4

Click here to load reader

Arun CV

Embed Size (px)

Citation preview

Page 1: Arun CV

ARUN .N.SHETTY.

Mobile: 9901556735

e-mail: [email protected]

Present Address: Arun N Shetty S/o Narayan Shetty, #38/64, 1st Floor Gangappa Layout Shakthi Nagar Near Tin factory BENGALURU – 560016

Permanent Address:

ARUN. N. HETTY S/o Narayan Shetty Kadekaru mane Heggujje village Mandarthi -576223 UDUPI Dist

Personnel Profile:

Name: ARUN SHETTY

Father: Narayan Shetty

DOB: 27/09/1984

Marital Status: Un-Married

Nationality: Indian

Religion: Hindu

Languages: Kannada, English, Marathi & Hindi.

Curriculum Vitae

Objective:

To achieve a responsible and challenging position in an organization by contributing my efforts, that leads towards organizational growth and self-development.

Professional Experience:

Having work experience of 7+ years in facility management and electromechanical maintenance.

Worked as M&E supervisor at CISCO Systems India Private Limited., Bangalore under AFM.

From: Nov. 2013 To till Date

Worked as Multi Technician at CISCO Systems India Private Limited., Bangalore under AMPS

From: - Dec-2009 to Nov-2013.

N A C in Electrical trade apprentice training in BESCOM 2007

Education:

Diploma in electrical engineering, from Karnataka state Open University.2014

N A C in Electrical trade apprentice training in BESCOM,2007

ITI (Electrical) in Allamprabhu ITI College, CHIKODI, 2004,

SSLC from R D high school, CHIKODI (T), BELGAVI (D), 2000

Page 2: Arun CV

Responsibilities:

Overseeing execution of various Facilities to deliver various services within time frame and Quality.

Operation & Maintenance of Transformers, HT/LT panels, VCB’s, ACB’s, DG sets, UPS, Inverters, AMF Panel, HVAC systems, Chillers, AHU, Pumps, all types of Air Conditioner units & maintenance of Data Centre.

Taking quotation from vendors, preparing business case, and processing.

52Week PPM calendar preparation, Annual shut down pre-preparation, preparing of monthly EB/DG Bill, preparation of SOP's, History cards, Daily check list & MMR Report.

Reporting to Facility Manager, Preparing daily Report, Weekly Report, Weekend Plan, Weekend Report, and Monthly Report, Shift Schedule, Reporting about Power consumption, PPM service, Breakdown, Incident, Root Cause Analysis.

Taking care of UDB, LDB & RPDBs, Earthling system, Work station lighting and power point work, raceway erection for work station power point cabling Etc.

Energy conservation tracking and Implementation of Energy saving methods.

Handling Fire System (FM Global), raising impairment, raising and closing of red tag permit.

Man Power planning, work allotting & training, handling small In-House project activities, Vendor co-ordination and follow-ups through mail.

Machines Worked on: Operations & Maintenance of UPS: 25, 40, 80, 120, 200 KVA, make: APC, Merlin Gerin,

Socomec, TATA Liberty & Emerson. Operation and Maintenance of 250, 380, 500, 625, 750, 1500 KVA DG Sets. Operation and Maintenance of Chiller's, AHU's through BMS system and manually. Operation and Maintenance of Air Conditioners like Split AC, Precession AC, Package AC,

Cassette AC, Etc., Operation and Maintenance of Distribution Transformers. Operation and Preventive Maintenance of LT Switchgear Panels, Distribution boards.

Page 3: Arun CV

SAFETY

Excellent knowledge of various aspects of safety equipment’s and its applications.

Lockout tag out of electrical switchgears during work as per Indian standard.

Issue of work permit from line clearance to work on electrical distribution network.

Aware of electrical safety standards.

Equipments and proper usage of personnel protective equipments.

Incident and accident reporting & Suggestion of remedial action.

Core Responsibilities:

Facility Management: In charge of maintaining the company facilities, CISCO SYSTEMS PVT LTD, Total area of 19150 Sq.ft.& 7150 Sq.ft Responsible for all in-house maintenance of Electricity, water, HVAC, Server room. Handling of relocation of offices / cabins / bays and Handling operations with a team of 9 staff. Ensuring all confidential files & folders are stored for statutory purpose.

Technical Aspect: Establish Engineering & Operational procedures and roll out the same for site staff, Review the maintenance/service practices of M&E Contractors to deliver quality work, practices in line with the manufacturer recommendations. Plan & take responsibility for smooth operations of all Mechanical, Electrical, Plumbing installations and civil works pertaining to the facility. Periodically inspect the logbooks, checklists and PPM schedules for a better management of engineering systems. Responsible for ensuring landlord’s compliance on availability of all statutory obligations Assume the responsibilities of FM, as and when required. Implement the Energy management programs to reduce the cost on utilities.

Declaration:

I hereby declare that the above mentioned details are true to the best of my knowledge and belief.

Date: Yours Truly

Place: Bangalore (Arun Shetty)