APPENDIX-I

Form-11

Eligible Assignments of Key Personnel '

(Refer Clause 3.1.4)

Page 2: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

Eli nments of Ke Personnel Form-C11 Name of Key Personnel: !---------------- -----------

Designation of Key Personnel:

Name of the Project:

Name of Consulting Firm where employed:

Mr. Jay Kaktikar

Partner & Chief Urban Planner

ESIC Medical College & 500 Bedded Hospital along with Boys I Girls Hostels & Faculty Housing at ESIC Hospital Campus, NIT-3, Faridabad.

-4--~~--~-------------------~--Design Associates Inc. ________ , _____________________ ____,

Description of services performed by the Key Personnel (including designation):

Type of Project

Name of client and Address: (indicate whether public or private)

s a team leader and Urban Designer was responsible for Designing, Planning, Feasibility Report, Detailed Project Report (DPR), To examine site condition, prepare conceptual design Urban and regional planners develop land use plans and programs that help create communities, accommodate population growth, and revitalize physical facilities in towns, cities, counties, and metropolitan areas etc. including project scheduling,

rchitectural Drawing, Design Development, Concept Development, Interior designing, Landscape Designing,

orking Drawings, Site Coordination, Service Co­ordination etc. Coordination of all Services, liaison with clients and site coordination for better execution of work. Hospital and Institutional and Educational Campus etc.

Employees State Insurance Corporation Superintending Engineer, Employees State Insurance Corporation, Panchdeep Bhawan, C.I.G. Marg, New Delhi-110002(PUBLIC)

>------------------------------------------------Professional Fee received (in Rs er. or US$ million)

rea in hectares (for Urban Planning Project only)

Capacity in million passengers per annum (for railway, bus terminal/ metro station or airport only)

Fee Received : 13.63 Cr.

(2,51,582 Sqm)

Not Applicable.

Start date and finish date of the services (month/ year) Commenced: 17.03.2009 Completed: 2015 No. of days spent on the assignment 145 Days Narrative Description of Project: The 29 Acre Site is located within the city limits of Faridabad at NIT Greens, Faridabad. An existing Hospital of 150 Bed Capacity is already functioning on the site. A Medical College with a Hospital of 500 Bed Capacity was planned along with all ancillary facilities of Hostels, Staff Housing, Auditorium etc. The Site as such was flat and featureless, However it had a large curving frontage. This feature was used and expressed in the building design and final form. The site has been planned in distinctive Zones. The Academic, Hospital, Housing & Hostels being the three distinct zones catering to the bulk of the requirement. The Hospital zone being located directly off the frontage and being the first on the primary access to the site from the city. This makes it easier to approach and access. Next on the frontage is the academic block zone which ties up with the hospital in continuation thus giving easy access to the students and faculty, to both the teaching facilities as well as the Hospital.

he Housing and Hostel zone has been kept at the rear in a relatively quiter area. The road network has been kept relatively simple allowing for all access points (Porch / Drop Offs etc.) To be easily visible from the entry points itself.

250m long feature wall is the face of both the Academic & Hospital buildings, Tying then together as well as Reflecting. The curving front site edge.

he Academic block is a simple curved form building which responds to the site edges and space available. It is a G+4 Structure which accommodates all facilities as per M.C.I norms for 100 Admissions. The shape allows for a landscaped spill out zone exclusively for the academic block users. The Hospital is a much more complex and elaborate structure, being essentially three separate wings closely tied up together allowing for small usable courts to act as buffers between them. The building is a G + 10 structure with emphasis being laid on its compact nature to acilitate interconnectivity between different departments, which is essential in a hospital. Horizontal circulation has

been reduced and hence vertical cores (placed strategically) facilitate movement throughout the hospital. A service block ties up all three of these wings at the rear thus enabling a segregated service movement which does not clash

ith patient/ public movement. The wards (between the 6th and 10th floors) have been placed such that they enjoy segregation, the least disturbance and the best views. The ward block lies perpendicularly across the three wings below thus tying the entire structure together at the same time making a visual statement by its large cantilever forms. Lastly the Housing and Hostels are a mix of rectangular shapes, placed at angles to provide broken smaller open spaces for interactive use and minimal over looking. The structures here vary in height with some of the housing block going up to G + 10 Stories. Overall the parking has been catered to in large parking basements under the Hospital, Academic Blocks as well as the Hostel & Housi Blocks with minimal parking on the surface thus freeing u s ace for landscaping and greens. ---------------------1+----------j

Page 3: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

I Name of the Personnel Jay Kaktikar "·-··---------~-------~~

Name of the Project: Comprehensive Architectural Consultancy Services for Construction of 100 Bedded Hospital at Peenya, Bangalore

--Description of services performed by the Key !As a team leader and Urban Designer was Personnel (including designation): responsible for Designing, Planning, Feasibility

Report, Detailed Project Report (DPR), To examine site condition, prepare conceptual design Urban and regional planners develop land use plans and programs that help create communities, accommodate population growth, and revitalize physical facilities in ~owns, cities, counties, and metropolitan areas etc ..

--

Type of Project Residential/Commercial/Training Centre

Name of client and Address: (indicate whether public Employees State Insurance Corporation (ESIC), or private) Panchdeep Bhawan, C.I.G. Marg, New Delhi-110002

(Public) Estimated Capital Cost (In Rs. Cr. or US$ Million)) Rs. 105Cr.

Area in hectares (for Urban Planning Project only) (BUA 22,000 Sqm.)

Capacity in million passengers per annum (for Not Applicable. railway, bus terminal/ metro station or airport only)

Start date and finish date of the services (month/ Commenced: 29.05.2008 Completed: May, 2012 year)

Payment Received by the Participants (in Rs. Millions) Fee Received: 1.53 Cr.

No. of days spent on the assignment 160 Days

Brief description of the project: The Site is located in Peenya, Bangalore. A Hundred Bed General Hospital was planned on a four Acre plot of land which had an access road and frontage along one length of the plot. The access to the plot has been kept in the middle which leads to a large circular fore court off which all the major entries to the building have been planned.

The Built form envelopes this circular landscaped entry court with the major circulation of the building planned around it. The rest of the built mass is a mix of radial and linear forms Juxta positioned together with the outer profile broadly following the contours of the plot line.

The extensive protrusions in the built mass, increases the overall skin of the building which allows a large amount of day light penetration. Day light enhancing features have been used extensively to light up public waiting area in the reception and OPD's. All critical care areas have been planned as Rectilinear spaces to conform to the functional needs of a hospital. The aluminum and granite cladding, reflective glass and extensive use of aluminum louvers all project, a modern contemporary Style of Design. The inside finishes too reflect the same at the same time being hardy and low maintenance. Different department and wings of the Hospital area were planned, keeping in mind their inter-relationship needs, patients, staff and doctor movement. The single main movement corridor in a circular profile allows for easy way fining and intuited movement for the patients. Overall the building is a G+1 structure with only the ward rising to G+3. The Building was planned as a green building and is a certified Silver rated building from LEED's India. It incorporates all energy saving measures. Low water consumption measures and other environmental friendly measures in its design.

It is certified that the aforesaid information is true and correct to the best of my knowledge d belief.

7: (Signatur•jif Ym• of Key Persf nel)

- .

,.. . ,-

1

½'

32

,' ~ ; '. \ ;;·I\

~ :"c'.'••' ,,<.

Page 4: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

Name of Key Personnel:

Designation of Key Personnel:

Name of the Project:

Name of Consulting Firm where employed:

Description of services performed by the Key Personnel (including designation):

Mr. Jay Kaktikar

Partner & Chief Urban Planner

-+----------------------, ESIC Medical College & 500 Bedded Hospital along ith Student Hostel & Faculty Housing at ESIC

Hospital Campus, Sanath Nagar, Hyderabad.

Design Associates Inc.

s a team leader and Urban Designer was responsible for Designing, Planning, Feasibility Report, Detailed Project Report (DPR), To examine site condition, prepare conceptual design Urban and regional planners develop land use plans and programs that help create communities, accommodate population growth, and revitalize physical facilities in owns cities counties and metro olitan areas etc.

Type of Project Hospital and Institutional and Educational Campus 1--~--~--------------------1-------------

Name of client and Address: (indicate whether public Employees State Insurance Corporation or private) Superintending Engineer, Employees State Insurance

Corporation, Panchdeep Bhawan, C.I.G. Marg, New Delhi-110002 (PUBLIC)

Professional Fee received (in Rs er. or US$ million) Area in hectares (for Urban Planning Project only)

Capacity in million passengers per annum (for railway, bus terminal/ metro station or airport only) Start date and finish date of the services (month/ year)

Fee Received: 10.86 Cr. (1,08,459 Sqm)

Not Applicable.

Commenced : 12.11.2008

Completed: August, 2015 No. of days spent on the assignment 155 Days

Brief description of the project: The 32 Acre Site is located in Sanath Nagar, Hyderabad off a major road. The Site has numerous structures already built up on it including an existing 300 Bed Hospital and a large housing component. The site is bifurcated into two parts with an existing central road that gives access to almost all existing facilities. This road has been expanded into a central spine off which all the new and old structures are accessed.

The built up area of the existing hospital block not being sufficient to cater to the requirement of a modern day 500 Bed Hospital as per MCI Norms. This necessitated addition of new blocks to increase floor plates areas. A new ward block (B+ G + 6) has been added, new connecting corridors with cores (Lifts / Stairs) have been added at strategic locations to facilitate movement as well as segregate services and patient movement so that there is no clash of the same. Since the existing buildings are old they cannot take too much of vertical expansion thereby necessitating a large footprint on an already congested site.

The academic block has been placed along the central spine across the hospital building. Enabling easy access for the students and staff as well as keeping the hospital in proximity. The Academic Block is a compact G + 4 Structure which again combines with the hostels behind to create a private landscaped space, exclusively for the academic block users and the hostel residents. The Hostels have been kept in a quiet zone behind the academic block. They are all joined up in a contigious form in order to keep them as compact as possible. At the same time they have distinct entrances and do not overlook each other thus maintaining privacy for all the concerned residents. A small pocket at the rear of the site has been reserved for the housing of faculty. These units have been arranged in clusters which create an internal court exclusively for use of these residents. An independent facility of a standalone 130 Bed Super Specialty Hospital has been planned, as an independent entity with a separate compound. It has an access directly off the central spine. All other essential services and utilities have been placed along the periphery of the site thus enabling easy servicing of the entire complex.

It is certified that the aforesaid information is true and c

------~-_-.ffl---··--------·----

Page 5: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

Name of Key Personnel: Mr. Jay Kaktikar -----

FD~e~s~i ~n~at~io~n~o=f~K~e~~P=er~s=o~n~n=el~: ____________ Partner & Chief Urban Planner Name of the Project: Construction of Post Graduate Institute/ Medical

College, Student Hostel and Faculty & Staff Housing (B+G+9) at Rajaji Nagar, Bangalore.

1------------------------Name of Consulting Firm where employed:

Description of services performed by the Key Personnel (including designation):

ype of Project

Name of client and Address: (indicate whether public or private)

Professional Fee received (in Rs er. or US$ million) rea in hectares for Urban Plannin Pro·ect onl

Capacity in million passengers per annum (for railway, bus terminal/ metro station or airport onl ) Start date and finish date of the services (month/ year)

No. of days spent on the assignment

Design Associates Inc.

s a team leader and Urban Designer was responsible for Designing, Planning, Feasibility Report, Detailed Project Report (DPR), To examine site condition, prepare conceptual design Urban and regional planners develop land use plans and programs that help create communities, accommodate population growth, and revitalize physical facilities in towns, cities, counties, and metropolitan areas etc. including project scheduling, Architectural Drawing, Design Development, Concept Development, Interior designing, Landscape Designing, Working Drawings,

. . . . . .

Hospital and Institutional and Educational Campus etc.

Employees State Insurance Corporation Superintending Engineer, Employees State Insurance Corporation, Panchdeep Bhawan, C.I.G. Marg, New Delhi-110002 (PUBLIC) Fee Received : 5.57 Cr

Not Applicable.

Commenced : 29.05.2009

Completed: May, 2012 125 Days

Brief description of the project: The Site is located in Rajaji Nagar, Bangalore. It is approximately 15 Acres with main roads on all four sides. The site has an existing hospital of 300 Bed Capacity and some Residential Units built up on it. The Residential Units being in a dilapidated condition were slated for Demolition, thus freeing up some of the land for new construction. The Proposal was to enhance the existing 300 Bedded Hospital to a 500 Bedded capacity adding facilities for a Teaching Hospital and modifying the old layouts to comply with the latest planning norms and standards. The existing hospital was enhanced. A completely new block G+6 was planned

ithin a large courtyard in the old layout. The new block was planned to accommodate all the critical care spaces like New O.T.'s, I.C.U's and Labour Complex. A state of the art coronary care complex was also accommodated on one of the floors with facilities of Gath, Labs, I.C.C.U's, O.T.'s etc. The old block has been upgraded by extensive renovation and modification. Peripheral areas have been used for ancillary building and support activities. The aluminum and granite cladding, reflective glass and extensive use of aluminum louvers all project, a modern contemporary Style of Design. The inside finishes too reflect the same at the same time being hardy and low maintenance. The Medical College is to accommodate 100 Admissions per year and comprises of the main academic block, Hostels for Student, Nurses, Jr. Residents etc as well as staff housing. The Site being extremely restrictive in size meant the buildings had to be planned in a compact way with them being vertical in nature, with the hostel and housing going up to G + 10 floors. The attempt was to create interactive usable spaces between the built mass at the same time try and minimize mutual overlooking. The Result is simple rectilinear forms Juxta positioned together.

It is certified that the aforesaid information is true and correct to the best of my knowledge

. - .

Page 6: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

Name of Ke Personnel: Designation of Key Personnel:

---------·-·· Name of the Project:

Name of Consulting Firm where employed:

Description of services performed by the Key Personnel (including designation):

Type of Project

Name of client and Address: (indicate whether public or private)

Professional Fee received (in Rs er. or US$ million) Area in hectares (for Urban Planning Project only)

Capacity in million passengers per annum (for railway, bus terminal/ metro station or airport only)

Start date and finish date of the services (month/ year) No. of days spent on the assignment

Mr. Jay Kaktikar ___ _ Partner & Chief Urban Planner Master Planning of Government Medical College,

Hospital and Staff Housing at Badaun.

Design Associates Inc. s a team leader and Urban Designer was

responsible for Designing, Planning, Feasibility Report, Detailed Project Report (DPR), To examine site condition, prepare conceptual design Urban and regional planners develop land use plans and programs that help create communities, accommodate population growth, and revitalize physical facilities in towns, cities, counties, and metropolitan areas etc. including project scheduling, Architectural Drawing, Design Development, Concept Development, Interior designing, Landscape Designing, Working Drawings,

. . . . . .

Hospital and Institutional and Educational Campus etc.

Uttar Pradesh Rajkiya Nirman Nigam Ltd. Project Manager, UPRNN Ltd, Bareily Unit-2, Govt. Medical Colle e u·hani Road Badaun PUBLIC Rs.2.25 Cr. (1,52,565 Sqm)

Not Applicable.

Commenced: Feb, 2014

175 Days

Brief description of the project: The 100 Acre Site is located within the city limits of Badaun. An. A Medical College with a Hospital of 500 Bed Capacity was planned along with all ancillary facilities of Hostels, Staff Housing etc. The Site as such was flat and featureless, However it had a large curving frontage. This feature was used and expressed in the building design and final form. The site has been planned in distinctive Zones. The Academic, Hospital, Housing & Hostels being the three distinct zones catering to the bulk of the requirement.

The Hospital zone being located directly off the frontage and being the first on the primary access to the site from the city. This makes it easier to approach and access. Next on the frontage is the academic block zone which ties up with the hospital in continuation thus giving easy access to the students and faculty, to both the teaching facilities as well as the Hospital. The Housing and Hostel zone has been kept at the rear in a relatively quiter area. The road network has been kept relatively simple allowing for all access points (Porch / Drop Offs etc.) To be easily visible from the entry points itself ..

The Academic block is a simple building which responds to the site edges and space available. It is a Structure which accommodates all facilities as per M.C.I norms for 100 Admissions. The shape allows for a landscaped spill out zone exclusively for the academic block users. The Hospital is a much more complex and elaborate structure, being essentially three separate wings closely tied up together allowing for small usable courts to act as buffers between them.

The building is emphasis being laid on its compact nature to facilitate interconnectivity between different departments, which is essential in a hospital. Horizontal circulation has been reduced and hence vertical cores (placed strategically) facilitate movement throughout the hospital. A service block ties up all three of these wings at the rear thus enabling a segregated service movement which does not clash with patient / public movement. The wards have been placed such that they enjoy segregation, the least disturbance and the best views. The ward block lies perpendicularly across the three wings below thus tying the entire structure together at the same time making a visual statement by its large cantilever forms. Lastly the Housing and Hostels are a mix of rectangular shapes, placed at angles to provide broken smaller open spaces for interactive use and minimal over lookin .

It is certified that the aforesaid information is true and corr t to the best of my knowledge a

/

e~nel)

..

Page 7: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

·------------------· Name of Key Personnel:

Designation of Key Personnel: -----

Name of the Project:

Mr. Jay Kaktikar +--------------------------<

Partner & Chief Urban Planner

Comprehensive Consultancy Architectural & Engineering and Project Management Consultancy Services for Construction of Mahamaya Girls Inter College at Sector 44 Naida, Uttar Pradesh.

---------------+--------

1-'-N,~a~m=e~o=f~C=o=n~s=u=lt~in=a~F~ir~m~w~b~e~re~em~P=IO~Y~e=d~: _____ ...µ,D'-"'-",.,,i wnLLA::,,;,,.,,,,,,,_u.,i w.,_sulwn.,,,_,__. -----------~ s a team leader and Urban Designer was

Description of services performed by the Key Personnel (including designation): responsible for Designing, Planning, Feasibility

Report, Detailed Project Report (DPR), To examine

Type of Project Name of client and Address: (indicate whether public or private)

Professional Fee received in Rs er. or US million Area in hectares (for Urban Planning Project only)

site condition, prepare conceptual design Urban and regional planners develop land use plans and programs that help create communities, accommodate population growth, and revitalize physical facilities in owns, cities, counties, and metropolitan areas etc.

including project scheduling, Architectural Drawing, Design Development, Concept Development, Interior designing, Landscape Designing, Working Drawings, Site Coordination, Service Co-ordination etc. Educational/Institutional along with Sport Complex

New Okhla Industrial Development Authority, Main dministrative Building, Sector -VI, Noida Uttar

Pradesh. (PUBLIC)

1------,----,---------------t-----------·------------j

Capacity in million passengers per annum (for Not Applicable. railway, bus terminal/ metro station or airport only)

Start date and finish date of the services (month/ Commenced : 2009 year) --------C~o=m=l=et=e=d~: =2~0=13~ _____________ __, No. of da s s ent on the assi nment 185 Da s Brief description of the project: The NOIDA Authority, our client for the Mahamaya Inter-College has conceived of this largely-residential school as an institution where education of the highest standard would be imparted to about 2000 of the brightest girl students selected from each district of the state, particularly those belonging to the economically weaker sections.

The site, a 20 acre linear plot, about 120 m deep and with nearly 800m of frontage along the Naida-Greater Naida Expressway has excellent connectivity and high visibility. As the school is an All-Girls-Residential­School, the client brief indicated that the buildings while maintaining a strong urban and architectural identity should also provide adequate privacy and access control. The resulting site plan reflects these dichotomous requirements: while the campus layout seems 'extrovert' with a progression of large built masses (of common building vocabulary yet distinct individual form) addressing the expressway and the urban fabric; the Academic Block and Hostel are essentially 'introvert' courtyard buildings.

The Campus Layout is centred on a formal green which provides a foreground to the Administration/Library Block, with the Academic Block to its East and the Auditorium and Hostel Block to the West. Staff Housing and the Sports Complex (with limited public membership) which have direct access to the outside are located at the extreme edges of the site. The total built up area of the campus 87008 sq.mtr with an achieved FAR-1.07 and Ground Coverage -12.4% are well within the prescribed norms, with the exception of Staff Housing all buildings on the campus are below G+3 floors .

The Academic Block, a four-storied (max.) structure, with Ground Coverage of 9496 sq. m. and built up area of 27327sq.m. constitutes the nerve centre of the campus. In its basic form this structure is best understood as a large square 'assembly-court' (on the lines of a school 'Quad') girded by a peristyle at ground floor level; the teaching areas (cells along doubly loaded corridors) are organized as built masses of different heights aligned along each edge of the court while maintaining a bi-axial symmetry. The road facing block is only two floors high and the height progressively increases with the flanking blocks (Junior School to th Right and Middle School to the Left) rising to three and the rear block (Senior School) to four floors respecti ly.

It is certified that the aforesaid information is true and corr ct to the best of my knowled

·;:- Ill ·-----~'--+~-a 6___ (Signature a d name of Key Personnel)

Page 8: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

~---------"-------------------~-------------·-·-------~ Name of Key Personnel: Mr. Jay Kaktikar

f--------------------·--~--"-------+--------------------·--~---1 Designation of Key Personnel: Partner & Chief Urban Planner Name of the Project: Comprehensive Consultancy Architectural &

Engineering and Project Management Consultancy Services for Construction of Panchsheel Boys Inter

----------------Name of Consulting Firm where employed:

Description of services performed by the Key Personnel (including designation):

Type of Project Name of client and Address: (indicate whether public or private)

Professional Fee received (in Rs er. or US$ million) Area in hectares (for Urban Planning Project only)

Capacity in million passengers per annum (for railway, bus terminal/ metro station or airport only)

Start date and finish date of the services (month/ year)

College at Sector 91 Naida, Uttar Pradesh.

Design Associates Inc. lt\s a team leader and Urban· Designer was responsible for Designing, Planning, Feasibility Report, Detailed Project Report (DPR), To examine site condition, prepare conceptual design Urban and regional planners develop land use plans and programs that help create communities, accommodate population growth, and revitalize physical facilities in owns, cities, counties, and metropolitan areas etc. including project scheduling etc.

Educational/Institutional along with Sport Complex New Okhla Industrial Development Authority, Main Administrative Building, Sector -VI, Naida Uttar Pradesh. (PUBLIC) Fee Received: 1.85 Cr.

Not Applicable.

Commenced: 2009 Completed: 2013

No. of days spent on the assignment 165 Days Brief description of the project: On the lines of the Mahamaya School for girls the NOIDA Authority, has planned a similar of school as an institution where education of the highest standard would be imparted to about 2000 of the brightest boys selected from each district of the state, particularly those belonging to the economically weaker sections. The site is a 20 acre rectangular plot, about 500m deep and with nearly 250m of frontage along the Naida-Greater Naida Expressway and has excellent connectivity and visibility. A high-rise housing development abuts the site to the west while to the east is a 100m wide green-belt. Responding to the site, the campus is organized into four distinct zones beginning with the Admin/Academic Zone aligned to the western edge and the Sports Facilities opening up towards the green-belt to the east and progressing to the hostel and Staff Housing zones respectively as one proceeds northwards. The Main Gate leads onto a curved driveway, the western edge of which is flanked by the distinctive triangular form of the Administration/Library Block while a continuous sweeping colonnade mimicking the curve of the road continues along the opposite face, the colonnade punctuated by distinctive staircase towers which mark the entrances to the Senior, Middle and junior School blocks also acts as the main pedestrian spine linking these blocks and leads onto the Auditorium Block on the northern end while the southern end is anchored by the arrival and dispersal pavilion for students who arrive by bus. Students arriving by private transport can be dropped at their respective blocks in the lay-byes provided along the main-drive. The School Blocks are aligned perpendicular to the colonnade on an east-west axis to avoid any overlooking from the adjacent high-rise housing complex. The linear blocks are separated by landscaped spaces where the soft landscape responds to and negotiates the repetitive geometry of the adjoining built masses on either edge while the hard landscape flow towards the play-field.

Each of the three school blocks begins with a faculty area adjacent to the colonnade (with the face fronting the colonnade clad in stone of a distinctive colour to ensure visual differentiation of each block) The academic area is organized around a street-like landscaped atrium which begins at the colonnade on one end and concludes at the play field. Class-rooms are organized on either side of the atrium coming off the flanking colonnades at various levels. Each Block is articulated in a unique manner to lend it its distinct character, be it by means of staircases and corridors spanning the atrium, the introduction of amphitheaters and performance spaces off the atrium or by means of massing and roof-form. The distinctive fac;:ade of these buildings is based on a series of stepped-buttress like repeat elements clad in Agra Red Sandstone with the inter-stitial spaces articulated by fenestration interspersed with cream sandstone panels. Vertically the soaring buttresses conclude in steel brackets which support the overhang of the half- curved, pitch roofs that define the distinctWe flowing form of the skyline. A /J

It is certified that the aforesaid information is true and core! to the best of my knowledge a belief

1h j « /}; ~ ~~ .. : ·" c1 3 7 (Signature and ame of Key Personnel)

~---------------------------·~· '""_' -~-···----------------------------------'

Page 9: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

,---------------~---~~---·-_--~---~

Name of Key Personnel: Mr. Jay Kaktikar

---- -·----

Designation of Key Personnel: Partner & Chief Urban Planner

- -~--

Name of the Project: Construction of 1000 Seater Convention Centre with Auditorium and Nursing College at Indira Nagar, Bangalore.

-· ..

Name of Consulting Firm where employed: Design Associates Inc.

·-

Description of services performed by the Key !As a team leader and Urban Designer was responsible for Designing, Planning, Feasibility

Personnel (including designation): Report, Detailed Project Report (DPR), To examine site condition, prepare conceptual design Urban and regional planners develop land use plans and programs that help create communities, accommodate population growth, and revitalize physical facilities in ~owns, cities, counties, and metropolitan areas etc. including project scheduling, Architectural Drawing, Design Development, Concept Development, Interior designing, Landscape Designing, Working Drawings, Site Coordination, Service Co-ordination etc.

Type of Project ~uditorium, Convention Centre

Name of client and Address: (indicate whether public Employees State Insurance Corporation or private) Superintending Engineer, Employees State Insurance

Corporation, Panchdeep Bhawan, C.I.G. Marg, New Delhi-110002 (PUBLIC)

Professional Fee received (in Rs er. or US$ million) Fee Received: 1.58 Cr.

Area in hectares (for Urban Planning Project only) 12,500 Sq.m.

Capacity in million passengers per annum (for Not Applicable. railway, bus terminal/ metro station or airport only)

Start date and finish date of the services (month/ Commenced: 11.11.2010 year)

Completed: May, 2014 No. of days spent on the assignment 120 Days

·-

Brief description of the project:

It is certified that the aforesaid information is true and correct to the best of my knowledge and belief.

~ /' (Signature ~ name of Key Personnel)

138

Page 10: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

r Name of Key Personnel:

Designation of Key Personnel: --------·

Name of the Project:

Name of Consulting Firm where employed:

Description of services performed by the Key Personnel (including designation):

==r~· Jay Kaktikar

-~rtner & Chief Urban Planner

--------~--1

Comprehensive Consultancy Architectural Engineering for Construction of University Petroleum at Dehradun, Uttarakhand

& of

---t---------------------------j Design Associates Inc.

s a team leader and Urban Designer was responsible for Designing, Planning, Feasibility Report, Detailed Project Report (DPR), To examine site condition, prepare conceptual design Urban and regional planners develop land use plans and programs that help create communities, accommodate population growth, and revitalize physical facilities in owns, cities, counties, and metropolitan areas etc ..

Type of Pro·ect ___ Educational/Institutional Campus Name of client and Address: (indicate whether public University of Petroleum & Energy Studies, Energy or private) cess, PO Bidholli, Via Prem Nagar, Dehradun - 248

007 (PUBLIC)

Professional Fee received (in Rs er. or US$ million) Fee Received: 1.67 Cr.

Area in hectares (for Urban Planning Project only) (BAU 50,000 Sqm.)

Start date and finish date of the services (month/ year) Commenced: 01.09.2004 Completed: 15.03.2010

No. of days spent on the assignment 210 Da s Brief description of the project: The UPES campus at Bidholi Village lies at the apex of the Pondha valley. Th gently sloping site, located at the very base of the Mussorie Ridge is girded on the north and west by a low foreste outcrop, to the east is a deep ravine while to the south the gradient transforms into the relatively flat fields of Bidholi.

rom the very first visit it was apparent that the campus had to 'blend in' with its natural context and not impose itself o he landscape. The task was made easier by the fact that the client fully supported this approach and also by the bye-laws

for the Mussorie Area which ensure low-rise development ather than flatten the land and build a large monolithic structure the whole approach to campus design is based o

creating a series of smaller 'component' buildings which respond to the sloping landform and are placed on shallo erraces extending along the slope. Individual buildings are custom designed for a specific purpose and have characte ithout being flamboyant The layout of these blocks with respect to each other, their inter-connections and the interpla

of open-spaces and built-mass gives the campus its character. The 'academic axis' at the heart of the campus commences with the twin administration and faculty blocks at its apex and extends through a linear stepped courtyard

ith a series of inter-connected classroom blocks ranged on either side and concludes at the laboratory complex. The ostels, Library and LT. Block Complex, Staff Housing and Sports Facilities are other distinct entities. It was intende

hat the buildings should respond to the genius loci and the material palette chosen reflects that concern. The plinths o he buildings are of random rubble using boulders collected from the site and constructed by local masons from the

adjoining Dunga village. The grit for the grit-wash comes from within 3 km of the site. The kota stone strips used fo cladding are recycled mining waste and their grey-green tone works well with the ambient colour of the landscape. To soil, a limited resource on this site, was protected, while the heavy monsoon and academic calendar ensured that the

hased construction never occurred during the rains. The lack of municipal infrastructure meant that we had to work ou a sustainable system of solid-waste management and also a water management system combining water-harvesting, use­

anagement, treatment and reuse. t the outset we did not begin with the intent of achieving a GRIHA rating for this project, it was just that the projec

earn and the client worked with a constructive mindset to address what could otherwise have been construed a roblematic issues or constraints of budget, building bye-laws, landform, the weather, the relative remoteness of the site

and used them positively to build into the campus buildings an inherent, built-in sustainable character. In conclusion, Common sense, Cost constraints, good construction practices and the client's sensitivity to the issues of sustainability and the environment, have, as a natural corollary, resulted in the evolution of a design which responds positively to its local context while addressing broader concerns of sustainability. Innovative, energy efficient, sustainable technological Architectural Design :

• Energy Conservation, Energy Sub Metering, Solar Voltaic. • Shadow Analysis for both summer and winter session. • Solar Exposure, Wind Analysis, Daylight Analysis, Water Conservation, Solid Waste Management, Indoor Ai

Quality, Insulation-wall and roof Green Building Technological Innovation such as Air purification, Water Earth Cooling, Solar Cooling.

It is certified that the aforesaid information is true and correct to the best of my knowledge an

'

--------------·-~ =·~·9 (Signature a me of Key Personnel) -------------+-----------'

Page 11: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

Name of Key Personnel: Mr. Jay Kaktikar -·--·

Designation of Key Personnel: Partner & Chief Urban Planner ·------------

Name of the Project: Comprehensive Architectural Consultancy Services for Construction of 300 bedded Hospital at Sector-24, Naida (UP)

Name of Consulting Firm where employed: Design Associates Inc.

Description of services performed by the Key As a team leader and Urban Designer was Personnel (including designation): responsible for Designing, Planning, Feasibility

Report, Detailed Project Report (DPR), To examine site condition, prepare conceptual design Urban and regional planners develop land use plans and programs that help create communities, accommodate population growth, and revitalize physical facilities in towns, cities, counties, and metropolitan areas etc ..

f---·

Type of Project Educational/Institutional Cam pus/Hospital

Name of client and Address: (indicate whether public Employees State Insurance Corporation (ESIC), or private) Panchdeep Bhawan, C.I.G. Marg, New Delhi-110002

(PUBLIC)

Professional Fee received (in Rs er. or US$ million) Fee Received: 2.41 Cr.

Area in hectares (for Urban Planning Project only) (BAU 27,500 Sqm.) Start date and finish date of the services (month/ year) Commenced: 12.11.2007 Completed: 11.10.2011

No. of days spent on the assignment 145 Days

- .

Brief description of the project: The site is approx 10 Acres located in Naida Sector - 24. The plot has an existing 150 Bedded Hospital in a building of Area 8478 sq.m. in the front of the plot. Vacant area behind was indentified to construct additional blocks for the hospital as well as staff housing.

The hospital was to be expanded to a 300 Bedded facility having the latest facilities and planned as per current standards and norms. This meant a shortfall of almost 28934 sqm of built up space. Critical activities like the O.T.'s, I.C.U's along with the wards were identified as activities that could be accommodated in the new block along with their support spaces like the Kitchen, Stores, C.S.SD, Laundry, Admin etc were also housed together in the new block. In order to keep the departments grouped together and keep the expansion compact the building was planned as a G+6 Structure. Large Grids, modular planning and adequate natural light, along with permanent outer finishes, maintenance free or low maintenances, interior finishes are some of the design features of the building. The aluminum and granite cladding, reflective glass and extensive use of aluminum louvers all project, a modern contemporary Style of Design.

The inside finishes too reflect the same at the same time being hardy and low maintenance. Simple rectangular blocks with wide linear corridors help patient movement making it easy for way finding at the same time. The old existing block has been completely renovated and upgraded while being redesigned to accommodate the more patient movement oriented activities like the OPD, Diagnostic and Casualty Department.

Other Utility blocks have been planned along the periphery of the site. Staff housing has been accommodated in high rise towers of G+10 with all modern amenities like Lifts, Fire Fighting, Power Back up etc. All units have been planned around central cores thus enabling them to be adequately light naturally. Large green areas have been kept as spill-out's for both the residents as well as the visitors.

--

It is certified that the aforesaid information is true and ! orrect to the best of my knowledge a belief.

9, 1/ &r# /)Jd' (Signature and I ame of Key Personnel)

Page 12: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

·---- ·-·····-· ···- ···----------·-----------------~ Name of the Personnel ay Kaktikar

. ----------Name of the Project: ~omprehensive Architectural ConsultanCy Service$ for ,

~;tuction of 100 Bedded Hospital at Peenya, galore

~-

Description of services performed by the Key s a team leader and Urban Designer was Personnel (including designation): responsible for Designing, Planning, Feasibility

Repori, Detailed Project Report (DPR), To examine site condition, prepare conceptual design Urban and regional planners develop land use plans and programs that help create communities, accommodate population growth, and revitalize physical facilities in ~owns, cities, counties, and metropolitan areas etc ..

-------- --~

Type of Project Residential/Commercial/Training Centre .. --

Name of client and Address: (indicate whether public Employees State Insurance Corporation (ESIC), or private) Panchdeep Bhawan, C.I.G. Marg, New Delhi-110002

(Public) Estimated Capital Cost (In Rs. Cr. or US$ Million)) Rs. 105Cr.

Area in hectares (for Urban Planning Project only) (BUA 22,000 Sqm.)

Capacity in million passengers per annum (for Not Applicable. railway, bus terminal/ metro station or airport only)

Start date and finish date of the services (month/ Commenced : 29.05.2008 Completed: May, 2012 year)

-Payment Received by the Participants (in Rs. Millions) Fee Received: 1.53 Cr.

--No. of days spent on the assignment 160 Days

Brief description of the project: The Site is located in Peenya, Bangalore. A Hundred Bed General Hospital was planned on a four Acre plot of land which had an access road and frontage along one length of the plot. The access to the plot has been kept in the middle which leads to a large circular fore court off which all the major entries to the building have been planned.

The Built form envelopes this circular landscaped entry court with the major circulation of the building planned around it. The rest of the built mass is a mix of radial and linear forms Juxta positioned together with the outer profile broadly following the contours of the plot line.

The extensive protrusions in the built mass, increases the overall skin of the building which allows a large amount of day light penetration. Day light enhancing features have been used extensively to light up public waiting area in the reception and OPD's. All critical care areas have been planned as Rectilinear spaces to conform to the functional needs of a hospital. The aluminum and granite cladding, reflective glass and extensive use of aluminum louvers all project, a modern contemporary Style of Design. The inside finishes too reflect the same at the same time being hardy and low maintenance. Different department and wings of the Hospital area were planned, keeping in mind their inter-relationship needs, patients, staff and doctor movement. The single main movement corridor in a circular profile allows for easy way fining and intuited movement for the patients. Overall the building is a G+1 structure with only the ward rising to G+3. The Building was planned as a green building and is a certified Silver rated building from LEED's India. It incorporates all energy saving measures. Low water consumption measures and other environmental friendly measures in its design.

--

It is certified that the aforesaid information is true and correct to the best of my knowledge and lief.

1/ (Signature andi, Ir of Key ,,.,Personnel)

Ii

.!U 141

Page 13: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

-------------------·-----------------------------------·--------

Name of the Personnel I.Jay Kaktikar f--------------------------------+---------------------

Name of the Project:

Description of services performed by the Key Personnel (including designation):

Comprehensive Consultancy service for Master Planning of Group Centre, Fully Residential Complex with training facilities, Sonepat, Haryana

As --a team leader and Urban Designer w~ responsible for Designing, Planning, Feasibility Report, Detailed Project Report (DPR), To examine site condition, prepare conceptual design Urban and regional planners develop land use plans and programs that help create communities, accommodate population growth, and revitalize physical facilities in towns, cities, counties, and metropolitan areas etc ..

f------------------------------+-----------------,-----------< Type of Project Residential/Commercial/Training Centre f----------------------------t--- ---------<

Name of client and Address: (indicate whether public National Building Construction Corporation (NBCC) or private) (India) Ltd., NBCC Bhawan, Lodhi Road, New Delhi

(Public)

Estimated Capital Cost (In Rs. Cr. or US$ Million)) Rs. 199.80 Cr.

Area in hectares (for Urban Planning Project only) (BUA 48,000 Sqm.)

f------------------------------t---------·-------------1

Capacity in million passengers per annum (for Not Applicable. railway, bus terminal/ metro station or airport only)

Start date and finish date of the services (month/ year)

Commenced : 2007 Completed: Nov, 2011

~~ii~n~c;~t Received by the Participants (in Rs. Fee Received: 0.76 Cr.

The Central Reserve Police Force came into existence as Crown Representative's Police on 27th July 1939. It became the Central Reserve Police Force on enactment of the CRPF Act on 28th December 1949. It has completed 60 years of glorious history. The Force has grown into a big organization with 207 Bn, (including 181 executive Bns, 2 Mahila Bns, 10 RAF Bns, 6 CoBRA Bns, 2 OM (NDRF) Bns, 5 Signal Bns and 1 Special Duty Group), 37 Group Centres, 11 Training Institutions, 2 CWS, 7 AWS, 3 SWS, 4 Composite Hospitals of 100 bed and 17 Composite Hospitals of 50 bed.

The Central Reserve Police Force is an armed Force of the Union of India, with the basic role of striking reserve to assist the State/Union Territories in Police operations to maintain law and order and contain insurgency. Its role is that of a catalyst in maintaining law & order, and returns to barracks once this objective is achieved. The force is also being used for various police duties in various States.

It is All India in character, both in deployment and in its composition. Due to its unique capability to quickly adapt to various situational requirements, and also, to work in perfect harmony with the State Police, CRPF has, over the years, acquired the distinction of being perhaps the most acceptable Force, by the people and the State administrations. Broad gamut of duties performed by the CRPF is:

Crowd control Riot control Counter Militancy/ Insurgency operations. Dealing with Left Wing Extremism Overall co-ordination of large scale security arrangement especially with regard to elections in disturbed reas. Protection of VIPs and vital installations. Checking environmental de-gradation and protection of local Flora and Fauna , . .: Fighting aggression during War time Participating in UN Peace Keeping Mission Rescue and Relief operations at the time of Natural Calamities.

; L

One of the vital roles of the CRPF, which is not very evident, is guarding vital Central Govt. installati~ns such as Airport, Power houses, Bridges, Doordarshan Kendras, All India Radio Stations, residence of Governers and Chief Ministers, Nationalised Banks and other Government establishments in insurgency affected States. The CRPF is ensuring the safety of the democratic institutions, and preventing the takeover of civil society by the militants, in these highly disturbed areas. This contribution of the CRPF, though not very visible, is nonetheless very vital. -

Page 14: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

····------~--- ------·--------------------·--------~

7.5% of the Force is deployed for the security of VIPs mostly in North-Eastern States, J&K, Bihar and Andhra Pradesh which include Governors, Chief Ministers, Ministers, MsP and MsLA of J&K, Assam, Arunachal Pradesh, Manipur and Nagaland, Tripura and Mizoram. CRPF is also providing security (Static guard) at the residence/office of Prime Minister of India, various Union Ministers and MsP and other dignitaries 17.5% of the Force is deputed for guarding the important installations of Central and State Govts mostly in insurgency

J affected areas which includes Secretariats, Doordarshan Kendras, Telephone exchanges, Banks, Hydroelectric projects, Jails etc. CRPF is also deployed for the security of Parliament House.

10 Coys of CRPF are deployed for the security of three sensitive shrines i.e. Krishna Janma Bhoomi, Shahi ldgah Masjid complex (Mathura), Ram Janma Bhoomi- Barbi Masjid complex (Ayodhya) and Kashi Vishwanath Temple- Gyanvapi Mosque (Varanasi). 4 Coys of the Force are deputed for the security of Mata Vaishno Devi Shrine, Katra, Jammu (J&K).

CRPF is the only Para Military Force in the Country which has two Mahila (Ladies) Battalions. After its training in March 1987, 88(M) Bn won laurels for its work assisting the Meerut riots and later with the IPKF in Srilanka. Personnel of second Mahila battalion (135 Bn) performed creditably during the Lok Sabha elections 1996 in many states. At present mahila personnel are deployed in active duty in Jammu & Kashmir, Ayodhya, Manipur, Assam and other parts of the country where they are doing commendable job. In addition each RAF battalion has a Mahila (Ladies) component consisting of 96 personnel.

Group Centers of Central Reserve Police Force which are located in different parts of the Country are responsible to maintain service records of the personnel of Units those are attached to them. Group Centers are also responsible for payment of all type of dues to the personnel of Units attached with it. Regular monthly pay bills are centrally prepared by EDP Cell at Force Hqrs New Delhi and are sent to all field units along with drafts/cheques so that the payment of monthly pay and allowances to the men /women is made by the last working day of the same month. For payment of bills a centralized Pay and Accounts office is functioning at Force Hqrs. at New Delhi which is responsible for clearing payment of all types of claim of the personnel.

CRPF acquired 120.48 acres of land at Khewra village, Bahalgarh, Sonepat (Haryana) for establishment of Group Centre/Range Hqr. The competent authority desired to develop authorized infrastructure at this campus on priority basis in order to provide basic accommodation. Accordingly, the GOI/MHA accorded approval for entrusting the construction work of GC, CRPF, Bahalgarh, Sonepat (Haryana to NBCC Ltd)

It is certified that the aforesaid information is true and correct to the best of my knowledge and

; ... -143

Page 15: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

Eliaible Assianments o f Kev p ersonne IF orm-C11 Name of Key Personnel: Mr. Sumere Dar

Designation of Key Personnel: Partner & Principal Architect

Name of the Project: ESIC Medical College & 500 Bedded Hospital along with Boys/ Girls Hostels & Faculty Housing at ESIC Hospital Campus, NIT-3, Faridabad.

--Name of Consulting Firm where employed: Design Associates Inc.

Description of services performed by the Key Personnel To examine site condition, prepare conceptual design

(including designation): and draft sketches, preliminary drawings, broad specifications, working drawings, roads, pathways and parking areas drawings, design of fall ceiling, tender document etc.

~-

!Type of Project Hospital and Institutional and Educational Campus etc.

Name of client and Address: (indicate whether public or Employees State Insurance Corporation Superintending private) Engineer, Employees State Insurance Corporation,

Panchdeep Bhawan, C.I.G. Marg, New Delhi-110002 (PUBLIC)

Professional Fee received (in Rs er. or US$ million) Fee Received : 13.63 Cr.

Area in hectares (for Urban Planning Project only) (2,51,582 Sqm) Capacity in million passengers per annum (for railway, Not Applicable. bus terminal/ metro station or airport only)

Start date and finish date of the services (month/ year) Commenced: 17.03.2009 Completed: 2015 No. of days spent on the assignment 245 Days Narrative Description of Project: The 29 Acre Site is located within the city limits of Faridabad at NIT Greens, Faridabad. An existing Hospital of 150 Bed Capacity is already functioning on the site. A Medical College with a Hospital of 500 Bed Capacity was planned along with all ancillary facilities of Hostels, Staff Housing, Auditorium etc. !fhe Site as such was flat and featureless, However it had a large curving frontage. This feature was used and expressed in the building design and final form. The site has been planned in distinctive Zones. The Academic, Hospital, Housing & Hostels being the three distinct zones catering to the bulk of the requirement. The Hospital zone being located directly off the frontage and being the first on the primary access to the site from the city. This makes it easier to approach and access. Next on the frontage is the academic block zone which ties up with the hospital in continuation thus giving easy access to the students and faculty, to both the teaching facilities as well as the Hospital. r'fhe Housing and Hostel zone has been kept at the rear in a relatively quiter area. The road network has been kept relatively simple allowing for all access points (Porch / Drop Offs etc.) To be easily visible from the entry points itself. A 250m long feature wall is the face of both the Academic & Hospital buildings, Tying then together as well as Reflecting. The curving front site edge. The Academic block is a simple curved form building which responds to the site edges and space available. It is a G+4 Structure which accommodates all facilities as per M.C.I norms for 100 Admissions. The shape allows for a landscaped spill out zone exclusively for the academic block users. The Hospital is a much more complex and elaborate structure, being essentially three separate wings closely tied up together allowing for small usable courts to act as buffers between them. The building is a G + 10 structure with emphasis being laid on its compact nature to facilitate interconnectivity between different departments, which is essential in a hospital. Horizontal circulation has been reduced and hence vertical cores (placed strategically) facilitate movement throughout the hospital. A service block ties up all three of these wings at the rear thus enabling a segregated service movement which does not clash with patient/ public movement. The wards (between the 6th and 10th floors) have been placed such that they enjoy segregation, the least disturbance and the best views. The ward block lies perpendicularly across the three wings below thus tying the entire structure together at the same time making a visual statement by its large cantilever forms. Lastly the Housing and Hostels are a mix of rectangular shapes, placed at angles to provide broken smaller open spaces for interactive use and minimal over looking. The structures here vary in height with some of the housing block going up to G + 10 Stories. Overall the parking has been catered to in large parking basements under the Hospital, Academic Blocks as well as the Hostel & Housing Blocks with minimal parking on the surface thus freeing uo soace for landscaoina and areens.

It is certified that the aforesaid information is true and correct to the best of my krrw~dge and belief. \,"- '

---')~:~--\,1, •..• ;},\ ·'-

(Signature and name of Key Personnel)

144

Page 16: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

--------· ----~------ ------~--~·---------

Name of Key Personnel: Mr. Sumere Dar

--

Designation of Key Personnel: Partner & Principal Architect

---

Name of the Project: ESIC Medical College & 500 Bedded Hospital along

lwith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad.

>--- --

Name of Consulting Firm where employed: Design Associates Inc.

Description of services performed by the Key !To examine site condition, prepare conceptual

Personnel (including designation): design and draft sketches, preliminary drawings, broad specifications, working drawings, roads, pathways and parking areas drawings, design of fall ceiling, tender document etc.

Type of Project Hospital and Institutional and Educational Campus

Name of client and Address: (indicate whether public Employees State Insurance Corporation or private) Superintending Engineer, Employees State Insurance

Corporation, Panchdeep Bhawan, C.I.G. Marg, New Delhi-110002 (PUBLIC)

Professional Fee received (in Rs er. or US$ million) Fee Received: 10.86 Cr.

Area in hectares (for Urban Planning Project only) (1,08,459 Sqm)

Capacity in million passengers per annum (for Not Applicable. railway, bus terminal/ metro station or airport only) Start date and finish date of the services (month/

Commenced: 12.11.2008 year)

Completed: August, 2015 --

No. of days spent on the assignment 240 Days

Brief description of the project: The 32 Acre Site is located in Sanath Nagar, Hyderabad off a major road. The Site has numerous structures already built up on it including an existing 300 Bed Hospital and a large housing component. The site is bifurcated into two parts with an existing central road that gives access to almost all existing facilities. This road has been expanded into a central spine off which all the new and old structures are accessed.

The built up area of the existing hospital block not being sufficient to cater to the requirement of a modern day 500 Bed Hospital as per MCI Norms. This necessitated addition of new blocks to increase floor plates areas. A new ward block (B+ G + 6) has been added, new connecting corridors with cores (Lifts / Stairs) have been added at strategic locations to facilitate movement as well as segregate services and patient movement so that there is no clash of the same. Since the existing buildings are old they cannot take too much of vertical expansion thereby necessitating a large footprint on an already congested site.

The academic block has been placed along the central spine across the hospital building. Enabling easy access for the students and staff as well as keeping the hospital in proximity. The Academic Block is a compact G + 4 Structure which again combines with the hostels behind to create a private landscaped space, exclusively for the academic block users and the hostel residents. The Hostels have been kept in a quiet zone behind the academic block. They are all joined up in a contigious form in order to keep them as compact as possible. At the same time they have distinct entrances and do not overlook each other thus maintaining privacy for all the concerned residents. A small pocket at the rear of the site has been reserved for the housing of faculty. These units have been arranged in clusters which create an internal court exclusively for use of these residents. An independent facility of a standalone 130 Bed Super Specialty Hospital has been planned, as an independent entity with a separate compound. It has an access directly off the central spine. All other essential services and utilities have been placed along the periphery of the site thus enabling easy servicing of the entire complex.

~-

It is certified that the aforesaid information is true and correct to the best of ei,i.Jnowledge and belief.

;"::::;\_;s\,,j;..,, ,_ V ,·· -y,,w• ~.,~w~ ~,~s,-• .. ,,o,,a<,,;-c>"

(Signature and name of y Personnel)

,:, ' .. ' : ,' ; i /\ :'-,: ··-:' . ''' ··, !__...

- ¥ - 145

Page 17: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

--~-----------·· -----~----- ··------Name of Key Personnel: Mr. Sumere Dar

--Desianation of Kev Personnel: Partner & Princioal Architect .-

Name of the Project: Construction of Post Graduate Institute/ Medical College, Student Hostel and Faculty & Staff Housing (B+G+9) at Rajaji Nagar, Bangalore.

--Name of Consulting Firm where employed: Design Associates Inc.

Description of services performed by the Key Personnel To examine site condition, prepare conceptual (including designation): design and draft sketches, preliminary drawings,

broad specifications, working drawings, roads, pathways and parking areas drawings, design of fall ceiling, tender document etc.

[Type of Project Hospital and Institutional and Educational Campus etc.

Name of client and Address: (indicate whether public or Employees State Insurance Corporation private) Superintending Engineer, Employees State Insurance

Corporation, Panchdeep Bhawan, C.I.G. Marg, New Delhi-110002 (PUBLIC)

Professional Fee received (in Rs er. or US$ million) Fee Received : 5.57 Cr lArea in hectares (for Urban Plannina Proiect onlv) 52 432 Sqm) Capacity in million passengers per annum (for railway, Not Applicable. bus terminal/ metro station or airport only) Start date and finish date of the services (month/ year)

Commenced : 29.05.2009

Completed: May, 2012 No. of days spent on the assignment 225 Days Brief description of the project: The Site is located in Rajaji Nagar, Bangalore. It is approximately 15 Acres with main roads on all four sides. The site has an existing hospital of 300 Bed Capacity and some Residential Units built up on it. The Residential Units being in a dilapidated condition were slated for Demolition, thus freeing up some of the land for new construction. The Proposal was to enhance the existing 300 Bedded Hospital to a 500 Bedded capacity adding facilities for a Teaching Hospital and modifying the old layouts to comply with the latest planning norms and standards. The existing hospital was enhanced. A completely new block G+6 was planned within a large courtyard in the old layout. The new block was planned to accommodate all the critical care spaces like New O.T.'s, I.C.U's and Labour Complex. A state of the art coronary care complex was also accommodated on one of the floors with facilities of Cath, Labs, I.C.C.U's, O.T.'s etc. The old block has been upgraded by extensive renovation and modification. Peripheral areas have been used for ancillary building and support activities. The aluminum and granite cladding, reflective glass and extensive use of aluminum louvers all project, a modern contemporary Style of Design. The inside finishes too reflect the same at the same time being hardy and low maintenance. The Medical College is to accommodate 100 Admissions per year and comprises of the main academic block, Hostels for Student, Nurses, Jr. Residents etc as well as staff housing. The Site being extremely restrictive in size meant the buildings had to be planned in a compact way with them being vertical in nature, with the hostel and housing going up to G + 1 O floors. The attempt was to create interactive usable spaces between the built mass at the same time try and minimize mutual overlooking. The Result is simple rectilinear forms Juxta positioned together.

It is certified that the aforesaid information is true and correct to the best of my knowledge and belief.

~"-' ·-·· ··s,s

(Signature and name of Key Personnel)

146

Page 18: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

--Name of Kev Personnel: Mr. Sumere Dar Designation of Key Personnel: Partner & Principal Architect Name of the Project: Master Planning of Government Medical College,

Hospital and Staff Housing at Badaun.

Name of Consulting Firm where employed: Design Associates Inc. ~

Description of services performed by the Key To examine site condition, prepare conceptual

Personnel (including designation): design and draft sketches, preliminary drawings, broad specifications, working drawings, roads, pathways and parking areas drawings, design of fall ceiling, tender document etc. Coordination of all Services, liaison with clients and site coordination for better execution of work.

Type of Project Hospital and Institutional and Educational Campus etc.

Name of client and Address: (indicate whether public Uttar Pradesh Rajkiya Nirman Nigam Ltd. Project or private) Manager, UPRNN Ltd, Bareily Unit-2, Govt. Medical

Colleqe Uihani Road Badaun (PUBLIC) Professional Fee received (in Rs er. or US$ million) Rs.2.25 Cr. Area in hectares (for Urban Planning Project only) (1,52,565 Sqm)

Capacity in million passengers per annum (for Not Applicable. railway, bus terminal/ metro station or airport only)

Start date and finish date of the services (month/ Commenced: Feb, 2014 year) 1.omnlPtPrl · Oi=>r 701 6 ---

No. of days spent on the assignment 275 Days ---- --

Brief description of the project: The 100 Acre Site is located within the city limits of Badaun. An. A Medical College with a Hospital of 500 Bed Capacity was planned along with all ancillary facilities of Hostels, Staff Housing etc. The Site as such was flat and featureless, However it had a large curving frontage. This feature was used and expressed in the building design and final form. The site has been planned in distinctive Zones. The Academic, Hospital, Housing & Hostels being the three distinct zones catering to the bulk of the requirement.

The Hospital zone being located directly off the frontage and being the first on the primary access to the site from the city. This makes it easier to approach and access. Next on the frontage is the academic block zone which ties up with the hospital in continuation thus giving easy access to the students and faculty, to both the teaching facilities as well as the Hospital. The Housing and Hostel zone has been kept at the rear in a relatively quiter area. The road network has been kept relatively simple allowing for all access points (Porch / Drop Offs etc.) To be easily visible from the entry points itself ..

The Academic block is a simple building which responds to the site edges and space available. It is a Structure which accommodates all facilities as per M.C.I norms for 100 Admissions. The shape allows for a landscaped spill out zone exclusively for the academic block users. The Hospital is a much more complex and elaborate structure, being essentially three separate wings closely tied up together allowing for small usable courts to act as buffers between them.

The building is emphasis being laid on its compact nature to facilitate interconnectivity between different departments, which is essential in a hospital. Horizontal circulation has been reduced and hence vertical cores (placed strategically) facilitate movement throughout the hospital. A service block ties up all three of these wings at the rear thus enabling a segregated service movement which does not clash with patient / public movement. The wards have been placed such that they enjoy segregation, the least disturbance and the best views. The ward block lies perpendicularly across the three wings below thus tying the entire structure together at the same time making a visual statement by its large cantilever forms. Lastly the Housing and Hostels are a mix of rectangular shapes, placed at angles to provide broken smaller open spaces for interactive use and minimal over looking.

It is certified that the aforesaid information is true and correct to the best of my1~wledge and belief. l l ' . '"¾~J

/::~/,i .. ,\'s.,-<c),.:·,, .. , (

(Signature and name of Key Personnel)

;- ·,,·.,·,,· .

147

. :·~ <: :"; :+:

/~­/4:)t; .. , ..

Page 19: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

Name of Key Personnel: Mr. Sumere Dar --

Designation of Key Personnel: Partner & Principal Architect

Name of the Project: Comprehensive Consultancy Architectural & Engineering and Project Management Consultancy Services for Construction of Mahamaya Girls Inter College at Sector 44 Noida, Uttar Pradesh.

N~mA nf r'nnc, •lting Firm where emolQlled: DA~ian A~~nr.iates Inc.

Description of services performed by the Key To examine site condition, prepare conceptual

Personnel (including designation): design and draft sketches, preliminary drawings, broad specifications, working drawings, roads, pathways and parking areas drawings, design of fall ceiling, tender document etc. Coordination of all Services, liaison with clients and site coordination for better execution of work.

----

Type of Project Educational/Institutional along with Sport Complex Name of client and Address: (indicate whether public New Okhla Industrial Development Authority, Main or private) !Administrative Building, Sector -VI, Naida Uttar

Pradesh. (PUBLIC)

Professional Fee received (in Rs er. or US$ million) Fee Received: 1.76 Cr. Area in hectares (for Urban Planning Project only)

Capacity in million passengers per annum (for Not Applicable. railway, bus terminal/ metro station or airport only)

Start date and finish date of the services (month/ year)

Commenced: 2009 Completed: 2013

No. of davs soent on the assignment 285 Days Brief description of the project: The NOIDA Authority, our client for the Mahamaya Inter-College has conceived of this largely-residential school as an institution where education of the highest standard would be imparted to about 2000 of the brightest girl students selected from each district of the state, particularly those belonging to the economically weaker sections.

The site, a 20 acre linear plot, about 120 m deep and with nearly 800m of frontage along the Noida-Greater Noida Expressway has excellent connectivity and high visibility. As the school is an All-Girls-Residential-School, the client brief indicated that the buildings while maintaining a strong urban and architectural identity should also provide adequate privacy and access control. The resulting site plan reflects these dichotomous requirements: while the campus layout seems 'extrovert' with a progression of large built masses (of common building vocabulary yet distinct individual form) addressing the expressway and the urban fabric; the Academic Block and Hostel are essentially 'introvert' courtyard buildings.

The Campus Layout is centred on a formal green which provides a foreground to the Administration/Library Block, with the Academic Block to its East and the Auditorium and Hostel Block to the West. Staff Housing and the Sports Complex (with limited public membership) which have direct access to the outside are located at the extreme edges of the site. The total built up area of the campus 87008 sq.mtr with an achieved FAR-1.07 and Ground Coverage -12.4% are well within the prescribed norms, with the exception of Staff Housing all buildings on the campus are below G+3 floors .

The Academic Block, a four-storied (max.) structure, with Ground Coverage of 9496 sq. m. and built up area of 27327sq.m. constitutes the nerve centre of the campus. In its basic form this structure is best understood as a large square 'assembly-court' (on the lines of a school 'Quad') girded by a peristyle at ground floor level; the teaching areas (cells along doubly loaded corridors) are organized as built masses of different heights aligned along each edge of the court while maintaining a bi-axial symmetry. The road facing block is only two floors high and the height progressively increases with the flanking blocks (Junior School to the Right and Middle School to the Left) rising to three and the rear block (Senior School) to four floors respectively.

It is certified that the aforesaid information is true and correct to the best of my kf1qwledge and belief.

~J ,~;,,A,,-<'""°~>'*<¢, S,:=/-~·"'""~ _,~~.·~"'··

(Signature and name of Key P;rsonnel)

• ! ;;;f~, -

- 148 - -

Page 20: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

------Name of Key Personnel: Mr. Sumere Dar

f-· ------ --------Designation of Key Personnel: Partner & Principal Architect

Name of the Project: Comprehensive Consultancy Architectural & Engineering and Project Management Consultancy Services for Construction of Panchsheel Boys Inter College at Sector 91 Neida, Uttar Pradesh.

Name of Consulting Firm where employed: Design Associates Inc.

Description of services performed by the Key To examine site condition, prepare conceptual

Personnel (including designation): design and draft sketches, preliminary drawings, broad specifications, working drawings, roads, pathways and parking areas drawings, design of fall ceiling, tender document etc. Coordination of all Services, liaison with clients and site coordination for better execution of work.

Type of Project Educational/Institutional along with Sport Complex

Name of client and Address: (indicate whether public New Okhla Industrial Development Authority, Main or private) Administrative Building, Sector -VI, Neida Uttar

Pradesh. (PUBLIC) Professional Fee received (in Rs er. or US$ million) Fee Received: 1.85 Cr. Area in hectares (for Urban Planning Project only) --Capacity in million passengers per annum (for Not Applicable. railway, bus terminal/ metro station or airport only)

Start date and finish date of the services (month/ Commenced : 2009 Completed: 2013 year)

No. of days spent on the assignment 265 Days Brief description of the project: On the lines of the Mahamaya School for girls the NOIDA Authority, has planned a similar of school as an institution where education of the highest standard would be imparted to about 2000 of the brightest boys selected from each district of the state, particularly those belonging to the economically weaker sections. The site is a 20 acre rectangular plot, about 500m deep and with nearly 250m of frontage along the Neida-Greater Noida Expressway and has excellent connectivity and visibility. A high-rise housing development abuts the site to the west while to the east is a 100m wide green-belt. Responding to the site, the campus is organized into four distinct zones beginning with the Admin/Academic Zone aligned to the western edge and the Sports Facilities opening up towards the green-belt to the east and progressing to the hostel and Staff Housing zones respectively as one proceeds northwards. The Main Gate leads onto a curved driveway, the western edge of which is flanked by the distinctive triangular form of the Administration/Library Block while a continuous sweeping colonnade mimicking the curve of the road continues along the opposite face, the colonnade punctuated by distinctive staircase towers which mark the entrances to the Senior, Middle and junior School blocks also acts as the main pedestrian spine linking these blocks and leads onto the Auditorium Block on the northern end while the southern end is anchored by the arrival and dispersal pavilion for students who arrive by bus. Students arriving by private transport can be dropped at their respective blocks in the lay-byes provided along the main-drive. The School Blocks are aligned perpendicular to the colonnade on an east-west axis to avoid any overlooking from the adjacent high-rise housing complex. The linear blocks are separated by landscaped spaces where the soft landscape responds to and negotiates the repetitive geometry of the adjoining built masses on either edge while the hard landscape flow towards the play-field.

Each of the three school blocks begins with a faculty area adjacent to the colonnade (with the face fronting the colonnade clad in stone of a distinctive colour to ensure visual differentiation of each block) The academic area is organized around a street-like landscaped atrium which begins at the colonnade on one end and concludes at the play field. Class-rooms are organized on either side of the atrium coming off the flanking colonnades at various levels. Each Block is articulated in a unique manner to lend it its distinct character, be it by means of staircases and corridors spanning the atrium, the introduction of amphitheaters and performance spaces off the atrium or by means of massing and roof-form. The distinctive fai;:ade of these buildings is based on a series of stepped-buttress like repeat elements clad in Agra Red Sandstone with the inter-stitial spaces articulated by fenestration interspersed with cream sandstone panels. Vertically the soaring buttresses conclude in steel brackets which support the overhang of the half- curved, pitch roofs that define the distinctive flowing form of the skyline.

It is certified that the aforesaid information is true and correct to the best of my knowledge and belief .

. ~ b t l "'~

i i ,-,,,----·=-·c-=,,,.,-

7 JSer 0ature and name of Key Personnel) 11 f, ··-·--·-·------------1;.A '.. '.. . - "'- "- V "lvf[:1r1 -

Page 21: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

~ --- ---~---·- --

Name of Key Personnel: Mr. Sumere Dar

--------

Designation of Key Personnel: Partner & Principal Architect

-·--·- ·---

Construction of 1000 Seater Convention Centre with-Name of the Project: Auditorium and Nursing College at Indira Nagar,

Bangalore.

Name of Consulting Firm where employed: Design Associates Inc.

Description of services performed by the Key [To examine site condition, prepare conceptual

Personnel (including designation): design and draft sketches, preliminary drawings, broad specifications, working drawings, roads, pathways and parking areas drawings, design of fall ceiling, tender document etc. Coordination of all Services, liaison with clients and site coordination for better execution of work.

Type of Project ~uditorium, Convention Centre

Name of client and Address: (indicate whether public Employees State Insurance Corporation or private) Superintending Engineer, Employees State Insurance

Corporation, Panchdeep Bhawan, C.I.G. Marg, New Delhi-110002 (PUBLIC)

Professional Fee received (in Rs er. or US$ million) Fee Received: 1.58 Cr.

Area in hectares (for Urban Planning Project only) 12,500 Sq.m.

Capacity in million passengers per annum (for Not Applicable. railway, bus terminal/ metro station or airport only)

Start date and finish date of the services (month/ Commenced: 11.11.2010 year)

Completed: May, 2014 No. of days spent on the assignment 220 Days

Brief description of the project:

It is certified that the aforesaid information is true and correct to the best of my knowledge and belief.

c;;,, '

(Signature and name of Key Personnel)

150

Page 22: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

Name of Key Personnel: 1 Mr. Su mere Dar -----+-----------------

Designation of Key Personnel: Partner & Principal Architect f----------------------------1-----------

Name of the Project: Comprehensive Consultancy Architectural &

Name of Consulting Firm where employed:

Description of services performed by the Key Personnel (including designation):

Engineering for Construction of University of Petroleum at Dehradun, Uttarakhand

Design Associates Inc.

o examine site condition, prepare conceptual design and draft sketches, preliminary drawings, broad specifications, working drawings, roads, pathways and parking areas drawings, design of fall ceiling, tender document etc. Coordination of all Services, liaison with clients and site coordination for better execution of work.

f-------------------------+----------------------

Type of Pro·ect Name of client and Address: (indicate whether public or private)

Professional Fee received (in Rs er. or US$ million)

Area in hectares (for Urban Planning Project only)

Educational/Institutional Campus niversity of Petroleum & Energy Studies, Energy cess, PO Bidholli, Via Prem Nagar, Dehradun - 248

007 (PUBLIC)

Fee Received: 1.67 Cr.

(BAU 50,000 Sqm.)

Start date and finish date of the services (month/ year) Commenced: 01.09.2004 Completed: 15.03.2010

No. of days spent on the assignment 210 Da s Brief description of the project: The UPES campus at Bidholi Village lies at the apex of the Pondha valley. Th gently sloping site, located at the very base of the Mussorie Ridge is girded on the north and west by a low foreste outcrop, to the east is a deep ravine while to the south the gradient transforms into the relatively flat fields of Bidholi.

rom the very first visit it was apparent that the campus had to 'blend in' with its natural context and not impose itself o he landscape. The task was made easier by the fact that the client fully supported this approach and also by the bye-laws

for the Mussorie Area which ensure low-rise development. ather than flatten the land and build a large monolithic structure the whole approach to campus design is based o

creating a series of smaller 'component' buildings which respond to the sloping landform and are placed on shallo erraces extending along the slope. Individual buildings are custom designed for a specific purpose and have characte ithout being flamboyant. The layout of these blocks with respect to each other, their inter-connections and the interplay

of open-spaces and built-mass gives the campus its character. The 'academic axis' at the heart of the campus commences with the twin administration and faculty blocks at its apex and extends through a linear stepped courtyard

ith a series of inter-connected classroom blocks ranged on either side and concludes at the laboratory complex. The ostels, Library and LT. Block Complex, Staff Housing and Sports Facilities are other distinct entities. It was intende

hat the buildings should respond to the genius loci and the material palette chosen reflects that concern. The plinths o he buildings are of random rubble using boulders collected from the site and constructed by local masons from the

adjoining Dunga village. The grit for the grit-wash comes from within 3 km of the site. The kota stone strips used fo cladding are recycled mining waste and their grey-green tone works well with the ambient colour of the landscape. To soil, a limited resource on this site, was protected, while the heavy monsoon and academic calendar ensured that the phased construction never occurred during the rains. The lack of municipal infrastructure meant that we had to work ou a sustainable system of solid-waste management and also a water management system combining water-harvesting, use­

anagement, treatment and reuse. t the outset we did not begin with the intent of achieving a GRIHA rating for this project, it was just that the projec

earn and the client worked with a constructive mindset to address what could otherwise have been construed a roblematic issues or constraints of budget, building bye-laws, landform, the weather, the relative remoteness of the site

and used them positively to build into the campus buildings an inherent, built-in sustainable character. In conclusion, Common sense, Cost constraints, good construction practices and the client's sensitivity to the issues of sustainabilit and the environment, have, as a natural corollary, resulted in the evolution of a design which responds positively to its local context while addressing broader concerns of sustainability. Innovative, energy efficient, sustainable technological Architectural Design :

• Energy Conservation, Energy Sub Metering, Solar Voltaic. • Shadow Analysis for both summer and winter session. • Solar Exposure, Wind Analysis, Daylight Analysis, Water Conservation, Solid Waste Management, Indoor Ai

Quality, Insulation-wall and roof Green Building Technological Innovation such as Air purification, Water Earth Cooling, Solar Cooling.

It is certified that the aforesaid information is true ahd c

Page 23: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

I Name of Key Personnel: ·-·- -"-···r-· ·-

Mr. Sumere Dar - --

Designation of Key Personnel: Partner & Principal Architect Name of the Project: Comprehensive Architectural Consultancy Services for

Construction of 300 bedded Hospital at Sector-24, Naida (UP)

Name of Consulting Firm where employed: Design Associates Inc.

Description of services performed by the Key To examine site condition, prepare conceptual Personnel (including designation): design and draft sketches, preliminary drawings,

broad specifications, working drawings, roads, pathways and parking areas drawings, design of fall ceiling, tender document etc. Coordination of all Services, liaison with clients and site coordination for better execution of work.

Type of Project Educational/Institutional Campus/Hospital

Name of client and Address: (indicate whether public Employees State Insurance Corporation (ESIC), or private) Panchdeep Bhawan, C.I.G. Marg, New Delhi-110002

(PUBLIC)

Professional Fee received (in Rs er. or US$ million) Fee Received: 2.41 Cr.

Area in hectares (for Urban Planning Project only) (BAU 27,500 Sqm.) Start date and finish date of the services (month/ year) Commenced: 12.11.2007 Completed: 11.10.2011

No. of days spent on the assignment 245 Days

Brief description of the project: The site is approx 10 Acres located in Noida Sector - 24. The plot has an existing 150 Bedded Hospital in a building of Area 8478 sq.m. in the front of the plot. Vacant area behind was indentified to construct additional blocks for the hospital as well as staff housing.

The hospital was to be expanded to a 300 Bedded facility having the latest facilities and planned as per current standards and norms. This meant a shortfall of almost 28934 sqm of built up space. Critical activities like the O.T.'s, I.C.U's along with the wards were identified as activities that could be accommodated in the new block along with their support spaces like the Kitchen, Stores, C.S.SD, Laundry, Admin etc were also housed together in the new block. In order to keep the departments grouped together and keep the expansion compact the building was planned as a G+6 Structure. Large Grids, modular planning and adequate natural light, along with permanent outer finishes, maintenance free or low maintenances, interior finishes are some of the design features of the building. The aluminum and granite cladding, reflective glass and extensive use of aluminum louvers all project, a modern contemporary Style of Design.

The inside finishes too reflect the same at the same time being hardy and low maintenance. Simple rectangular blocks with wide linear corridors help patient movement making it easy for way finding at the same time. The old existing block has been completely renovated and upgraded while being redesigned to accommodate the more patient movement oriented activities like the OPD, Diagnostic and Casualty Department.

Other Utility blocks have been planned along the periphery of the site. Staff housing has been accommodated in high rise towers of G+10 with all modern amenities like Lifts, Fire Fighting, Power Back up etc. All units have been planned around central cores thus enabling them to be adequately light naturally. Large green areas have been kept as spill-out's for both the residents as well as the visitors.

--

It is certified that the aforesaid information is true and correct to the best of my ~~ledge and belief.

" } l

1?~i~~-:';,_ --/ ~ 152 - . .

(Signature and name of Key Personnel)

Page 24: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team
Page 25: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team
Page 26: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team
Page 27: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

Form-C11 Eligible Assignments of Key Personnel

rRahul Baro ---·~·-··----·--·----·--·- - -- -- ---·-·· - ,, __ _ fStation Planning Expert

- .. L .... ______ - ·--- - -- - ----------- - -- ------ ------ --1Detailed Design Consultancy Services for 09 Nos Elevated Stations! I '

~rchitectural/ Structural and Building Services for DMRC Contract n9 iccoo-11 Extension of Dilshad Garden to Ghaziabad Bus Adda

1

Name of K~ Personnel: Designation of Key Personnel

--·--·---··------- -~~-------~ Name of the Project

i

-- _____ J

I ,

::~~!:Ot::~:jr~:;.~:;~:;~y ih~-~:S.rf.I:9~"i~~t~0i:~~·~.~!:,~bl• f~,~~.·~;ch;.~:,.,~7~~ Key Personnel (including designation): !related to the stations, including planning, lay-out, Space utilization with

p ptimum economy and functional sufficiency, all architectural finishing rorks and various options for overall aesthetic appearances. Developing ~rea landscaping, lay-out etc. Responsibility also include Planning o !Passenger Handling, Platform & Concourse Design Standards, Entrances, Escalators, Stairs & Lifts Design Standards, Design for access to person

~

ith physical disability, Corridor and Ramp Design Standards, Passenge menities, Access for Maintenance Fire Protection, Provisions for Far

I ollection, Rain water harvesting, Solar panels, Building Materials and

Finishes etc. The station planning and design should also ensur l~equirement of provisions for different type of commuters like senio

~~ btizens, ladies, etc. to cater to all sections of the society buildings.

~~~~:~~~,~~~ .. ~::,, ~=.~1:~r~:.;;,"c~~:~.~.·ion ~:;:~:. . ~-- ~--. --~~~---1 !Metro Bhawan, Fire Brigade Lane, ~ !sarakhamba Road, New Delhi-01

1~r.?!e~s10~~'-~i~=!:.~~!~~-Ti~=Rs ~i~=9~T~~:!7_~. o__s~~~-00_~3~3.~~~~1~ervic~T~~I~--~ ---- -~-~---~~==:·== ~a in_ hectares (for _Urban Planning_ Not Applicable ____________ -------------------------·--------------·---Capacity in million passengers per annum 72 Million (for railway, bus terminal/ metro station or

1

start date-and finish date of the services tartoate: "January 201 s·------------ ___________________ , _____ _ ~o~~h~:::~pent on the assignment ----- ~~~s:~~t~~-~ri~_2~-~~----------·---------------------------!Narrative Description of Project: --------------------------------------------------------------------

• Station Planning, Architectural Planning, Structural Design and Drawings. • Preparation of Detailed Architectural, Structural and Building Services (MEP & HVAC) • Planning and Design of Utility Diversion • Taking of Approval of Design/ Drawing from DMRC and issuing of GFC drawing. • Attending all coordination design review/Interface meeting • Preparation as built drawings.

It is certified that the aforesaid information is true and correct to the best of my knowledge and belief.

~ ( (Signature and name of Key Personnel)

In

156

Page 28: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

Name of KeyPersonnel:_. Designation of Key Personnel: --- --- --- ------- ·-- - --- - - .

Name of the Project:

Rahul Baro -~iatfonPlan11i11g Expert ---·- ·-· --- -·· ! I •••••. ·····-~········-·-···---··-·-· .•••• ·-·· ..... -·-·--·--···- ---··-·--·· ..•••. ·1 [Detail Design Consultant for 2 Nos of Elevated Stationi.eKarkardumai \court and Maujpur and Elevated Viaduct of Line -7 Phase Ill of Delhi\ :MRTS (CC 64R) j

Nameorconsulting Firm where ·····---· )M1s"t.:K'(E.ngineerin9Consuitants-Ltd- -··--- ... - -- ·-----·--·---· I .... ···--···---·-··-- -····-·-· ... . ... -··· ..... ·······--·r.·· ·-· ...... -·· ··•····· ·-··-· ···------·-··-· .... ····- ·-· ........... ······-·----·--·-· ··-- -·····- ··I Description of services performed by the jAs a Station Planner Expert, responsible for All Architectural Service~ Key Personnel (including designation) lrelated to the stations, including planning, lay-out, Space utilization withl·

Eoptimum economy and functional sufficiency, all architectural finishing

1 orks and various options for overall aesthetic appearances. Developing1

!rea landscaping, lay-out etc. Responsibility also include Planning o~fl assenger Handling, Platform & Concourse Design Standards, Entrances, scalators, Stairs & Lifts Design Standards, Design for access to person ith physical disability, Corridor and Ramp Design Standards, Passenge menities, Access for Maintenance Fire Protection, Provisions for Fare!

eollection, Rain water harvesting, Solar panels, Building Materials andl !Finishes etc. The station planning and design should also ensurej requirement of provisions for different type of commuters like seniorl citizens, ladies, etc. to cater to all sections of the society buildings. I

. ype of Project ----======--===-~,Detail Desigri__-====·-· ---~-===-·-·-·--··----·---~--=··J Name of client and Address: (indicate Delhi Metro Rail Corporation Limited. I

hether public or private) Delhi Metro Rail Corp. Ltd, · Metro Bhawan, Fire Brigade Lane, Barakhamba Road, New Delhi-01

·--·· --- ·-·----·------· --- ·--·-·-··--··------·-i

p~::es~on:~c~a::/ec~:~veir~~nn R;la;~i:; ::~ ~:P~~~o:i~~~--------·-·--·---·-------···--------·----·--·-j Capacity in million passengers per annum 30 Million (for railway, bus terminal/ metro station or , Starfdate -and finTsh date of The services Start Date: November 2014 1

1~:0 ::h~:;:~pent on the assignrn•~- ~~~·;.~;t•-~ay~:~7___ -··----- ~ ___ -1 !Narrative Description of Project: I

! • Station Planning, Architectural Planning, Structural Design and Drawings.

1

1 •• Preparation of Detailed Architectural, Structural and Building Services (MEP & HVAC) Planning and Design of Utility Diversion

1

• Taking of Approval of Design/ Drawing from DMRC and issuing of GFC drawing. 1 • Attending all coordination design review/Interface meeting

L·. _P_r_ep_a_ra_ti~~-a_s ~~i~~~~-~~~~s-·-----------------·----·-----·----------·-------------·-·--jlt is certified that the aforesaid information is true and correct to the best of my knowledge and belief.

(Signature and name of Key Personnel)

f

!/!l

iates// //

157 - -

Page 29: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

Name ofKeyPersonneI [ Designation of Key Personnel

filahul Baro _ -[Station Planning Expert ' )consultancy-Services for Preparati?n of Detailed Engineering Services fo~ 1the 5 Nos of Elevated Metro Station of Jaipur Metro East-West Corridor.;

Name otthe Project:

/(Jan 2012 to Dec 2013) I - -- -------------- ------- -- ------- - -------+--- ------------ ----- -------------- l

Name of Consulting Firm where Mis LKT Engineering Consultants Ltd. i Description services performed by the-~s a Staffon Plan-ne_r_ -Expe-rt~es-ponsibte for All Architectural Service~ Key Personnel (including designation): related to the stations. including planning, lay-out, Space utilization witHi

I bptimum economy and functional sufficiency, all architectural finishing! j Forks and various options for overall aesthetic appearances. Developin~ I fArea landscaping, lay-out etc. Responsibility also include Planning o~

1 ' Passenger Handling, Platform & Concourse Design Standards, Entrances,'

li=:scalators, Stairs & Lifts Design Standards, Design for access to person~ f ith physical disability, Corridor and Ramp Design Standards, Passenge ~menities, Access for Maintenance Fire Protection, Provisions for Far iCollection, Rain water harvesting, Solar panels, Building Materials an '

1

1Finishes etc. The station planning and design should also ensur requirement of provisions for different type of commuters like senio

I ~itizens, ladies, etc. to cater to all sections of the society buildings. ~- -- ------------------------------ ---- ------- -----i=---- . --------. -------------------------- -------------------------- ------------------------------- --

i!YP~_()_f Project _ ______________________ Detail Design _____________ _______ __ _ __ _ ___ ____ ________ _ _ __ jName of client and Address: (indicate Delhi Metro Rail Corporation Limited.

/

whether public or private) Delhi Metro Rail Corp. Ltd, Metro Bhawan, Fire Brigade Lane.

- Barakhamba Road, New Delhi-01 b------------------------------ --------------+-------------------------------------------

~:es~~onh~c~::s re(~=~vei~:nn_ ~la~~ ino; ~~AitJc°~~~O ·9-°. _________ -------------------- ------- ----kapacity in million passengers--per annum 75 Million -------- --------------------- - ----------------------- ---- ----------- -------

•Start date and finish date of the services Start Date: January 2012 , /or !ai!'.Vay, ~~ lef!!1incil/ ni~tro ~~t!_on s,r_f. _ ___ __ __ _

~o~:;pent On ihe assignment ~ F~~s;.~:te-l)ecemb: ..2"'-3 -=--=~~~ ~ :- =~===~

Narrative Description of Project: I

• • • • •

Station Planning, Architectural Planning, Structural Design and Drawings . Preparation of Detailed Architectural, Structural and Building Services (MEP & HVAC) Planning and Design of Utility Diversion Taking of Approval of Design/ Drawing from DMRC and issuing of GFC drawing . Attending all coordination design review/Interface meeting Preparation as built drawings.

is certified that the aforesaid information is trne and correct to the best of my knowledge and belief.

(Signature and name of Key Personnel)

In

'~ ( .. :1 l\,· ,

--------·- - ______ 1_ 5 8 . - -

I

Page 30: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

fRahul Baro :station Planning Expert

Name of Key Pe,_rsQn_nel: Designation of Key Personnel ---- ---- -· - - ---·-··"

Name of the Project: [Detaii . Design for. ·3 Nos ETevated stationsOkhlaPh-111, lshwarnagar, ' iKalindiKunj Delhi MRTS Delhi. (Contract No CCDD02) (Oct 2011 to May i2013)

. Name ofConsulting Firm where :M/s LKT Engineering Consultants Ltd. ,

Description of services performed by the--(As.aStaffc1n Planner Expert, responsTbfe.for All 'Archite.ctural-Servlcesl Key Personnel (including designation) !related to the stations, including planning, lay-out, Space utilization with i

pptimum economy and functional sufficiency, all architectural finishing I r,vorks and various options for overall aesthetic appearances. Developing I frea landscaping, lay-out etc. Responsibility also include Planning of

1

.Passenger Handling, Platform & Concourse Design Standards, '1·

!Entrances, Escalators, Stairs & Lifts Design Standards, Design for access , to persons with physical disability, Corridor and Ramp Design Standards, I !Passenger Amenities, Access for Maintenance Fire Protection, Provisions 1

; for Fare Collection, Rain water harvesting, Solar panels, Building

~ JMaterials and Finishes etc. The station planning and design should also )ensure requirement of provisions for different type of commuters like !senior citizens, ladies, etc. to cater to all sections of the society buildings.

ype of Project __ . __ .......... ---·. --·· __ _)Detail_ Design·_-·-···· __ __· _ _ ---·-·-· _----~==:-=--~~-:.-:: .. =~---· Name of client and Address: (indicate! ·Delhi Metro Rail Corporation Limited. r'hether public or private) !Delhi Metro Rail Corp. Ltd, I Metro Bhawan, Fire Brigade Lane, • iBarakhamba Road, New Delhi-01 L .. ~. -----·----·-·--·-· .. ·-·-··---··· --·-------t,---··---·-·----·-----·-·-·--·-.. -· .. ·---· . ··-· . ··-----· .. ··-·---· ... -·--!Professiona I Fee received (in Rs er. or iRs. 91, 00,000.00

---·-----·------··--·----.. L-------·-· ·-·--·-·-···-·-· ... ·-··----·--··-·-----·· ·-·------·-·· ·-----·-----·----........... . rea in hectares (for Urban Planning ~ot Applicable apacity in million passengers per annum ~5 Million ··· · ·· ---· ------- -·---·-·--·---

~~;Ja~l::y ~~~~i~~:'i~:!: :t;~/~~~{1Z~ !start Date october2011

~:

0

::~~::::pent on the assignment -·---t~n~~;a~:te: __ ~~!. 2

~1-~- .. ---·- - -·------·-·-· --·-· ····----·----------

NB-rr8tive Description of Project: · e·-·--···-*---·----·----·-~·-·---

• Station Planning, Architectural Planning, Structural Design and Drawings. • Preparation of Detailed Architectural, Structural and Building Services (MEP & HVAC) • Planning and Design of Utility Diversion • Taking of Approval of Design/ Drawing from DMRC and issuing of GFC drawing. • Attending all coordination design review/Interface meeting • Preparation as built drawings.

It is certified that the aforesaid information is true and correct to the best of my knowledge and belief.

(Signature and name of Key Personnel)

159

Page 31: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

.... N?m~ qffS~yf~T§Q.nr,el Designation of Key Personnel:

.. ·--- ---·---·--·-------·-·- ---·--- --Name of the Project

iRahul Baro ~tation Planning Expe-rt \Consultancy Services for Engineerin·g- Services for Civil anci Building Services "Design & Construction of Contract of Underground Stations ,~nd Tunnel including the Ventilations, Air-conditioning (Contract iBMR/UG2 (EAST-WEST CORRIDOR) for Bangalore Metro Rail eorporations. (Nov 2008 to May 2009)

i Name.otconsultingFirm where M/sl..kTEngineerTng consuttantsTid ...... .

i Description'ot servicesperiorm_e.cft;·y the ~s-a station Pian ner Expert;" responsTfile for-Ali ArchitecturaTservices I Key Personnel (including designation): ,related to the stations, including planning, lay-out, Space utilization with

pptimum economy and functional sufficiency, all architectural finishing

torks and various options for overall aesthetic appearances. Developing rea landscaping, lay-out etc. Responsibility also include Planning of

:Passenger Handling, Platform & Concourse Design Standards, I jEntrances, Escalators, Stairs & Lifts Design Standards, Design for access I ~o persons with physical disability, Corridor and Ramp Design Standards, JPassenger Amenities, Access for Maintenance Fire Protection, Provisions for Fare Collection, Rain water harvesting, Solar panels, Building !Materials and Finishes etc. The station planning and design should also

/ !ensure requirement of provisions for different type of commuters like

~~Of Proj8Ct =:__:_-:::: ::::. ::=::: ::j::~v_biti:;·'a:•~•~k,==ter~an:•=on5.01the. soc,e~b~ild=== 1Name of client and Address: (indicate

1

Delhi Metro Rail Corporation Limited. whether public or private) !Delhi Metro Rail Corp. Ltd,

Metro Bhawan, Fire Brigade Lane, lsarakhamba Road, New Delhi-01

Profes~ionalFee received .(in Rs er . or~. 30, ~0,000.00. __ . ____ ·---- --· _____ . -----===~===-=-=:=~~~-rea in hectares (for Urban Planning !Not Applicable

~f f rt~~i;j~~:~:~:r.:~~i ;~~~~;: b;.:i::~. November 200a - · · . · ·· . ·· · -- ---- ·····

~

mo::h~::::pent on the assignment . . !:n~s:a:te May 2009 · · . . . .. .

rrative Description of Project:

1 Station Planning, Architectural Planning, Structural Design and Drawings.

I • Preparation of Detailed Architectural, Structural and Building Services (MEP & HVAC) • Planning and Design of Utility Diversion • Taking of Approval of Design/ Drawing from DMRC and issuing of GFC drawing. • Attending all coordination design review/Interface meeting • Preparation as built drawings. -~·-· -- --··-----------·--- ---------------------·-·-------·------------- --------·--·-·---·~----·------------·-------------··-·--·-------·----- ···-----

It is certified that the aforesaid information is true and correct to the best of my knowledge and belief.

(Signature and name of Key Personnel)

:160

Page 32: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

. Name of Key Personnel: Designation of Key Personnel:

-1Rahul Baro 1staHon PiannTng Expert

---- ·- ··--·------. -· .. --Name of the Project Consultancy Services for Detailed Engineering Services for Civil and

Building Services including BOQ for ''Design & Construction of Viaduct ;of Length 21 Km and 11 no of Elevated Metro Stations part of Central JSecretariat -Badarpur Border Corridor MRTS Contract No BC-

-· ---- --·- -- f.7,28,29,30. l Name of Consulting Firm where Mis LKT Engineering Consultants Ltd. I- - ----------·--···--·-·····- -·-· --·-·--·-·-···--··--·····-··---~·--·i-:-----~--·--- ·--·--·------ ····-······-·····--· ·-~--·-·-·--·- ··----·---·---··-·--··· - ·······. ···--·--····-··-

I Description of services performed by the !As a Station Planner Expert, responsible for All Architectural Services l Key Personnel (including designation) \related to the stations, including planning, lay-out, Space utilization with

1

1 ~bptimum economy and functional sufficiency, all architectural finishing orks and various options for overall aesthetic appearances. Developing rea landscaping, lay-out etc. Responsibility also include Planning of

I !Passenger Handling, Platform & Concourse Design Standards, I !Entrances, Escalators, Stairs & Lifts Design Standards, Design for access I ~o persons with physical disability, Corridor and Ramp Design Standards, I wassenger Amenities, Access for Maintenance Fire Protection, Provisions I It Fare Collection, Rain water harvesting, Solar panels, Building I

1

Materials and Finishes etc. The station planning and design should also I :ensure requirement of provisions for different type of commuters like

~r:~~,~~ot:;~, ;;i.t.tress• (indicate ~}Ii §i!~i~:;6;;;p;;.:::·:~::~I sections ofthe society buildings,

1· Metro Bhawan, Fire Brigade Lane,

f r0f0ssional Fee reciiVOd (in Rs ci: Or f ra,'.~r:; o~6ag(j New Delhi-O 1

. .. - ..... . -. ~~ .. ~rea in hectares--(for-Urban Planning Not Applicable - ---- ------ -- ------ ------------ ---------·---

Cap8city-frli11illion~-passengers per annum 110Million -- ----- --- - --- --~------~-----------­

(for railway, bus terminal/ metro station or 1

Start date and finish date of the services Start Date: May 2007 · --- -----------------------·--------------··----

(m~~~.?'=~~~------ _______________ ~~~~~-~~t:: ~-e_c. ~~~-=- ---------------· ---------------------------f'J?'. of_9c3l~ ~EEl_~!_o_r, ~~El~~~~gnment _ 151~_9<3}'~ Narrative Description of Project:

• Station Planning, Architectural Planning, Structural Design and Drawings. • Preparation of Detailed Architectural, Structural and Building Services (MEP & HVAC) • Planning and Design of Utility Diversion

I • Taking of Approval of Design/ Drawing from DMRC and issuing of GFC drawing. I I • Attending all coordination design review/Interface meeting 1 : • Preparation as built drawings. _J f---·--- ··--·-·-------·--------·-----·--··-·- .. --------·-···--------··--- --·-· -------·---·----·-----··---------·-------·--------··--------IIt is certified that the aforesaid information is true and correct to the best of my knowledge and belief. I I I

~1 (Signature and name of Key Personnel)!

I aa--·---•-a ••-•~-•-·•••----·-----·--- • __ _._. __ J

.. 161

Page 33: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

• r-.J,arne Qf l<_~y P~r.§gfln~I _ , D_esi~nc3_ti.9n o! Key Personnel: j Name of the Project:

;Rahul Baro I [station Planning Expert - . . .

1

1

;consufrancy Services tor betaitecfEngfr,eering services for cTv11 and 1Building Services including BOQ for "Design & Construction of SaritaViha pepot part of Central Secretariat -Badarpur Border Corridor MRTS1 ;(May 2007 to Mar 2010). I

j , I i Name of Consuiting·F,rm where · ., .. ,., 1rJUs LKTEngineering Consultants Ltd, ., -······· ... · ,.,. · .... 1

l.i5esciiptio-nof servTcesperiormed by the··· fs-a station Planri.er Ex.pert; respon-sTb.iefor Alf Architectural services·j Key Personnel (including designation): 1related to the stations, including planning, lay-out, Space utilization with I

!optimum economy and functional sufficiency, all architectural finishing ~orks and various options for overall aesthetic appearances. Developing , V\rea landscaping, lay-out etc. Responsibility also include Planning of !Passenger Handling, Platform & Concourse Design Standards, !Entrances, Escalators, Stairs & Lifts Design Standards, Design for access ~o persons with physical disability, Corridor and Ramp Design Standards, [Passenger Amenities, Access for Maintenance Fire Protection, Provisions for Fare Collection, Rain water harvesting, Solar panels, Building !Materials and Finishes etc. The station planning and design should also bnsure requirement of provisions for different type of commuters like

-········--·--·-··--····-···--··-·--·-----··-·-·--~-~t~~_E:~S, ladies, etc._to cater to all sections of the ~?~iety _t:>_uildinis.

[YPe of Project ·-------· . Detail Design . ·····-··----------·-·-·---·-----------·

fName of client and Address: (indicate Delhi Metro Rail Corporation Limited.

hether public or private) Delhi Metro Rail Corp Ltd, Metro Bhawan, Fire Brigade Lane,

I Barakhamba Road, New Delhi-01 professional Fee received (in Rs er. or Rs. 70,00,000.00 .. ... . . . .. . ----···- --···--· fea1nh-ectares···( for.Urban - P lannlng·- Not Applicable· ... . ... -·-···· . --· -· ·-·····-- ·- .. . -- ··------· .. - ··--- -··--papacity in million passengers p·erannum 10 Million ·-- . ---· --------------·-··-------·---····-····-----··

art ·date-and. finish. date. of the services 1~;~t Date: May 2007

~

for railway, bus terminal/ metro station or

~m;;.::::pent on·· the··assignment--···-~a~:t=-~~~-2~-~~·=: .. ~~··~~··=.·---~-----·-··:.·· ···········--······-··----·--·······

Narrative Description of Project:

• Station Planning, Architectural Planning, Structural Design and Drawings. • Preparation of Detailed Architectural, Structural and Building Services (MEP & HVAC) • Planning and Design of Utility Diversion • Taking of Approval of Design/ Drawing from DMRC and issuing of GFC drawing.

Attending all coordination design review/Interface meeting Preparation as built drawings

certified that the aforesaid information is true and correct to the best of my knowledge and belief.

(Signature and name of Key Personnel)

162

Page 34: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

Form-C11 Eligible Assignments of Key Personnel

l Name of Key Personnel : Designation of Key Personnel:

r-------- ·--·----- --- ------

Name of the Project:

I 1----·-- -·- ------------ -------------------------------1 ~a_me ?! ~onsultin~ Firm wher_: _ _ _ I Description of services performed by the I Key Personnel (including designation):

I /

~~~:~tu~:i~~gT~!;rrconstruction Expert -- ----- i -b-- --- ··- ----------·-------- ------------------ - -- ----- ------------·------- - -- - - --, petailed Design Consultancy Services for 09 Nos Elevated Station~ ~rchitectural/ Structural and Building Services for DMRC Contract n~ iCCDD-11 Extension of Dilshad Garden to Ghaziabad Bus Adda. I , I

___ J __ - ---------- ------ ------ - -- ------- ------------------------ -----·------ _________ J lM/s LKT Engineering Consultants Ltd. : ~s a structure Engineer Responsible tor befailed-DesTgn Engineering oft

!substructure & super structure viz. Foundations, concourse levels, lowe~ platform levels, upper platform levels, roof levels, connecting sky walks ~1

JEntry exit structures. Responsible for Preparation of general arrangemen !drawings including Roof Level & Fai;ade supporting structure Gettin ~pproval of all necessary drawings along with documentation from clien~

f:C & release of GFC drawings to site. Responsible for station structure nd sub-structures detailed and typical sections, prepare structura

easibility report indicating the loading parameters and other importan

tactors influencing the structural design with Accordance to Local Laws,

Seismic Conditions & relevant Codes. Finalize the method and program fo

1 he construction of the structural framework of the

~ype of Project·· · ,~:::~~:sign . . Eame. of ciient -and Address, (;ndicate rlh; Metro Rail Corporation Limited.

~;~:;;:n~:~~~:;~:ei~~~nn R:1.r~~~ i?:~~~~~if !~~~i~:~;;~JLMce Tax l . ~ .... ·~ ... --~ .

~------ - ---------------------·------------------ -------- -- ---------------------------------------------1~:~acity in million passengers per annum 72 Million ~ railway, bus terminal/ metro station or ~tart· date and finish· date of the services Start Date: January 2015 ·· · -(month/ year) Finish Date: April 2017

~ spent on the assignment 15 days · ---------------!~~;~---------------------·-'--·~ '"-·---·-··-·· .... ,. ---··------···-~------------·----··---·-··-~---·------·--·-----·---------·-/Narrative Description of Project:

! • Station Planning, Architectural Planning, Structural Design and Drawings. • Preparation of Detailed Architectural, Structural and Building Services (MEP & HVAC) • Planning and Design of Utility Diversion • Taking of Approval of Design/ Drawing from DMRC and issuing of GFC drawing. • Attending all coordination design review/Interface meeting

Preparation as built drawings.

is certified that the aforesaid information is true and correct to the best of my knowledg and belief.

(S ey Personnel)

163

Page 35: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

Name of Key Personnel: , Designation of Key Personnel i Name of the-Proiect -

}..__gke~h KUrl}§[J_yc1gi _ __ Structural Engineer/ Construction Expert

___ ,, -- . [P-roof Consultant for3 -Nos Elevated stations orE-xtension of Line--ffl fromj iNoida Sector-32 to Noida Sector-62 of Phase-Ill Delhi, (July 2016 to Aprili !2017) i \ -· .. \

i Name of Consulting Firm where Mis LKT Engineering Consultants ltd. : r ·---· ··---·- .. ·----------·--· .. --·--- ·--··- - -- ... i--- .... .. .... ·-------.. ·----·-·-------·-·-· - ..... - ---· ... -·-----.. ... . .... .. . . ..... _, i Description of services performed by the ~s a Structure Engineer Responsible for Proof Checking of Detailed! i Key Personnel (including designation): jDesign of substructure & super structure viz. Foundations, concours~ I jlevels, lower platform levels, upper platform levels, roof levels, connecting! i

1sky walks & Entry exit structures. Responsible for Preparation of generaJ

j arrangement drawings including Roof Level & Fa9ade supporting structur~

I. !Getting Approval of all necessary drawings along with documentation from~·

,client GC & release of GFC drawings to site. Responsible for station I 'jstructures and sub-structures detailed and typical sections, prepar I structural feasibility report indicating the loading parameters and othe~ /

11

' !important factors influencing the structural design with Accordance to Loca.11 Laws, Seismic Conditions & relevant Codes. Finalize the method and program for the construction of the structural framework of the buildings.

I ~e-of _Project _ •........ ,.. .. . __ -- _ --.. ____ __ _b_()~f ~~~~_ir,-~ ----- -----------·--·· --· __ --------·-------------

rame of client and Address: (indicate 'Delhi Metro Rail Corporation Limited. hether public or private) Delhi Metro Rail Corp. ltd,

Metro Bhawan, Fire Brigade Lane, k Barakharnba Road, New Delhi-01

1Professional Fee received (in Rs er, or Rs, 16, 22,000,00 · · · ··

~e~~~ -- (for Urban _ Planning Not Applicable __ ------------ ----=-~~·=---==-=-=--=-~~===-=-

~

pac1ty 1n million passengers per annum 30 Million railway, bus terminal/ metro station or

~O:r::::.:;:; t::t:.::g::;~Nice]~:;:•J~rii~1~7 ..... ·--~~~=-------- J Narrative Description of Project:

• Proof Check of Architectural Design and Drawing, • Proof check of Structural Detail Design, calculation of Elevated Metro Stations 2 Nos, Elevated Viaduct, and

Underground Tunnel AND Economize where Possible Keeping safety of Structure Intact, • Proof checking of MEP Services.

It is certified that the aforesaid information is trne and correct to the best of my knowledge and belief: -

Page 36: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

.... J_~kesbJ<\1rri.§l_rTy_~.9L __ _ . ... . .. -· Name ofK~_Personnel: _ Designation of Key Personnel: ;Structural Engineer/ Construction Expert 1

. j...... • .... ·-········--··· .. ·-· --····· ----· .. ·····---·-······-·-····· ·- .1 - -------·-- -----····"-···· -Name of the Project: '!Detail Design Consultant for 2 Nos of Elevated Stationi.eKarkardumai

Gourt and Maujpur and Elevated Viaduct of Line .. 7 Phase Ill of Delhi!

1 !MRTS (CC 64R) I

i Name of Consulting Firm where 1MlstKT Enginee-ring Cons-uitants Tfo •' ··--- - -·-· .... -· ······-· .... I

'······---· ·--·-··-· ... ·-··· ·---····-···-··--· ··--- ·--·· ._J" ·-- - -- .. ·-· ....... -· ·····-··--···-··-··-··· -·- -··· ·-·-·····--··· -·--·-····· ····-·--··-. -· ········ ··j,

1

1 Description of services performed by the !ft.s a Structure Engineer Responsible for Detailed Design Engineering o Key Personnel (including designation): 1substructure & super structure viz. Foundations, concourse levels, lowe 1

, platform levels. upper platform levels, roof levels, connecting sky walks &I

II !Entry exit structures. Responsible for Preparation of general arrangemen~

'drawings including Roof Level & Fa9ade supporting structure Getting, . ~pproval of all necessary drawings along with documentation from clien~ J iGC & release of GFC drawings to site. Responsible for station structure f ~nd sub-structures detailed and typical sections, prepare structura 1 1teasibility report indicating the loading parameters and other importan I ractors influencing the structural design with Accordance to Local Laws, I Seismic Conditions & relevant Codes. Finalize the method and program fo

~YP"Of Pr0i0Ct .... . . . . . . .... . . .... ~~::g:;.::rt~truct:~rame=ork otthe. ~········---·---·---

rN-ame of cli_ent ---a~crAcfdress: (indicate i~lh_i Metro Rail Corporation Limited.

hether public or private) fDelh1 Metro Rail Corp Ltd, Metro Bhawan, Fire Brigade Lane,

. Barakhamba Road, New Delhi-01 1--·----··--· ' ---·- ---------·· .. ----·--··-... - ... ·---·--··-·--··----·----·---··----frofessional Fee received (in Rs er. or Rs. 88, 00,000.00 !Area in hectares (for Urban Planning Not Applicable · · · · · · · · · f pacity in million passengers per annum 30 Million · · --- ··--···· -··-···-·

~or railway, bus_ terlll_iQclllrnt::t~() stc1ti_on_o_r - - ·-·-- -- ·-- - -- - --· .

'

Start date and finish date of the services ~Start Date: November 2014 (month/ year} Finish Date. May 2017 ~-- --·------------------·---- -- ----- --- - --·-·---------- ---- --- ------- --·--- -- -----··--r~;!jt~y~."!:n~,:~ ~r" :~;!~;ment .... _<4.days ~ -- - ---·---·----·----·----------------1 • Station Planning, Architectural Planning, Structural Design and Drawings. I • Preparation of Detailed Architectural, Structural and Building Services (MEP & HVAC) I • Planning and Design of Utility Diversion

I • Taking of Approval of Design/ Drawing from DMRC and issuing of GFC drawing.

I • Attending all coordination design review/Interface meeting

. • Preparation as built drawings. I -- - -- -------- - - -- -------- - ----~-------------- ---------- -- ------------ ---

/

'It is certified that the aforesaid information is true and correct to the best of my knowle~g~,.~nd ~~ ef.

// ,~··1 C I /,.-

0\\\•;:j ·01;

I // v'-.':,..,-- --1 / o/

II j~ Ill (lw ~~~~

L . . .. ( gnatur ~ ~~ , -- ·-·-··-. --·-·--···········---·----·--······-·--.. ·--·--··--·······----·- ···-·----·-··- --···-·-··--·-- ·)__,c,,_____,~

,, -~, ,/ ---------·---

sonnel)

,7·,:-,··· 'e,, ..

./

165

Page 37: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

r-.JcitTlEl Qfl\Ely PElr§onnEll Designation of Key Personnel: Name of the Project

' Name of Consulting Firm where -·---- - -~- -- ~- - --~---

Description of services performed by the ' Key Personnel (including designation):

·:~oke_~h Kuni?rJyElgi .. ;structural Engineer/ Construction Expert . :c·onsultancy Services tor Preparation of Detailed Engineering ·services to~ ~he 5 Nos of Elevated Metro Station of Jaipur Metro East-West Corridor; !(Jan 2012 to Dec 2013) i MtsLKT Engineering consuftants Ltd~ -- . .. l .r.:. ..... -··· ··-- -·········--- --·--······-·--··- ·-···--·----···-· ·-- ·-·-····--····--···--·---·· .,.-, ~s a Structure Engineer Responsible for Detailed Design Engineering o~

1substructure & super structure viz. Foundations, concourse levels, lowe~ !platform levels, upper platform levels, roof levels, connecting sky walks ~, !Entry exit structures. Responsible for Preparation of general arrangemen !drawings including Roof Level & Fayade supporting structure Gettin , ~pproval of all necessary drawings along with documentation from clien~ IIGC & release of GFC drawings to site. Responsible for station structure51 and sub-structures detailed and typical sections, prepare structural !ieasibility report indicating the loading parameters and other importanti ~actors influencing the structural design with Accordance to Local Laws} !seismic Conditions & relevant Codes. Finalize the method and program fo1

I ~he construction of the structural framework of the 1buildings.

~

··-···--·-··-···-· _.,_ ··-------·-· -·---·· ·-·-·-·-·····-·-------- -+.:-----···---·· ·--·--·-··-··--·--·-·--·-·----·---"·--·----·-------------"-···"·--··-ype of Project Detail Design

~~~~.~~u~/i~"J, ~~~at:~dress (indicate ro::~: ::.':oo RR;lilC~~:~;;tion Limited. . .. . . ............... ········· ............. .

Metro Bhawan, Fire Brigade Lane, Barakhamba Road, New Delhi-01 Protess .. iona(-Fee received (inRicr.-or Rs. 105,oo,ooo.oo . . ·--------·-·- ........ ______ .. . .. ------- --

1 -- ·--· -- _,_ .. ______ , __ .,_ ..... , .. , ..... , ... _.,.,_, __ ... ,_ .. _ .... _ .. """" ,, ______ ,_ ......... , .. - ......... ____ ............. -._., ____ _ ~ in hectares (for Urban Planning Not Applicable ~~i~~i1~~~. ~~~ot:f~~~~

1n~e;i::~a~i~~u; 75 Million · · ·· · -- ________ .. ______ .. ___ ··---··-----.. ---

/

%tart date and finish date of the services ·-tart bate January 2012 ''

r~:°-::h~:;::pent on the assignment-=-~-,n~s;a~:te_!_f:~:~=~~-~?~-

3--=~~-=~:-·:===~-----=====-~~~~ ~arrative Description of Project:

/ • Station Planning, Architectural Planning, Structural Design and Drawings. , • Preparation of Detailed Architectural, Structural and Building Services (MEP & HVAC)

• Planning and Design of Utility Diversion • Taking of Approval of Design/ Drawing from DMRC and issuing of GFC drawing. • Attending all coordination design review/Interface meeting • Preparation as built drawings.

It is certified that the aforesaid information is true and correct to the best ofmy knowledge and beli

rsonnel)I

.~

,·y·{,·, .. '. '! ,.: ,. .,

166

Page 38: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

. --·-···· ~

, t'llci_me C>fKey Personnel ]Lokesh Kum9r Tyagi _ Designation of Key Personnel ;structural Engineer/ Construction Expert Name.ofThe Project: ..

---,~:iti~i~i~}~'tel~~rM~T~0;el~:e~~~~~ra:~a~~n;gi~;~\~~t ';~~a~~a~:~ .

!2013) ____________________ I Name ofConsulting Firm where - - [Mis Il<T Engineering Consultants .. - · ·- -1 Description-of services pelior-med-by-the ___ [As-ii StructtireEng (near· Resp on slbie-for -De-taTiecroesig n Eng ineerTng- o~ Key Personnel (including designation): jsubstructure & super structure viz Foundations, concourse levels, !owe

platform levels, upper platform levels, roof levels, connecting sky walks IEntry exit structures. Responsible for Preparation of general arrangemen ~rawings including Roof Level & Fa9ade supporting structure Gettin bpproval of all necessary drawings along with documentation from clien

iGC & release of GFC drawings to site. Responsible for station structure51 and sub-structures detailed and typical sections, prepare structura!i easibility report indicating the loading parameters and other importan~ actors influencing the structural design with Accordance to Local Laws,I

.

~Seismic Conditions & relevant Codes. Finalize the method and program fo~I l~he construction of the structural framework of the

:1;.or;,o~~~; ·~~~ :~,.,,· (i:di=~ ~;;:~~::;~nR~ilC~~oration Limit8d. . ........... ······ .......... ·- -j

hether public or private) Delhi Metro Rail Corp. Ltd, Metro Bhawan, Fire Brigade Lane,

----····-··------ ____________________ Barakhamba Road, New Delhi-01 __ ----------------·-----------···------!

~~o=~~;::~:~~J1:~~~; ~;s~~~~~o~~oo ~: == . ~~ : ::: . .::::..:::: ~: .. ·: (for railway, bus terminal/ metro station or I

~t~-t~Jt~:r~<riin-ish date-otTheservfces ·· ~~i::~:~~~~~:;~ ~-~ 11- ··- · ! ~o o-f -da_y_s_s_p-enton -the as-s-ig_n_m_e_n_t --=~~-!?1-2 __ d-=_ay'--··s_·-··-_---_---------·--------------·------· ___________ - 1 1Narrative Description of Project:

I • i I • ! •

• • •

Station Planning, Architectural Planning, Structural Design and Drawings. Preparation of Detailed Architectural, Structural and Building Services (MEP & HVAC) Planning and Design of Utility Diversion Taking of Approval of Design/ Drawing from DMRC and issuing of GFC drawing . Attending all coordination design review/Interface meeting Preparation as built drawings .

--···-·······---·---------···-·--·---··· -------- ---------------------~-- 1_ 6 7 /

Page 39: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

. NamE? ofKE;y PE?rSC>fJ_nel Designation of Key Personnel

---·-····-·-- -·· -··· --··--

1 Name of the Project

--- - -- - . ---·- --

J~o_ki~h KJJ11J_clr Jyagi _ . i

lfStructural Engineer/ Construction Expert ________ ... ______ _ J

Proof Checking for .2 Nos of Elevated· Station at Meenabakkam and ! tirport Station, Elevated Viaduct from chainage km 18527 to 22871 I[

l~amp & Cut & Cover Underground Tunnel chainage km 19000 to 20400

I 1r~:7r:~t~6~:~7~hennai Airport at Meenabakkam and Chennai Airport i

f ·----·---··· ···--·····-·-·- ............. -···-··· .. ·-··· - -··+--··----··--··-·---··---··-···--··--·· ........ ········--····--·-··---···-·· ···········-···-···· ... . . ........ j

/-~!~~iti~~~r~~Src!r~e~£~~eedb-yThe g~s~-~~J~~:~~~~i~:::~~:t~o-~~~le ·for.Proof Checkingof Deta1led.11·

I Key Personnel (including designation): l~esign of substructure & super structure viz. Foundations, concourse

,levels, lower platform levels, upper platform levels, roof levels, connecting Jsky walks & Entry exit structures. Responsible for Preparation of general !arrangement drawings including Roof Level & Fa<;:ade supporting

~

tructure Getting Approval of all necessary drawings along with ocumentation from client GC & release of GFC drawings to site.

Responsible for station structures and sub-structures detailed and typical

1

sections, prepare structural feasibility report indicating the loading

[

arameters and other important factors influencing the structural design ith Accordance to Local Laws, Seismic Conditions & relevant Codes.

Finalize the method and program for the construction of the structural ---·---·------------···---·-----··--·--·-·-·- -~~-.i..........._lL,,Jl~--------------------------ype of Project Proof checking

Name of client and Address: (indicate Delhi Metro Rail Corporation Limited. ·· hether public or private) Delhi Metro Rail Corp. Ltd,

Metro Bhawan, Fire Brigade Lane, Barakhamba Road, New Delhi-01

---------------~----·----·-+----Professional Fee received (in Rs er. or Rs. 20, 00,000 00 ·

----~-------··---------+------·--·-------------··--·-····-----· -----~-------~-----

c~e:ac:;y i~e~~~i~e: P:~;en~~r:n P:1:~~~n! Ni~~~~~~_ble ------- - ··--·----··-·-··--·-··-·-··--·-···-·--····-------·------1

(for railway, bus terminal/ metro station or 1

r~;~t~7~::r __ ~:~~:-~ate of· the. se-~ice~-~~;ho~~~~:;ig~f~f 3---·------ .-------··· I No. of days spent on the assignment 300 days l 1Na rrative Description-·oTP-ro}ect: ------- --·-····-··-·------·-··-·-···········-···--···-·---··---···-·-------·-----·-··--·-----··--·---···------,

/ • Proof Check of Architectural Design and Drawing. i / • Proof check of Structural Detail Design, calculation of Elevated Metro Stations 2 Nos, Elevated Viaduct, and

1

1

r Underground Tunnel AND Economize where Possible Keeping safety of Structure Intact. I • Proof checking of MEP Services. I

I I i;-·-··--·-···--·-·-·-··-·-··-·-···----···---···--···-··--·-----··-··-----·---····--··------·-----···-···---····-----------·- ------1 jit is certified that the aforesaid information is true and correct to the best of my knowledge and.. · ef. : i ~----~ ! I /.,.<'\119200 i I §~~ ~ I

C ,I W re --++-..:.t1--y Personnel)J

8

Page 40: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

' Na111e ofKey Personnel Designation of Key Personnel: Name of the Projeci

-- ----

M¥i~Pu-~nJtgT~!;~i Construction Expert :consultancy Services for Engineering Services for Civil anlBuilding iServices "Design & Construction of Contract of Underground Stations

1

and Tunnel including the Ventilations, Air-conditioning (Contract :BMR/UG2 (EAST-WEST CORRIDOR) for Bangalore Metro Rail J Corporations (Nov 2008 to May 2009) ---- --------------- --- ------ --- ---------- ------------- L__ ---------------------- -- - --- ----------------- ---- ---- - -

~~me of Consulting Firmwhere _ ___ -tis_ LKT ~n-~ineerin~~onsulta_~ts__________ _ __ _ ________________ _j Description services performed by the fs a Structure Engineer Responsible for Detailed Design Engineering ~ Key Personnel (including designation):

1substructure & super structure viz. Foundations, concourse levels, lowe platform levels, upper platform levels, roof levels, connecting sky walks lEntry exit structures. Responsible for Preparation of general arrangemen ~rawings including Roof Level & Fa9ade supporting structure Gettin ~pproval of all necessary drawings along with documentation from clien tGC & release of GFC drawings to site. Responsible for station structure bnd sub-structures detailed and typical sections, prepare structura

ype of Project !Name of client and Address: -(indicate

hether public or private)

easibility report indicating the loading parameters and other importan actors influencing the structural design with Accordance to Local Laws,

Seismic Conditions & relevant Codes. Finalize the method and program fo he construction of the structural framework of the buildings

Detail Design Delhi Metro Rail Corporation Limited. · ·- · · Delhi Metro Rail Corp. Ltd, Metro Bhawan, Fire Brigade Lane, Barakhamba Road, New Delhi-01

Professio_n_a_l _F_e_e --re_c_e-ive-d--(,-_n_R_s_c_r. or Rs. 30, 00,000.00 · -- -------------+------

rea in hectares (for Urban Planning Not Applicable Capacity.in million passengers per annum 50 Million ----··-·-·-------·-·---·-----·----·----·--·--·~----·---~------------·

(for railway, bus terminal/ metro station or Start date and finish date of the services -ti1r1:Date: November-2008 __________ -(month/ year) Finish Date: May 2009 ------------·------··----!------------------·--------------------------------------·----·-------------, No. of days spent on the assignment Narrative Description of Project:

• Station Planning, Architectural Planning, Structural Design and Drawings. • Preparation of Detailed Architectural, Structural and Building Services (MEP & HVAC) • Planning and Design of Utility Diversion • Taking of Approval of Design/ Drawing from DMRC and issuing of GFC drawing. • Attending all coordination design review/Interface meeting • Preparation as built drawings.

. - -

Page 41: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

, N~:1rne of f<1?Y P1?r§9_Dri_eL __ _ ___ ]'=.QKE,§ij1 K_uQl~r Tyc1gi _ ' Designation of Key Personnel: :Structural Engineer/ Construction Expert

I·--. - -· - ----- --- . ·----

:con SU lta n c y Services for Detailed Engineering Services for Civil and !Building Services including BOO for "Design & Construction of Viaduct

--·----~ ·- -Name of the Project

Jot Length 2 1 Km and 11 no of Elevated Metro Stations part of Central :Secretariat -Badarpur Border Corridor MRTS Contract No BC· ~7,28,29, 30.

i-Name of Cor1sulting Firm where --lMtsT.KfEngineerTng-ConsuTtants Ltd. - - , r- ·--· . - ------ -- ·--···. ------------------- ... ····-- ---- ·----- ----- L ---- ------- -------------------·-- -- ------- -· --- ------------ --- --- .. --- ·-· - -----· --------- -----------------1

1 Description of service~ performed by the ~s a Structure Engineer Responsible for Detailed Design Engineering of !

11 Key Personnel (1ncludrng desrgnatlon):

1

substructure & super structure v,z. Foundatrons, concourse levels, lower : 1 lplatform levels, upper platform levels, roof levels, connecting sky walks & \ I Entry exit structures. Responsible for Preparation of general arrangement / I ,drawings including Roof Level & Far;ade supporting structure Getting / ~pproval of all necessary drawings along with documentation from client 1 GC & release of GFC drawings to site. Responsible for station structures

~nd sub-structures detailed and typical sections, prepare structural ~easibility report indicating the loading parameters and other important

~

~actors influencing the structural design with Accordance to Local Laws, Seismic Conditions & relevant Codes. Finalize the method and program

1 or the construction of the structural framework of the buildings

--y1:;e-ofProJe'ct- _ ---------------------------~1oes1g;,··---------------- _ --------------------------- _ ----------1 Name of client and Address: (indicate ':Delhi Metro Rail Corporation Limited. 1

hether public or private) Delhi Metro Rail Corp. Ltd, =~~ Metro Bhawan, Fire Brigade Lane, Barakhamba Road, New Delhi-01

Professional Fee received· (in· Rs er. or Rs. 1,23, 00,000.00 · · ·

rea in-hectares (for --Urban Planning Not Applicable . -~,--··--··--····------------·--------·--"·--------------

apacity in million passengers per annum 110 Million

~~;Ja~l::\~i~i~~~ri~:::-:t;~es~~~~Z~-istartDate May2007 -- ------------

~:0:~~;:::pent on the assignment _J;t;.~:: :c 2009

________________________________________________ · -----------Narrative Description of Project:

• Station Planning, Architectural Planning, Structural Design and Drawings. • Preparation of Detailed Architectural, Structural and Building Services (MEP & HVAC) • Planning and Design of Utility Diversion • Taking of Approval of Design/ Drawing from DMRC and issuing of GFC drawing. • Attending all coordination design review/Interface meeting • Preparation as built drawings.

/ j L _____ ------ -------- -----------------·--------------------- ------------

170

Page 42: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

_Nameof Key Personnel ;Lols__e.§tl l:(_urnar Tyfl,gi _ ; :structural Engineer/ Construction Expert ! ,- --- ---- -- - ------ ------------ --~------ -- - - -- - - - - -I ;consultancy Services for Detailed Engineering Services for Civil andi ;suilding Services including BOQ for "Design & Construction of SaritaViha~ !Depot part of Central Secretariat -Badarpur Border Corridor MRTSI

: Designation of Key Personnel: ' Name ot the Project:

_ _ l<_~a~ :_O~~to Mar 201~). ___ _ _ _ __ _ _ _ _ __ _ J ~::~i;~~

0

:rs~~~fc-ft;e;:~~:d by the ~~s a~~rc~~i:ef ~~ir,~~?~~~!~l~n~tie-tor-l5efailecf6esig-n frigineeririg orl Key Personnel (including designation): /substructure & super structure viz. Foundations, concourse levels, lower I

!platform levels, upper platform levels, roof levels, connecting sky walks & !Entry exit structures. Responsible for Preparation of general arrangement k:Jrawings including Roof Level & Fa9ade supporting structure Getting ~pproval of all necessary drawings along with documentation from client

C & release of GFC drawings to site. Responsible for station structures nd sub-structures detailed and typical sections, prepare structural

eas1bility report indicating the loading parameters and other important

YPiOi Pro;ec; ==~=~ . ~. . . ·~ ~:~7~;;~~~;!~: 0~

1~~·:i~~!,~~1~~:~~;~·~~~~~~~~~9~nd

program

jName of cli_ent and Address: (indicate ~~lh_i Metro Rail Corporation Limited.

!whether public or private) /Delhi Metro Rail Corp. Ltd, 1 Metro Bhawan, Fire Brigade Lane,

lnrofessionaTFee received(in--Rs ~r- 1::r~~~~~~~OR~~-N-~~-?_elh~-O~---- --- -- -- ---------------·----

~rea - in --- hectares - (for -Urban·--· Planning Not Applicable ____ ---- ------ ---- ------------ ----- ----------------1;-------·----------------------·-------------···- -------·- -····· - ------ ----------- ----- -------- ··-------- - -·- ···-·-------------·-------·---iCapacity in million passengers per annum 1 O Million !(for railway,_ bus terminal/metro_station "! __ __ _ _ !Start date and finish date of the services Start Date: May 2007 (month/ year) Finish Date: Mar 2010 ~- ---- -----------------·---------------- --------iNo of days spent on the assignment ---~~~---- _ Narrative Description of Project:

• Station Planning, Architectural Planning, Structural Design and Drawings. • Preparation of Detailed Architectural, Structural and Building Services (MEP & HVAC)

I • Planning and Design of Utility Diversion , • Taking of Approval of Design/ Drawing from DMRC and issuing of GFC drawing.

• Attending all coordination design review/Interface meeting • Preparation as built drawings.

Page 43: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

- -·--··-------··-----------------

~me of Key Personnel: Mr. B. S. Kukreja --·~-~-···----~---------------- --

esignation of Key Personnel: ____ Environment Expert I N f th p · t" ESIC Medical College & 500 Bedded Hospital along with

ame O e roJec · Boys / Girls Hostels & Faculty Housing at ESIC Hospital Campus, NIT-3, Faridabad.

N~me of Consulting Firm where employ~~===--1 Design Associates Inc. __ . . . Geotechnical Investigation, Evaluation of geotechnical

~escn~t1on of _serv~ces performed by the Key Personnel hazards including potential of landslides Determination (including designation): of bearing capacity, deformations of fo'undations, and

likely interactions between soil, foundation and the structure, Assessment of earth pressure and the performance of retaining walls, Analysis of embankment behaviour. Strength of excavations, caves, tunnels, Conducting of response analysis for a site, ground water levels, determining material strength, identifying geological constraints etc.

rrype of Project Hospital and Institutional and Educational Campus etc.

Name of client and Address: (indicate whether public or Employees State Insurance Corporation Superintending private) Engineer, Employees State Insurance Corporation,

Panchdeep Bhawan, C.I.G. Marg, New Delhi-110002(PUBLIC)

Professional Fee received (in Rs er. or US$ million) Fee Received : 13.63 Cr. Area in hectares (for Urban Planning Project only) (2,51,582 Sqm) Capacity in million passengers per annum (for railway, Not Applicable. bus terminal/ metro station or airport only)

Start date and finish date of the services (month/ year) Commenced: 17.03.2009 Completed: 2015 No. of days spent on the assignment 185 Days Narrative Description of Project: The 29 Acre Site is located within the city limits of Faridabad at NIT Gree~ Faridabad. An existing Hospital of 150 Bed Capacity is already functioning on the site. A Medical College with a Hospital of 500 Bed Capacity was planned along with all ancillary facilities of Hostels, Staff Housing, Auditorium etc. The Site as such was flat and featureless, However it had a large curving frontage. This feature was used and expressed in the building design and final form. The site has been planned in distinctive Zones. The Academic, Hospital, Housing & Hostels being the three distinct zones catering to the bulk of the requirement. The Hospital zone being located directly off the frontage and being the first on the primary access to the site from the city. This makes it easier to approach and access. Next on the frontage is the academic block zone which ties up with the hospital in continuation thus giving easy access to the students and faculty, to both the teaching facilities as well as the Hospital. The Housing and Hostel zone has been kept at the rear in a relatively quiter area. The road network has been kept relatively simple allowing for all access points (Porch / Drop Offs etc.) To be easily visible from the entry points itself. ~ 250m long feature wall is the face of both the Academic & Hospital buildings, Tying then together as well as Reflecting. The curving front site edge. rrhe Academic block is a simple curved form building which responds to the site edges and space available. It is a G+4 Structure which accommodates all facilities as per M.C.I norms for 100 Admissions. The shape allows for a landscaped spill out zone exclusively for the academic block users. The Hospital is a much more complex and elaborate structure, being essentially three separate wings closely tied up together allowing for small usable courts to act as buffers between them. The building is a G + 1 O structure with emphasis being laid on its compact nature to iacilitate interconnectivity between different departments, which is essential in a hospital. Horizontal circulation has been reduced and hence vertical cores (placed strategically) facilitate movement throughout the hospital. A service block ties up all three of these wings at the rear thus enabling a segregated service movement which does not clash !With patient/ public movement. The wards (between the 6th and 10th floors) have been placed such that they enjoy segregation, the least disturbance and the best views. The ward block lies perpendicularly across the three wings below thus tying the entire structure together at the same time making a visual statement by its large cantilever forms. Lastly the Housing and Hostels are a mix of rectangular shapes, placed at angles to provide broken smaller open spaces for interactive use and minimal over looking. The structures here vary in height with some of the housing block going up to G + 10 Stories. Overall the parking has been catered to in large parking basements under the Hospital, Academic Blocks as well as the Hostel & Housing Blocks with minimal parking on the surface thus freeing uo soace for landscaoina and areens. ·---

It is certified that the aforesaid information is true and correct to the best of my knowledge and belief.

~ ei"MS t )rz-,.'<'.~ (Signature '// me of Key Personnel)

. .. . - . .. -- --------- ~~i --~;:;::_· :iii.,) 'i1 C ·-- 112 ~ ~~ - -

Page 44: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

I Name of Key Personnel: ----------·---·---·----!Mr" 8. S. Kukreja ·--·--·

-Designation of Key Personnel:·--·---·--· I Environment Expert ··---··

-----··---Name of the Project: ESIC Medical College & 500 Bedded Hospital along

with Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad .

----- . -------~-------------·

Name of Consulting Firm where employed: Design Associates Inc.

Description of services performed by the Key Geotechnical Investigation, Evaluation of geotechnical hazards including potential of landslides, Personnel (including designation): Determination of bearing capacity, deformations of ~oundations, and likely interactions between soil, ~oundation and the structure, Assessment of earth pressure and the performance of retaining walls, !Analysis of embankment behaviour. Strength of excavations, caves, tunnels, Conducting of response analysis for a site, ground water levels, determining material strength, identifying geological constraints etc.

Type of Project Hospital and Institutional and Educational Campus

Name of client and Address: (indicate whether public Employees State Insurance Corporation or private) Superintending Engineer, Employees State Insurance

Corporation, Panchdeep Bhawan, C.I.G. Marg, New Delhi-110002 (PUBLIC)

Professional Fee received (in Rs er. or US$ million) Fee Received: 10.86 Cr. Area in hectares (for Urban Planning Project only) (1,08,459 Sqm)

Capacity in million passengers per annum (for Not Applicable. railway, bus terminal/ metro station or airport only) Start date and finish date of the services (month/

Commenced : 12.11.2008 year)

Completed: August, 2015 No. of days spent on the assignment 196 Days

Brief description of the project: The 32 Acre Site is located in Sanath Nagar, Hyderabad off a major road. The Site has numerous structures already built up on it including an existing 300 Bed Hospital and a large housing component. The site is bifurcated into two parts with an existing central road that gives access to almost all existing facilities. This road has been expanded into a central spine off which all the new and old structures are accessed.

The built up area of the existing hospital block not being sufficient to cater to the requirement of a modern day 500 Bed Hospital as per MCI Norms. This necessitated addition of new blocks to increase floor plates areas. A new ward block (B+ G + 6) has been added, new connecting corridors with cores (Lifts / Stairs) have been added at strategic locations to facilitate movement as well as segregate services and patient movement so that there is no clash of the same. Since the existing buildings are old they cannot take too much of vertical expansion thereby necessitating a large footprint on an already congested site.

The academic block has been placed along the central spine across the hospital building. Enabling easy access for the students and staff as well as keeping the hospital in proximity. The Academic Block is a compact G + 4 Structure which again combines with the hostels behind to create a private landscaped space, exclusively for the academic block users and the hostel residents. The Hostels have been kept in a quiet zone behind the academic block. They are all joined up in a contigious form in order to keep them as compact as possible. At the same time they have distinct entrances and do not overlook each other thus maintaining privacy for all the concerned residents. A small pocket at the rear of the site has been reserved for the housing of faculty. These units have been arranged in clusters which create an internal court exclusively for use of these residents. An independent facility of a standalone 130 Bed Super Specialty Hospital has been planned, as an independent entity with a separate compound. It has an access directly off the central spine. All other essential services and utilities have been placed along the periphery of the site thus enabling easy servicing of the entire complex.

It is certified that the aforesaid information is true and correct to the best of my knowledge and belief.

Ji:,<-~~ (Signature ame of Key Personnel)

'' ,c .. ; (i :; t:tc c::: 1n ·-· . ,:;

·------------·---·---- -· - ·-·

173 ~··

Page 45: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

r;;-----· ···------------ .. . - . T···-·-········--··--·····------·-··------··--·-------·-

Na me of Key Personnel: . Mr. B. S. Kukreja besiqnation of Key Personnel: ----------------------+.1_____=E~n~v-=i-r~o-~n-~m-~--e::n::t:E::x::::e:rt:~~=---------Name of the Project: Construction of Post Graduate Institute/ Medical

1

college, Student Hostel and Faculty & Staff Housing

N-ameoT Co-ns_u_lt-in-g · Firm where--employ-e-d:====~--~:~(~:~;~)A:~::!:~~~~:car, Bangalore.----------

Description of services performed by the Key Personnel Geotechnical Investigation, Evaluation of (including designation): geotechnical hazards including potential of landslides,

Type of Project

Determination of bearing capacity, deformations of oundations, and likely interactions between soil, oundation and the structure, Assessment of earth

pressure and the performance of retaining walls, nalysis of embankment behaviour. Strength of

excavations, caves, tunnels, Conducting of response analysis for a site, ground water levels, determining material strength, identifying geological constraints etc.Coordination of all Services, liaison with clients . . . .

Hospital and Institutional and Educational Campus etc.

Name of client and Address: (indicate whether public or Employees State Insurance Corporation private) Superintending Engineer, Employees State Insurance

Corporation, Panchdeep Bhawan, C.I.G. Marg, New Delhi-110002 (PUBLIC)

Professional Fee received (in Rs er. or US$ million) Fee Received : 5.57 Cr rea in hectares for Urban Plannin Pro·ect onl __ 52 432 S9!!1L

Capacity in million passengers per annum (for railway, Not Applicable. bus terminal/ metro station or airport onl ) Start date and finish date of the services (month/ year)

No. of days spent on the assignment

Commenced: 29.05.2009

Completed: May, 2012 145 Days

Brief description of the project: The Site is located in Rajaji Nagar, Bangalore. It is approximately 15 Acres with main roads on all four sides. The site has an existing hospital of 300 Bed Capacity and some Residential Units built up on it. The Residential Units being in a dilapidated condition were slated for Demolition, thus freeing up some of the land for new construction. The Proposal was to enhance the existing 300 Bedded Hospital to a 500 Bedded capacity adding facilities for a Teaching Hospital and modifying the old layouts to comply with the latest planning norms and standards. The existing hospital was enhanced. A completely new block G+6 was planned

ithin a large courtyard in the old layout. The new block was planned to accommodate all the critical care spaces like New O.T.'s, I.C.U's and Labour Complex. A state of the art coronary care complex was also accommodated on one of the floors with facilities of Gath, Labs, I.C.C.U's, O.T.'s etc. The old block has been upgraded by extensive renovation and modification. Peripheral areas have been used for ancillary building and support activities. The aluminum and granite cladding, reflective glass and extensive use of aluminum louvers all project, a modern contemporary Style of Design. The inside finishes too reflect the same at the same time being hardy and low maintenance. The Medical College is to accommodate 100 Admissions per year and comprises of the main academic block, Hostels for Student, Nurses, Jr. Residents etc as well as staff housing. The Site being extremely restrictive in size meant the buildings had to be planned in a compact way with them being vertical in nature, with the hostel and housing going up to G + 1 O floors. The attempt was to create interactive usable spaces between the built mass at the same time try and minimize mutual overlooking. The Result is simple rectilinear forms Juxta positioned together.

It is certified that the aforesaid information is true and correct to the best of my knowledge and belief.

174

Page 46: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

~ - --· .---- -~-----------------------~-----~

Name of Key Personnel: ·---·---~M=r~·~B=·~S=·~K=u=k=r=e·=a~-----------------, Designation of Key Personnel: Name of the Project:

;----------------------Name of Consulting Firm where employed:

Description of services performed by the Key Personnel (including designation):

Type of Project

Name of client and Address: (indicate whether public or private)

Professional Fee received (in Rs er. or US$ million) Area in hectares (for Urban Planning Project only)

Capacity in million passengers per annum (for railway, bus terminal/ metro station or airport only)

Start date and finish date of the services (month/ year) No. of days spent on the assignment

Environment Expert --------·

Master Planning of Government Medical College, Hospital and Staff Housing at Badaun.

Design Associates Inc. Geotechnical Investigation, Evaluation of geotechnical hazards including potential of landslides, Determination of bearing capacity, deformations of oundations, and likely interactions between soil, oundation and the structure, Assessment of earth pressure and the performance of retaining walls,

nalysis of embankment behaviour. Strength of excavations, caves, tunnels, Conducting of response analysis for a site, ground water levels, determining material strength, identifying geological constraints etc. Coordination of all Services, liaison with clients

. . . .

Hospital and Institutional and Educational Campus etc.

Uttar Pradesh Rajkiya Nirman Nigam Ltd. Project Manager, UPRNN Ltd, Bareily Unit-2, Govt. Medical Colle e u·hani Road Badaun PUBLIC Rs.2.25 Cr. (1,52,565 Sqm)

Not Applicable.

Commenced: Feb, 2014

163 Days

Brief description of the project: The 100 Acre Site is located within the city limits of Badaun. An. A Medical College with a Hospital of 500 Bed Capacity was planned along with all ancillary facilities of Hostels, Staff Housing etc. The Site as such was flat and featureless, However it had a large curving frontage. This feature was used and expressed in the building design and final form. The site has been planned in distinctive Zones. The Academic, Hospital, Housing & Hostels being the three distinct zones catering to the bulk of the requirement.

The Hospital zone being located directly off the frontage and being the first on the primary access to the site from the city. This makes it easier to approach and access. Next on the frontage is the academic block zone which ties up with the hospital in continuation thus giving easy access to the students and faculty, to both the teaching facilities as well as the Hospital. The Housing and Hostel zone has been kept at the rear in a relatively quiter area. The road network has been kept relatively simple allowing for all access points (Porch / Drop Offs etc.) To be easily visible from the entry points itself ..

The Academic block is a simple building which responds to the site edges and space available. It is a Structure which accommodates all facilities as per M.C.I norms for 100 Admissions. The shape allows for a landscaped spill out zone exclusively for the academic block users. The Hospital is a much more complex and elaborate structure, being essentially three separate wings closely tied up together allowing for small usable courts to act as buffers between them.

The building is emphasis being laid on its compact nature to facilitate interconnectivity between different departments, which is essential in a hospital. Horizontal circulation has been reduced and hence vertical cores (placed strategically) facilitate movement throughout the hospital. A service block ties up all three of these wings at the rear thus enabling a segregated service movement which does not clash with patient / public movement. The wards have been placed such that they enjoy segregation, the least disturbance and the best views. The ward block lies perpendicularly across the three wings below thus tying the entire structure together at the same time making a visual statement by its large cantilever forms. Lastly the Housing and Hostels are a mix of rectangular shapes, placed at angles to provide broken smaller open spaces for interactive use and minimal over lookin .

It is certified that the aforesaid information is true and correct to the best of my knowledge and belief.

Page 47: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

·- ·-··---·----·-

Name of Key Personnel: Mr. B. S. Kukreja ---- ---··-·

Designation of Key Personnel: Environment Expert

Name of the Project: Comprehensive Consultancy Architectural & Engineering and Project Management Consultancy Services for Construction of Mahamaya Girls Inter College at Sector 44 Naida, Uttar Pradesh.

t-Jame of Consulting Firm where emola'led: ni=oc:ian Ac:c:nriates Inc.

Description of services performed by the Key Geotechnical Investigation, Evaluation of geotechnical hazards including potential of landslides,

Personnel (including designation): Determination of bearing capacity, deformations of foundations, and likely interactions between soil, foundation and the structure, Assessment of earth pressure and the performance of retaining walls, Analysis of embankment behaviour. Strength of excavations, caves, tunnels, Conducting of response analysis for a site, ground water levels, determining material strength, identifying geological constraints etc. Coordination of all Services, liaison with clients and site coordination for better execution of work etc. -

Type of Project Educational/Institutional along with Sport Complex Name of client and Address: (indicate whether public New Okhla Industrial Development Authority, Main or private) Administrative Building, Sector -VI, Naida Uttar

Pradesh. (PUBLIC)

Professional Fee received (in Rs er. or US$ million) ll=cc R;:o.--, .. -..,. 1 7f.. rr Area in hectares (for Urban Planning Project only)

Capacity in million passengers per annum (for Not Applicable. railway, bus terminal/ metro station or airport only)

Start date and finish date of the services (month/ Commenced : 2009 year) Comnleted: 2013 No. of days spent on the assignment 172 Days Brief description of the project: The NOIDA Authority, our client for the Mahamaya Inter-College has conceived of this largely-residential school as an institution where education of the highest standard would be imparted to about 2000 of the brightest girl students selected from each district of the state, particularly those belonging to the economically weaker sections.

The site, a 20 acre linear plot, about 120 m deep and with nearly 800m of frontage along the Naida-Greater Neida Expressway has excellent connectivity and high visibility. As the school is an All-Girls-Residential-School, the client brief indicated that the buildings while maintaining a strong urban and architectural identity should also provide adequate privacy and access control. The resulting site plan reflects these dichotomous requirements: while the campus layout seems 'extrovert' with a progression of large built masses (of common building vocabulary yet distinct individual form) addressing the expressway and the urban fabric; the Academic Block and Hostel are essentially 'introvert' courtyard buildings.

The Campus Layout is centred on a formal green which provides a foreground to the Administration/Library Block, with the Academic Block to its East and the Auditorium and Hostel Block to the West. Staff Housing and the Sports Complex (with limited public membership) which have direct access to the outside are located at the extreme edges of the site. The total built up area of the campus 87008 sq.mtr with an achieved FAR-1.07 and Ground Coverage -12.4% are well within the prescribed norms, with the exception of Staff Housing all buildings on the campus are below G+3 floors .

The Academic Block, a four-storied (max.) structure, with Ground Coverage of 9496 sq. m. and built up area of 27327sq.m. constitutes the nerve centre of the campus. In its basic form this structure is best understood as a large square 'assembly-court' (on the lines of a school 'Quad') girded by a peristyle at ground floor level; the teaching areas (cells along doubly loaded corridors) are organized as built masses of different heights aligned along each edge of the court while maintaining a bi-axial symmetry. The road facing block is only two floors high and the height progressively increases with the flanking blocks (Junior School to the Right and Middle School to the Left) rising to three and the rear block (Senior School) to four floors respectively. -·

It is certified that the aforesaid information is true and correct to the best of my knowledge and belief.

,. ±f,~a_!l--_17~- L (Signature me of Key Personnel)

' -·-------------· .• -

Page 48: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

I Name of Key Personnel: ----

I Mr. B. S. Kukreja -----

-: Environment Expert

----.. --------------~-Designation of Key Personnel:

-~

Name of the Project: Comprehensive Consultancy Architectural & Engineering and Project Management Consultancy Services for Construction of Panchsheel Boys Inter College at Sector 91 Noida, Uttar Pradesh.

--Name of Consulting Firm where employed: Design Associates Inc.

Description of services performed by the Key Geotechnical Investigation, Evaluation of geotechnical hazards including potential of landslides,

Personnel (including designation): Determination of bearing capacity, deformations of foundations, and likely interactions between soil, foundation and the structure, Assessment of earth pressure and the performance of retaining walls, Analysis of embankment behaviour. Strength of excavations, caves, tunnels, Conducting of response analysis for a site, ground water levels, determining material strenath etc ..

Type of Project Educational/Institutional along with Sport Complex Name of client and Address: (indicate whether public New Okhla Industrial Development Authority, Main or private) ~dministrative Building, Sector -VI, Naida Uttar

Pradesh. (PUBLIC) Professional Fee received (in Rs er. or US$ million) Fee Received: 1.85 Cr. --Area in hectares (for Urban Planning Project only) --

--Capacity in million passengers per annum (for Not Applicable. railway, bus terminal/ metro station or airport only)

Start date and finish date of the services (month/ year) Commenced : 2009 Completed: 2013 No. of days spent on the assignment 154 Days Brief description of the project: On the lines of the Mahamaya School for girls the NOIDA Authority, has planned a similar of school as an institution where education of the highest standard would be imparted to about 2000 of the brightest boys selected from each district of the state, particularly those belonging to the economically weaker sections. The site is a 20 acre rectangular plot, about 500m deep and with nearly 250m of frontage along the Neida-Greater Neida Expressway and has excellent connectivity and visibility. A high-rise housing development abuts the site to the west while to the east is a 100m wide green-belt. Responding to the site, the campus is organized into four distinct zones beginning with the Admin/Academic Zone aligned to the western edge and the Sports Facilities opening up towards the green-belt to the east and progressing to the hostel and Staff Housing zones respectively as one proceeds northwards. The Main Gate leads onto a curved driveway, the western edge of which is flanked by the distinctive triangular form of the Administration/Library Block while a continuous sweeping colonnade mimicking the curve of the road continues along the opposite face, the colonnade punctuated by distinctive staircase towers which mark the entrances to the Senior, Middle and junior School blocks also acts as the main pedestrian spine linking these blocks and leads onto the Auditorium Block on the northern end while the southern end is anchored by the arrival and dispersal pavilion for students who arrive by bus. Students arriving by private transport can be dropped at their respective blocks in the lay-byes provided along the main-drive. The School Blocks are aligned perpendicular to the colonnade on an east-west axis to avoid any overlooking from the adjacent high-rise housing complex. The linear blocks are separated by landscaped spaces where the soft landscape responds to and negotiates the repetitive geometry of the adjoining built masses on either edge while the hard landscape flow towards the play-field.

Each of the three school blocks begins with a faculty area adjacent to the colonnade (with the face fronting the colonnade clad in stone of a distinctive colour to ensure visual differentiation of each block) The academic area is organized around a street-like landscaped atrium which begins at the colonnade on one end and concludes at the play field. Class-rooms are organized on either side of the atrium coming off the flanking colonnades at various levels. Each Block is articulated in a unique manner to lend it its distinct character, be it by means of staircases and corridors spanning the atrium, the introduction of amphitheaters and performance spaces off the atrium or by means of massing and roof-form. The distinctive fa9ade of these buildings is based on a series of stepped-buttress like repeat elements clad in Agra Red Sandstone with the inter-stitial spaces articulated by fenestration interspersed with cream sandstone panels. Vertically the soaring buttresses conclude in steel brackets which support the overhang of the half- curved, pitch roofs that define the distinctive flowing form of the skyline.

--It is certified that the aforesaid information is true and correct to the best of my knowledge and belief.

~ B·~ ~ )-2-~ ,:.::-------

wv: • (Signature me of Key Personnel) -- 1.7/

Page 49: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

Name of the Personnel ·-

Mr. B. S. Kukreja - -··------ ·---------

Name of the Project: Comprehensive Consultancy service for Master Planning of Group Centre, Fully Residential Complex twith training facilities, Sonepat, Haryana

--------·-----------Name of Consulting Firm where employed: Design Associates Inc.

---Description of services performed by the Key Geotechnical Investigation, Evaluation of geotechnical Personnel (including designation): hazards including potential of landslides,

Determination of bearing capacity, deformations of foundations, and likely interactions between soil, foundation and the structure, Assessment of earth pressure and the performance of retaining walls, Analysis of embankment behaviour. Strength of excavations, caves, tunnels, Conducting of response analysis for a site, ground water levels, determining material strength, identifying geological constraints etc. Coordination of all Services, liaison with clients and site coordination for better execution of work etc.

Type of Project Residential/Commercial/Training Centre

Name of client and Address: (indicate whether public National Building Construction Corporation (N BCC) or private) (India) Ltd., NBCC Bhawan, Lodhi Road, New Delhi

(Public)

Estimated Capital Cost (In Rs. Cr. or US$ Million)) Rs. 199.80 Cr.

Area in hectares (for Urban Planning Project only) (BUA 48,000 Sqm.)

Capacity in million passengers per annum (for Not Applicable. railway, bus terminal/ metro station or airport only)

Start date and finish date of the services (month/ Commenced : 2007 year) Completed: Nov, 2011

Payment Received by the Participants (in Rs. Fee Received: 0. 76 Cr. Milli"n~) No. of days spent on the assignment 158 Days

The Central Reserve Police Force came into existence as Crown Representative's Police on 27th July 1939. It became the Central Reserve Police Force on enactment of the CRPF Act on 28th December 1949. It has completed 60 years of glorious history. The Force has grown into a big organization with 207 Bn, (including 181 executive Bns, 2 Mahila Bns, 10 RAF Bns, 6 CoBRA Bns, 2 DM (NDRF) Bns, 5 Signal Bns and 1 Special Duty Group), 37 Group Centres, 11 Training Institutions, 2 CWS, 7 AWS, 3 SWS, 4 Composite Hospitals of 100 bed and 17 Composite Hospitals of 50 bed.

The Central Reserve Police Force is an armed Force of the Union of India, with the basic role of striking reserve to assist the State/Union Territories in Police operations to maintain law and order and contain insurgency. Its role is that of a catalyst in maintaining law & order, and returns to barracks once this objective is achieved. The force is also being used for various police duties in various States.

It is All India in character, both in deployment and in its composition. Due to its unique capability to quickly adapt to various situational requirements, and also, to work in perfect harmony with the State Police, CRPF has, over the years, acquired the distinction of being perhaps the most acceptable Force, by the people and the State administrations. Broad gamut of duties performed by the CRPF is:

Crowd control Riot control Counter Militancy/ Insurgency operations. Dealing with Left Wing Extremism Overall co-ordination of large scale security arrangement especially with regard to elections in disturbed areas. Protection of VIPs and vital installations. Checking environmental de-gradation and protection of local Flora and Fauna Fighting aggression during War time Participating in UN Peace Keeping Mission

~ Rescue and Relief operations at the time of Natural Calamities. ------i 18----·--- ·---~- < ,., ....

- -

Page 50: APPENDIX-I Form-11 Eligible Assignments of Key Personnel … · ith Student Hostel & Faculty Housing at ESIC Hospital Campus, Sanath Nagar, Hyderabad. Design Associates Inc. s a team

!----·---~------------------------~-------------·-------------- -------------, One of the vital roles of the CRPF, which is not very evident, is guarding vital Central Govt. installations such as

Airport, Power houses, Bridges, Doordarshan Kendras, All India Radio Stations, residence of Governers and Chief Ministers, Nationalised Banks and other Government establishments in insurgency affected States. The CRPF is ensuring the safety of the democratic institutions, and preventing the takeover of civil society by the militants, in these highly disturbed areas. This contribution of the CRPF, though not very visible, is nonetheless very vital. 7.5% of the Force is deployed for the security of VIPs mostly in North-Eastern States, J&K, Bihar and Andhra Pradesh which include Governors, Chief Ministers, Ministers, MsP and MsLA of J&K, Assam, Arunachal Pradesh, Manipur and Nagaland, Tripura and Mizoram. CRPF is also providing security (Static guard) at the residence/office of Prime Minister of India, various Union Ministers and MsP and other dignitaries 17.5% of the Force is deputed for guarding the important installations of Central and State Govts mostly in insurgency affected areas which includes Secretariats, Doordarshan Kendras, Telephone exchanges, Banks, Hydroelectric projects, Jails etc. CRPF is also deployed for the security of Parliament House.

10 Coys of CRPF are deployed for the security of three sensitive shrines i.e. Krishna Jan ma Bhoomi, Shahi ldgah Masjid complex (Mathura), Ram Janma Bhoomi- Barbi Masjid complex (Ayodhya) and Kashi Vishwanath Temple- Gyanvapi Mosque (Varanasi). 4 Coys of the Force are deputed for the security of Mata Vaishno Devi Shrine, Katra, Jammu (J&K).

CRPF is the only Para Military Force in the Country which has two Mahila (Ladies) Battalions. After its training in March 1987, 88(M) Bn won laurels for its work assisting the Meerut riots and later with the IPKF in Srilanka. Personnel of second Mahila battalion (135 Bn) performed creditably during the Lok Sabha elections 1996 in many states. At present mahila personnel are deployed in active duty in Jammu & Kashmir, Ayodhya, Manipur, Assam and other parts of the country where they are doing commendable job. In addition each RAF battalion has a Mahila (Ladies) component consisting of 96 personnel.

Group Centers of Central Reserve Police Force which are located in different parts of the Country are responsible to maintain service records of the personnel of Units those are attached to them. Group Centers are also responsible for payment of all type of dues to the personnel of Units attached with it. Regular monthly pay bills are centrally prepared by EDP Cell at Force Hqrs New Delhi and are sent to all field units along with drafts/cheques so that the payment of monthly pay and allowances to the men /women is made by the last working day of the same month. For payment of bills a centralized Pay and Accounts office is functioning at Force Hqrs. at New Delhi which is responsible for clearing payment of all types of claim of the personnel.

CRPF acquired 120.48 acres of land at Khewra village, Bahalgarh, Sonepat (Haryana) for establishment of Group Centre/Range Hqr. The competent authority desired to develop authorized infrastructure at this campus on priority basis in order to provide basic accommodation. Accordingly, the GOI/MHA accorded approval for entrusting the construction work of GC, CRPF, Bahalgarh, Sonepat (Haryana to NBCC Ltd)

It is certified that the aforesaid information is true and correct to the best of my knowledge and belief.