Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
CORRICK'S FORD BATTLEFIELD
BLACKWATER INDUSTRIAL HISTORIC DISTRICT
STUDY AREA
BATTLEFIELD AVOIDANCE
AVOIDANCE STUDY AREA
BLACKWATER
WETLAND MITIGATION SITE
LEADING CREEK
WETLAND MITIGATION SITEWALNUT BOTTOM RUN
WILSON #1 PHASE III
GEORGE MILEY PHASE III
REED FARMSTEAD PHASE III
CONSERVATION EASEMENTRUDOLPH FARM
1312
12 11
1110
9 8
109
8
6 5
5 4
4 3
7
1516
NE
RE
KOT
SIN
KLE
S
SECTIO
N 2
SECTIO
N 3
PARSONS OT DAVSI
SNOSRAP OT SNEREK
1
NOIT
CES
KCRAMSIB OT SIVAD
BIS
MA
RC
K T
O
FO
RM
AN
DLEIFEROOM OT NAMROF
REKAB OT DLEI
FEROOM
OT REKAB
ELLIVSNEDRAW
AINIGRIV OT ELLIVSNEDRAW
TO PARSONS
KERENS
SEC
TIO
N 4
1
3
8 12 13109 11
1
2
8
9
10
11
12
13
14
15
16
17
18
19
20
21
19
20 DATE DESCRIPTION
27 28 30 31
22
23
24
25
26
3214 1715 16
27
28
29
30
31
32
18
19
20
21
21
22 23 24 25 26 29
Moorefield to Baker, WVDOT, Final Alignment 3-11-02...Open to Traffic
SECTION, CONSULTANT, PROJECT MANAGER, DATE RECEIVED.......DESCRIPTION
Parsons to Davis, Preliminary Design, Baker, 6-30-99 SFEIS and AROD Ongoing
Parsons to Davis, Preliminary Design, Baker, 02-32-98 SFEIS and AROD Ongoing
Wardensville Intersection Preliminary Design, Baker, 03-05-03 AROD Issued May 2003
Wardensville to VA Line
Wardensville to VA Line, Preliminary Design, Baker, 03-05-03 AROD Issued May 2003
Original Preferred Alternative of 1996
Elkins to Kerens, Deleuw, Final Alignment 7-31-01... Open to Traffic
Baker to Wardensville Parsons Brinckerhoff, 12-27-04... Open to Traffic
Moorefield to Baker, Greiner, Final Alignment 2-14-02...Open to Traffic
Davis to Bismarck Section 2, Legion Design / Campbell & Assoc., Martin Dougherty 01-19-05
Bismarck to Forman Section 6, MS Consultants...Open to Traffic Fall 2010
Bismarck to Forman Section 7, NLB...Open to Traffic Fall 2010
Bismarck to Forman Section 8, HW Lochner...Open to Traffic Fall 2010
Forman to Moorefield, E. L. Robinson...Open to Traffic Fall 2010
Forman to Moorefield, Baker...Open to Traffic Fall 2010
Bismarck to Forman Section 5, TRC...Open to Traffic
Bismarck to Forman Section 4, Buchart Horn...Open to Traffic
Bismarck to Forman Section 3, HMB....Open to Traffic
Bismarck to Forman Section 2, Palmer Engineering...Open to Traffic
Davis to Bismarck Section 8, Thrasher Engineering, Ben Savage 02-09-04... Open to Traffic
Bismarck to Forman Section 1, Chapman Tech Group...Open to Traffic
3
2
Davis to Bismarck Section 7, A & E Associates, Dirar Ahmad 07-27-06...Open to Traffic
Kerens to Parsons Section 3 and 4, Baker International, Design Ongoing
Davis to Bismarck Section 1, E. L. Robinson, Bill Murray 01-19-05...Open to Traffic
Open to Traffic
Davis to Bismarck Section 3, Modjeski & Masters, Ben Savage 01-20-05...Open to Traffic
Davis to Bismarck Section 4, MS Consultants, Chad Lowther 01-17-05...Open to Traffic
Davis to Bismarck Section 5, Parsons Brinckerhoff, Chad Lowther 01-20-05...Open to Traffic
Davis to Bismarck Section 6, Stantec, Dirar Ahmad 01-19-05...Open to Traffic
DeLEUW
Desig
n-Build
Tea
mKokosin
gKerens to
US 219
SE
CTIO
N
1
72 Interchange
US 219
Connector
SE
CTIO
N
2
Mackeyville
Road
Connector
Rte. 72 Interchange to
SE
CTIO
N
3 SFEIS and AROD OngoingBAKER
SFEIS and
AR
OD
Ongoin
gB
AK
ER
E.
L.
RO
BIN
SO
NS
EC
TIO
N
1
CA
MP
BE
LL
&
AS
SO
C.
LE
GIO
N
DESIG
N /
SE
CTIO
N
2
MO
DJES
KI
&
MA
ST
ER
SS
EC
TIO
N
3
MS
CO
NS
ULT
AN
TS
SE
CTIO
N
4
PA
RS
ON
S
BRIN
CK
ER
HO
FF
SE
CTIO
N
5
ST
AN
TE
CS
EC
TIO
N
6
A
&
E
AS
SO
CIA
TES
SE
CTIO
N
7
TH
RA
SH
ER
EN
GIN
EE
RIN
GS
EC
TIO
N
8
CH
AP
MA
N
TE
CH
GR
OU
PS
EC
TIO
N
1
TR
CS
EC
TIO
N
5
MS
CO
NS
ULT
AN
TS
SE
CTIO
N
6
NL
BS
EC
TIO
N
7
HW
LO
CH
NE
RS
EC
TIO
N
8
E.
L.
RO
BIN
SO
N
BAKER
SECTION 2, PALMER ENGINEERING
SECTION 3, HMB
SECTION 4, BUCHART HORN
WVDOT GREINER BRINCKERHOFFPARSONS
Issued May 2003BAKER - AROD
Issued
May 2003
BA
KE
R -
AR
OD
DEVELOPMENT
PREFERRED ALTERNATIVE
APPALACHIAN CORRIDOR H
REVISIONS
Constructed and Open to Traffic
GENERAL NOTES
COMPLETED PROJECTS
REMAINING CORRIDOR H PROJECTS
Construction Underway Or Awarded
Additional Environmental Studies Required
February, 2020
Kerens to Parsons Section 1 and 2, Under Constuction or Awarded
I:\corh\task19\arlp_bm_gov_V8_TEST.dgn
21-FEB-2020 14:42
5000ft
0
Legend
10000ft
1km 2km 3km
N
RANDOLPH
TUCKER
HARDY
GRANT
Corridor H Alignment Resource Plans (ARLPs) can be found on-line at....www.wvcorridorh.com/mapping.
they will be depicted in updated versions of the map. More detailed mapping of the current
alignments shifts during the final design and construction process. As those shifts are identified,
multiple sources used to make this map. Some non-built sections of Corridor H are also subject to minor
non-built sections of Corridor H. Any distortion are a result of differences and errors inherent to the
The Corridor H alignment and the base mapping depicted are an approximation of the actual built and
NOTE:
15000ft5000ft
0
10000ft
1km 2km 3km
15000ft5000ft
0
10000ft
1km 2km 3km
15000ft5000ft
0
10000ft
1km 2km 3km
15000ft5000ft
0
10000ft
1km 2km 3km
15000ft5000ft
0
10000ft
1km 2km 3km
15000ft5000ft
0
10000ft
1km 2km 3km
15000ft5000ft
0
10000ft
1km 2km 3km
15000ft5000ft
0
10000ft
1km 2km 3km
15000ft5000ft
0
10000ft
1km 2km 3km
15000ft5000ft
0
10000ft
1km 2km 3km
15000ft5000ft
0
10000ft
1km 2km 3km
15000ft5000ft
0
10000ft
1km 2km 3km
15000ft5000ft
0
10000ft
1km 2km 3km
15000ft5000ft
0
10000ft
1km 2km 3km
15000ft5000ft
0
10000ft
1km 2km 3km
15000ft
0 1mi 2mi 2.5mi
4km
5 4 Original Design Sections
PRELIMINARY
PRELIMINARY
(as of March 1, 2002).
Per the Settlement Agreement, Alternatives are currently being evaluated in the Blackwater Study area
NOTE:
ELKINS TO WEST VIRGINIA STATE LINE
APPALACHIAN CORRIDOR H
DI
VI
S
IO N
OFHI
GH
W A
YS
WVDOT0