ARCHITECT’S SUPPLEMENTAL INSTRUCTIONS
This document is based on AIA DOCUMENT G710
The Work shall be carried out in accordance with the following supplemental instructions issued in accordance with the Contract Documents without change in Contract Sumor Contract Time. Proceeding with the Work in accordance with these instructions indicates your acknowledgement that there will be no change in the Contract Sum orContract Time.
PROJECT: ARCHITECT’S SUPPLEMENTAL INSTRUCTION NO.
CONTRACTOR: ARCHITECT: COLAB Architecture + Urban Design llc421 SW 6th Ave, Suite 1250Portland, OR 97204503.827.5339
OWNER: DATE OF ISSUANCE:
CONTRACT FOR:
DESCRIPTION: (Provide all material and labor to perform the following)
ATTACHMENTS:
ISSUED BY:ARCHITECT: COLAB Architecture + Urban Design llc
Item: Pages: Date:
ARCHITECT’S PROJECT NO.:
CONTRACT DATED:
OWNERARCHITECTCONSULTANTCONTRACTORFIELDOTHER
✔
✔
✔
✔
✔
View Point Terrace Apartments 3939 SW View Point Terrace Portland, OR 97239
12
VPT llc 12/18/2014
Pavilion Construction 4700 SW Macadam Ave Portland, OR 97239
General Construction 1309
09/30/2014
Revised portions of sheets S2.12, S2.13 which include revisions to glu-lam depths and one eliminated glu-lam Revised holdown schedule Holdown details HSS posts to conc. and shear wall details
Structural drawings 8 12/18/2014
Jessica Molinar
1 of 8
2 of 8
3 of 8
4 of 8
5 of 8
6 of 8
7 of 8
8 of 8