Arena Group projects at the Fifa 2014 World Cup in Brazil
Citation preview
www.arenagroup.com
Global Events. Designed and Delivered.
ARENA GROUP PROJECTS AT THE FIFA 2014 WORLD CUP IN BRAZILOver one billion people across the world tuned in to watch Germany beat Argentina in the
final, 11 million people requested tickets and more than three million made their way to
Brazil to witness the beautiful game in all its glory. Every four years the World Cup captures
the world’s imagination. Creating a winning atmosphere is vital for host cities, brands and
organisers. For the 2014 FIFA World Cup Arena Group helped do just that.
FIFA World Cup 2014 Case Study
Arena Corinthians, Sao Paulo Arena Group’s clearview™ seating system showcased how
overlay can temporarily transform venues ahead of major
events, as it was used to construct Brazil’s largest ever
demountable structures at the Arena Corinthians.
• 42,000capacityincreasedto62,000
• Two9,000+seatdemountablegrandstandssituated in the North and South stands
• Incorporatingfoodandbeverageoutlets,toilets, officials and media rooms
• Fullworkingelectricsandwater
• Eachstructurestoodat102mwideand30mhigh, with54rowsofseats
• ArenaGroupworkedcloselywithBrazilianpartner FASTEngenharia
Estadio Beira-Rio Stadium, Porto AlegreArenaGroupandstrategicpartnersFASTEngenhariaand
Rohr S.A. led the overlay design, procurement, management
andimplementationfortheEstadioBeira-RiostadiuminPorto
Alegre, a host city for the World Cup.
• Responsibleforeverysingletemporaryelementonthe24acresite
• Extensivetemporarystructures
• Barriers,toilets,seating,mediadesks,screens,cabins,CCTV,furniture,lighting,HVAC,wallinganddecor
Joe O’[email protected] +44 (0) 207 484 5003
arena_groupwww.arenagroup.com
Estadio Beira-Rio Stadium and Arena Corinthians (top) Photographs © Portal da Copa/Governo do Brasil
Joe O’[email protected] +44 (0) 207 484 5003
arena_groupwww.arenagroup.com
Where Next?FollowingthesesuccessfulprojectsArenaGrouphasexpandeditsoverlayteamwiththerecruitmentofnewprojectmanagers,
architectsanddesigners.With19officesacrosstheUSA,Europe,MiddleEastandAsiaandanetworkoftrustedlocalpartners,
ArenaGroupisintheprimepositiontoofferfulloverlaymanagementandtemporaryinfrastructureprovisionforthenextgeneration
ofmajorsportingevents.ThegroupiscurrentlyfocusingonpotentialfutureprojectsincludingToronto2015andBaku2015.
Arena Fonte Nova, SalvadorTheArenaFonteNovastadium’sstandard
capacityof56,500wasincreasedby5,000
temporary clearview™ grandstand seats.
• Thegrandstandcanberemovedtoallow concerts and other events to be hosted
• SeatsinstalledfortheConfederationsCup, then moved and used at the RioATPOpenTennisandthenRioF1beforebeingreinstalledatArenaFonteNovainreadinessfortheFIFAWorld Cup Soccer.
ITV Fever Pitch Fan Zone, Manchester ArenaGroupwascontractedbySportCelonbehalfofITVSporttocreateaBrazilianbeachsoccerstadiuminManchesterduringthe
FIFA2014WorldCup.TheITVFeverPitchFanZonefeaturedworldclassbeachsocceractionandscreenedWorldCupmatchesto
thousands of fans.
• Designedandinstalledthreetieredgrandstands
• Configuredaroundtheperimeterofthebeachsoccerpitch,creating a temporary stadium
• Totalcapacityof2,200
• Brandedin-linewiththeaspirationsofITVSport
• Threedayinstallationtime
• DetailedCADdrawingstoensurethegrandstandsfitted
the limited available space
• Maximumcapacityachievedwhileadheringtostringent
access and egress regulations