Click here to load reader

AR - University of Melbourne · PDF file library studio hall workspace workspace workspace workspace workspace airlock machine workshop workspace amenities amenities amenities amenities

  • View
    2

  • Download
    0

Embed Size (px)

Text of AR - University of Melbourne · PDF file library studio hall workspace workspace workspace...

  • LIBRARY

    STUDIO HALL

    WORKSPACE WORKSPACE

    WORKSPACE

    WORKSPACE WORKSPACE

    AIRLOCK

    MACHINE WORKSHOP

    WORKSPACE

    AMENITIES

    AMENITIES

    AMENITIES

    AMENITIES

    Masson Road

    Building Redmond Barry

    LARGE LECTURE THEATRE LIBRARY

    B138B117B202

    G29G24 G23

    SPACE WORKSHOP BENCH

    135

    132

    124

    233

    221 219

    344

    329

    WORKSPACE

    334

    437

    423

    425 WORKSPACE

    429

    STAIR 3

    (EXTERNAL) ENTRY

    FOYER

    UFAD / MECH. PLENUM

    02

    4311

    218

    RL 65.500

    5 0 0

    9 0 0

    1 0 0 0

    5 0 0

    5 0 0

    35°

    9 5 0

    4 5 0

    133

    000C R07

    PLANTPLANTPLANT R06R05

    5 0 0

    9 0 0

    1 0 0 0

    5 0 0

    5 0 0

    35°

    9 5 0

    4 5 0

    A B C D E F G H 9000300082507250300090007500

    CCC

    3502

    BBB

    3501

    AAA

    3500

    L01 +48.50m

    L02 +52.50m

    L03 +56.50m

    L04 +60.50m

    L05 +64.50m

    G01 +43.40m

    G01 +42.65

    G01 +41.30m

    B01 +38.50m

    B01 +37.20m

    B01 +36.00m

    B02 +34.68m

    B02 - SSL +34.56m

    PARAPET +65.50m

    FCL +63.40m

    1 0 0 0

    1 1 0 0

    2 9 0 0

    1 1 0 0

    2 9 0 0

    FCL +59.40m

    1 1 0 0

    2 9 0 0

    FCL +55.40m

    1 1 0 0

    2 9 0 0

    FCL +51.40m

    B01 +37.50m

    B01 +38.00m

    9 8 0

    4 4 5 0

    4 0 0 0

    4 0 0 0

    4 0 0 0

    4 0 0 0

    5 1 0 0

    4 9 0 0

    1 3 0 0

    2 5 2 0

    PARAPET +68.95m

    PARAPET +69.93m

    2 2 4 2

    Project No.

    Drawing No.

    FILENAME - $FILE$

    Date Drwn Co-Ord Chck

    Revision

    Title

    AND DRAWINGS COPYRIGHT OF THIS DRAWING IS VESTED IN WARDLE

    DRAWING SHOULD BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACT, SPECIFICATIONS

    BY THE CONSULTANT. FIGURED DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED. THIS

    SHALL NOT COMMENCE PRIOR TO THE RETURN OF UNAMENDED SHOP DRAWINGS SIGNED

    ALL SHOP DRAWINGS SHALL BE SUBMITTED TO THE SUPERINTENDENT AND MANUFACTURE

    CONTRACTORS SHALL VERIFY JOB DIMENSIONS BEFORE ANY JOB COMMENCES.

    Rev Amd DateRevision DescriptionIssue

    Scale

    THIS DRAWING IS AN UNCONTROLLED COPY UNLESS STAMPED OTHERWISE

    +1 617 442 6232

    Facsimile

    +1 888 442 1417

    Email

    Telephone

    1920 Washington

    Street No.2

    Boston

    Massachusetts

    02118 USA [email protected]

    NADAAA

    0913

    AR

    Project

    Client

    Parkville Campus

    University of Melbourne

    Building and Planning

    Faculty of Architecture

    Tel : +61 3 8662 0400 www.johnwardlearchitects.com

    ABN 83 006 814 268© 2012 John Wardle Architects

    25 Rokeby Street, Collingwood, Victoria 3066 Australia

    FOR CONSTRUCTION

    General Notes

    REFER ARCHITECTURAL DRAWINGS:

    AR6550-AR6554SCREEN DETAILS

    AR1552-AR1557SCREEN SETOUT

    AR1512-AR1517PRECAST SETOUT

    AR1502-AR1507FACADE SETOUT

    - - -

    3505 A

    1:100 @ A0

    1:200 @ A2

    GENERAL ARRANGEMENT

    SECTION F

    Sept 2011

    SG - 07.10.11PRELIMINARY DD01

    SG -PRELIMINARY DD02 02.11.11

    SG -DESIGN DEVELOPMENT ISSUE 22.12.1103

    SG - 20.01.12DD UPDATE04

    SG - 24.02.12FINAL DD ISSUE05

    06 SG -25% CD ISSUE 20.04.12

    06

    6102

    05

    6102

    03

    6114

    01

    6204

    02

    6106

    03

    6204

    02

    6114

    01

    6114

    05

    6114

    04

    6114

    SG - 01.06.1250% CD ISSUE07

    SIM.

    SG -08 08.06.1250% CD ISSUE - UPDATE

    09 SG -75% CD ISSUE 13.07.12

    10 SG 90% CD ISSUE - 10.08.12

    09

    3554

    SG - 07.09.12100% CD - TENDER ISSUE11

    02

    6204

    SIM.

    06

    6104

    05

    6104

    SG - 21.03.13PRECAST REVIEW12

    SG13 VALUE MANAGEMENT ISSUE 28.03.13

    SGA ISSUED FOR CONSTRUCTION 10.01.14

Search related