15
GSPublisherVersion 0.21.100.100 Client: Project title: ARCHITECTS GeConsult Office No. 529, 5th Floor, 680 Hotel Building, Muindi Mbingu Street, Off Kenyatta Avenue. PROJECT DETAILS ARCHITECTURE & ENGINEERING CONSULTANTS [email protected] www.geconsultarchitects.com P.O Box 103525 - 00101 Nairobi,Kenya Tel:+254 724 008 839 / +254 725 178 875 Implementation Partner: : Somali Stabilization Initiative (SSI) Rehabilitation of a Stadium in Hudur (Grant No. BAI071) IOM

ARCHITECTS PROJECT DETAILS - Hiiraan - Hudur... · 2018-01-28 · Office No. 529, 5th Floor, 680 Hotel Building, Muindi Mbingu Street, Off Kenyatta Avenue. PROJECT DETAILS ARCHITECTURE

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ARCHITECTS PROJECT DETAILS - Hiiraan - Hudur... · 2018-01-28 · Office No. 529, 5th Floor, 680 Hotel Building, Muindi Mbingu Street, Off Kenyatta Avenue. PROJECT DETAILS ARCHITECTURE

GSPublisherVersion 0.21.100.100

Client: Project title:

ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.

PROJECT DETAILS

ARCHITECTURE & ENGINEERING CONSULTANTS

[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875

Implementation Partner::

Somali Stabilization Initiative(SSI)

Rehabilitation of a Stadium inHudur (Grant No. BAI071)

IOM

Page 2: ARCHITECTS PROJECT DETAILS - Hiiraan - Hudur... · 2018-01-28 · Office No. 529, 5th Floor, 680 Hotel Building, Muindi Mbingu Street, Off Kenyatta Avenue. PROJECT DETAILS ARCHITECTURE

GSPublisherVersion 0.21.100.100

Client: Project title:

ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.

PROJECT DETAILS

ARCHITECTURE & ENGINEERING CONSULTANTS

[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875

Implementation Partner::

SHEET NO. CONTENT

Somali Stabilization Initiative(SSI)

Rehabilitation of a Stadium inHudur (Grant No. BAI071)

IOM

A-01

A-02

A-03

A-04

A-05

A-06

A-07

A-08

GPS Coordinates

Site Plan

Set Out Plan

Rehabilitation Notes 01

Rehabilitation Notes 02

Rehabilitation Notes 03

Rehabilitation Notes 04

Rehabilitation Notes 05

A-09

A-10

E-01

E-02

Power Distribution Layout

Stadium Electrical Details

Spectator Stands

Mosque, Changing rooms & Washrooms

A-11

Door & Window Schedule

Page 3: ARCHITECTS PROJECT DETAILS - Hiiraan - Hudur... · 2018-01-28 · Office No. 529, 5th Floor, 680 Hotel Building, Muindi Mbingu Street, Off Kenyatta Avenue. PROJECT DETAILS ARCHITECTURE

GSPublisherVersion 0.21.100.100

Client: Project title:

ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.

PROJECT DETAILS Drawing Tittle:

Drawn by: Sheet No. Scale:

Revision No.

Checked by:

Date:

Hassan Abdisamad

November 2017

ARCHITECTURE & ENGINEERING CONSULTANTS

[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875 ARCHITECTURAL DRAWINGS

--

A.K

4°07'03.7"N 43°53'25.5"E

Rehabilitation of a Stadium inHudur (Grant No. BAI071)

IOM [SSI]

GPS COORDINATES

A-01 N/A

Page 4: ARCHITECTS PROJECT DETAILS - Hiiraan - Hudur... · 2018-01-28 · Office No. 529, 5th Floor, 680 Hotel Building, Muindi Mbingu Street, Off Kenyatta Avenue. PROJECT DETAILS ARCHITECTURE

GSPublisherVersion 0.21.100.100

Client: Project title:

ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.

PROJECT DETAILS Drawing Tittle:

Drawn by: Sheet No. Scale:

Revision No.

Checked by:

Date:

Hassan Abdisamad

November 2017

ARCHITECTURE & ENGINEERING CONSULTANTS

[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875 ARCHITECTURAL DRAWINGS

--

A.K

125M

155M

116M

145M

14M

A

ABCDEF

Changing rooms

Washrooms

Spectator Stand

Guard House

Mosque

Football pitch

ENTRY 1

ENTRY 2

B B C

D

D

E

F

SITE PLAN

A-02 1:500Rehabilitation of a Stadium inHudur (Grant No. BAI071)

IOM [SSI]

Page 5: ARCHITECTS PROJECT DETAILS - Hiiraan - Hudur... · 2018-01-28 · Office No. 529, 5th Floor, 680 Hotel Building, Muindi Mbingu Street, Off Kenyatta Avenue. PROJECT DETAILS ARCHITECTURE

GSPublisherVersion 0.21.100.100

Client: Project title:

ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.

PROJECT DETAILS Drawing Tittle:

Drawn by: Sheet No. Scale:

Revision No.

Checked by:

Date:

Hassan Abdisamad

November 2017

ARCHITECTURE & ENGINEERING CONSULTANTS

[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875 ARCHITECTURAL DRAWINGS

--

A.K

125M

155M

116M

145M

14M

26.7M 105M 26.6M

50.7

M60

M13

.7MA

ABCDEF

Changing rooms

Washrooms

Spectator Stand

Guard House

Mosque

Football pitch

ENTRY 1

ENTRY 2

B B C

D

D

E

F

SET OUT PLAN

A-03 1:500Rehabilitation of a Stadium inHudur (Grant No. BAI071)

IOM [SSI]

Page 6: ARCHITECTS PROJECT DETAILS - Hiiraan - Hudur... · 2018-01-28 · Office No. 529, 5th Floor, 680 Hotel Building, Muindi Mbingu Street, Off Kenyatta Avenue. PROJECT DETAILS ARCHITECTURE

GSPublisherVersion 0.21.100.100

Client: Project title:

ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.

PROJECT DETAILS Drawing Tittle:

Drawn by: Sheet No. Scale:

Revision No.

Checked by:

Date:

Hassan Abdisamad

November 2017

ARCHITECTURE & ENGINEERING CONSULTANTS

[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875 ARCHITECTURAL DRAWINGS

--

A.K

43,000

1,10

01,

100

1,10

01,

100

1,10

01,

100

4,90

0

11,5

00

6,10

0

18,000

600

600

600

600

600

600

600

3,16

0

4002,400

4002,400

4002,400

4002,400

4002,400

4002,400

400

2,70

0

ELEVATION E-01

ELEVATION E-02

SPECTATOR STAND PLAN

E-01

E-02

SPECTATOR STAND DETAILS

A-04 1:140Rehabilitation of a Stadium inHudur (Grant No. BAI071)

IOM [SSI]

Page 7: ARCHITECTS PROJECT DETAILS - Hiiraan - Hudur... · 2018-01-28 · Office No. 529, 5th Floor, 680 Hotel Building, Muindi Mbingu Street, Off Kenyatta Avenue. PROJECT DETAILS ARCHITECTURE

GSPublisherVersion 0.21.100.100

Client: Project title:

ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.

PROJECT DETAILS Drawing Tittle:

Drawn by: Sheet No. Scale:

Revision No.

Checked by:

Date:

Hassan Abdisamad

November 2017

ARCHITECTURE & ENGINEERING CONSULTANTS

[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875 ARCHITECTURAL DRAWINGS

--

A.K

11,380

3,00

01,

500

900

2,16

580

02,

300

1,843 8,943 595

10,6

65

200

2,40

01,

200

3,00

01,

765

900

2,40

080

01,

800

10,6

65

11,380

11,380

1,20

02,

800

1,150 1,500 1,200 2,300 1,200 1,500 1,150

10,000

4,00

0

2,60

0

200

1,70

02,20

03,

000

6,500

1,50

03,

000

4,50

0

2001,416

2001,334

2001,382

2001,368

200

6,500

ELEVATION E-01 ELEVATION E-02

E-01

E-02

G.LFloor Level +200

Porch Level +2600

Parapet Level +3800

MOSQUE FLOOR PLANG.L

Floor Level +200

Porch Level +2600

Parapet Level +3800

G.LFloor Level +200

Sill Level +1700

Lintel Level +2200

Roof Level +3000

G.LFloor Level +200

Sill Level +1700

Lintel Level +2200

Roof Level +2800

CHANGING ROOMS FLOOR PLAN

ELEVATION E-01 ELEVATION E-02

ROOF PLAN

Mosque

Porch

ChangingRoom 1

ChangingRoom 2

E-01

E-02

FALL

FALL FALL

FALL

FALL

G.LFloor Level +200

Roof Level +3000

ELEVATION E-01

Front Wall Level +2600

G.LFloor Level +200

Roof Level +3000

ELEVATION E-02

Front Wall Level +2600

E-01

E-02

ROOF PLAN

LATRINES FLOOR PLAN

MOSQUE, CHANGING ROOMS & WASHROOMS

A-05 1:140Rehabilitation of a Stadium inHudur (Grant No. BAI071)

IOM [SSI]

Page 8: ARCHITECTS PROJECT DETAILS - Hiiraan - Hudur... · 2018-01-28 · Office No. 529, 5th Floor, 680 Hotel Building, Muindi Mbingu Street, Off Kenyatta Avenue. PROJECT DETAILS ARCHITECTURE

GSPublisherVersion 0.21.100.100

Client: Project title:

ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.

PROJECT DETAILS Drawing Tittle:

Drawn by: Sheet No. Scale:

Revision No.

Checked by:

Date:

Hassan Abdisamad

November 2017

ARCHITECTURE & ENGINEERING CONSULTANTS

[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875 ARCHITECTURAL DRAWINGS

--

A.K

IMAGE DIMENSIONS QUANTITY DESCRIPTION

2200MM (H)X

900 (W)

1200MM (H)X

800 (W)

2200MM (H)X

800 (W)8

6

2

STEEL PANEL SWING DOORS WITH 3 NO. BUSH HINGESAND A LOCKABLE DEAD LOCK LATCH TO FABRICATOR'SDETAILS AND ARCHITECT'S APPROVAL(Door dimensions to be confirmed from the existingopening sizes by fabricator before fabrication)

STEEL PANEL SWING DOORS WITH 3 NO. BUSH HINGESAND A LOCKABLE DEAD LOCK LATCH TO FABRICATOR'SDETAILS AND ARCHITECT'S APPROVAL(Door dimensions to be confirmed from the existingopening sizes by fabricator before fabrication)

PRECAST CONCRETE VENTILATION BLOCKS TOFABRICATOR'S DETAILS AND ARCHITECT'S APPROVAL(Window dimensions to be confirmed from the existingopening sizes by fabricator before fabrication)

LOCATION

CHANGINGROOMS ANDMOSQUE

MOSQUE

LATRINES

500MM (H)X

1200 (W)2

PRECAST CONCRETE VENTILATION BLOCKS TOFABRICATOR'S DETAILS AND ARCHITECT'S APPROVAL(Window dimensions to be confirmed from the existingopening sizes by fabricator before fabrication)

CHANGINGROOMS

22400MM (H)

X900 (W)

MOSQUE

STEEL FRAME SWING DOORS WITH 3 NO. BUSH HINGESAND A LOCKABLE DEAD LOCK LATCH TO FABRICATOR'SDETAILS AND ARCHITECT'S APPROVAL(Door dimensions to be confirmed from the existingopening sizes by fabricator before fabrication)

Rehabilitation of a Stadium inHudur (Grant No. BAI071)

IOM [SSI]

DOOR & WINDOW SCHEDULE

A-06 N/A

Page 9: ARCHITECTS PROJECT DETAILS - Hiiraan - Hudur... · 2018-01-28 · Office No. 529, 5th Floor, 680 Hotel Building, Muindi Mbingu Street, Off Kenyatta Avenue. PROJECT DETAILS ARCHITECTURE

GSPublisherVersion 0.21.100.100

Client: Project title:

ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.

PROJECT DETAILS Drawing Tittle:

Drawn by: Sheet No. Scale:

Revision No.

Checked by:

Date:

Hassan Abdisamad

November 2017

ARCHITECTURE & ENGINEERING CONSULTANTS

[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875 ARCHITECTURAL DRAWINGS

--

A.K

REHABILITATION NOTES

A-07 N/A

1

2

3

4

BEFORE

AFTER

REHABILITATION NOTES

Cut and Fill uneven ground and open pit, compact and mark the pitchto approval.

Introduce a chainlink barrier between spectators and players,with support columns at 3M centre to centre

Scrape off all loose material on spectator stand's walls, fill cracks andworn out plaster then paint to architect's approval. Raise back wall tomatch shade height for security purposes.

Scrape off all loose material from the worn out spectator stand floorand rescreed and finish to architect's approval.

5

21

3

4

5

Provide and install 4 No. pitch floodlights. 1 at every corner of the field.

Page 10: ARCHITECTS PROJECT DETAILS - Hiiraan - Hudur... · 2018-01-28 · Office No. 529, 5th Floor, 680 Hotel Building, Muindi Mbingu Street, Off Kenyatta Avenue. PROJECT DETAILS ARCHITECTURE

GSPublisherVersion 0.21.100.100

Client: Project title:

ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.

PROJECT DETAILS Drawing Tittle:

Drawn by: Sheet No. Scale:

Revision No.

Checked by:

Date:

Hassan Abdisamad

November 2017

ARCHITECTURE & ENGINEERING CONSULTANTS

[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875 ARCHITECTURAL DRAWINGS

--

A.K

REHABILITATION NOTES

A-08 N/A

1

2

3BEFORE

AFTER

REHABILITATION NOTES

Introduce a 12mm chipboard ceiling in the changingrooms. Paint to approval.

Replace broken ventilation blocks and repaint to thechanging rooms to approval.

Existing doors in good condition, only repainting isrequired.

2

3

1

Page 11: ARCHITECTS PROJECT DETAILS - Hiiraan - Hudur... · 2018-01-28 · Office No. 529, 5th Floor, 680 Hotel Building, Muindi Mbingu Street, Off Kenyatta Avenue. PROJECT DETAILS ARCHITECTURE

GSPublisherVersion 0.21.100.100

Client: Project title:

ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.

PROJECT DETAILS Drawing Tittle:

Drawn by: Sheet No. Scale:

Revision No.

Checked by:

Date:

Hassan Abdisamad

November 2017

ARCHITECTURE & ENGINEERING CONSULTANTS

[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875 ARCHITECTURAL DRAWINGS

--

A.K

1

2

3

4

BEFORE

AFTER

REHABILITATION NOTES

Cut and Fill uneven ground and open pit, compact to approval.

Introduce a chainlink barrier between spectators and players,with support columns at 3M centre to centre

Provide and install 4 No. pitch floodlights. 1 at every corner of the field.

Extend the perimeter wall an extra 600mm high and install razor wire for extra security in the pitch.

1

2

3

54

5 Scrape off all loose material on the mosque's wall, fill in cracks n dentsthen paint to approval.

REHABILITATION NOTES

A-09 N/A

Page 12: ARCHITECTS PROJECT DETAILS - Hiiraan - Hudur... · 2018-01-28 · Office No. 529, 5th Floor, 680 Hotel Building, Muindi Mbingu Street, Off Kenyatta Avenue. PROJECT DETAILS ARCHITECTURE

GSPublisherVersion 0.21.100.100

Client: Project title:

ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.

PROJECT DETAILS Drawing Tittle:

Drawn by: Sheet No. Scale:

Revision No.

Checked by:

Date:

Hassan Abdisamad

November 2017

ARCHITECTURE & ENGINEERING CONSULTANTS

[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875 ARCHITECTURAL DRAWINGS

--

A.K

1

2

3

4

REHABILITATION NOTES

Cut and Fill uneven ground and open pit, compact to approval.

Introduce a chainlink barrier between spectators and players,with support columns at 3M centre to centre

Provide and install 4 No. pitch floodlights. 1 at every corner of the field.

Extend the perimeter wall an extra 600mm high and install razor wire for extra security in the pitch.

12

3

4

BEFORE

AFTER

REHABILITATION NOTES

A-10 N/A

Page 13: ARCHITECTS PROJECT DETAILS - Hiiraan - Hudur... · 2018-01-28 · Office No. 529, 5th Floor, 680 Hotel Building, Muindi Mbingu Street, Off Kenyatta Avenue. PROJECT DETAILS ARCHITECTURE

GSPublisherVersion 0.21.100.100

Client: Project title:

ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.

PROJECT DETAILS Drawing Tittle:

Drawn by: Sheet No. Scale:

Revision No.

Checked by:

Date:

Hassan Abdisamad

November 2017

ARCHITECTURE & ENGINEERING CONSULTANTS

[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875 ARCHITECTURAL DRAWINGS

--

A.K

2

1

3

4

1

2

3

4BEFORE

AFTER

REHABILITATION NOTES

Cut and Fill uneven ground and open pit, compact to approval.

Introduce a chainlink barrier between spectators and players,with support columns at 3M centre to centre

Provide and install 4 No. pitch floodlights. 1 at every corner of the field.

Extend the perimeter wall an extra 600mm high and install razor wire for extra security in the pitch.

REHABILITATION NOTES

A-11 N/A

Page 14: ARCHITECTS PROJECT DETAILS - Hiiraan - Hudur... · 2018-01-28 · Office No. 529, 5th Floor, 680 Hotel Building, Muindi Mbingu Street, Off Kenyatta Avenue. PROJECT DETAILS ARCHITECTURE

GSPublisherVersion 0.21.100.100

Client: Project title:

ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.

PROJECT DETAILS Drawing Tittle:

Drawn by: Sheet No. Scale:

Revision No.

Checked by:

Date:

Hassan Abdisamad

November 2017

ARCHITECTURE & ENGINEERING CONSULTANTS

[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875 ARCHITECTURAL DRAWINGS

--

A.K

125M

155M

116M

FLOODLIGHTS SWITCH

MAIN DISTRIBUTIONBOARD

FLOODLIGHT

FLOODLIGHTFLOODLIGHT

FLOODLIGHT

DISTRIBUTIONBOARD

DISTRIBUTIONBOARD

ENTRY 2

STADIUM POWER DISTRIBUTION LAYOUT

E-01 1:500Rehabilitation of a Stadium inHudur (Grant No. BAI071)

IOM [SSI]

Page 15: ARCHITECTS PROJECT DETAILS - Hiiraan - Hudur... · 2018-01-28 · Office No. 529, 5th Floor, 680 Hotel Building, Muindi Mbingu Street, Off Kenyatta Avenue. PROJECT DETAILS ARCHITECTURE

GSPublisherVersion 0.21.100.100

Client: Project title:

ARCHITECTSGeConsultOffice No. 529,5th Floor, 680 Hotel Building,Muindi Mbingu Street,Off Kenyatta Avenue.

PROJECT DETAILS Drawing Tittle:

Drawn by: Sheet No. Scale:

Revision No.

Checked by:

Date:

Hassan Abdisamad

November 2017

ARCHITECTURE & ENGINEERING CONSULTANTS

[email protected] Box 103525 - 00101 Nairobi,KenyaTel:+254 724 008 839 / +254 725 178 875 ARCHITECTURAL DRAWINGS

--

A.K

MOSQUE ELECTRICAL LAYOUTLATRINES ELECTRICAL LAYOUT

CHANGING ROOMS ELECTRICAL LAYOUT

TWIN SOCKET WITH SWITCHES

4FT FLOURESCENT LIGHT

2 GANG 1 WAY SWITCH

1 GANG 1 WAY SWITCH

CEILING MOUNTED LIGHT POINT

INTERNAL LIGHTING CURCUIT

INTERNAL POWER DISTRIBUTION CURCUIT

SECURITY LIGHTING CURCUIT

EXTERNAL POWER DISTRIBUTION CURCUIT

POWER DISTRIBUTION BOARD

MAIN CONSUMER POWER UNIT

4 GANG 1 WAY SECURITY LIGHTING SWITCH

SECURITY LIGHTING FLOODLIGHTS

LEGEND

STADIUM ELECTRICAL LAYOUT

E-02 1:500Rehabilitation of a Stadium inHudur (Grant No. BAI071)

IOM [SSI]