Appendices Appendix A – Compendium Forecast of connection point maximum demands Customer forecasts of connection point peaks Tables A.1 to A.18 show 10‑year forecasts of summer and winter native demand at connection point peak, for high, medium and low growth scenarios (refer to Appendix A.2). These forecasts have been supplied by Powerlink customers. The connection point reactive power (MVAr) forecast includes the customer’s downstream capacitive compensation. Groupings of some connection points are used to protect the confidentiality of specific customer loads. In tables A.1 to A.18 the zones in which connection points are located are abbreviated as follows: FN Far North zone R Ross zone N North zone CW Central West zone G Gladstone zone WB Wide Bay zone S Surat zone B Bulli zone SW South West zone M Moreton zone GC Gold Coast zone 1

Appenices TRANSMISSION ANNUAL PLANNING REPORT

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Appendix A – Compendium

Forecast of connection point maximum demandsCustomer forecasts of connection point peaks Tables A.1 to A.18 show 10‑year forecasts of summer and winter native demand at connection point peak, for high, medium and low growth scenarios (refer to Appendix A.2). These forecasts have been supplied by Powerlink customers.

The connection point reactive power (MVAr) forecast includes the customer’s downstream capacitive compensation.

Groupings of some connection points are used to protect the confidentiality of specific customer loads.

In tables A.1 to A.18 the zones in which connection points are located are abbreviated as follows:

FN Far North zone

R Ross zone

N North zone

CW Central West zone

G Gladstone zone

WB Wide Bay zone

S Surat zone

B Bulli zone

SW South West zone

M Moreton zone

GC Gold Coast zone

1

Page 2: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Con

nect

ion

poin

tVo

ltage

(kV

)Z

one

2020

/21

2021

/22

2022

/23

2023

/24

2024

/25

2025

/26

2026

/27

2027

/28

2028

/29

2029

/30

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

Ala

n Sh

errif

f13

2R

298

298

298

298

298

308

308

319

319

329

Alig

ator

Cre

ek

(Lou

isa C

reek

)13

2N

4112

4112

4112

4212

4213

4213

4313

4313

4313

4413

Allig

ator

Cre

ek33

N43

743

744

844

844

845

846

847

847

848

8

Bilo

ela

66C

W33

433

433

433

434

434

434

435

435

435

4

Blac

kwat

er13

2C

W29

829

829

829

830

830

830

830

831

831

8

Blac

kwat

er66

CW

106

1910

619

107

1910

720

108

2011

321

117

2111

822

119

2212

022

Bow

en N

orth

66N

297

297

297

297

308

308

318

318

318

328

Bulli

Cre

ek

(Wag

gam

ba)

132

B20

521

521

521

521

521

521

522

522

522

5

Cai

rns

22FN

6513

6512

6513

6613

6613

6613

6713

6813

6913

7013

Cai

rns

City

132

FN44

044

044

044

044

044

045

045

046

046

0

Cal

liope

Riv

er13

2G

587

587

597

598

598

608

618

618

628

628

Car

dwel

l22

R5

25

25

26

26

26

26

26

26

26

2

Chi

nchi

lla13

2S

225

225

225

235

235

235

246

246

246

256

Cla

re S

outh

66R

8326

8627

8828

8928

9028

9129

9129

9229

9329

9430

Col

linsv

ille

Nor

th33

N17

417

417

417

417

417

417

417

418

418

4

Col

umbo

ola

132

S74

1174

1174

1175

1176

1176

1177

1178

1178

1179

11

Dan

Gle

eson

66R

120

312

13

116

211

82

119

212

22

124

212

61

129

113

22

Dys

art

66C

W44

1044

1045

1045

1046

1046

1046

1047

1047

1047

10

Edm

onto

n22

FN45

445

446

447

448

449

450

451

452

454

5

Egan

s H

ill66

CW

5414

5514

5514

5614

5615

5715

5815

5914

6014

6114

El A

rish

22FN

60

60

60

60

60

60

60

70

70

70

Tabl

e A

.1

Ergo

n co

nnec

tion

poin

t fo

reca

st o

f sum

mer

hig

h gr

owth

nat

ive

max

imum

dem

and

2

Page 3: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Con

nect

ion

poin

tVo

ltage

(kV

)Z

one

2020

/21

2021

/22

2022

/23

2023

/24

2024

/25

2025

/26

2026

/27

2027

/28

2028

/29

2029

/30

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

Gar

butt

66R

115

311

63

111

211

32

114

211

62

119

212

11

123

112

61

Gin

Gin

132

WB

162

1816

419

167

1917

019

172

2017

520

177

2018

021

183

2118

721

Gla

dsto

ne S

outh

66G

567

567

577

577

588

588

598

608

618

628

Ingh

am66

R19

219

219

219

220

220

220

220

220

220

2

Inni

sfai

l22

FN28

428

529

529

529

529

530

530

530

531

5

Kam

erun

ga22

FN64

365

366

467

468

470

471

472

474

475

4

Lily

vale

(B

arca

ldin

e &

C

lerm

ont)

132

CW

437

437

447

447

447

457

457

467

467

468

Lily

vale

66C

W14

867

149

6715

068

151

6915

369

154

7015

570

157

7115

872

160

72

Mac

kay

33N

9124

9124

9124

9124

9224

9324

9425

9425

9525

9725

Mid

dle

Rid

ge11

0SW

237

6023

760

239

6124

261

245

6224

863

252

6425

665

261

6626

668

Mid

dle

Rid

ge

(Pos

tman

s R

idge

)11

0M

297

297

297

297

307

308

308

318

318

328

Mor

anba

h (B

road

lea)

132

N44

1151

1258

1458

1459

1459

1460

1560

1561

1561

15

Mor

anba

h66

and

11

N13

849

150

5416

359

164

6016

660

167

6116

961

170

6217

262

173

63

Mou

ra66

CW

6220

6220

6220

6320

6320

6420

6421

6521

6521

6621

Neb

o11

N3

03

03

03

04

04

04

04

04

14

1

New

land

s66

N27

727

727

727

727

728

728

728

728

729

7

Oak

ey11

0SW

196

196

196

196

196

196

196

206

206

206

Pand

oin

66C

W41

1141

1142

1142

1143

1143

1144

1145

1045

1146

11

Pion

eer V

alle

y66

N69

1270

1270

1271

1272

1273

1274

1375

1376

1378

13

Pros

erpi

ne66

N52

1053

1053

1054

1054

1155

1156

1157

1158

1159

11

Rock

ham

pton

66C

W95

2596

2597

2598

2599

2610

026

102

2610

324

105

2510

725

Tabl

e A

.1

Ergo

n co

nnec

tion

poin

t fo

reca

st o

f sum

mer

hig

h gr

owth

nat

ive

max

imum

dem

and

(con

tinue

d)

3

Page 4: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Con

nect

ion

poin

tVo

ltage

(kV

)Z

one

2020

/21

2021

/22

2022

/23

2023

/24

2024

/25

2025

/26

2026

/27

2027

/28

2028

/29

2029

/30

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

Ross

(Ki

dsto

n,

Millc

hest

er a

nd

Geo

rget

own)

132

R42

1043

1043

1043

1043

1044

1044

1045

1045

1145

11

Ston

y C

reek

132

N3

13

13

13

13

13

13

13

13

13

1

Tang

kam

110

SW33

733

734

734

734

734

735

735

736

736

7

Taro

ng66

SW47

1248

1348

1349

1349

1350

1350

1351

1352

1453

14

Teeb

ar C

reek

(Is

is an

d M

aryb

orou

gh)

132

WB

142

4814

750

152

5215

452

156

5315

854

161

5416

455

167

5617

058

Tow

nsvi

lle E

ast

66R

462

462

442

452

452

462

472

482

482

502

Tow

nsvi

lle S

outh

66R

104

510

55

100

410

14

103

410

54

106

510

85

110

511

35

Tully

22R

153

153

153

153

153

163

163

163

163

173

Turk

inje

(Cra

iglie

an

d La

kela

nd)

132

FN20

1120

1120

1220

1220

1221

1221

1221

1222

1222

13

Turk

inje

66FN

702

702

712

712

722

732

742

762

772

792

Woo

loog

a (K

ilkiv

an)

132

WB

153

163

163

163

163

173

173

173

184

184

Wor

ee (C

airn

s N

orth

)13

2FN

462

462

462

472

482

482

492

502

512

522

Yarw

un (

Boat

C

reek

)13

2G

4218

4218

4218

4318

4318

4318

4418

4418

4419

4519

Hai

l Cre

ek a

nd

King

Cre

ekVa

rious

N38

638

638

638

639

739

739

740

740

740

7

Tabl

e A

.1

Ergo

n co

nnec

tion

poin

t fo

reca

st o

f sum

mer

hig

h gr

owth

nat

ive

max

imum

dem

and

(con

tinue

d)

4

Page 5: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Con

nect

ion

poin

tVo

ltage

(kV

)Z

one

2020

/21

2021

/22

2022

/23

2023

/24

2024

/25

2025

/26

2026

/27

2027

/28

2028

/29

2029

/30

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

Ala

n Sh

errif

f13

2R

298

298

288

288

288

298

298

298

308

308

Alig

ator

Cre

ek

(Lou

isa C

reek

)13

2N

4012

4012

4012

4112

4112

4112

4112

4112

4112

4112

Allig

ator

Cre

ek33

N42

743

743

743

743

743

844

844

845

845

8

Bilo

ela

66C

W33

433

433

433

433

433

433

433

433

433

4

Blac

kwat

er13

2C

W29

829

829

829

829

829

829

829

829

829

8

Blac

kwat

er66

CW

105

1910

519

105

1910

519

105

1910

920

112

2111

321

113

2111

321

Bow

en N

orth

66N

297

297

297

297

297

297

297

297

308

308

Bulli

Cre

ek

(Wag

gam

ba)

132

B20

520

520

520

520

520

521

521

521

521

5

Cai

rns

22FN

6512

6412

6412

6412

6412

6412

6412

6512

6512

6613

Cai

rns

City

132

FN43

043

043

043

043

043

043

043

043

043

0

Cal

liope

Riv

er13

2G

587

587

587

587

587

587

587

587

597

597

Car

dwel

l22

R5

25

25

25

25

25

25

26

26

26

2

Chi

nchi

lla13

2S

225

225

225

225

225

225

235

235

235

235

Cla

re S

outh

66R

8326

8527

8727

8727

8727

8727

8828

8828

8828

8928

Col

linsv

ille

Nor

th33

N17

417

417

417

417

417

417

417

417

417

4

Col

umbo

ola

132

S73

1173

1173

1173

1173

1173

1174

1174

1174

1174

11

Dan

Gle

eson

66R

119

312

03

114

211

52

116

211

72

119

212

02

122

212

42

Dys

art

66C

W44

944

944

944

944

1044

1044

1045

1045

1045

10

Edm

onto

n22

FN45

445

445

446

446

447

448

449

449

450

4

Egan

s H

ill66

CW

5414

5414

5414

5414

5514

5514

5514

5614

5615

5715

El A

rish

22FN

60

60

60

60

60

60

60

60

60

60

Tabl

e A

.2

Ergo

n co

nnec

tion

poin

t fo

reca

st o

f sum

mer

med

ium

gro

wth

nat

ive

max

imum

dem

and

5

Page 6: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Con

nect

ion

poin

tVo

ltage

(kV

)Z

one

2020

/21

2021

/22

2022

/23

2023

/24

2024

/25

2025

/26

2026

/27

2027

/28

2028

/29

2029

/30

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

Gar

butt

66R

114

311

53

109

211

02

111

211

22

114

211

52

117

211

92

Gin

Gin

132

WB

161

1816

219

164

1916

619

167

1916

819

170

1917

220

173

2017

620

Gla

dsto

ne S

outh

66G

557

557

567

567

567

567

577

578

588

598

Ingh

am66

R19

119

119

119

119

119

119

119

119

119

1

Inni

sfai

l22

FN28

428

428

428

428

428

528

529

529

529

5

Kam

erun

ga22

FN64

364

365

366

466

467

468

469

470

471

4

Lily

vale

(B

arca

ldin

e &

C

lerm

ont)

132

CW

437

437

437

437

437

437

437

437

437

447

Lily

vale

66C

W14

767

147

6714

767

148

6714

867

149

6714

967

149

6815

068

150

68

Mac

kay

33N

9024

9024

8923

8923

8923

8923

9024

9024

9024

9124

Mid

dle

Rid

ge11

0SW

235

6023

560

235

6023

660

237

6023

961

241

6124

462

247

6325

064

Mid

dle

Rid

ge

(Pos

tman

s R

idge

)11

0M

287

287

297

297

297

297

297

297

307

308

Mor

anba

h (B

road

lea)

132

N43

1150

1257

1457

1457

1457

1457

1457

1457

1457

14

Mor

anba

h66

and

11

N13

749

148

5416

058

160

5816

159

161

5916

259

162

5916

359

163

59

Mou

ra66

CW

6120

6120

6120

6120

6120

6120

6220

6220

6220

6220

Neb

o11

N3

03

03

03

03

03

03

03

03

03

0

New

land

s66

N27

727

727

727

727

727

727

727

727

727

7

Oak

ey11

0SW

196

196

196

196

196

196

196

196

196

196

Pand

oin

66C

W41

1141

1141

1141

1141

1142

1142

1142

1143

1143

11

Pion

eer V

alle

y66

N69

1269

1269

1269

1270

1270

1271

1272

1272

1273

12

Pros

erpi

ne66

N52

1052

1052

1053

1053

1053

1054

1054

1155

1156

11

Rock

ham

pton

66C

W95

2495

2495

2596

2596

2597

2597

2598

2599

2610

026

Tabl

e A

.2

Ergo

n co

nnec

tion

poin

t fo

reca

st o

f sum

mer

med

ium

gro

wth

nat

ive

max

imum

dem

and

(con

tinue

d)

6

Page 7: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Con

nect

ion

poin

tVo

ltage

(kV

)Z

one

2020

/21

2021

/22

2022

/23

2023

/24

2024

/25

2025

/26

2026

/27

2027

/28

2028

/29

2029

/30

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

Ross

(Ki

dsto

n,

Millc

hest

er a

nd

Geo

rget

own)

132

R42

1042

1042

1042

1042

1042

1042

1042

1043

1043

10

Ston

y C

reek

132

N3

13

13

13

13

13

13

13

13

13

1

Tang

kam

110

SW33

733

733

733

733

733

733

734

734

734

7

Taro

ng66

SW47

1247

1247

1248

1248

1348

1348

1349

1349

1349

13

Teeb

ar C

reek

(Is

is an

d M

aryb

orou

gh)

132

WB

140

4814

549

150

5115

051

151

5115

252

154

5215

653

158

5316

054

Tow

nsvi

lle E

ast

66R

452

452

432

442

442

442

452

452

462

472

Tow

nsvi

lle S

outh

66R

103

510

35

984

994

100

410

14

102

410

34

105

410

64

Tully

22R

153

153

153

153

153

153

153

153

153

163

Turk

inje

(Cra

iglie

an

d La

kela

nd)

132

FN19

1120

1120

1120

1120

1120

1220

1220

1220

1221

12

Turk

inje

66FN

692

692

692

702

702

712

712

722

732

742

Woo

loog

a (K

ilkiv

an)

132

WB

153

163

163

163

163

163

163

163

173

173

Wor

ee (C

airn

s N

orth

)13

2FN

452

452

462

462

462

472

472

472

482

492

Yarw

un (

Boat

C

reek

)13

2G

4217

4217

4217

4217

4217

4218

4218

4218

4218

4218

Hai

l Cre

ek a

nd

King

Cre

ekVa

rious

N37

637

637

637

637

638

638

638

638

638

6

Tabl

e A

.2

Ergo

n co

nnec

tion

poin

t fo

reca

st o

f sum

mer

med

ium

gro

wth

nat

ive

max

imum

dem

and

(con

tinue

d)

7

Page 8: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Con

nect

ion

poin

tVo

ltage

(kV

)Z

one

2020

/21

2021

/22

2022

/23

2023

/24

2024

/25

2025

/26

2026

/27

2027

/28

2028

/29

2029

/30

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

Ala

n Sh

errif

f13

2R

288

288

288

288

288

288

288

288

288

288

Alig

ator

Cre

ek

(Lou

isa C

reek

)13

2N

4012

4012

4012

4012

4012

4012

3912

3912

3912

3912

Allig

ator

Cre

ek33

N42

742

742

742

742

742

742

742

742

743

7

Bilo

ela

66C

W33

432

432

332

332

332

332

331

331

331

3

Blac

kwat

er13

2C

W28

828

828

828

828

828

828

828

728

727

7

Blac

kwat

er66

CW

104

1910

419

103

1910

319

102

1910

519

108

2010

820

107

2010

619

Bow

en N

orth

66N

287

287

287

287

287

287

287

287

287

287

Bulli

Cre

ek

(Wag

gam

ba)

132

B20

520

520

520

520

520

520

520

520

519

5

Cai

rns

22FN

6412

6412

6312

6312

6212

6212

6212

6212

6212

6212

Cai

rns

City

132

FN43

043

042

042

042

041

041

041

041

041

0

Cal

liope

Riv

er13

2G

577

577

577

567

567

567

567

567

567

557

Car

dwel

l22

R5

25

25

25

25

25

25

25

25

25

2

Chi

nchi

lla13

2S

225

225

225

225

225

225

225

225

225

225

Cla

re S

outh

66R

8226

8426

8527

8527

8527

8527

8427

8426

8426

8326

Col

linsv

ille

Nor

th33

N17

416

416

416

416

416

416

416

416

416

4

Col

umbo

ola

132

S73

1172

1072

1072

1071

1071

1071

1071

1070

1070

10

Dan

Gle

eson

66R

119

311

93

112

211

32

113

211

42

114

211

52

116

211

72

Dys

art

66C

W44

944

943

943

943

943

943

943

942

942

9

Edm

onto

n22

FN44

444

445

445

445

446

446

447

447

448

4

Egan

s H

ill66

CW

5414

5314

5314

5314

5314

5314

5314

5314

5414

5414

El A

rish

22FN

60

60

60

60

60

60

60

60

60

60

Tabl

e A

.3

Ergo

n co

nnec

tion

poin

t fo

reca

st o

f sum

mer

low

gro

wth

nat

ive

max

imum

dem

and

8

Page 9: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Con

nect

ion

poin

tVo

ltage

(kV

)Z

one

2020

/21

2021

/22

2022

/23

2023

/24

2024

/25

2025

/26

2026

/27

2027

/28

2028

/29

2029

/30

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

Gar

butt

66R

114

311

43

107

210

82

108

210

92

109

211

02

111

211

22

Gin

Gin

132

WB

160

1816

118

162

1816

219

162

1916

319

163

1916

419

164

1916

619

Gla

dsto

ne S

outh

66G

557

557

557

557

547

557

557

557

557

557

Ingh

am66

R19

119

119

119

118

118

118

118

118

118

1

Inni

sfai

l22

FN28

428

428

428

427

427

427

427

427

427

4

Kam

erun

ga22

FN63

364

364

364

365

365

365

366

466

467

4

Lily

vale

(B

arca

ldin

e &

C

lerm

ont)

132

CW

437

427

427

427

427

427

427

417

417

417

Lily

vale

66C

W14

666

146

6614

566

145

6514

465

144

6514

365

143

6514

264

141

64

Mac

kay

33N

9024

8923

8823

8723

8723

8723

8623

8623

8623

8623

Mid

dle

Rid

ge11

0SW

233

5923

259

231

5923

159

231

5923

259

232

5923

359

234

5923

660

Mid

dle

Rid

ge

(Pos

tman

s R

idge

)11

0M

287

287

287

287

287

287

287

287

287

287

Mor

anba

h (B

road

lea)

132

N43

1049

1256

1456

1455

1355

1355

1355

1354

1354

13

Mor

anba

h66

and

11

N13

649

147

5315

757

157

5715

657

156

5715

657

155

5615

456

154

56

Mou

ra66

CW

6120

6119

6019

6019

6019

6019

5919

5919

5919

5819

Neb

o11

N3

03

03

03

03

03

03

03

03

03

0

New

land

s66

N26

726

726

726

726

726

726

626

626

625

6

Oak

ey11

0SW

196

196

186

186

186

186

186

186

186

186

Pand

oin

66C

W41

1041

1040

1040

1040

1040

1040

1041

1041

1041

10

Pion

eer V

alle

y66

N68

1268

1268

1268

1268

1268

1268

1269

1269

1269

12

Pros

erpi

ne66

N51

1051

1051

1051

1051

1052

1052

1052

1052

1053

10

Rock

ham

pton

66C

W94

2494

2494

2493

2493

2494

2494

2494

2494

2495

24

Tabl

e A

.3

Ergo

n co

nnec

tion

poin

t fo

reca

st o

f sum

mer

low

gro

wth

nat

ive

max

imum

dem

and

(con

tinue

d)

9

Page 10: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Con

nect

ion

poin

tVo

ltage

(kV

)Z

one

2020

/21

2021

/22

2022

/23

2023

/24

2024

/25

2025

/26

2026

/27

2027

/28

2028

/29

2029

/30

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

Ross

(Ki

dsto

n,

Millc

hest

er a

nd

Geo

rget

own)

132

R42

1042

1041

1041

1041

1041

1041

1041

1040

940

9

Ston

y C

reek

132

N3

13

13

13

13

13

13

13

13

13

1

Tang

kam

110

SW33

733

732

732

632

632

632

632

632

632

6

Taro

ng66

SW47

1247

1247

1247

1246

1247

1246

1247

1247

1247

12

Teeb

ar C

reek

(Is

is an

d M

aryb

orou

gh)

132

WB

140

4714

449

147

5014

750

147

5014

850

148

5014

951

150

5115

151

Tow

nsvi

lle E

ast

66R

452

452

422

432

432

432

432

432

442

442

Tow

nsvi

lle S

outh

66R

102

510

25

974

974

974

984

984

994

994

100

4

Tully

22R

153

153

153

153

153

153

153

153

153

153

Turk

inje

(Cra

iglie

an

d La

kela

nd)

132

FN19

1119

1119

1119

1119

1119

1119

1119

1119

1119

11

Turk

inje

66FN

692

682

682

682

682

682

682

692

692

702

Woo

loog

a (K

ilkiv

an)

132

WB

153

163

153

153

153

153

163

163

163

163

Wor

ee (C

airn

s N

orth

)13

2FN

452

452

452

452

452

452

452

452

452

462

Yarw

un (

Boat

C

reek

)13

2G

4117

4117

4117

4117

4117

4117

4017

4017

4017

4017

Hai

l Cre

ek a

nd

King

Cre

ekVa

rious

N37

637

637

637

636

636

636

636

636

636

6

Tabl

e A

.3

Ergo

n co

nnec

tion

poin

t fo

reca

st o

f sum

mer

low

gro

wth

nat

ive

max

imum

dem

and

(con

tinue

d)

10

Page 11: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Con

nect

ion

poin

tVo

ltage

(kV

)Z

one

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

Ala

n Sh

errif

f13

2R

163

163

163

163

163

163

164

174

174

174

Alig

ator

Cre

ek

(Lou

isa C

reek

)13

2N

4013

4013

4013

4113

4113

4113

4113

4113

4113

4213

Allig

ator

Cre

ek33

N27

627

627

627

628

628

628

628

629

629

6

Bilo

ela

66C

W29

728

728

728

729

729

729

729

729

729

7

Blac

kwat

er13

2C

W27

1127

1127

1127

1127

1127

1127

1128

1128

1128

12

Blac

kwat

er66

CW

9210

9210

9110

9210

9310

9610

9911

9911

100

1110

111

Bow

en N

orth

66N

249

249

249

249

249

249

249

259

259

259

Bulli

Cre

ek

(Wag

gam

ba)

132

B22

722

722

722

722

722

722

722

722

723

7

Cai

rns

22FN

399

399

389

389

389

399

399

399

399

4010

Cai

rns

City

132

FN30

029

029

029

029

029

029

029

030

030

0

Cal

liope

Riv

er13

2G

502

502

502

502

512

512

512

512

512

522

Car

dwel

l22

R4

14

14

14

14

14

14

14

14

14

1

Chi

nchi

lla13

2S

183

183

183

183

183

183

183

183

193

193

Cla

re S

outh

66R

5712

5812

5812

5812

5812

5812

5912

5912

5912

6013

Col

linsv

ille

Nor

th33

N14

414

414

414

414

414

414

414

414

414

4

Col

umbo

ola

132

S59

1759

1759

1759

1759

1760

1760

1760

1760

1761

18

Dan

Gle

eson

66R

100

910

09

937

947

957

967

987

997

100

710

37

Dys

art

66C

W42

941

941

942

942

942

942

942

942

943

9

Edm

onto

n22

FN30

430

430

430

431

431

432

432

533

534

5

Egan

s H

ill66

CW

426

426

426

426

426

426

436

436

446

456

El A

rish

22FN

50

50

50

50

50

50

50

50

50

50

Tabl

e A

.4

Ergo

n co

nnec

tion

poin

t fo

reca

st o

f win

ter

high

gro

wth

nat

ive

max

imum

dem

and

11

Page 12: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Con

nect

ion

poin

tVo

ltage

(kV

)Z

one

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

Gar

butt

66R

999

999

937

947

957

967

977

987

100

710

27

Gin

Gin

132

WB

127

1612

916

130

1713

117

132

1713

317

134

1713

617

138

1814

118

Gla

dsto

ne S

outh

66G

5127

5127

5127

5128

5228

5228

5228

5328

5329

5529

Ingh

am66

R15

215

215

215

215

215

215

215

215

215

2

Inni

sfai

l22

FN19

519

519

519

519

519

519

519

519

519

5

Kam

erun

ga22

FN42

343

343

344

444

445

445

446

447

448

4

Lily

vale

(B

arca

ldin

e &

C

lerm

ont)

132

CW

3211

3211

3211

3211

3211

3211

3211

3211

3211

3311

Lily

vale

66C

W13

656

136

5613

656

137

5613

857

138

5713

857

138

5713

957

140

58

Mac

kay

33N

5919

5919

5819

5919

5919

5919

5919

5919

5919

6020

Mid

dle

Rid

ge11

0SW

252

4425

143

251

4425

444

256

4425

845

260

4526

345

267

4627

347

Mid

dle

Rid

ge

(Pos

tman

s R

idge

)11

0M

134

134

134

134

134

134

144

144

144

144

Mor

anba

h (B

road

lea)

132

N41

847

953

1153

1153

1153

1154

1154

1154

1154

11

Mor

anba

h66

and

11

N13

143

142

4715

251

154

5115

551

155

5115

552

156

5215

652

158

52

Mou

ra66

CW

6120

6020

6019

6120

6120

6120

6120

6120

6120

6220

Neb

o11

N2

02

02

02

02

02

02

02

02

02

0

New

land

s66

N22

122

122

122

122

122

122

122

122

122

1

Oak

ey11

0SW

196

196

196

196

196

196

196

196

196

206

Pand

oin

66C

W31

431

531

432

532

532

532

533

533

534

5

Pion

eer V

alle

y66

N49

449

449

450

450

450

451

451

452

453

4

Pros

erpi

ne66

N33

333

333

334

334

334

334

335

335

336

3

Rock

ham

pton

66C

W69

1069

1069

1070

1070

1071

1071

1072

1073

1074

10

Tabl

e A

.4

Ergo

n co

nnec

tion

poin

t fo

reca

st o

f win

ter

high

gro

wth

nat

ive

max

imum

dem

and

(con

tinue

d)

12

Page 13: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Con

nect

ion

poin

tVo

ltage

(kV

)Z

one

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

Ross

(Ki

dsto

n,

Millc

hest

er a

nd

Geo

rget

own)

132

R36

1536

1536

1536

1536

1536

1536

1536

1537

1537

15

Ston

y C

reek

132

N3

13

13

13

13

13

13

13

13

13

1

Tang

kam

110

SW30

530

530

530

531

531

531

531

531

532

5

Taro

ng66

SW46

1146

1146

1147

1147

1147

1147

1148

1148

1149

12

Teeb

ar C

reek

(Is

is an

d M

aryb

orou

gh)

132

WB

127

3112

931

131

3213

232

133

3213

432

135

3313

633

138

3314

134

Tow

nsvi

lle E

ast

66R

434

434

403

413

413

413

423

423

433

443

Tow

nsvi

lle S

outh

66R

909

909

846

856

866

876

886

896

917

937

Tully

22R

101

101

101

101

101

101

101

101

101

111

Turk

inje

(Cra

iglie

an

d La

kela

nd)

132

FN17

1117

1117

1117

1117

1117

1118

1118

1118

1218

12

Turk

inje

66FN

624

624

624

634

634

644

644

654

664

674

Woo

loog

a (K

ilkiv

an)

132

WB

176

186

186

186

186

186

186

196

197

207

Wor

ee (C

airn

s N

orth

)13

2FN

313

313

313

323

324

324

324

334

334

344

Yarw

un (

Boat

C

reek

)13

2G

4215

4215

4215

4215

4216

4216

4316

4316

4316

4316

Hai

l Cre

ek a

nd

King

Cre

ekVa

rious

N36

636

636

637

637

637

637

637

637

637

7

Tabl

e A

.4

Ergo

n co

nnec

tion

poin

t fo

reca

st o

f win

ter

high

gro

wth

nat

ive

max

imum

dem

and

(con

tinue

d)

13

Page 14: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Con

nect

ion

po

int

Volta

ge(k

V)

Zon

e20

2120

2220

2320

2420

2520

2620

2720

2820

2920

30

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

Ala

n Sh

errif

f13

2R

163

163

163

163

163

163

163

163

163

164

Alig

ator

Cre

ek

(Lou

isa C

reek

)13

2N

4013

4013

4013

4013

4013

4013

4013

3913

3913

3913

Allig

ator

Cre

ek33

N27

627

627

627

627

627

627

627

627

628

6

Bilo

ela

66C

W28

728

628

628

628

628

628

628

628

628

6

Blac

kwat

er13

2C

W27

1127

1127

1127

1127

1127

1127

1127

1126

1127

11

Blac

kwat

er66

CW

9110

9010

9010

9010

9010

9310

9610

9610

9610

9610

Bow

en N

orth

66N

249

249

238

249

249

249

249

249

249

249

Bulli

Cre

ek

(Wag

gam

ba)

132

B22

722

622

622

622

622

622

621

621

621

6

Cai

rns

22FN

399

389

389

389

389

389

389

379

389

389

Cai

rns

City

132

FN29

029

029

029

029

029

029

028

028

028

0

Cal

liope

Riv

er13

2G

502

492

492

492

492

492

492

492

492

492

Car

dwel

l22

R4

14

14

14

14

14

14

14

14

14

1

Chi

nchi

lla13

2S

183

173

173

183

183

183

183

183

183

183

Cla

re S

outh

66R

5612

5712

5712

5712

5712

5712

5712

5712

5712

5712

Col

linsv

ille

Nor

th33

N14

414

414

414

414

414

414

413

413

414

4

Col

umbo

ola

132

S59

1758

1758

1758

1758

1758

1758

1758

1758

1758

17

Dan

Gle

eson

66R

999

989

927

937

937

947

957

957

967

987

Dys

art

66C

W41

941

941

841

941

941

841

841

841

841

8

Edm

onto

n22

FN29

429

429

430

430

430

431

431

432

432

4

Egan

s H

ill66

CW

416

416

416

416

416

416

426

426

426

426

El A

rish

22FN

50

50

50

50

50

50

50

50

50

50

Tabl

e A

.5

Ergo

n co

nnec

tion

poin

t fo

reca

st o

f win

ter

med

ium

gro

wth

nat

ive

max

imum

dem

and

14

Page 15: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Con

nect

ion

po

int

Volta

ge(k

V)

Zon

e20

2120

2220

2320

2420

2520

2620

2720

2820

2920

30

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

Gar

butt

66R

989

989

916

927

937

937

947

957

967

977

Gin

Gin

132

WB

126

1612

716

128

1612

816

129

1613

017

130

1713

117

132

1713

417

Gla

dsto

ne S

outh

66G

5027

5027

5027

5027

5027

5127

5127

5127

5128

5228

Ingh

am66

R15

215

214

215

214

214

214

214

214

214

2

Inni

sfai

l22

FN18

518

518

518

518

518

518

518

518

518

5

Kam

erun

ga22

FN42

342

342

343

343

443

444

444

445

445

4

Lily

vale

(B

arca

ldin

e &

C

lerm

ont)

132

CW

3211

3111

3111

3111

3111

3111

3111

3111

3111

3111

Lily

vale

66C

W13

556

134

5513

455

134

5513

455

134

5513

455

133

5513

355

133

55

Mac

kay

33N

5919

5819

5719

5719

5719

5718

5718

5718

5718

5719

Mid

dle

Rid

ge11

0SW

250

4324

843

247

4324

943

250

4325

143

253

4425

344

255

4426

045

Mid

dle

Rid

ge

(Pos

tman

s R

idge

)11

0M

134

134

134

134

134

134

134

134

134

134

Mor

anba

h (B

road

lea)

132

N40

846

952

1052

1052

1052

1052

1052

1052

1052

10

Mor

anba

h66

and

11

N13

043

140

4615

050

151

5015

150

151

5015

150

150

5015

050

150

50

Mou

ra66

CW

6019

6019

5919

6019

6019

5919

5919

5919

5919

5919

Neb

o11

N2

02

02

02

02

02

02

02

02

02

0

New

land

s66

N22

121

121

121

121

121

121

121

121

121

1

Oak

ey11

0SW

196

196

196

196

195

195

195

185

185

195

Pand

oin

66C

W31

431

431

431

431

431

431

431

432

432

4

Pion

eer V

alle

y66

N49

448

448

449

449

449

449

449

449

450

4

Pros

erpi

ne66

N33

333

333

333

333

333

333

334

334

334

3

Rock

ham

pton

66C

W69

1068

1068

1069

1069

1069

1069

1069

1070

1071

10

Tabl

e A

.5

Ergo

n co

nnec

tion

poin

t fo

reca

st o

f win

ter

med

ium

gro

wth

nat

ive

max

imum

dem

and

(con

tinue

d)

15

Page 16: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Con

nect

ion

po

int

Volta

ge(k

V)

Zon

e20

2120

2220

2320

2420

2520

2620

2720

2820

2920

30

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

Ross

(Ki

dsto

n,

Millc

hest

er a

nd

Geo

rget

own)

132

R36

1535

1535

1435

1435

1435

1435

1435

1435

1435

14

Ston

y C

reek

132

N3

13

13

13

13

13

13

13

13

13

1

Tang

kam

110

SW30

530

530

530

530

530

530

530

530

530

5

Taro

ng66

SW46

1146

1145

1146

1146

1146

1146

1146

1146

1147

11

Teeb

ar C

reek

(Is

is an

d M

aryb

orou

gh)

132

WB

125

3012

731

129

3113

031

130

3213

032

131

3213

132

132

3213

432

Tow

nsvi

lle E

ast

66R

424

424

393

403

403

403

413

413

413

423

Tow

nsvi

lle S

outh

66R

898

898

836

846

846

856

856

866

876

886

Tully

22R

101

101

101

101

101

101

101

101

101

101

Turk

inje

(Cra

iglie

an

d La

kela

nd)

132

FN17

1117

1117

1117

1117

1117

1117

1117

1117

1117

11

Turk

inje

66FN

623

613

613

623

623

623

624

634

634

644

Woo

loog

a (K

ilkiv

an)

132

WB

176

186

186

186

186

186

186

186

186

196

Wor

ee (C

airn

s N

orth

)13

2FN

313

313

313

313

313

313

313

323

323

324

Yarw

un (

Boat

C

reek

)13

2G

4215

4115

4115

4115

4115

4115

4115

4115

4115

4115

Hai

l Cre

ek a

nd

King

Cre

ekVa

rious

N36

636

636

636

636

636

636

636

636

636

6

Tabl

e A

.5

Ergo

n co

nnec

tion

poin

t fo

reca

st o

f win

ter

med

ium

gro

wth

nat

ive

max

imum

dem

and

(con

tinue

d)

16

Page 17: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Con

nect

ion

po

int

Volta

ge(k

V)

Zon

e20

2120

2220

2320

2420

2520

2620

2720

2820

2920

30

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

Ala

n Sh

errif

f13

2R

163

163

153

153

153

153

153

153

153

153

Alig

ator

Cre

ek

(Lou

isa C

reek

)13

2N

3913

3913

3912

3912

3912

3812

3812

3712

3712

3712

Allig

ator

Cre

ek33

N26

626

626

626

626

626

626

626

626

626

6

Bilo

ela

66C

W28

628

627

627

627

627

626

626

626

626

6

Blac

kwat

er13

2C

W27

1126

1126

1126

1126

1126

1125

1025

1025

1025

10

Blac

kwat

er66

CW

9010

8910

889

889

879

9010

9110

9010

8910

8910

Bow

en N

orth

66N

238

238

238

238

238

238

238

228

228

228

Bulli

Cre

ek

(Wag

gam

ba)

132

B22

621

621

621

621

621

620

620

620

620

6

Cai

rns

22FN

389

379

379

379

369

369

369

358

358

358

Cai

rns

City

132

FN29

029

028

028

028

027

027

027

026

026

0

Cal

liope

Riv

er13

2G

492

492

482

482

482

472

472

462

462

462

Car

dwel

l22

R4

14

14

14

14

14

14

14

14

14

1

Chi

nchi

lla13

2S

173

173

173

173

173

173

173

173

173

173

Cla

re S

outh

66R

5612

5612

5612

5512

5512

5511

5411

5311

5311

5311

Col

linsv

ille

Nor

th33

N14

414

413

413

413

413

413

313

313

313

3

Col

umbo

ola

132

S58

1757

1757

1657

1656

1656

1655

1654

1654

1654

15

Dan

Gle

eson

66R

989

979

906

906

906

906

906

906

906

917

Dys

art

66C

W41

840

840

840

840

839

839

838

838

838

8

Edm

onto

n22

FN29

429

429

429

429

429

429

429

429

430

4

Egan

s H

ill66

CW

416

406

406

406

406

406

396

396

395

395

El A

rish

22FN

50

50

50

50

40

40

40

40

40

40

Tabl

e A

.6

Ergo

n co

nnec

tion

poin

t fo

reca

st o

f win

ter

low

gro

wth

nat

ive

max

imum

dem

and

17

Page 18: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Con

nect

ion

po

int

Volta

ge(k

V)

Zon

e20

2120

2220

2320

2420

2520

2620

2720

2820

2920

30

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

Gar

butt

66R

979

969

896

896

906

896

896

896

896

907

Gin

Gin

132

WB

125

1612

516

125

1612

516

125

1612

416

124

1612

316

123

1612

416

Gla

dsto

ne S

outh

66G

5027

4927

4926

4926

4926

4826

4826

4826

4826

4826

Ingh

am66

R15

214

214

214

214

214

214

213

213

213

2

Inni

sfai

l22

FN18

518

518

518

518

518

517

417

417

417

4

Kam

erun

ga22

FN42

341

341

342

342

342

342

342

342

342

3

Lily

vale

(B

arca

ldin

e &

C

lerm

ont)

132

CW

3111

3110

3110

3010

3010

3010

3010

2910

2910

2910

Lily

vale

66C

W13

455

132

5413

154

131

5413

054

129

5312

752

126

5212

451

124

51

Mac

kay

33N

5819

5718

5618

5618

5618

5518

5418

5417

5317

5317

Mid

dle

Rid

ge11

0SW

247

4324

442

242

4224

342

242

4224

142

240

4223

941

238

4124

142

Mid

dle

Rid

ge

(Pos

tman

s R

idge

)11

0M

134

134

134

134

134

134

124

124

124

124

Mor

anba

h (B

road

lea)

132

N40

845

951

1051

1050

1050

1049

1049

1048

1048

10

Mor

anba

h66

and

11

N12

842

138

4614

749

147

4914

649

145

4814

347

141

4714

046

139

46

Mou

ra66

CW

5919

5919

5819

5819

5819

5718

5618

5618

5518

5518

Neb

o11

N2

02

02

02

02

02

02

02

02

02

0

New

land

s66

N21

121

121

121

121

121

120

120

120

120

1

Oak

ey11

0SW

196

195

185

185

185

185

185

175

175

175

Pand

oin

66C

W31

430

430

430

430

430

430

430

429

430

4

Pion

eer V

alle

y66

N48

448

447

447

447

447

447

446

446

446

4

Pros

erpi

ne66

N32

332

332

332

332

332

332

332

332

332

3

Rock

ham

pton

66C

W68

1067

1067

1067

1067

1066

966

965

965

966

9

Tabl

e A

.6

Ergo

n co

nnec

tion

poin

t fo

reca

st o

f win

ter

low

gro

wth

nat

ive

max

imum

dem

and

(con

tinue

d)

18

Page 19: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Con

nect

ion

po

int

Volta

ge(k

V)

Zon

e20

2120

2220

2320

2420

2520

2620

2720

2820

2920

30

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

Ross

(Ki

dsto

n,

Millc

hest

er a

nd

Geo

rget

own)

132

R35

1435

1434

1434

1434

1434

1433

1433

1433

1333

13

Ston

y C

reek

132

N3

13

13

13

13

13

12

12

12

12

1

Tang

kam

110

SW30

529

529

529

529

529

528

528

428

428

4

Taro

ng66

SW45

1145

1145

1145

1144

1044

1044

1043

1043

1043

10

Teeb

ar C

reek

(Is

is an

d M

aryb

orou

gh)

132

WB

124

3012

530

126

3112

631

126

3112

530

125

3012

430

123

3012

530

Tow

nsvi

lle E

ast

66R

424

424

393

393

393

393

393

383

393

393

Tow

nsvi

lle S

outh

66R

888

878

816

816

826

816

816

816

816

826

Tully

22R

101

101

101

101

101

101

91

91

91

91

Turk

inje

(Cra

iglie

an

d La

kela

nd)

132

FN17

1117

1116

1116

1116

1116

1016

1016

1016

1016

10

Turk

inje

66FN

613

603

603

603

603

603

593

593

593

593

Woo

loog

a (K

ilkiv

an)

132

WB

176

176

176

176

176

176

176

176

176

176

Wor

ee (C

airn

s N

orth

)13

2FN

313

303

303

303

303

303

303

303

303

303

Yarw

un (

Boat

C

reek

)13

2G

4115

4115

4015

4015

4015

4015

3914

3914

3814

3814

Hai

l Cre

ek a

nd

King

Cre

ekVa

rious

N36

635

635

635

635

634

634

634

633

633

6

Tabl

e A

.6

Ergo

n co

nnec

tion

poin

t fo

reca

st o

f win

ter

low

gro

wth

nat

ive

max

imum

dem

and

(con

tinue

d)

19

Page 20: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Con

nect

ion

poin

tVo

ltage

(kV

)Z

one

2020

/21

2021

/22

2022

/23

2023

/24

2024

/25

2025

/26

2026

/27

2027

/28

2028

/29

2029

/30

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

Abe

rmai

n 11

0M

739

749

7510

7610

7810

8210

8311

8511

8711

8911

Abe

rmai

n33

M11

015

116

1612

417

128

1812

918

132

1813

418

137

1914

019

142

20

Alg

este

r33

M71

1672

1672

1673

1673

1674

1675

1676

1777

1778

17

Ash

grov

e W

est

110

M12

024

123

2512

926

134

2713

728

138

2814

029

142

2914

430

146

30

Ash

grov

e W

est

33M

779

7710

7910

7910

8010

8110

8210

8410

8510

8611

Belm

ont

110

M42

610

444

110

845

011

045

611

246

211

346

811

547

311

648

411

849

112

049

912

2

Blac

ksto

ne

(Rac

evie

w)

110

M10

413

107

1311

014

113

1411

514

118

1512

115

124

1512

716

131

16

Bund

amba

11

0M

3512

3612

3612

3713

3813

3813

3813

3913

4014

4014

Goo

dna

33M

138

514

35

148

515

35

157

516

35

169

617

66

183

619

06

Loga

nlea

11

0M

429

153

437

156

446

160

455

163

462

165

472

169

482

173

499

178

511

183

524

187

Loga

nlea

33

M10

17

997

100

710

17

102

710

38

104

810

78

109

811

18

Mid

dle

Rid

ge

(Pos

tman

s R

idge

an

d G

atto

n)11

0M

110

611

36

115

611

66

117

611

96

120

612

37

124

712

67

Mol

endi

nar

110

GC

462

346

93

481

349

03

500

351

13

519

353

43

546

355

93

Mud

geer

aba

110

GC

370

111

375

112

383

114

389

116

394

118

401

120

406

121

416

125

424

127

435

130

Mud

geer

aba

33G

C25

725

726

726

826

827

827

828

829

829

9

Mur

arrie

11

0M

545

4956

150

574

5159

353

616

5562

756

634

5764

658

654

5866

259

Palm

woo

ds

110

& 1

32M

398

149

414

155

427

160

438

164

447

167

460

172

469

175

483

181

499

187

513

192

Redb

ank

Plai

ns

11M

294

304

314

315

325

335

345

365

375

396

Ric

hlan

ds

33M

122

2112

221

123

2112

421

125

2112

721

128

2213

022

133

2213

523

Rock

lea

110

M17

024

166

2416

824

170

2417

224

174

2517

625

180

2618

326

186

26

Runc

orn

33M

600

630

640

640

650

660

660

680

690

700

Sout

h Pi

ne

110

M98

290

1001

9210

1994

1034

9510

4896

1066

9810

8199

1109

102

1129

104

1152

106

Tabl

e A

.7

Ener

gex

conn

ectio

n po

int

fore

cast

of s

umm

er h

igh

grow

th n

ativ

e m

axim

um d

eman

d

20

Page 21: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Con

nect

ion

poin

tVo

ltage

(kV

)Z

one

2020

/21

2021

/22

2022

/23

2023

/24

2024

/25

2025

/26

2026

/27

2027

/28

2028

/29

2029

/30

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

Sum

ner

110

M35

1335

1335

1336

1336

1336

1336

1337

1337

1337

13

Tenn

yson

33

M18

110

187

1019

411

198

1120

211

205

1120

711

211

1121

412

216

12

Wec

ker R

oad

33M

134

1813

518

137

1813

818

140

1914

219

143

1914

719

149

2015

220

Woo

loog

a (G

ympi

e)13

2M

224

122

71

230

123

31

236

123

91

241

124

71

250

125

51

Tabl

e A

.7

Ener

gex

conn

ectio

n po

int

fore

cast

of s

umm

er h

igh

grow

th n

ativ

e m

axim

um d

eman

d (c

ontin

ued)

21

Page 22: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Con

nect

ion

poin

tVo

ltage

(kV

)Z

one

2020

/21

2021

/22

2022

/23

2023

/24

2024

/25

2025

/26

2026

/27

2027

/28

2028

/29

2029

/30

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

Abe

rmai

n 11

0M

719

729

729

729

729

7510

7510

7610

7710

7810

Abe

rmai

n33

M10

815

113

1511

816

120

1712

117

121

1712

117

123

1712

417

125

17

Alg

este

r33

M70

1570

1569

1569

1568

1568

1568

1568

1568

1569

15

Ash

grov

e W

est

110

M11

724

119

2412

425

126

2612

726

127

2612

726

127

2612

826

128

26

Ash

grov

e W

est

33M

759

759

759

759

759

759

749

759

759

769

Belm

ont

110

M41

810

242

810

543

010

543

110

543

010

543

010

543

010

543

310

643

610

743

910

7

Blac

ksto

ne

(Rac

evie

w)

110

M10

213

104

1310

513

106

1310

713

109

1311

014

111

1411

314

115

14

Bund

amba

11

0M

3412

3512

3512

3512

3512

3512

3512

3512

3512

3512

Goo

dna

33M

135

513

95

142

514

45

147

515

05

153

515

85

162

516

76

Loga

nlea

11

0M

421

150

424

152

427

153

429

154

430

154

434

155

438

157

447

160

453

162

460

165

Loga

nlea

33

M99

796

796

795

795

795

795

796

796

797

7

Mid

dle

Rid

ge

(Pos

tman

s R

idge

an

d G

atto

n)11

0M

108

610

96

110

611

06

109

610

96

109

611

06

110

611

16

Mol

endi

nar

110

GC

453

345

53

460

346

33

466

346

93

472

347

93

484

349

13

Mud

geer

aba

110

GC

363

109

364

109

366

109

367

110

367

110

368

110

369

110

373

112

376

112

383

114

Mud

geer

aba

33G

C24

724

725

725

725

725

725

725

725

726

7

Mur

arrie

11

0M

534

4854

549

549

4956

050

574

5157

651

576

5157

952

580

5258

252

Palm

woo

ds

110

& 1

32M

390

146

402

150

408

153

414

155

416

156

422

158

425

159

433

162

443

166

451

169

Redb

ank

Plai

ns

11M

284

294

294

304

304

314

315

325

335

345

Ric

hlan

ds

33M

119

2011

820

118

2011

720

117

2011

620

116

2011

720

118

2011

920

Rock

lea

110

M16

724

161

2316

023

160

2316

023

160

2316

023

161

2316

223

163

23

Runc

orn

33M

590

610

610

610

600

600

600

610

610

620

Sout

h Pi

ne

110

M96

389

971

8997

590

977

9097

690

979

9098

290

993

9110

0192

1012

93

Tabl

e A

.8

Ener

gex

conn

ectio

n po

int

fore

cast

of s

umm

er m

ediu

m g

row

th n

ativ

e m

axim

um d

eman

d

22

Page 23: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Con

nect

ion

poin

tVo

ltage

(kV

)Z

one

2020

/21

2021

/22

2022

/23

2023

/24

2024

/25

2025

/26

2026

/27

2027

/28

2028

/29

2029

/30

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

Sum

ner

110

M35

1234

1234

1234

1233

1233

1233

1233

1233

1233

12

Tenn

yson

33

M17

810

181

1018

610

187

1018

910

188

1018

810

189

1019

010

190

10

Wec

ker R

oad

33M

131

1713

117

131

1713

117

130

1713

017

130

1713

117

132

1813

318

Woo

loog

a (G

ympi

e)13

2M

220

122

01

220

122

01

219

121

91

219

122

11

222

122

41

Tabl

e A

.8

Ener

gex

conn

ectio

n po

int

fore

cast

of s

umm

er m

ediu

m g

row

th n

ativ

e m

axim

um d

eman

d (c

ontin

ued)

23

Page 24: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Con

nect

ion

poin

tVo

ltage

(kV

)Z

one

2020

/21

2021

/22

2022

/23

2023

/24

2024

/25

2025

/26

2026

/27

2027

/28

2028

/29

2029

/30

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

Abe

rmai

n 11

0M

709

709

699

689

689

699

699

699

699

699

Abe

rmai

n33

M10

615

109

1511

316

114

1611

316

112

1511

115

111

1511

115

111

15

Alg

este

r33

M69

1568

1566

1565

1464

1463

1462

1462

1461

1361

13

Ash

grov

e W

est

110

M11

524

116

2411

924

120

2511

924

118

2411

624

116

2411

523

113

23

Ash

grov

e W

est

33M

749

739

729

719

709

698

688

688

678

678

Belm

ont

110

M41

210

141

610

241

210

140

810

040

299

399

9839

496

393

9639

196

387

95

Blac

ksto

ne

(Rac

evie

w)

110

M10

012

101

1210

112

101

1210

012

101

1210

012

101

1210

113

101

13

Bund

amba

11

0M

3412

3412

3311

3311

3311

3211

3211

3211

3211

3111

Goo

dna

33M

133

413

54

136

513

75

137

513

95

140

514

35

146

514

85

Loga

nlea

11

0M

414

148

413

148

409

146

407

145

402

144

402

144

401

144

406

145

406

145

407

145

Loga

nlea

33

M97

793

792

790

789

688

687

687

686

686

6

Mid

dle

Rid

ge

(Pos

tman

s R

idge

an

d G

atto

n)11

0M

106

610

66

105

610

46

102

510

15

100

510

05

995

985

Mol

endi

nar

110

GC

446

344

33

441

343

83

436

343

53

432

343

53

434

343

43

Mud

geer

aba

110

GC

357

107

354

106

351

105

348

104

344

103

341

102

338

101

339

101

337

101

338

101

Mud

geer

aba

33G

C24

724

724

723

723

723

723

723

723

723

7

Mur

arrie

11

0M

526

4753

047

526

4753

147

537

4853

448

527

4752

647

521

4651

446

Palm

woo

ds

110

& 1

32M

384

144

391

146

391

146

392

147

389

146

392

147

390

146

393

147

397

149

398

149

Redb

ank

Plai

ns

11M

284

284

284

284

284

284

294

294

304

304

Ric

hlan

ds

33M

117

2011

519

113

1911

119

109

1810

818

106

1810

618

105

1810

518

Rock

lea

110

M16

423

157

2215

422

152

2215

021

148

2114

721

146

2114

521

144

20

Runc

orn

33M

580

590

580

570

570

560

550

550

550

540

Sout

h Pi

ne

110

M94

887

945

8793

486

925

8591

384

908

8389

983

902

8389

883

894

82

Tabl

e A

.9

Ener

gex

conn

ectio

n po

int

fore

cast

of s

umm

er lo

w g

row

th n

ativ

e m

axim

um d

eman

d

24

Page 25: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Con

nect

ion

poin

tVo

ltage

(kV

)Z

one

2020

/21

2021

/22

2022

/23

2023

/24

2024

/25

2025

/26

2026

/27

2027

/28

2028

/29

2029

/30

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

Sum

ner

110

M34

1233

1232

1232

1131

1131

1130

1130

1129

1129

10

Tenn

yson

33

M17

510

176

1017

810

178

1017

610

175

1017

29

171

917

09

168

9

Wec

ker R

oad

33M

129

1712

717

126

1712

416

122

1612

116

119

1611

916

119

1611

816

Woo

loog

a (G

ympi

e)13

2M

216

121

41

211

120

81

205

120

31

201

120

11

199

119

81

Tabl

e A

.9

Ener

gex

conn

ectio

n po

int

fore

cast

of s

umm

er lo

w g

row

th n

ativ

e m

axim

um d

eman

d (c

ontin

ued)

25

Page 26: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Con

nect

ion

poin

tVo

ltage

(kV

)Z

one

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

Abe

rmai

n 11

0M

296

296

296

306

316

326

336

347

357

377

Abe

rmai

n33

M78

1085

1188

1191

1192

1295

1297

1210

013

104

1310

914

Alg

este

r33

M54

1054

1054

1054

1055

1056

1057

1058

1160

1162

11

Ash

grov

e W

est

110

M11

729

120

3012

632

131

3313

434

137

3413

935

142

3614

737

153

38

Ash

grov

e W

est

33M

641

641

641

651

661

671

681

701

721

752

Belm

ont

110

M32

238

329

3933

439

338

4034

340

351

4135

842

367

4338

044

397

46

Blac

ksto

ne

(Rac

evie

w)

110

M69

1070

1171

1173

1175

1178

1280

1282

1286

1391

14

Bund

amba

11

0M

3112

3112

3112

3213

3213

3313

3413

3414

3614

3715

Goo

dna

33M

100

010

20

104

010

70

110

011

50

120

012

50

132

014

10

Loga

nlea

11

0M

312

4331

644

319

4432

545

330

4634

147

352

4936

551

380

5340

156

Loga

nlea

33

M75

1675

1675

1676

1677

1678

1780

1782

1785

1889

19

Mid

dle

Rid

ge

(Pos

tman

s R

idge

an

d G

atto

n)11

0M

102

1210

412

105

1210

612

107

1311

013

112

1311

513

119

1412

414

Mol

endi

nar

110

GC

395

039

90

405

041

20

421

043

40

445

046

00

479

050

40

Mud

geer

aba

110

GC

276

4127

942

281

4228

543

289

4329

744

304

4531

247

326

4934

151

Mud

geer

aba

33G

C19

319

319

319

320

320

321

321

422

423

4

Mur

arrie

11

0M

347

3535

536

360

3637

338

385

3939

640

404

4141

342

426

4344

345

Palm

woo

ds

110

& 1

32M

284

9629

610

030

210

231

010

531

610

732

811

133

711

434

911

836

912

539

013

2

Redb

ank

Plai

ns

11M

201

201

211

211

221

231

241

251

261

281

Ric

hlan

ds

33M

9512

9512

9412

9512

9612

9812

100

1210

213

106

1311

114

Rock

lea

110

M10

924

106

2410

624

107

2410

824

111

2511

325

115

2611

927

124

28

Runc

orn

33M

490

510

510

510

520

530

540

560

580

600

Sout

h Pi

ne

110

M76

082

769

8377

383

783

8479

585

816

8883

490

858

9289

096

932

100

Tabl

e A

.10

Ener

gex

conn

ectio

n po

int

fore

cast

of w

inte

r hi

gh g

row

th n

ativ

e m

axim

um d

eman

d

26

Page 27: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Con

nect

ion

poin

tVo

ltage

(kV

)Z

one

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

Sum

ner

110

M24

524

523

524

524

524

524

525

526

527

5

Tenn

yson

33

M14

511

143

1114

911

153

1115

612

159

1216

212

166

1217

213

179

13

Wec

ker R

oad

33M

915

925

925

936

946

966

986

101

610

56

109

7

Woo

loog

a (G

ympi

e)13

2M

302

030

30

305

030

80

312

031

90

325

033

40

345

036

20

Tabl

e A

.10

Ener

gex

conn

ectio

n po

int

fore

cast

of w

inte

r hi

gh g

row

th n

ativ

e m

axim

um d

eman

d (c

ontin

ued)

27

Page 28: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Con

nect

ion

poin

tVo

ltage

(kV

)Z

one

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

Abe

rmai

n 11

0M

285

285

285

285

296

296

306

306

316

326

Abe

rmai

n33

M76

1082

1084

1186

1186

1187

1188

1190

1191

1294

12

Alg

este

r33

M53

1052

1051

951

951

951

951

952

1053

1054

10

Ash

grov

e W

est

110

M11

429

115

2912

030

123

3112

531

126

3212

732

128

3212

933

131

33

Ash

grov

e W

est

33M

621

621

611

611

611

621

621

631

641

651

Belm

ont

110

M31

437

318

3731

937

319

3731

937

323

3832

538

329

3833

539

342

40

Blac

ksto

ne

(Rac

evie

w)

110

M68

1068

1068

1069

1070

1171

1172

1174

1176

1178

12

Bund

amba

11

0M

3012

3012

3012

3012

3012

3012

3112

3112

3112

3213

Goo

dna

33M

970

980

100

010

10

103

010

60

109

011

20

117

012

20

Loga

nlea

11

0M

304

4230

542

305

4230

643

308

4331

444

320

4432

745

335

4734

548

Loga

nlea

33

M73

1573

1572

1572

1571

1572

1573

1574

1675

1677

16

Mid

dle

Rid

ge

(Pos

tman

s R

idge

an

d G

atto

n)11

0M

100

1210

012

100

1210

012

100

1210

112

102

1210

312

104

1210

612

Mol

endi

nar

110

GC

385

038

50

387

038

90

393

039

90

405

041

20

422

043

40

Mud

geer

aba

110

GC

269

4026

940

269

4026

940

270

4027

341

276

4128

042

287

4329

444

Mud

geer

aba

33G

C18

318

318

318

318

319

319

319

320

320

3

Mur

arrie

11

0M

338

3434

235

344

3535

136

359

3636

437

367

3737

037

375

3838

139

Palm

woo

ds

110

& 1

32M

277

9428

597

289

9829

299

294

100

302

102

307

104

313

106

325

110

336

114

Redb

ank

Plai

ns

11M

191

201

201

201

201

211

211

221

231

241

Ric

hlan

ds

33M

9211

9111

9011

9011

9011

9011

9111

9211

9411

9612

Rock

lea

110

M10

624

103

2310

123

101

2310

123

102

2310

223

103

2310

524

107

24

Runc

orn

33M

480

490

490

480

480

490

490

500

510

520

Sout

h Pi

ne

110

M74

180

742

8073

979

738

7974

080

751

8175

882

769

8378

484

802

86

Tabl

e A

.11

Ener

gex

conn

ectio

n po

int

fore

cast

of w

inte

r m

ediu

m g

row

th n

ativ

e m

axim

um d

eman

d

28

Page 29: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Con

nect

ion

poin

tVo

ltage

(kV

)Z

one

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

Sum

ner

110

M23

523

522

522

522

522

522

522

523

523

5

Tenn

yson

33

M14

110

138

1014

311

144

1114

511

147

1114

711

149

1115

111

154

11

Wec

ker R

oad

33M

895

895

885

885

885

895

895

905

925

946

Woo

loog

a (G

ympi

e)13

2M

294

029

30

291

029

10

291

029

30

295

029

90

304

031

10

Tabl

e A

.11

Ener

gex

conn

ectio

n po

int

fore

cast

of w

inte

r m

ediu

m g

row

th n

ativ

e m

axim

um d

eman

d (c

ontin

ued)

29

Page 30: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Con

nect

ion

poin

tVo

ltage

(kV

)Z

one

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

Abe

rmai

n 11

0M

275

275

275

265

275

275

275

275

275

275

Abe

rmai

n33

M74

980

1080

1080

1080

1080

1080

1079

1079

1079

10

Alg

este

r33

M51

950

949

948

947

947

947

946

846

845

8

Ash

grov

e W

est

110

M11

128

112

2811

529

116

2911

629

116

2911

429

113

2811

228

111

28

Ash

grov

e W

est

33M

611

601

591

571

571

571

561

551

551

551

Belm

ont

110

M30

636

307

3630

436

299

3529

735

297

3529

434

292

3429

034

288

34

Blac

ksto

ne

(Rac

evie

w)

110

M66

1066

1065

1064

1065

1066

1066

1065

1066

1066

10

Bund

amba

11

0M

2912

2912

2911

2811

2811

2811

2811

2711

2711

2711

Goo

dna

33M

950

950

950

950

960

970

990

100

010

10

102

0

Loga

nlea

11

0M

296

4129

541

291

4028

740

286

4028

840

289

4029

040

290

4029

040

Loga

nlea

33

M71

1570

1569

1467

1466

1466

1466

1465

1465

1465

14

Mid

dle

Rid

ge

(Pos

tman

s R

idge

an

d G

atto

n)11

0M

9711

9711

9511

9411

9311

9311

9211

9111

9011

9010

Mol

endi

nar

110

GC

375

037

30

369

036

40

365

036

70

366

036

50

365

036

50

Mud

geer

aba

110

GC

262

3926

039

256

3825

238

251

3825

138

250

3724

837

249

3724

737

Mud

geer

aba

33G

C18

318

317

317

317

317

317

317

317

317

3

Mur

arrie

11

0M

329

3333

134

328

3332

933

334

3433

534

332

3432

833

325

3332

132

Palm

woo

ds

110

& 1

32M

270

9127

694

275

9327

493

274

9327

794

277

9427

794

281

9528

296

Redb

ank

Plai

ns

11M

191

191

191

191

191

191

191

201

201

201

Ric

hlan

ds

33M

9011

8811

8611

8410

8310

8310

8210

8110

8110

8010

Rock

lea

110

M10

323

9922

9722

9421

9421

9421

9321

9121

9120

9020

Runc

orn

33M

460

470

460

450

450

450

450

440

440

440

Sout

h Pi

ne

110

M72

278

718

7770

476

692

7468

874

690

7468

674

681

7367

973

675

73

Tabl

e A

.12

Ener

gex

conn

ectio

n po

int

fore

cast

of w

inte

r lo

w g

row

th n

ativ

e m

axim

um d

eman

d

30

Page 31: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Con

nect

ion

poin

tVo

ltage

(kV

)Z

one

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

Sum

ner

110

M23

522

521

421

421

420

420

420

419

419

4

Tenn

yson

33

M13

710

133

1013

610

135

1013

510

135

1013

310

132

1013

110

129

10

Wec

ker R

oad

33M

875

865

845

825

815

815

815

805

805

795

Woo

loog

a (G

ympi

e)13

2M

286

028

30

278

027

20

270

027

00

267

026

50

263

026

20

Tabl

e A

.12

Ener

gex

conn

ectio

n po

int

fore

cast

of w

inte

r lo

w g

row

th n

ativ

e m

axim

um d

eman

d (c

ontin

ued)

31

Page 32: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Con

nect

ion

poin

t (1)

2020

/21

2021

/22

2022

/23

2023

/24

2024

/25

2025

/26

2026

/27

2027

/28

2028

/29

2029

/30

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

Tran

smiss

ion

conn

ecte

d in

dust

rial l

oads

(2)

1,14

8 3

77

1,17

1 3

88

1,17

9 3

92

1,17

9 3

92

1,17

9 3

92

1,17

9 3

92

1,17

9 3

92

1,17

9 3

92

1,17

9 3

92

1,17

9 3

92

Tran

smiss

ion

conn

ecte

d m

inin

g lo

ads

(3)

55

16

76

25

96

37

103

4

2 1

12

45

112

4

5 1

22

48

122

4

8 1

22

48

122

4

8

Tran

smiss

ion

conn

ecte

d C

SG lo

ads

(4)

882

1

26

894

1

28

891

1

28

874

1

26

859

1

23

845

1

21

846

1

21

830

1

18

824

1

18

820

1

17

Tran

smiss

ion

conn

ecte

d ra

il su

pply

sub

stat

ions

(5)

(6)

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

Not

es:

(1)

Tran

smis

sion

con

nect

ed c

usto

mer

s su

pply

10‑

year

act

ive

pow

er (

MW

) fo

reca

sts.

The

rea

ctiv

e po

wer

(M

VAr)

fore

cast

s ar

e ca

lcul

ated

bas

ed o

n hi

stor

ical

pow

er fa

ctor

s at

eac

h co

nnec

tion

poin

t.

(2)

Indu

stri

al lo

ads

incl

ude:

R

oss

zone

– In

vict

a M

ill, Q

ueen

slan

d N

icke

l and

Sun

Met

als.

Gla

dsto

ne z

one

– BS

L, R

TA a

nd Q

AL.

(3)

Min

ing

load

s in

clud

e:

Nor

th z

one

– Ea

gle

Dow

ns, G

oony

ella

Riv

ersi

de a

nd N

orth

Goo

nyel

la.

(4)

CSG

load

s in

clud

e:

Sura

t zo

ne –

Col

umbo

ola,

Ora

na a

nd W

ando

an S

outh

. Bu

lli z

one

– Ku

mba

rilla

Par

k.

(5)

Rai

l sup

ply

subs

tatio

ns in

clud

e:

Nor

th z

one

– Bo

lingb

roke

, Cop

pabe

lla, M

acka

y Po

rts,

Min

di, M

t M

cLar

en, O

onoo

ie, P

eak

Dow

ns, W

ando

o an

d W

oton

ga.

Cen

tral

Wes

t zo

ne –

Bla

ckw

ater

, Blu

ff, D

uari

nga,

Gra

ntle

igh,

Gre

gory

, Nor

wic

h Pa

rk, R

agla

n an

d W

ycar

bah.

G

lads

tone

zon

e –

Cal

lem

onda

h.

(6)

The

re a

re a

num

ber

of c

onne

ctio

n po

ints

tha

t su

pply

the

Aur

izon

rai

l net

wor

k an

d th

ese

indi

vidu

al c

onne

ctio

n po

int

peak

s ha

ve b

een

sum

mat

ed. D

ue t

o th

e lo

ad d

iver

sity

bet

wee

n th

e co

nnec

tion

poin

ts, t

he r

eal a

nd r

eact

ive

pow

er (

MW

and

MVA

r) c

oinc

iden

t pe

ak is

sig

nific

antly

low

er.

Tabl

e A

.13

Sum

of i

ndiv

idua

l sum

mer

hig

h gr

owth

nat

ive

peak

fore

cast

dem

ands

for

the

tran

smiss

ion

conn

ecte

d lo

ads

32

Page 33: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Con

nect

ion

poin

t (1)

2020

/21

2021

/22

2022

/23

2023

/24

2024

/25

2025

/26

2026

/27

2027

/28

2028

/29

2029

/30

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

Tran

smiss

ion

conn

ecte

d in

dust

rial l

oads

(2)

1,14

8 3

77

1,17

1 3

88

1,17

4 3

89

1,17

4 3

89

1,17

4 3

89

1,17

4 3

89

1,17

4 3

89

1,17

4 3

89

1,17

4 3

89

1,17

4 3

89

Tran

smiss

ion

conn

ecte

d m

inin

g lo

ads

(3)

55

16

73

23

87

30

97

37

110

4

4 1

10

44

120

4

7 1

20

47

120

4

7 1

20

47

Tran

smiss

ion

conn

ecte

d C

SG lo

ads

(4)

810

1

12

834

1

19

837

1

21

825

1

19

816

1

18

796

1

15

779

1

12

774

1

11

746

1

09

725

1

07

Tran

smiss

ion

conn

ecte

d ra

il su

pply

sub

stat

ions

(5)

(6)

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

Not

es:

(1)

Tran

smis

sion

con

nect

ed c

usto

mer

s su

pply

10‑

year

act

ive

pow

er (

MW

) fo

reca

sts.

The

rea

ctiv

e po

wer

(M

VAr)

fore

cast

s ar

e ca

lcul

ated

bas

ed o

n hi

stor

ical

pow

er fa

ctor

s at

eac

h co

nnec

tion

poin

t.

(2)

Indu

stri

al lo

ads

incl

ude:

R

oss

zone

– In

vict

a M

ill, Q

ueen

slan

d N

icke

l and

Sun

Met

als.

Gla

dsto

ne z

one

– BS

L, R

TA a

nd Q

AL.

(3)

Min

ing

load

s in

clud

e:

Nor

th z

one

– Ea

gle

Dow

ns, G

oony

ella

Riv

ersi

de a

nd N

orth

Goo

nyel

la.

(4)

CSG

load

s in

clud

e:

Sura

t zo

ne –

Col

umbo

ola,

Ora

na a

nd W

ando

an S

outh

. Bu

lli z

one

– Ku

mba

rilla

Par

k.

(5)

Rai

l sup

ply

subs

tatio

ns in

clud

e:

Nor

th z

one

– Bo

lingb

roke

, Cop

pabe

lla, M

acka

y Po

rts,

Min

di, M

t M

cLar

en, O

onoo

ie, P

eak

Dow

ns, W

ando

o an

d W

oton

ga.

Cen

tral

Wes

t zo

ne –

Bla

ckw

ater

, Blu

ff, D

uari

nga,

Gra

ntle

igh,

Gre

gory

, Nor

wic

h Pa

rk, R

agla

n an

d W

ycar

bah.

G

lads

tone

zon

e –

Cal

lem

onda

h.

(6)

The

re a

re a

num

ber

of c

onne

ctio

n po

ints

tha

t su

pply

the

Aur

izon

rai

l net

wor

k an

d th

ese

indi

vidu

al c

onne

ctio

n po

int

peak

s ha

ve b

een

sum

mat

ed. D

ue t

o th

e lo

ad d

iver

sity

bet

wee

n th

e co

nnec

tion

poin

ts, t

he r

eal a

nd r

eact

ive

pow

er (

MW

and

MVA

r) c

oinc

iden

t pe

ak is

sig

nific

antly

low

er.

Tabl

e A

.14

Sum

of i

ndiv

idua

l sum

mer

med

ium

gro

wth

nat

ive

peak

fore

cast

dem

ands

for

the

tran

smiss

ion

conn

ecte

d lo

ads

33

Page 34: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Con

nect

ion

poin

t (1)

2020

/21

2021

/22

2022

/23

2023

/24

2024

/25

2025

/26

2026

/27

2027

/28

2028

/29

2029

/30

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

Tran

smiss

ion

conn

ecte

d in

dust

rial l

oads

(2)

1,14

8 3

77

1,16

5 3

88

1,16

8 3

89

1,16

8 3

89

1,16

8 3

89

1,16

8 3

89

1,16

8 3

89

1,16

8 3

89

1,16

8 3

89

1,16

8 3

89

Tran

smiss

ion

conn

ecte

d m

inin

g lo

ads

(3)

55

16

68

21

79

27

86

32

97

37

97

37

104

4

0 1

04

40

104

4

0 1

04

40

Tran

smiss

ion

conn

ecte

d C

SG lo

ads

(4)

810

1

12

822

1

19

821

1

21

810

1

19

798

1

18

779

1

15

763

1

12

758

1

11

731

1

09

711

1

07

Tran

smiss

ion

conn

ecte

d ra

il su

pply

sub

stat

ions

(5)

(6)

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

Not

es:

(1)

Tran

smis

sion

con

nect

ed c

usto

mer

s su

pply

10‑

year

act

ive

pow

er (

MW

) fo

reca

sts.

The

rea

ctiv

e po

wer

(M

VAr)

fore

cast

s ar

e ca

lcul

ated

bas

ed o

n hi

stor

ical

pow

er fa

ctor

s at

eac

h co

nnec

tion

poin

t.

(2)

Indu

stri

al lo

ads

incl

ude:

R

oss

zone

– In

vict

a M

ill, Q

ueen

slan

d N

icke

l and

Sun

Met

als.

Gla

dsto

ne z

one

– BS

L, R

TA a

nd Q

AL.

(3)

Min

ing

load

s in

clud

e:

Nor

th z

one

– Ea

gle

Dow

ns, G

oony

ella

Riv

ersi

de a

nd N

orth

Goo

nyel

la.

(4)

CSG

load

s in

clud

e:

Sura

t zo

ne –

Col

umbo

ola,

Ora

na a

nd W

ando

an S

outh

. Bu

lli z

one

– Ku

mba

rilla

Par

k.

(5)

Rai

l sup

ply

subs

tatio

ns in

clud

e:

Nor

th z

one

– Bo

lingb

roke

, Cop

pabe

lla, M

acka

y Po

rts,

Min

di, M

t M

cLar

en, O

onoo

ie, P

eak

Dow

ns, W

ando

o an

d W

oton

ga.

Cen

tral

Wes

t zo

ne –

Bla

ckw

ater

, Blu

ff, D

uari

nga,

Gra

ntle

igh,

Gre

gory

, Nor

wic

h Pa

rk, R

agla

n an

d W

ycar

bah.

G

lads

tone

zon

e –

Cal

lem

onda

h.

(6)

The

re a

re a

num

ber

of c

onne

ctio

n po

ints

tha

t su

pply

the

Aur

izon

rai

l net

wor

k an

d th

ese

indi

vidu

al c

onne

ctio

n po

int

peak

s ha

ve b

een

sum

mat

ed. D

ue t

o th

e lo

ad d

iver

sity

bet

wee

n th

e co

nnec

tion

poin

ts, t

he r

eal a

nd r

eact

ive

pow

er (

MW

and

MVA

r) c

oinc

iden

t pe

ak is

sig

nific

antly

low

er.

Tabl

e A

.15

Sum

of i

ndiv

idua

l sum

mer

low

gro

wth

nat

ive

peak

fore

cast

dem

ands

for

the

tran

smiss

ion

conn

ecte

d lo

ads

34

Page 35: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Con

nect

ion

poin

t (1)

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

(7)

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

Tran

smiss

ion

conn

ecte

d in

dust

rial l

oads

(2)

1,17

9 3

94

1,1

87

399

1

,187

3

99

1,1

87

399

1

,187

3

99

1,1

87

399

1

,187

3

99

1,1

87

399

1

,187

3

99

1,1

87

399

Tran

smiss

ion

conn

ecte

d m

inin

g lo

ads

(3)

76

25

96

37

103

4

2 1

12

45

112

4

5 1

22

48

122

4

8 1

22

48

122

4

8 1

22

48

Tran

smiss

ion

conn

ecte

d C

SG lo

ads

(4)

851

1

18

895

1

28

878

1

26

860

1

23

852

1

22

846

1

21

833

1

19

827

1

18

817

1

17

806

1

15

Tran

smiss

ion

conn

ecte

d ra

il su

pply

sub

stat

ions

(5)

(6)

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

Not

es:

(1)

Tran

smis

sion

con

nect

ed c

usto

mer

s su

pply

10‑

year

act

ive

pow

er (

MW

) fo

reca

sts.

The

rea

ctiv

e po

wer

(M

VAr)

fore

cast

s ar

e ca

lcul

ated

bas

ed o

n hi

stor

ical

pow

er fa

ctor

s at

eac

h co

nnec

tion

poin

t.

(2)

Indu

stri

al lo

ads

incl

ude:

R

oss

zone

– In

vict

a M

ill, Q

ueen

slan

d N

icke

l and

Sun

Met

als.

Gla

dsto

ne z

one

– BS

L, R

TA a

nd Q

AL.

(3)

Min

ing

load

s in

clud

e:

Nor

th z

one

– Ea

gle

Dow

ns, G

oony

ella

Riv

ersi

de a

nd N

orth

Goo

nyel

la.

(4)

CSG

load

s in

clud

e:

Sura

t zo

ne –

Col

umbo

ola,

Ora

na a

nd W

ando

an S

outh

. Bu

lli z

one

– Ku

mba

rilla

Par

k.

(5)

Rai

l sup

ply

subs

tatio

ns in

clud

e:

Nor

th z

one

– Bo

lingb

roke

, Cop

pabe

lla, M

acka

y Po

rts,

Min

di, M

t M

cLar

en, O

onoo

ie, P

eak

Dow

ns, W

ando

o an

d W

oton

ga.

Cen

tral

Wes

t zo

ne –

Bla

ckw

ater

, Blu

ff, D

uari

nga,

Gra

ntle

igh,

Gre

gory

, Nor

wic

h Pa

rk, R

agla

n an

d W

ycar

bah.

G

lads

tone

zon

e –

Cal

lem

onda

h.

(6)

The

re a

re a

num

ber

of c

onne

ctio

n po

ints

tha

t su

pply

the

Aur

izon

rai

l net

wor

k an

d th

ese

indi

vidu

al c

onne

ctio

n po

int

peak

s ha

ve b

een

sum

mat

ed. D

ue t

o th

e lo

ad d

iver

sity

bet

wee

n th

e co

nnec

tion

poin

ts, t

he r

eal a

nd r

eact

ive

pow

er (

MW

and

MVA

r) c

oinc

iden

t pe

ak is

sig

nific

antly

low

er.

(7)

Con

nect

ion

poin

t lo

ads

for

win

ter

2030

hav

e be

en e

xtra

pola

ted.

Tabl

e A

.16

Sum

of i

ndiv

idua

l win

ter

high

gro

wth

nat

ive

peak

fore

cast

dem

ands

for

the

tran

smiss

ion

conn

ecte

d lo

ads

35

Page 36: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Con

nect

ion

poin

t (1)

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

(7)

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

Tran

smiss

ion

conn

ecte

d in

dust

rial l

oads

(2)

1,17

8 3

94

1,18

1 3

96

1,1

81

396

1

,181

3

96

1,1

81

396

1

,181

3

96

1,1

81

396

1

,181

3

96

1,1

81

396

1

,181

3

96

Tran

smiss

ion

conn

ecte

d m

inin

g lo

ads

(3)

73

23

87

30

97

37

110

4

4 1

10

44

120

4

7 1

20

47

120

4

7 1

20

47

120

4

7

Tran

smiss

ion

conn

ecte

d C

SG lo

ads

(4)

794

1

10

836

1

19

830

1

20

821

1

18

804

1

16

780

1

12

780

1

12

753

1

10

730

1

07

709

1

05

Tran

smiss

ion

conn

ecte

d ra

il su

pply

sub

stat

ions

(5)

(6)

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

Not

es:

(1)

Tran

smis

sion

con

nect

ed c

usto

mer

s su

pply

10‑

year

act

ive

pow

er (

MW

) fo

reca

sts.

The

rea

ctiv

e po

wer

(M

VAr)

fore

cast

s ar

e ca

lcul

ated

bas

ed o

n hi

stor

ical

pow

er fa

ctor

s at

eac

h co

nnec

tion

poin

t.

(2)

Indu

stri

al lo

ads

incl

ude:

R

oss

zone

– In

vict

a M

ill, Q

ueen

slan

d N

icke

l and

Sun

Met

als.

Gla

dsto

ne z

one

– BS

L, R

TA a

nd Q

AL.

(3)

Min

ing

load

s in

clud

e:

Nor

th z

one

– Ea

gle

Dow

ns, G

oony

ella

Riv

ersi

de a

nd N

orth

Goo

nyel

la.

(4)

CSG

load

s in

clud

e:

Sura

t zo

ne –

Col

umbo

ola,

Ora

na a

nd W

ando

an S

outh

. Bu

lli z

one

– Ku

mba

rilla

Par

k.

(5)

Rai

l sup

ply

subs

tatio

ns in

clud

e:

Nor

th z

one

– Bo

lingb

roke

, Cop

pabe

lla, M

acka

y Po

rts,

Min

di, M

t M

cLar

en, O

onoo

ie, P

eak

Dow

ns, W

ando

o an

d W

oton

ga.

Cen

tral

Wes

t zo

ne –

Bla

ckw

ater

, Blu

ff, D

uari

nga,

Gra

ntle

igh,

Gre

gory

, Nor

wic

h Pa

rk, R

agla

n an

d W

ycar

bah.

G

lads

tone

zon

e –

Cal

lem

onda

h.

(6)

The

re a

re a

num

ber

of c

onne

ctio

n po

ints

tha

t su

pply

the

Aur

izon

rai

l net

wor

k an

d th

ese

indi

vidu

al c

onne

ctio

n po

int

peak

s ha

ve b

een

sum

mat

ed. D

ue t

o th

e lo

ad d

iver

sity

bet

wee

n th

e co

nnec

tion

poin

ts, t

he r

eal a

nd r

eact

ive

pow

er (

MW

and

MVA

r) c

oinc

iden

t pe

ak is

sig

nific

antly

low

er.

(7)

Con

nect

ion

poin

t lo

ads

for

win

ter

2030

hav

e be

en e

xtra

pola

ted.

Tabl

e A

.17

Sum

of i

ndiv

idua

l win

ter

med

ium

gro

wth

nat

ive

peak

fore

cast

dem

ands

for

the

tran

smiss

ion

conn

ecte

d lo

ads

36

Page 37: Appenices TRANSMISSION ANNUAL PLANNING REPORT

2020 TRANSMISSION ANNUAL

PLANNING REPORT Appendices

Con

nect

ion

poin

t (1)

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

(7)

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

MW

MVA

rM

WM

VAr

Tran

smiss

ion

conn

ecte

d in

dust

rial l

oads

(2)

1,17

8 3

94

1,18

0 3

96

1,18

0 3

96

1,18

0 3

96

1,18

0 3

96

1,18

0 3

96

1,18

0 3

96

1,18

0 3

96

1,18

0 3

96

1,18

0 3

96

Tran

smiss

ion

conn

ecte

d m

inin

g lo

ads

(3)

73

23

84

29

91

35

101

4

1 1

01

41

109

4

3 1

09

43

109

4

3 1

09

43

109

4

3

Tran

smiss

ion

conn

ecte

d C

SG lo

ads

(4)

794

1

10

824

1

19

815

1

20

805

1

18

788

1

16

765

1

12

765

1

12

738

1

10

717

1

07

697

1

05

Tran

smiss

ion

conn

ecte

d ra

il su

pply

sub

stat

ions

(5)

(6)

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

255

‑2

58

Not

es:

(1)

Tran

smis

sion

con

nect

ed c

usto

mer

s su

pply

10‑

year

act

ive

pow

er (

MW

) fo

reca

sts.

The

rea

ctiv

e po

wer

(M

VAr)

fore

cast

s ar

e ca

lcul

ated

bas

ed o

n hi

stor

ical

pow

er fa

ctor

s at

eac

h co

nnec

tion

poin

t.

(2)

Indu

stri

al lo

ads

incl

ude:

R

oss

zone

– In

vict

a M

ill, Q

ueen

slan

d N

icke

l and

Sun

Met

als.

Gla

dsto

ne z

one

– BS

L, R

TA a

nd Q

AL.

(3)

Min

ing

load

s in

clud

e:

Nor

th z

one

– Ea

gle

Dow

ns, G

oony

ella

Riv

ersi

de a

nd N

orth

Goo

nyel

la.

(4)

CSG

load

s in

clud

e:

Sura

t zo

ne –

Col

umbo

ola,

Ora

na a

nd W

ando

an S

outh

. Bu

lli z

one

– Ku

mba

rilla

Par

k.

(5)

Rai

l sup

ply

subs

tatio

ns in

clud

e:

Nor

th z

one

– Bo

lingb

roke

, Cop

pabe

lla, M

acka

y Po

rts,

Min

di, M

t M

cLar

en, O

onoo

ie, P

eak

Dow

ns, W

ando

o an

d W

oton

ga.

Cen

tral

Wes

t zo

ne –

Bla

ckw

ater

, Blu

ff, D

uari

nga,

Gra

ntle

igh,

Gre

gory

, Nor

wic

h Pa

rk, R

agla

n an

d W

ycar

bah.

G

lads

tone

zon

e –

Cal

lem

onda

h.

(6)

The

re a

re a

num

ber

of c

onne

ctio

n po

ints

tha

t su

pply

the

Aur

izon

rai

l net

wor

k an

d th

ese

indi

vidu

al c

onne

ctio

n po

int

peak

s ha

ve b

een

sum

mat

ed. D

ue t

o th

e lo

ad d

iver

sity

bet

wee

n th

e co

nnec

tion

poin

ts, t

he r

eal a

nd r

eact

ive

pow

er (

MW

and

MVA

r) c

oinc

iden

t pe

ak is

sig

nific

antly

low

er.

(7)

Con

nect

ion

poin

t lo

ads

for

win

ter

2030

hav

e be

en e

xtra

pola

ted.

Tabl

e A

.18

Sum

of i

ndiv

idua

l win

ter

low

gro

wth

nat

ive

peak

fore

cast

dem

ands

for

the

tran

smiss

ion

conn

ecte

d lo

ads

37

Page 38: Appenices TRANSMISSION ANNUAL PLANNING REPORT