Industry’s preferred partner for handling flexible products
• Globally renowned for laying and retrieving flexible and semi‐rigid products• Unparalleled track record in:
• Shallow and deepwater operations• Off and onshore installations• Transpooling• Recovery and decommissioning projects
Modular drive systems | Tensioners | Carousel | Installation reels
More than equipment suppliers…
• Engineered solutions • Deck layouts and packing drawings• Structural checks• Compliance to regulations • Offshore procedures
• Operation management• Offshore personnel• Equipment preparation• Logistics• Interface management• Supplier integration• Disposal management of scrap product
…with 40 years of offshore experience, our peoplemake the difference
Case Study: North Sea Anasuria project
Decommissioning project for a major Operator including recovery, cutting and disposal of a dynamic umbilical .
Phase 1
• Detailed engineering
• Offshore recovery procedures
• Disposal management planning
Phase 2
• Supply of personnel and equipment
• Offshore recovery of a 6” umbilical
• Transport reel + product to WallsendDisposal Site
Phase 3
• NORM testing
• Flushing and nitrogen purging
• Off‐spooling of used product
• Cutting product
• Waste management control
• Recycling product
Phase 2 Offshore Campaign: Dynamic control umbilical
Length 955 ft
OD 6.5“
Material Polyurethane coating w/ armour wire sheath
Static MBR 6.4 ft
Dynamic MBR 8.1 ft
Nominal Weight in Air 40.2 lb/ft
End Terminations Static UTA
Phase 2 Offshore Campaign: Deck layout
400te Power Reel Drive with Tracks
15te Tensioner
Lay Ramp
8.5m Reel
Lay ramp 400te reel drive system with tracks
15te tensioner
8.5m Installation reel
Phase 2 Offshore Campaign: Full spread of equipment
Phase 3 Onshore Campaign: Contamination and testing
• NORM testing conducted prior to offloading
• A 33 foot umbilical section was collected behind the bend stiffener for product testing
Phase 3 Onshore Campaign: Planning
Reel + Product 15te Tensioner150te PRDCutting area with fluid containment
Phase 3 Onshore Campaign: Flushing and purging
• Injection of potable water and gaseous nitrogen displacing umbilical fluid into waste tanks
6” Umbilical Contents
Lines 1 to 5 Castrol Brayco SV/3
Lines 6 & 7 Mi‐SWACO Methanol
Line 8 Scale Inhibitor
Lines 9 & 10 Corrosion Inhibitor
E1 & E2 Power Cores
E3 & E4 Signal Cores
Phase 3 Onshore Campaign: Cutting and disposal
• Significant safety precautions to ensure no personnel injury or environmental pollution
• Plastic sheeting is applied at cut ends to capture any remain fluids
Results and Value Proposition
• Executed both the offshore and onshore campaigns safely for our people and the environment
• Developed capability to offer turnkey solution for disposal with an integrated supply chain
• Capable of managing multiple interfaces on behalf of the customer
• Received licensing to perform disposal at Peterhead site for future projects.
Case Study: Recovery of bundled systems
• 9 different bundled line types• Limited deck space• Full contamination control
500te RDS w/ tracks
200te RDS
50Te Tensioner
Control Umbilical
6” ProdRiser
2” ID GasLift Riser
200te RDS
Level Winder
Handling Area
• It’s 40 years of accumulated expertise and working together to achieve smarter solutions
• It’s taking safety seriously and never cutting corners• It’s a commitment to being the best and a passion for quality• It’s maintaining a progressive outlook and answering future needs before they
arise• It’s rapidly delivering dependable solutions and getting the job done, whatever it
takes.