Are You Ready for a Post-Covid-19 Recovery?Design-Build Done Right® 101
Are You Ready for a Post-Covid-19 Recovery?Design-Build Done Right® 101
Welcome to DBIA’s Webinar Series
Christine WilliamsDBIA Special Projects Manager
We’re in it for your success.
Webinar Rules of the Road
We’re in it for your success.
• We will take questions throughout the webinar • Use Q&A to post your question
• Webinar slides and the recording will be emailed to attendees
• An attendance certificate (for CEUs) will be emailed in a separate email from the Education Department within a couple of weeks
Are You Ready for a Post-Covid-19 Recovery?Design-Build Done Right® 101
Richard J. Formella, PMP, DBIADBIA Instructor, DBIA Director of Owner Support & Resources, and President of Design-Build Strategic Solutions, LLC
Today’s Presenter
We’re in it for your success.
Learning Objectives
Review characteristics of three of the most common project delivery methods.
Question and answers
Review the unique characteristics of the Design-Build project delivery method.
Are You Ready for a Post-Covid-19 Recovery?Design-Build Done Right® 101
Are You Ready for a Post-Covid-19 Recovery?Design-Build Done Right® 101
Design-Build is a method of project delivery in which
one entity (Design-Builder) forges a single contract
with the Owner to provide for Architectural Engineering
Design Services & Construction Services
We’re in it for your success.
What is Design-Build?
How is it Fundamentally Different?
1 . 0 D E S I G N - B I D - B U I L D P R O J E C T D E L I V E R Y
Are You Ready for a Post-Covid-19 Recovery?Design-Build Done Right® 101
•Design-Bid-Build
• Bifurcated Responsibility
• Linear End to End
• Two Contracts
We’re in it for your success.
Are You Ready for a Post-Covid-19 Recovery?Design-Build Done Right® 101
We’re in it for your success.
2 . 0 C O N S T R U C T I O N M A N A G E R ( C M G C ; C M A R ; C M c ) P R O J E C T D E L I V E R Y
Are You Ready for a Post-Covid-19 Recovery?Design-Build Done Right® 101
We’re in it for your success.
CMGC; CMc; CMARBifurcated Responsibility
Linear Staggered
Two Contracts
Are You Ready for a Post-Covid-19 Recovery?Design-Build Done Right® 101
We’re in it for your success.
Are You Ready for a Post-Covid-19 Recovery?Design-Build Done Right® 101
We’re in it for your success.
3 . 0 D E S I G N - B U I L D P R O J E C T D E L I V E R Y
Are You Ready for a Post-Covid-19 Recovery?Design-Build Done Right® 101
We’re in it for your success.
Design-BuildSingle Point of Responsibility
Design & Construction Concurrently Integrated
One Contract
Are You Ready for a Post-Covid-19 Recovery?Design-Build Done Right® 101
We’re in it for your success.
Are You Ready for a Post-Covid-19 Recovery?Design-Build Done Right® 101
We’re in it for your success.
Are You Ready for a Post-Covid-19 Recovery?Design-Build Done Right® 101
We’re in it for your success.
Are You Ready for a Post-Covid-19 Recovery?Design-Build Done Right® 101
We’re in it for your success.
Are You Ready for a Post-Covid-19 Recovery?Design-Build Done Right® 101
We’re in it for your success.
Are You Ready for a Post-Covid-19 Recovery?Design-Build Done Right® 101
We’re in it for your success.
Are You Ready for a Post-Covid-19 Recovery?Design-Build Done Right® 101
We’re in it for your success.
Are You Ready for a Post-Covid-19 Recovery?Design-Build Done Right® 101
We’re in it for your success.
Are You Ready for a Post-Covid-19 Recovery?Design-Build Done Right® 101
We’re in it for your success.
Are You Ready for a Post-Covid-19 Recovery?Design-Build Done Right® 101
We’re in it for your success.
• Results of CII/Pankow 2018 Study• Cost Growth 2.4% less than CMAR and 3.8% less than Design-Bid-Build• Construction Speed 13% faster than CMAR and 36% faster than Design-
Bid-Build• Schedule Growth 3.9% less than CMAR and 1.7% less than Design-Bid-
Build• Delivery Speed 61% faster than CMAR and 102% faster than Design-Bid-
Build
Are You Ready for a Post-Covid-19 Recovery?Design-Build Done Right® 101
We’re in it for your success.
Are You Ready for a Post-Covid-19 Recovery?Design-Build Done Right® 101
• Short List the Three Most Highly Qualified Firms Based on Past Performance• Define the Problem – Let the Design-Builders Provide the Solution• Make Price Significantly Less Important than Non-Price Evaluation Factors• Do NOT Administer a Design-Build Contract as if it was Design-Bid-Build• Promote/Require Early Engagement of Key Trades and Consultants• Ensure the Builder and Key Trades are Engaged in the Design Phase, and the
Designer is Engaged and Performs QA/QC during the Build Phase• Think/Act/Work as a TEAM (Owner Included)!
We’re in it for your success.
Some Design-Build Done Right® Best Practices
Are You Ready for a Post-Covid-19 Recovery?Design-Build Done Right® 101
We’re in it for your success.
Next DBIA WebinarFRIDAY, MAY 1, 202011:00 – 12:30PM EST
Owners’ Only Virtual Forum –Project Delivery During COVID-19
Moderator:Robynne Thaxton, JD, FDBIA, Attorney at Thaxton Parkinson PLLC
Panelists:Bruce W. Husselbee, PE, DBIA, Director of Engineering, Hampton Roads Sanitation DistrictGeoff Neumayr, SE, P.E., Chief Development Officer, San Francisco International AirportDavid J. Simmons, PE, Design Liaison / Design-Build Coordinator, Missouri DOTKenneth Simmons, AIA, LEED AP BD+C, Architect, U.S. Army Corps of Engineers – HQJanice Zahn, Assistant Engineering Director, Port of Seattle - Engineering/PMG Department