8

Aramco ExPats...cement into void space under the Refinery's outfall canal, which bad been drained, and a six-inch cement pad was laid on the floor of the canal. Marine growth was cleared

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)