42
BS5837:2012 Trees in relation to design, demolition and construction Recommendations Arboricultural Method Statement 28 Maiden Lane, Langley Green, Crawley, RH11 7QR. 25 November 2015 Author: Matthew Middle Dip., (Arb.), Tech.Arbor.A.

Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

  • Upload
    hathu

  • View
    358

  • Download
    6

Embed Size (px)

Citation preview

Page 1: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

BS5837:2012

Trees in relation to design, demolition and construction –

Recommendations

Arboricultural Method Statement

28 Maiden Lane,

Langley Green,

Crawley,

RH11 7QR.

25 November 2015

Author: Matthew Middle Dip., (Arb.), Tech.Arbor.A.

Page 2: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Arbtech Consulting Ltd 5678552 GB903660148 Directors: R. M. Oates Unit 3 Well House Barn, Chester Road, Chester, CH4 0DH Tel. 01244 661170 Web. www.arbtech.co.uk

pg. 2 28 Maiden Lane – Arbtech AMS 02

Table of Contents

If this report has been released electronically the appendices referred to herein can be

found in the annexed zip folder/s as .pdf or .dwg files. If this report has been released in

hard copy the appendices will be bound into the back of this report. Plans may be

annexed separately as A1 or A2 copies where a bound-in A3 copy is not appropriate.

Executive Summary .................................................................................................................................... 3

General Information .................................................................................................................................... 4

Tree Survey .................................................................................................................................................. 5

Arboricultural Impact Assessment ............................................................................................................ 6

Arboricultural Method Statement .............................................................................................................. 7

Accidents and emergencies involving trees........................................................................................ 7

Phasing of tree protection measures ................................................................................................... 7

Tree Works ............................................................................................................................................... 8

Protected Species ................................................................................................................................. 10

Site Management .................................................................................................................................. 12

Prohibition .............................................................................................................................................. 13

Sequencing of works ............................................................................................................................ 14

Protective Measures ............................................................................................................................. 15

Demolition .............................................................................................................................................. 19

Construction ........................................................................................................................................... 20

Services .................................................................................................................................................. 26

Landscaping ........................................................................................................................................... 28

Monitoring and Supervision ................................................................................................................. 29

Appendix 1: Tree Survey Schedule........................................................................................................ 31

Appendix 2: Tree Protection Notice ....................................................................................................... 35

Appendix 3: Cellweb TRP® Weight Capabilities ................................................................................. 37

Appendix 4: Reinforcement with Cellweb TRP® ................................................................................. 39

Appendix 5: Contact Details .................................................................................................................... 41

Document Production Record ................................................................................................................. 42

Page 3: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Arbtech Consulting Ltd 5678552 GB903660148 Directors: R. M. Oates Unit 3 Well House Barn, Chester Road, Chester, CH4 0DH Tel. 01244 661170 Web. www.arbtech.co.uk

pg. 3 28 Maiden Lane – Arbtech AMS 02

Executive Summary

This report describes the extent and effect of the proposed development at 28 Maiden

Lane, Langley Green, Crawley, RH11 7QR (“site”) on individual trees and groups of

trees within and adjacent to the site.

Trees within the site were surveyed; using a methodology guided by British Standard

5837:2012 ‘Trees in relation to design, demolition and construction –

Recommendations’ (“BS5837”).

Subsequently, this report has been produced, balancing the layout of the proposed

development against the competing needs of trees. This report comprises all of the

requisite elements of an arboricultural implications assessment, method statement and

supporting plans.

Checklist for Submission to Local Planning Authority

Tree survey

Tree constraints plan

Arboricultural method statement

Tree protection plan

This report and its appendices follow precisely the strategy for arboricultural appraisal

intended to provide local planning authorities with evidence that trees have been

properly considered throughout the development process.

It is the conclusion of this report that the overall quality and longevity of the amenity

contribution provided for by the trees and groups of trees within and adjacent to the site

will not be adversely affected as a result of the local planning authority consenting to the

proposed development. It is considered that any issues raised in this report, or beyond

the scope of it can be dealt with by planning conditions.

Page 4: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Arbtech Consulting Ltd 5678552 GB903660148 Directors: R. M. Oates Unit 3 Well House Barn, Chester Road, Chester, CH4 0DH Tel. 01244 661170 Web. www.arbtech.co.uk

pg. 4 28 Maiden Lane – Arbtech AMS 02

General Information

Client: Mr R and Mr G Dias

Site: 28 Maiden Lane, Langley Green, Crawley, RH11 7QR.

Brief proposal description: Construction of a new two storey dwelling.

Planning application reference: -

Documents referred to:

Document Reference

Topographical survey drawing OS Tile

Proposed layout drawing OPTION/FEB_15

Landscape master plan drawing OPTION/FEB-15/01/LS

LPA pre-app comments -

British Standard 5837:2012 “BS5837”

Tree Protection Plan Arbtech TPP 02

Page 5: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Arbtech Consulting Ltd 5678552 GB903660148 Directors: R. M. Oates Unit 3 Well House Barn, Chester Road, Chester, CH4 0DH Tel. 01244 661170 Web. www.arbtech.co.uk

pg. 5 28 Maiden Lane – Arbtech AMS 02

Tree Survey

Survey: An arboricultural survey to BS5837 of all trees within impacting distance of the

site was undertaken by Alan Thompson on 31st July 2013.

A total of seven (7) individual trees were surveyed. Details for each of the trees

surveyed are provided in the Schedule of Trees (see Appendix 1)

Limitations: The survey was made at ground level using visual observation only.

Detailed examinations, such as climbing inspections and decay detection equipment

were not employed, though may form part of the survey’s management

recommendations. Measurements were taken using specialist tapes, laser and GPS

devices. Where this was not possible, measurements are estimated.

Scope: Pre-development tree surveys make arboricultural management

recommendations based exclusively upon the individual tree or group of trees condition

relative to their present context (i.e. not in relation to the proposed development).

Legal Status: No statutory protection check has been performed. BS5837 does not draw

any distinction between trees subject to statutory protection, such as a Tree

Preservation Order (“TPO”), and those trees without. This is principally because a

detailed planning consent overrides any TPO protection. Consequently, we do not seek

to offer any comparison between or infer any difference in the quality or importance of

TPO trees and other trees.

* For more information on the surveyed trees please see Arbtech Consulting Ltd, Tree Survey Schedule (Appendix 1), Tree Survey

Report and Tree Constraints Plan.

Page 6: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Arbtech Consulting Ltd 5678552 GB903660148 Directors: R. M. Oates Unit 3 Well House Barn, Chester Road, Chester, CH4 0DH Tel. 01244 661170 Web. www.arbtech.co.uk

pg. 6 28 Maiden Lane – Arbtech AMS 02

Arboricultural Impact Assessment

There are a number of issues that may need to be addressed in an arboricultural impact

assessment between the trees and the proposed development, these are as follows –

The effect and extent of the proposed development within the root protection

areas (RPAs) of retained trees;

The potential conflicts of the proposed development with canopies of retained

trees; and

The likelihood of any future remedial works to retained trees beyond which would

have been scheduled as a part of usual management.

These impacts can be seen on the Tree Protection Plan drawing no. Arbtech TPP 02.

Trees to be removed

There is one tree that will need to be removed as they are in direct conflict with the

proposed development.

Number of individual trees to be removed:

U A B C

0 0 0 1

Canopy cover is ecologically important and the loss of canopy cover by this tree will be

mitigated with planting within the development.

Page 7: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Arbtech Consulting Ltd 5678552 GB903660148 Directors: R. M. Oates Unit 3 Well House Barn, Chester Road, Chester, CH4 0DH Tel. 01244 661170 Web. www.arbtech.co.uk

pg. 7 28 Maiden Lane – Arbtech AMS 02

Arboricultural Method Statement

Details of key site personnel, including site / project manager will be submitted to the

Council’s Tree Officer prior to the commencement of site works.

This method statement is to be approved and agreed to in writing by all key personnel

prior to the commencement of site works.

No site personnel are to be present and no demolition, site clearance, building work or

delivery of materials is to occur until the protective measures are in accordance with this

method statement and the Tree Protection Plan drawing no. Arbtech TPP 02.

Protective measures should be in accordance with this method statement and the Tree

Protection Plan; drawing no. Arbtech TPP 02 will remain unaltered and in situ, unless

otherwise specified, for the entire duration of the construction.

Accidents and emergencies involving trees

Any accidents and emergencies involving trees shall be immediately reported to

Arbtech and their advice sought and agreed to by the council.

Phasing of tree protection measures

The tree protection measures shall be phased as follows.

a) Undertake tree works

b) Install the protective measures in accordance with the approved protection plans

and this method statement

c) Undertaken demolition works

d) Undertake and complete construction works

e) Undertake external landscape works to areas outside of construction exclusion

zones

f) Remove protective measures

g) Undertake external landscaping works within the construction exclusion zones

h) Sign off from the company as no further involvement required

Page 8: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Arbtech Consulting Ltd 5678552 GB903660148 Directors: R. M. Oates Unit 3 Well House Barn, Chester Road, Chester, CH4 0DH Tel. 01244 661170 Web. www.arbtech.co.uk

pg. 8 28 Maiden Lane – Arbtech AMS 02

Tree Works

For reasons of public safety, all tree works referred to herein must be carried out prior to

any site personnel commencing works or any building materials being delivered.

Summary of Tree Works

No. Species Works Category

T1 English oak Reduce N canopy to provide 2m clearance from dwelling.

A2

T2 Apple Fell to ground level; remove stump. C1

T3 English oak Crown lift / reduce SE canopy to provide 2m clearance from dwelling.

A12

T5 Plum Crown reduce E canopy to boundary. C1

T6 Crab apple Crown reduce E / S canopy to boundary. C1

Notes

All tree work is to be undertaken in accordance with British Standard BS 3998:2010,

Recommendations for tree work. All arising’s are to be removed and the site is to be left

as found. Care is to be taken of the ground around retained trees to make sure that it

does not become compacted as a result of tree surgery operations. No equipment or

vehicles such as timber Lorries, tractors, excavators or cranes shall be parked or driven

beneath the crowns of any retained trees, to prevent subsequent compaction and root

death.

Tree removal

A tree should be felled in one piece only when there is no significant risk of damage to

people, property or protected species (see Annex A).

Where restrictions (e.g. lack of space, buildings, other features, land ownership or use,

or other trees which are to be retained) cannot be overcome, trees should be

dismantled in sections.

Page 9: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Arbtech Consulting Ltd 5678552 GB903660148 Directors: R. M. Oates Unit 3 Well House Barn, Chester Road, Chester, CH4 0DH Tel. 01244 661170 Web. www.arbtech.co.uk

pg. 9 28 Maiden Lane – Arbtech AMS 02

This also applies where a tall stump is being retained but where branches are to be

removed/pruned.

Extensively decayed trees can be unpredictable when they are being felled, and special

precautions should therefore be taken, such as the use of a winch to guide the direction

of fall.

Stump removal – stump grinding

Stump grinding should be to a minimum of 300mm deep or to extend through the base

of the stump leaving the major roots disconnected if the intention is to reduce the

potential for the spread of Honey fungus.

The grinding residue should be treated as arising’s and removed from site.

NOTE Mechanical destruction of a stump by stump grinding is less disruptive to the site

than digging out.

The hole left by stump removal, should be filled with soil or other material. The filling

should be appropriate for future site usage, and for any surface treatment that is to be

installed.

Where future plant growth is desired, the backfill material should be firmed in 150 mm

layers by treading, avoiding excessive compaction and destruction of the soil structure.

After stump removal

The hole left by stump removal, whether by digging out or grinding, should be filled with

soil or other material. The filling should be appropriate for future site usage and for any

surface treatment that is to be installed.

Where future plant growth is desired, the back fill material should be firmed in 150mm

layers by treading, avoiding excessive compaction and destruction of the soil structure.

Page 10: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Arbtech Consulting Ltd 5678552 GB903660148 Directors: R. M. Oates Unit 3 Well House Barn, Chester Road, Chester, CH4 0DH Tel. 01244 661170 Web. www.arbtech.co.uk

pg. 10 28 Maiden Lane – Arbtech AMS 02

Protected Species

Conservation Status of British Bats

The general consensus in Britain and Europe is that virtually all bat species are

declining and vulnerable. Our understanding of population status is poor as there is very

little historical data for most bat species. Certain species, such as the horseshoe bats,

are better understood and have well documented contractions in range and population

size.

Given this general picture of decline in UK Government within the UK Biodiversity

Action Plan has designated five species of bats as priority species (greater and lesser

horseshoe bats, barbastelle, Bechstein’s and pipistrelle). These plans provide an action

pathway whereby the maintenance and restoration of the former populations levels are

investigated.

Legal Status of British Bats

Given the above position all British bats as well as their breeding sites and resting

places enjoy national and international protection.

All bat species in the UK are fully protected under the Wildlife and Countryside Act 1981

(as amended) through inclusion in Schedule 5. All bats are also listed on Annex IV (and

some on Annex II) of the EC Habitats Directive giving further, European protection.

Taken together the act and Conservation of Habitats and Species Regulations 2012 (as

amended)* make it an offence to; intentionally or deliberately kill, injure or capture (take)

bats;

• Deliberately disturb bats (whether in a roost or not);

• Damage, destroy or obstruct access to bat roosts;

• Possess or transport a bat or any part of a bat, unless acquired legally;

• Sell, barter or exchange bats, or parts of bats

The legislation although not strictly affording protection to foraging grounds does protect

roost sites. Bat roosts are protected at all times of the year whether or not bats are

present. Any disturbance of a roost due to development must be licenced.

*the regulations that delivered by the UK’s commitments to the Habitats Directive.

Page 11: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Arbtech Consulting Ltd 5678552 GB903660148 Directors: R. M. Oates Unit 3 Well House Barn, Chester Road, Chester, CH4 0DH Tel. 01244 661170 Web. www.arbtech.co.uk

pg. 11 28 Maiden Lane – Arbtech AMS 02

Breeding birds

All nesting birds are protected under the Wildlife and Countryside Act (as amended)

1981, which makes it an offence to intentionally kill, injure or take any wild bird or take,

damage or destroy its nest whilst in use or being built, or take or destroy its eggs.

Furthermore a number of birds enjoy further protection under that Act and are listed on

Schedule 1 of the Act. These further protected birds are also protected from disturbance

and it may be necessary to operate “no-go” buffer zones around such nests – typically

out to 100m.

Planning policy guidance on the treatment of species identified as priorities under the

biodiversity action programme suggests that local authorities should take measures to

protect the habitats of these species from further decline through policies in local

development documents and should ensure that they are protected from the adverse

effects of development, where appropriate, by using planning conditions or obligations.

The conservation of these species should be promoted through the incorporation of

beneficial biodiversity designs within developments.

Page 12: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Arbtech Consulting Ltd 5678552 GB903660148 Directors: R. M. Oates Unit 3 Well House Barn, Chester Road, Chester, CH4 0DH Tel. 01244 661170 Web. www.arbtech.co.uk

pg. 12 28 Maiden Lane – Arbtech AMS 02

Site Management

The site manager will be responsible for briefing and inducting all personnel who will be

working on any stage of this development and especially those who will be working

within or adjacent to the canopies or RPAs of retained trees; and will make them aware

of, and provide a copy of this this method statement and tree protection plan drawing

number Arbtech TPP 02; this is to include but not exclusively of the movement and or

operation of plant, excavations, unloading deliveries, mixing and or pouring of cement

and concrete.

The site manager will be responsible for the day to day running and protection of all

retained trees and for leasing with the project arborist about any tree related matters

and prior to any works that may or will affect the RPAs or canopies of retained trees;

this is to include but not exclusively of the movement and or operation of plant,

excavations, unloading deliveries, mixing, pouring and storage of all caustic materials

that may cause harm to retained trees.

Any incidents of damage to retained trees or of tree protection measures will be

documented by the site manager who will then report these incidents to the project

arboriculturist immediately and make sure that works within this area cease until the

project arborist has had an opportunity to inspect the damage and where appropriate,

agree a mitigation plan with the local planning authority tree officer.

The site manager may designate another person to take charge of briefing and

inducting process of new site personnel or visitors in his absence.

If the site manager is replaced or is absent from site for more than three consecutive

working days the project arborist will be informed and a pre start meeting will be held

with the new or acting site manager.

It is the responsibility of the site manager to ensure that the planning conditions

attached to the planning consent are adhered to at all times and that a monitoring

regime and supervision of any works within or adjacent to the RPAs are adopted.

If at any time pruning works are required other than those previously approved,

permission must be sought from the LPA tree officer and once permission is granted

they are to be carried out by a suitably qualified person in accordance with

BS3998:2010 Tree work – Recommendations.

Page 13: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Arbtech Consulting Ltd 5678552 GB903660148 Directors: R. M. Oates Unit 3 Well House Barn, Chester Road, Chester, CH4 0DH Tel. 01244 661170 Web. www.arbtech.co.uk

pg. 13 28 Maiden Lane – Arbtech AMS 02

Prohibition

Mechanical digging or scraping is not permitted within a defined root protection

area or within areas cordoned off by protective barrier fencing.

No access will be permitted within the protected areas;

No materials, equipment or debris will be stored within any of the fenced areas,

or against the fencing;

Fires are not permitted within 10m of any vegetation.

Leaning objects against or attaching of objects to a tree is not permitted.

Machinery, plant and vehicles are not permitted to be washed down within 10.0m

of vegetation.

Chemicals and materials are not to be transported, stored, used or mixed within

a root protection area or within areas cordoned off by protective barrier fencing.

Cement silos, mixing site to be situated within a bunded area to prevent

pillage/leaking of chemicals harmful to trees. These areas are to be sited well

clear of protected trees.

Refuelling of plant or machinery is prohibited within 10m of the construction

exclusion zones.

It is essential that allowance should be made for the slope of the ground so that

damaging materials such as concrete washings, mortar or diesel oil cannot run

towards trees.

Where machinery is to be used within 5m of retained tree canopies a banks man

will be required at all times whilst setting up, moving or operating within this

distance of retained trees canopies.

Storage of all caustic material and chemicals are to be situated well clear of protected

areas and preferably on lower ground if slopes are present, or to be situated within a

bonded area to prevent any spills or leaks entering the ground.

Page 14: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Arbtech Consulting Ltd 5678552 GB903660148 Directors: R. M. Oates Unit 3 Well House Barn, Chester Road, Chester, CH4 0DH Tel. 01244 661170 Web. www.arbtech.co.uk

pg. 14 28 Maiden Lane – Arbtech AMS 02

Sequencing of works

A logical sequence of events is to be observed and shall be phased as follows.

Stage Event

Stage 1 Pre-commencement site meeting

Stage 2 Carry out tree works as specified within the summary of tree

works

Stage 3 Installation of protective measures in accordance with the

approved tree protection plan

Stage 4 Installation of site set up

Stage 5 Undertake and complete construction works

Stage6 Undertake external landscaping works outside of the construction exclusion zones

Stage 7 Removal of all machinery and materials form site

Stage 8 Dismantle and removal of protective measures

Stage 9 Undertake external landscaping works within the construction exclusion zones

Stage 10 Sign off from project arboriculturist

Page 15: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Arbtech Consulting Ltd 5678552 GB903660148 Directors: R. M. Oates Unit 3 Well House Barn, Chester Road, Chester, CH4 0DH Tel. 01244 661170 Web. www.arbtech.co.uk

pg. 15 28 Maiden Lane – Arbtech AMS 02

Protective Measures

Protective measures are to be installed immediately following the completion of the tree

works, and are to be sited and aligned in accordance with the tree protection plan

(Arbtech TPP02) prior to the commencement of any works or the introduction of any

machinery or material to site.

Upon installation of the protective measures around the retained trees the project

arboriculturist will visit the site to insect and document the position and specifications of

the protective measures.

In the event that the protective measures and their positions do not comply with this

arboricultural method statement document number Arbtech AMS 02 (25th November

2015) and tree protection plan drawing number Arbtech TPP 02, the project

arboriculturist shall inform the client and fencing contractor so adjustments can be

made.

When the protective measures comply with document number Arbtech AMS 02 (25th

November 2015) and tree protection plan drawing number Arbtech TPP 02, the project

arboriculturist will sign off the protective measures in writing to the client and will send a

copy to the fencing contractor, site agent and local authority tree officer.

If the protective measures become damaged or there is any accident or emergencies

involving trees, these areas are to be cordoned off with immediately with high visibility

plastic mesh fencing. The site agent is to photograph and document the damage and

inform the project arboriculturist immediately after the incident and all work within in this

area is to cease until the project arboriculturist has made a visit to the site. Any and all

damaged sections of protective measures shall be replaced within 48 hours of the initial

incident.

The protected area is sacrosanct and will not be invaded by the storage of materials,

mixing of concrete or other products, accessed by machinery, equipment or pedestrians

or in any other way disturbed by construction activity.

The protective measures will remain in place until the completion of stage 7 (see

Sequencing of Works), there after they will be carefully dismantled only with the

agreement of the project arboriculturist and or the local authority tree officer.

The existing site boundary measures are to be retained for the duration of the

development. If for any reason the existing boundary measures are not to be used

protective barrier fencing is to be installed along the line of the boundaries and is only to

be removed upon the written permission of the project arboriculturist or LPA tree officer

Page 16: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Arbtech Consulting Ltd 5678552 GB903660148 Directors: R. M. Oates Unit 3 Well House Barn, Chester Road, Chester, CH4 0DH Tel. 01244 661170 Web. www.arbtech.co.uk

pg. 16 28 Maiden Lane – Arbtech AMS 02

upon the completion of the development or immediately prior to the installation of the

permanent boundary measures.

Proposed hard surfacing is to be installed immediately to act as ground protection,

where it is decided that this is not a viable option these areas are to be covered by

ground boarding as designed by the project engineer to cope with any likely loading.

No equipment, vehicles or plant shall operate beyond the tree protection fencing.

Booms, hoists and rigs should be kept as far away from the canopies of retained trees

at all times. Where it is necessary to operate within 5m of a tree canopy, it will be done

with the utmost caution and under the control of a banks man. Damage to trees will be

considered a breach of this tree protection plan, which in turn could be a breach of

planning permission.

Protective Barrier Fencing

Protective barrier fencing should be appropriate for the intensity and proximity of the

development to protect trees where development activity is in close proximity.

Default specification: To comprise either 2.4m wooden site hoarding; or a 2.3m high

scaffold framework, well braced to resist impacts, with uprights to be spaced at a

maximum of 3.0m intervals and driven into the ground by a minimum of 600mm. On o

this, standard anti-climb welded mesh panels are to be securely fixed to each other with

at least two scaffold clamps and to the scaffold frame work with wire.

Page 17: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Arbtech Consulting Ltd 5678552 GB903660148 Directors: R. M. Oates Unit 3 Well House Barn, Chester Road, Chester, CH4 0DH Tel. 01244 661170 Web. www.arbtech.co.uk

pg. 17 28 Maiden Lane – Arbtech AMS 02

Secondary specification: To comprise of 2m tall welded mesh panels on rubber or

concrete feet. Panels are to be joined together using a minimum of two anti-tamper

couplers, installed so that they can only be removed from inside the fence. The panels

should be supported on the inner side by stabiliser struts, which should be attached to a

base plate and secured with ground pins.

Signage denoting the words “tree protection area” at 5.0m intervals should be fixed to

the protective barrier fencing (See Appendix 2).

Protective fencing is to be removed ONLY with the written permission of the

arboricultural consultant and approval of the local planning authority (LPA).

Page 18: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Arbtech Consulting Ltd 5678552 GB903660148 Directors: R. M. Oates Unit 3 Well House Barn, Chester Road, Chester, CH4 0DH Tel. 01244 661170 Web. www.arbtech.co.uk

pg. 18 28 Maiden Lane – Arbtech AMS 02

Ground boarding

New temporary ground protection should be capable of supporting any traffic entering or

using the site without being distorted or causing compaction of underlying soil.

Where is determined by the project engineer that the any hard surfacing is not adequate

protection from any expected loading, ground boarding is to be installed to the

engineers specification on top of the hard surfacing within the root protection areas of

retained trees.

Where machinery will be stored or used from the ground boarding within the RPAs of

the retained trees an impervious barrier and or bunding to prevent oils, fuel or chemicals

is to be installed to prevent leaching into the soil within or adjacent to the RPAs.

Note The ground protection might comprise of one of the following:

a) for pedestrian movements only, a single thickness of scaffold boards placed

either on top of a driven scaffold frame, as to form a suspended walkway, or on

top of a compression-resistant layer (e.g. 100mm depth of woodchip), laid onto a

geotextile membrane;

b) for pedestrian-operated plant up to a gross weight of 2t, proprietary inter-linked

ground protection boards placed on top of a compression-resistant layer (e.g.

150mm depth of woodchip), laid onto a geotextile membrane;

c) for wheeled or tracked construction traffic exceeding 2t gross weight, an

alternative system (e.g. proprietary system or pre-cast reinforced concrete slabs)

to an engineering specification designed in conjunction with arboricultural advice,

to accommodate the likely loading to which it will be subjected.

For any situations other than those described in a) or b) (as above), the ground

boarding is to be designed by a suitably qualified person to an engineering specification

in conjunction with arboricultural advice, to be suitable of supporting the expected

loading to be placed upon it.

In all cases, the objective of the ground boarding is to avoid compaction of the soil

beneath, so that tree root functions remain unimpaired.

Page 19: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Arbtech Consulting Ltd 5678552 GB903660148 Directors: R. M. Oates Unit 3 Well House Barn, Chester Road, Chester, CH4 0DH Tel. 01244 661170 Web. www.arbtech.co.uk

pg. 19 28 Maiden Lane – Arbtech AMS 02

Demolition

Prior to the demolition of the existing site features, all tree works are to have been

completed, tree protection measures are to be in place as per Arbtech Consulting Ltd.

tree protection plan document no. Arbtech TPP 02 and have been signed off and a copy

of the demolition method statement has been submitted and approved by the project

arboriculturist and LPA tree officer, to ensure that there is no conflict with this method

statement.

All demolition work within or immediately adjacent to RPAs or canopies of retained trees

is to be undertaken under the direct on-site supervision of an arboriculturist.

Existing Underground Services

Existing services within the site should be retained where ever possible. Where existing

services within RPAs require upgrading, the upmost care must be taken to minimise

disturbance, and where feasible trenchless techniques are to be employed, and only

where necessary should open excavations be considered.

Page 20: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Arbtech Consulting Ltd 5678552 GB903660148 Directors: R. M. Oates Unit 3 Well House Barn, Chester Road, Chester, CH4 0DH Tel. 01244 661170 Web. www.arbtech.co.uk

pg. 20 28 Maiden Lane – Arbtech AMS 02

Construction

Prior to the construction of the proposed dwelling, a copy of the construction method

statement should have been submitted and approved by the project arboriculturist and

LPA tree officer, to ensure that there is no conflict with this method statement.

All excavations and construction work within or immediately adjacent to RPAs or

canopies of retained trees is to be undertaken under the direct on-site supervision of an

arboriculturist.

Foundations design

New foundations for buildings, structures and hard surfacing situated within the RPAs of

retained trees are to be designed in conjunction with arboricultural advice to

accommodate the likely loading of the structure. The foundations will be been designed

to limit the amount of excavation required within RPAs to retain roots that are important

to the trees stability as identified during the site investigations.

The use of strip foundations within RPAs of retained trees can cause extensive root loss

and as such are to be avoided.

Design of foundations for the new dwelling within the RPAs of trees nos.T1, T3, T5 and

T6 are to be designed to minimise the adverse impact upon trees and should pay

particular attention to the existing ground levels and proposed finished floor level.

Foundation design should be undertaken using site specific information in conjunction

with the project arboriculturist and engineer.

Root damage can be minimised using:

Piles, with a site investigation it is possible to determine their optimal location

whilst avoiding damage to roots important for the stability of the tree.

Investigative excavations are to be undertaken with the use of hand tools or

compressed air displacement to a minimum depth of 600mm;

Beams laid at or above ground level and or cantilevered as necessary to avoid

tree roots identified by the site investigation

Multi-dimensional confinement systems.

These are just an example of a few types of foundations that can be used to minimise

root damage. In order to arrive at a suitable solution, site specific and specialist advice

regarding foundation design should be sought from the project arboriculturist and

engineer.

Page 21: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Arbtech Consulting Ltd 5678552 GB903660148 Directors: R. M. Oates Unit 3 Well House Barn, Chester Road, Chester, CH4 0DH Tel. 01244 661170 Web. www.arbtech.co.uk

pg. 21 28 Maiden Lane – Arbtech AMS 02

Large structures

Slabs for larger structures such as the dwelling should be designed and constructed

with a ventilated air space between the underside of the slab and the existing soil

surface. A specialist irrigation system is to be installed underneath the slab e.g. rain

water runoff from the roof.

Small structures

Slabs for smaller structures (less than 20% of the total area of the un-surfaced RPA)

such as garages and shed may be formed / constructed directly onto the existing soil

surface. It may be possible to use a multi-dimensional confinement system such as

CellWeb TM or similar as the foundation for these structures (specialist advice should be

sought from the manufacturer).

Where piling is to be installed near to trees, the smallest practical pile diameter should

be used, as this reduces the possibility of striking major tree roots, and reduces the size

of the rig requires to sink the piles. If a piling mat is required, this should conform to the

specification for ground boarding.

All and any excavations that may be required for foundations within the RPAs of

retained trees will initially be undertaken manually under arboricultural supervision (see

Manual excavation).

Dwelling

Arbtech Consulting Limited has been informed that the proposed dwelling will be

constructed on a pile and beam type of foundation. The foundations have not yet been

designed and should be designed in conjunction with arboricultural advice either

following trial excavations to find suitable locations for the piles and depth of the beam

or piles should be designed to be movable; the smallest suitable pile size and minimum

number required are to be used.

Any piling rig should be situated outside of any RPAs of the retained trees or on top of

ground boarding designed by the project engineer capable of dealing with the likely

loading; all piles to be installed within the RPAs of trees numbers T1, T3 and T5 are to

be installed under arboricultural supervision directly through the ground boarding which

may only be removed upon completion of the installation of the pile foundation.

Page 22: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Arbtech Consulting Ltd 5678552 GB903660148 Directors: R. M. Oates Unit 3 Well House Barn, Chester Road, Chester, CH4 0DH Tel. 01244 661170 Web. www.arbtech.co.uk

pg. 22 28 Maiden Lane – Arbtech AMS 02

Tree No.

Species RPA Proposed structure

Incursion

T1 English

oak 350.50m2

Hard surfacing

6.1m2 1.74%

Dwelling 3.01m2 0.86%

T3 English

oak 461.34m2

Hard surfacing

12.24m2 2.65%

Dwelling 29.15m2 6.32%

T5 Plum 30.91m2

Hard surfacing

0.02m2 0.05%

Dwelling 1.08m2 3.48%

T6 Crab apple 73.56m2 Hard

surfacing 6.4m2 8.7%

T7 Plum 30.91m2 Hard

surfacing 0.23m2 1.74%

Hard Surfacing

The new hard surfacing to be situated within the RPAs of tree numbers T1, T3, T5, T6

and T7 is to be designed in conjunction with arboricultural advice to accommodate the

likely loading. The design should not require excavation however the removal of the turf

layer or other surface vegetation may be acceptable if necessary, but ideally the

construction will be situated entirely above the existing ground level.

Appropriate options for the sub base of hard surfacing situated within the RPAs of

retained trees include multi-dimensional confinement systems (CellWebTM or similar).

Alternatively piles, pads or elevated beams can be used to bridge over the RPAs, or

following exploratory investigations to determine location, to provide support within the

RPAs while allowing retention of roots of 25mm or greater in diameter.

Exploratory investigation is to be undertaken manually under arboricultural supervision

using hand tools (See Manual excavation).

Prior to the installation of the hard surfacing within the RPAs vegetation may be

removed using hand tools or sprayed with an approved non residual herbicide such as

‘Glyphosate’.

Page 23: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Arbtech Consulting Ltd 5678552 GB903660148 Directors: R. M. Oates Unit 3 Well House Barn, Chester Road, Chester, CH4 0DH Tel. 01244 661170 Web. www.arbtech.co.uk

pg. 23 28 Maiden Lane – Arbtech AMS 02

Multi-dimensional confinement system

If a multi-dimensional confinement system (such as CellWebTM or similar) is to be used

it is to be laid entirely above the existing soil surface over a geo textile membrane and

or a bi-axel geo-grid (such as tensar TriAx).

Based on the use of the design the hard surfacing is for a footpath, cycle / bin store

area and shed base; it is recommended by Geosynthetics Limited that a cell depth of

75mm to 100mm of their product Cellweb TRP® would be possibly suitable (see

Appendix 3: Cellweb TRP® Weight Capabilities) for use of pedestrian use.

As a part of the design process and to allow Geosynthetics Limited to be able to

calculate the correct depth of Cellweb TRP® please complete and return to

Geosynthetics Limited (see Appendix 4: Reinforcement with Cellweb TRP®).

Installation of a multi-dimensional confinement system

a) Prepare the surface

Remove any surface rocks and debris;

Create a level surface by filling in any hollows with clean angular stone or

sharp sand;

Do not level off any high spots or compact the soil through rolling.

b) Layout Geotextile membrane

Layout the permeable Geotextile membrane, overlaying edges of the required

area by 300mm;

Overlap any joints by 300m or more.

c) Layout multi-dimensional confinement system (MDC)

Layout the collapsed MDC system on-top of the Geotextile membrane;

Place one steel pin into the center cell at one end of the panel and secure it

into the ground;

Pull out the MDC to its full length (see manufacturers specifications), place a

steel pin in the center at the opposite end and secure it into the ground;

Pull out the MDC to its full width (see manufacturers specifications), and

secure each corner into the ground with steel pins;

Create a panel to the correct size using the required number of steel pins (as

per the manufacture specifications);

Makes sure all cells are fully extended (as per manufactures specifications);

Staple adjacent panels together (as per manufacturers specifications);

Page 24: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Arbtech Consulting Ltd 5678552 GB903660148 Directors: R. M. Oates Unit 3 Well House Barn, Chester Road, Chester, CH4 0DH Tel. 01244 661170 Web. www.arbtech.co.uk

pg. 24 28 Maiden Lane – Arbtech AMS 02

If a curved shape is required, the panels are to be cut down to the required

size and shape once the MDC is pinned out. Do not curve or bend panels into

place.

d) Infill with clean angular stone

The infill material must be a clean (no fines) angular stone (as per

manufactures specifications)

Do not use M.O.T type 1 or crushed stone with fines within or adjacent to

RPAs;

Infill the MDC cells with clean angular stone, working towards the tree using

the infilled panels as a platform;

No compaction is requires of the infill. Do not use a whacker plate, roller or

any other means of compaction.

e) Edge restraints

All kerb edging should be situated on top of the MDC within RPAs, Do not

excavate within RPAs to install kerb edging;

Where edging is required for light structures, a peg and treated timber board

edging is normally acceptable;

Other options include wooden sleepers, plastic or metal edging;

The outer edges of the supports may be banked up with clean top soil and or

mulch.

f) Wearing course

Install a permeable geotextile membrane, over lapping any joints by 300mm

before laying the wearing course;

Surfaces can include block paving, asphalt, loose gravel, resin bound gravel,

concrete etc.;

Within RPAs the wearing course shall be permeable to both water and air.

Boundary fences

Proposed and or replacement boundary fence posts are to be excavated manually (see

Manual excavation) within RPAs of retained trees, individual posts may require moving

to prevent damage of roots 25mm or greater in diameter.

Concrete foundations

Prior to concrete being poured to form the foundations within or immediately adjacent to

the RPAs of retained trees the excavation is to be lined and sealed to prevent any

Page 25: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Arbtech Consulting Ltd 5678552 GB903660148 Directors: R. M. Oates Unit 3 Well House Barn, Chester Road, Chester, CH4 0DH Tel. 01244 661170 Web. www.arbtech.co.uk

pg. 25 28 Maiden Lane – Arbtech AMS 02

leaching of the concrete into the soil and causing desiccation of retained roots by

concrete run off.

Manual excavation

Excavation within RPAs will be undertaken by hand under direct on-site arboricultural

supervision of the required depth of the foundation; Or to a minimum of 600mm deep of

any excavation, whether for proposed foundations, hard surfacing or underground

services. The total depth of the manual excavation will be determined by the

arboriculturist whilst on site.

The soil is to be loosened with the aid of a fork or pick axe and then cleared with the aid

of an Air-spade, Air-vac and or shovel. Any roots found will be cleanly severed by the

arboricultural consultant with either a hand saw or secateurs.

Any roots found with a diameter of less than 25mm shall be cleanly severed by the

arboricultural consultant. Any roots of 25mm and above shall be excavated around

without damaging them; the arboricultural consultant shall decide if it’s feasible or

necessary to retain the root, if not it shall be severed.

The edge of the excavation closest to the trees will be covered with damp hessian to

prevent soil collapse or contamination by concrete.

Soil beneath the depth may be sheet piled, regular piled or excavated deeper.

Machinery may be used for this providing that it is situated outside of the RPA or has

appropriate ground protection in place to move around on and work upon.

Page 26: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Arbtech Consulting Ltd 5678552 GB903660148 Directors: R. M. Oates Unit 3 Well House Barn, Chester Road, Chester, CH4 0DH Tel. 01244 661170 Web. www.arbtech.co.uk

pg. 26 28 Maiden Lane – Arbtech AMS 02

Services

Detailed drawings of proposed underground services are not available at this time;

hence it is not possible to identify any specific potential impacts associated with the

scheme at this stage.

Existing services within the site should be retained where ever possible. Where existing

services within RPAs require upgrading, the upmost care must be taken to minimise

disturbance, and where feasible trenchless techniques are to be employed, and only

where necessary should open excavations be considered.

Where new services are to be introduced into the site they should be located outside of

RPAs, where they will not interfere with tree roots. If any excavations are required within

the RPAs all trenches are to be excavated by hand and radially to the tree trunks under

direct on-site arboricultural supervision and are to be carried out under NJUG

guidelines.

Final positions of any proposed services should be verified and approved by the

arboricultural consultant and local authority tree officer before implementation.

New Underground services

Trenching for installation of underground services and drainage routes could sever any

roots that may be present and as such adversely affects the health of the tree. For this

reason particular care should be taken in routing and methods of installation of all

underground services. All underground services and drainage routes should be located

so that no excavations are required within RPAs.

Where it has been impossible to keep underground services from passing through

RPAs or within close proximity to trees, these sections are to be installed in one of three

ways in accordance with the guidance set out in National Joint Utilities Group guidelines

(NJUG 4), under on site arboricultural supervision.

Trenchless Techniques

There are three main types of trenchless techniques, these include, guided and

unguided boring and pipe replacement by lining or bursting. These allow for the

installation, maintenance or renewal of underground services, without the disturbance of

soil in which roots are likely to be growing. Starting and receiving pits for the boring

machinery are to be located outside of the RPAs of any retained trees, with the bore

depth being maintained at a minimum depth of 600mm below the existing ground level.

Techniques involving external lubrication of the equipment shall use no material other

than water as other lubricants could contaminate the soil (e.g. oil, bentonite, etc.).

Page 27: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Arbtech Consulting Ltd 5678552 GB903660148 Directors: R. M. Oates Unit 3 Well House Barn, Chester Road, Chester, CH4 0DH Tel. 01244 661170 Web. www.arbtech.co.uk

pg. 27 28 Maiden Lane – Arbtech AMS 02

Manual Excavation

Excavation within RPAs will be undertaken by hand under direct on-site arboricultural

supervision of the required depth of the foundation; Or to a minimum of 600mm deep of

any excavation, whether for proposed foundations, hard surfacing or underground

services. The total depth of the manual excavation will be determined by the

arboriculturist whilst on site.

The soil is to be loosened with the aid of a fork or pick axe and then cleared with the aid

of an Air-spade, Air-vac and or shovel. Any roots found will be cleanly severed by the

arboricultural consultant with either a hand saw or secateurs.

Any roots found with a diameter of less than 25mm shall be cleanly severed by the

arboricultural consultant. Any roots of 25mm and above shall be excavated around

without damaging them; the arboricultural consultant shall decide if it’s feasible or

necessary to retain the root, if not it shall be severed.

The edge of the excavation closest to the trees will be covered with damp hessian to

prevent soil collapse or contamination by concrete.

Soil beneath the depth may be sheet piled, regular piled or excavated deeper.

Machinery may be used for this providing that it is situated outside of the RPA or has

appropriate ground protection in place to move around on and work upon.

Broken Trench – Hand Dug

This technique combines both trenchless techniques and manual excavation where

excavation is unavoidable. Excavations should be limited to where there is clear access

around and below the roots. All trenches are to shall be excavated by hand with the

same precautions taken as for manual excavation. Open section of trench should only

be large enough to allow access for linking to the next section.

Page 28: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Arbtech Consulting Ltd 5678552 GB903660148 Directors: R. M. Oates Unit 3 Well House Barn, Chester Road, Chester, CH4 0DH Tel. 01244 661170 Web. www.arbtech.co.uk

pg. 28 28 Maiden Lane – Arbtech AMS 02

Landscaping

Shed Base

The installation of the proposed shed base and shed are to be undertaken as a part of

the landscaping phase and is to follow the methodology of the installation as set out in

the ‘Construction’, ‘Hard Surfacing’ and ‘Multi-dimensional confinement system’

sections.

Soft Landscaping

The ratio of trees removed to trees replanted should not necessarily be 1:1. Instead, the

ratio should take into consideration the available space for tree growth and development

in order to ensure the trees are physically suited to the site at maturity. A specification

for and notation relating to the precise alignment of replacement trees will be contained

in the landscape proposals.

Landscaping around retained trees may only be carried out once all tree protection

measures have been removed (planting, turfing, fencing etc.).

All excavations within the Root Protection Areas shall be undertaken by hand and

without reducing current ground levels unless it is agreed in writing with the LPA. At no

time is the use of a rotavator permitted within the RPAs of retained tree.

Any tree roots discovered will be left in-situ and shall not be cut or otherwise damaged.

Where possible, the soil structure within the Root Protection area shall be preserved.

No works will be carried out within the RPAs of any trees if the soil moisture is of such a

level that soil compaction may be likely. Should the soil become compacted or has poor

structure which would hinder the development of the existing trees and plants or any

new plantings the arboriculturist should be consulted about soil decompaction

techniques.

Page 29: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Arbtech Consulting Ltd 5678552 GB903660148 Directors: R. M. Oates Unit 3 Well House Barn, Chester Road, Chester, CH4 0DH Tel. 01244 661170 Web. www.arbtech.co.uk

pg. 29 28 Maiden Lane – Arbtech AMS 02

Monitoring and Supervision

Where trees have been identified within this method statement and tree protection plan

drawing number Arbtech TPP 02 for retention, there should be an auditable system of

arboricultural monitoring. This is to extend to arboricultural supervision whenever

demolition or construction activity is to take place within or adjacent to any canopy or

RPA.

The development’s tree protection measures are to be monitored and all demolition and

construction works to be undertaken within or adjacent to the RPAs of retained trees are

to be supervised by project arboriculturist, who should be retained to record and report

observations to the council at appropriate intervals.

Pre-commencement site meeting

Prior to the commencement of any works or machinery and materials arriving on site a

pre-commencement site meeting involving the project arborist, land owner or agent, site

manager, contractors and engineer (as appropriate) and the relevant LPA officers will

be held to ensure that all aspects of the arboricultural method statement and tree

protection are understood and for all parties to swap contact details (see Appendix 5).

Monitoring and supervision schedule

The initial monitoring visit will be to check that the tree protective measures are in the

correct location and as specified within the approved method statement; if so to sign off

their installation.

There after monitoring visits are to take place at regular intervals, to ensure that tree

protection measures are in place and are functioning as designed or whenever

necessary to undertake works to be carried out under arboricultural supervision. The

frequency of the monitoring visits is to be determined with the LPA tree officer at the

pre-commencement site meeting.

A record of all arboricultural monitoring and supervision visits will be kept and any faults

will be logged, this will then be copied to the site agent, developer and local planning

authority in a digital format.

If during the course of the development it is necessary for areas to be re-designed so

that they would require changes to the approved arboricultural method statement or tree

protection plan and so affecting retained trees the project arborist and LPA tree officer

will be invited to attend a site meeting with all relevant parties. Prior to any changes

being implemented these must have been approved in writing by the LPA tree officer.

Page 30: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Arbtech Consulting Ltd 5678552 GB903660148 Directors: R. M. Oates Unit 3 Well House Barn, Chester Road, Chester, CH4 0DH Tel. 01244 661170 Web. www.arbtech.co.uk

pg. 30 28 Maiden Lane – Arbtech AMS 02

Supervision

The arboricultural consultant will be required to attend site to directly supervise all

demolition and construction works that are to be undertaken within or adjacent to the

RPAs of all retained trees and will be advised a minimum of 72 hours prior to the

commencement of any works that require his attendance, these will include:

1. Pre-commencement site meeting;

2. Location of protective measures;

3. Manual / Supervised excavation of foundations within and immediately adjacent

to the RPAs of tree nos. T1, T3 and T5;

4. Installation of ‘ No Dig’ hard surfacing;

5. Any excavations within and immediately adjacent to RPAs, including

foundations, hard surfacing or underground services;

6. Removal of protective measures and sign off.

Completion meeting

Once all construction works have been completed all materials and machinery has been

removed from site the project arborist shall be informed and will invite the LPA tree

officer to meet on site to discuss the process and discuss any final remedial works that

may be required and to sign the development off so that the protective measures may

be removed.

Page 31: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Arbtech Consulting Ltd 5678552 GB903660148 Directors: R. M. Oates Unit 3 Well House Barn, Chester Road, Chester, CH4 0DH Tel. 01244 661170 Web. www.arbtech.co.uk

pg. 31 28 Maiden Lane – Arbtech AMS 02

Appendix 1: Tree Survey Schedule

Page 32: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Arbtech Consulting Ltd.

Murlain HouseUnion Street

Chester

CH1 1QP

Cheshire

Phone: 08450 176 950

BS5837:2012 Tree SurveyBS5837:2012 Tree SurveyBS5837:2012 Tree SurveyBS5837:2012 Tree SurveyClient: Graham & Reginald Dias

Project: 28 Maiden Lane, Langley Green, Crawley, RH11 7QR

Surveyor: Alan Thompson

Survey Date: 31/07/2013

Stems

No

Tree and Tag No

SpeciesHght(m)

Ø(mm)

Crown

AgePhys

ConditionStructuralCondition

Preliminary Recommendations CatERC

Spread(m)

Clear(m)

RPA (m )R (m)

2

Survey Comment

16 880 A: 350.4

R: 10.56 Good

Good

S:

B:

C:M

T1

Common Oak 8

8

7

5

N

E

Good A.2

>40 yrsQuercus robur

Good8

8

S

W

3

4

1

Minor deadwood in crown.

5 300 A: 40.7

R: 3.59 Good

Good

S:

B:

C:M

T2

Apple 4

4

2

2

N

E

Good C.1

10 to 20

yrs

Malus Unknown

Good4

4

S

W

2

2

1

Malus, cultivar unknown.

14.5 1010 A: 461.5

R: 12.12 Good

Good

S:

B:

C:M

T3

Common Oak 8

8

6

6

N

E

Good A.1.2

>40 yrsQuercus robur

Good8

8

S

W

7

6

1

Fine, mature specimen is showing good vigour.

3.5 80 A: 2.9

R: 0.96 Fair

Fair

S:

B:

C:Y

T4

Common Hawthorn 1

1.5

3

2

N

E

Fair C.1

10 to 20

yrs

Crataegus monogyna

Good1.5

1.5

S

W

2

2

1

Tree is suppressed by T3

5 261 A: 30.8

R: 3.13 Good

Fair

S:

B:

C:M

T5

Plum 3

3.5

3

3

N

E

Fair C.1

10 to 20

yrs

Prunus Domestica

Good2.5

1.5

S

W

3

4

3 (Eq)

A moderate amount of deadwood was observed in tree's

crown. Tree's crown is partially suppressed by neighbouring

trees.

02 August 2013TreeMinder

Age Classifications: N

Y

SM

M

OM

D

Newly planted

Young

Semi-mature

Mature

Over Mature

Dead

Condition: C Crown

S Stem

B Basal area

Page 1

Stems: Ø Diameter

(Eq) Equivalent stem diameter using BS5837:2012 definition

Page 33: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Stems

No

Tree and Tag No

SpeciesHght(m)

Ø(mm)

Crown

AgePhys

ConditionStructuralCondition

Preliminary Recommendations CatERC

Spread(m)

Clear(m)

RPA (m )R (m)

2

Survey Comment

7.5 403 A: 73.5

R: 4.83 Good

Good

S:

B:

C:M

T6

Crab Apple 4.5

4

2

4

N

E

Good C.1

10 to 20

yrs

Malus sylvestris

Good3.5

7.5

S

W

4

2

2 (Eq)

Minor deadwood in crown.

6 170 A: 13.1

R: 2.04 Fair

Fair

S:

B:

C:SM

T7

Plum 3.5

0.5

4

5

N

E

Fair C.1

10 to 20

yrs

Prunus Domestica

Good0.5

4

S

W

5

4

1

Tree is heavily suppressed by neighbouring trees. Minor bark

damage in stem.

02 August 2013TreeMinder

Age Classifications: N

Y

SM

M

OM

D

Newly planted

Young

Semi-mature

Mature

Over Mature

Dead

Condition: C Crown

S Stem

B Basal area

Page 2

Stems: Ø Diameter

(Eq) Equivalent stem diameter using BS5837:2012 definition

Page 34: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Projects.

Number of trees in selected Project(s)Number of trees in selected Project(s)Number of trees in selected Project(s)Number of trees in selected Project(s) 7

7 Number of trees in Report selection

---> Last survey for each selected tree.

Work types.

All surveys for the selected trees. Work Completed

Work Not Completed

--->

--->

Date Range.

Any Date

Latest Survey. Work Completed.

Report selection criteria.

28 Maiden Lane, Langley Green, Crawley, RH11 7QR

-No Selection made----->

02 August 2013TreeMinder

Age Classifications: N

Y

SM

M

OM

D

Newly planted

Young

Semi-mature

Mature

Over Mature

Dead

Condition: C Crown

S Stem

B Basal area

Page 3

Stems: Ø Diameter

(Eq) Equivalent stem diameter using BS5837:2012 definition

Page 35: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Arbtech Consulting Ltd 5678552 GB903660148 Directors: R. M. Oates Unit 3 Well House Barn, Chester Road, Chester, CH4 0DH Tel. 01244 661170 Web. www.arbtech.co.uk

pg. 35 28 Maiden Lane – Arbtech AMS 02

Appendix 2: Tree Protection Notice

Page 36: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Do not move this fence

Tree Protection Area

KEEP OUT

(TOWN & COUNTRY PLANNING ACT 1990)

TREES ENCLOSED BY THIS FENCE ARE PROTECTED BY PLANNING CONDITIONS

AND/OR ARE THE SUBJECT OF A TREE PRESERVATION ORDER.

CONTRAVENTION OF A TREE PRESERVATION ORDER MAY LEAD TO CRIMINAL

PROSECUTION

ANY INCURSION INTO THE PROTECTED AREA MUST BE WITH THE WRITTEN

PERMISSION OF THE LOCAL PLANNING AUTHORITY

RBTECHC o n s u l t i n g L i m i t e d

Arbtech Consulting Limited.

Unit 3, Well House Barn, Chester Road, Chester, CH4 0DH

Also in Bedfordshire, Birmingham, Kent, Manchester, Lancashire, London, Surrey and Sussex

[email protected] - 01244 660558

www.arbtech.co.uk

Page 37: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Arbtech Consulting Ltd 5678552 GB903660148 Directors: R. M. Oates Unit 3 Well House Barn, Chester Road, Chester, CH4 0DH Tel. 01244 661170 Web. www.arbtech.co.uk

pg. 37 28 Maiden Lane – Arbtech AMS 02

Appendix 3: Cellweb TRP® Weight Capabilities

Page 38: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

PRODUCT DATA SHEET

Cellweb® TRP Weight Capabilities Geosynthetics Limited Tel: 01455 617 139 Fax: 01455 617 140 Email: [email protected]

DR: 100/v1/29.09.14

• 75mmCellwebconfinementsystemFor foot and cycle traffic. This also provides a control measure for crust compaction

• 100mmCellwebconfinementsystemFor domestic traffic, such as cars and transit vans up applicable up to a 6t gross weight

• 150mmCellwebconfinementsystemFor emergency access and refuse collection applicable up to a 30t gross weight

• 200mmCellwebconfinementsystemFor H.G.V and construction traffic applicable up to a 60t gross weight

In some specific conditions 2 layers of Cellweb 100mm can be installed for the construction phase of traffic. On completion of the construction phase, the top 100mm can be removed. The bottom 100mm can remain insitu to provide a permanent access for cars and transit vans.For higher demand weight applications, the Cellweb system can be layered to create a 300mm system.

Depth of Cellweb Unit Gross Vehicle Weight (GVW) Application

200 mm Kg < 60,000 HGV & Unusual – Crane / piling rig

200 mm Kg < 50,000 Heavy Construction Traffic

150-200 mm Kg < 30,000 Standard Construction Traffic & Refuse vehicle

150 mm Kg < 16,000 Emergency Access & Tractors

100-150 mm Kg < 9,000 Delivery Vans

100-150 mm Kg < 6,000 Car Park: Cars & Light van

100 mm Kg < 3,000 Domestic Traffics: Cars

75 mm Kg < 1,000 Pedestrians (with cyclist) path

Note: This is a general guidance for the depth of Cellweb according to Gross Vehicle Weight for a firm and stable subgrade (CBR>3%). If the ground conditions are poor and/or unstable please Geosynthetics Ltd to provide a site specific design.

This information corresponds to our current knowledge on the subject. It is offered solely to provide possible suggestions for your own experimentation. It is not intended, however, to substitute for any testing you may need to conduct to determine for yourself the suitability of our products for your particular purposes. This information may be subject to revision as new knowledge becomes available. Since we cannot anticipate all variations in actual end use conditions, Geosynthetics Limited makes no warranties and assumes no liabilities in connection with this information. Nothing in this publication is to be considered as a licence to operate under or a recommendation to infringe any patent right.

This chart is provided as a guide line for generic average site conditions only. For a site specific calculation, please ask a member of Geosynthetics to provide a questionnaire. This information will provide our engineers the capability to produce a site specific technical recommendation and CAD detail.

Page 39: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Arbtech Consulting Ltd 5678552 GB903660148 Directors: R. M. Oates Unit 3 Well House Barn, Chester Road, Chester, CH4 0DH Tel. 01244 661170 Web. www.arbtech.co.uk

pg. 39 28 Maiden Lane – Arbtech AMS 02

Appendix 4: Reinforcement with Cellweb TRP®

Page 40: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Application

[11 RUR-CEL]

Date:

Client / End user:

Designer / Specifier:

Planning Authority:

Project Title:

Location:

Application:

Vehicle Type (nb of axles)

Axle Load: P (kN/axle) Granular Soil

Wheel load: (kN/wheel) Cohesive Soil

Vehicle Weight:(kg or Ton) Peat Soil

Number of traffic passages:

Regular HGV useduring

construction

after construction

Occasional HGV use Block Paving+Sand Bedding

No HGV use Porous Tarmac

Unusual load e.g. crane or piling

rig

Resin bonded gravel + Binder

course AC 14

Occasional fire engines Loose Gravel

Bin lorries Golpla System infill gravel

Golpla System infill grass

Sudscape

Existing Ground Other

CBR (%) Depth of Surface*

*See drawing below

Traffic (Please Tick)

Document Ref: G14/03/21.03.14

Traffic information

Reinforcement

with CellWeb TRP®

Information For

Calculation

Type of Surfacing

(Porous surface always

recommended for TRP

zones)

Surface to be used

Existing ground

Type of soil

Page 41: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Arbtech Consulting Ltd 5678552 GB903660148 Directors: R. M. Oates Unit 3 Well House Barn, Chester Road, Chester, CH4 0DH Tel. 01244 661170 Web. www.arbtech.co.uk

pg. 41 28 Maiden Lane – Arbtech AMS 02

Appendix 5: Contact Details

Name Position Company Contact

Client / Agent

Tree Officer

Matthew Middle Arboricultural Consultant Arbtech Consulting Ltd. 01244 661170

Site Manager

Main contractor

Page 42: Arboricultural Method Statement - Crawley · Arboricultural Method Statement ... and this method statement c) Undertaken demolition works d) Undertake and complete construction works

Arbtech Consulting Ltd 5678552 GB903660148 Directors: R. M. Oates Unit 3 Well House Barn, Chester Road, Chester, CH4 0DH Tel. 01244 661170 Web. www.arbtech.co.uk

pg. 42 28 Maiden Lane – Arbtech AMS 02

Document Production Record

Document number

Editor Signature Position Issue

number Date

Arbtech AMS 02 Matthew Middle Senior

Consultant 1 25/11/2015

Limitations

Arbtech Consulting Ltd has prepared this Report for the sole use of the above named

Client/Agent in accordance with our terms of business, under which our services were

performed. No other warranty, expressed or implied, is made as to the professional

advice included in this Report or any other services provided by us. This Report may not

be relied upon by any other party without the prior and express written agreement of

Arbtech Consulting Ltd. The assessments made assume that the sites and facilities will

continue to be used for their current purpose without significant change. The

conclusions and recommendations contained in this Report are based upon information

provided by others and upon the assumption that all relevant information has been

provided by those parties from whom it has been requested. Information obtained from

third parties has not been independently verified by Arbtech Consulting Ltd.

Copyright

© This Report is the copyright of Arbtech Consulting Ltd. Any unauthorised reproduction

or usage by any person other than the addressee is strictly prohibited.