APPROVED MAKE LIST OF EQUIPMENT AND ACCESSORIES 1 PVC rigid conduits & Accessories: 1.5 mm thick ( MMS ) ISI and FIA approved - Precision / Vraj / Nihir / BLP / PFI / Anchor / Polycab make. ( Only white coloured pipes FRLS type to be used. ). 2 L.T. Cables: Havells / KEI / Polycab / R. R. Kable. 3 Wires (FRLS): R. R. Kable / Havells / KEI / Polycab. 4 Main Distribution Boards: MDS Legrand (Lexic ) / Hager / Crabtree XPOA / Schneider ( Eazy 9 ) / L & T EXORA / C & S Wintrip / Siemens Bitaguard. 5 ELCB / RCCB / Miniature Circuit Breaker: MDS Legrand (Lexic ) / Hager / Crabtree XPOA / Schneider ( Eazy 9 ) / L & T EXORA / C & S Wintrip / Siemens Bitaguard. 6 Switch gears: MDS Legrand (Lexic ) / Hager / Crabtree XPOA / Schneider ( Eazy 9 ) / L & T EXORA / C & S Wintrip / Siemens Bitaguard. 7 Change Over Switch: HPL Socomac/ Havells / L & T / Hager. 8 Domestic fittings: a) All Switching Modular Accessories. Schneider Livia / L & T oris / Crabtree Verona / Salzer S90 (Elite Plate) / Legrand Myris. b) Holders / ceiling roses Anchor or equivalent approved make. c) Adhesive Tape Bhor (Steel Grip) or approved . 9 10 - 30 A Polycarbonate Socket & Top: MDS Legrand (Lexic ) / Hager / Crabtree XPOA / Schneider ( Eazy 9 ) / L & T EXORA / C & S Wintrip / Siemens Bitaguard. 10 Telephone Wires / Cable: Finolex / R. R. Kable / Havells / L & T / Polycab. 11 Telephone tag block: Krone make. 12 Cable Lugs: Dowell / Lotus / Jainson / 3 D. 13 Cable gland Single / Double Compression: HMI / Comet / 3D. 14 Ammeter / Voltmeter: AE / HPL /MECO/ Enercon make. 15 Selector switches: L & T salzer / Kaycee make. 16 Indicator lamps: LED type Teknic / Precifine/ Binay. 17 Connector strips: Wago / Elmex make. 18 Lighting Fixtures : Wipro / Philips / GE / Crompton / C&S. / Orient 19 Exhaust fan (Light duty): Khaitan / Crompton / Havells. 20 Ceiling Fan ( 5 star rated ): Crompton ( High Breeze Plus ) / Havells. 21 Wall mounted Fan ( 5 star rated ): Crompton ( High Flow Wave) / Havells. 22 Data Cable - I / O Unit: D - Link / Digi Link. LIGHTING / FAN FIXTURES - SEE CAT NO. & SPECIFIED MAKE IN THE PRICE BID. CONTRACTOR SHOULD USE ONLY ONE COMPANY FOR ALL SWITCHBOARDS / DBS. CONTRACTOR SHOULD SUBMIT SIGNED COPY OF MAKE LIST BEFORE WORK STARTED.

APPROVED MAKE LIST OF EQUIPMENT AND ACCESSORIES … · 14 atm 221d 18 , d 19 15 cdm 221d 20 , d 21 16 ecd 221d 22 , d 23 17 swayam 221d 24 , d 25 total 2 16 8 24 181200 2513 ups ups

Embed Size (px)

Citation preview

APPROVED MAKE LIST OF EQUIPMENT AND ACCESSORIES

1PVC rigid conduits & Accessories:

1.5 mm thick ( MMS ) ISI and FIA approved - Precision / Vraj / Nihir / BLP / PFI / Anchor / Polycab make. ( Only white coloured pipes FRLS type to be used. ).

2 L.T. Cables: Havells / KEI / Polycab / R. R. Kable.

3 Wires (FRLS): R. R. Kable / Havells / KEI / Polycab.

4 Main Distribution Boards:MDS Legrand (Lexic ) / Hager / Crabtree XPOA / Schneider ( Eazy 9 ) / L & T EXORA / C & S Wintrip / Siemens Bitaguard.

5ELCB / RCCB / Miniature Circuit Breaker:

MDS Legrand (Lexic ) / Hager / Crabtree XPOA / Schneider ( Eazy 9 ) / L & T EXORA / C & S Wintrip / Siemens Bitaguard.

6 Switch gears:

MDS Legrand (Lexic ) / Hager / Crabtree XPOA / Schneider ( Eazy 9 ) / L & T EXORA / C & S Wintrip / Siemens Bitaguard.

7 Change Over Switch: HPL Socomac/ Havells / L & T / Hager.

8 Domestic fittings:

a) All Switching Modular Accessories.

Schneider Livia / L & T oris / Crabtree Verona / Salzer S90 (Elite Plate) / Legrand Myris.

b) Holders / ceiling roses Anchor or equivalent approved make.

c) Adhesive Tape Bhor (Steel Grip) or approved .

910 - 30 A Polycarbonate Socket & Top:

MDS Legrand (Lexic ) / Hager / Crabtree XPOA / Schneider ( Eazy 9 ) / L & T EXORA / C & S Wintrip / Siemens Bitaguard.

10 Telephone Wires / Cable: Finolex / R. R. Kable / Havells / L & T / Polycab.

11 Telephone tag block: Krone make.

12 Cable Lugs: Dowell / Lotus / Jainson / 3 D.

13Cable gland Single / Double Compression:

HMI / Comet / 3D.

14 Ammeter / Voltmeter: AE / HPL /MECO/ Enercon make.

15 Selector switches: L & T salzer / Kaycee make.

16 Indicator lamps: LED type Teknic / Precifine/ Binay.

17 Connector strips: Wago / Elmex make.

18 Lighting Fixtures : Wipro / Philips / GE / Crompton / C&S. / Orient

19 Exhaust fan (Light duty): Khaitan / Crompton / Havells.

20 Ceiling Fan ( 5 star rated ): Crompton ( High Breeze Plus ) / Havells.

21Wall mounted Fan ( 5 star rated ):

Crompton ( High Flow Wave) / Havells.

22 Data Cable - I / O Unit: D - Link / Digi Link.

LIGHTING / FAN FIXTURES - SEE CAT NO. & SPECIFIED MAKE IN THE PRICE BID.CONTRACTOR SHOULD USE ONLY ONE COMPANY FOR ALL SWITCHBOARDS / DBS.

CONTRACTOR SHOULD SUBMIT SIGNED COPY OF MAKE LIST BEFORE WORK STARTED.

KAMLESH CHOKSHI

BOQ NO.

BO

Q

A

1.1

BO

Q

A

1.9

BO

Q

A

1.2

BO

Q

A

1.2

BO

Q

A

1.3

BO

Q

A

1 .4

BO

Q

A

1.9

BO

Q

A

2 .1

BO

Q

A

2 .2

BO

Q

A

3

BO

Q

B

4.1

BO

Q

B

4.1

BO

Q

B

4.2

BO

Q

B

4.2

BO

Q

B

4.3

BO

Q

B

4.5

BO

Q

B

4.6

BO

Q

B

4.7

BO

Q

B

4.7

BO

Q

B

4.8

BO

Q

B

4.8

sb 1 nr. Ele. Panel wallLDB - R 1 + inverter

DP8 M - 1 no + 2 M - 2 no 2 1 2 1 1 2 1 4 1

sb 2 bm cabin LDB - Y 1 + inverter

DP PDB - R 1 for AC 6 M - 1 no + 2 M - 2 no 1 2 1 1 1 1 4 1

sb 3on centre column nr. Ser. Mgr. table

LDB - B 1 8 M - 1 no 3 2 1 2 4sb 4 b/h. ser. Mgr. table inverter DP PDB - Y 1 for AC 4 M - 1 no + 2 M - 2 no 2 2 1 2 1

note counting machine nr. Swo 1 table

PDB - R 3 6 M - 1 no 1 1sb 5 cash room LDB - R 2 8 M - 1 no + 3 M - 1 no 1 1 1 1 1 2sb 6

nr. Locker room wall sb - backside entrance

LOOP from SB 1 - R 1

PDB - B 1 for AC 8 M - 1 no + 2 M - 2 no 2 1 1 2 1 2 2 1sb 7

b/h. sale table - on record room wall

LOOP from SB 2 - Y 1 + inverter DP

PDB - R 2 for AC 8 M - 1 no + 2 M - 3 no 2 1 1 1 1 1 1 2 1 2 1sb 8 record / stationary room LDB - Y 2 12 M - 1 no + 3 M - 1 no 2 2 1 1 2 4sb 9 locker room LDB - B 2

8 M - 1 no + 3 M - 1 no + 2 M - 1 no 1 1 1 1 1 1 2

sb 10 backside passage areaLOOP from SB 6 - R

1 + inverter DP4 M - 1 no + 2 M - 1 no 1 1 1 2 1

sb 11 o/s. ups room LOOP from SB 3 - B 1 12 M - 1 no + 2 M - 1 no 3 1 1 1 1 1 1 1 2server room

PDB - Y 3 + Panel Y phase for AC

3 M - 1 no 1 2sb 12 Pantry area

LOOP from SB 7 -Y 1

8 M - 1 no

WATER COOLER PDB - B 3 6 M - 1 no 1 1sb 13 o/s. toilet area

LOOP from SB 11 - B 1

8 M - 1 no + 2 M - 2 no 2 1 2 2 2

TOTAL 18 6 14 0 13 7 5 3 3 6 9 6 18 1 2 3 5 10 0 1 4

2 3 5

Wal

l Fan

1x20

W

led

wal

l

FIXTURES TOTAL ---------------- 10

1x36

W

led

fi

ttin

g

1x20

W

led

wal

l

1 s/

w 1

L

1 s/

w 2

L

Wal

l Fan

A.C

.

S.S.

modular box size on b

oard

pl

ug

519

Ex. F

an

15

1 s/

w 1

L

1 s/

w 3

L

S.S.

ELE. POINTS FOR STATE BANK OF INDIA , VADAVALI BRANCH, VADAVALI, GAO.

Fan

1x36

W

led

fitt

ing

1x11

W

Led

dow

n

1x10

W

MCB PHASE - LOOP FROM SB - CKT.

DAETAILS

MCB PHASE - LOOP FROM SB - CKT.

DAETAILS

S. P

lug

S.B. No. Location of S.B.

1x11

W

Led

dow

n

S. P

lug

RED COLOURED COLUMN IS CONSIDERED FOR INVERTER POINTS. CONTRACTOR SHOULD FOLLOW THE LAYOUT AS PER THIS SCHEDULE. ON SAME LOCATION, TWO SB MUST HAVE DIFF. CIRCUIT MAINS.

KAMLESH CHOKSHI

BOQ ITEM NO. BOQ

A - 1.4BOQ C - 5

BOQ C - 6

BOQ C - 8

BOQ C - 9

BOQ C - 15

BOQ C - 15

BOQ C - 15

BOQ C - 8

BOQ C - 12

BOQ C - 13

BOQ C - 14

1 BM CABIN 1 1 1 1 1 1 1 2 1 D 1 , D 2 T 1 , T 2 , T 3

2 BM CABIN CC TV 13 SER. MGR. 1 1 1 1 1 1 D 3 T 4

4 SWO 1 2 1 2 1 2 1 D 4 , D 5 T 5

5 SWO 2 2 1 2 1 2 1 D 6 , D 7 T 6

6 SWO 3 2 1 2 1 2 1 D 8 , D 9 T 7

7 SERVER ROOM 3 1 3 1 3 1 D 10 , D 11 , D 12 T 8

8 SALES TABLE 1 1 1 1 1 1 D 13 T 9

9 GRAHAK MITRA 1 1 1 1 1 1 D 14 T 10

10 LCD 1 1 1 1 D 15

11TOKEN M/C DISPLAY 1 1 1 D 16

12 QMS SYSTEM 1 1 1 D 17

13 FIRE ALARM PANEL 1 1 T 11

14 ATM 2 2 1 D 18 , D 19

15 CDM 2 2 1 D 20 , D 21

16 ECD 2 2 1 D 22 , D 23

17 SWAYAM 2 2 1 D 24 , D 25

TOTAL 2 16 8 24 1 8 1 2 0 0 25 13

UPS UPS RPP RJ-451 MTR. PATCH CORD

INTERCOM TELE.

IP TELE. FAX TELE.INTERCOM TELE.

Ferruls

DATA TELE. POINTS FOR STATE BANK OF INDIA, VADAVALI BRANCH, VADAVALI, GAO.

I/O NO. ferruls

S.B. No.

Location of S.B.2 MTR. PATCH CORD

RJ 45 CONNECT

OR

LEASE & ISDN

LINES I/O

DIRECT TELE.

CONTRACTOR SHOULD FOLLOW THE LAYOUT AS PER THIS SCHEDULE. Dual I/O plate should not be allowed.

KAMLESH CHOKSHI

MTRS. MTRS. MTRS. MTRS. MTRS. MTRS. MTRS. MTRS. MTRS. NOS NOS MTRS. MTRS. MTRS. NOS NOS NOS NOS MTRS. MTRS. MTRS. MTRS.

BOQ ITEM NO. BOQ F 25.1

BOQ F 25.2

BOQ F 25.3

BOQ F 25.4

BOQ F 25.5

BOQ F 25.6

BOQ F 25.7

BOQ F 25.8

BOQ F 25.10

BOQ F 26.1

BOQ F 26.2

BOQ F 26.3

BOQ F 26.4

BOQ F 26.5

BOQ F 26.6

BOQ F 26.7

BOQ F 26.8

BOQ F 26.10

BOQ E 24.3

BOQ E 24.4

BOQ E 24.1

BOQ E 24.2

1 EARTH PIT

2 MCCB 10 8 20

3 MAIN PANEL 30 2 30 30

4 SIGN BOARD 15 1

5 LDB 5 2 5

6 UPS I/P DB 30 2 50 50

7 ACDB PDB 5 2 5

8 ATMDB 10 2

9 DG SET

10 UPS TO UPS I/P DB 4 2

11 UPS TO UPS O/P DB 4 2

TOTAL 15 0 30 0 20 30 0 10 8 1 0 2 0 6 2 0 8 4 60 50 80 0

12 80

4 C

X 4

.0 s

q.

mm

. Cu

. CA

BL

E

MEASUREMENT SHEET FOR STATE BANK OF INDIA, MITHAPUR BRANCH, OKHA, RAO.

CABLE MEASUREMENT CABLE TERMINATIONS

4 C

X 2

.5 s

q.

mm

. Cu

. CA

BL

E

3.5

X 5

0 sq

. mm

. A

l. C

AB

LE

MA

IN P

AN

EL

4 C

X 2

.5 s

q.

mm

. Cu

. CA

BL

E

8 G

AU

GE

G. I

. W

IRE

S

4 C

X 1

0.0

sq.

mm

. Cu

. CA

BL

E

4 X

25

sq. m

m.

Al.

CA

BL

E

25 s

q. m

m.

LO

AD

WIR

ES

25 X

3

G. I

. S

TR

IP

3 C

X 6

sq

. mm

. C

u. C

AB

LE

8 G

AU

GE

Cu

. W

IRE

S

3 C

X 6

sq

. mm

. C

u. C

AB

LE

4 C

X 1

0.0

sq.

mm

. Cu

. CA

BL

E

4 C

X 4

.0 s

q.

mm

. Cu

. CA

BL

E

4 X

16

sq. m

m.

Al.

CA

BL

E

25 s

q. m

m.

LO

AD

WIR

ES

4 X

25

sq. m

m.

Al.

CA

BL

E

3.5

X 5

0 sq

. mm

. A

l. C

AB

LE

EARTHING DETAILS

4 C

X 6

.0 s

q.

mm

. Cu

. CA

BL

E

SR

. No.

MTRS.DATA CAT - 2 WIRES FROM SERVER KRONE BOX TO BSNL KRONE BOX - BOQ NO . C - 8

25 X

3 C

u.

ST

RIP

4 X

16

sq. m

m.

Al.

CA

BL

E

4 C

X 6

.0 s

q.

mm

. Cu

. CA

BL

E

2 WIRE OF 40 MTRS.

CLIENT : DATE :

PROJECT : ITEM :

a).

b).

c).

d).

e).

f).

g).

a). INSULATION WITH 1 KV MEGGER BETWEENR & Y R & NY & B Y & NB & R B & N

RYBN - Eb).

c). OPERATIONAL VOLTAGE ( 415 / 230 / 110 ) VPOWER CIRCUITCONTROL CIRCUIT

DRAWINGDRAWING

TEST

R & YY & BB & R

HIGH VOLTAGE ( 2.5 KV FOR 1 MIN. ) WITHSTAND

IDENTIFIERS / NAME PLATECOMPONENTS MAKE / RANGE

P. O. DUST & VERMIN PROOFDRAWINGSTANDARD / DRAWINGDRAWINGDRAWINGDRAWING

PANEL TEST CERTIFICATE FOR STATE BANK OF INDIA, VADAVALI, GAO.

LIGHTING PANEL

DISCRIPTION OBSERVATIONREQUIREMENTS

MIN. 50 MEGA OHMS

RYBN & EARTH

HOUSINGSEALING ARRANGEMENTFEEDER ARRANGEMENTINSIDE WIRINGBUSBAR SIZE / CLEARANCE

KAMLESH CHOKSHI

ITEM NO.

1].

2]. 5 AMP. 1000 W POWER POINT15 AMP. 3000 W POWER POINT

3].

4].

R - N Y - N B - N E - N RY YB BR

a). MAIN PANEL

b). UPS DB

5].

R - Y Y - B B - R R - E Y - E B - E N - E

a).

b).

MINUTES.MINUTES.

ohm

100 FP AMP. MCCB

TEST SHEET FOR STATE BANK OF INDIA, VADAVALI, GAO.

I. R. TEST :

LOAD TEST :

R PHASE TO EARTHY PHASE TO EARTH

EARTH RESISTANCE FOR EARTHING ELECTRODE :

VOLTAGE TEST :

INSULATION RESISTANCE TEST :

INSULATION RESISTANCE ( IN MEGA OHMS ) MEASURED BETWEEN

3.5 C X 50 sq. mm. Al. CABLE

VOLTS IN VOLTS

TEST PARTICULARS :

MEGA OHMSMEGA OHMSMEGA OHMSB PHASE TO EARTH

KAMLESH CHOKSHI

ITEM NO.

TEST SHEET FOR STATE BANK OF INDIA, VADAVALI, GAO.

TEST PARTICULARS :

6].

NOS.

a). W CONCELLED POINT WIRING

b). W CONCELLED POINT WIRING

c). W CONCELLED POINT WIRING

d). W CONCELLED POINT WIRING

e). W CONCELLED POINT WIRING

7].

a).

b).

c).

d).

Resistance of earthing electrode or earthing system mega ohms

Resistance maximum of installation mega ohms

INSULATION RESISTANCE FOR THE WHOLE INSTALLATION :

TOTAL

Between each conductors mega ohms

Between each conductors & earth mega ohms

LIGHT POINT WIRING

5 AMP. PLUG POINT

COMPUTER PLUG POINT

15 AMP. PLUG POINT

AC POINT WIRING

TOTAL LOAD CONNECTED :

PARTICULARS OF WORK TYPE OF SYSTEM WIRINGTOTAL LOAD

KAMLESH CHOKSHI

KAMLESH CHOKSHI – DISHITA ELECTRICALS

IMPORTANT POINTS TO BE NOTED

1) Rates for LIGHT, FAN, EX. FAN, CALL BELL, RAW POWER ETC. POINTS includes the cost

of main wires and PVC pipes from LDB-ROW POWER DB to DIFFERENT

SWITCHBOARDS WITH REQUIRE CIRCUITS .

2) Rates for COMPUTER POWER POINTS include the cost of wires and PVC pipes from UPS

DB to COMPUTER POWER POINTS.

3) Rates for COMPUTER I/O include the cost of DATA cables and PVC pipes from SERVER

SWITCH to COMPUTER NODES.

4) Rates for TELE POINTS include the cost of TELEPHONE Wires and PVC pipes from

EPABX/CRONE BOX to TELE. POINTS.

5) Rates for A.C. / POWER POINTS include the cost of wires and PVC pipes from A.C. DB to

DIFFERENT A.C. AND POWER POINTS WITH REQUIRE CIRCUITS.

6) THE CONTRACTOR SHOULD SUBMIT THE BUILTUP SLD OF PANEL, SLD OF

DIFFERENT DBS TO DIFFERENT SWITCHBOARDS WITH NUMBERING, SLD OF

DATARACK TO DIFFERENT I/O POINTS WITH NUMBERING, TELE. KRONE BOX TO

DIFFERENT TELE. POINTS WITH NUMBERING, ETC. AFTER EXECUTION OF THE

BRANCH. – 2 SETS OF COPIES – 1 WITH LAMINATION.

7) THE CONTRACTOR SHOULD USE MAX. 3 CIRCUITS IN ONE CONDUIT FOR UPS &

RAW POWER POINTS.

8) THE CONTRACTOR SHOULD USE MAX. 3 WIRES OF DATA & TELE. IN ONE

CONDUIT.

9) EVERY CONDUIT FOR UPS , RAW POWER , DATA & TELE., POWER POINTS, AC

POINTS , LIGHTING POINTS SB SHOULD BE SEPARATE.

10) FOR DATA & TELE. POINTS, BIG JUNCTION BOX MUST BE REQUIRED.

11) FOR UPS & RAW POWER POINTS, BIG/ SMALL JUNCTION BOX MUST BE REQUIRED.

12) EMPTY CONDUIT MUST BE LAID FOR SECURITY SYSTEM.

13) PVC CONDUITS MUST BE CLAMPED WITH SADDLES IN CEILING ONLY.

14) ELE. CONTRACTOR MUST SUBMIT CERTIFIED LOAD LIST WITH ELE. LICENSE NO. /

SUPERVISOR CERTIFICATE NO.

15) CONTRACTOR SHOULD SUBMIT TEST REPORT.

16) CONTRACTOR SHOULD PRESENT EARTHING PLATES BEFORE EXECUTION.

( I )R - N M. OHMS :

Y - N M. OHMS :

B - N M. OHMS :

( ii ):

:

( iii )

1 OHM :2 OHM :3 OHM :

4 - N - E Volts :

( iv )

( v )

( vi )

( vii )

DATE :

PLACE :

SIGNATURE OF ELECTRICAL SUPERVISOR -

PERMIT NO. :

SIGNATURE OF ELECTRICAL

CONTRACTOR - LICENSE NO. :

15 A - 1000W Power Point - 15 Minutes

EARTH RESISTANCE FOR EACH ELECTRODE IS

CERTIFICATE OF MAKES OF MATERIALS USED IN THE WORK :

CERTIFIED THAT THE EARTHING PALTE / PIPE HAS BEEN VERIFIED AND PLACED AT CORRECT

DEPTH CONFIRMING TO IE RULES.:

CERTIFIED THAT THE ELECTRIFICATION WORK HAS BEEN CARRIED OUT UNDER THE SUPERVISION OF LICENSED ELECTRICAL SUPERVISIOR :

CIRCUIT DIAGRAM:

INSULATION TEST CERTIFICATE BY ELECTRICAL CONTRACTOR

THIS CONTRACTOR IS TO CERTIFY THAT THE WORK IS CARRIED OUT CONFIRMING TO IE RULES & CODE OF PRACTICE. HE HAS TO GIVE THE TEST REPORT IS UNDER :

5 A - 1000W Power Point - 15 MinutesLOAD TEST IS

INSULATION RESISTANCE TEST IS

KAMLESH CHOKSHIDISHITA ELECTRICALS

ELE. CONSULTANT:KAMLESH CHOKSHIDISHITA ELECTRICALSVADODARA

LOAD CALCULATION 09426032096 (M) 08128874936 (M)

No. Load items Qty Kw. Total Kw.NO.

A] A.C.1 1.0 TR HW 2 1.20 2.402 1.5 TR HW 1.80 0.003 2.0 TR HW 3 2.40 7.204 3.0 TR CASSETTE 3.60 0.005 4.0 TR CASSETTE 4.80 0.006 7.5 TR DUCTABLE 9.00 0.007 8.5 TR DUCTABLE 10.20 0.008 17.0 TR VRF 20.40 0.00

B] LIGHTING FIXTURES1 1 X 40 W LED SQUARE 15 0.04 0.602 12 W LED FIXTURE 19 0.015 0.293 1 X 10 W MINOLTA 2 0.01 0.024 1 X 18 W DOWN LIGHTER 0.04 0.005 1 X 20 W T/L 10 0.02 0.206 CEILING FAN 5 0.06 0.307 WALL FAN / PEDSTRAL FAN 6 0.06 0.368 EX. FAN 3 0.07 0.219 LCD 2 0.25 0.50

10 WATER COOLER / FREEZE 1 0.3 0.3011 SIGN BOARD 1 1.00 1.0012 1 X 36 W STREETLIGHT 0.04 0.0013 BORE MOTOR 0.75 0.00

C] COMPUTER SYSTEM1 UPSS - 10 KVA 8.00 0.002 UPSS - 5 KVA 1 4.00 4.003 UPSS - 3 KVA 2.40 0.004 UPSS - 2 KVA 1 1.60 1.605 UPSS - 1 KVA 0.80 0.006 COMPUTERS 10 0.25 2.507 PRINTERS - BIG 1 0.30 0.308 PRINTERS - DRAFT / PASSBOOK 4 0.30 1.209 NOTE COUNTING M/C 1 0.50 0.50

10 ATM 1 5.00 5.00TOTAL LOAD REQUIRED KW 28.48

TOTAL LOAD SANCTIONED

EXTRA LOAD DEMANDED KW 28.48

31.64

KW = 1.71 *V*I*0.85PER PHASE AMP. 44.52

BRANCH: SBI VADAVALI BRANCH, GAO.

DEMAND LOAD IN KVA

[email protected]@gmail.com

[email protected]

Ramp Ramp

RECORD ROOM

3700 X 4250

LOCKER ROOM

3650 X 2450

CASH ROOM

2300 X 3070

L.TOILET

1220 X 2000

G.TOILET

1530 X 2000

PANTRY

2480 X 2000

UPS

2150 X 2000

SERVER

1840 X 3180

2.0

TR

2

2.0 TR

32.0 TR

4

1

1.0

TR

8

1.0

TR7

5

1.0

TR

6

1.0

TR

1.0

TR

low

height storage

ATMCDM

SWA

YAM

ECD

ELE. PANELLDB, ACDB - PDB,EMERGENCY DB

BRANCH HEAD

3350 X 2800

SER.MANAGER

ENTRY

E lobby

3700 X 2900

T R A N

S A C T I O

N

SALES

GRAHAK MITRA

SW

O 1

SW

O 2

SW

O 3

FAN POINT (1200 MM SWEEP)

20 A / 25 A. DP MCB WITH METAL ENCLOSURE FOR A.C.

5/15 A SOCKET WITH SWITCH

SWITCH BOARD WITH 5 A PLUG POINT

L E G E N D

DBS. & ELE. PANEL,

1X40 W LED RECESS MOUNTED TUBE LIGHT (2' X 2')

area 84.27 sq. mtrs. : 595 W LED fixutres ::: 7.06 W / sq. mtr.area 165.45 sq. mtrs. : 28.48 KW load :::: 0.172 KW / sq. mtr. :::: 172 W / sq. mtr.

SPEAKER POINT

L E G E N D

EXHAUST FAN

1 X 20 W LED SURFACE MOUNTED TUBE LIGHT - 4' FEET

1 x 7 W LED SURFACE MOUNTED (U.T) FIXTURE

WALL FAN

1 X 36 W STREET LIGHT FIXTURE ( CFL)

DECORATIVE HANGING LIGHT - LED

3 W LED LIGHT

DECORATIVE EYE BALL 6 W LED LIGHT

L E G E N D

5 A SOCKET ONLY

5 A SWITCH + 5 A SOCKET

PICTURE LIGHT POINT

1X11W LED DOWNLIGHTER LIGHT POINT

* DWGS. ARE PROPERTY OF "STUDIO 919 "& SHALL NOT BE COPY WITHOUT PERMISSION

50

010

25

100

50

100

25

100NOTE :

* ALL DIMENSIONS ARE TO BE READ, NOT TO BE MEASURED.

*ALL DIMENSIONS ARE IN FEET - INCHES

* BEFORE STARTING CONSTRUCTION, THE CONTRACTOR/SUB CONTRACTOR SHALL REVIEW AND VERIFY. ALL

DRGS,DIMENSION AND CONDITIONS, DISCREPANCIES. IN THE DRGS, OR IN BETWEEN THE DRGS AND ACTUAL. FIELD

CONDITIONS SHALL BE REPORTED TO THE ARCHITECTS BEFORE STARING CONSTRUCTION.

* THE ARCHITECTS SHALL NOT BE RESPONSIBLE IN ANY WAY FOR THE CONTRACTOR/ SUB CONTRACTOR

COMPLIANCE WITH SAFETY AND REGULATION.

*ANY AMBIGUITY FOUND, CONTACT ARCHITECT / INTERIOR DESIGNER BEFORE EXECUTION.

* DWGS. ARE PROPERTY OF "STUDIO 919 ARCHITECTS"& SHALL NOT BE COPY WITHOUT PERMISSION

STUDIO 919SBI-VADAVALI

NTS

SHAILESH

DEVDATT

06.08.18

DEVDATT PANDYA+91 9879 234 919

Architect

"VADAVALI" BRANCH AT, GUJARAT.STATE BANK OF INDIA

2nd Flr. - 8, AJITNATH SOC., Nr. PALDI P.O.,AHMEDABAD - 380007, INDIA.

TELEFAX: 079 - 26630154, EMAIL: [email protected]

01

ELECTICAL LAYOUTdate: 06.08.2018

low

height storage

low

height storage

low

height storage

Ramp Ramp

ATMCDM

SWA

YAM

ECD

electrical panel

BRANCH HEAD

3350 X 2800

SER.MANAGER

ENTRY

RECORD ROOM

3700 X 4250

E lobby

3700 X 2900

LOCKER ROOM

3650 X 2450

T R A N

S A C T I O

N

CASH ROOM

2300 X 3070

L.TOILET

1220 X 2000

G.TOILET

1530 X 2000

PANTRY

2480 X 2000

UPS

2150 X 2000

SERVER

1840 X 3180

1075mm WIDE PASSAGE

low

height storage

DA

TA R

AC

KTE

LE. K

RO

NE

BOX

UPS I/P DBUPS O/P DB

QMSMACHINE FIRE

ALARMPANEL

TOK

ENM

AC

HIN

ED

ISPL

AY

LCD

TV

CCTV

1]. For data rack - two ups points should be laid from diff. ups units for continuous power supply of data rack.2]. In E Lobby - two ups points should be laid from diff. ups units for continuous power supply of ATM.3]. ONE SEPARATE UPS CIRCUIT SHOULD BE LAID IN BM CABIN FOR CCTV & COMPUTER SUPPLY.4]. 6 A. S. PLUG UPS SUPPLY FOR FIRE ALARM SYSTE & ONE TELE. POINT .5]. 6 A. S. PLUG UPS SUPPLY & DATA I/O FOR QM SYSTEM .

SALES

GRAHAK MITRA

SW

O 1

SW

O 2

SW

O 3

F

D 1 , D 2T 1 , T 2 , T 3

D 3T 4

D 4 , D 5T 5

D 6 , D 7T 6

D 8 , D 9T 7

D 10 , D 11 , D 12T 8

D 13T 9

D 14T 10

D 15

D 16

T 11

D 1

8 , D

19

D 2

0 , D

21

D 2

2 , D

23

D 2

4 , D

25

D 17

L E G E N D2 NOS. 6 A. SOCKET WITH ONE NO.

6 A. SWITCH.

2 NOS. 6 A. SOCKET + ONE NO. 16 A.

SOCKET WITH ONE NO. 16 AMP.

SWITCH WITH INDICATOR.

COMPUTER DATA I/O NODE.

L E G E N D

F

INTERCOM TELE. RJ 11 JACK POINT.

DIRECT TELE. RJ 11 JACK POINT.

IP TELE. RJ 45 JACK POINT.

FAX TELE. RJ 11 JACK POINT.

UPS DB - I/P DB & O/P DB.

L E G E N D300 X 300 X 40 mm FLOOR JUNCTION BOX.

150 X 150 X 40 mm FLOOR JUNCTION BOX.

UPS / RAW POWER - PIPE LINE.

DATA / TELE. - PIPE LINE.

20 / 25 mm DIA. PIPE BEND.

* DWGS. ARE PROPERTY OF "STUDIO 919 "& SHALL NOT BE COPY WITHOUT PERMISSION

50

010

25

100

50

100

25

100NOTE :

* ALL DIMENSIONS ARE TO BE READ, NOT TO BE MEASURED.

*ALL DIMENSIONS ARE IN FEET - INCHES

* BEFORE STARTING CONSTRUCTION, THE CONTRACTOR/SUB CONTRACTOR SHALL REVIEW AND VERIFY. ALL

DRGS,DIMENSION AND CONDITIONS, DISCREPANCIES. IN THE DRGS, OR IN BETWEEN THE DRGS AND ACTUAL. FIELD

CONDITIONS SHALL BE REPORTED TO THE ARCHITECTS BEFORE STARING CONSTRUCTION.

* THE ARCHITECTS SHALL NOT BE RESPONSIBLE IN ANY WAY FOR THE CONTRACTOR/ SUB CONTRACTOR

COMPLIANCE WITH SAFETY AND REGULATION.

*ANY AMBIGUITY FOUND, CONTACT ARCHITECT / INTERIOR DESIGNER BEFORE EXECUTION.

* DWGS. ARE PROPERTY OF "STUDIO 919 ARCHITECTS"& SHALL NOT BE COPY WITHOUT PERMISSION

STUDIO 919SBI-VADAVALI

NTS

SHAILESH

DEVDATT

06.08.18

DEVDATT PANDYA+91 9879 234 919

Architect

"VADAVALI" BRANCH AT GUJARAT.STATE BANK OF INDIA

2nd Flr. - 8, AJITNATH SOC., Nr. PALDI P.O.,AHMEDABAD - 380007, INDIA.

TELEFAX: 079 - 26630154, EMAIL: [email protected]

01

NETWORK LAYOUTdate: 06.08.2018

MAIN MCCB FPBOX 100 A.

3.5 C X 50 sq.mm.AL Cable

MAIN PANEL FP MCCB100 A.

CHANGE OVER

125 A. Al. BUS BAR

25 sq.mm.singlewire (4 wires)

40A DP+Timer for signboard(1 nos)

4 C x 2.5 sq.mm.Cu Cable

FOR signboard

MAIN PANEL

UPS I/P DBDP

UPS 1

UPS O/P DB

BANKINGHALL UPSPOINTS

SERVERUPSPOINTS

S. L. D. FOR PANEL & DBS WIRING + CABLING

DISHITA ELECTRICALSELECTRICAL CONSULTANT

GF, 30/B, UMA COLONY, WAGHODIA ROAD,VADODARA - 390019.094260 32096(M) , 081288 74936 (M)[email protected], [email protected],[email protected]

RINA CHOKSHI

KAMLESH CHOKSHI(B.E. ELECTRICAL)

01-08-2018.

ELE. CONTROL DIAGRAM.

LOCATION : - VADAVALI BRANCH, VADAVALI.

CLIENTS : - VADAVALI BRANCH, STATE BANK OFINDIA , GAO.

DATE DRAWNBY:SCALE

PROJECTTYPE: CHECKEDBY

REV.DATE

REV.NO.

6 sq.mm.singlewire (2 wires)

25A DP+Timer for SERVER AC(1 nos)

2x4.0 sq.mm. + 1x2.5 sq. mm. wires

FOR SERVER AC

125 A. Al. BUS BAR

4 sq.mm.single wire (1 wires) USED FOREARTH WIRE

25 sq.mm.singlewire (4 wires)

DG SET

10 sq.mm.X 4Ccable

UPSCIRCUITS

40 Amp.FPLDB MCB

FORLDB

6 sq.mm.singlewire (4 wires)

63 Amp.SPAREMCB

6 sq.mm.singlewire (4 wires)

THE CONTRACTOR SHOULD FOLLOW THIS PANEL SLD & GA DRAWING & MAKE THE PANEL WITH CPRI / ERDA GUIDELINES , TERMS & CONDITIONS. ALSO SUBMIT THE TEST CERTIFICATE AS PER PERFOMA GIVEN IN TENDER.

63 Amp.ACDBPDBMCB

FORACDBPDB

4 C x 16 sq.mm.Al. Cable

10 sq.mm.singlewire (4 wires)

4 C x 16 sq.mm.Al. Cable

10 sq.mm.X 3Ccable

UPS I/P DBDP

UPS 2

UPS O/P DB

6 sq.mm.X 4Ccable

UPSCIRCUITS

6 sq.mm.X 3Ccable

4 sq.mm.singlewire (2 wires)

06A DP+Timer for digital clock(1 nos)

2x2.5 sq.mm. + 1x1.0 sq. mm. wires

FOR digitalclock

10 sq.mm.singlewire (4 wires)

10 sq.mm.singlewire (4 wires)

63 Amp.FPATMDB MCB

FORATMDB

4 C x 16 sq.mm.Al. Cable

10 sq.mm.singlewire (4 wires)

63 Amp. FPUPS DBMCB

FORUPSDB

4 C x 6 sq.mm.Cu Cable

G. A. DRAWING FOR MAIN PANEL - SBI VADAVALI BRANCH, GAO.

cablealley

busbarchamber

changeoverswitch

FP MCCBwithbusbar

busbarchamberA - V metersselector switchescontrol fuses

Indicator lampscontrol fuses

leftsideview

1 nos DPMCB

signboard+ Timer

+ Contactor

rightsideviewcable

alley

1 nos FPMCBs

forUPS

DB

1 nosDP

MCBserver

AC

1 nosDP

MCBdigital

clock

1 nos FPMCBs

forACDB

PDB

1 nosFP

MCBsfor

SPARE

1 nos FPMCBs

forATM

DB

1 nosFP

MCBsfor

LDB

Ramp Ramp

ATMCDM

SWA

YAM

ECD

electrical panel

BRANCH HEAD

12'-0"X9'-0"

low

height storage

SER.MANAGER

low

height storage

ENTRY

low

height storage

RECORD ROOM

12'-0" X 13'-10"

E lobby

12'-0" X 10'-0"

LOCKER ROOM

11'-11" X 8'-0"

BANKING HALL

27'-1" X 33'-1"

S A L E S

T R A N

S A C T I O

N

CASH ROOM

7'-6" X 10'-0"

L.TOILET

4'-0" X 6'-6"

G.TOILET

5'-0" X 6'-6"

PANTRY

8'-1" X 6'-6"

UPS

7'-0" X 6'-6"

SERVER

6'-0" X 10'-4½"

3'-6" WIDE PASSAGE

5'3"

5'3"

5'3"

7'-1

0"3"

9'

300 X 300 X 40 mm FLOOR JUNCTION BOX.

150 X 150 X 40 mm FLOOR JUNCTION BOX.

UPS / RAW POWER - PIPE LINE.

DATA / TELE. - PIPE LINE.

1 # 25 MM PIPE

fix 1" PVC bends of 10 nos.

here from this j. box

1 # 25 MM PIPE

8'-2"

5"

1'9'

-6"

1'10

'-9"

2"

5'-2" 1'8'

-3"

1'

5'-2"

8'-2"

2'

10'-5

"

3'-8"

1'-3"

6'5'

-3"

3 # 25 MM PIPE

2 # 25 MM PIPE

4 # 25 MM PIPE

2 # 25 MM PIPE

3 # 25 MM PIPE

1 # 25 MM PIPE

3 # 25 MM PIPE

3 # 25 MM PIPE

2 # 25 MM PIPE

2 # 25 MM PIPE2 # 25 MM PIPE

3 # 25 MM PIPE

1 # 25 MM PIPE

5 # 25 MM PIPE

1 # 25 MM PIPE

9 # 25 MM PIPE

4 # 25 MM PIPE

2 # 25 MM PIPE

3 # 25 MM PIPE

fix 1" PVC bends of 10 nos.

here from this j. box

fix 1" PVC bends of 10 nos.

here from this j. box

* DWGS. ARE PROPERTY OF "STUDIO 919 "& SHALL NOT BE COPY WITHOUT PERMISSION

50

010

25

100

50

100

25

100NOTE :

* ALL DIMENSIONS ARE TO BE READ, NOT TO BE MEASURED.

*ALL DIMENSIONS ARE IN FEET - INCHES

* BEFORE STARTING CONSTRUCTION, THE CONTRACTOR/SUB CONTRACTOR SHALL REVIEW AND VERIFY. ALL

DRGS,DIMENSION AND CONDITIONS, DISCREPANCIES. IN THE DRGS, OR IN BETWEEN THE DRGS AND ACTUAL. FIELD

CONDITIONS SHALL BE REPORTED TO THE ARCHITECTS BEFORE STARING CONSTRUCTION.

* THE ARCHITECTS SHALL NOT BE RESPONSIBLE IN ANY WAY FOR THE CONTRACTOR/ SUB CONTRACTOR

COMPLIANCE WITH SAFETY AND REGULATION.

*ANY AMBIGUITY FOUND, CONTACT ARCHITECT / INTERIOR DESIGNER BEFORE EXECUTION.

* DWGS. ARE PROPERTY OF "STUDIO 919 ARCHITECTS"& SHALL NOT BE COPY WITHOUT PERMISSION

STUDIO 919SBI-VADAVALI

NTS

SHAILESH

DEVDATT

06.08.18

DEVDATT PANDYA+91 9879 234 919

Architect

"VADAVALI" BRANCH AT GUJARAT.STATE BANK OF INDIA

2nd Flr. - 8, AJITNATH SOC., Nr. PALDI P.O.,AHMEDABAD - 380007, INDIA.

TELEFAX: 079 - 26630154, EMAIL: [email protected]

01

FLOOR CONDUIT LAYOUTdate: 06.08.2018