    Arijit Mukherjee

    Plot # 104 Jessore Road, Prantik Apartment, Flat # 4A & 4B.Kolkata 700074Phone: 91- 33- 25600040, Mobile: 9903972985,

    [email protected]

    http://in.linkedin.com/in/mukherjeearijit

    IT Infrastructure Project Management | Networking & eSecurity | Service Support & Delivery

    Target oriented, goal focused and creative professional in the field of Information Technology Operations & Services,

    System Integration projects, and IT service management. Experienced in ITSM processes, Project Management as well as

    directing Technical, Change Control, Implementation, Infrastructure Analysis and Design. Proven ability to oversee

    technology operations and processes. Hands-on professional with ability to liaison between technical and other non-

    technical teams and managing IT infrastructure operations

    PROFILE:

    Seasoned and dynamic IT professional with comprehensive technical skill set; proficient in handling large-scale

    delivery assignments for enterprise environments and platform technologies.

    Proven skills and expertise in assessment of network security, design and Pre- Implementation of WAN Setup,

    project implementation, management of firewall, Implementation and configuration of Etrust Firewall v 3.0.

    Sound knowledge and expertise in the installation /commissioning of Cisco/Nortel Routers, WAN, network

    implementation along with leased line/ISDN/VSAT based Wide Area Networking.

    Cisco Certified Network Associate 3.0 (CCNA), successfully achieved BrainBench Certification in Network

    Technical Support and also BrainBench certification in WAN Technologies.

    Consummate Professionalwith rich exposure in organizing IT infrastructure, negotiations, vendor management and

    IT design and development.

    Steer the management of IT department with focus on achievement of organizational targets as perbudgeted parameters. Conceptualize and execute strategic IT plans.

    Interface with Internal Depts. for assessing requirements for future / existing resources; presentneed based product solutions and finalize specifications for the same.

    Liase with Vendors / Service Providers for procurement of material, hardware, accessories etc.

    Maintain updated documentation for current hardware and software configurations, and also for

    proposed future installations & modifications to the current environment for Depts.

    Project scheduling & analysis, effort & cost Estimation, resource procurement, deployment &allocation.

    Co-ordinate for development activities; report project progress, technical support to project team.

    Deliver and implement the project as per scheduled milestones.

    Facilitate implementation & support. Ensure compliance to quality standards.

    Resolve support / operational issues in liaison with all Internal Depts.

    http://var/www/apps/conversion/current/tmp/scratch_1/[email protected]://in.linkedin.com/in/mukherjeearijithttp://var/www/apps/conversion/current/tmp/scratch_1/[email protected]://in.linkedin.com/in/mukherjeearijit
  • 7/31/2019 Arijit_CV

    2/5

    Oversee manpower planning, recruitment, performance management & training.

    Areas Of Expertise:

    IT Infrastructure Management

    Steer the management of IT department with focus on achievement of organisational targets asper budgeted parameters. Conceptualise and execute strategic IT plans.

    Interface with Internal Depts for assessing requirements for future / existing resources; present

    need based product solutions and finalise specifications for the same.

    Liase with Vendors / Service Providers for procurement of material, hardware, accessories etc.

    Maintain updated documentation for current hardware and software configurations, and also for

    proposed future installations & modifications to the current environment for Depts.

    IT Project Implementation & Consulting

    Interface with Internal Depts / Clients for Business Process Analysis and Mapping with

    identification of system / processes and priorities. Conduct Case / System / Process Study, Requirements Management.

    Solutions Architecting, Process Reengineering & Development

    Calculate ROI with focus delivering promised value of applications.

    Leadership and team Management

    Resolve support / operational issues in liaison with all Internal Depts.

    Oversee manpower planning, recruitment, performance management & training.

    Develop operational budgets and ensure adherence to set parameters.

    Technical Skills:

    o Cisco Routers 805, 1751, 2501, 2522, 2620, 3640,7200

    o Cisco Switches CE500,2950,2960,3750,4503.

    o Nortel Routers PP2430, ASN and ARN

    o E-Trust Firewall v 3.1.

    o Operating System:Windows NT 4.0, Windows 2000 server, Windows 2003 server.

    o Protocols: IP, Ethernet.

    o Routing.

    Career Highlights

    Project Manager Information Systems, Haldia Petrochemicals Ltd., Kolkata,

    Dec 2003 Present

    Roles & Responsibilities:

    Entrusted with the responsibility to work on Cisco, Nortel Router Installation and Configuration, Etrust Firewall and

    IDS agents/console installation, configuration and monitoring along with troubleshooting.

    Successfully handle all aspects of maintenance functions in Gigabit local area network and leased line/ISDN based

    Wide Area Networking.

    In charge for Network management and administration encompassing monitoring LAN devices (Ethernet switches and

    WAN routers).

  • 7/31/2019 Arijit_CV

    3/5

    Installed, configured and administered WAN devices, Cisco & Nortel routers.

    Designed and implemented support for WAN.

    Look after vendor management, handle IT procurement and undertake technical bid analysis and technical negotiation

    for procurements.

    Look after the infrastructure and facility management support of HPL.

    Look after the day to day helpdesk support.

    Involve in IT procurement.

    Projects Undertaken:

    Gigabit LAN Migration (9 months) Perform the functions of a Team Leader, entrusted with the responsibility for

    project migration of the corporate office along with the research and development centre LAN to Gigabit LAN using

    Cisco Products.

    Assessment of Network Security (Implementation of BS7799) (Ongoing since 6 months)

    o Presently working as a Team Leader while handling different phases encompassing security policy, security

    organization, assets classification and control, personnel security, physical and environmental security,

    communications and operations management, access control, systems development and maintenance along withbusiness continuity management and compliance.

    Design and Pre- Implementation of HPLs WAN Setup (4 months)

    o Successfully completed the above project while ensuring secured and cost effective design using a point-to-point link

    between offices.

    o Implemented project using Nortel routers, primarily link is leased line and the secondary is ISDN and tertiary is VSAT.

    o New Design resulted to profit, which was over 55%.

    Implementation and configuration of Etrust Firewall v 3.0 (3 months)

    o Implementation consisted of Etrust (v3.0) intranet, Internet, firewalls and IDS.

    o Designed scalable HPL network with high security aspects, with the policies being well structured and configured

    accordingly in the firewalls.o Security features were audited and eventually considered in project design.

    Re- Implementation of HPL Plant Internet Setup After ISP Changeover 15 days

    o Reconfigured required devises by new pool of IP addresses.

    o Successfully reconfiguredCisco 2620 router, ETrust firewalls both for Internet/Intranet and DMZ after assigning new

    connectivity with necessary equipments.

    o Reconfigured DMZ servers (e.g.webmail/DNS/SMTP) of different applications with new parameters.

    Configuration of MRTG (15 days) : Functioned as a Team Member and handled configuration/installation for MRTG

    software to validate /check the utilization of bandwidth of WAN.

    Firewall & Security (3 months):

    o Installed Nortel Alteon with checkpoint by replacing the existing E-Trust firewalls as an integral team member for a

    four-member team.

    o Designed scalable HPL network with high security aspects, with the policies being well structured and configured

    accordingly in the firewalls.

    o Security features were audited and eventually considered in project design.

    NIS Engineer, Network Solutions Ltd., Kolkata, Nov 2002 Nov 2003

    Roles & Responsibilities:

  • 7/31/2019 Arijit_CV

    4/5

    Provided support to the Standard Chartered Bank for maintaining the network for them, which included Cisco 7200

    routers, Cisco 2600 routers along with the maintenance of leased lines and ISDNs.

    Implemented new leased lines and configured routers.

    Project Executed:

    Undertook network implementation of IIBI, which encompassed configuration of chanelized E1, and implementation

    of leased lines. Configured VOIP with the use of Cisco 2600 router, Cisco 1700 router and Cisco IP phones and Call

    Manager.

    Effected network implementation of Citi Financial which entailed configuration of leased lines in Cisco 1721 routersand ISDN backup along with the execution of leased line and ISDN.

    Systems Executive, Shriram City Union Finance Ltd., Kolkata, Oct 2001 Oct 2002

    Roles & Responsibilities:

    Effectively maintained leased line and ISDN network, configured and troubleshooted RAS.

    Implemented the process of laying the leased line from Kolkata to 30 different locations.

    Maintained and managed large networks which encompassed 400 numbers of branches.

    Configured and managed Cisco 803, Cisco805, Cisco770, Cisco1720, Cisco2600 and Cisco3600 series routers.

    Instrumental in the successful implementation of the process of setting up ISDN connectivity between the branches.

    Configured and maintained chanelized E1 and ISDN PRI.

    Successfully handled different types of HSL (Telindus, Ascom etc.)

    CMS Computers Limited, Kolkata, Sep 1999 Sep 2001

    Roles & Responsibilities:

    Deputed as FM Engineer in IDBI

    Supervised and monitored 121 machines along with Win NT 4.0, Linux 6.2 and Sun Solaris Servers.

    Installed and configured terminal emulation software like Kermit and Telnet.

    Successfully installed proxy server in Linux through squid and Internet connection through ISDN router.

    Deputed as FM Engineer in Global Tele Systems Ltd., (ISP)

    Regularly monitored and maintained the ATLAS Messaging System.

    Responsible for Unix System Administration (Sun Solaris).

    Maintained RAS & SNS servers running in Win NT environment.

    Provided hardware solutions and network support to the clients.

    Deputed as FM Engineer Reliance Telecom Ltd., Kolkata

    Administered Unix Operating system for the Telecom Software, which pertained with the daily back up of the filesystem.

    Maintained the incoming Ttfiles, identified errors, checked disk space and kept tab on daily call ratings and bill runs.

    Provided first level support in networking along with hardware solution to the customers.

    EDUCATIONAL QUALIFICATION

    Master of Computer Management (MCM), 1999 Pune University

    Bachelor of Science (B Sc. - Hons). Chemistry, 1997 Calcutta University

  • 7/31/2019 Arijit_CV

    5/5

    TRAINING

    Successfully completed six months project with Tata Technologies India Ltd., Telco, Pune on Non- Auto Purchase order

    online system. The project was done on UNIX operating system with Oracle as back end and SQL forms 3.0 as front end,

    during Master degree in Computer Management, Pune University.

    LANGUAGES KNOWN: English, Hindi and Bengali

    DATE OF BIRTH: 26th December 1975