Arfco Prof 12013 14.New Copy

Embed Size (px)

Citation preview

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 1/39

 

OFFICE L HORE

 40-T, 2nd Floor, Commercial Area Phase-II, DHA Lahore Cantt, -

Contact: +92-42-35707689, +92-42-36187634

FAISALABAD 

117-P, Koh-e-Noor Town Faisalabad, Contact: +92-41-8723989

[email protected] [email protected]

2013 – 2014

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 2/39

We Believe

ALWAYS ASSURING YOU THE BEST

ENGINEERING SERVICES ANDQUALITY WORKS

 We believe that a project can be

won or lost before construction ever

begins. A Through and intensive

approach to pre-construction activities

can greatly affect the success of the

project. Preliminary budgeting,

scheduling, value engineering and

planning, combined with systematic

procurement and contracting practices

can minimize risk and maximum thereturn.

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 3/39

INDEX

• Introduction

• Contacts

• Membership

• NTN Number Cert

• Enlistment

• Bankers

• Staff

• Plant & Machinery

• RCC Pipe Factory

• Major Projects

• Financial States 

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 4/39

M/S ARFCO Trading Construction established in

2000 and underlook variety of construction projects

through out the length and breath of the country

since its inception. After years of experience in

construction it has now achieved specialization in

construction and rehabilitation of Roads, Bridges,Buildings, Sewerage Works, Water Supply Systems

and Manufacturing the RCC Pipe.

INTRODUCTION

Chief Executive : RAHEEL ANWAR

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 5/39

CONTACTS 

Head Office Lahore

40-T, 2nd

 Floor, Commercial Area Phase-II, DHALahore Cantt

Branch Office Faisalabad

117-P, Koh-e- Noor Town Faisalabad

E-mail [email protected]

Contacts

+92-42-35707689

+92-42-36187634

+92-41-8723989

Fax: +92-42-5707689 Mob:0300-8658989

E-mail - [email protected]

www.arfco.pk

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 6/39

CONTACTS dddddddddddddddddd

ddddddddd

N I C

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 7/39

Pakistan Engineering Council

REGISTRATION

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 8/39

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 9/39

NTN CERTIFICATE

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 10/39

Capital Development Authority Islamabad

National Logistic Corporation (No Limit)

Punjab Highway Department

LDA TEPA, Government of Punjab

Faisalabad Development Authority

Lahore Development Authority

Punjab Housing Department, Govt of Punjab

C W Building Deptt, Govt of Punjab

DHA . Lahore.isb

DCL (Oil Gas), Islamabad

ENLISTMENT

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 11/39

  Bank Alfalah, DHA Phase-II, Lahore

  Askari Commercial Bank, Tufail

Road Lahore

  Askari Commercial Bank, Line

Town, Mall Road Lahore  Barlays, Phase-III, Z-Block, DHA

Lahore, Pakistan

  Bank Alfalah, People Colony

Faisalabad

BANKERS

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 12/39

SITE STAFF

• Project Manager Two

• Site Engineer Four

• Sub Engineer Four

• Chief Surveyor One

• Surveyor Four

• Site Supervisor Four

• Helpers Eight

• Motor Grader(G-14) One

• Static Road Rollers Seven

• Sheep Road Rollers  Five

• Vibratory Rollers Three

• Excavator Two

 Bulldozer (D-6) One• Loader (2.0 m3) One

• P.T.R One

OPERATORS

Note: AS PER PROJECT REQUIREMENT,

MANPOWER WILL BE ENHANCED.

• Project Manager Two

• Site Engineer Four

• Sub Engineer Four

• Chief Surveyor One

• Surveyor Four

• Site Supervisor Four

• Helpers Eight

. OperatorFiftee

n

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 13/39

• Finance Manager One

• Quantity Surveyors Two

• Clerk One

• Computer Operator Four

• Office Boy Five

• S.Guard Ten

• Cook Three

• Cook- Helpers Five

OFFICE STAFF

Note: AS PER PROJECT REQUIREMENT,

MANPOWER WILL BE ENHANCED.

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 14/39

• Tar Boilers Four• Compressor One

Note: AS PER PROJECT REQUIREMENT,

MANPOWER WILL BE ENHANCED.

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 15/39

MACHINERY/PLANT

• Motor Grader(G-14) 2 Nos

• Static Road Rollers 6 Nos

• Sheep Road Rollers  5 Nos• Vibratory Rollers 3 Nos

• Excavator 1 Nos

• Bulldozer (D-6) 2 Nos

• Loader (2.0 m3) 1 Nos• P.T.R 1 Nos

• Tar Boilers 5 Nos

• Compressor 1 Nos

• Tractor Trolleys 8 Nos• Water Tankers 5 Nos

• Concrete Mizers (2 Bags Capacity) 2 Nos

• Tractor With Front Blades 7 Nos

• Dump Trucks 4 Nos• Transit Mixture Machine 4 Nos

Note: AS PER PROJECT REQUIREMENT, PLANT /

MACHINERY WILL BE PURCHASE/HIRED.

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 16/39

MACHINERY/PLANT

• Steel shuttering 25000sft

• Steel scaffolding 30tons

• Bar cutter  5 Nos

• Concrete Vibrators 3 Nos

• Diesel Generators 3 Nos• Concrete Mixer Machines 5 Nos

• Electric Welding set 3 Nos

• Campactor 4 Nos

Note: AS PER PROJECT REQUIREMENT, PLANT /

MACHINERY WILL BE PURCHASE/HIRED.

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 17/39

LIGHT VEHICLES

• Hyundai Shahzore 3 Nos

• Toyota Dala 4 Nos

• Cars 2 Nos

• Motorcycle 8 Nos

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 18/39

MAJOR PROJECTS

Our firm has completed the works awarded by

NLC, DHA & Oil & Gas Deptt Public Health ,C&W

Punjab ,Private Sector Industrial &

Housing,Sector,costing to Rs.900 Million. The

performance and quality of work of Our firm

remains satisfactory upto the entire satisfaction of

official of NLC Engineers, Project Control Lahore.

Detail of projects is appended below: -

 DHA Sector ‘G’ Extension 

 DHA Rohi Nallah (Bridge & Road)

 Hardstanding at Wahgah Border Terminal

 DHA Boys College Road Works DHA Air Avenue Ph-VIII (Roads,

Sewerage System & Water Supply)

 Earth filling at DHA Ph-V

 Supply of RCC pipes to NLC projects 

 DHA Projs Parkview, DHA-VI

 Building Work awarded by Oil & Gas

Deptt, Kunnar Plant Hyderabad

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 19/39

COMPLETE PROJECTS

Arfco Trading & Construction has completed

the works awarded by NLC, DHA & Oil & Gas Deptt

costing to Rs.900 Million. The performance and

quality of work of our firm remains satisfactory

upto the entire satisfaction of official of NLC

Engineers, Project Control Lahore. Detail of projects

is appended below: - DHA Rohi Nallah (Bridge & Road)

 Hardstanding at Wahgah Border Terminal

 Construction Of R.C.C Cover Shed At

NLC Dry Port Thokar Niaz Baig Lhr.

 Construction Of Leftover Portion Main

Boulevard

 DHA Sector ‘G’ Extension DHA Boys

College Road Works

 DHA Air Avenue Ph-VIII (Roads,

Sewerage System & Water Supply)

Defense Housing Authority (Phase VIIIEx-Park View Sector G Road Works)

Construction Of Underground Parking

(Ex-Park View DHA Phase VIII)

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 20/39

COMPLETE PROJECTS

 Defense Housing Authority (Phase - VIII Ex-

Park View) Sector –  C.

 Defense Housing Authority(Phase - VII

Dev of Water Tank and Staff Room).

 Defense Housing Authority (Phase - VIII

(Ex –  Park View) Block –  G,D&F.

 Defense Housing Authority (Phase - VIII

(Ex –  Park View) Block –  J Road Works.

 Defense Housing Authority (Phase- VIII)

(Ex –  Park View) Block –  G & H Road Works.

 Defense Housing Authority Villas (Phase - VIII)

Road Works.

 Defense Housing AuthorityVillas(Phase - VIII)

Sector –  C Ext , Road Works.

 Defense Housing Authority (Phase –  VIII)

Block –  F Road Works.

 Defense Housing Authority Villas (Phase - VIII)

Block –  A Road Works.

 Ring Road (Package - 03.07.08 & 09)

R.C.C Wall (6.5’) 9 Killometers’’  Supply Of RCC Pipes To NLC Projects.

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 21/39

COMPLETE PROJECTS

 Masha-Allah Industry Faisalabad

 Zaheer Textile Faisalabad

 Iqra Textile Faisalabad

Building Structural Construction Work

Staff Quarters Construction Work ..

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 22/39

WORK IN PROGRESS

 Defense Housing Authority (Main

Bulovered Phase VI Road Works)

 Defense Housing Authority (Phase VIIDev of Water Tank and Staff Room)

 Defense Housing Authority (Phase VIIIEx-Park View Sector G Road Works)

 Defense Housing Authority (Phase VIIIEx-Park View Sector C Road Works of Villas)

 Ring Road (Package – 9 RoadConstruction Harbanspura Canal

 Ring Road (Package - 03.07.08 & 09)R.C.C Wall (6.5’) 9 Killometers’’ 

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 23/39

 Ring Road (Package – 9)Road Construction Of Interchange AtHarbanspura Canal Crossing To AirPort Access Road –  R.C.C Wall (6.5) 9Kilometers.

 Ring Road ( Package – 03) 

Construction Of Road Portion FromNiazi Chowk To Mehmood Booti(Widening Of Service Road)Entrance &Exist Ramps City & River Side.

Filling of under Ground Parking Ph,8

…………DHA.Lahore .

Construction of Road / Street Areadevelopment Scheme-!! , Gojra.

WORK IN PROGRESS

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 24/39

RCC PIPE FACTORY

RCC pipe factory established in Feb 2008 &have the capacity to make 120 pipes per day ofdifferent sizes. The machinery involved formaking pipes include: -

1x Welding Plant1x Steel Molder

1x Generator Set

3x Peter Engine

1x Large Mixer Machine

1x Tube well1x Water Pond 200 ft x 200 ft

16x Labour

1x Tractor with Tlr for transportation

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 25/39

RCC PIPE FACTORY

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 26/39

RCC PIPE FACTORY

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 27/39

ROHI NALLAH BRIDGE DHA

LAHORE

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 28/39

ASPHALT WORK DHA

PHASE-V LAHORE

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 29/39

OGDCL WORKS

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 30/39

DHA WORKS

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 31/39

DHA WORKS

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 32/39

DHA WORKS

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 33/39

DHA WORKS

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 34/39

Ring Road Lahore

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 35/39

Ring Road Lahore

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 36/39

DHA PH,8 FILLING

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 37/39

DHA PH,8

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 38/39

 We are also proud of our goodreputation which has been

earned through many years of

personal commitment 

Chief Executive

RAHEEL ANWAR

M/S ARFCO TRADING CONSTRUCTION

8/11/2019 Arfco Prof 12013 14.New Copy

http://slidepdf.com/reader/full/arfco-prof-12013-14new-copy 39/39