Upload
janice-potter
View
218
Download
3
Tags:
Embed Size (px)
Citation preview
Area Sources and Area Sources and Fugitive Fugitive
Emissions:Emissions:Source ManagementSource Management
James PayneJames Payne
Morongo Band of Mission Indians Morongo Band of Mission Indians Environmental Protection Environmental Protection
DepartmentDepartment
22
Area Sources & Fugitive Area Sources & Fugitive EmissionsEmissions
Area refers to the sourceArea refers to the source Fugitive refers to the emissionsFugitive refers to the emissions
Also called non-point sourcesAlso called non-point sources Quantifying emissions is difficultQuantifying emissions is difficult Controlling emissions is Controlling emissions is
challengingchallenging
33
Particulate Matter (PM): Particulate Matter (PM): ExamplesExamples
Traffic on dirt roadsTraffic on dirt roads Tillage of croplandTillage of cropland Burning grasslands, pastures, crop Burning grasslands, pastures, crop
stubblestubble Construction activitiesConstruction activities Material conveyance, loading & Material conveyance, loading &
unloadingunloading Hard- and soft-rock surface miningHard- and soft-rock surface mining Rock crushing & handlingRock crushing & handling
44
Burning of Grasslands, Burning of Grasslands, Pastures, Crop StubblePastures, Crop Stubble
55
Rock Crushing YardRock Crushing Yard
66
Agriculture OperationsAgriculture Operations
77
FiresFires
88
Dirt RoadsDirt Roads
99
Methane ReleaseMethane Release
Guess what I’m sorry
about now…
1010
Examples of Volatile Examples of Volatile Organic Compounds (VOCs)Organic Compounds (VOCs)
Larger facilities (oil refineries, chemical Larger facilities (oil refineries, chemical plants, manufacturing)plants, manufacturing) Large lagoons, holding ponds (aerated)Large lagoons, holding ponds (aerated) Tank farms Tank farms
Tanks & tank pressure-equalization ventsTanks & tank pressure-equalization vents Pipe seals, pumps, & valvesPipe seals, pumps, & valves
1111
Pipe Flanges & SealsPipe Flanges & Seals
1212
Examples of Volatile Examples of Volatile Organic Compounds (VOCs) Organic Compounds (VOCs)
[cont.][cont.] CommunitiesCommunities
LandfillsLandfills Uncovered wastewater treatment Uncovered wastewater treatment
processesprocesses Sedimentation & aeration basinsSedimentation & aeration basins Trickling filters & bio-towersTrickling filters & bio-towers
Residential wood combustionResidential wood combustion
1313
Inefficient Wood StoveInefficient Wood Stove
1414
Residential Aeration Residential Aeration BasinBasin
1515
Examples of Volatile Examples of Volatile Organic Compounds (VOCs) Organic Compounds (VOCs)
[cont.][cont.] Smaller facilitiesSmaller facilities
Dry cleanersDry cleaners Body & paint shopsBody & paint shops Service stations & gas pumpsService stations & gas pumps Office equipment (i.e., toner cartridges, Office equipment (i.e., toner cartridges,
etc.)etc.) Small combustion devices (i.e., propane Small combustion devices (i.e., propane
burners)burners) Any source using / storing solventsAny source using / storing solvents
1616
VOC sourceVOC source
1717
Source “Control” and Source “Control” and ManagementManagement
Controlling these sources is most practical Controlling these sources is most practical by targeted management actions of the by targeted management actions of the activity that creates the emissionsactivity that creates the emissions
Identify sources and data needsIdentify sources and data needs Quantify sourcesQuantify sources Evaluate impact on ambient air Evaluate impact on ambient air
quality quality
1818
Management (cont.)Management (cont.)
Develop management Develop management options/practicesoptions/practices Local / state / tribal regulationsLocal / state / tribal regulations
Implement control practicesImplement control practices Evaluate effectiveness of control Evaluate effectiveness of control
practicespractices Improve management “controls”Improve management “controls”
1919
Identification, Identification, Quantification, & Impact Quantification, & Impact
of the Problemof the Problem
Establish methodologyEstablish methodology How sources identifiedHow sources identified How emissions quantifiedHow emissions quantified
Integrate informationIntegrate information Regional or local AQ monitoring dataRegional or local AQ monitoring data Emissions inventory dataEmissions inventory data
Is there a problem? How big?Is there a problem? How big?
2020
Develop Management Develop Management OptionsOptions
Who has authority to regulate the Who has authority to regulate the source?source?
Air quality agencyAir quality agency Fire districtFire district Planning/zoning districtPlanning/zoning district City councilCity council Tribal authorityTribal authority
Could be delegated to your environmental department!!Could be delegated to your environmental department!!
2121
Develop Management Develop Management Options (cont.)Options (cont.)
Do avenues of control exist that Do avenues of control exist that are not being enforced?are not being enforced?
What has been done in the past by What has been done in the past by other groups?other groups?
How effective have past practices How effective have past practices been?been?
2222
ImplementationImplementation
Develop program to implement chosen Develop program to implement chosen control strategycontrol strategy Public educationPublic education Permit programPermit program Financial incentivesFinancial incentives Codes, ordinances, lawsCodes, ordinances, laws Source permittingSource permitting
Be sure program has flexibility to deal Be sure program has flexibility to deal with problems as they arisewith problems as they arise
2323
Control Strategy: ExamplesControl Strategy: Examples PMPM
Apply suppressant to heavily traveled Apply suppressant to heavily traveled roadsroads
Keep construction site dampKeep construction site damp Provide cover for material Provide cover for material
conveyance, loading & unloadingconveyance, loading & unloading Install enclosure/shroud for rock Install enclosure/shroud for rock
crushing/handingcrushing/handing Dampen stock aggregate & sand pilesDampen stock aggregate & sand piles
2424
Control Strategy: Examples Control Strategy: Examples (cont.)(cont.)
PM (cont.)PM (cont.) Use wind breaks such as landscaping, Use wind breaks such as landscaping,
fencingfencing Encourage vegetation growth (re-Encourage vegetation growth (re-
vegetation)vegetation) Install burlap or other porous, meshed Install burlap or other porous, meshed
materialmaterial
Driving at 15 mphDriving at 15 mph
2525
Driving at 25 mphDriving at 25 mph
2626
2727
Oat Cover CropOat Cover Crop
2828
Control Strategy: Examples Control Strategy: Examples (cont.)(cont.)
VOCsVOCs Repair & maintain pump & piping sealsRepair & maintain pump & piping seals Cover or install recovery vents on open tanksCover or install recovery vents on open tanks
BurningBurning Restrictions on open burning & wood burningRestrictions on open burning & wood burning Certified wood stoves in new homesCertified wood stoves in new homes
Cover wastewater treatment processesCover wastewater treatment processes Business licenses require material balance Business licenses require material balance
informationinformation
2929
Program EvaluationProgram Evaluation
Develop procedure to evaluate Develop procedure to evaluate effectiveness of programeffectiveness of program Ambient air monitoringAmbient air monitoring Cost analysisCost analysis Tracking of response from regulated Tracking of response from regulated
communitycommunity Documentation of progress—success & Documentation of progress—success &
failuresfailures Develop new control strategies based on Develop new control strategies based on
program resultsprogram results