15
91 APPENDIX E PUBLIC PARTICIPATION

APPENDIX E PUBLIC PARTICIPATION - CESNET II WEF Electricity... · 2017-06-13 · 103 APPENDIX E7: COMPREHENSIVE I&AP LIST COMPANY / DEPARTMENT CONTACT PERSON POSTAL ADDRESS TELEPHONE

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: APPENDIX E PUBLIC PARTICIPATION - CESNET II WEF Electricity... · 2017-06-13 · 103 APPENDIX E7: COMPREHENSIVE I&AP LIST COMPANY / DEPARTMENT CONTACT PERSON POSTAL ADDRESS TELEPHONE

91

APPENDIX E

PUBLIC PARTICIPATION

Page 2: APPENDIX E PUBLIC PARTICIPATION - CESNET II WEF Electricity... · 2017-06-13 · 103 APPENDIX E7: COMPREHENSIVE I&AP LIST COMPANY / DEPARTMENT CONTACT PERSON POSTAL ADDRESS TELEPHONE

92

APPENDIX E1: PROOF OF ADVERTISEMENTS

Site Notice:

Figure E1: Site notice placed at the PPC Grassridge.

Figure E2: Site notice placed at the PPC Grassridge entrance.

Page 3: APPENDIX E PUBLIC PARTICIPATION - CESNET II WEF Electricity... · 2017-06-13 · 103 APPENDIX E7: COMPREHENSIVE I&AP LIST COMPANY / DEPARTMENT CONTACT PERSON POSTAL ADDRESS TELEPHONE

93

Newspaper Advertisement – To Be Published on 24 October 2016:

Figure E3: Newspaper advert to be placed in The Herald on 24 October 2016. Proof of advertisement to be included in the Final Basic Assessment Report.

BASIC ASSESSMENT FOR THE PROPOSED GRASSRIDGE II WIND ENERGY FACILITY: PROPOSED ELECTRICITY

TRANSMISSION INFRASTRUCTURE

DEA REF: 14/12/16/3/3/1/1675

Notice is hereby given in terms of regulation 41, as published in the Government Gazette No 982 Environmental Impact Assessment (EIA) regulations of the National Environmental Management Act (NEMA) No 107 of 1998 (as amended), for the intent to undertake a Basic Assessment. EOH Coastal & Environmental Services has been appointed by Ukomeleza Wind Power (Pty) Ltd to apply for environmental authorisation for the following Listed Activities in GN R 983 and GN R 985, which are triggered by the proposed project: GN R 983, 11 (i): The development of facilities or infrastructure for the transmission and distribution of electricity… GN R 983, 19 (i): … the dredging, excavation, removal or moving of soil, sand, shells, shell grit, pebbles or rock of more than 5 cubic metres from (i) a watercourse GN R 983, 27: The clearance of an area of 1 hectares or more... GN R 985, 12 (a) (ii): The clearance of an area of 300 square metres or more of indigenous vegetation… The Draft Basic Assessment Report (DBAR) is available for review from the 25

th of October 2016

until the 24th of November 2016. Copies of the DBAR will be available for review at the following

locations:

The CES website (public documents) – http://www.cesnet.co.za/grassridgeII.html

The PE Public Library, North-Western corner of Market Square, Central Comments can be submitted in writing by post, fax or email to Mr Roberto Almanza: 13 Stanley Street, Richmond Hill, Port Elizabeth, 6001; Tel: 041-585 1715; Fax: 086-604 8781; Email: [email protected]

Page 4: APPENDIX E PUBLIC PARTICIPATION - CESNET II WEF Electricity... · 2017-06-13 · 103 APPENDIX E7: COMPREHENSIVE I&AP LIST COMPANY / DEPARTMENT CONTACT PERSON POSTAL ADDRESS TELEPHONE

94

APPENDIX E2: PROOF OF NOTIFICATION OF KEY STAKEHOLDERS Land Owner:

Notification Sent on 10 October 2016:

Page 5: APPENDIX E PUBLIC PARTICIPATION - CESNET II WEF Electricity... · 2017-06-13 · 103 APPENDIX E7: COMPREHENSIVE I&AP LIST COMPANY / DEPARTMENT CONTACT PERSON POSTAL ADDRESS TELEPHONE

95

Attachment to Notification (‘Land Owner Notification’):

Page 6: APPENDIX E PUBLIC PARTICIPATION - CESNET II WEF Electricity... · 2017-06-13 · 103 APPENDIX E7: COMPREHENSIVE I&AP LIST COMPANY / DEPARTMENT CONTACT PERSON POSTAL ADDRESS TELEPHONE

96

Response Received on 11 October 2016:

EAP Response Sent on 13 October 2016:

Page 7: APPENDIX E PUBLIC PARTICIPATION - CESNET II WEF Electricity... · 2017-06-13 · 103 APPENDIX E7: COMPREHENSIVE I&AP LIST COMPANY / DEPARTMENT CONTACT PERSON POSTAL ADDRESS TELEPHONE

97

Attachment to EAP Response:

Page 8: APPENDIX E PUBLIC PARTICIPATION - CESNET II WEF Electricity... · 2017-06-13 · 103 APPENDIX E7: COMPREHENSIVE I&AP LIST COMPANY / DEPARTMENT CONTACT PERSON POSTAL ADDRESS TELEPHONE

98

Key Stakeholders (Other than Organs of State):

Notification Sent on 28 June 2016:

Page 9: APPENDIX E PUBLIC PARTICIPATION - CESNET II WEF Electricity... · 2017-06-13 · 103 APPENDIX E7: COMPREHENSIVE I&AP LIST COMPANY / DEPARTMENT CONTACT PERSON POSTAL ADDRESS TELEPHONE

99

Background Information Document Sent to All I&APs:

Page 10: APPENDIX E PUBLIC PARTICIPATION - CESNET II WEF Electricity... · 2017-06-13 · 103 APPENDIX E7: COMPREHENSIVE I&AP LIST COMPANY / DEPARTMENT CONTACT PERSON POSTAL ADDRESS TELEPHONE

100

Page 11: APPENDIX E PUBLIC PARTICIPATION - CESNET II WEF Electricity... · 2017-06-13 · 103 APPENDIX E7: COMPREHENSIVE I&AP LIST COMPANY / DEPARTMENT CONTACT PERSON POSTAL ADDRESS TELEPHONE

101

Page 12: APPENDIX E PUBLIC PARTICIPATION - CESNET II WEF Electricity... · 2017-06-13 · 103 APPENDIX E7: COMPREHENSIVE I&AP LIST COMPANY / DEPARTMENT CONTACT PERSON POSTAL ADDRESS TELEPHONE

102

APPENDIX E3: COMMENTS AND RESPONSES REPORT No comments received to date. All comments and responses will be included in the Final Basic Assessment Report. APPENDIX E4: AUTHORITY PARTICIPATION Notification Sent on 28 June 2016:

The notification email was sent to all relevant organs of state including DEDEAT, DWS, NMBM, SAHRA, ECPHRA, Eskom, SANParks and SKA. The Background Information Document (Appendix E2) was included as an attachment to this email notification. No comments have been received to date. An additional notification announcing the availability of the Draft Basic Assessment Report for public review will be sent to all I&APs on 24 October 2016. Proof of the notification and all comments received will be included in the Final Basic Assessment Report. APPENDIX E5: REGISTERED I&APs No I&APs have requested to be registered to date. Any I&APs who register during the review period of the Draft Basic Assessment Report will be included in the Final Basic Assessment Report. A full list of the current I&APs is included in Appendix E7. APPENDIX E6: CORRESPONDENCE AND MINUTES OF ANY MEETINGS No meetings have been required to date. If any meetings are held during the review period of the Draft Basic Assessment Report, the minutes and/or correspondence will be included in the Final Basic Assessment Report.

Page 13: APPENDIX E PUBLIC PARTICIPATION - CESNET II WEF Electricity... · 2017-06-13 · 103 APPENDIX E7: COMPREHENSIVE I&AP LIST COMPANY / DEPARTMENT CONTACT PERSON POSTAL ADDRESS TELEPHONE

103

APPENDIX E7: COMPREHENSIVE I&AP LIST

COMPANY / DEPARTMENT CONTACT PERSON

POSTAL ADDRESS TELEPHONE EMAIL

LANDOWNER

PPC LTD Hugo Badenhorst Private Bag X2016, North End, Port Elizabeth, 6056

041 486 2272 [email protected]

KEY STAKEHOLDERS

WESSA Morgan Griffiths [email protected]

NiMBLE (Local Env. NGO) Greg Smith [email protected] The EC Herald Patrick Cull [email protected] SANPARKS Dr Ané

Oosthuizen [email protected]

Coega Development Corporation (ECO)

Dr Paul Martin [email protected]

DME (ELC) Jan van As [email protected] Port of Ngqura (Env. Manager) Ms Renee de

Klerk [email protected]

Zwartkops Trust Arthur Rump [email protected] Motherwell Library Marian [email protected] Port Elizabeth Library Deseree [email protected] Other Stakeholders Andre

Buchnault

[email protected]

Anngus Tanner [email protected]; [email protected]

Egmont Ottermann

[email protected]

Marc Later [email protected]

Willie Claasen [email protected]

Gillian Solom [email protected]

Danie Gerber [email protected]

John Drinkwater

[email protected]

Brett Williams [email protected]

Johann Steyn [email protected]

Page 14: APPENDIX E PUBLIC PARTICIPATION - CESNET II WEF Electricity... · 2017-06-13 · 103 APPENDIX E7: COMPREHENSIVE I&AP LIST COMPANY / DEPARTMENT CONTACT PERSON POSTAL ADDRESS TELEPHONE

104

COMPANY / DEPARTMENT CONTACT PERSON

POSTAL ADDRESS TELEPHONE EMAIL

Wayne Poultan [email protected]

Len Cowely [email protected] GOVERNMENT DEPARTMENTS & NGOS

DEDEAT Regional Manager Jeff Govender Assistant Director: IEM Andries Struwig

Private Bag X5001 Greenacres Port Elizabeth 6057

[email protected] [email protected] [email protected]

OCEANS AND COASTS Nitasha Baijnath-Pillay

[email protected]

EASTERN CAPE PROVINCIAL HERITAGE RESOURCE AGENCY (ECPHRA)

Mr Sello Mokhanya

74 Alexander Road King Williams Town 5600

[email protected]

DEPARMENT OF WATER AND SANITATION (DWS)

Mr Joseph Jacobs

P/Bag X6041; P.E., 6000

0415864884 [email protected]

DEPARMENT OF WATER AND AFFAIRS & FORESTRY (DWAF)

Andrew Lucas [email protected]

WESSA Morgan Griffiths [email protected]

DEPARTMENT OF FISHERIES AND FORESTRY Thabo Nokoyo

[email protected]

DEAPRTMENT OF ROADS AND PUBLIC WORKS

Roads Engineer Marius Keyser

[email protected]

EASTERN CAPE CONSERVANCIES Megan Hope [email protected]

DEPARTMENT OF AGRICULTURE Anneliza Collett

Private Bag X250 Pretoria 0001

[email protected]

NELSON MANDELA BAY MUNICIPALITY (NMBM) AND LOCAL WARD COUNCILLORS

Joram Mkosana PO Box 11 Port Elizabeth 6000

[email protected] [email protected] [email protected] [email protected] [email protected]

[email protected] [email protected] [email protected]