1
Unit 1 R/B Unit 2 R/B Unit 3 R/B Unit 4 R/B Unit: mSv/h 2.0 0.28 0.70 0.055 0.35 0.32 0.15 0.10 July 2011 70100 October 2012 0.26 0.30 0.060 0.21 0.10 0.90 0.65 0.17 0.25 0.38 0.17 0.20 0.05 0 0.25 0.30 0.20 June 2012 July 2012 0.25 0.32 1.2 0.50 0.20 0.80 0.20 0.30 0.05 0.43 0.24 1.3 0.50 0.60 0.21 0.10 0.20 0.20 0.60 1.0 0.7 0.20 November 2012 December 2012 March 2013 0.019 0.050 0.019 0.070 0.012 0.022 0.18 0.050 0.040 0.15 0.15 0.3 0.8 0.3 1.3 0.20 0.27 0.14 0.10 0.10 0.040 0.090 0.030 0.20 0.90 1.0 1.0 0.40 0.092 0.055 0.47 0.085 0.13 0.26 0.50 0.026 0.12 0.068 0.20 2.4 0.055 0.17 0.11 June 2013 0.35 July 2013 0.20 2.0 2.5 4.0 Atmosphere 1.8 Ground surface 8.5 1.5 Atmosphere 1.7 Ground surface 8.5 0.90 September 2013 November 2013 0.4 In front of the door of carry-in entrance 3.5 2.7 0.045 0.35 0.050 0.045 0.085 0.055 0.090 0.050 April 2014 0.030 0.050 0.050 0.026 0.025 0.050 0.050 0.050 0.070 0.20 July 2014 June 2014 0.11 November 2014 0.33 Fukushima Daiichi NPS Survey Map As of 5:00 PM on November 10, 2014Upper part of concrete-filled vertical shaft 0.25 (after gravel installation) Unit 1, 2 SGTS pipe >10,000 Bottom of side ditch 30Surface1.3 Atmosphere) Transfer pipe 1.2(Surface) 0.80(Atmosphere) Transfer pipe 0.10(Surface) 0.060(Atmosphere) Transfer pipe 1.5(Surface) 1.0(Atmosphere) 0.50 RooftopTransfer pipe 0.18(Surface) 0.18(Atmosphere) Transfer pipe 0.35(Surface) 0.065(Atmosphere) Transfer pipe 80(Surface) 10(Atmosphere)

As of 5:00 PM on November 10, 2014 - TEPCO...2014/11/28  · Unit 1 R/B Unit 2 R/B Unit 3 R/B Unit 4 R/B Unit: mSv/h 2.0 0.28 0.70 0.055 0.35 0.32 0.15 0.10 July 2011 70~ 100 October

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: As of 5:00 PM on November 10, 2014 - TEPCO...2014/11/28  · Unit 1 R/B Unit 2 R/B Unit 3 R/B Unit 4 R/B Unit: mSv/h 2.0 0.28 0.70 0.055 0.35 0.32 0.15 0.10 July 2011 70~ 100 October

Unit 1R/B Unit 2

R/BUnit 3R/B

Unit 4R/B

Unit: mSv/h

2.0

0.28

0.70

0.055

0.35

0.32

0.15

0.10

July 2011

70~100

October 2012

0.26

0.30

0.060

0.21

0.10

0.90

0.65

0.170.25

0.38

0.17

0.20

0.050

0.25 0.30 0.20

June 2012

July 2012

0.25

0.32

1.2

0.50

0.20

0.80

0.20

0.300.05 0.43

0.24

1.3

0.500.60

0.21

0.10

0.20 0.20

0.60

1.0 0.7 0.20

November 2012

December 2012

March 2013

0.019

0.050 0.019

0.070

0.0120.022

0.18

0.050

0.040

0.15

0.150.3

0.80.3

1.30.200.27

0.14

0.10

0.10

0.040

0.0900.030

0.20

0.90

1.0

1.0

0.40

0.092

0.0550.470.085

0.13

0.26

0.50

0.026

0.12

0.068

0.20

2.4

0.0550.17

0.11

June 2013

0.35

July 2013

0.20

2.02.5

4.0

Atmosphere 1.8Ground surface 8.5

1.5

Atmosphere 1.7Ground surface 8.5

0.90

September 2013November 2013

0.4

In front of the door of carry-in entrance

3.5

2.7

0.0450.35

0.050

0.045

0.085

0.0550.090

0.050

April 2014

0.030

0.050

0.050

0.026

0.0250.050

0.050

0.050 0.070 0.20

July 2014June 2014

0.11

November 2014

0.33

Fukushima Daiichi NPS Survey Map ( As of 5:00 PM on November 10, 2014)

Upper part of concrete-filled vertical shaft

0.25 (after gravel installation)

Unit 1, 2SGTS pipe

>10,000

Bottom of side ditch30(Surface)

1.3 (Atmosphere)

Transfer pipe1.2(Surface)

0.80(Atmosphere) Transfer pipe0.10(Surface)

0.060(Atmosphere)Transfer pipe1.5(Surface)

1.0(Atmosphere)

0.50(Rooftop)

Transfer pipe0.18(Surface)

0.18(Atmosphere)

Transfer pipe0.35(Surface)

0.065(Atmosphere)

Transfer pipe80(Surface)

10(Atmosphere)