NO. 2 TO THE DRAWINGS AND THE PROJECT MANUAL PROJECT NAME: The Colony High School New Football Pressbox CLIENT NAME: Lewisville ISD LOCATION: The Colony, Texas PROJECT NUMBER: 1743-51-01 PROPOSAL DATE: Tuesday, June, 29 th , 2021, 2:00 PM ADDENDUM DATE: Thursday, June 24th, 2021 For additional information regarding this project, contact Northstar Builders at bid- [email protected]. THIS ADDENDUM INCLUDES: Civil Items 0 Pages Landscape Items 0 Pages Structural Items 0 Pages Architectural Items 1 Pages Fire Protection Items 0 Pages Plumbing Items 1 Pages Mechanical Items 0 Pages Electrical Items 0 Pages Technology Items 0 Pages AND ALL ATTACHED REVISED DRAWING REFERENCES IN THE ADDENDUM 2021.06.24

ARCHITECTURAL ITEMS FOR ADDENDUM NO. 2

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

NO. 2

TO THE DRAWINGS AND THE PROJECT MANUAL

PROJECT NAME: The Colony High School New Football Pressbox

CLIENT NAME: Lewisville ISD

LOCATION: The Colony, Texas

PROJECT NUMBER: 1743-51-01

PROPOSAL DATE: Tuesday, June, 29th, 2021, 2:00 PM

ADDENDUM DATE: Thursday, June 24th, 2021

For additional information regarding this project, contact Northstar Builders at bid-

[email protected].

THIS ADDENDUM INCLUDES:

Civil Items 0 Pages

Landscape Items 0 Pages

Structural Items 0 Pages

Architectural Items 1 Pages

Fire Protection Items 0 Pages

Plumbing Items 1 Pages

Mechanical Items 0 Pages

Electrical Items 0 Pages

Technology Items 0 Pages

AND ALL ATTACHED REVISED DRAWING REFERENCES IN THE ADDENDUM

2021.06.24

Project Name: The Colony High School New Football Pressbox

Client: Lewisville ISD

The Colony, Texas

Project Number: 1743-51-01

Architectural Items For

Addendum No. 2

Page 1 of 1

ARCHITECTURAL ITEMS FOR ADDENDUM NO. 2NOTICE TO PROPOSERS:

A. This Addendum shall be considered part of the contract documents for the above-mentioned project as though it had

been issued at the same time and incorporated integrally therewith. Where provisions of the following supplementary

data differ from those of the original contract documents, this Addendum shall govern and take precedence.

B. Proposers are hereby notified that they shall make any necessary adjustments in their estimate on account of this

Addendum. It will be construed that each Proposer’s proposal is submitted with full knowledge of all modifications and

supplemental data specified therein. Acknowledge receipt of this addendum in the space provided on the proposal

form. Failure to do so may subject Proposer to disqualification.

REFERENCE IS MADE TO THE DRAWINGS AND THE PROJECT MANUAL AS NOTED:

PROJECT MANUAL:

AD No 2, Arch. Item 1: To the Project Manual, Section 00 0110, “TABLE OF CONTENTS – VOL. 1,”

This section re-issued in its entirety to include correct seals.

AD No 2, Arch. Item 2: To the Project Manual, Section 00 0110, “TABLE OF CONTENTS – VOL. 2,”

This section re-issued in its entirety to include correct seals.

AD No 2, Arch. Item 3: To the Project Manual, Section 00 0115, “LIST OF DRAWING SHEETS,”

This section re-issued in its entirety to include correct seals.

DRAWINGS:

END OF ARCHITECTURAL ADDENDUM

2021.06.24

Project Name: The Colony High School New Football Pressbox Client: Lewisville ISD The Colony, Texas Project Number: 1743-51-01

Plumbing Items For Addendum No. 2

Page 1 of 1

PLUMBING ITEMS FOR ADDENDUM NO. 2 NOTICE TO PROPOSERS:

A. This Addendum shall be considered part of the contract documents for the above-mentioned project as though it

had been issued at the same time and incorporated integrally therewith. Where provisions of the following supplementary data differ from those of the original contract documents, this Addendum shall govern and take

precedence. B. Proposers are hereby notified that they shall make any necessary adjustments in their estimate on account of this

Addendum. It will be construed that each Proposer’s proposal is submitted with full knowledge of all modifications

and supplemental data specified therein. Acknowledge receipt of this addendum in the space provided on the proposal form. Failure to do so may subject Proposer to disqualification.

REFERENCE IS MADE TO THE DRAWINGS AND THE PROJECT MANUAL AS NOTED:

DRAWINGS:

AD No 2, Plumb. Item 1: To the Drawings, Sheet PL1.1, “PLUMBING FLOOR PLAN – FOOTBALL PRESSBOX,” 1) Refer to attached sheet for revised pipe routings.

END OF PLUMBING ADDENDUM EMA REGISTRATION NO. F-893

Lewisville ISD – The Colony High School New Football Press Box (1743-51-01)

The Colony, Texas

Huckabee 00 0110 - 1

TABLE OF CONTENTS

TABLE OF CONTENTS – VOLUME 1 OF 2

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 0115 LIST OF DRAWING SHEETS 4

00 2116 INSTRUCTIONS TO PROPOSERS 2

00 3132 GEOTECHNICAL DATA 24

00 7343 WAGE RATE REQUIREMENTS 5

DIVISION 01 - GENERAL REQUIREMENTS

01 1100 SUMMARY OF WORK 1

01 1400 WORK RESTRICTIONS 2

01 2100 ALLOWANCES 1

01 2200 UNIT PRICES 2

01 3000 ADMINISTRATIVE REQUIREMENTS 19

01 3216 CONSTRUCTION PROGRESS SCHEDULE 6

01 4000 QUALITY REQUIREMENTS 3

01 4100 REGULATORY REQUIREMENTS 3

01 4516 CONTRACTORS QUALITY CONTROL 4

01 4533 CODE-REQUIRED QUALITY CONTROL 18

01 5000 TEMPORARY FACILITIES AND CONTROLS 3

01 5713 TEMPORARY EROSION AND SEDIMENT CONTROL 12

01 5719 INDOOR AIR QUALITY CONTROLS 5

01 6000 PRODUCT REQUIREMENTS 8

01 6210 SCHEDULE OF MATERIALS AND COLORS 6

01 7000 EXECUTION AND CLOSEOUT REQUIREMENTS 13

01 7800 CLOSEOUT SUBMITTALS 5

01 7900 DEMONSTRATION AND TRAINING 3

01 9100 BUILDING SYSTEMS COMMISSIONING 41

Lewisville ISD – The Colony High School New Football Press Box (1743-51-01)

The Colony, Texas

Huckabee 00 0110 - 2

TABLE OF CONTENTS

DIVISION 02 - EXISTING CONDITIONS

02 4100 DEMOLITION 4

DIVISION 03 – CONCRETE

03 1000 CONCRETE FORMING AND ACCESSORIES 4

03 2000 CONCRETE REINFORCING 2

03 3000 CAST-IN-PLACE CONCRETE 12

DIVISION 04 – MASONRY

04 0100 MAINTENANCE OF MASONRY 5

04 0511 MORTAR AND MASONRY GROUT 5

04 2000 UNIT MASONRY 12

04 4313 STONE MASONRY VENEER 5

04 7200 CAST STONE MASONRY 5

DIVISION 05 – METALS

05 2100 STEEL JOIST FRAMING 3

05 3100 STEEL DECKING 5

05 4000 COLD-FORMED METAL FRAMING 4

05 5000 METAL FABRICATIONS 6

05 5100 METAL STAIRS 4

05 5133 METAL LADDERS 4

05 5213 PIPE AND TUBE RAILINGS 3

05 5516 METAL STAIR NOSINGS 3

Lewisville ISD – The Colony High School New Football Press Box (1743-51-01)

The Colony, Texas

Huckabee 00 0110 - 3

TABLE OF CONTENTS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 1000 ROUGH CARPENTRY 7

06 2000 FINISH CARPENTRY 3

06 8316 FIBERGLASS REINFORCED PANELING 2

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 1300 SHEET WATERPROOFING 4

07 1900 WATER REPELLENTS 3

07 2100 THERMAL INSULATION 4

07 2119 FOAMED-IN-PLACE INSULATION 2

07 2200 ROOF AND DECK INSULATION 5

07 2500 WEATHER BARRIERS 6

07 4213.23 METAL COMPOSITE MATERIAL WALL PANELS 8

07 4213 METAL WALL PANELS 4

07 4643 COMPOSITE SIDING 3

07 5113 THREE-PLY MODIFIED BUILT-UP BITUMINOUS ROOFING 11

07 6200 SHEET METAL FLASHING AND TRIM 7

07 7200 ROOF ACCESSORIES 5

07 8400 FIRESTOPPING 5

07 9200 JOINT SEALANTS 7

07 9513 EXPANSION JOINT COVER ASSEMBLIES 3

Lewisville ISD – The Colony High School New Football Press Box (1743-51-01)

The Colony, Texas

Huckabee 00 0110 - 4

TABLE OF CONTENTS

DIVISION 08 – OPENINGS

08 1113 HOLLOW METAL DOORS AND FRAMES 6

08 1416 FLUSH WOOD DOORS 4

08 1473 INTERIOR SLIDING WOOD DOOR ASSEMBLIES 4

08 1613 FIBERGLASS DOORS 3

08 3100 ACCESS DOORS AND PANELS 3

08 4313 ALUMINUM-FRAMED STOREFRONTS 8

08 7100 DOOR HARDWARE 21

08 8000 GLAZING 8

DIVISION 09 - FINISHES

09 2116 GYPSUM BOARD ASSEMBLIES 8

09 2226 SUSPENSION SYSTEMS 3

09 3000 TILING 8

09 5100 ACOUSTIAL CEILINGS 5

09 5450 LINEAR METAL CEILING SYSTEM 4

09 6500 RESILENT FLOORING 4

09 6813 TILE CARPETING 3

09 9000 PAINTING AND COATING 10

Lewisville ISD – The Colony High School New Football Press Box (1743-51-01)

The Colony, Texas

Huckabee 00 0110 - 5

TABLE OF CONTENTS

DIVISION 10 - SPECIALTIES

10 1100 VISUAL DISPLAY UNITS 3

10 1400 SIGNAGE 6

10 2113.19 PLASTIC TOILET COMPARTMENTS 3

10 2600 WALL AND DOOR PROTECTION 2

10 2800 TOILET, BATH AND LAUNDRY ACCESSORIES 6

10 4313 DEFIBRILLATOR CABINETS 2

10 4400 FIRE PROTECTION SPECIALTIES 4

DIVISION 11 - EQUIPMENT

11 3013 RESIDENTIAL APPLIANCES 2

DIVISION 12 - FURNISHINGS

12 3200 MANUFACTURED WOOD CASEWORK 8

12 3600 COUNTERTOPS 3

DIVISION 13 - SPECIAL CONSTRUCTION

13 3416 GRANDSTANDS AND BLEACHERS 5

DIVISION 14 – CONVEYING EQUIPMENT

14 2100 ELECTRIC TRACTION ELEVATORS 11

Lewisville ISD – The Colony High School New Football Press Box (1743-51-01)

The Colony, Texas

Huckabee 00 0110 - 1

TABLE OF CONTENTS

TABLE OF CONTENTS – VOLUME 2 OF 2

DIVISION 21 – FIRE SUPPRESSION

21 0010 BASIC FIRE PROTECTION SYSTEM REQUIREMENTS 12

21 0090 FIRE PROTECTION SYSTEM SUBMITTAL PROCEDURES 6

21 1316 FIRE PROTECTION SYSTEM 8

DIVISION 22 – PLUMBING

22 0010 BASIC PLUMBING REQUIREMENTS 12

22 0090 PLUMBIING SUBMITTAL PROCEDURES 8

22 0524 VALVES GENERAL 3

22 0530 PIPE AND PIPE FITTINGS GENERAL 9

22 0554 PLUMBING IDENTIFICATION 6

22 0720 PIPING INSULATION 8

22 0800 COMMISSIONING OF PLUMBING 6

22 1117 DOMESTIC WATER PIPING AND APPURTENANCES 7

22 1317 SOIL, WASTE AND SANITARY DRAIN PIPING, VENT PIPING AND

APPURTENANCES

8

22 1318 CONDENSATE PIPING 4

22 1401 ROOF DRAINAGE AND APPURTENANCES 4

22 3334 ACCESS DOORS 2

22 4001 PLUMBING FIXTURES AND FIXTURE CARRIERS 9

Lewisville ISD – The Colony High School New Football Press Box (1743-51-01)

The Colony, Texas

Huckabee 00 0110 - 2

TABLE OF CONTENTS

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING

23 0000 BASIC MECHANICAL REQUIREMENTS 11

23 0090 HVAC SUBMITTAL PROCEDURES 6

23 0400 ARCHITECTURAL REQUIREMENTS FOR HVAC 2

23 0529 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 5

23 0532 ROOF CURBS 3

23 0553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT 6

23 0593 TESTING, ADJUSTING AND BALANCING FOR HVAC 9

23 0713 DUCT AND GRILLE INSULATION 4

23 0721 REFRIGERANT PIPING INSULATION 3

23 0800 COMISSIONING OF HEATING, VENTILATING AND AIR CONDITIONING (HVAC) 13

23 0923 ENERGY MANAGEMENT CONTROL SYSTEM (EMCS) BACNET 43

23 2300 REFRIGERANT PIPING 3

23 3113 METAL DUCTWORK 8

23 3333 ACCESS DOORS 2

23 3416 HVAC FANS 5

23 3713 DIFFUSERS, REGISTERS AND GRILLES 3

23 4323 BIPOLAR IONIZATION AIR PURIFICATION SYSTEM 5

23 8126 SPLIT SYSTEM HVAC UNITS 5

23 8127 SMALL CAPACITY SPLIT SYSTEMS UNITS 4

23 8239 ELECTRIC UNIT HEATERS 3

Lewisville ISD – The Colony High School New Football Press Box (1743-51-01)

The Colony, Texas

Huckabee 00 0110 - 3

TABLE OF CONTENTS

DIVISION 26 – ELECTRICAL

26 0000 ELECTRICAL 11

26 0030 WARRANTY PERIOD 1

26 0090 ELECTRICAL SUBMITTAL PROCEDURES 6

26 0511 ELECTRICAL DEMOLITION 2

26 0519 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 5

26 0526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 7

26 0533.11 RACEWAYS AND CONDUITS FOR ELECTRICAL SYSTEMS 9

26 0533.13 BOXES AND FITTINGS FOR ELECTRICAL SYSTEMS 5

26 0534 PROVISIONS FOR COMMUNICATIONS, SECURITY AND SAFETY SYSTEMS 6

26 0553 IDENTIFICATION FOR ELECTRICAL SYSTEMS 4

26 0800 COMMISSIONING OF ELECTRICAL SYSTEMS 11

26 0811 TESTING OF ELECTRICAL SYSTEM 6

26 0921 CONTACTORS 3

26 0941 LIGHTING CONTROLS 12

26 2100 LOW VOLTAGE ELECTRICAL SERVICE ENTRANCE 2

26 2213 LOW VOLTAGE DISTRIBUTION TRANSFORMERS 4

26 2416 PANELBOARDS FOR DISTRIBUTION SWITCHGEAR 6

26 2726 WIRING DEVICES 5

26 2813 FUSES 2

26 2816 ENCLOSED SAFETY SWITCHES AND CIRCUIT BREAKERS 3

26 2819 GROUND FAULT PROTECTION SYSTEM 2

26 4300 SURGE PROTECTIVE DEVICES (SPD) 4

26 5000 LIGHTING 7

26 8213 ELECTRICAL HAND-HAIR DRYERS 2

Lewisville ISD – The Colony High School New Football Press Box (1743-51-01)

The Colony, Texas

Huckabee 00 0110 - 4

TABLE OF CONTENTS

DIVISION 27 – COMMUNICATIONS

27 0500 GENERAL COMMUNICATION SYSTEMS REQUIREMENTS 11

27 1030 DATA AND TELEPHONE CABLE PLANT 27

27 5125 SOUND REINFORCEMENT SYSTEMS 30

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 0500 GENERAL ELECTRONIC SAFETY AND SECURITY SYSTEM REQUIREMENTS 10

28 1327 BUILDING ACCESS CONTROL SYSTEM 20

28 2123 VIDEO SURVEILLANCE SYSTEM 8

28 3124 PREMISES INTRUDER ALARM SYSTEM 17

28 4621 FIRE DETECTION AND ALARM SYSTEM 24

DIVISION 31 - EARTHWORK

31 1000 SITE PREPARATION 5

31 2000 EARTH MOVING 5

31 2310 BUILDING EXCAVATION AND FILL 5

31 2313 SUBGRADE PREPARATION 2

31 2334 EXCAVATION AND BACKFILL FOR CONDUITS 6

31 3116 TERMITE CONTROL 2

31 6329 DRILLED CONCRETE PIERS AND SHAFTS 5

Lewisville ISD – The Colony High School New Football Press Box (1743-51-01)

The Colony, Texas

Huckabee 00 0110 - 5

TABLE OF CONTENTS

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 1129 LIME TREATED SUBGRADE 5

32 1230 FLEXIBLE BASE (CRUSHED STONE) 3

32 1313 PORTLAND CEMENT CONCRETE PAVING 10

32 1600 CONCRETE CURBS AND GUTTERS 3

32 1723 PAVEMENT MARKINGS 2

32 2000 SIDEWALKS AND DRIVEWAY APPROACHES 6

32 3113 CHAIN LINK FENCES AND GATES 5

32 3119 DECORATIVE METAL FENCES AND GATES 3

DIVISION 33 - UTILITIES

33 0800 TESTING 4

33 1100 WATER CONDUIT INSTALLATION 9

33 3100 SANITARY SEWER LINE INSTALLATION 9

33 4100 STORM SEWER LINE INSTALLATION 8

Lewisville ISD – The Colony High School New Football Press Box (1743-51-01)

The Colony, Texas

Huckabee 00 0115 - 1

LIST OF DRAWING SHEETS

SECTION 00 0115 LIST OF DRAWING SHEETS

PART 1 - GENERAL

1.01 SUMMARY

A. Following are the drawings which form a part of the contract, as set forth in subparagraph 1.1.1 of the accompanying "General Conditions of the Contract for Construction".

1.02 TITLE OF DRAWINGS:

GENERAL

G1.1 COVER SHEET

G2.1 CODE ANALYSIS PLAN

G3.1 EXTERIOR WALL TYPES

G3.2 INTERIOR PARTITION TYPES

G3.3 TYPICAL INTERIOR PARTITION BRACING DETAILS

CIVIL

C0.00 COVER SHEET

C0.01 FINAL PLAT

C0.02 GENERAL NOTES

C1.00 DEMOLITION PLAN

C2.00 SITE & PAVING PLAN

C3.00 GRADING AND EROSION CONTROL PLAN

C4.00 UTILITY PLAN

C4.01 UTILITY PROFILES

C5.00 STANDARD CONSTRUCTION DETAILS

C5.01 STANDARD CONSTRUCTION DETAILS

ARCHITECTURAL SITE

AS1.1 ARCHITECTURAL SITE PLAN

AS1.2 ENLARGED SITE PLANS AND DETAILS

Lewisville ISD – The Colony High School New Football Press Box (1743-51-01)

The Colony, Texas

Huckabee 00 0115 - 2

LIST OF DRAWING SHEETS

STRUCTURAL

S0.00 GENERAL NOTES

S0.01 CONCEPTUAL ISOMETRIC DRAWING

S0.02 DEMOLITION PLAN - FOOTBALL PRESSBOX

S2.01 FOUNDATION PLAN - FOOTBALL PRESSBOX

S3.01 TYPICAL FOUNDATION DETAILS

S3.02 FOUNDATION SECTIONS

S3.03 FOUNDATION SECTIONS

S4.01 TYPICAL CMU DETAILS

S5.01 FRAMING PLANS - FOOTBALL PRESSBOX

S5.02 FRAMING PLANS - FOOTBALL PRESSBOX

S6.01 TYPICAL FRAMING DETAILS

S6.02 TYPICAL FRAMING DETAILS

S6.03 TYPICAL FRAMING DETAILS

S6.04 FRAMING SECTIONS

S6.05 FRAMING SECTIONS

S6.06 FRAMING SECTIONS

S7.01 BRACED FRAME DETAILS

S7.02 BRACED FRAME ELEVATIONS

S8.01 TYPICAL NON-LOAD BEARING WALL BRACING DETAIL

ARCHITECTURAL DEMOLITION

AD1.1 DEMOLITION FLOOR PLANS

Lewisville ISD – The Colony High School New Football Press Box (1743-51-01)

The Colony, Texas

Huckabee 00 0115 - 3

LIST OF DRAWING SHEETS

ARCHITECTURAL

A1.1 FLOOR PLAN - FOOTBALL PRESSBOX

A1.2 TOILET FIXTURE & ACCESSORIES SCHEDULE

A1.3 ENLARGED PLANS - ELEVATOR, STAIRS AND TOILETS

A1.4 PLAN DETAILS

A2.1 REFLECTED CEILING PLAN - FOOTBALL PRESSBOX

A3.1 DOOR SCHEDULES AND CONFIGURATIONS

A3.2 DOOR AND WINDOW DETAILS

A4.1 FINISH PLAN - FOOTBALL PRESSBOX

A4.2 INTERIOR ELEVATIONS & FINISH DETAILS

A5.1 EXTERIOR ELEVATIONS

A6.0 BUILDING SECTIONS - FOOTBALL PRESS BOX

A6.1 WALL SECTIONS - FOOTBALL PRESS BOX

A6.2 WALL SECTIONS - FOOTBALL PRESS BOX

A6.3 WALL SECTIONS DETAILS

A6.4 WALL SECTION DETAILS

A6.5 STAIR RAILING DETAILS

A6.6 STAIR DETAILS

A7.1 ROOF PLANS

A7.2 TYPICAL ROOFING DETAILS BUILT-UP ROOFING

A7.3 TYPICAL ROOFING DETAILS

A8.1 CASEWORK ELEVATIONS & DETAILS

A9.1 TYPICAL DETAILS

PLUMBING

PS1.1 PLUMBING SITE PLAN

PL1.1 PLUMBING FLOOR PLAN - FOOTBALL PRESSBOX

PL7.1 PLUMBING SYMBOLS AND DETAILS

PL7.2 PLUMBING DETAILS

PL8.1 PLUMBING SCHEDULE

FIRE PROTECTION

FP1.1 FIRE PROTECTION FLOOR PLANS

MECHANICAL

MH1.1 MECHANICAL FLOOR PLAN - FOOTBALL PRESSBOX

MH7.1 MECHANICAL DETAILS

MH8.1 MECHANICAL SCHEDULE AND SYMBOLS

Lewisville ISD – The Colony High School New Football Press Box (1743-51-01)

The Colony, Texas

Huckabee 00 0115 - 4

LIST OF DRAWING SHEETS

ELECTRICAL

E0.1 ELECTRICAL & LIGHTING GENERAL NOTES AND SYMBOLS

ES1.1 ELECTRICAL SITE PLAN

EP1.1 ELECTRICAL FLOOR PLAN - FOOTBALL PRESSBOX, PANELBOARD SCHEDULES, & RISER DIAGRAM

EP7.1 ELECTRICAL DETAILS & SYMBOLS

EP7.2 ELECTRICAL DETAILS

EP7.3 ELECTRICAL DETAILS

LIGHTING

EL1.0 INTERIOR & EXTERIOR LIGHTING COMPLIANCE CERTIFICATES

EL1.1 LIGHTING FLOOR PLAN - FOOTBALL PRESSBOX

EL7.1 LIGHTING DETAILS & SYMBOLS

EL8.1 LUMINAIRE SCHEDULE

EL8.2 LUMINAIRE SCHEDULE - LED TAPE LIGHTING FOR EXTERIOR SIGNS

COMMUNICATION

ET1.1 ELECTRICAL COMMUNICATION FLOOR PLAN - FOOTBALL PRESSBOX

ET7.1 ELECTRICAL COMMUNICATION DETAILS & SYMBOLS

ET7.2 ELECTRICAL COMMUNICATION DETAILS & SYMBOLS

END OF SECTION

R1

ELEC

PB.03

FIRE RISER

PB.01

ELEV

PB.02

FIR

E P

UM

P

N1H1

H1

D2

P1

P9

P9

6" RD

4" SS

P49

P52

P4

P4

2" CW

3/4" CW

D1

F.D.C.

ELEVATOR SUMP SYSTEM SERVICE ALERT PANEL

6" FP

2" CW

P7

R2

P8

3/4" CW

4" SD

4" SSD

4" SSD

3/4" CW 4" SSD

4" SSD

P67

4" RD

4" ORD

P11

P12P12

P11 4" ORD4" RD

P52 6" RD

2

P52

APPROX. 64" BFF

APPROX. 68" BFF

APPROX 24" BFF

EXPANSION JOINT VAULT. REFER TO STRUCTURAL FOR VAULT DIMENSIONS AND REQUIREMENTS.

P19P17

1/2"

CO

ND

4

PL7.2

3

PL7.2

2

PL7.2

1

PL7.2

M1

E1

B1

D1

A1

D1

B1

A1

G1

RADIO

PB.13SCOUTS / PRESS

PB.12

RADIO

PB.11

VIS COACHES

PB.14HOME COACHES

PB.10

TOILET

PB.05

TOILET

PB.06

MECH

PB.09

CORRIDOR

PB.08

ELEV

PB.02STAIR

PB.04

STAIR

PB.07

F1

J1

4" RDP52

P4

P51P52

P52P51 P51 4" SS P52

4" RD

P50

1" HW

1" CW

D2

3" SS

P4

P4

P4

2" CW 1/2" CW

P3

P49

P4

P4

P49P52

1 1/2" CW1 1/2" CW

3/4" HW

3" SS

1/2" CW

2" CW 1 1/2" CW

3" SS

P14P14

P17

P52

1" COND 1" COND

P15

P15

P49P4

D2

M2

P4

P141" COND

E2

2

B1

D1

A1

D1

B1

A1

M1

D3

WEB

PB.29VIP

PB.27

VIDEO DECK

PB.26SCORER

PB.24 ADMIN / GUEST

PB.25

IDF

PB.21JAN

PB.19

ELEC

PB.22

P.A.

PB.23

T.V.

PB.28

TOILET

PB.18

TOILET

PB.17

CIRC

PB.16

ELEV

PB.02

STAIR

PB.04

STAIR

PB.07

P51

4" RD

G11" CW

P501 1/2" CW P3

P4

P51 P3

4" SS P4

P4P50

4" ORD

4" RD

6" ORD

6" RD

P51P51

6" ORD

6" RD

4" RD

4" ORD

P14

P14P14

P19

1" COND

1" COND 1" CONDP15

P50P51

H2

P10

1/2" CW

P12P11P12

P11

D2

M2

P43" SS

P51

9504"

14006"

2904"

6154"

2" V

2" V

2" V

2" CW2" SS

1/2" CW

1 1/2" V

1" CW1" HW

3/4" HW

3" SS

3" SS

4" SS

2" SS

1/2" CW

1/2" CW

1/2" CW

1/2" HW

1/2" HW

2" V

1 1/2" CW

2" CW

4" SS

2" V

4" SS

4" SS

1 1/2" CW

1 1/2" CW

1 1/2" CW

1" HW

3/4" HW

2" V3" V

3" SS

1" CW

1 1/2" CW

3" V2" V

1/2" CW

1 1/4" CW

1 1/4" CW

1 1/2" CW

Tyler | Austin | Houston | DFW | El PasoTBPE Firm Registration No. F-893www.EMAengineer.comPhone: 1 . 800 . 933 . 0538

EMA Engineering & Consulting

NEW WORK REQUIRED FOR INSTALLATION OF A COMPLETE AND WORKINGSYSTEM.

SUBMISSION OF BID WILL BE CONSIDERED ACKNOWLEDGMENT THAT THECONTRACTOR HAS VISITED THE SITE AND HAS VERIFIED ALL EXISTING JOBCONDITIONS AND INCLUDED ANY NECESSARY MODIFICATION TO EXISTING AND

Sheet No.Job No.

Drawn By:

Date:

Pro

ject

:

Copyright © 2021, Huckabee & Associates, Inc.

ASD

PL1.1

PLUMBING FLOOR PLAN -

FOOTBALL PRESSBOX

06.02.2021

1743-51-01

THE

CO

LON

Y H

IGH

SC

HO

OL

NE

W F

OO

TBA

LL P

RE

SS

BO

X43

01 B

LAIR

OA

KS

DR

IVE

THE

CO

LON

Y, T

EX

AS

750

56LE

WIS

VIL

LE I.

S.D

.

1/8" = 1'-0"1 PLUMBING FLOOR PLAN - FOOTBALL PRESSBOX - GROUND

1/8" = 1'-0"2 PLUMBING FLOOR PLAN - FOOTBALL PRESSBOX - LEVEL 1

1/8" = 1'-0"3 PLUMBING FLOOR PLAN - FOOTBALL PRESSBOX - LEVEL 2

1. PLUMBING CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR A.D.A. PLUMBING FIXTURE AND STANDARD MOUNTING HEIGHTS.

2. PLUMBING CONTRACTOR TO COORDINATE ALL PIPING ROUTING ABOVE WITH MECHANICAL AND ELECTRICAL CONTRACTORS BEFORE INSTALLING.

3. ALL VALVES SHALL BE INSTALLED NO HIGHER THAN 2'-0" ABOVE THE CEILING. ACCESS DOORS TO BE INSTALLED AT ALL HARD CEILING LOCATIONS.

4. ALL PIPING PENETRATIONS SHALL BE SLEEVED. COMPLETELY GROUT AROUND OUTSIDE OF SLEEVE AND FILL SLEEVE VOID AROUND PIPE WITH FIBERFRAX FYRE-PUTTY.

5. AT ALL DISSIMILAR METAL CONNECTIONS, PROVIDE AND INSTALL DIELECTRIC UNIONS IMMEDIATELY TO MINIMIZE USE OF GALVANIZED PIPE MATERIAL.

6. PLUMBING CONTRACTOR SHALL COORDINATE WITH THE MECHANICAL CONTRACTOR MOUNTING HEIGHTS OF ALL AIR HANDLERS TO GUARANTEE POSITIVE DRAINAGE OF ALL CONDENSATE DRAINS (1/8" PER FT. SLOPE - MINIMUM).

7. MECHANICAL CONTRACTOR TO PROVIDE TO THE PLUMBING CONTRACTOR THE RECOMMENDED AC MANUFACTURERS' DATA FOR CONDENSATE TRAPS PER EACH TYPE OF UNIT.

8. PLUMBING CONTRACTOR TO PROVIDE TRAP PRIMERS TO ALLFLOOR DRAINS, SHOWER DRAINS, OPEN SITE DRAINS AND FLOOR SINKS.

9. DO NOT INSTALL PLUMBING VENTS WITHIN 10'-0" OF ANY ROOFTOP UNITS OR FRESH AIR UNITS / INTAKES. COORDINATE WITH MECHANICAL CONTRACTOR.

10. MOUNT A.D.A. FLUSH CONTROLS TO WIDE SIDE OF STALL.

11. PLUMBING CONTRACTOR TO PROVIDE A CLEAN-OUT FOR EACH URINAL.

12. PLUMBING CONTRACTOR TO PROVIDE AND INSTALL ALL BACK-FLOW PREVENTERS TO KITCHEN EQUIPMENT AS REQUIRED BY THE LOCAL AUTHORITY HAVING JURISDICTION.

13. ALL CONCEALED EXISTING PIPING SHOWN IS BASED ON EXISTING M.E.P. DRAWINGS. FIELD VERIFY AS NECESSARY.

14. PLUMBING CONTRACTOR TO COORDINATE ROUTING OF ANY NEW SEWER PIPING UNDER EXISTING BUILDINGS WITH STRUCTURAL ENGINEER TO AVOID PIERS.

PLUMBING GENERAL NOTESALL DOMESTIC HOT WATER SHALL MEET 2015 IECC HOT WATER REQUIREMENTS.

AT LOCATIONS OF HOT WATER LOOP PIPING GOING DOWN IN WALL AND BACK UP, PROVIDE 1/2" HOT

WATER TO CONNECT TO EACH HAND SINK/LAVATORY. HOT WATER LOOP PIPING SHALL BE WITHIN 2'-0" OF THE CONNECTION TO THE FIXTURE, PER 2015 IECC.

PROVIDE 3/4" TO CONNECT TO EACH LAVATORY STATION/WASH FOUNTAIN.

PLUMBING PLAN NOTESKEY

VALUE KEYNOTE TEXT

P1 TWO-WAY CLEANOUT

P3 WALL CLEANOUT

P4 DOWN IN WALL/CHASE

P7 COLD WATER VALVE BOX BELOW GRADE

P8 UP FROM BELOW SLAB

P9 DOWN TO BELOW SLAB

P10 COLD WATER UP THROUGH ROOF TO ROOF HOSE BIBB

P11 PRIMARY ROOF DRAIN

P12 OVERFLOW ROOF DRAIN

P14 CONDENSATE TIE-IN TO UNIT/AIR HANDLER WITH P-TRAP

P15 CONDENSATE DRAIN CLEANOUT

P17 CONDENSATE DRAIN DOWN TO MOP SINK/FLOORSINK/HUB DRAIN

P19 1/2" CONDENSATE DRAIN FROM WALL UNIT. LINEPRESSURIZED FROM INTERNAL CONDENSATE PUMP.(ROUTE SEPARATELY FROM GRAVITY SYSTEMS OR TIEINTO TOP OF GRAVITY PIPE)

P49 UP TO LEVEL ABOVE

P50 UP FROM LEVEL BELOW

P51 DOWN TO LEVEL BELOW

P52 DOWN FROM LEVEL ABOVE

P67 PROVIDE BACKWATER VALVE ON STORM LINE

1/8" = 1'-0"4 PLUMBING ROOF PLAN - FOOTBALL PRESSBOX

5 FOOTBALL PRESSBOX

Rev

isio

n /

Dat

e

20

6.2

4. 2

1A

DD

EN

DU

M #

2