Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
W/L
SOUTHLANDFILL
HOWAR
D DRAI
N
HOWARD DRAIN
THO
MPS
ON
DR
AIN
ALLI
SON
LIN
E
206
206
PRO
POSED
SCR
EENIN
G BER
M
205
210
215
220
225
230
210 215220
225
230
188.52
191.32
2.00%2.00%
2.00%2.00%
2.00% 2.00%
1.00
%
1.20
%
1.00
%
1.20
%
1.20
%
1.00
%
1.00
%
1.00
%
1.00
%
1.20
%1.20
%
2.00%2.00%
2.00%2.00%
2.00%2.00%
190
191
192
190
191
192
190
190
191
191
190
191
192
193
190
191
192
193
195
200
190
195
200
189189189
189
191191191
192 193194
194
194
196
197
198
199
201
202
203
204
188.50
(L.P.)
(L.P.)
SOUTH LANDFILL
HOWAR
D DRAI
N
HOWARD DRAIN
THOMPSONDRAIN
THO
MPS
ON
DR
AIN
ALLI
SON
LIN
E
AREA 'B'
HEADER PIPE
LEACHATEFORCEMAIN
RISER PIPECLEANOUT
LATERAL PIPE
LEACHATEFORCEMAIN
HEADER PIPE
LATERAL PIPE
GALES DRAIN
235
WEST LANDFILL
X
X X
AREA 'B'
1:1,500
0 50 100
METRES
www.golder.com
025
mm
18111331CONTROL0001
DRAWING
17D
GOLDER ASSOCIATES LTD.6925 CENTURY AVENUE, SUITE #100MISSISSAUGA, ONTARIO, L5N 7K2CANADA[+1] (905) 567-4444A 2019-06-10 ISSUED FOR DESIGN AND OPERATIONS REPORT APPROVAL (EA PHASE) - CLIENT REVIEW MRFRG FRG FSB
B 2019-07-10 ISSUED FOR DESIGN AND OPERATIONS REPORT APPROVAL (EA PHASE) - EA REVIEW MRFRG FRG FSB
C 2020-01-09 ISSUED FOR DESIGN AND OPERATIONS REPORT APPROVAL (EA AND ECA) MRFRG FRG FSB
D 2020-03-06 RE-ISSUED FOR DESIGN AND OPERATIONS REPORT ECA APPROVAL FC/MRFRG FRG FSB
17 29
NOTE(S)
APPROVED PRE-EXPANSION WASTE LIMIT
APPROVED PRE-EXPANSION LANDFILL FINAL COVER CONTOUR(1.0 masl INTERVAL)
PROPOSED EXPANSION WASTE LIMIT
PROPOSED EXPANSION BASE EXCAVATION AREA
PROPOSED ACCESS ROAD
PROPOSED ROAD AND DITCH
PROPOSED RELOCATED HOWARD DRAIN
EXISTING GROUND SURFACE CONTOUR (1.0 masl INTERVAL)
EXISTING GRAVEL ROAD
EXISTING PAVED ROAD
EXISTING DRAINAGE DITCH
EXISTING WATER BODY
EXISTING TREE LINE
EXISTING FENCE LINE
LOW POINT OF PROPOSED BASE GRADE
LEACHATE SUMP
PUMP STATION
LEGEND
REFERENCE(S)
FOR AGENCY REVIEW
RIDGE LANDFILLBLENHEIM, ONTARIO
WASTE CONNECTIONS OF CANADA INC.
PROPOSED LEACHATE COLLECTION SYSTEM - AREA B TITLE
PROJECT NO. REV.
PROJECTCLIENT
CONSULTANT
Path
: \\g
olde
r.gds
\com
plex
data
\offi
ce\m
issi
ssau
ga\S
IM\C
lient
s\W
CC
\Rid
ge_L
andf
ill\99
_PR
OJ\
1811
1331
_Rid
ge_L
andf
ill_Ex
pans
ion_
EA\4
0_PR
OD
\000
1_D
andO
_Pla
n\ |
File
Nam
e: 1
8111
331-
0001
-CW
-001
7.dw
g |
Las
t Edi
ted
By: m
ram
paul
Dat
e: 2
020-
03-0
5 T
ime:
8:03
:17
AM |
Prin
ted
By: B
Rad
ojev
ic
Dat
e: 2
020-
05-0
8 T
ime:
4:22
:58
PM
REV. DESCRIPTIONYYYY-MM-DD PREPARED REVIEWED APPROVEDDESIGNED
SEAL
of
IF T
HIS
MEA
SUR
EMEN
T D
OES
NO
T M
ATC
H W
HAT
IS S
HO
WN
, TH
E SH
EET
SIZE
HAS
BEE
N M
OD
IFIE
D F
RO
M: A
NSI
D
TRUE NORTH
PLAN
NO
RTH
(L.P.)
1. PROJECTION: UTM NAD27-17N. VERTICAL DATUM: CGVD28 (GEODETIC).2. CONTOURS AND ELEVATIONS REPRESENT THE TOP OF CLAY LINER/BOTTOM OF THE
LEACHATE COLLECTION SYSTEM.
1. TOPOGRAPHIC BASE PLAN FOR SITE, EXCLUDING WITHIN EXISTING PONDS, OBTAINEDFROM EXISTING GROUND SURFACE, EXTRACTED FROM DEM, 6 cm GSD, FOR THE ENTIRESITE AREA, CAPTURED ON MAY 5, 2019 BY THE BASE MAPPING COMPANY LTD.
2. TOPOGRAPHIC BASE PLAN FOR EXISTING PONDS 1, 2, 4, 5 AND EAST AREA OF DUKE DRAINOBTAINED FROM EXISTING GROUND SURFACES, EXTRACTED FROM DEM, HORIZONTALAND VERTICAL ACCURACY 0.020 m, CAPTURED IN OCT. AND NOV. 2019, BY SURVEYORS ONSITE INC.
3. APPROVED WASTE LIMITS AND PROPERTY LIMITS FROM INTERIM ALTERNATIVE METHODSREPORT, DECEMBER 2018, FIGURE 2 - ALTERNATIVE 1 (HORIZONTAL AND VERTICALEXPANSION) PREPARED BY DILLON CONSULTING.
4H1V
4H1V
6%
1 m
1 m
3H1V
3H1V
EXISTINGACCESS ROAD
EXISTINGDITCH
PROPOSED 3.7 m DEEP, 1 m WIDE FINGERDRAIN, PLACED MAX. 25 m APART
EXISTING 1 m THICK FINALCOVER TO BE REMOVED
AND RECONSTRUCTEDOVER FINGER DRAIN
PROPOSED WASTE FILL
LIMIT OF WASTE FILL
3:1 (TYP.)2:1 (MAX.)
GEOTEXTILE FILTERABOVE FINGER DRAIN
1 %
1H1V LANDFILL WASTE
3H1V
50 mm CLEAR STONE
3.7 m DEEP, 1 m WIDE(MIN.) FINGER DRAIN
1 %
PROPOSED 1.0 m THICK FINAL COVER
REMOVE EXISTING COVERPRIOR TO WASTE PLACEMENT
EXISTING 200 mm DIA.PERFORATED COLLECTORPIPE AND TRENCH
PROPOSED 200 mm DIA.PERFORATED HDPECOLLECTOR PIPE ANDTRENCH
25 m
APPROXIMATELOWER LIMIT OF
WEATHERED CLAY
EXISTING CLAY CUT-OFF WALLTOE OF SIDE SLOPE EXCAVATION
1.2 m HIGH SEEPAGEDIVERSION BERM
4 mWIDE BERM
1.5 %
1.5 m
4H1V
6%
4H1V
EXISTING 1 m THICK FINALCOVER TO BE REMOVEDAND RECONSTRUCTEDOVER FINGER DRAIN
EXISTINGGROUND
EXISTING DITCH
LANDFILL WASTE
3.7 m DEEP, 1m WIDE (MIN.)FINGER DRAIN
LIMIT OF WASTE FILL
GEOTEXTILE FILTERABOVE FINGER DRAIN
200 mm DIA.PERFORATEDCOLLECTORHDPE PIPE
PROPOSEDWASTE FILL
COMPACTED BACKFILL
200 mm DIA. SOLID HDPE HEADER PIPE
APPROXIMATELOWER LIMIT OF
WEATHERED CLAY
1 m
3:1 (TYP.)2:1 (MAX.) 3H
1V
50 mm CLEAR STONE
600 mm THICK RECOMPACTEDCLAY SIDESLOPE LINER
GEOTEXTILE FILTER AROUNDDRAINAGE BLANKET
500 mm THICK CONTINUOUS 50 mmCLEAR STONE DRAINAGE BLANKET
3.7
m
25 mPROPOSED 1.0 m THICKFINAL COVER
REMOVE EXISTINGCOVER PRIOR TOWASTE PLACEMENT
1.2 m HIGH SEEPAGEDIVERSION BERM
4 m WIDEBERM
3.7
m
25 m
0 %
1.5 m
4H1V
EXISTINGGROUND
DITCH
LANDFILL WASTE
3.7 m DEEP, 1 m WIDE(MIN.) FINGER DRAIN
200 mm DIA. SOLID HDPE HEADER PIPE
600 mm THICK RECOMPACTEDCLAY SIDESLOPE LINER
LIMIT OF WASTE FILL
GEOTEXTILE FILTERABOVE FINGER DRAIN
GEOTEXTILE FILTER AROUNDDRAINAGE BLANKET
500 mm THICK CONTINUOUS 50 mmCLEAR STONE DRAINAGE BLANKET
APPROXIMATELOWER LIMIT OF
WEATHERED CLAY COMPACTED BACKFILL
1 mPROPOSED 1.0 m THICK
FINAL COVER
3H1V
3H1V
ELEV. 194.0 m
200 mm DIA.PERFORATEDCOLLECTORHDPE PIPE
50 mm CLEAR STONE
4 m WIDEBERM
1 %
1.5 m0.6 m
4H1V
EXISTINGGROUND
DITCHLANDFILL WASTE
200 mm DIA. SOLIDHDPE PIPE200 mm DIA. SOLID HDPE HEADER PIPE
600 mm THICK RECOMPACTEDCLAY SIDESLOPE LINER
LIMIT OF WASTE FILL
200 mm DIA.PERFORATEDCOLLECTORHDPE PIPE
APPROXIMATELOWER LIMIT OF
WEATHERED CLAY
1800 mm INSIDEDIA. MANHOLE
COMPACTED BACKFILL
50 mm CLEAR STONEWITH GEOTEXTILEFILTER SURROUND
1 mPROPOSED 1.0 m THICKFINAL COVER
3:1 (TYP.)2:1 (MAX.) 3H
1V
www.golder.com
025
mm
18111331CONTROL0001
DRAWING
18E
GOLDER ASSOCIATES LTD.6925 CENTURY AVENUE, SUITE #100MISSISSAUGA, ONTARIO, L5N 7K2CANADA[+1] (905) 567-4444A 2019-03-05 ISSUED FOR REVIEW MRFRG FRG FSB
B 2019-06-10 ISSUED FOR DESIGN AND OPERATIONS REPORT APPROVAL (EA PHASE) - CLIENT REVIEW FCFRG FRG FSB
C 2019-07-10 ISSUED FOR DESIGN AND OPERATIONS REPORT APPROVAL (EA PHASE) - EA REVIEW FC/MRFRG FRG FSB
D 2020-01-09 ISSUED FOR DESIGN AND OPERATIONS REPORT APPROVAL (EA AND ECA) FC/MRFRG FRG FSB
E 2020-03-06 RE-ISSUED FOR DESIGN AND OPERATIONS REPORT ECA APPROVAL FC/MRFRG FRG FSB
18 29
PRELIMINARY DESIGNRIDGE LANDFILLBLENHEIM, ONTARIO
PERIMETER ROAD-WASTE INTERFACE SECTIONS -OLD LANDFILL EXPANSION
TITLE
PROJECT NO. REV.
PROJECTCLIENT
CONSULTANT
Path
: \\g
olde
r.gds
\com
plex
data
\offi
ce\m
issi
ssau
ga\S
IM\C
lient
s\W
CC
\Rid
ge_L
andf
ill\99
_PR
OJ\
1811
1331
_Rid
ge_L
andf
ill_Ex
pans
ion_
EA\4
0_PR
OD
\000
1_D
andO
_Pla
n\ |
File
Nam
e: 1
8111
331-
0001
-CW
-001
8.dw
g |
Las
t Edi
ted
By: m
ram
paul
Dat
e: 2
020-
04-0
8 T
ime:
12:1
9:27
PM
| P
rinte
d By
: BR
adoj
evic
D
ate:
202
0-05
-08
Tim
e:4:
23:5
0 PM
REV. DESCRIPTIONYYYY-MM-DD PREPARED REVIEWED APPROVEDDESIGNED
SEAL
of
IF T
HIS
MEA
SUR
EMEN
T D
OES
NO
T M
ATC
H W
HAT
IS S
HO
WN
, TH
E SH
EET
SIZE
HAS
BEE
N M
OD
IFIE
D F
RO
M: A
NSI
D
FOR AGENCY REVIEW
TYPICAL SECTION - INFILL (CELL 8) PROPOSED VERTICAL LANDFILL EXPANSION AT FINGER DRAINN.T.S.
TYPICAL SECTION - PROPOSED FINGER DRAIN AND VERTICAL LANDFILL EXPANSION (OUTSIDE THE INFILL AND EAST INFILL LIMITS)N.T.S.
TYPICAL SECTION - EAST INFILL PROPOSED LEACHATE CONTROL SYSTEM AT FINGER DRAINN.T.S.
TYPICAL SECTION - APPROVED INFILL (CELL 8) AND EAST INFILL LEACHATE CONTROL SYSTEM AT MANHOLEN.T.S.
WASTE CONNECTIONS OF CANADA INC.
1 m
0.15 m
0.3 m
LANDFILLED WASTE
INTERMEDIATE COVER
COMPACTED SOILTOPSOIL
4H1V
3H1V
0.6 m
0.5 m
DRAINAGE LAYER
0.45 m0.15 m
0.9 m
RECOMPACTED CLAYSIDE SLOPE LINER
PREPARED SUBGRADEAFTER TOPSOILSTRIPPING
ORIGINAL GROUND
1.2
m
2%
2%
2%
2%
PERIMETER ROADPROFILE CONTROL
CLAY BACKFILL
℄ PE
RIM
ETER
DIT
CH
LIM
IT O
FW
ASTE
FIL
L
TOE
OF
LAN
DFI
LL S
LOPE
SURFACE WATERCONTROL BERM
3H1V
3H1V
℄ ROAD
2 m2 m
3.48 m2.7 m2.65 m
SAND PROTECTIVE LAYER
FINALCOVER
V DITCH AT APPROX.0.5% GRADES
3H1V
0.15 m
1H1V
3H1V
3H1V
ROAD GRANULAR MATERIAL
ANCHOR TRENCH
3H1V
4H1V
PREPARED SUBGRADEAFTER TOPSOIL
STRIPPING
PROFILECONTROL
TOE OF LANDFILLSLOPE ELEVATION
SEE ROADPROFILE
TOE
OF
LAN
DFI
LL S
LOPE
℄ PE
RIM
ETER
DIT
CH
ACCESS ROAD PROFILE ELEVATION
℄ ROAD
2%2%
2% 2%3H1V
3H1V 1.
2 m
1 mSHOULDER
4 m 4 m
1 mSHOULDER
3.3 m 3.15 m
V DITCH AT APPROX.0.5% GRADES;
1.5 m WIDE FLAT BASEDITCH AT 0.2% GRADES
1.5 m
TOE
OF
LAN
DFI
LL S
LOPE
℄ PE
RIM
ETER
DIT
CH
1.2
m
3.3 m3.15 m 1.5 m
LANDFILLED WASTE
4H1V
3H1V
0.6 m
0.5 m
DRAINAGE LAYER
0.6 m0.3 m
RECOMPACTED CLAYSIDE SLOPE LINER
LIM
IT O
FW
ASTE
FIL
L
SURFACE WATERCONTROL BERM
3H1V
3H1V
2.65 m
LANDFILLED WASTE
0.6 m
0.5 m
0.6 m0.3 m
RECOMPACTED CLAYSIDE SLOPE LINER
LIM
IT O
FW
ASTE
FIL
L
SURFACE WATERCONTROL BERM
3H1V
2.65 m
DRAINAGE LAYER
3H1V
ANCHOR TRENCH ANCHOR TRENCH
0.9 m 0.9 m
CLAY BACKFILL
ROAD GRANULAR MATERIAL
ASPHALT
www.golder.com
025
mm
18111331CONTROL0001
DRAWING
19E
GOLDER ASSOCIATES LTD.6925 CENTURY AVENUE, SUITE #100MISSISSAUGA, ONTARIO, L5N 7K2CANADA[+1] (905) 567-4444A 2019-01-31 ISSUED FOR CLIENT REVIEW MLFFRG FRG FSB
B 2019-06-10 ISSUED FOR DESIGN AND OPERATIONS REPORT APPROVAL (EA PHASE) - CLIENT REVIEW FCFRG FRG FSB
C 2019-07-10 ISSUED FOR DESIGN AND OPERATIONS REPORT APPROVAL (EA PHASE) - EA REVIEW FC/MRFRG FRG FSB
D 2020-01-09 ISSUED FOR DESIGN AND OPERATIONS REPORT APPROVAL (EA AND ECA) FC/MRFRG FRG FSB
E 2020-03-06 RE-ISSUED FOR DESIGN AND OPERATIONS REPORT ECA APPROVAL FC/MRFRG FRG FSB
19 29
RIDGE LANDFILLBLENHEIM, ONTARIO
PERIMETER ROAD-LANDFILL INTERFACE SECTIONS - AREAS AAND B
TITLE
PROJECT NO. REV.
PROJECTCLIENT
CONSULTANT
Path
: \\g
olde
r.gds
\com
plex
data
\offi
ce\m
issi
ssau
ga\S
IM\C
lient
s\W
CC
\Rid
ge_L
andf
ill\99
_PR
OJ\
1811
1331
_Rid
ge_L
andf
ill_Ex
pans
ion_
EA\4
0_PR
OD
\000
1_D
andO
_Pla
n\ |
File
Nam
e: 1
8111
331-
0001
-CW
-001
9.dw
g |
Las
t Edi
ted
By: m
ram
paul
Dat
e: 2
020-
03-2
3 T
ime:
1:03
:26
PM |
Prin
ted
By: B
Rad
ojev
ic
Dat
e: 2
020-
05-0
8 T
ime:
4:24
:37
PM
REV. DESCRIPTIONYYYY-MM-DD PREPARED REVIEWED APPROVEDDESIGNED
SEAL
of
IF T
HIS
MEA
SUR
EMEN
T D
OES
NO
T M
ATC
H W
HAT
IS S
HO
WN
, TH
E SH
EET
SIZE
HAS
BEE
N M
OD
IFIE
D F
RO
M: A
NSI
D
119
SCALE 1:100 m TYPICAL LANDFILL SECTION (PERIMETER ROAD)
219
SCALE 1:100 m TYPICAL LANDFILL SECTION (MAIN ACCESS ROAD)
NOTE(S)1. ALL DIMENSIONS IN METER UNLESS OTHERWISE NOTED.
FOR AGENCY REVIEW
WASTE CONNECTIONS OF CANADA INC.
DITCH
4 m
WID
E BE
RM200 mm Ø SOLID HDPE
HEADER PIPE
COMPACTED BACKFILL
1800 mm INSIDE DIA. MANHOLE
TOE OF 3H:1V SIDE SLOPE
3H:1
V3H
:1V
LIMIT OFWASTE FILL
3H:1
V
0.5% 0.5%
200 mm Ø PERFORATEDHDPE COLLECTOR PIPE
200 mm Ø SOLID HDPE PIPE
1.5
m500 mm THICK CONTINUOUSCLEAR STONE DRAINAGE BLANKET
0.5% 0.5%
1.8 m
0.9
m
1.5
m2.
5 m
30°
600 mm THICK RECOMPACTEDCLAY SLIDESLOPE LINER
1.5 m DIA.
0.6
m
FINISHED GRADE
EXISTING 200 mm DIA. SOLIDLEACHATE COLLECTOR PIPE
CLAY BARRIER FOR ONE LENGTHON EACH SIDE OF MANHOLE.SEE DETAIL A.
EXISTING 200 mm DIA. SOLIDLEACHATE COLLECTOR PIPE
SILTATION SUMP
PROPOSED 200 mm DIA. SOLIDLEACHATE COLLECTOR PIPE
PROPOSED 200 mm DIA. SOLIDLEACHATE COLLECTOR PIPE
1500 mm INSIDEDIAMETER MANHOLE
1.8 m DIA.
0.6
m
FINISHED GRADE
200 mm DIA. SOLID LEACHATEHEADER PIPE
1800 mm INSIDEDIAMETER MANHOLE
200 mm DIA. SOLID LEACHATEHEADER PIPE
SILTATION SUMP
200 mm DIA. SOLID HDPECOLLECTOR PIPE
0.9
m
0.9
m
2.2
m
6 m AT BASE OF BARRIER 6 m AT BASE OF BARRIER
UPPER LIMIT OF CLAY BARRIERTO MATCH FINISHED GRADE
200 mm DIA. HDPE PERFORATEDCOLLECTOR PIPE
200 mm DIA. SOLID HDPE PIPEWITHIN CLAY BARRIER
UPPER LIMIT OF CLAY BARRIERTO MATCH FINISHED GRADE
200 mm DIA. HDPE PERFORATEDCOLLECTOR PIPE
200 mm DIA. SOLID HDPE PIPEWITHIN CLAY BARRIER
1500 mm INSIDEDIA. MANHOLE
2" STONE OR COARSE CRUSHED CONCRETEINFILTRATION TRENCH AT LOW POINT
REMOVE EXISTING COVERPRIOR TO WASTE PLACEMENT
TEMPORARY INTERIOR SLOPE BERM
2H1V
2H1V 1
m
2 m
1 m0.5 mINTO
EXISTINGWASTE
3H1V
TEMPORARY INTERIOR SLOPE
1 m THICKEXISTING
FINAL COVERINCLUDING
0.15 m THICKTOPSOIL
REMOVE EXISTING TOPSOIL PRIOR TOBERM CONSTRUCTION
6% EXISTING TOP SLOPES,4H:1V EXISTING SIDE SLOPES
LANDFILL WASTE
PROPOSEDWASTE FILL
www.golder.com
025
mm
18111331CONTROL0001
DRAWING
20E
GOLDER ASSOCIATES LTD.6925 CENTURY AVENUE, SUITE #100MISSISSAUGA, ONTARIO, L5N 7K2CANADA[+1] (905) 567-4444A 2019-03-05 ISSUED FOR REVIEW MRFRG FRG FSB
B 2019-06-10 ISSUED FOR DESIGN AND OPERATIONS REPORT APPROVAL (EA PHASE) - CLIENT REVIEW FCFRG FRG FSB
C 2019-07-10 ISSUED FOR DESIGN AND OPERATIONS REPORT APPROVAL (EA PHASE) - EA REVIEW FC/MRFRG FRG FSB
D 2020-01-09 ISSUED FOR DESIGN AND OPERATIONS REPORT APPROVAL (EA AND ECA) FC/MRFRG FRG FSB
E 2020-03-06 RE-ISSUED FOR DESIGN AND OPERATIONS REPORT ECA APPROVAL FC/MRFRG FRG FSB
20 29
PRELIMINARY DESIGNRIDGE LANDFILLBLENHEIM, ONTARIO
LEACHATE COLLECTION SYSTEM DETAILS- OLD LANDFILL EXPANSION
TITLE
PROJECT NO. REV.
PROJECTCLIENT
CONSULTANT
Path
: \\g
olde
r.gds
\com
plex
data
\offi
ce\m
issi
ssau
ga\S
IM\C
lient
s\W
CC
\Rid
ge_L
andf
ill\99
_PR
OJ\
1811
1331
_Rid
ge_L
andf
ill_Ex
pans
ion_
EA\4
0_PR
OD
\000
1_D
andO
_Pla
n\ |
File
Nam
e: 1
8111
331-
0001
-CW
-002
0.dw
g |
Las
t Edi
ted
By: m
ram
paul
Dat
e: 2
020-
03-2
2 T
ime:
5:46
:36
PM |
Prin
ted
By: B
Rad
ojev
ic
Dat
e: 2
020-
05-0
8 T
ime:
4:25
:30
PM
REV. DESCRIPTIONYYYY-MM-DD PREPARED REVIEWED APPROVEDDESIGNED
SEAL
of
IF T
HIS
MEA
SUR
EMEN
T D
OES
NO
T M
ATC
H W
HAT
IS S
HO
WN
, TH
E SH
EET
SIZE
HAS
BEE
N M
OD
IFIE
D F
RO
M: A
NSI
D
SECTION - TYPICAL EXISTING MANHOLE OUTSIDE THE INFILL AND EAST INFILL LIMITSSCALE 1:50 m
FOR AGENCY REVIEW
WASTE CONNECTIONS OF CANADA INC.
SECTION - TYPICAL MANHOLE AT INFILL (CELL 8) AND EAST INFILLSCALE 1:50 m
SECTION - TYPICAL EXISTING MANHOLE OUTSIDE THE INFILL AND EAST INFILL LIMITSSCALE 1:50 m
DETAIL B - TYPICAL PLAN VIEW OF LEACHATE COLLECTION SYSTEM AT INFILL (CELL 8) AND EAST INFILLSCALE 1:50 m
DETAIL A - TYPICAL EXISTING MANHOLE OUTSIDE INFILL (CELL 8) AND EAST INFILL LIMITSSCALE 1:50 m
DETAIL C - TYPICAL SECTION THROUGH TEMPORARY INTERIOR SLOPE BERMSCALE 1:50 m
NONWOVEN GEOTEXTILE SEPARATOR
NONWOVEN GEOTEXTILE FILTER50 mm CLEAR STONE DRAINAGE LAYER
200mm SAND PROTECTIVE LAYER
200mm I.D. PERFORATEDHDPE LEACHATE LATERALPIPE
200mm I.D. PERFORATEDHDPE LEACHATE
HEADER PIPE LOW POINT18.5 m 31.5 m 31.5 m 18.5 m 31.5 m
350mm 350mm
630mm630mm
2.0%
0.5%
2.0%
1.0% (APPROX.)
2.0%
1.0% (APPROX.)1.0% (APPROX.)
2.0%
NONWOVEN GEOTEXTILE SEPARATOR
NONWOVEN GEOTEXTILE FILTER
0.3 m 1.5 m 2 m
VARIES150mm(min.)
0.2 m
1 m
VARIES466
(max.)
0.6
m0.
5 m
NATIVE CLAY TILL
RECOMPACTED CLAYSIDE SLOPE LINER
200 mm SAND PROTECTIVE LAYER 50 mm CLEAR STONEDRAINAGE LAYER
200mm I.D. HDPELEACHATE HEADERPIPE
TOE
OF
LIN
ER
TOE
OF
LCS
SLO
PE
3H1V
3H1V
NONWOVEN GEOTEXTILE SEPARATOR
NONWOVEN GEOTEXTILE FILTER
NATIVE CLAY TILL
RECOMPACTED CLAYSIDE SLOPE LINER
200 mm SAND PROTECTIVE LAYER
3H1V
3H1V
0.43 m
0.2 m
1 m
3 m
1.5 m 2 m
0.6
m0.
5 m
0.6
m
TOE
OF
LCS
SLO
PE
50 mm CLEAR STONEDRAINAGE LAYER
200mm I.D. HDPE LEACHATEHEADER PIPE
200mm I.D. HDPE LEACHATELATERAL PIPE
200mm I.D. HDPERISER PIPE
22 12 ° LONGBEND
450 mm I.D. HDPEEXTRACTION PIPE
450mm I.D. HDPEPERFORATED LEACHATEEXTRACTION PIPE
200mm I.D. PERFORATEDHDPE LEACHATELATERAL PIPE
200mm I.D. PERFORATEDHDPE HEADER PIPE
200mm I.D. NON-PERFORATEDHDPE RISER PIPE
3H:1V
3 m
3 m
0.7 m0.8 m 0.8 m 0.7 m
3H:1V
3H:1
V
400mm I.D. NON-PERFORATEDEXTRACTION PIPE
NONWOVEN GEOTEXTILE SEPARATOR
NONWOVEN GEOTEXTILE FILTER
CLAY BACKFILL
NATIVE CLAY TILL 3H1V
4H1V
LEACHATE COLLECTIONSYSTEM
0.9 m
0.5 m
1 m 1.
5 m
0.3 m
0.6
m0.
5 m
LAN
DFI
LLED
1 m
RECOMPACTED CLAYSIDE SLOPE LINER
WAS
TE(B
Y O
THER
S)FI
NAL
CO
VER
(BY
OTH
ERS)
TOE
OF
LAN
DFI
LL S
LOPE
LIM
IT O
F R
ECO
MPA
CTE
DC
LAY
LIN
ER LIM
IT O
F W
ASTE
FILL
TOP
OF
REC
OM
PAC
TED
CLA
Y LI
NER
0.6 m
200mm I.D. NON-PERFORATEDHDPE RISER PIPE
NATIVE CLAY TILL
RECOMPACTED CLAYSIDE SLOPE LINER
NONWOVEN GEOTEXTILE SEPARATOR
50 mm CLEAR STONE DRAINAGE LAYERNONWOVEN GEOTEXTILE FILTER
200 mm SAND PROTECTIVE LAYER
0.6
m0.
5 m0.
2 m
0.3
m
50 mm
NATIVE CLAY TILL
RECOMPACTED CLAYSIDE SLOPE LINER
NONWOVEN GEOTEXTILE SEPARATOR
50 mm CLEAR STONE DRAINAGE LAYERNONWOVEN GEOTEXTILE FILTER
200 mm SAND PROTECTIVE LAYER
450mm I.D. NON-PERFORATEDHDPE EXTRACTION PIPE (typ.)
200mm I.D. NON-PERFORATEDHDPE RISER PIPE
0.5
m0.2
m
0.6
m0.
6 m
0.7 m 0.8 m 0.8 m 0.7 m
50 mm
www.golder.com
025
mm
18111331CONTROL0001
DRAWING
21E
GOLDER ASSOCIATES LTD.6925 CENTURY AVENUE, SUITE #100MISSISSAUGA, ONTARIO, L5N 7K2CANADA[+1] (905) 567-4444A 2019-01-31 ISSUED FOR CLIENT REVIEW MLFFRG FRG FSB
B 2019-06-10 ISSUED FOR DESIGN AND OPERATIONS REPORT APPROVAL (EA PHASE) - CLIENT REVIEW FCFRG FRG FSB
C 2019-07-10 ISSUED FOR DESIGN AND OPERATIONS REPORT APPROVAL (EA PHASE) - EA REVIEW FC/MRFRG FRG FSB
D 2020-01-09 ISSUED FOR DESIGN AND OPERATIONS REPORT APPROVAL (EA AND ECA) FC/MRFRG FRG FSB
E 2020-03-06 RE-ISSUED FOR DESIGN AND OPERATIONS REPORT ECA APPROVAL FC/MRFRG FRG FSB
21 29
RIDGE LANDFILLBLENHEIM, ONTARIO
LEACHATE COLLECTION SYSTEM DETAILS - AREAS A AND B TITLE
PROJECT NO. REV.
PROJECTCLIENT
CONSULTANT
Path
: \\g
olde
r.gds
\com
plex
data
\offi
ce\m
issi
ssau
ga\S
IM\C
lient
s\W
CC
\Rid
ge_L
andf
ill\99
_PR
OJ\
1811
1331
_Rid
ge_L
andf
ill_Ex
pans
ion_
EA\4
0_PR
OD
\000
1_D
andO
_Pla
n\ |
File
Nam
e: 1
8111
331-
0001
-CW
-002
1.dw
g |
Las
t Edi
ted
By: m
ram
paul
Dat
e: 2
019-
07-1
0 T
ime:
4:48
:23
PM |
Prin
ted
By: B
Rad
ojev
ic
Dat
e: 2
020-
05-0
8 T
ime:
4:26
:23
PM
REV. DESCRIPTIONYYYY-MM-DD PREPARED REVIEWED APPROVEDDESIGNED
SEAL
of
IF T
HIS
MEA
SUR
EMEN
T D
OES
NO
T M
ATC
H W
HAT
IS S
HO
WN
, TH
E SH
EET
SIZE
HAS
BEE
N M
OD
IFIE
D F
RO
M: A
NSI
D
121
SCALE NTS BASE LEACHATE COLLECTION DRAINAGE LAYER
321
SCALE NTS SECTION ALONG SIDE SLOPE (TYPICAL)
621
SCALE SCALE SECTION AT LEACHATE COLLECTION SUMP
421
SCALE NTS PLAN VIEW LEACHATE COLLECTION SUMP
221
SCALE NTS ANCHOR TRENCH DETAIL
521
SCALE NTS SIDE SLOPE RISER PIPE DETAIL
721
SCALE NTS SIDE SLOPE EXTRACTION PIPE DETAIL FOR AGENCY REVIEW
WASTE CONNECTIONS OF CANADA INC.
W/L
W/L
W/L
W/L
W/L
199.07
197.78
197.48
197.48
196.96
W/L196.45
X
XX
X
X
XX
X
XX
XX
XX
X
X
XX
XX
XX
X
X
X
XXXX
XX
XX
X
X X X X X X
XX
X
X
X
XX
XX
XX
XXX
X
XX
XX
XX
X
EX.FLOOD
CONTROLFACILITY
OLDLANDFILL
SOUTHLANDFILL
WESTLANDFILL
INFILL AREA
NORTHEASTWOODLOT
SOUTHEASTWOODLOT
SOUTHWESTWOODLOT
LEACHATEMANAGEMENTENTRANCE
MAIN SITEENTRANCE
EX. SWP 2
EX.SWP 3EX.
SWP 4
EX.SWP 5
LEWIS DRAIN
SCOTT DRAIN
GALES DRAIN DUKE DRAIN
BLOWER/FLARESTATION
CHARING CROSS ROAD (COUNTY ROAD 10)
HOWAR
D DRAI
N
HOWARD DRAIN
HOWARD DRAIN
THOMPSON DRAIN
THO
MPS
ON
DR
AIN
ALLI
SON
LIN
E
ERIEAU ROAD (CONCESSION ROAD 4)
HOWARD DRAIN
PUBLIC WASTEDROP-OFF AREA
ADMIN.BUILDING
MAINTENANCEBUILDING
HOWARD/SCOTT DRAIN
SCOTT DRAIN
EX. SWP 1
FRONTPOND
EXISTING/FUTURE
LANDFILLGAS MGMT.
AREA
TOPSOILSTOCKPILE 1
206
206
206
206 206
PRO
POSE
D S
CR
EEN
ING
BER
M
RELOCATED HOWARD DRAIN
BENEFICIAL USEMATERIALS
LAYDOWN AREA 2
MATERIALS STORAGEAREA / GRINDING
OPERATIONS
SERVICE /EMERGENCYSITE ACCESS
NORTHEAST WOODLOT(OPEN SPACE /
CONSERVATION LANDS)
SOUTHEAST WOODLOT(OPEN SPACE /
CONSERVATION LANDS)
PROPOSED SCREENING BERM
PRO
POSED
SCR
EENIN
G BER
M
SERVICE /EMERGENCY SITEACCESS
7
34
1
2
PROPOSEDCULVERT
RELOCATEDHOWARD DRAIN
0+0000+100
0+2000+300
0+4000+500
0+60
00+
700
0+80
00+
900
1+00
0
1+1001+200
1+3001+400
1+5001+600
1+7001+800
1+9002+000
2+1002+200
2+3002+400
2+500
2+60
02+
700
2+80
02+
824
0+000 0+100 0+200 0+300 0+400 0+500 0+600
0+70
00+
800
0+90
01+
000
1+10
01+
200
1+3001+400
1+500
1+600
1+700
1+800
1+9001+946
6
5
PROPOSEDFLOOD CONTROL
FACILITYEXPANSION
SOILSTOCKPILE 1
208
208
TOPSOILSTOCKPILE
2
2-LANEROAD
CELL 1
CELL 2
STO
RM
WAT
ERPO
ND
4
SOILSTOCKPILE 2
CEL
L 1
CEL
L 2
STORMWATERPOND 5
STORMWATERPOND 1
STORMWATERPOND 6
POND 2CELL 1 POND 2
CELL 2
STO
RM
WAT
ER P
ON
D 7
200
200
205 20
5
205
205
205 205
210 21
0
205
205
205210
215220
225230
205 210 215 220 225230
200205
210215
220225
230
235
240
200205
210215
220225
230
235
205210
215220
225230
235
200205
210215
220225
230
235
240
205210
215220
225230
235
240
200205210215220225230235240
200
205
205
210
210
215
215
220
220
225
225
230
230
235
235
240
240
DOWNCHUTE CHANNEL (TYP.)SEE DETAILS
FINAL COVERSEE DETAIL
TACK ON BERM (TYP.)SEE DETAIL
HIGHPOINT
HIGHPOINT
HIGHPOINT
HIGHPOINT
HIGHPOINT
HIGHPOINT
HIGHPOINT
HIGHPOINT
HIGHPOINT
HIGHPOINT
HIGHPOINT
HIGHPOINT
124
124
324
424
OLD LANDFILL
AREA 'A'
WEST LANDFILL
SOUTH LANDFILL
AREA 'B'
BENEFICIALUSE
MATERIALSLAYDOWN
AREA 1(YEARS 1-17)
O23
O'23
0+0000+100
0+2000+300
0+4000+500
0+60
00+
700
0+80
00+
900
1+00
0
1+1001+200
1+3001+400
1+5001+600
1+7001+800
1+9002+000
2+1002+200
2+3002+400
2+500
2+60
02+
700
2+80
02+
824
0+000 0+100 0+200 0+300 0+400 0+500 0+600
0+70
00+
800
0+90
01+
000
1+10
01+
200
1+3001+400
1+500
1+600
1+700
1+800
1+9001+946
N23
N' 23
OLD LANDFILL
AREA 'A'
SOUTH LANDFILL
AREA 'B'
HP
HP
HP
HP
LP
HP
HP
LP
HP
HP LP
LP
GALES DRAIN
235
WEST LANDFILL0+9001+000
W/L199.07
SWP 3
HOW
ARD
DRAI
N
235
X X
1+5001+6001+700
7
1
2
3
4
5
6
www.golder.com
025
mm
18111331CONTROL0001
DRAWING
22E
GOLDER ASSOCIATES LTD.6925 CENTURY AVENUE, SUITE #100MISSISSAUGA, ONTARIO, L5N 7K2CANADA[+1] (905) 567-4444A 2019-05-07 ISSUED DRAFT FOR REVIEW JJB/MRTDJ FRG FSB
B 2019-06-10 ISSUED FOR DESIGN AND OPERATIONS REPORT APPROVAL (EA PHASE) - CLIENT REVIEW FCFRG FRG FSB
C 2019-07-10 ISSUED FOR DESIGN AND OPERATIONS REPORT APPROVAL (EA PHASE) - EA REVIEW FC/MRFRG FRG FSB
D 2020-01-09 ISSUED FOR DESIGN AND OPERATIONS REPORT APPROVAL (EA AND ECA) FC/MRFRG FRG FSB
E 2020-03-06 RE-ISSUED FOR DESIGN AND OPERATIONS REPORT ECA APPROVAL FC/MRFRG FRG FSB
22 29
LEGEND
FOR AGENCY REVIEW
0
1:5,000
200 400
METRES
PRELIMINARY DESIGNRIDGE LANDFILLBLENHEIM, ONTARIO
WASTE CONNECTIONS OF CANADA INC.
PROPOSED FINAL COVER SURFACE WATER CONTROL TITLE
PROJECT NO. REV.
PROJECTCLIENT
CONSULTANT
Path
: \\g
olde
r.gds
\com
plex
data
\offi
ce\m
issi
ssau
ga\S
IM\C
lient
s\W
CC
\Rid
ge_L
andf
ill\99
_PR
OJ\
1811
1331
_Rid
ge_L
andf
ill_Ex
pans
ion_
EA\4
0_PR
OD
\000
1_D
andO
_Pla
n\ |
File
Nam
e: 1
8111
331-
0001
-CW
-002
2.dw
g |
Las
t Edi
ted
By: m
ram
paul
Dat
e: 2
020-
03-2
3 T
ime:
8:28
:31
AM |
Prin
ted
By: B
Rad
ojev
ic
Dat
e: 2
020-
05-0
8 T
ime:
4:32
:24
PM
REV. DESCRIPTIONYYYY-MM-DD PREPARED REVIEWED APPROVEDDESIGNED
SEAL
of
IF T
HIS
MEA
SUR
EMEN
T D
OES
NO
T M
ATC
H W
HAT
IS S
HO
WN
, TH
E SH
EET
SIZE
HAS
BEE
N M
OD
IFIE
D F
RO
M: A
NSI
D
TRUE NORTH
PLAN
NO
RTH
NOTE(S)1. PROJECTION: UTM NAD27-17N. VERTICAL DATUM: CGVD28 (GEODETIC).
PROPERTY LIMIT
APPROVED PRE-EXPANSION WASTE LIMIT
APPROVED PRE-EXPANSION LANDFILL FINAL COVER CONTOUR(1.0 masl INTERVAL)
PROPOSED EXPANSION WASTE LIMIT
APPROXIMATE OLD LANDFILL VERTICAL EXPANSION LIMIT
PROPOSED EXPANSION LANDFILL FINAL COVER CONTOUR(1.0 amsl INTERVAL)
PROPOSED ACCESS ROAD
PROPOSED DITCH
PROPOSED RELOCATED HOWARD DRAIN
EXISTING GROUND SURFACE CONTOUR (1.0 masl INTERVAL)
EXISTING GRAVEL ROAD
EXISTING PAVED ROAD
EXISTING DRAINAGE DITCH
EXISTING WATER BODY
EXISTING TREE LINE
EXISTING FENCE LINE
DRAINAGE CATCHMENT AREAS
DOWNCHUTE CHANNEL
SURFACE WATER DIVERSION BERM (AT 3% SLOPE MINIMUM)
PERIMETER DITCH LOW POINT
PERIMETER DITCH HIGH POINT
PERIMETER DITCH FLOW DIRECTION
SCALE HOUSE
ADMINISTRATION BUILDING
MAINTENANCE BUILDING 1
MAINTENANCE BUILDING 2 / HOT BOX
PROPOSED ANCILLARY FACILITIES
EXISTING / FUTURE LEACHATE MANAGEMENT AREA
EXISTING / FUTURE LANDFILL GAS MANAGEMENT AREA
REFERENCE(S)
LP
HP
1. TOPOGRAPHIC BASE PLAN FOR SITE, EXCLUDING WITHIN EXISTING PONDS, OBTAINEDFROM EXISTING GROUND SURFACE, EXTRACTED FROM DEM, 6 cm GSD, FOR THE ENTIRESITE AREA, CAPTURED ON MAY 5, 2019 BY THE BASE MAPPING COMPANY LTD.
2. TOPOGRAPHIC BASE PLAN FOR EXISTING PONDS 1, 2, 4, 5 AND EAST AREA OF DUKE DRAINOBTAINED FROM EXISTING GROUND SURFACES, EXTRACTED FROM DEM, HORIZONTALAND VERTICAL ACCURACY 0.020 m, CAPTURED IN OCT. AND NOV. 2019, BY SURVEYORS ONSITE INC.
3. APPROVED WASTE LIMITS AND PROPERTY LIMITS FROM INTERIM ALTERNATIVE METHODSREPORT, DECEMBER 2018, FIGURE 2 - ALTERNATIVE 1 (HORIZONTAL AND VERTICALEXPANSION) PREPARED BY DILLON CONSULTING.