“Knots Ahead of the Rest” Armada Synergy Ltd. Mitchell Pinckard 15 April 2014

Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

Embed Size (px)

Citation preview

Page 1: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

“Knots Ahead of the Rest”

Armada Synergy Ltd.

Mitchell Pinckard

15 April 2014

Page 2: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

Oil & Gas

The global oil and gas industry relies on quality data collection, assessment and

interpretation services over the entire life of field, contributing to exploration,

development, production, decommissioning and remediation.

Page 3: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

3

Fugro: Local Presence - Global Perspective

Fugro delivers services from a global network of offices and facilities. Localised

services are backed by an internationally acclaimed knowledge base and resource

provision.

Page 4: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

4

Bumi Armada: A new player in Well Intervention

Page 5: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

Armada Synergy ltd (JV Bumi Armada & Fugro)

Page 6: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

6

Construction and Installation

Off the Critical Path –

Build The Foundation

You Need (Pilot Hole First?)

Set the Primary ConductorLosses?

Set a Liner

Set Surface

Page 7: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

7

Construction and Installation

Bring Your Drilling Unit on

Location to set BOP and Drill

Your Money Section

Page 8: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

8

Set the Tree with The

Synergy

Construction and Installation

Page 9: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

9

FPSO?

Set SURF

Construction and Installation

Page 10: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

10

Operation - Ramp up to full capacity

Fugro - After Storm Survey

Page 11: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

11

Decommission & Reinstatement

Page 12: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

12

Decommission & Reinstatement

Page 13: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

13

Decommission & Reinstatement

Page 14: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

Typical Large Bore Gas Well

Page 15: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

Targeted Tasks

Well Foundation

Top Hole Drilling

Running XT

Cleaning up wells

Benefits of this strategy are:

Tasks Eliminated from MODU Critical Path

Reduced overall spud to Production time though concurrent operations

Decrease well ‘stagnation’ time prior to well start up and final cleanup to the

facility

Cyclone Flexibility – with concurrent operations

Additional Tasks

SubSea Foundations

Permanent Anchors

Life of Field Utility

25%

15%

Page 16: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

Delivered and working from

November 2009

Built in Bergen, Norway

Length 103.7m, Breadth 19.7m

DP-2 Dynamic Positioning

UK Safety Case

Class Notation

DNV+1A1 R

ICE-C

SF

COMF-V(3)

HELDK-SH

E0

DYNPOS-AUTR

CLEAN

DRILL

DK(+)

The Vessel: Synergy

Page 17: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

The Vessel: Synergy

150 ton compensated SWL below top

drive (Actual Working)

Fully automated drilling system

Substantial underdeck bulk and fluid

storage

Halliburton Cement Unit

7m x 7m Moonpool

Adaptable cursor system

Integrated tree handling and skidding

system FWD of mast.

AHC 25t Deck Crane

Additional compensated heavy lift

wires (2) 32 tonnes capacity each

Integrated ROV system

Page 18: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

Seacor Drilling Rig and Top Drive

R190 Seacore Drilling Rig Compensated

Varco TDS 250 Top Drive

150 Ton Safe Working Load below Top Drive

Page 19: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

Automatic Pipe Handling System.

PLC controlled pipe handling crane and pipe feeder.

Hands - off tubular handling.

650 m (2,000+ ft) /hr tripping speed (doubles).

Varco Iron Roughneck.

Power slips.

Page 20: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

Drilling Control

Automatic cyber drillers console.

Remote touch screen mud mixing controls.

Pipe-handler/pipe-feeder control work station.

Page 21: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

Drilling Control

Raised doghouse

Commanding view of fwd and aft work decks.

Aker Cherry picker work platform (no man-riding winch required)

Auto elevators

Page 22: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

Drilling – Korea 2010

Drilling operations offshore Korea

2010

Page 23: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

Deck Operations

Page 24: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

Mud Pumps

3 x Wirth 800HP mud pumps

2000gpm at 1600psi

1000gpm at 3000psi

5000psi surface system

Page 25: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

Mud Mixing and Storage

Automatic mud mixing system

6 x 71m3

(6 x 2,500 ft3)

bulk silos

1,930 bbls surface liquid mud tanks

5,220 bbls brine capacity

Can Upgrade Brine to Mud & DW to

Brine

Page 26: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

Halliburton Advantage Cement Unit

Page 27: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

Moonpool / Cursor System

Standard 7.2m x 7.2m Moonpool

Internal size of Cursor 6.0m x 6.0m

Optional Cursor/Protection system for

BOPs and Trees or other heavy items.

Protects Moonpool and Bottom of boat

upon exit/entry of object to moonpool.

Page 28: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

Rooster Box Details

Page 29: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

Scope of Work

The work scope will be executed over five (5) phases;

Pre-project planning and Engineering

Mobilization

Offshore Operations

De-mobilization

Project Completion.

Page 30: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

Basic Schematic

Page 31: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

Over-trawl Structure

Page 32: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

Details

A project Master Document Schedule (MDS) developed

Operating limits matrix specific to the Project

Rigging/sea fastening design.

Deck layouts/vessel stability & installation design

Asset tracking register.

Project specific procedures/rig books.

Definition of and interface management

Hazard Identification and Risk Assessment

HAZID/HAZOP Report

SIMOPS manual.

Page 33: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

Wells Initiation

Recover Anti-Trawling Structure from Wellhead.

Run in hole Selective Perforating guns and Recoverable Packer.

Set packer and selectively perforate 9-5/8" casing.

Check for pressure or flow from 9-5/8" x 13-3/8" Annulus. Bleed off

Selectively perforate both 9-5/8" and 13-3/8" casing.

Check for pressure or flow from 13-3/8" x 20" Annulus, Bleed off.

Recover Packer and perforating guns.

Cut and recover 9-5/8" casing from +/240m below seabed.

Cut and recover 13-3/8" casing from +/-230 m below seabed.

Run in hole cement stinger on Drill pipe and set final cement

abandonment plug over 9-5/8“ and 13-3/8" casing stumps. Pull out

of hole.

Run diamond saw cutter, Cut and recover Casing.

Confirm seabed clear and complete as left survey

Page 34: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

Second Set of Wells

Recover Anti-Trawling Structure from Wellhead

Run diamond saw cutter.

Cut and recover 13-3/8“

Confirm seabed clear.

Page 35: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

Some Photo’s

Page 36: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

Contact Details – Armada Synergy

Mitchell Pinckard – Business

Development

Email [email protected]

Mobile +1-832-294-9013

Kevin Bosley – Managing Director

Email [email protected]

Mobile +1-713-444-4893

Fugro Drilling & Well Services, Inc.

6100 Hillcroft (77081), Houston, Texas 77274

Web site: www.fugro.com

Tel: +1-713-369-5600

Fax: +1-281-749-8162

David John Carr– VP Oil Field

Services

Email [email protected]

Mobile +6-012-638-0486

Roberto Beneventi – GM Vessel Well

Operations

Email [email protected]

Mobile +6-0112-300-1678

BUMI ARMADA BERHAD

Level 21, Menara Perak - 24, Jalan Perak,

50450 Kuala Lumpur, Malaysia

Web site: http://www.bumiarmada.com

Tel: +6-03-2171-5799

Page 37: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

“Knots Ahead of the Rest”

Thank You

Page 38: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

Helix – State of the Nation

2014 OWI Conference

New Vessel Technology Panel

Phil Bosworth

Rev 0115th April 2014

Page 39: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

39

Groups of vessels used for well intervention

Vessel Usable

Deck m²

Helix units

1 Small monohull - Life of Field

ROV vessels (also used for

construction) : 100-120m long

1000-

1200

2 Medium monohull – dedicated

riserless intervention vessels

110-150m long

1200-

1500

3 Semi-sub – dedicated HP riser

based heavy intervention

vessels

2700-

2850

4 Large monohull - dedicated HP

riser based heavy intervention

vessels >150m long

<3000

5 New design combos – purpose

designed to client specs around

field development needs

>3000??

Page 40: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

40

Capabilities – Life of Field vessels

1. Acid scale squeeze

2. Limited stimulation <10bpm

3. Well abandonment – Cat 1 wellhead recovery

4. Limited wireline operations – benign regions

1. Low operability & efficiency

Page 41: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

41

Capabilities – dedicated riserless intervention

vessel

1. All Slickline & E:line ops

2. High rate pumping - full stimulation to 50bpm

3. Efficient XT change

4. Abandonment preparation for MODU

1. Suspend well, CXT recovery & wellhead recovery (Cat 1)

5. High operability & highly efficient

Page 42: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

42

Capabilities – dedicated HP riser based semi-sub

& long monohull intervention vessels

16

On the well site - SIMOPS

Q4000 was continually

over well site for 47

days

1. Heavy well intervention w/ coiled tubing, WL & pumping

2. Full or partial well abandonment w/ completion & csg recovery

3. Spill response

4. Field development

1. Booster well construction & maintenance

2. Upper completions, XT & well clean-up/hand-over

3. Subsea construction & top hole drilling

Page 43: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

43

New for UK market H2 2016 – Q7000

Aimed at increased recovery – out of plan jobs

• Short duration campaigns

• Heavy well intervention & CTD

• Full or partial well abandonment

• Workover in CNS/NNS

• Field development

• Open flat deck – 3 sided access

• Efficiency of rig-up & service change

• DP3 fast move & position vs MODU

• Safety improvements vs MODU

• Operability improvements vs MODU

Page 44: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

44

Q7000 – purpose built DP3 intervention semi-sub

Cost efficiency

1. <2/3 job duration vs MODU

2. Higher operating limits vs MODU

3. UKCS job cost : 44-54% of MODU

4. WoS job cost : 53-67% of MODU

$0

$5,000,000

$10,000,000

$15,000,000

$20,000,000

$25,000,000

$30,000,000

$35,000,000

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Q7000

MODU

Q7000 & IRS Moored Rig & BOP

Transit to 500m & over well (towing, mooring, DP, etc) 0.67 3.50

Mob & prep kit on site 0.25 0.50

ROV survey & well handover 0.25 0.25

Recover TC, run & test IRS 1.04 2.58

Surface rig up CTLF etc 0.25 1.00

In-hole services 14.00 14.00

Service change-overs (SL, EL, CT) 0.58 2.25

Surface rig down CTLF etc 0.25 0.42

Recover IRS, deploy TC & as-left 0.71 1.50

ROV survey & well handover 0.25 0.25

Demob kit on site 0.25 0.50

Move off well to 500m 0.25 1.00

Total days 18.75 27.75

Q7 does in % faster 32%

Page 45: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

45

Q7000 – purpose built DP3 intervention semi-sub

1. Operational risk mitigators

1. Coiled Tubing & Drill Pipe capability at all times

2. Dedicated crews

3. Workover riser not required from operator

4. Speed to leave site & transit

2. Safety risk mitigators

1. Integrated riser, CTU, tower & vessel EQD system

2. Zero manriding

3. No anchor handlers

4. FRC close cover virtually eliminated

3. New frontiers / harsh environments - North WoS

1. HP riser ops over riserless ops

Page 46: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

46

Thank you…..

Page 47: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

“Knots Ahead of the Rest”

Bumi Armada

New Vessel Technology

Panel

Building Trust

Page 48: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

Disclaimer

This presentation may contain statements of future expectations and other forward-looking statements based on

management’s and/or other information providers’ current views and assumptions and involve known and unknown risks

and uncertainties that could cause actual results, performance, or events to differ materially from those in such

statements. Such forward-looking statements are subject to various risks and uncertainties, which may materially and

adversely impact the actual results and performance of the Company’s businesses. Certain such forward-looking

statements can be identified by the use of forward-looking terminology such as “believes”, “may”, “will”, “should”, “would

be”, “expects” or “anticipates” or similar expressions, or the negative thereof, or other variations thereof, or comparable

terminology, or by discussions of strategy, plans, or intentions. Should one or more of these risks or uncertainties

materialise, or should underlying assumptions prove incorrect, actual results may vary materially from those described as

anticipated, believed, or expected in this presentation. The Company does not intend, and does not assume any

obligation, to update any industry information or forward-looking statements set forth in this presentation to reflect

subsequent events or future circumstances.

48

Page 49: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

New Vessel Technology Panel

49

a

s

d

f

• Current Vessel Capability/SWOT analysis

• Innovation and New Technology

• Capability vs Cost

Page 50: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

Major ProjectsE&TEngineering and

Technology AMOAsset Management

and Operations

OFSOilfield

Services

T&ITransport and

InstallationFPSO

Floating Production,

Storage and OffloadingOSV

Offshore Support

Vessels

BUSINESS

STREAMS

ENABLERS

GDTGas Development

and Technology

Integrated Offshore Oilfield Services Provider

50

Page 51: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

Shore base / office

T & I

SOUTH EAST ASIA

FPSO Armada PerdanaFPSO Armada Perkasa

FPSO Armada Sterling FPSO Armada TGT1

FPSO Armada Claire

Armada Installer, DLB

SINGAPORE

BRUNEI

VIETNAM

Miri

Perth

Kemaman

Kuala Lumpur

INDONESIA

ANGOLA

CONGO

NIGERIA

Lagos

Port Harcourt

Port Point - Noire

Ciudad del Carmen

MEXICO

BRAZIL

Turkmenbashi

Ashgabat

Mumbai

Dubai

TURKMENISTAN

UAE

INDIA

GHANA

RUSSIA

Astrakhan

Houston

UNITED STATES

Labuan

Jakarta

Rio de Janeiro

London

UNITED KINGDOM

SAUDI

ARABIA

Al Khobar

MALAYSIA

Kraken Field - FPSO Under

Conversion

FPSO Armada Sterling II-

FPSO Under Conversion

Integrated Offshore Oilfield Services Provider

Global Execution Local Delivery

51

Aberdeen

Vung Tau

SOUTH

AFRICA

AUSTRALIA

FPSO

Armada Hawk

Armada Condor

Page 52: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

Oilfield Services - ‘Armada’ Synergy

103.7m long lightweight riserless

drillship.

DP-2, Ice class vessel.

Fully automated riserless drilling

system with 150ton AHC tower.

Halliburton Cement Unit.

7.2m x 7.2m Moonpool.

Adaptable cursor system.

Integrated tree handling and skidding

system FWD of mast.

AHC 25t Deck Crane.

Additional compensated heavy lift

wires (2) 32 tonnes capacity each.

Integrated ROV system.

Page 53: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

OFS Subsea Intervention System – Project LIMO

Subsea Equipment:

53

• The image to the

right is a

developing

representation of

what the OFS

Subsea Well

Intervention System

may look like? Still

early days...? Work

continues.

• With research

already confirming

the optimum Supply

Chain.

Page 54: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

‘VS 4819’ Light Well Intervention Vessel

120 m long, 23.40 m breadth Light Well

Intervention vessel.

NOV WISE Stimulation Spread, Cement Unit,

Wireline Unit built into vessel capability.

110 POB.

7.2m x 7.2m Moonpool, c/w adaptable

cursor system.

165 T NOV Varco AHC Tower.

AHC 100 T Crane.

Fully integrated ROV system, for two

working class ROVs.

OFS Subsea Intervention System, 7” nominal,

10,000 psi working pressure (FEED

ongoing).

Currently under conceptual study, moving to

detailed Class and Tender design.

Page 55: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

“Knots Ahead of the Rest”

Thank You

Page 56: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

“Knots Ahead of the Rest”

Bumi Armada,

Oilfield Services,

the Armada Synergy,

the VS 4819 LWIV,

Armada Atlántico Sul &

Introducing Project ‘LIMO’

Page 57: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

Our Vision

“To be the Trusted Offshore and Marine

Energy Services Provider in Every Corner of

the World”

Our Mission

“To provide effective integrated floating

solutions in a safe, reliable and

environmentally-friendly manner therefore

“fueling” the growth of our host nations and

communities”

Core

Values

Building Trust

Brutal

Openness

Customer

Focus

Hands-on

Execution

People

Development

Commercial

Awareness

Safety

Mindset

Collaboration

7

Vision, Mission and Core Values

knots ahead of the rest

Our Company’s One Vision, One DNA

Page 58: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

10knots ahead of the rest

OFS OilfieldServices

Major ProjectsE&T Engineering andTechnology

T&I Transport andInstallationFPSO Floating Production,

Storage and Offloading

OSV Offshore Support Vessels

AMO Asset Managementand Operations

BUSINESS

STREAMS

ENABLERS

8

Integrated Offshore Oilfield Services Provider

GDTGas Development

and Technology

Page 59: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

Oilfield Services (OFS);

59

Mission:

To maximise the ‘life of

field’ recovery from

our clients’ Oil and Gas

assets

Subsea Well

Services

Enhanced

Oil

Recovery

Page 60: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

‘Armada’ Synergy

103.7m long lightweight riserless

drillship.

DP-2, Ice class vessel.

Fully automated riserless drilling

system with 150ton AHC tower.

Halliburton Cement Unit.

7.2m x 7.2m Moonpool.

Adaptable cursor system.

Integrated tree handling and

skidding system FWD of mast.

AHC 25t Deck Crane.

Additional compensated heavy lift

wires (2) 32 tonnes capacity each.

Integrated ROV system.

Page 61: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

Armada Synergy; added value

Top hole drilling

Remove up to 20% of the drilling

program off the rig critical path,

Determine ‘drillability’ in advance

of rig arrival,

Confirm shallow hazards offline of

the drilling rig.

MPSV

Aid subsea development and

installation activities.

Subsea Well Intervention (2015)

OFS Subsea Intervention System

under development allowing light

well interventions subsea (Project

‘LiMo’)

Page 62: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

‘VS 4819’ Light Well Intervention Vessel

120 m long, 23.40 m breadth Light Well

Intervention vessel.

NOV WISE Stimulation Spread, Cement

Unit, Wireline Unit built into vessel

capability.

110 POB.

7.2m x 7.2m Moonpool, c/w adaptable

cursor system.

165 T NOV Varco AHC Tower.

AHC 100 T Crane.

Fully integrated ROV system, for two

working class ROVs.

OFS Subsea Intervention System, 7”

nominal, 10,000 psi working pressure

(FEED ongoing).

Currently under conceptual study,

moving to detailed Class and Tender

design.

Page 63: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

‘Armada Atlantico Sul’ Hybrid Vessel

Multi Purpose Deepwater Well

Intervention, THC, Well Stimulation,

P&A, and Well Testing / Clean Up

Vessel.

150 m long, 30.20 m breadth Hybrid

Multi Purpose Vessel.

NOV WISE Stimulation Spread, Cement

Unit, Wireline Unit built into vessel

capability.

120 POB.

11.2m x 9.2m Moonpool,

750 T NOV Varco AHC Tower, 170ft

clear height, Crown Block Motion

Compensator.

AHC 250 T Crane.

Fully integrated ROV system, for two

working class ROVs.

OFS Rigid Riser Subsea Intervention

System, 7 3/8”, 10,000 psi working

pressure (FEED in dialogue).

Page 64: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

OFS Intervention System – Project LIMO

Meaning; “Light of Weight” & “Modular of Design”

• Research committed to and decision made to engage with Subsea

Technologies Limited of Aberdeen in the role of; FEED Lead, Design House,

and Project Manager.

• First system to be of 7 1/8”, 10K working pressure with the challenge being to develop a subsea

intervention system fully compliant with and based around API, ISO and DNV standards for subsea

well control products, work over risers, ROV interfaces and subsea structures.

• System to weigh no more than 60 tons whilst being compliant with Client needs and expectations

in terms of well control and redundancy.

• The subsea well intervention system will be designed around ‘shelf’ deployment in, largely, the UK

Continental Shelf but with other geo markets in mind.

• System designed around shallow to mid water depths, thru water deployment and offering light

intervention but with modularity built into its design…

• Modularity to consider deeper water depths requiring the deployment of Rigid Riser and extension

of services provided by OFS into Coil Tubing and Well Clean Up.

• 5 1/8” System will follow…

64

Page 65: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

Project LIMO (continued 01);

• The intervention system will be designed with an electro-hydraulic control

system in order to provide responsiveness, a smaller umbilical diameter,

enhanced monitoring of operations and system diagnostics and ease of moving

the system from shallow to deep water.

• While research continues on developing our optimum Supply Chain OFS

driver is to offer a mix of proven and innovative technologies via diversity

of suppliers.

• Proven shear seal technology Qualified to NORSOK D002 Standard,

• Innovative Technology;

• The multi-functional SLIC Connector; comprises a family of products which allow

the user to create; a riser connector, a wireline pressure control head or a subsea

lifting tool through the installation of various cartridges.

• XR Connector; providing radically improved vessel safety, and offering reduced

cost through enhanced vessel operability.

65

Page 66: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

OFS Subsea Intervention System – “evolving”

Subsea Equipment:

66

• The image to the

right is a

developing

representation of

what the OFS

Subsea Well

Intervention

System may look

like? Still early

days...? Work

continues.

• With research

already

confirming the

optimum Supply

Chain.

Page 67: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

Project LIMO; what remains?

• FEED Study scheduled to complete at the end of May 2014…already well developed.

• FMEA scheduled for mid May with STL, Client and JV participation. This is KEY!

• Detailed design…resulting in Bill of Materials and approved Basis of Design.

• Enter Build Period, estimating ~ 18 months…

• FAT, SIT test programmes already in development.

67

Page 68: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

Preferred Model moving Forward:

• Vessels to integrate Marine, ROV, MPT, SIS, Wireline and perhaps a

light Stimulation Capability for Client in support of a safe,

integrated and effective service delivery…

• Should some Clients however prefer a “call off” model reflecting current

contracting arrangements can also be negotiated.

68

Page 69: Armada Synergy Ltd. - OPO Conferenceproductioneu.offsnetevents.com/uploads/2/4/3/8/24384857/____armada... · Armada Synergy ltd ... BOPs and Trees or other heavy items. ... Heavy

“Knots Ahead of the Rest”

Finally, thanks for being given the

opportunity to meet you, your

attention and interest.