 17107 - Kusile WOP BA

Sent: Thursday, 23 November 2017 4:26 PM

To: Mathys Vosloo

Cc: Lebo Petlane

Subject: 17107-02-001 Kusile BA: Notice of Project Announcement

Attachments: 17107-82-BID-001-WOS BA incl CommSheet-Rev0.pdf

Importance: High

TrackingTracking: Recipient Delivery

Mathys Vosloo Delivered: 23/11/2017 4:26 PM

Lebo Petlane

Dear Stakeholder,

BASIC ASSESSMENT FOR ENGINEERING INTERVENTIONS PROPOSED FOR THE REHABILITATION OF DEGRADED

WETLANDS AROUND KUSILE POWER STATION, MPUMALANGA PROVINCE

Notice is given in terms of Section 41(2)(b) of the EIA regulations , 2014 (GN R.982), as amended, in terms of the

National Environmental Management Act (Act 107 of 1998), as amended, of the intention of Eskom Holdings SOC

Ltd to undertake activities relating to the rehabilitation of several degraded wetlands at and around the Kusile

Power Station, Mpumalanga. A Basic Assessment process must be undertaken in terms of the EIA regulations, 2014

to identify, assess and mitigate all potential impacts to within acceptable levels.

You have been identified as a key stakeholder for the abovementioned project and are therefore informed of the

Basic Assessment process underway. A Background Information Document (BID) that contains information regarding

the proposed project, Basic Assessment process and how you can become involved is attached to this email

notification. All documents will be available on the internet at www.zitholele.co.za/environmental, under heading

“Kusile WOP and PPP”. Further communication will follow in due course as the Basic Assessment process unfolds.

BIDs have furthermore been placed at the following public venues for collection:

PUBLIC VENUE ADDRESS

Victor Khanye

Local

Municipality

Cnr Samuel & Van

der Walt Streets,

Delmas

Delmas Public

Library

Cnr Sarel Cilliers &

Van Riebeeck Street

Phola Public

Library

2427 Qwabe Street,

Phola Location

Ogies Public

Library

61 Main Street,

Ogies

It is advised to complete the comment sheet attached at the back of the BID and return to the PPP Desk in order for

us to confirm your contact details on the project database. However, if you do not wish to be involved in this Basic

Assessment process please request the PPP Desk to remove you from the project database as a key stakeholder.

The PPP Desk can be contacted at the contact details provided in the BID and below.

Kind regards

Page 6: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

2

Dr. Mathys Vosloo

17107 Kusile Basic Assessment: PPP Desk

Tel: 011 207 2060, Fax: 086 674 6121, E-mail: [email protected]

FOR Zitholele Consulting (Pty) Ltd

Page 7: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

1

Mathys Vosloo

From: 17107 - Kusile WOP BA on behalf of [email protected]

Sent: Thursday, 23 November 2017 4:47 PM

To: Mathys Vosloo

Cc: Lebo Petlane

Subject: 17107-02-001 Kusile BA: Notice of Project Announcement

Attachments: 17107-82-BID-001-WOS BA incl CommSheet-Rev0.pdf

Importance: High

Bcc: '[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

[email protected]; [email protected]; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

[email protected]; [email protected]; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]'; 'pjvv777

@gmail.com'; RamabulanaN ([email protected]); '[email protected]';

'[email protected]'; [email protected]; [email protected];

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'

Dear Stakeholder,

BASIC ASSESSMENT FOR ENGINEERING INTERVENTIONS PROPOSED FOR THE REHABILITATION OF DEGRADED

WETLANDS AROUND KUSILE POWER STATION, MPUMALANGA PROVINCE

Zitholele Consulting (Pty) Ltd completed an application for Environmental Authorisation for the development of the

proposed 60 year Ash Disposal Facility at Kusile Power Station near Ogies. Given your interest in this recently

completed project, you have been identified as a potential Interested and Affected Party for another Environmental

Authorisation process related to the Kusile Power Station currently underway. Notice is therefore given in terms of

Section 41(2)(b) of the EIA regulations , 2014 (GN R.982), as amended, in terms of the National Environmental

Management Act (Act 107 of 1998), as amended, of the intention of Eskom Holdings SOC Ltd to undertake activities

relating to the rehabilitation of several degraded wetlands at and around the Kusile Power Station, Mpumalanga. A

Basic Assessment process must be undertaken in terms of the EIA regulations, 2014 to identify, assess and mitigate

all potential impacts to within acceptable levels.

A Background Information Document (BID) that contains information regarding the proposed project, Basic

Assessment process and how you can become involved is attached to this email notification. All documents will be

available on the Zitholele website at www.zitholele.co.za/environmental, under heading “Kusile WOP and PPP”. BIDs

have furthermore been placed at the following public venues for collection:

PUBLIC VENUE ADDRESS

Victor Khanye Local

Municipality

Cnr Samuel & Van der Walt Streets,

Delmas

Delmas Public Library Cnr Sarel Cilliers & Van Riebeeck

Street

Phola Public Library 2427 Qwabe Street, Phola Location

Ogies Public Library 61 Main Street, Ogies

Page 8: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

2

If you wish to be registered as an Interested and Affected Party (IAP) for this Basic Assessment process, please

complete the comment sheet attached at the back of the BID and return to the PPP Desk in order for us to register

you on the project database. Please be advised that if you do not return the comment sheet to the PPP desk or

reply to this email with a request to be registered as an IAP by 8 December 2017, it will be assumed that you do

not wish to register as an IAP for this Basic Assessment process and will not receive further notifications relating

to this project.

The PPP Desk can be contacted at the contact details provided in the BID and below.

Kind regards

Dr. Mathys Vosloo

17107 Kusile Basic Assessment: PPP Desk

Tel: 011 207 2060, Fax: 086 674 6121, E-mail: [email protected]

FOR Zitholele Consulting (Pty) Ltd

Page 9: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

���������� ������� ���������������� ��� ��������������� !"�# $%�"&��'())�*��&+,��-��./�� �����"������

� �0��������� ���������������� ��� ��������������� !"�# $%�"&��'())�*��&+,��-��./�� �����"������ ��1

23456789:; 234567<;=>3?6@?48

����� (����AB� ��#�AC�

DE48;85:F;3 G9@;H?:; I5=@4:;3JG K@9@5=

��'��'���L� �-�M�"�����A��0N- %!�$OP%

%���A$ �,QA(����A,.AB� ��#�AP����AC���A����# A�#���/��A.��A� �0�� �#���������R�S ���A���AC$%A��A��T�� A����A�������U�� ����������A����������L

��R�-RL��-- �-�M�"�����A��0N- %!�$OP%

%���A$ �,QA(����A,.AB� ��#�AP����AC���A����# A�#���/��A.��A� �0�� �#���������R�S ���A���AC$%A��A��T�� A����A�������U�� ����������A����������L

��R�1'-NL�� �-�M�"�����A��0N- %!�$OP%

%���A$ �,QA(����A,.AB� ��#�AP����AC���A����# A�#���/��A.��A� �0�� �#���������R�S ���A���AC$%A��A��T�� A����A�������U�� ����������A����������L

��R�1'L��-1 �-�M�"�����A��0N- !V,$P!%

%���A$ �,QA(����A,.AB� ��#�AP����AC���A����# A�#���/��A.��A� �0�� �#���������R�S ���A���AC$%A��A��T�� A����A�������U�� ����������A����������L

��R�1L111�- �-�M�"�����A��0N- %!�$OP%

%���A$ �,QA(����A,.AB� ��#�AP����AC���A����# A�#���/��A.��A� �0�� �#���������R�S ���A���AC$%A��A��T�� A����A�������U�� ����������A����������L

��R�1��1N'� �-�M�"�����A��0N- %!�$OP%

%���A$ �,QA(����A,.AB� ��#�AP����AC���A����# A�#���/��A.��A� �0�� �#���������R�S ���A���AC$%A��A��T�� A����A�������U�� ����������A����������L

��R�1L��'-� �-�M�"�����A��0N- %!�$OP%

%���A$ �,QA(����A,.AB� ��#�AP����AC���A����# A�#���/��A.��A� �0�� �#���������R�S ���A���AC$%A��A��T�� A����A�������U�� ����������A����������L

��R�1�1�L�N �-�M�"�����A��0N- %!�$OP%

%���A$ �,QA(����A,.AB� ��#�AP����AC���A����# A�#���/��A.��A� �0�� �#���������R�S ���A���AC$%A��A��T�� A����A�������U�� ����������A����������L

��R�N�-��L- �-�M�"�����A��0N- %!�$OP%

%���A$ �,QA(����A,.AB� ��#�AP����AC���A����# A�#���/��A.��A� �0�� �#���������R�S ���A���AC$%A��A��T�� A����A�������U�� ����������A����������L

��R�1''�-R1 �-�M�"�����A��0N- %!�$OP%

%���A$ �,QA(����A,.AB� ��#�AP����AC���A����# A�#���/��A.��A� �0�� �#���������R�S ���A���AC$%A��A��T�� A����A�������U�� ����������A����������L

��R�-RR�NL� �-�M�"�����A��0N- %!�$OP%

%���A$ �,QA(����A,.AB� ��#�AP����AC���A����# A�#���/��A.��A� �0�� �#���������R�S ���A���AC$%A��A��T�� A����A�������U�� ����������A����������L

��R�---���R �-�M�"�����A��0N- %!�$OP%

%���A$ �,QA(����A,.AB� ��#�AP����AC���A����# A�#���/��A.��A� �0�� �#���������R�S ���A���AC$%A��A��T�� A����A�������U�� ����������A����������L

��R�-RR-�R� �-�M�"�����A��0N- %!�$OP%

%���A$ �,QA(����A,.AB� ��#�AP����AC���A����# A�#���/��A.��A� �0�� �#���������R�S ���A���AC$%A��A��T�� A����A�������U�� ����������A����������L

��R�-RR--R� �-�M�"�����A��0N- %!�$OP%

%���A$ �,QA(����A,.AB� ��#�AP����AC���A����# A�#���/��A.��A� �0�� �#���������R�S ���A���AC$%A��A��T�� A����A�������U�� ����������A����������L

��R�NL�L�NR �-�M�"�����A��0N- %!�$OP%

%���A$ �,QA(����A,.AB� ��#�AP����AC���A����# A�#���/��A.��A� �0�� �#���������R�S ���A���AC$%A��A��T�� A����A�������U�� ����������A����������L

��R�-N��N�1 �-�M�"�����A��0N- !V,$P!%

%���A$ �,QA(����A,.AB� ��#�AP����AC���A����# A�#���/��A.��A� �0�� �#���������R�S ���A���AC$%A��A��T�� A����A�������U�� ����������A����������L

��R�'R-��N� �-�M�"�����A��0N- %!�$OP%

%���A$ �,QA(����A,.AB� ��#�AP����AC���A����# A�#���/��A.��A� �0�� �#���������R�S ���A���AC$%A��A��T�� A����A�������U�� ����������A����������L

��R�-LLL-�N �-�M�"�����A��0N- %!�$OP%

%���A$ �,QA(����A,.AB� ��#�AP����AC���A����# A�#���/��A.��A� �0�� �#���������R�S ���A���AC$%A��A��T�� A����A�������U�� ����������A����������L

��R�-�-���L �-�M�"�����A��0N- %!�$OP%

%���A$ �,QA(����A,.AB� ��#�AP����AC���A����# A�#���/��A.��A� �0�� �#���������R�S ���A���AC$%A��A��T�� A����A�������U�� ����������A����������L

��R-'NL��L1 �-�M�"�����A��0N- %!�$OP%

%���A$ �,QA(����A,.AB� ��#�AP����AC���A����# A�#���/��A.��A� �0�� �#���������R�S ���A���AC$%A��A��T�� A����A�������U�� ����������A�

Page 10: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

���������� ������� ���������������� ��� ��������������� !"�# $%�"&��'())�*��&+,��-��./�� �����"������

� �0��������� ���������������� ��� ��������������� !"�# $%�"&��'())�*��&+,��-��./�� �����"������ ��1

���������2

��3--�2��2� �-�4�"�����5��06- %!�$78%

%���5$ �,95(����5,.5:� ��#�58����5;���5����# 5�#���/��5.��5� �0�� �#���������3�< ���5���5;$%5��5��=�� 5����5�������>�� ����������5����������2

��3-'--113� �-�4�"�����5��06- ;�$.�

%���5$ �,95(����5,.5:� ��#�58����5;���5����# 5�#���/��5.��5� �0�� �#���������3�< ���5���5;$%5��5��=�� 5����5�������>�� ����������5����������2

��3--��3��� �-�4�"�����5��06- %!�$78%

%���5$ �,95(����5,.5:� ��#�58����5;���5����# 5�#���/��5.��5� �0�� �#���������3�< ���5���5;$%5��5��=�� 5����5�������>�� ����������5����������2

��3--���36� �-�4�"�����5��06- %!�$78%

%���5$ �,95(����5,.5:� ��#�58����5;���5����# 5�#���/��5.��5� �0�� �#���������3�< ���5���5;$%5��5��=�� 5����5�������>�� ����������5����������2

��3-6'2-�'� �-�4�"�����5��06- %!�$78%

%���5$ �,95(����5,.5:� ��#�58����5;���5����# 5�#���/��5.��5� �0�� �#���������3�< ���5���5;$%5��5��=�� 5����5�������>�� ����������5����������2

��3�33�6�1' �-�4�"�����5��06- %!�$78%

%���5$ �,95(����5,.5:� ��#�58����5;���5����# 5�#���/��5.��5� �0�� �#���������3�< ���5���5;$%5��5��=�� 5����5�������>�� ����������5����������2

��3�'6��-�� �-�4�"�����5��06- %!�$78%

%���5$ �,95(����5,.5:� ��#�58����5;���5����# 5�#���/��5.��5� �0�� �#���������3�< ���5���5;$%5��5��=�� 5����5�������>�� ����������5����������2

��3�3�3���� �-�4�"�����5��06- %!�$78%

%���5$ �,95(����5,.5:� ��#�58����5;���5����# 5�#���/��5.��5� �0�� �#���������3�< ���5���5;$%5��5��=�� 5����5�������>�� ����������5����������2

��3�3�2'�6� �-�4�"�����5��06- %!�$78%

%���5$ �,95(����5,.5:� ��#�58����5;���5����# 5�#���/��5.��5� �0�� �#���������3�< ���5���5;$%5��5��=�� 5����5�������>�� ����������5����������2

��3-�6�3��� �-�4�"�����5��06- %!�$78%

%���5$ �,95(����5,.5:� ��#�58����5;���5����# 5�#���/��5.��5� �0�� �#���������3�< ���5���5;$%5��5��=�� 5����5�������>�� ����������5����������2

��3��3-''63 �-�4�"�����5��06- +4%!�$7

%���5$ �,95(����5,.5:� ��#�58����5;���5����# 5�#���/��5.��5� �0�� �#���������3�< ���5���5;$%5��5��=�� 5����5�������>�� ����������5����������2

��3����6��6 �-�4�"�����5��06- %!�$78%

%���5$ �,95(����5,.5:� ��#�58����5;���5����# 5�#���/��5.��5� �0�� �#���������3�< ���5���5;$%5��5��=�� 5����5�������>�� ����������5����������2

��3����1--- �-�4�"�����5��06- %!�$78%

%���5$ �,95(����5,.5:� ��#�58����5;���5����# 5�#���/��5.��5� �0�� �#���������3�< ���5���5;$%5��5��=�� 5����5�������>�� ����������5����������2

��3�32-�16� �-�4�"�����5��06- %!�$78%

%���5$ �,95(����5,.5:� ��#�58����5;���5����# 5�#���/��5.��5� �0�� �#���������3�< ���5���5;$%5��5��=�� 5����5�������>�� ����������5����������2

���22��3331 �-�4�"�����5��06- %!�$78%

%���5$ �,95(����5,.5:� ��#�58����5;���5����# 5�#���/��5.��5� �0�� �#���������3�< ���5���5;$%5��5��=�� 5����5�������>�� ����������5����������2

��3-''1�'�� �-�4�"�����5��06- %!�$78%

%���5$ �,95(����5,.5:� ��#�58����5;���5����# 5�#���/��5.��5� �0�� �#���������3�< ���5���5;$%5��5��=�� 5����5�������>�� ����������5����������2

���-�-�132- �-�4�"�����5��06- %!�$78%

%���5$ �,95(����5,.5:� ��#�58����5;���5����# 5�#���/��5.��5� �0�� �#���������3�< ���5���5;$%5��5��=�� 5����5�������>�� ����������5����������2

���23�-��-� �-�4�"�����5��06- %!�$78%

%���5$ �,95(����5,.5:� ��#�58����5;���5����# 5�#���/��5.��5� �0�� �#���������3�< ���5���5;$%5��5��=�� 5����5�������>�� ����������5����������2

���-�6-�-'� �-�4�"�����5��06- %!�$78%

%���5$ �,95(����5,.5:� ��#�58����5;���5����# 5�#���/��5.��5� �0�� �#���������3�< ���5���5;$%5��5��=�� 5����5�������>�� ����������5����������2

���-��2���- �-�4�"�����5��06- !?,$8!%

%���5$ �,95(����5,.5:� ��#�58����5;���5����# 5�#���/��5.��5� �0�� �#���������3�< ���5���5;$%5��5��=�� 5����5�������>�� ����������5����������2

����2�2'6�1 �-�4�"�����5��06- %!�$78%

%���5$ �,95(����5,.5:� ��#�58����5;���5����# 5�#���/��5.��5� �0�� �#���������3�< ���5���5;$%5��5��=�� 5����5�������>�� ����������5����������2

�����61�'�- �-�4�"�����5��06- %!�$78%

Page 11: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

���������� ������� ���������������� ��� ��������������� !"�# $%�"&��'())�*��&+,��-��./�� �����"������

� �0��������� ���������������� ��� ��������������� !"�# $%�"&��'())�*��&+,��-��./�� �����"������ -�1

%���2$ �,32(����2,.24� ��#�25����26���2����# 2�#���/��2.��2� �0�� �#���������7�8 ���2���26$%2��2��9�� 2����2�������:�� ����������2����������;

����';1<�1< �-�=�"�����2��0<- %!�$>5%

%���2$ �,32(����2,.24� ��#�25����26���2����# 2�#���/��2.��2� �0�� �#���������7�8 ���2���26$%2��2��9�� 2����2�������:�� ����������2����������;

���-1<<<7�; �-�=�"�����2��0<- %!�$>5%

%���2$ �,32(����2,.24� ��#�25����26���2����# 2�#���/��2.��2� �0�� �#���������7�8 ���2���26$%2��2��9�� 2����2�������:�� ����������2����������;

����<;7;��� �-�=�"�����2��0<- !?,$5!%

%���2$ �,32(����2,.24� ��#�25����26���2����# 2�#���/��2.��2� �0�� �#���������7�8 ���2���26$%2��2��9�� 2����2�������:�� ����������2����������;

�����'-<��� �-�=�"�����2��0<- %!�$>5%

%���2$ �,32(����2,.24� ��#�25����26���2����# 2�#���/��2.��2� �0�� �#���������7�8 ���2���26$%2��2��9�� 2����2�������:�� ����������2����������;

������;��7� �-�=�"�����2��0<- %!�$>5%

%���2$ �,32(����2,.24� ��#�25����26���2����# 2�#���/��2.��2� �0�� �#���������7�8 ���2���26$%2��2��9�� 2����2�������:�� ����������2����������;

����������� �-�=�"�����2��0<- %!�$>5%

%���2$ �,32(����2,.24� ��#�25����26���2����# 2�#���/��2.��2� �0�� �#���������7�8 ���2���26$%2��2��9�� 2����2�������:�� ����������2����������;

������;''-1 �-�=�"�����2��0<- %!�$>5%

%���2$ �,32(����2,.24� ��#�25����26���2����# 2�#���/��2.��2� �0�� �#���������7�8 ���2���26$%2��2��9�� 2����2�������:�� ����������2����������;

����-1<�<7- �-�=�"�����2��0<- %!�$>5%

%���2$ �,32(����2,.24� ��#�25����26���2����# 2�#���/��2.��2� �0�� �#���������7�8 ���2���26$%2��2��9�� 2����2�������:�� ����������2����������;

����<;'1;�1 �-�=�"�����2��0<- %!�$>5%

%���2$ �,32(����2,.24� ��#�25����26���2����# 2�#���/��2.��2� �0�� �#���������7�8 ���2���26$%2��2��9�� 2����2�������:�� ����������2����������;

����11�-��� �-�=�"�����2��0<- %!�$>5%

%���2$ �,32(����2,.24� ��#�25����26���2����# 2�#���/��2.��2� �0�� �#���������7�8 ���2���26$%2��2��9�� 2����2�������:�� ����������2����������;

���;77��<1� �-�=�"�����2��0<- %!�$>5%

%���2$ �,32(����2,.24� ��#�25����26���2����# 2�#���/��2.��2� �0�� �#���������7�8 ���2���26$%2��2��9�� 2����2�������:�� ����������2����������;

���'��117�- �-�=�"�����2��0<- %!�$>5%

%���2$ �,32(����2,.24� ��#�25����26���2����# 2�#���/��2.��2� �0�� �#���������7�8 ���2���26$%2��2��9�� 2����2�������:�� ����������2����������;

���1--��--1 �-�=�"�����2��0<- %!�$>5%

%���2$ �,32(����2,.24� ��#�25����26���2����# 2�#���/��2.��2� �0�� �#���������7�8 ���2���26$%2��2��9�� 2����2�������:�� ����������2����������;

���;7�<71;- �-�=�"�����2��0<- %!�$>5%

%���2$ �,32(����2,.24� ��#�25����26���2����# 2�#���/��2.��2� �0�� �#���������7�8 ���2���26$%2��2��9�� 2����2�������:�� ����������2����������;

���;����;�� �-�=�"�����2��0<- %!�$>5%

%���2$ �,32(����2,.24� ��#�25����26���2����# 2�#���/��2.��2� �0�� �#���������7�8 ���2���26$%2��2��9�� 2����2�������:�� ����������2����������;

���;--<�';; �-�=�"�����2��0<- %!�$>5%

%���2$ �,32(����2,.24� ��#�25����26���2����# 2�#���/��2.��2� �0�� �#���������7�8 ���2���26$%2��2��9�� 2����2�������:�� ����������2����������;

���7;�-;��� �-�=�"�����2��0<- %!�$>5%

%���2$ �,32(����2,.24� ��#�25����26���2����# 2�#���/��2.��2� �0�� �#���������7�8 ���2���26$%2��2��9�� 2����2�������:�� ����������2����������;

���;����--; �-�=�"�����2��0<- %!�$>5%

%���2$ �,32(����2,.24� ��#�25����26���2����# 2�#���/��2.��2� �0�� �#���������7�8 ���2���26$%2��2��9�� 2����2�������:�� ����������2����������;

���11�<'��� �-�=�"�����2��0<- %!�$>5%

%���2$ �,32(����2,.24� ��#�25����26���2����# 2�#���/��2.��2� �0�� �#���������7�8 ���2���26$%2��2��9�� 2����2�������:�� ����������2����������;

���77��'�'� �-�=�"�����2��0<- %!�$>5%

%���2$ �,32(����2,.24� ��#�25����26���2����# 2�#���/��2.��2� �0�� �#���������7�8 ���2���26$%2��2��9�� 2����2�������:�� ����������2����������;

���71-777�� �-�=�"�����2��0<- %!�$>5%

%���2$ �,32(����2,.24� ��#�25����26���2����# 2�#���/��2.��2� �0�� �#���������7�8 ���2���26$%2��2��9�� 2����2�������:�� ����������2����������;

Page 12: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

���������� ������� ���������������� ��� ��������������� !"�# $%�"&��'())�*��&+,��-��./�� �����"������

� �0��������� ���������������� ��� ��������������� !"�# $%�"&��'())�*��&+,��-��./�� �����"������ 1�1

���''-�2'�- �-�3�"�����4��02- %!�$56%

%���4$ �,74(����4,.48� ��#�46����49���4����# 4�#���/��4.��4� �0�� �#���������:�; ���4���49$%4��4��<�� 4����4�������=�� ����������4����������>

���'>�>>�-> �-�3�"�����4��02- !?,$6!%

%���4$ �,74(����4,.48� ��#�46����49���4����# 4�#���/��4.��4� �0�� �#���������:�; ���4���49$%4��4��<�� 4����4�������=�� ����������4����������>

���'->����� �-�3�"�����4��02- !?,$6!%

%���4$ �,74(����4,.48� ��#�46����49���4����# 4�#���/��4.��4� �0�� �#���������:�; ���4���49$%4��4��<�� 4����4�������=�� ����������4����������>

���'�-:�'-� �-�3�"�����4��02- %!�$56%

%���4$ �,74(����4,.48� ��#�46����49���4����# 4�#���/��4.��4� �0�� �#���������:�; ���4���49$%4��4��<�� 4����4�������=�� ����������4����������>

���'��1�>:' �-�3�"�����4��02- %!�$56%

%���4$ �,74(����4,.48� ��#�46����49���4����# 4�#���/��4.��4� �0�� �#���������:�; ���4���49$%4��4��<�� 4����4�������=�� ����������4����������>

���'1'�1�22 �-�3�"�����4��02- %!�$56%

%���4$ �,74(����4,.48� ��#�46����49���4����# 4�#���/��4.��4� �0�� �#���������:�; ���4���49$%4��4��<�� 4����4�������=�� ����������4����������>

���:1-�>��' �-�3�"�����4��02- %!�$56%

%���4$ �,74(����4,.48� ��#�46����49���4����# 4�#���/��4.��4� �0�� �#���������:�; ���4���49$%4��4��<�� 4����4�������=�� ����������4����������>

��:-����1�2 �-�3�"�����4��02- %!�$56%

%���4$ �,74(����4,.48� ��#�46����49���4����# 4�#���/��4.��4� �0�� �#���������:�; ���4���49$%4��4��<�� 4����4�������=�� ����������4����������>

Page 13: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

���������� ������� ���������������� ��� ��������������� !"�# $%��&'�()$"����**��+,"-./�� �����"������

� �0��������� ���������������� ��� ��������������� !"�# $%��&'�()$"����**��+,"-./�� �����"������ ���

123456789: 123456;:<=2>5?>37

�����- @����A-�A�� �# ���

BC37:749D:2 E8?:F>9: G4<?39:2HE I?8?4<

��&JJ���K�& �J�L�"�����A��0�� ML%!�$*

%���A$ �'NA@����A'.AO� ��#�AP����A-���A����# A�#���Q��A.��A� �0�� �#���������&�R ���A���A-$%A A��S� ��A��� ����� ��#A�#A ��A��������� ����� ��#A�����A����A�������T�� ����������A�A���������+A)�� ���A�������#��#��A�#��AQ� �A��S� ����A$ �'

������&&(�K �J�L�"�����A��0�� %!�$*P%

%���A$ �'NA@����A'.AO� ��#�AP����A-���A����# A�#���Q��A.��A� �0�� �#���������&�R ���A���A-$%A A��S� ��A��� ����� ��#A�#A ��A��������� ����� ��#A�����A����A�������T�� ����������A�A���������+A)�� ���A�������#��#��A�#��AQ� �A��S� ����A$ �'

��&JK&&(&�� �J�L�"�����A��0�� !U'$P!%

%���A$ �'NA@����A'.AO� ��#�AP����A-���A����# A�#���Q��A.��A� �0�� �#���������&�R ���A���A-$%A A��S� ��A��� ����� ��#A�#A ��A��������� ����� ��#A�����A����A�������T�� ����������A�A���������+A)�� ���A�������#��#��A�#��AQ� �A��S� ����A$ �'

��&��&+V+�( �J�L�"�����A��0�� %!�$*P%

%���A$ �'NA@����A'.AO� ��#�AP����A-���A����# A�#���Q��A.��A� �0�� �#���������&�R ���A���A-$%A A��S� ��A��� ����� ��#A�#A ��A��������� ����� ��#A�����A����A�������T�� ����������A�A���������+A)�� ���A�������#��#��A�#��AQ� �A��S� ����A$ �'

��&J��&�&�K �J�L�"�����A��0�� %!�$*P%

%���A$ �'NA@����A'.AO� ��#�AP����A-���A����# A�#���Q��A.��A� �0�� �#���������&�R ���A���A-$%A A��S� ��A��� ����� ��#A�#A ��A��������� ����� ��#A�����A����A�������T�� ����������A�A���������+A)�� ���A�������#��#��A�#��AQ� �A��S� ����A$ �'

��&JJ��(K&+ �J�L�"�����A��0�� %!�$*P%

%���A$ �'NA@����A'.AO� ��#�AP����A-���A����# A�#���Q��A.��A� �0�� �#���������&�R ���A���A-$%A A��S� ��A��� ����� ��#A�#A ��A��������� ����� ��#A�����A����A�������T�� ����������A�A���������+A)�� ���A�������#��#��A�#��AQ� �A��S� ����A$ �'

��&��&&+V�+ �J�L�"�����A��0�� %!�$*P%

%���A$ �'NA@����A'.AO� ��#�AP����A-���A����# A�#���Q��A.��A� �0�� �#���������&�R ���A���A-$%A A��S� ��A��� ����� ��#A�#A ��A��������� ����� ��#A�����A����A�������T�� ����������A�A���������+A)�� ���A�������#��#��A�#��AQ� �A��S� ����A$ �'

��&JJJ�&&(+ �J�L�"�����A��0�� %!�$*P%

%���A$ �'NA@����A'.AO� ��#�AP����A-���A����# A�#���Q��A.��A� �0�� �#���������&�R ���A���A-$%A A��S� ��A��� ����� ��#A�#A ��A��������� ����� ��#A�����A����A�������T�� ����������A�A���������+A)�� ���A�������#��#��A�#��AQ� �A��S� ����A$ �'

��&JKV�+V�+ �J�L�"�����A��0�� %!�$*P%

%���A$ �'NA@����A'.AO� ��#�AP����A-���A����# A�#���Q��A.��A� �0�� �#���������&�R ���A���A-$%A A��S� ��A��� ����� ��#A�#A ��A��������� ����� ��#A�����A����A�������T�� ����������A�A���������+A)�� ���A�������#��#��A�#��AQ� �A��S� ����A$ �'

��&�V&�+��� �J�L�"�����A��0�� %!�$*P%

%���A$ �'NA@����A'.AO� ��#�AP����A-���A����# A�#���Q��A.��A� �0�� �#���������&�R ���A���A-$%A A��S� ��A��� ����� ��#A�#A ��A��������� ����� ��#A�����A����A�������T�� ����������A�A���������+A)�� ���A�������#��#��A�#��AQ� �A��S� ����A$ �'

��&�(�K���K �J�L�"�����A��0�� %!�$*P%

%���A$ �'NA@����A'.AO� ��#�AP����A-���A����# A�#���Q��A.��A� �0�� �#���������&�R ���A���A-$%A A��S� ��A��� ����� ��#A�#A ��A��������� ����� ��#A�����A����A�������T�� ����������A�A���������+A)�� ���A�������#��#��A�#��AQ� �A��S� ����A$ �'

��&�K(K��(+ �J�L�"�����A��0�� %!�$*P%

%���A$ �'NA@����A'.AO� ��#�AP����A-���A����# A�#���Q��A.��A� �0�� �#���������&�R ���A���A-$%A A��S� ��A��� ����� ��#A�#A ��A��������� ����� ��#A�����A����A�������T�� ����������A�A���������+A)�� ���A�������#��#��A�#��AQ� �A��S� ����A$ �'

��&JVV&+�JK �J�L�"�����A��0�� %!�$*P%

%���A$ �'NA@����A'.AO� ��#�AP����A-���A����# A�#���Q��A.��A� �0�� �#���������&�R ���A���A-$%A A��S� ��A��� ����� ��#A�#A ��A��������� ����� ��#A�����A����A�������T�� ����������A�A���������+A)�� ���A�������#��#��A�#��AQ� �A��S� ����A$ �'

��&�J����KV �J�L�"�����A��0�� ML%!�$*

%���A$ �'NA@����A'.AO� ��#�AP����A-���A����# A�#���Q��A.��A� �0�� �#���������&�R ���A���A-$%A A��S� ��A��� ����� ��#A�#A ��A��������� ����� ��#A�����A����A�������T�� ����������A�A���������+A)�� ���A�������#��#��A�#��AQ� �A��S� ����A$ �'

��&�V(J&�JV �J�L�"�����A��0�� %!�$*P%

%���A$ �'NA@����A'.AO� ��#�AP����A-���A����# A�#���Q��A.��A� �0�� �#���������&�R ���A���A-$%A A��S� ��A��� ����� ��#A�#A ��A��������� ����� ��#A�����A����A�������T�� ����������A�A���������+A)�� ���A�������#��#��A�#��AQ� �A��S� ����A$ �'

��&�K�&KK&� �J�L�"�����A��0�� %!�$*P%

%���A$ �'NA@����A'.AO� ��#�AP����A-���A����# A�#���Q��A.��A� �0�� �#���������&�R ���A���A-$%A A��S� ��A��� ����� ��#A�#A ��A��������� ����� ��#A�����A����A�������T�� ����������A�A���������+A)�� ���A�������#��#��A�#��AQ� �A��S� ����A$ �'

��&��(J�&�+ �J�L�"�����A��0�� ML%!�$*

%���A$ �'NA@����A'.AO� ��#�AP����A-���A����# A�#���Q��A.��A� �0�� �#���������&�R ���A���A-$%A A��S� ��A��� ����� ��#A�#A ��A��������� ����� ��#A�����A����A�������T�� ����������A�A���������+A)�� ���A�������#��#��A�#��AQ� �A��S� ����A$ �'

��&�+V�(��( �J�L�"�����A��0�� %!�$*P%

%���A$ �'NA@����A'.AO� ��#�AP����A-���A����# A�#���Q��A.��A� �0�� �#���������&�R ���A���A-$%A A��S� ��A��� ����� ��#A�#A ��A��������� ����� ��#A�����A����A�������T�� ����������A�A���������+A)�� ���A�������#��#��A�#��AQ� �A��S� ����A$ �'

���+(�(��+� �J�L�"�����A��0�� %!�$*P%

%���A$ �'NA@����A'.AO� ��#�AP����A-���A����# A�#���Q��A.��A� �0�� �#���������&�R ���A���A-$%A A��S� ��A��� ����� ��#A�#A ��A��������� ����� ��#A�����A����A�������T�� ����������A�A���������+A)�� ���A�������#��#��A�#��AQ� �A��S� ����A$ �'

���VV&��&�� �J�L�"�����A��0�� %!�$*P%

%���A$ �'NA@����A'.AO� ��#�AP����A-���A����# A�#���Q��A.��A� �0�� �#���������&�R ���A���A-$%A A��S� ��A��� ����� ��#A�#A ��A������

Page 14: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

���������� ������� ���������������� ��� ��������������� !"�# $%��&'�()$"����**��+,"-./�� �����"������

� �0��������� ���������������� ��� ��������������� !"�# $%��&'�()$"����**��+,"-./�� �����"������ ���

��� ����� ��#1�����1����1�������2�� ����������1�1���������+1)�� ���1�������#��#��1�#��13� �1��4� ����1$ �'

���55�&�56( �5�7�"�����1��0�� !8'$9!%

%���1$ �':1;����1'.1<� ��#�19����1-���1����# 1�#���3��1.��1� �0�� �#���������&�= ���1���1-$%1 1��4� ��1��� ����� ��#1�#1 ��1��������� ����� ��#1�����1����1�������2�� ����������1�1���������+1)�� ���1�������#��#��1�#��13� �1��4� ����1$ �'

���65>+656( �5�7�"�����1��0�� %!�$*9%

%���1$ �':1;����1'.1<� ��#�19����1-���1����# 1�#���3��1.��1� �0�� �#���������&�= ���1���1-$%1 1��4� ��1��� ����� ��#1�#1 ��1��������� ����� ��#1�����1����1�������2�� ����������1�1���������+1)�� ���1�������#��#��1�#��13� �1��4� ����1$ �'

����+�+6(�> �5�7�"�����1��0�� %!�$*9%

%���1$ �':1;����1'.1<� ��#�19����1-���1����# 1�#���3��1.��1� �0�� �#���������&�= ���1���1-$%1 1��4� ��1��� ����� ��#1�#1 ��1��������� ����� ��#1�����1����1�������2�� ����������1�1���������+1)�� ���1�������#��#��1�#��13� �1��4� ����1$ �'

����&���55� �5�7�"�����1��0�� %!�$*9%

%���1$ �':1;����1'.1<� ��#�19����1-���1����# 1�#���3��1.��1� �0�� �#���������&�= ���1���1-$%1 1��4� ��1��� ����� ��#1�#1 ��1��������� ����� ��#1�����1����1�������2�� ����������1�1���������+1)�� ���1�������#��#��1�#��13� �1��4� ����1$ �'

������(���� �5�7�"�����1��0�� %!�$*9%

%���1$ �':1;����1'.1<� ��#�19����1-���1����# 1�#���3��1.��1� �0�� �#���������&�= ���1���1-$%1 1��4� ��1��� ����� ��#1�#1 ��1��������� ����� ��#1�����1����1�������2�� ����������1�1���������+1)�� ���1�������#��#��1�#��13� �1��4� ����1$ �'

�����5>�+�( �5�7�"�����1��0�� %!�$*9%

%���1$ �':1;����1'.1<� ��#�19����1-���1����# 1�#���3��1.��1� �0�� �#���������&�= ���1���1-$%1 1��4� ��1��� ����� ��#1�#1 ��1��������� ����� ��#1�����1����1�������2�� ����������1�1���������+1)�� ���1�������#��#��1�#��13� �1��4� ����1$ �'

�����6�&��� �5�7�"�����1��0�� %!�$*9%

%���1$ �':1;����1'.1<� ��#�19����1-���1����# 1�#���3��1.��1� �0�� �#���������&�= ���1���1-$%1 1��4� ��1��� ����� ��#1�#1 ��1��������� ����� ��#1�����1����1�������2�� ����������1�1���������+1)�� ���1�������#��#��1�#��13� �1��4� ����1$ �'

�����+�>�(� �5�7�"�����1��0�� !8'$9!%

%���1$ �':1;����1'.1<� ��#�19����1-���1����# 1�#���3��1.��1� �0�� �#���������&�= ���1���1-$%1 1��4� ��1��� ����� ��#1�#1 ��1��������� ����� ��#1�����1����1�������2�� ����������1�1���������+1)�� ���1�������#��#��1�#��13� �1��4� ����1$ �'

����(���66> �5�7�"�����1��0�� %!�$*9%

%���1$ �':1;����1'.1<� ��#�19����1-���1����# 1�#���3��1.��1� �0�� �#���������&�= ���1���1-$%1 1��4� ��1��� ����� ��#1�#1 ��1��������� ����� ��#1�����1����1�������2�� ����������1�1���������+1)�� ���1�������#��#��1�#��13� �1��4� ����1$ �'

��&�55>>��6 �5�7�"�����1��0�� %!�$*9%

%���1$ �':1;����1'.1<� ��#�19����1-���1����# 1�#���3��1.��1� �0�� �#���������&�= ���1���1-$%1 1��4� ��1��� ����� ��#1�#1 ��1��������� ����� ��#1�����1����1�������2�� ����������1�1���������+1)�� ���1�������#��#��1�#��13� �1��4� ����1$ �'

��&>�(��>5> �5�7�"�����1��0�� !8'$9!%

%���1$ �':1;����1'.1<� ��#�19����1-���1����# 1�#���3��1.��1� �0�� �#���������&�= ���1���1-$%1 1��4� ��1��� ����� ��#1�#1 ��1��������� ����� ��#1�����1����1�������2�� ����������1�1���������+1)�� ���1�������#��#��1�#��13� �1��4� ����1$ �'

Page 15: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

APPENDIX E-3: Background Information Document

Page 16: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

1. BACKGROUND

Eskom Holdings SOC Limited (Eskom) intends to rehabilitate several degraded

wetlands in and around the Kusile Power Station. The rehabilitation of the degraded

wetlands will be undertaken by implementing the wetland offset strategy which was

developed and approved in support of the integrated environmental authorisation for

the Kusile 60-year Ash Disposal Facility (ADF) project.

2. DESCRIPTION OF THE PROJECT

Eskom Holdings (Pty) Ltd, intends to rehabilitate several degraded wetlands at the

Kusile Power Station, Mpumalanga. Wetland rehabilitation involves the construction

of a variety of interventions that could include gabions, concrete structures; as well

as soft options such as re-vegetation, removal of alien vegetation and in-filling of

agricultural scars. The number, type, scale and location of each of these

interventions within the wetlands would vary according to the nature and magnitude

of the problem and the condition of the receiving environment.

Figure 1: Location of wetlands to be rehabilitated (in green) at Kusile Power Station

PURPOSE OF THIS

DOCUMENT

This Background Information

Document (BID) has been

structured to provide all

potential Interested and

Affected Parties (I&APs) with

a concise overview of the

proposed project activities as

well as the associated

Environmental Authorisation

Processes. Furthermore this

BID also intend to provide

I&APs with information

relating to the manner in

which I&APs can voice any

issues concering the

proposed project. The

compilation and distribution of

this BID form part of the

Public Participation Process

for the project.

When you complete and

return the registration form

included with the BID, you will

be included in the

stakeholder database and

receive further documents for

review and comment. Your

comment will ensure that all

issues of concern are

incorporated. To raise your

concerns, please complete

the enclosed registration

sheet, write a letter, call or e-

mail the public participation

office. All documents will be

available on the internet at

www.zitholele.co.za/environm

ental, under heading “Kusile

WOP and PPP”.

For enquiries, please

contact: Dr. Mathys Vosloo

Zitholele Consulting (Pty) Ltd

Building 1, Maxwell Office

Park, Magwa Crescent West,

Waterfall City, Midrand, 1685

PO Box 6002, Halfway

House, 1685

Tel: 011 207 2060

Fax: 086 674 6121

E-mail:

[email protected]

Basic Assessment for engineering interventions proposed for the

rehabilitation of degraded wetlands around Kusile Power Station,

Mpumalanga Province.

BACKGROUND INFORMATION DOCUMENT

22 November 2017

7/537

3/566

Page 17: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

3. DESCRIPTION OF THE STUDY AREA

The focal area is located just east of Bronkhorstspruit along the border of Gauteng and Mpumalanga province. The

Kusile Power Station is situated south of the N4 highway and is accessed from the secondary road, D686. The New

Largo Colliery is situated eat of the power station, while the Eyethu Coal’s Klipfontein Colliery is situated directly south

of the approved location for the Kusile Power Station 60 year Ash Disposal Facility (ADF).

The wetlands that will be investigated are given in the Figure 1 and are located within the following properties:

Parcel 537; Portions 1 (Re.), 2, 4, 5, 6 and 7

Parcel 565; Portions 1 and 2

Parcel 566; Portions 3

The proposed activities fall in the Olifants River Catchment (Primary Catchment B), but more specifically in quaternary

catchment B20F and is directly linked to the Wilge River (sub-quaternary B20F-01150). The Wilge River flows north

and forms a tributary of the larger Olifants River. Two key tributaries of the Wilge River are the Klipfonteinspruit and

the Holspruit, both of which extend past the north and southern extents of the Kusile Power Station infrastructure

footprint. These tributaries form the focal systems of the rehabilitation.

Most of the wetlands in the area (along the Wilge River and associated tributaries in the study area) have been

denoted as Freshwater Ecosystem Priority Areas (Wetland FEPAs) or recognised as important wetland clusters.

These wetlands are important contributors to base flow maintenance of the perennial Wilge River (SQ B20F-01150),

as well as flood attenuation which protects the integrity of banks along the downstream Wilge environment. The

predominant land use in the region is agriculture (cultivation) and various mining activities. The extent of cultivated

land ranges in intensity of use from historically cultivated land to currently cultivated. There is also a mixed mosaic of

improved and unimproved grassland throughout the area.

4. NEED AND DESIRABILITY OF THE PROJECT

The rehabilitation of these wetlands function to address the loss of various wetlands within the footprint of the Kusile

Power Station ADF. The construction of ADF infrastructure will result in residual impacts and, in worst cases, the loss

of various wetlands. In order to compensate for this loss, Eskom propose to undertake the rehabilitation of

downstream wetlands in the same catchment through the implementation of a wetland offset. It is the specific wetland

rehabilitation measures proposed to be implemented that triggers the need to undertake this environmental

authorisation process.

5. LEGAL REQUIREMENTS

Environmental Authorisation

The proposed rehabilitation interventions require environmental authorisation from the Competent Authority, i.e. the

Department of Environmental Affairs (DEA), in terms of the National Environmental Manament Act, No 107 of 1998

(NEMA): Environmental Impact Assessment (EIA) regulations 2014, as amended. The proposed project is likely to

trigger a number of listed activities in terms of Listing Notice 1 (GN R983) and Listing Notice 3 (GN R985) of EIA

regulations 2014 as amended (refer to Table 1).

Activities triggered in Listing Notice 1 indicates that an application for environmental authorisation must be undertaken

via a Basic Assessment Process.

Table 1: Listed activities that may be applicable to the project

Listed Activities as per EIA regulations 2014, GN R983 (Listing

Notice 1) and GN R985 (Listing Notice 3), as amended

Applicability to proposed project

Listing Notice 1, Item 12: The development of (i) dams or weirs,

where the dam or weir, including infrastructure and water surface

area, exceeds 100 square metres; or (ii) infrastructure or structures

with a physical footprint of 100 square metres or more; where such

development occurs (a) within a watercourse; or (c) if no

development setback exists, within 32 metres of a watercourse,

measured from the edge of a watercourse. Exclusions not

applicable.

Combined area of engineering structures for

wetland rehabilitation measures is expected

to be >100m2.

Page 18: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

Listing Notice 1, Item 19: The infilling or depositing of any material

of more than 10 cubic metres into, or the dredging, excavation,

removal or moving of soil, sand, shells, shell grit, pebbles or rock of

more than 10 cubic metres from a watercourse. Exclusions not

applicable.

Comined area of material deposition or

excavation for the proposed rehabilitation

measures is expected to be >10m3.

Listing Notice 1, Item 30:. Any process or activity identified in terms

of section 53(1) of the National Environmental Management:

Biodiversity Act, 2004 (Act No. 10 of 2004).

Study area contain threatened ecosystems

listed in Biodiversity Act (Act 10 of 2004),

some of which are classified as Vulnerable.

Listing Notice 3, Item 12: The clearance of an area of 300 square

metres or more (exclusion not applicable) in:c. Gauteng or f

Mpumalanga, in specific identified geographical areas that contain

sensitive or protected ecosystems, habitat or species as stipulated in

GN R985, as amended.

Combined area of vegetation clearance is

expected to be >300m2 and the study area fall

within Gauteng and Mpumalanga Province

and contain threatened ecosystems listed in

Biodiversity Act (Act 10 of 2004), or Critical

Biodiversity Areas (CBAs).

Listing Notice 3, Item 14: The development of (i) dams or weirs,

where the dam or weir, including infrastructure and water surface

area, exceeds 10 square metres; or (ii) infrastructure or structures

with a physical footprint of 10 square metres or more; where such

development occurs (a) within a watercourse; or (c) if no

development setback has been adopted, within 32 metres of a

watercourse, measured from the edge of a watercourse (exclusions

not applicable) in:c. Gauteng or f Mpumalanga, in specific identified

geographical areas that contain sensitive or protected ecosystems,

habitat or species as stipulated in GN R985, as amended.

Combined area of vegetation clearance is

expected to be >10m2 and the study area fall

within Gauteng and Mpumalanga Province

and contain threatened ecosystems listed in

Biodiversity Act (Act 10 of 2004), or Critical

Biodiversity Areas (CBAs).

Listed activities that may be applicable to this project will be confirmed during the Basic Assessment process and

considered in the application

Water Use Licence

In terms of Section 39 of the National Water Act, No 36 of 1998 (NWA), a General Authorisation (GA) has been

granted for use of water in respect of section 21(c) and (i) of the NWA for activities occurring near or in a wetland (GN

509 of 26 August 2016). This GA relieves a water user from the need to apply for a licence for impeding or diverting

the flow of water in a watercourse in terms of section 21 (c) or altering the bed, banks, course or characteristics of a

watercourse in terms of section 21 (i) of the Act for activities proposed near or within a wetland, provided that the use

is within the provisions set out in the GA. An application for water use authorisation in the form of application for GA is

therefore required to be submitted to the competent authority, i.e. the Department of Water and Sanitation (DWS).

In terms of the above, an integrated authorisation process will be undertaken for the application of an Environmental

Authorisation and a General Authorisation for the rehabilitation of degraded wetlands associated with the wetland

offset for the Kusile Power Station 60 year ADF.

6. BASIC ASSESSMENT PROCESS

A Basic Assessment (BA) aims to provide an objective view of the potential environmental and social impacts that

could arise during the planning, construction, operation and decommissioning phase of a proposed project. A critical

element of the BA Process is the Public Participation Process that gives Interested and Affected Parties (I&APs) an

opportunity to provide comments on a proposed development. The outcome of the BA Process is consicely presented

and documented in the Basic Assessment Report (BAR) in order to provide the Conmpetent Authority with all ithe

information in order to maka an informed decision.

The BAR content aligns with the requirements of Appendix 1 of the EIA regulations, 2014 (GN R.982) and timeframes

are strictly adhered to through careful management of process. Figure 2 provides a process flow diagram indicating

the key tasks to be carried out for the BA Process.

Page 19: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

Figure 2: Process Flow Diagram for the steps required in a Basic Assessment Process

A decision on the application for environmental authorisation through a BA process is usually reached within 107 days

of receipt of the BAR by the Competent Authority.

7. PUBLIC PARTICIPATION PROCESS

As an important element in undertaking the BA for the proposed project, Zitholele Consulting will conduct the public

participation process as set out in the NEMA EIA regulations, 2014. Applicable guidelines and best practice

procedures will furthermore be taken into consideration. The public participation process will enable stakeholders to

contribute to the process through information sharing and to review the findings of the independent studies that are to

be undertaken. The steps of the public participation component are outlined below.

Figure 3: Process Flow of the Public Participation Process

Determine application for Env. Authorisation

process

Confirm scope of work and undertake initial

investigations

Pre-application meeting with authorities

Undertake site screening / scoping and identify

alternatives

Specialist studies & stakeholder engagement (Project announcement)

Comparative impact assessment and

alternatives assessment

Impact Assessment for preferred alternative

(Assess, rate, mitigate)

Compile Basic Assessment Report and

EMPr

Submit application & BAR to authorities /

I&APs for review

Authority and public review and engagement

(30 days)

Submit Basic Assessment Report and EMPr to

Authorities for consideration

Authority Decision

Advertising - public notice of the BA process in national / provincial

newspaper

Place site notice boards at the project sites being

investigated and at public places at closest town

Notify affected and adjacent landowners and Interested and Affected Parties (I&APs) of the proposed application

Undertake Public and Focus Group Meetings

during public review period

Document stakeholder comments in the

Comments and Responses Report (CRR)

Notify stakeholders when the Final BAR is submitted

to the DEA

Notify stakeholders when the Environmental

Authorisation is issued.

90

days

10

7 d

ays

Page 20: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

8. GENERAL AUTHRISATION REGISTRATION PROCESS

The GA registration process is undertaken in terms of GN 1198 of 18 December 2009, as contemplated in section 5

above. The registration process include the completion of water use registration forms that are submitted to the

Department of Water and Sanitation for consideration. Upon completion of registration, the Department will provide a

certificate of registration to the water user.

9. DECISION-MAKING (ENVIRONMENTAL AUTHORISATION)

Based on the information provided in the final BAR, the Competent Authority will make a decision to grant or refuse

environmental authorisation. The granting of environmental authorisation will allow the Applicant to proceed with

implementing the proposed project activities. Once the Competent Authority has reached a decision, with regards to

granting the environmental authorisation, all registered I&APs will be notified thereof within 14 days of the date of the

decision. An appeal may be lodged against the decision made in terms of the National Environmental Management

Act (107 of 1998) and National Appeal Regulations, 2014. I&APs will be notified of the decision made by the

Competent Authority by means of the following:

Via electronic mail;

Facsimile (to I&APs who do not have access to electronic mail);

Registrered mail (to those I&APs who do not have access to electronic mail nor facsimile facilities).

The Basic Assessment Process will be concluded by the notification of I&APs of the decision made by the

Competent Authority.

10. MAP OF PROJECT LOCATION

A locality Map of the proposed project can be found in Figure 4 below.

11. BID COMMENT SHEET

A comment sheet associated with this project and Basic Assessment process in included at the end of this BID.

Please complete and return to the PPP desk by hand delivery to the offices of Zitholele Consultin, scan and email to

the email address provided, fax to fax noumber provided or by submitting your comments elephinically to the PPP

desk via the landline number specified in the left column on page 1 of this BID.

Page 21: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

Figure 4: Locality Map of the Proposed Project

Page 22: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

ENVIRONMENTAL AUTHORISATION: BASIC ASSESSMENT FOR ENGINEERING

INTERVENTIONS PROPOSED FOR THE REHABILITATION OF DEGRADED WETLANDS

AROUND KUSILE POWER STATION, MPUMALANGA PROVINCE.

22 November 2017

REGISTRATION AND COMMENT SHEET

Public Participation Process desk

Dr. Mathys Vosloo Zitholele Consulting (Pty) Ltd

P O Box 6002, Halfway House, 1685 Tel: 011 207 2060 - Fax: 086 674 6121

Email: [email protected]

PLEASE NOTE: ALL FIELDS ARE MANDATORY TO COMPLETE. Please complete by 8 December 2017 and return to the Public Participation Process desk (as above).

TITLE NAME

SURNAME

ORGANISATION (Please do not use any acronyms)

ADDRESS

POSTAL CODE

TELEPHONE NO FAX NO

E-MAIL ADDRESS

CELLPHONE NO

DATE SIGNATURE

Would you be interested in attending the Public Meeting envisaged for January 2018? YES NO

Please formally register me as an interested and/or affected party (I&AP) so that I may receive further

information and notifications during the BA process YES NO

I would like to receive documents for comment as follows:

By e-mail

By SMS

By fax

In terms of the National Environmental Management Act, (Act No. 107 of 1998), EIA Regulations GN R 982 – Government Gazette No. 38282 of 04 December 2014, as amended, Regulation 43(1), I disclose below any direct business, financial, personal or other interest that I may have in the approval or refusal of the application (please use additional sheet if required):

………………………………………………………………………………………………………………………………………….

………………………………………………………………………………………………………………………………………….

COMMENTS (please use separate sheets if you wish)

I suggest that the following issues of concern be considered in the BA:

…………………………………………………………………………………………………………………………………………… ……………………………………………………………………………………………………………………………………………

……………………………………………………………………………………………………………………………………………

Please inform the following of my colleagues/friends/neighbors whom may be interested to register their participation in this project (Please provide name, mobile number and email address of the potential I&AP):

………………………………………………………………………………………………………………………………………….. …………………………………………………………………………………………………………………………………………..

THANK YOU FOR YOUR CONTRIBUTION

Page 23: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

APPENDIX E-4: Site Notice

Page 24: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

Notice is hereby given in terms of the National Environmental

Management Act, No 107 of 1998 (NEMA), and Environmental

Impact Assessment Regulations 2014 (GN R.982), of the

intention of Eskom Holdings SOC Ltd to implement proposed

engineering interventions for the rehabilitation of degraded

wetlands around Kusile Power Station.

Nature of Proposed Development

Eskom Holdings (Pty) Ltd, intends to rehabilitate several degraded wetlands at the Kusile

Power Station, Mpumalanga. Wetland rehabilitation involves the construction of a variety of

interventions that could include gabions, concrete structures; soft options such as re-

vegetation, removal of alien vegetation and in-filling of agricultural scars. The number, type,

scale and location of each of these interventions within the wetlands would vary according to

the nature and magnitude of the problem and the condition of the receiving environment.

Location of Proposed Development

The study area is located northwest of the Kusile Power Station nearby the settlements of

Bronkhorstspruit and Phola. Engineering wetland interventions are proposed on farm portions

owned by Eskom and includes the following properties:

Parcel 537; Portions 1 (Re.), 2, 4, 5, 6 and 7

Parcel 565; Portions 1 and 2

Parcel 566; Portion 3

Legislative requirements

The proposed wetland rehabilitation interventions will trigger a number of listed activities in

terms of the EIA regulations, 2014, Listing Notice 1 (GN R.983) and Listing Notice 3 (GN

R.985), as amended, and will require a Basic Assessment process to be undertaken.

The interventions will also trigger water uses in terms of section 21 (c) and (i) of the National

Water Act, No 36 of 1998. The proposed water uses relate to the rehabilitation of wetlands for

conservation purposes which is an activity already authorised in terms of General

Authorisation 509 of 26 August 2016 and only require registration of the water use with the

Department of Water and Sanitation.

How to contact the Public Participation Process desk

I&APs may contact the PPP desk at the following detail below:

Dr. Mathys Vosloo

Zitholele Consulting (Pty) Ltd, P O Box 6002, Halfway House, 1685

Tel: (011) 207 2060, Fax: 086 674 6121, or Email: [email protected]

BASIC ASSESSMENT FOR ENGINEERING INTERVENTIONS PROPOSED FOR THE REHABILITATION

OF DEGRADED WETLANDS AROUND KUSILE POWER STATION, MPUMALANGA PROVINCE

PUBLIC COMMENT ENCOURAGED Interested and Affected Parties (I&APs) are invited to participate by

registering as an I&AP and commenting on the project in the following way:

1. Download BID at the link: www.zitholele.co.za/environmental, under heading “Kusile

WOP and PPP” or obtain copy at the Ogies, Phola or Emhalahleni Public Library

2. Register in writing by completing and returning registration form attached to the BID

to the PPP desk at the details specified on this site notice

3. Request BID or more info from PPP desk at contact details specified in this site notice

4. Review and comment on documents sent to registered IA&Ps and uploaded to: www.zitholele.co.za/environmental, under heading “Kusile WOP and PPP”. THIS SITE NOTICE WAS PLACED ON 22 NOVEMBER 2017

7/537

3/566

Page 25: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

APPENDIX E-5: Advertisement

Page 26: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort
Page 27: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

APPENDIX E-6: Comments and Responses Report

Page 28: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

Zitholele Consulting Reg. No. 2000/000392/07

PO Box 6002 Halfway House 1685, South Africa Building 1, Maxwell Office Park, Magwa Crescent West c/o Allandale Road & Maxwell Drive, Waterfall City, Midrand T : 011 207 2060 F : 086 674 6121 E : [email protected]

Directors : Dr. R.G.M. Heath, S. Pillay, N. Rajasakran

REPORT ON

Comments and Responses for the proposed Kusile 60 Year ADF

Wetland Rehabilitation Interventions

Report No : 17107-46-Rep-003-CRR

Submitted to :

Eskom Holdings SOC Limited

PO Box 1091 Johannesburg

2000

12 December 2017 17107

Page 29: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

12 December 2017 iii 17107

ZITHOLELE CONSULTING

TABLE OF CONTENTS

SECTION PAGE

1 INTRODUCTION.................................................................................................. 4 2 COMMENTS RECEIVED DURING PUBLIC PARTICIPATION PROCESS ..... 4

2.1 Comments by Bronkhorstspruit and Wilge River Conservation Association ..... 4 2.2 Comments raised by Ms Wilma Lutsch (DEA) ................................................. 4 2.3 Comments raised by Ms Sandria Lensley (Rooibokkop Boerdery) .................. 5 2.4 Comments raised by Dr James Meyer (Topigs SA, nominated representative) 5

LIST OF ACRONYMS

BA Basic Assessment

BAR Basic Assessment Report

CBA Critical Biodiversity Area

CRR Comments and Response Report

DAFF Department of Agriculture, Forestry and Fisheries

DWS Department of Water and Sanitation

EAP Environmental Assessment Practitioner

EIA Environmental Impact Assessment

EMC Environmental Monitoring Committee

EMPr Environmental Management Programme

EP Environmental Practitioner

ER Ecological Reserve

FGM Focus Group Meeting

KPS Kusile Power Station

NEMA National Environmental Management Act, 107 of 1998, as amended

NEMBA National Environmental Management: Biodiversity Act

NFEPA National Freshwater Ecosystem Priority Areas

PES Present Ecological State

PP Public Participation

PPP Public Participation Process

SANBI South African National Biodiversity Institute

WOP Wetland Offset Plan

WOS Wetland Offset Strategy

ZC Zitholele Consulting

Page 30: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

12 December 2017 4 17107-46-Rep-003-CRR

ZITHOLELE CONSULTING

1 INTRODUCTION

This Comments and Responses Report (CRR) captures the comments and issues raised by

stakeholders during the Public Participation Process for the proposed Wetland Rehabilitation

Interventions for degraded wetland around the Kusile Power Station. Details of the PP process

have been captured in the BAR, to which this CRR is included as an appendix. For easy

reference and review, comments / concerns / issues / recommendations have been captured

alphabetically according to surname.

2 COMMENTS RECEIVED DURING PUBLIC PARTICIPATION PROCESS

2.1 Comments by Bronkhorstspruit and Wilge River Conservation Association

No COMMENT / CONCERN / RECOMMENDATION

RAISED BY SOURCE DATE RESPONSE

1 Please change our email address on your database to [email protected]

Bronkhorstspruit and Wilge River Conservancy Association

Email 27/11/2017 Thank you for your feedback. We will change the email address to [email protected] as requested. Mathys Vosloo, Public Participation Process Desk

2.2 Comments raised by Ms Wilma Lutsch (DEA)

No COMMENT / CONCERN / RECOMMENDATION

RAISED BY SOURCE DATE RESPONSE

2 Please be so kind and send me the CD . The address: Environment House, Cnr Steve Biko and Soutpansberg St, Arcadia, Pretoria

Lutsch, Wilma: Director: Biodiversity Conservation (DEA)

Email 24/11/2017 Dear Wilma, We are currently at the start of the BA process and we only have the BID available for public input. Are you requesting us to send you a CD with the BID, or to provide you with a CD of the Draft BAR for public review once it becomes available for review? Mathys Vosloo, Public Participation Process Desk

3 Please forward CD of the Draft BAR when it becomes available.

Wilma Lutsch, Director: Biodiversity Conservation (DEA)

Email 27/11/2017 Hi, We will send the CD as soon as it becomes available. Mathys Vosloo, Public Participation Process Desk

4 Dear Mathys, Apologies if I misunderstood you. I would like to request that you send the draft BAR once it becomes available for review.

Wilma Lutsch, Director: Biodiversity Conservation (DEA)

Email 27/11/2017 Dear Wilna, Thanks for the clarification. We will certainly do so once the draft BAR is ready to go out for review. Mathys Vosloo, Public Participation Process Desk

Page 31: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

12 December 2017 5 17107-46-Rep-003-CRR

ZITHOLELE CONSULTING

2.3 Comments raised by Ms Sandria Lensley (Rooibokkop Boerdery)

No COMMENT / CONCERN / RECOMMENDATION

RAISED BY SOURCE

DATE RESPONSE

5 Sandria Lensley Cell no 079 850 5918 Portion 19 of the farm Spitskop 502 JR Rooibokkop Boerdery (SHP Lensley director) Thanks Sandria Lensley

Lensley, Sandria: Rooibokkop Boerdery

Email 30/11/2017 Dear Sandria, Thank you for your response to the project announcement notification. You remain registered on the project stakeholder database and we have updated you details as per your response email. We will notify you in due course of the availability of the Draft Basic Assessment Report for review and comment. Mathys Vosloo, Public Participation Process Desk

2.4 Comments raised by Dr James Meyer (Topigs SA, nominated representative)

No COMMENT / CONCERN / RECOMMENDATION

RAISED BY SOURCE

DATE RESPONSE

6 Dear Mathys The BID received refers. Please confirm the following: 1) Topigs SA (Pty) Ltd is already a registered I&AP for this process.

Dr James Meyer Topigs SA (nominated representative)

Email 05/12/2017 Hi James, Trust you are doing well. Apologies for the delay in responding. In terms of your points in your email: 1. Yes, Topigs SA is a key stakeholder and given the proximity to the proposed offset Topigs SA has been automatically included in the project stakeholder database. Yourself and Topigs SA will therefore receive all communications regarding the Basic Assessment. Mathys Vosloo, Public Participation Process Desk

7 2) Comments submitted by Topigs SA (Pty) Ltd pertaining to the WOS have been received and incorporated.

Dr James Meyer Topigs SA (nominated representative)

Email 05/12/2017 2. The comments submitted previously by Topigs has been received and considered by Prime Africa. Prime Africa is the EAP on this Basic Assessment Process and it is anticipated that the Basic Assessment Report will be submitted to all stakeholder by 15 December 2017. You can therefore comment on the BAR and supporting documents, which will include the wetland offset document completed. Mathys Vosloo, Public Participation Process Desk

8 3) Topigs SA (Pty) Ltd would like to attend the PPP planned for January 2018 – please provide the planned date.

Dr James Meyer Topigs SA (nominated representative)

Email 05/12/2017 3. The EAP have not confirmed the date for the PPP meeting but will communicated by 15 December 2017. Mathys Vosloo, Public Participation Process Desk

9 4) The BID received appears to address the first phase of the WOS received, namely addressing the wetlands on Eskom property first. a. I do not see any mention in the BID that this is part of a broader strategy, with the next phase involving other wetland offset areas, e.g. the Topigs SA

Dr James Meyer Topigs SA (nominated representative)

Email 05/12/2017 4. a) The Background Information Document is aimed at introducing the proposed project. The broader wetland offset strategy includes the different phases as propose in the wetland offset strategy. The wetland specialist have however found that no engineering wetland interventions will be required for the Topigs property and as such the property is not included in the application

Page 32: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

12 December 2017 6 17107-46-Rep-003-CRR

ZITHOLELE CONSULTING

No COMMENT / CONCERN / RECOMMENDATION

RAISED BY SOURCE

DATE RESPONSE

(Pty) Ltd property as noted in the comments submitted by Topigs SA (Pty) Ltd.

to authorise the construction of wetland rehabilitation interventions (hard structures) Mathys Vosloo, Public Participation Process Desk

10 b. If there are any EAs, or WULs, that relate to the WOS which have been issued, please provide me with copies thereof.

Dr James Meyer Topigs SA (nominated representative)

Email 05/12/2017 b) An environmental authorisation for the construction of the Kusile 60 year Ash Disposal Facility was issued in July 2015. I have attached this EA to this email for information. As you may recall, the EIA undertaken for the Kusile 60 year ADF included a preliminary wetland offset strategy proposed in terms of the mitigation hierarchy. This wetland offset strategy was therefore approved as part of the EA after consultation with DWS on the content and extent of the proposed wetland offset. Earlier this year (2017) Zitholele Consulting undertook another public participation process for the updated wetland offset strategy presented in the EIA, which you were part of. There has been no further EAs or WULs issued pertaining to the Kusile 60 year ADF wetland offset. Mathys Vosloo, Public Participation Process Desk

11 c. Please clarify the context of the “approval” referred to in Point 1 Background, and provide me with a copy thereof.

Dr James Meyer Topigs SA (nominated representative)

Email 05/12/2017 c) the approval referred to in Point 1 Background of the Background Information Document relates to the EA that was granted in July 2015 for the Kusile 60 year ADF EIA application, as discussed in point b) above. I trust the responses at this stage answers your question and look forward to engage with you in the public participation process soon to kick off for this Basic Assessment application. Mathys Vosloo, Public Participation Process Desk

12 Dear Mathys, Given the end day tomorrow set, could you please respond as soon as possible, at least to point 1 below in my email sent on Dec 5th. The BID requires a returned I&AP page by the 8th – but what is the date for comments to the BID – I do not see this specified?

Dr James Meyer Topigs SA (nominated representative)

Email 07/12/2017 Dear James, Thank you for your email. I have responded to your original email. You do not need to return the I&AP page as yourself and Topigs SA are automatically included in the project stakeholder database. Furthermore, you do not need to respond to the BID as this document is intended to introduce the proposed development and Basic Assessment process to Interested and Affected Parties. Notification will be sent out in due course to inform all registered IA&Ps of the availability of the Basic Assessment Report for stakeholder comment. We look forward to your participation in the Basic Assessment processes for this project.

Page 33: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

12 December 2017 7 17107-46-Rep-003-CRR

ZITHOLELE CONSULTING

No COMMENT / CONCERN / RECOMMENDATION

RAISED BY SOURCE

DATE RESPONSE

Mathys Vosloo, Public Participation Process Desk

Page 34: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

APPENDIX E-7: Proof of Correspondence with I&APs

Page 35: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

1

Mathys Vosloo

From: 17107 - Kusile WOP BA

Sent: Monday, 27 November 2017 1:49 PM

To: Bhs and Wilge River Conserv Ass; 17107 - Kusile WOP BA

Subject: RE: 17107-02-001 Kusile BA: Notice of Project Announcement

Importance: High

Dear Annamie,

Thank you for your feedback. We will change the email address to [email protected] as requested.

Kind regards

Dr. Mathys Vosloo

17107 Kusile Basic Assessment: PPP Desk

Tel: 011 207 2060, Fax: 086 674 6121, E-mail: [email protected]

FOR Zitholele Consulting (Pty) Ltd

From: Bhs and Wilge River Conserv Ass [mailto:[email protected]]

Sent: Monday, 27 November 2017 8:40 AM

To: 17107 - Kusile WOP BA Subject: RE: 17107-02-001 Kusile BA: Notice of Project Announcement

Good day

Please change our email address on your database to [email protected]

Kind Regards

Annamie Duvenage

Bronkhorstspruit and Wilge River Conservancy Association (GCA067)

Defining ourselves not by what and how we consume

But by what we refuse to destroy

From: 17107 - Kusile WOP BA [mailto:[email protected]]

Sent: 23 November 2017 04:26 PM

To: Mathys Vosloo

Cc: Lebo Petlane Subject: 17107-02-001 Kusile BA: Notice of Project Announcement

Importance: High

Page 36: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

2

Dear Stakeholder,

BASIC ASSESSMENT FOR ENGINEERING INTERVENTIONS PROPOSED FOR THE REHABILITATION OF DEGRADED

WETLANDS AROUND KUSILE POWER STATION, MPUMALANGA PROVINCE

Notice is given in terms of Section 41(2)(b) of the EIA regulations , 2014 (GN R.982), as amended, in terms of the

National Environmental Management Act (Act 107 of 1998), as amended, of the intention of Eskom Holdings SOC

Ltd to undertake activities relating to the rehabilitation of several degraded wetlands at and around the Kusile

Power Station, Mpumalanga. A Basic Assessment process must be undertaken in terms of the EIA regulations, 2014

to identify, assess and mitigate all potential impacts to within acceptable levels.

You have been identified as a key stakeholder for the abovementioned project and are therefore informed of the

Basic Assessment process underway. A Background Information Document (BID) that contains information regarding

the proposed project, Basic Assessment process and how you can become involved is attached to this email

notification. All documents will be available on the internet at www.zitholele.co.za/environmental, under heading

“Kusile WOP and PPP”. Further communication will follow in due course as the Basic Assessment process unfolds.

BIDs have furthermore been placed at the following public venues for collection:

PUBLIC VENUE ADDRESS

Victor Khanye

Local

Municipality

Cnr Samuel & Van

der Walt Streets,

Delmas

Delmas Public

Library

Cnr Sarel Cilliers &

Van Riebeeck Street

Phola Public

Library

2427 Qwabe Street,

Phola Location

Ogies Public

Library

61 Main Street,

Ogies

It is advised to complete the comment sheet attached at the back of the BID and return to the PPP Desk in order for

us to confirm your contact details on the project database. However, if you do not wish to be involved in this Basic

Assessment process please request the PPP Desk to remove you from the project database as a key stakeholder.

The PPP Desk can be contacted at the contact details provided in the BID and below.

Kind regards

Dr. Mathys Vosloo

17107 Kusile Basic Assessment: PPP Desk

Tel: 011 207 2060, Fax: 086 674 6121, E-mail: [email protected]

FOR Zitholele Consulting (Pty) Ltd

Page 37: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

1

Mathys Vosloo

From: 17107 - Kusile WOP BA

Sent: Tuesday, 28 November 2017 4:04 PM

To: Wilma Lutsch; 17107 - Kusile WOP BA

Cc: Stanley Tshitwamulomoni

Subject: RE: 17107-02-001 Kusile BA: Notice of Project Announcement

Importance: High

Dear Wilna,

Thanks for the clarification. We will certainly do so once the draft BAR is ready to go out for review.

Kind regards

Dr. Mathys Vosloo

17107 Kusile Basic Assessment: PPP Desk

Tel: 011 207 2060, Fax: 086 674 6121, E-mail: [email protected]

FOR Zitholele Consulting (Pty) Ltd

From: Wilma Lutsch [mailto:[email protected]]

Sent: Monday, 27 November 2017 2:40 PM

To: 17107 - Kusile WOP BA Cc: Stanley Tshitwamulomoni

Subject: RE: 17107-02-001 Kusile BA: Notice of Project Announcement

Dear Mathys

Apologies if I misunderstood you. I would like to request that you send the draft BAR once it becomes available for

review.

Thanks

Wilma

From: 17107 - Kusile WOP BA [mailto:[email protected]]

Sent: 27 November 2017 01:54 PM

To: Wilma Lutsch; 17107 - Kusile WOP BA

Cc: Stanley Tshitwamulomoni

Subject: RE: 17107-02-001 Kusile BA: Notice of Project Announcement

Importance: High

Dear Wilma,

We are currently at the start of the BA process and we only have the BID available for public input.

Are you requesting us to send you a CD with the BID, or to provide you with a CD of the Draft BAR for public review

once it becomes available for review?

Kind regards,

Dr. MATHYS VOSLOO [Pr.Sci.Nat.]

Senior Environmental Scientist

Page 38: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

2

Building 1, Maxwell Office Park, Magwa Crescent West, Waterfall City, Midrand, RSA

T: +27 11 207 2060 | F: +27 86 674 6121

C: +27 84 748 3018 | E: [email protected]

W: www.zitholele.co.za

Please consider the environment before printing this e-mail!

From: Wilma Lutsch [mailto:[email protected]]

Sent: Friday, 24 November 2017 9:15 AM

To: 17107 - Kusile WOP BA Cc: Stanley Tshitwamulomoni

Subject: RE: 17107-02-001 Kusile BA: Notice of Project Announcement

Dear Mathys

Please be so kind and send me the CD .

The address

Environment House

Cnr steve Biko and Soutpansberg St

Arcadia

Pretoria

Thanks

Wilma Lutsch

Director: Biodiversity Conservation

Tel 012 3998827

From: 17107 - Kusile WOP BA [mailto:[email protected]]

Sent: 23 November 2017 04:26 PM

To: Mathys Vosloo

Cc: Lebo Petlane

Subject: 17107-02-001 Kusile BA: Notice of Project Announcement

Importance: High

Dear Stakeholder,

BASIC ASSESSMENT FOR ENGINEERING INTERVENTIONS PROPOSED FOR THE REHABILITATION OF DEGRADED

WETLANDS AROUND KUSILE POWER STATION, MPUMALANGA PROVINCE

Notice is given in terms of Section 41(2)(b) of the EIA regulations , 2014 (GN R.982), as amended, in terms of the

National Environmental Management Act (Act 107 of 1998), as amended, of the intention of Eskom Holdings SOC

Page 39: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

3

Ltd to undertake activities relating to the rehabilitation of several degraded wetlands at and around the Kusile

Power Station, Mpumalanga. A Basic Assessment process must be undertaken in terms of the EIA regulations, 2014

to identify, assess and mitigate all potential impacts to within acceptable levels.

You have been identified as a key stakeholder for the abovementioned project and are therefore informed of the

Basic Assessment process underway. A Background Information Document (BID) that contains information regarding

the proposed project, Basic Assessment process and how you can become involved is attached to this email

notification. All documents will be available on the internet at www.zitholele.co.za/environmental, under heading

“Kusile WOP and PPP”. Further communication will follow in due course as the Basic Assessment process unfolds.

BIDs have furthermore been placed at the following public venues for collection:

PUBLIC VENUE ADDRESS

Victor Khanye

Local

Municipality

Cnr Samuel & Van

der Walt Streets,

Delmas

Delmas Public

Library

Cnr Sarel Cilliers &

Van Riebeeck Street

Phola Public

Library

2427 Qwabe Street,

Phola Location

Ogies Public

Library

61 Main Street,

Ogies

It is advised to complete the comment sheet attached at the back of the BID and return to the PPP Desk in order for

us to confirm your contact details on the project database. However, if you do not wish to be involved in this Basic

Assessment process please request the PPP Desk to remove you from the project database as a key stakeholder.

The PPP Desk can be contacted at the contact details provided in the BID and below.

Kind regards

Dr. Mathys Vosloo

17107 Kusile Basic Assessment: PPP Desk

Tel: 011 207 2060, Fax: 086 674 6121, E-mail: [email protected]

FOR Zitholele Consulting (Pty) Ltd

Please consider the environment before you print this email. Only print if it is essential. A message from the

Department of Environmental Affairs.

Please consider the environment before you print this email. Only print if it is essential. A message from the

Department of Environmental Affairs.

This message and any attachments transmitted with it are intended solely for the addressee(s) and may be

legally privileged and/or confidential. If you have received this message in error please destroy it and notify

the sender. Any unauthorized usage, disclosure, alteration or dissemination is prohibited. The Department of

Environmental Affairs accepts no responsibility for any loss whether it be direct, indirect or consequential,

arising from information made available and actions resulting there from. The views and opinions expressed

in this e-mail message may not necessarily be those of Management.

Please consider the environment before you print this email. Only print if it is essential. A message from the

Department of Environmental Affairs.

Please consider the environment before you print this email. Only print if it is essential. A message from the

Department of Environmental Affairs.

This message and any attachments transmitted with it are intended solely for the addressee(s) and may be

legally privileged and/or confidential. If you have received this message in error please destroy it and notify

Page 40: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

4

the sender. Any unauthorized usage, disclosure, alteration or dissemination is prohibited. The Department of

Environmental Affairs accepts no responsibility for any loss whether it be direct, indirect or consequential,

arising from information made available and actions resulting there from. The views and opinions expressed

in this e-mail message may not necessarily be those of Management.

Page 41: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

1

Mathys Vosloo

From: 17107 - Kusile WOP BA

Sent: Tuesday, 05 December 2017 2:32 PM

To: 'Sandria van Staden'; 17107 - Kusile WOP BA

Subject: RE: 17107-02-001 Kusile BA: Notice of Project Announcement

Importance: High

Dear Sandria,

Thank you for your response to the project announcement notification.

You remain registered on the project stakeholder database and we have updated you details as per your response

email.

We will notify you in due course of the availability of the Draft Basic Assessment Report for review and comment.

Kind regards

Dr. Mathys Vosloo

17107 Kusile Basic Assessment: PPP Desk

Tel: 011 207 2060, Fax: 086 674 6121, E-mail: [email protected] FOR Zitholele Consulting (Pty) Ltd

-----Original Message-----

From: Sandria van Staden [mailto:[email protected]]

Sent: Thursday, 30 November 2017 9:47 AM

To: 17107 - Kusile WOP BA

Subject: Re: 17107-02-001 Kusile BA: Notice of Project Announcement

Sandria Lensley

Cell no 079 850 5918

Portion 19 of the farm Spitskop 502 JR

Rooibokkop Boerdery (SHP Lensley director)

Thanks

Sandria Lensley

On 11/23/17, 17107 - Kusile WOP BA <[email protected]> wrote:

> Dear Stakeholder,

>

> BASIC ASSESSMENT FOR ENGINEERING INTERVENTIONS PROPOSED FOR THE

> REHABILITATION OF DEGRADED WETLANDS AROUND KUSILE POWER STATION,

> MPUMALANGA PROVINCE

>

> Notice is given in terms of Section 41(2)(b) of the EIA regulations ,

> 2014 (GN R.982), as amended, in terms of the National Environmental

> Management Act (Act 107 of 1998), as amended, of the intention of

> Eskom Holdings SOC Ltd to undertake activities relating to the

> rehabilitation of several degraded wetlands at and around the Kusile

> Power Station, Mpumalanga. A Basic Assessment process must be

> undertaken in terms of the EIA regulations,

> 2014 to identify, assess and mitigate all potential impacts to within

Page 42: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

2

> acceptable levels.

>

> You have been identified as a key stakeholder for the abovementioned

> project and are therefore informed of the Basic Assessment process

> underway. A Background Information Document (BID) that contains

> information regarding the proposed project, Basic Assessment process

> and how you can become involved is attached to this email

> notification. All documents will be available on the internet at

> www.zitholele.co.za/environmental<http://www.zitholele.co.za/environme

> ntal>, under heading "Kusile WOP and PPP". Further communication will

> follow in due course as the Basic Assessment process unfolds.

>

> BIDs have furthermore been placed at the following public venues for

> collection:

>

> PUBLIC VENUE

>

> ADDRESS

>

> Victor Khanye Local Municipality

>

> Cnr Samuel & Van der Walt Streets, Delmas

>

> Delmas Public Library

>

> Cnr Sarel Cilliers & Van Riebeeck Street

>

> Phola Public Library

>

> 2427 Qwabe Street, Phola Location

>

> Ogies Public Library

>

> 61 Main Street, Ogies

>

>

> It is advised to complete the comment sheet attached at the back of

> the BID and return to the PPP Desk in order for us to confirm your

> contact details on the project database. However, if you do not wish

> to be involved in this Basic Assessment process please request the PPP

> Desk to remove you from the project database as a key stakeholder.

>

> The PPP Desk can be contacted at the contact details provided in the

> BID and below.

>

> Kind regards

>

> Dr. Mathys Vosloo

> 17107 Kusile Basic Assessment: PPP Desk

> Tel: 011 207 2060, Fax: 086 674 6121, E-mail:

> [email protected]<mailto:[email protected]>

> FOR Zitholele Consulting (Pty) Ltd

>

>

Page 43: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

1

Mathys Vosloo

From: 17107 - Kusile WOP BA on behalf of [email protected]

Sent: Thursday, 07 December 2017 4:27 PM

To: 'Dr JA Meyer'

Cc: Lebo Petlane

Subject: RE: 17107-02-001 Kusile BA: Notice of Project Announcement

Attachments: 12712-Environmental Authorisation.pdf

Importance: High

Hi James,

Trust you are doing well. Apologies for the delay in responding.

In terms of your points in your email:

1. Yes, Topigs SA is a key stakeholder and given the proximity to the proposed offset Topigs SA has been

automatically included in the project stakeholder database. Yourself and Topigs SA will therefore receive all

communications regarding the Basic Assessment.

2. The comments submitted previously by Topigs has been received and considered by Prime Africa. Prime

Africa is the EAP on this Basic Assessment Process and it is anticipated that the Basic Assessment Report will

be submitted to all stakeholder by 15 December 2017. You can therefore comment on the BAR and

supporting documents, which will include the wetland offset document completed.

3. The EAP have not confirmed the date for the PPP meeting but will communicated by 15 December 2017.

4. a) The Background Information Document is aimed at introducing the proposed project. The broader

wetland offset strategy includes the different phases as propose in the wetland offset strategy. The wetland

specialist have however found that no engineering wetland interventions will be required for the Topigs

property and as such the property is not included in the application to authorise the construction of wetland

rehabilitation interventions (hard structures)

b) An environmental authorisation for the construction of the Kusile 60 year Ash Disposal Facility was issued

in July 2015. I have attached this EA to this email for information. As you may recall, the EIA undertaken for

the Kusile 60 year ADF included a preliminary wetland offset strategy proposed in terms of the mitigation

hierarchy. This wetland offset strategy was therefore approved as part of the EA after consultation with

DWS on the content and extent of the proposed wetland offset. Earlier this year (2017) Zitholele Consulting

undertook another public participation process for the updated wetland offset strategy presented in the

EIA, which you were part of. There has been no further EAs or WULs issued pertaining to the Kusile 60 year

ADF wetland offset.

c) the approval referred to in Point 1 Background of the Background Information Document relates to the EA

that was granted in July 2015 for the Kusile 60 year ADF EIA application, as discussed in point b) above.

I trust the responses at this stage answers your question and look forward to engage with you in the public

participation process soon to kick off for this Basic Assessment application.

Kind regards

Dr. Mathys Vosloo

17107 Kusile Basic Assessment: PPP Desk

Tel: 011 207 2060, Fax: 086 674 6121, E-mail: [email protected]

FOR Zitholele Consulting (Pty) Ltd

From: Dr JA Meyer [mailto:[email protected]]

Sent: Tuesday, 05 December 2017 1:17 PM

To: 17107 - Kusile WOP BA; Mathys Vosloo

Page 44: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

2

Cc: Lebo Petlane

Subject: RE: 17107-02-001 Kusile BA: Notice of Project Announcement

Dear Mathys

The BID received refers.

Please confirm the following:

1) Topigs SA (Pty) Ltd is already a registered I&AP for this process.

2) Comments submitted by Topigs SA (Pty) Ltd pertaining to the WOS have been received and incorporated.

3) Topigs SA (Pty) Ltd would like to attend the PPP planned for January 2018 – please provide the planned

date.

4) The BID received appears to address the first phase of the WOS received, namely addressing the wetlands

on Eskom property first.

a. I do not see any mention in the BID that this is part of a broader strategy, with the next phase

involving other wetland offset areas, e.g. the Topigs SA (Pty) Ltd property as noted in the comments

submitted by Topigs SA (Pty) Ltd.

b. If there are any EAs, or WULs, that relate to the WOS which have been issued, please provide me

with copies thereof.

c. Please clarify the context of the “approval” referred to in Point 1 Background, and provide me with a

copy thereof.

Regards

James

From: 17107 - Kusile WOP BA [mailto:[email protected]]

Sent: Thursday, November 23, 2017 4:26 PM To: Mathys Vosloo

Cc: Lebo Petlane Subject: 17107-02-001 Kusile BA: Notice of Project Announcement

Importance: High

Dear Stakeholder,

BASIC ASSESSMENT FOR ENGINEERING INTERVENTIONS PROPOSED FOR THE REHABILITATION OF DEGRADED

WETLANDS AROUND KUSILE POWER STATION, MPUMALANGA PROVINCE

Notice is given in terms of Section 41(2)(b) of the EIA regulations , 2014 (GN R.982), as amended, in terms of the

National Environmental Management Act (Act 107 of 1998), as amended, of the intention of Eskom Holdings SOC

Ltd to undertake activities relating to the rehabilitation of several degraded wetlands at and around the Kusile

Power Station, Mpumalanga. A Basic Assessment process must be undertaken in terms of the EIA regulations, 2014

to identify, assess and mitigate all potential impacts to within acceptable levels.

You have been identified as a key stakeholder for the abovementioned project and are therefore informed of the

Basic Assessment process underway. A Background Information Document (BID) that contains information regarding

the proposed project, Basic Assessment process and how you can become involved is attached to this email

notification. All documents will be available on the internet at www.zitholele.co.za/environmental, under heading

“Kusile WOP and PPP”. Further communication will follow in due course as the Basic Assessment process unfolds.

BIDs have furthermore been placed at the following public venues for collection:

PUBLIC VENUE ADDRESS

Victor Khanye Cnr Samuel & Van

Page 45: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

3

Local

Municipality

der Walt Streets,

Delmas

Delmas Public

Library

Cnr Sarel Cilliers &

Van Riebeeck Street

Phola Public

Library

2427 Qwabe Street,

Phola Location

Ogies Public

Library

61 Main Street,

Ogies

It is advised to complete the comment sheet attached at the back of the BID and return to the PPP Desk in order for

us to confirm your contact details on the project database. However, if you do not wish to be involved in this Basic

Assessment process please request the PPP Desk to remove you from the project database as a key stakeholder.

The PPP Desk can be contacted at the contact details provided in the BID and below.

Kind regards

Dr. Mathys Vosloo

17107 Kusile Basic Assessment: PPP Desk

Tel: 011 207 2060, Fax: 086 674 6121, E-mail: [email protected]

FOR Zitholele Consulting (Pty) Ltd

Page 46: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

1

Mathys Vosloo

From: 17107 - Kusile WOP BA on behalf of [email protected]

Sent: Thursday, 07 December 2017 4:34 PM

To: 'Dr JA Meyer'

Cc: Lebo Petlane

Subject: RE: 17107-02-001 Kusile BA: Notice of Project Announcement

Importance: High

Dear James,

Thank you for your email. I have responded to your original email.

You do not need to return the I&AP page as yourself and Topigs SA are automatically included in the project

stakeholder database.

Furthermore, you do not need to respond to the BID as this document is intended to introduce the proposed

development and Basic Assessment process to Interested and Affected Parties. Notification will be sent out in due

course to inform all registered IA&Ps of the availability of the Basic Assessment Report for stakeholder comment.

We look forward to your participation in the Basic Assessment processes for this project.

Kind regards

Dr. Mathys Vosloo

17107 Kusile Basic Assessment: PPP Desk

Tel: 011 207 2060, Fax: 086 674 6121, E-mail: [email protected]

FOR Zitholele Consulting (Pty) Ltd

From: Dr JA Meyer [mailto:[email protected]]

Sent: Thursday, 07 December 2017 3:09 PM

To: 17107 - Kusile WOP BA; Mathys Vosloo Cc: Lebo Petlane

Subject: RE: 17107-02-001 Kusile BA: Notice of Project Announcement

Importance: High

Dear Mathys

Given the end day tomorrow set, could you please respond as soon as possible, at least to point 1 below in my email

sent on Dec 5th

.

The BID requires a returned I&AP page by the 8th

– but what is the date for comments to the BID – I do not see this

specified?

Regards

James

From: Dr JA Meyer [mailto:[email protected]]

Sent: Tuesday, December 05, 2017 1:17 PM To: '17107 - Kusile WOP BA'; 'Mathys Vosloo'

Cc: 'Lebo Petlane'

Subject: RE: 17107-02-001 Kusile BA: Notice of Project Announcement

Dear Mathys

Page 47: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

2

The BID received refers.

Please confirm the following:

1) Topigs SA (Pty) Ltd is already a registered I&AP for this process.

2) Comments submitted by Topigs SA (Pty) Ltd pertaining to the WOS have been received and incorporated.

3) Topigs SA (Pty) Ltd would like to attend the PPP planned for January 2018 – please provide the planned

date.

4) The BID received appears to address the first phase of the WOS received, namely addressing the wetlands

on Eskom property first.

a. I do not see any mention in the BID that this is part of a broader strategy, with the next phase

involving other wetland offset areas, e.g. the Topigs SA (Pty) Ltd property as noted in the comments

submitted by Topigs SA (Pty) Ltd.

b. If there are any EAs, or WULs, that relate to the WOS which have been issued, please provide me

with copies thereof.

c. Please clarify the context of the “approval” referred to in Point 1 Background, and provide me with a

copy thereof.

Regards

James

From: 17107 - Kusile WOP BA [mailto:[email protected]]

Sent: Thursday, November 23, 2017 4:26 PM To: Mathys Vosloo

Cc: Lebo Petlane Subject: 17107-02-001 Kusile BA: Notice of Project Announcement

Importance: High

Dear Stakeholder,

BASIC ASSESSMENT FOR ENGINEERING INTERVENTIONS PROPOSED FOR THE REHABILITATION OF DEGRADED

WETLANDS AROUND KUSILE POWER STATION, MPUMALANGA PROVINCE

Notice is given in terms of Section 41(2)(b) of the EIA regulations , 2014 (GN R.982), as amended, in terms of the

National Environmental Management Act (Act 107 of 1998), as amended, of the intention of Eskom Holdings SOC

Ltd to undertake activities relating to the rehabilitation of several degraded wetlands at and around the Kusile

Power Station, Mpumalanga. A Basic Assessment process must be undertaken in terms of the EIA regulations, 2014

to identify, assess and mitigate all potential impacts to within acceptable levels.

You have been identified as a key stakeholder for the abovementioned project and are therefore informed of the

Basic Assessment process underway. A Background Information Document (BID) that contains information regarding

the proposed project, Basic Assessment process and how you can become involved is attached to this email

notification. All documents will be available on the internet at www.zitholele.co.za/environmental, under heading

“Kusile WOP and PPP”. Further communication will follow in due course as the Basic Assessment process unfolds.

BIDs have furthermore been placed at the following public venues for collection:

PUBLIC VENUE ADDRESS

Victor Khanye

Local

Municipality

Cnr Samuel & Van

der Walt Streets,

Delmas

Delmas Public

Library

Cnr Sarel Cilliers &

Van Riebeeck Street

Page 48: APPENDIX E-1: Full Stakeholder  · PDF fileMr Jaco Pieterse Gijima (082) 323-1009 Mr/Ms Lungile Sibeko Gijima (079) 770-0910 ... Mnr JP Joubert Plaas: Nooitgedacht & Witpoort

3

Phola Public

Library

2427 Qwabe Street,

Phola Location

Ogies Public

Library

61 Main Street,

Ogies

It is advised to complete the comment sheet attached at the back of the BID and return to the PPP Desk in order for

us to confirm your contact details on the project database. However, if you do not wish to be involved in this Basic

Assessment process please request the PPP Desk to remove you from the project database as a key stakeholder.

The PPP Desk can be contacted at the contact details provided in the BID and below.

Kind regards

Dr. Mathys Vosloo

17107 Kusile Basic Assessment: PPP Desk

Tel: 011 207 2060, Fax: 086 674 6121, E-mail: [email protected]