14
ARCHITECTS NATIONAL CODE THE ARCHITECT’S CODE OF ETHICS “GISRIP”, “BBCC” G-eneral Objectives B-usiness I-deals B-ehavior S-uccess C-riticism R-emuneration C-reative Endeavor I-nterest of the Client P-rofessional Prerogative SPECTRUM OF THE ARCHITECTS SERVICES The Spectrum of the Architect’s Services UAP Doc 201 Pre-Design Services “EPASSSSP” - NON CREATIVE – no design and construction 1. E-conomic Feasibility Studies 2. P-roject Financing 3. A-rchitectural Programming 4. S-ite Selection and Analysis* 5. S-ite Utilization and Land-Use Studies* 6. S-pace/Management Studies 7. P-romotional Services *Must be EnP, Environmental Planner

ARCHITECT’S NATIONAL CODE.pdf

Embed Size (px)

DESCRIPTION

reviewer notes

Citation preview

  • ARCHITECTS NATIONAL CODE THE ARCHITECTS CODE OF ETHICS GISRIP, BBCC G-eneral Objectives B-usiness I-deals B-ehavior S-uccess C-riticism R-emuneration C-reative Endeavor I-nterest of the Client P-rofessional Prerogative SPECTRUM OF THE ARCHITECTS SERVICES The Spectrum of the Architects Services UAP Doc 201 Pre-Design Services EPASSSSP - NON CREATIVE no design and construction 1. E-conomic Feasibility Studies 2. P-roject Financing 3. A-rchitectural Programming 4. S-ite Selection and Analysis* 5. S-ite Utilization and Land-Use Studies* 6. S-pace/Management Studies 7. P-romotional Services *Must be EnP, Environmental Planner

  • MDPE compensation method Methods of Compensation 1. Percentage of Construction 2. Multiple Direct Personnel Expense MDPE Architect = NTRMf Consultant = NTRMf Staff= NTRMf E = Direct Cost E + MP + RE = Project Cost; where MP (Marginal Cost = 30%), RE (Reimbursable Expense) Project Cost + AE = Professional Fee: where AE = Architect & Engineer Fee N T R Mf Min. Fee = 2.0 2.5 as Multiplier 3. Lump Sum/ Fixed Fee 4. Per Diem Plus Reimbursable Expense 5. Combination 6. Professional Fee and Expenses 7. Turn Key Reimbursable Expenses Conditions: 1. Pertinent to the Project 2. Must occur within 100 K = radius 3. Mutual agreement Schedule of Payments CONTRACTOR 1. Downpayment - 20 50% of Project Cost 2. Progressive Billing base on percentage of completion (not more than 1 month) 3. Final Billing/Payment - 98% Complete 4. Guarantee Bond enforced for 1 year

  • ARCHITECT 1. Proposal Fee 5% 2. Schematic Design 15% 3. Design Devt 15% 4. Contract Docs 50% 5. Retention 15%=Liability 10%, Supervision 5% SPECIALIZED ALLIED SERVICES SAS 1. Proposal Fee 5% 2. Prelim Drawings 25% 3. Final Drawings 50% 4. Retention 20% = 3 monthss after the acceptance of the Architect UAP Doc 202 Design Services: Regular Architectural Services PWSP SDCC - Sequential 1. P-reliminary Design/S-chematic Design 2. W-orking Drawings/D-esign Devt Phase 3. S-pecifications and Other Contract Documents/C-ontract Documents* 4. P-art-Time Supervision/C-onstruction Phase* *Under Contract Doc. Phase (Refer to UAP Doc 301 General Conditions of a Contract) GASSD 1. G-eneral Conditions Execution, Intent satisfaction to finish the proj., Correlation 2. A-greement 3. S-pecifications 4. S-pecial Provisions 5. D-rawings *Under Construction Phase

  • Important Milestones of Construction RERCF 1. R-eference Horizontal, Vertical 2. E-xcavation min. depth .60m until stable w/ signature of the Architect, must have a permit 3. R-ebars 4. C-oncreting 5. F-inishes Mock up (samples) 5 Ms of Construction 1. M-achines 2. M-oney 3. M-anpower 4. M-aterial 5. M-inutes PROJECT CLASSIFICATION UAP degree of difficulty/complexity of design FCP risk of occurrence of Fire NCP use and occupancy ARCHITECTURAL PROJECTS (SCHEDULE OF MINIMUM BASIC FEE) SMERM RHEAC

    GROUP DEFINITION MINIMUM BASIC FEE

    S-imple (Hangars) Without partitions P50M & less 6% M-oderate (Art Galleries) With partitions P50M & less 7% E-xceptional (Aquariums) Requires

    Consultants P50M & less 8%

    R-esidences Single Detached or Duplex

    10% of Proj. Const. Cost

  • M-onumental Buildings (Expositions, Mausoleums, Memorials)

    Requires Concepts

    12% of Proj. Const. Cost

    R-epetitive Buildings Construction of Similar Structures

    1st Structure MBF2nd Structure 80% of BF3rd Structure 60% of BFSucceeding 40% of BF

    H-ousing Projects Construction of several residential units

    1st Unit = 10% MBF = A 2 to 10 Units = A + (60% of MBF x N) = B 11 and above = B + (30% of MBF x N) ; where N = no. of units

    E-xtensive Detailing Design of detailed Parts of appurtenances, special fittings, etc.

    15% of Proj. Const. Cost

    A-lterations and Additions

    Structures belonging to Groups 1 to 5

    MBF + 50% of MBF

    C-onsultations and Arbitration

    Technical matters, service

    P200, P500

  • as an expert witness

    UAP Doc 203 Specialized Allied Services SAS PILAC

    SERVICES PARTICULARS PAYMENTS/SCHEDULE OF FEES

    P-hysical Planning

    Must be an EnP Type I Site Devt Planning 50 HAS P5000/HAS = A 50-100 A + P4500/HAS = B 100-200 B + P4000/HAS = C over 200 C + P3000 Type II Subdivision Planning (Urban) MM, Cities, Regional Centers, Provincial Capitals 100 HAS P3000/HAS = A 100-200 A + P2300/HAS = Bover-200 B + P2000/HAS = C Type II Subdivision Planning (Rural) other localities 100 HAS P2000/HAS = A 100-200 A + P1500/HAS = Bover-200 B + P1000/HAS

  • = C I-nterior Design Licensed IND 12 20% cost of work L-andscape Design

    Landscape Architect

    10 15% cost of work

    A-coustic, Communication and Electronic Engineering Services

    Engineer ECE 10 15% cost of work

    C-omprehensive Planning

    Must be an EnP 1. Physical Component 2. Economic Planning 3. Socio-Cultural 4. Transport 5. Legal & Administrative

    a. Same w/ Physical Planningb. MDPE

    Civil works (preparation of detailed engineering drawings and specifications, roads, drainage, sewerage, power and communication) 4% cost of the development

  • STANDARDS OF PROFESSIONAL PRACTICE UAP DOC 204 Construction Services FC 1. F-ull Time Supervision Team or Individual, Quality Control, Evaluation, Records Basic Salary if Architect 1- 1.5% 2. C-onstruction Management CM - Team or Individual, Time and Cost Control, Coordination and Supervision:1.5-3% of Construction Cost 3*. P-roject Management PM 2 5% (Refer to UAP Doc 206 Comprehensive Architectural Services) Before

    Construction During After

    CM Present PM Present

    Identifies, accredits,

    recommends potential

    contractors & suppliers

    Present Present Advertising, Promotional

    Services, Building

    Administrator

    UAP Doc 205 Post-Construction Services (Maintenance and Administration) 1. BE Building and Equipment Maintenance If the building is Safe and habitable will issue Certificate of Occupancy Good working condition and properly maintained 2. BG Building & Grounds Administration 1. Billing of Tenants 2. Security and Janitorial Services (Monitoring) 3. Local Ordinances

    Method of Compensation (BG) 1. Fixed Salary Basis monthly 2. Percentage of Gross Rentals 4-6%

  • UAP 206 Comprehensive Architectural Services (Scope from UAP Doc 201 to 205) The Project Manager PM 2 - 5% of Estimated Project Cost, Combination Methods if performs in regular Architectural Services for the same project will compensate separately. Basic Functions a. Operates as a member of Owner-Architect-Engineer-Contractor b. Contractor men and equipment, project delivery as per contract, Owner funds are available to complete project w/in budget estimates c. Plan, Program, Monitor activities, Adviser of material cost and Construction methods, Exercise Overall cost control. Detailed Functions a. Pre-Construction Phase b. Construction Phase UAP 207 Design-Build Services Method of Project Delivery 1. DBA Design-Build Services by Administration - 7% of Proj. Const. Cost Proj. Const. Cost. in addition to Architects fee for Regular Design Services (UAP 202) 10% (if residential proj.) + 7% = 17% 2. DBGMC Design Build by Guaranteed Maximum Cost a. Lump Sum b. If the cost is exceeded by not more than 10% it is divided = bet. Architect and Client. However if the excess is more than 10% the Architect pays for all extra cost of the10%

  • UAP Doc 208 Selection of the Architect & Methods of Compensation 1. Direct Selection 2. Indirect

    a. Referral from satisfied client b. Recommendation form another Architect c. Comparative Selection

    3. Design Competition Methods of Compensations (Refer to UAP Doc 201 Pre-Design Services) UAP Doc 301 General Conditions of a Contract 1. Establishes the relationship bet:

    a. Architect and Client b. Contractor and Client c. Architect and Contractor

    2. Establishes the norms of conduct a. must have an Architect b. must have an Engineer c. its Conditions

    3. Current Standards of the Practice whether in DESIGN and CONSTRUCTION Section 1 Definition of Documents (Glossary of Terms) Section 2 Laws Regulation a. Site Conditions b. Permits c. Taxes d. Royalties e. Patents f. Surveys Section 3 Equipment Materials Quality and Quantity

  • Section 4 Premises Temporary Facilities TEMPACIL* a. Office bedroom for Architect b. Quarters for staying workers c. Warehouse storage d. Accessway road ways, bridge, hoist (elevator) e. Enclosure f. Signage g. Trial usage *contractors expense Section 5 Protection a. Property (work area) b. Adjacent Property and Existing Utilities c. Life, work, and Property during emergencies Section 6 Labor, Work, and Payments Labor characteristics/quality No. /quality, no. of workers signed by YOU Work duration and deadlines; if delay P20,000 per day. Liquidated Damages = 0.01 of the Contract Sum by the government Payments Contractor 1. Progressive Billing partial % of Completion 2. Request for inspection Architect will issue (if accept)

    a. Certificate of Acceptance b. Certificate of Payment Owner for payment pay or

    not pay c. If 65% completion the contractor will issue of non-

    financial obligation (certificate)

  • Section 7 Relationship bet. Architect and Sub-Contractor 5 copies of Drawings to: a. Contractor b. Owner c. Office of the Building Official (OBO) d. Fire Dept. e. Site Laws Affecting Real Estate Housing, General Design, Construction, etc. 1. PD 1096 The National Building Code 2. PD 1185 The Fire Code of the Philippines Enforced by PNP Gen. Hermohenes Ebdane 3. PD 957 The Condominium & Subdivision Buyers Protective Law 4. BP 220 Socialized Housing Law 5. BP 344 Law Enhancing the Mobility of the Disabled (Accessibility Law) Laws that regulate the Practice of Architecture 1. RA 545/RA9266 the Architecture Law 2. EO 164 Regulating the Hiring of Foreign Consultants 3. PD 49 Intellectual Property Law 4. PD 223 - PRC Law 5. LOI 1000 Letter of Instructions, mandating government support only to APO (Accredited Professional Organization) See print out of PRC 6. RA 9283 Copyright Law

  • PD Presidential Decree BP Batas Pambansa EO - Executive Order LOI Letter of Instruction RA Republic Act Additional Terms: 1. According to RA9266 all projects either big or small must have a contract. LAWYER NOTARY REGISTER OF CONTRACT 2. Contractor pays for the Building Permit (cannot be reimbursed, not included in Estimates) 3. Architect cannot be a Contractor at the same time. 4. Contractor is profit motivated; Builder is completion motivated; Contractor holds the money; Builder doesnt hold the money. 15 days can a contractor, atter giving due notice to the owner/architect suspend work or terminate a contract. Responsible for the payment of insurance for personal injury and to property; Responsible for the As-Built Plans of the Project 5. 2% per annum Interest (if money is not fully collected) 6. TOR Terms of Reference 7. Building Permit validity 120 days, valid 12 months if constructed has not commenced; exception government structure; excepted if P15,000 proj. cost 8. Notary to legalize document with series no., document no., etc. 9. Arbitration can file a case after 30 days 10. Specifications are printed documents stipulating the procedural aspects of the contract 11. Variance is the minimum possible deviation from standards which is permitted to make a highly beneficial housing project. 12. Project duration is computed immediately from the receipt date of the NTP

  • 13. Design of any religious structures is assessed professional fees 14. Competitive bidding is mandatory for public work projects 15. 7 Days affectivity of a Construction contract from receipt of Notice of Final Payment 16. Civil Code liability of Architect for Regular Design of structures 15 years 17. PERT Prog. Evaluation Review Technique 18. CPM Critical Path Method