60
MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected] Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC01 No.07-05/SG-9B-II/3871 Jabalpur,dated:27/01/2017 To As per distribution list Sub: Minutes of 55 th meeting of Operation and Coordination Committee of MP. The Minutes of 55 th meeting of the Operation and Coordination Committee of MP held on 22 nd December 2016 at 11:00 AM at hotel Vijan Mahal, Tilhari, Mandla Road, Jabalpur has been uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded. (K.K.Parbhakar) Member Secretary OCC SLDC,MPPTCL,Jabalpur vkbZ ,l vks : 9001-2008 ISO: 9001-2008

As per distribution list

  • Upload
    others

  • View
    10

  • Download
    0

Embed Size (px)

Citation preview

Page 1: As per distribution list

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected] Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC01 No.07-05/SG-9B-II/3871 Jabalpur,dated:27/01/2017

To

As per distribution list

Sub: Minutes of 55th meeting of Operation and Coordination Committee of MP.

The Minutes of 55th meeting of the Operation and Coordination Committee of MP held

on 22nd December 2016 at 11:00 AM at hotel Vijan Mahal, Tilhari, Mandla Road, Jabalpur

has been uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded.

(K.K.Parbhakar) Member Secretary OCC SLDC,MPPTCL,Jabalpur

vkbZ ,l vks : 9001-2008

ISO: 9001-2008

Page 2: As per distribution list

Distribution List

1. The Chief Engineer (T&C), MP Power Transmission Co. Limited, Jabalpur. Fax No- 0761-2665593, 2702710 Email- [email protected]

2. The Chief Engineer (Plg & Des), MP Power Transmission Co. Limited, Jabalpur, Fax No- 0761-2660908 Email- [email protected]

3. The Chief Engineer (Procurement.), MP Power Transmission Co. Limited, Jabalpur, .Fax No- 0761-2660908 Email – [email protected]

4. The Executive Director (O & M:Gen), MP Power Generating Company Limited, Jabalpur. Fax No- 0761-2664749, Email- [email protected], Email- [email protected]

5. The Chief Engineer (O & M:Hydel), MP Power Generating Company Limited, Jabalpur. Fax No- 0761-2664749.

6. The General Manager(PM), MPPMCL, Jabalpur Email – [email protected] [email protected]

7. The Superintending Engineer (GCC), MPPGCL, Jabalpur Email – [email protected] [email protected]

8. The General Manger (DCC-EZ), DISCOM Control Centre, MP Poorva Kshetra Vidyut Vitaran Co. Limited, Jabalpur, Fax No- 0761-2668503, Email – [email protected]

9. The Dy. General Manager (DCC –CZ), DISCOM Control Centre, MP Madhya Kshetra Vidyut Vitaran Co. Limited, Bhopal, Fax No-0755-2580611,Email- [email protected]

10. The Executive Engineer (DCC-WZ), DISCOM Control Centre, MP Paschim Kshetra Vidyut Vitaran Co. Limited, Near Polo Ground, Jail Road, Indore, Fax No- 0731-2421554, Email- [email protected]

11. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Indore, Fax No- 0731-2874515, Email – [email protected]

12. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Bhopal, Fax No- 0755-2885220, Email – [email protected]

13. The General Manger(RO), MPPMCL, In front of Bhojpur Club, E-4, Arera Colony,Bhopal, Fax No-0755-2423046, [email protected]

14. The Chief Engineer (PM&C), Narmada Hydroelectric Development Corpn. Ltd, NHDC Parisar, Shamla Hills, Bhopal – 462013., Fax No- 0755-4030130,Email – [email protected]

15. The Chief Electrical Distribution Engineer, West Central Railway (WCR), General Manager’s Office, Electrical Department, Jabalpur-482001 (MP), Fax: 0761-2627629, Email- [email protected]

16. The General Manager, Indira Sagar Power Station, NHDC Office complex, PO : Narmada Nagar, Distt : Khandwa (MP) – 450 119, Fax No- 07323-284080, Email – [email protected]

17. The General Manager, Omkareshwar Power Station, Prashsnik Bhawan, Urja Vihar, Sidhwarkut, Distt : Khandwa (MP) – 450 554, FaxNo-07280-271703, Email- [email protected]

18. The Director (Projects), BLA Power Limited, At : Niwari, PO: Khorsipan, Tah : Gadarwara, Distt ; Narsinghpur 487 551, Fax No. 07791-243667 / 243669, Email – [email protected]

19. The Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Agasod, Post Office-Bina- 470113 Distt- Sagar, Fax No. 07580-277200, Email – [email protected]

20. The Deputy General Manager, Kalpataru Satpura Transco Pvt. Ltd., Satpura Colony, Betul Road, Old

Itarsi, Distt. Hoshangabad, Email – [email protected]

21. M/s Ujaas Energy Ltd. 701, NRK Business park, Vijay Nagar Sqaure, Indore – 452010, Email id :- [email protected]

22. M/s Suzlon Global Services Ltd., 1090, Scheme no. 114, Park-2, Ring Road, Universal Hospital Row, Email- [email protected], Indore – 452010, [email protected]

Page 3: As per distribution list

MINUTES FOR 55TH MEETING OF OPERATION & COORDINATION COMMITTEE OF MP HELD AT 11:00 AM AT HOTEL VIJAN MAHAL, TILHARI,

MANDLA ROAD, JABALPUR ON 22NDDECEMBER 2016.

Page 4: As per distribution list

The 55th meeting of Operation & Coordination Committee of MP held on 22nd December 2016 at 11:00 AM at hotel Vijan MahaL, Tilhari, Mandla Road, Jabalpur under the Chairmanship of Shri P.A.R. Bende C.E.(SLDC). The list of participants is enclosed at Annexure -1.0.

Shri C.Bhandari, CEO & GM Shri Tripathi (Kalpataru Satpura Transco Pvt. Ltd.), the host of 55th

OCCM welcomed Shri P.A.R. Bende C.E.(SLDC) & Chairman OCC, Shri K.K.Parbhaker Member Secretary OCC & Addl. C.E.(SLDC), Shri A.K.Shankule ED(O&M) Generation, MPPGCL and Shri S.N. Goyal C.E.(Plg.&Design.) with bouquet of flowers. Thereafter he welcomed all the guests and participants. Shri C.Bhandari apprised the participants about the company and presented the Power point presentation of Company. He stated that Kalpataru was established in the Year 1969 is the largest single location manufacturer of lattice steel structure. He also stated that the company is transporting Transmission Tower to 28 countries across the world and company has been honored by Engineering Awards from EEPC. Thereafter he requested Shri P.A.R.Bende C.E.(SLDC) & Chairman OCC to take up the proceedings of meeting.

Shri P.A.R.Bende C.E.(SLDC) & Chairman OCC welcomed all the participants attending the

OCCM. He greeted and congratulated M/s Kalpataru Transmission Pvt Ltd for excellent arrangement in the meeting. He stated that the frequency remained within operating band in the range 70-75 % in the month of October and November 2016 and frequency profile remained improved. The average frequency for the month of Oct & Nov 2016 was 50.00 Hz. and 49.99 Hz respectively which is a good sign and hoped that with collective efforts across the country, the frequency profile within the band will reach above 90% mark soon. He also intimated that MP SLDC has started computing ATC-TTC of MP and uploaded the same on SLDC website. He stated that overall scenario for last two months in MP system operation performed well despite N-1 constraint and requested MPPTCL for system studies considering import capability of MP with N-1 criteria.

Thereafter Chairman OCC requested Member Secretary, OCC to take up the agenda points.

ITEM NO. 1 : CONFIRMATION OF MINUTES : Member Secretary OCC informed the committee that Minutes of 54th meeting of Operation & Coordination Committee of MP held on 22nd October 2016 at SLDC, MPPTCL, Nayagaon, Jabalpur were forwarded to the committee members vide No. 07-05/SG-9B-II/3020 dated 18.11.2016. No comments have been received to SLDC, Committee confirmed the minutes. ITEM NO. 2 : REVIEW OF SYSTEM OPERATION DURING THE MONTHS OCT 2016 TO NOV 2016.

2.1 Frequency Particulars: Member Secretary OCCM informed the committee that during Nov 2016 the system frequency was below 49.9 Hz for 9.02% of time against 5.43% of time during Oct 2016. The system frequency was above 50.05 Hz for 19.04% of time during Nov 2016 against 19.80% of time during Oct 2016. The system frequency was within the IEGC range of 49.9-50.05 Hz for 71.94% of the time during Nov 2016 against 74.77% of time during Oct 2016. The average monthly frequency was 50.00 Hz during month of Oct 2016 and 49.99 Hz during month of Nov 2016. The system frequency did not touch 49.20 Hz during the above period.

The detailed frequency particulars for the month of Oct 2016 and Nov 2016 are enclosed at

Annexure-2.1. The brief detail of frequency profile is given here under:

Month Average Minimum Maximum Instantaneous Instantaneous Minutes of 55th OCCM of MP 1

Page 5: As per distribution list

Frequency integrated integrated minimum maximum frequency over frequency over frequency frequency an hour an hour

Oct 2016 50.00 Hz 49.89 Hz 50.11 Hz 49.74 Hz 50.25 Hz Nov 2016 49.99 Hz 49.78 Hz 50.09 Hz 49.54 Hz 50.27 Hz

2.2 Operational Matters

2.2.1 Operational Discipline : Member Secretary, OCC informed the Committee that system

operated in terms of frequency profile for the months Oct 2016 and Nov 2016 is as given below:-

Month % of time % of time % of time Average No. of times Frequency Frequency frequency within Monthly frequency Below 49.9 above 50. 05 Hz the permissible frequency dipped below Hz range of 49.9- 49.2 Hz 50.05 Hz Oct 2016 5.43 % 19.80 % 74.77 % 50.00 Hz 0 Nov 2016 9.02 % 19.04 % 71.94 % 49.99 Hz 0

Voltage Profile: Member Secretary, OCC informed the Committee that during the months Oct 2016 and Nov 2016, the maximum and minimum voltage as recorded at following important 400 KV s/s in MP Grid is as given below-

Oct 2016 Nov 2016 Max. Voltage Min. Voltage Max. Voltage Min. Voltage Name of observed observed observed Observed Sr 400 KV

Voltag Volt

No Substation Voltage ag Voltage

Date e Date Date Date KV e KV KV KV

1 Indore 425 12.10.16 395 25.10.16 423 01.11.16 394 11.11.16 2 Itarsi 419 13.10.16 394 25.10.16 416 17.11.16 388 11.11.16 3 Bina 418 12.10.16 395 24.12.16 417 14.11.16 393 07.11.16 4 Gwalior 414 11.10.16 384 06.10.16 419 22.11.16 387 19.11.16 5 Nagda 427 12.10.16 397 27.10.16 425 16.11.16 393 08.11.16 6 Satpura 428 12.10.16 403 16.10.16 426 01.11.16 403 08.11.16 7 Birsinghpur 425 31.10.16 410 20.10.16 426 17.11.16 408 04.11.16 8 ISP 429 12.10.16 405 22.10.16 427 01.11.16 403 30.11.16

2.3.2 Status of Capacitor Banks in sub-transmission system : Member Secretary, OCC informed the Committee that the updated information of the status of capacitor banks in sub-transmission system as on

30th Nov 2016 as submitted by DISCOMs is as detailed below:-

Minutes of 55th OCCM of MP 2

Page 6: As per distribution list

Capacitor bank Capacitor Capacitor Req Requirem Capacitor Balance installed in Banks bank installed Uirem ent against banks capacitor good condition healthy but but defective & ent of non- already banks to be (No) not in service are repairable Repair repairable Covered covered in due to control (No) Again capacitor under ADB other

ckt problem St banks T-V schemes Each (No)

DISCOM Unit 600 1200 1500 600 1200 1500 600 1200 1500 No of 600 1200 600 1200 600 1500 KVA KVA KVA KVA KVA KVA KVA KVA KVA 100 KVA KVA KVA KVA KVA KVA R R R R R R R R R KVAR R R R R R R Units

Required

EZ 409 159 26 - - - 32 13 01 29 0 0 0 0 0 77

CZ 5 687 686 0 0 0 0 0 0 0 0 0 0 588 0 0

WZ 638 544 485 17 16 09 14 11 75 237 2 11 - - 0 114

Chairman OCC stated that in the ongoing Rabi season, the availability of Capacitor Banks in the

distribution network is utmost necessary for maintaining the voltages within operational range. He also

requested the Discoms to furnish all the information in the prescribed format and ensure healthiness and

availability of Capacitor Bank during Rabi season.

2.3.3 Status of Shunt Capacitor Banks installed at various EHV Transmission Substation: The Member Secretary, OCC informed the Committee that the updated information of the status of installed capacitor banks (in MVAR) in EHV transmission system as on 30.11.2016 as submitted by MPPTCL is as given below:-

Voltage Capacitor bank Capacity

Capacitor banks

Total capacity as on 30.11.2016 Capacitor Bank

Class installed as on Added after already covered

Installed but defective

30.09.16 (MVAR) Last OCC

under ADB T-V

& are not repairable

Meeting (No & MVAR) (MVAR)

220 KV 100.00 MVAR 0.00

100.00 MVAR All in Service 132 KV 1205.00 MVAR 0.00 1205.00 MVAR 33 KV 4384.50 MVAR 72.00 4456.50 MVAR Total 5689.50 MVAR 72.00 5761.50 MVAR

The Member Secretary, OCC brought to the notice of the Committee that during the last three

meetings, MPPTCL assured to submit the details of capacity banks at EHV level within a week time but not received the same. He reiterated the need that this data is required for calculation of ATC/TTC

Minutes of 55th OCCM of MP 3

Page 7: As per distribution list

using PSS/E software which will not give correct results without modeling of capacitor bank details in PSS/E software.

MPPTCL representative agreed to furnish the information shortly.

2.3.4 Status of completion of ongoing Transmission Schemes being executed by MPPTCL: Member Secretary, OCC informed the Committee that the various ongoing Transmission Schemes completed during the current financial year 2016-2017 (up to Nov. 2016) and plan for completion of various ongoing Transmission Schemes for the Year 2016-2017 is enclosed as Annexure 2.3.4(i) and 2.3.4(ii).

2.3.5 U/F and df/dt Relay Operation U/F and df/dt Relay Operation: Member Secretary, OCC informed the Committee that the frequency did not touch 49.20 Hz during Oct 2016 and Nov 2016. There was no df/dt operation during the same period. (ii) Defective u/f, df/dt relays: Member Secretary, OCC informed the Committee that MPPTCL has informed that all the df/dt relays are in good/healthy working condition and where the U/F relays are not available, the numerical relays programmed for under frequency operation.

2.4 Power Cuts / Load restrictions/Differential Load Shedding by DISCOMS & group

allocation to 33 KV feeders :

(i) Member Secretary informed the committee that the details of DISCOM wise Power supply given to various domestic categories during the period Oct 2016 and Nov 2016 is enclosed at Annexure 2.4(i).

(ii) Group Allocation to Newly Commissioned existing EHV substations:- Member

Secretary OCC informed the committee that the region wise list of 33 KV feeders emanating from various newly commissioned/existing EHV substations for which groups have not been allocated is given in Annexure 2.4 (ii). The DISCOM wise details of pending group allocation to 33 KV feeders as informed by respective Discom representative is given as below:-

SN DISCOM Region No of 33 KV feeders for which groups to be allocated

01 Jabalpur Nil 02 EAST Sagar Nil 03

Rewa Nil

04 Total 05 Indore 03 06 WEST Ujjain 09 07 Total 12 08 Bhopal 10 09 CENTRAL Gwalior 03 10 Total 13

TOTAL Grand Total 25

East Discom representative informed the committee that 01 No. feeder group allocation has been done and there is no pending. Representative from Central Discom informed that 10 No. group allocations has been done, 2 Nos. feeders named as 33KV Jatkheda-I and Jatkheda-II at Minutes of 55th OCCM of MP 4

Page 8: As per distribution list

132KV Shyampur EHV Substation are not existing and remaining 13 Nos. feeders group allocation is under process. West Discom representative informed the committee that group allocation of 1 No. feeder has been done, 3 No. feeders are not existing and for remaining 8 No. feeder”s group allocation is under process. The current updated status is enclosed as Annexure-2.4(ii).

ITEM NO. 3 : OPERATIONAL PLANNNING:

3.1 Generating Units under planned outage and proposed maintenance programme : Member Secretary informed the committee that the annual maintenance /outages of thermal generating units of MPPGCL during Jan.2017 to Feb ‘17 is Nil as intimated by ED(O&M:Gen.), MPPGCL, Jabalpur.

3.2 Proposed shutdown programme of Transmission lines / Transformers: Member Secretary informed the committee that the he proposed shutdown of transmission elements for the period 01.01.2017 to 28.02.2017 submitted by MPPTCL is enclosed as Annexure-3.2. 3.3 Long outages of transmission and elements and protections : Chairman OCC informed the committee about the long outages of transmission elements and protections and the status submitted by MPPGCL/MPPTCL are given below:

SN

Line/Transformer/Breaker/ Reactor etc. under long outage

Outage date

Reason Response from Utility

1 220 KV Bus bar protection scheme at SGTPS Birsinghpur

07.09.16 Due to mal-operation 220 KV Bus Bar Protection kept out

MPPGCL representative informed that 220 KV Bus bar protection scheme of M/s GE India Bangalore has been commissioned on dtd.23-05-2016 & taken into service w.e.f. 26.07.2016. Due to mal-operation it has been kept out since 07.09.2016 as intimated by SE (ET&I), SGTPS. MPPGCL intimated that a tripping through LBB protection observed on 25.11.2016 during failure of lightning arrestor of Unit No.2. Further, M/s GE India Bangalore has been informed about the matter for attending the same. MPPGCL representative informed that 220 KV bus bar protection scheme is out of service and M/s GE India, Bangalore has been requested for attending the same. Member Secretary, OCC requested MPPGCL to expedite the matter for earlier restoration of 220KV bus bar protection from system security point of view.

2 Main Breaker of 400 KV Nagda-Rajgarh-II

23.07.15 Y-phase CT burst / BKR Problem

400 KV Rajgarh- II is charged from 400 KV Main Bus-I, for ensuring connectivity with Main Bus-II. The work is in progress with work of providing Reactor on ISP Bay. 400 KV Rajgarh-I is shifted in diameter of 315 MVA ICT-IV, which has facility to connect on Main Bus-I and Main Bus-II. This will impact when outage of Bus-II occurs in outage of Nagda-Rajgarh–II circuit. MPPTCL representative informed in the meeting that the work will be taken up by end of March 2017.

3. 40 MVA 132/33 06.10.15 Internal MPPTCL informed that the repair work has been

Minutes of 55th OCCM of MP 5

Page 9: As per distribution list

KV Transformer ECE make at 132 KV Lakhnadon

sparking in Y Ph. HV side winding.

completed and the transformer has been commissioned on dated 05.11.2016.

4. 315 MVA, 400/220 kV ICT-I at 400 kV S/s Bina.

15.10.15 Due to Buchholtz relay alarm.

The transformer bank is out of circuit from 02.08.2015. 2 No. 105 MVA Units of these banks have failed. The complete bank has to The 315 MVA X’mer Sr. No. 6005210 is out of circuit from 15.10.2015. The Transformer has been shifted from Bina to M/s BHEL works for repairs. MPPTCL representative informed that the order for repair has been placed, the transformer is shortly to be despatched and expected to be commissioned by end of January 2017 as intimated by MPPTCL.

5. 315 MVA, 400/220 KV ICT at 400 KV S/s, Julwaniya.

05.01.16 The ICT has been removed for installation at Bina 400 KV S/s and commissioned there at 16:49 Hrs. on dtd. 05.01.2016. In 52nd OCCM MPPTCL representative informed the committee that new Transformer of 315 MVA, 400/220 KV EMCO make order has been placed. MPPTCL representative informed the Committee that it will be commissioned by the end of Feb-2017.

6. 315 MVA, 400/220 KV X’mer II (TELK make) Main Breaker at 400 KV S/s Katni

03.11.15 X’mer commissioned through bus coupler breaker since commissioning.

It has come to notice that the transformer-II has been connected through bus coupler breaker both side (400 KV & 220 KV) and there is no main breaker for this 315 MVA X’mer-II. In 54th OCCM MPPTCL informed the committee work of 220 KV Ckt. breaker has been completed and 400 KV Ckt. Bkr. work is under progress. MPPTCL representative informed that the work will be completed by end of Jan., 2017.

7. 40 MVA ,132 /33 KV EMCO make X’mer Sr.No. HT-1344/ 11641 at 132 KV S/s Ashta

10.05.16 Transformer failed on dated 10.05.2016 as intimated by T&C, MPPTCL.

50 MVA 132/33 KV X’mer has been commissioned on 18.11.2016 as intimated by MPPTCL.

8. 12.5 MVA, 132/66/33 KV X’mer CGL make Sr. No. 23615 at 132 KV S/s Pichhore

19.05.16 Transformer failed on 19.05.2016 as intimated by T&C, MPPTCL.

The load is manageable through (1x20 + 1x40) MVA X’mers in running condition at S/s Pichhore. Hence replacement of failed X’mer is not required as intimated by MPPTCL. In 52nd, 53rd & 54th OCCM, Chairman requested MPPTCL P&D to submit letter for removal of transformer from Asset. Representative from P&D informed that matter will be settled by end of Jan., 2017.

9. 20 MVA, BBL Make X’mer (Sr. No.-2195/4) at 132 KV S/s Katangi.

08.07.16 Tripped on differential indication.

16 MVA 132/33 kv X’mer has been commissioned on dated 09.11.2016 as intimated by MPPTCL.

10.

12.5MVA, BBL Make (Sr. No.-1428/3) at 132 KV S/s Chapda.

Not intimated

X’mer failed It has been proposed to withdraw the X’mer from system as intimated by MPPTCL. Representative from P&D, MPPTCL informed that comments for withdrawal of transformer is required from T&C, MPPTCL for further needful,

11.

40 MVA, ECE Make X’mer (Sr. N0.-86020) at 132 KV S/s Shajapur.

14.06.16 Tripped on differential indication.

X’mer is under investigation and testing. Internal Inspection of X’mer shall be done as soon as monsoon permits. Transformer is likely to be charged by January 2017 as intimated by MPPTCL. Representative informed that the transformer has

Minutes of 55th OCCM of MP 6

Page 10: As per distribution list

been charged on 22.12.2016. 12.

50 MVAR Line Reactor of 400 KV Katni – Damoh Ckt at 400 KV S/s Damoh (PGCIL).

Not intimated.

Tan-∂ of the bushing was not correct.

In 54th OCCM MPPTCL informed the committee that by end of November, 2016 line reactor shall be put into service. MPPTCL representative informed that new bushing has been installed and after testing and oil filtration work reactor will be put into service by end of Jany.2017.

13.

40 MVA, 132/33 KV BBL X’mer at 132 KV S/s, Chourai

25.09.16 Defect developed in transformer

50 MVA 132/33 KV X’mer has been commissioned on dated 10.11.2016 as intimated by MPPTCL.

14.

160 MVA, 220/132 KV BHEL X’mer at 220 KV S/s Jabalpur

30.09.16 MPPTCL informed in the 55th OCCM Xmer tripped on differential protection.

MPPTCL representative informed that X’mer is under testing & investigation. Further Company engineer has visited the site and matter is under process.

15.

20 MVA, 132/33 KV X’mer at 132 KV S/s Jaora.

07.09.16 Capacity enhancement work (20 MVA X’mer to be replaced by 50 MVA X’mer).

20 MVA X’mer has been shifted from Jaora to Neemuch as intimated by MPPTCL. Installation of 50 MVA new X’mer has been done and Xmer commissioned on dtd. 05.12.2016 at 132KV S/S Jaora as intimated by MPPTCL.

16.

63MVAR 400KV Bus reactor-II at STPS, Sarni

06.09.16 Not intimated

The Bus-reactor is out of service since 06.09.2016. MPPGCL representative informed that the cause of outage shall be intimated shortly to SLDC and reactor shall be commissioned by end of March 2017.

ITEM NO. 4 : OPERATIONAL STATISTICS FOR THE MONTH OF OCT 2016 AND NOV 2016:

The Member Secretary, OCC informed the committee that the details of actual generation, Schedule

from Central Sector, demand etc. are given in the following Annexures:

Annex. 4.1 Unit wise actual Generation of MPPGCL thermal Units and station wise Generation of

MPPGCL & NHDC Hydel Units. Annex. 4.2 Power Supply Position. Annex. 4.3 Hourly Average of Availability and Demand. Annex. 4.4 Hourly average schedule Vs Drawal of DISCOMs.

ITEM NO. 5.0 : SYSTEM DISTURBANCE IN MP DURING OCT 2016 AND NOV 2016 : The Member

Secretary, OCC informed the committee that there was no major grid disturbance in MP during OCT

2016 and NOV 2016. Moreover, the Grid Disturbances and Grid Incidents in MP during these months

are given in Annexure 5.0.

ITEM NO. 6.0 : IMPORTANT OPERATIONAL ISSUES:- 6.1 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS /

TRANSMISSION ELEMENTS:- The Member Secretary, OCC informed the committee that the present status regarding schedule and commissioning of reactors / transmission elements is as below:-

Minutes of 55th OCCM of MP 7

Page 11: As per distribution list

Sr. No.

400 KV S/S Size MVAR

Implementing Agency

Expected Date of Commissioning as intimated in last OCC

1 Bus Reactor : ISP

125 MVAR

NHDC NHDC informed that the order for bus reactor has been placed on 03.08.2016, drawing received for approval and tentative date of commissioning by end of June 2017. More over Chairman OCC requested NHDC to commission the reactor before ensuing monsoon 2017 i.e. before May 2017.

2 Line reactor at Nagda-ISP line at Nagda end

50 MVAR

MPPTCL MPPTCL representative informed in the 55th OCCM that the work will be completed by March 2017.

3 Line Reactor on 400 kV Satpura –ISP line at STPS.

50 MVAR

MPPGCL MPPGCL representative informed that re-tendering is under process for procure-ment of line reactor and it will be made available by June 2017.

4 Bus Reactor at SSTPS

125 MVAR

MPPGCL Work will be carried out under PSDF as intimated by MPPGCL. Thereafter Chairman OCC stated in 54th and also in 55th OCCM that procurement process can be started without waiting for PSDF approval. MPPGCL representative informed in the 55th OCCM that NIT shall be floated in the first week of Jan. 2017 and Reactor is expected by June 2017.

6.2 Provision of synchronization facility at EHV sub-stations of MPPTCL:- The Member Secretary,

OCC informed the committee that as per Grid Code, the synchronization facility should be available at all

the Power Stations, 400 KV Sub-stations and 220 KV Sub-stations and 132 KV sub-stations in the path

of black start. Further it was informed by chairman OCC that synchronization trolley at 400 KV S/s Indore

is not in order and requires immediate attention for its proper functioning. MPPTCL representative informed the committee that order of 69 no. synchronization trolley

has been placed and 1 no. synchronization trolley has been delivered for checking and testing purpose

at 220KV S/S Barwaha. Further MPPTCL representative informed that the synchronization trolley will be

delivered in Feb.2017.

6.3 The Procedure for processing the new TSS application by WRC Railway:- The Member Secretary, OCC informed the committee that Indian Railways have been declared as “Deemed Licensee” vide Hon’ble CERC order dated 05.11.15. It is also laid down in aforesaid order that for each of the state concerned, all the TSS operating therein shall be treated as a “single entity” operating under a “Fragmented Control Area”. The concerned SLDC has been designated as the Nodal Agency by Hon’ble CERC, with powers vested for managing the scheduling of power to all the Railway’s traction sub-stations deemed to operate as a single entity under a “Fragmented Control Area” in MP. As per the directives, the Railways have availed long-term inter-state open access for their 37 nos. existing Traction Sub-stations in MP, by scheduling 200 MW power from Ratnagiri Gas & Power Pvt. Ltd. (RGPPL), Ratnagiri (MS). Thereafter new TSS are being under commissioning.

The MPPTCL has framed a procedure for processing the new TSS applications of Railways for connecting the new/upcoming sub-station. The procedure as received is attached as Annexure-6.3. 6.4 Training on Power Systems at WRPC, Mumbai:- The Member Secretary, OCC informed the committee that WRPC, Mumbai has intimated that NLDC is going to organize training on Power Systems

Minutes of 55th OCCM of MP 8

Page 12: As per distribution list

for five days by the International Consultant (M/s Tractebel) at WRPC, Mumbai. The training programme has been scheduled from 09.01.2017 to 13.01.2017. WRPC has requested to nominate engineers with protection ground for this training. SLDC requested the concerned utilities for submitting the nominations to SLDC.

The concerned utilities have confirmed the nominations in the meeting.

6.5 LINE DIFFERENTIAL PROTECTION ON SHORT LINES:- The Member Secretary, OCC informed the committee that in the 128th Protection Committee Meeting of WRPC scheduled on 06.12.16 & 07.12.16 at WRPC Mumbai, Line Differential Protection provision on short lines was discussed. This is in regard to the recommendation of the Sub Committee on relay under protection Task Force for Power System Analysis under Contingencies (Para-14 in Sec. 6 of the Report under Relay Setting guidelines for Transmission Lines):

Many transmission lines are now having OPGW or separate optic fiber laid for the communication. Where ever such facilities are available, it is recommended to have the line differential protection as Main-I protection with distance protection as backup (built-in Main relay or standalone). Main-II protection shall continue to be distance protection. For cables and composite lines, line differential protection with built in distance back up shall be applied as Main-I protection and distance relay as Main-II protection. Auto-re-closer shall be blocked for faults in the cables.

The matter was discussed in the meeting regarding line differential protection provision on short lines. Chairman OCC requested MPPTCL, MPPGCL and other concerned entities to submit the list of short lines on which the line differential protection has to be provided.

6.6 DATA FOR PROTECTION SETTING OF 400 KV AND ABOVE SYSTEM:- The Member Secretary, OCC informed the committee that WRPC has submitted the format for collection of data of protection settings of 400 KV and above system from all generating stations, load sub-stations for submission to WRPC. The format is enclosed as Annexure-6.6. The data of 400 KV Bina, Bhopal, Pithampur, Katni, Indore, Nagda, Chhegaon and ISP is received from MPPTCL and ISP. However the requisite data of JP Bina, 400 KV Sub Station Astha, Julwania,, SGTPS, SSTPS and STPS is to be submitted to the SLDC by respective utilities. SLDC requested utilities to furnish the transformer protection and backup protection details in the prescribed format by 24th December 2016 so that same may be forwarded to WRPC/WRLDC. MPPTCL submitted the data for Ashta & Julwania 400 KV S/s. Further Member Secretary requested MPPGCL to submit the data within 3 days to SLDC for onward submission to WRLDC/WRPC. 6.7 Overloading of 220 KV Gwalior(PGCIL)-Malanpur Ckt. I & II:- Member Secretary, OCC informed the committee that presently loading of 220 KV Gwalior (PGCIL)-Malanpur Ckt. I & II remain on higher side and it is expected to increase further and may cause over loading of these lines. The matter was taken up with POSOCO by SLDC. The Addl. General Manager, POSOCO had advised to provide load trimming scheme at Malanpur and Mehgaon for contingency of 220 KV Gwalior-Malanpur lines. Accordingly, CE (T&C) had proposed load drop scheme (two stage) at 220 KV S/s Malanpur which was forwarded to WRLDC for concurrence. Stage-1

Minutes of 55th OCCM of MP 9

Page 13: As per distribution list

If load on any of Gwalior-Malanpur circuit exceeds 250 MW, 132 KV S/s Malanpur-Badgaon line shall be open at Malanpur end in 500 msec. This will give relief of nearly 50 MW to 70 MW. Porsa-Ambah link shall be kept open, when be load dropping scheme in service. Stage-2 If loading of Gwalior-Malanpur is still more than 250 MW after operating stage-1, then after 132 KV Morar-I&II, shall be tripped after 300 msec. (in addition to stage-1 time of 500 msec.)Tripping of 132 KV (Morar I&II) shall give load relief of 50 MW. The WRLDC has requested for time delay for stage-1 as 250 msec. instead of 500 msec. and

for stage-2 as 200 msec. instead of 500 msec to ensure that load relief is obtained within 500 msec. The

CE(T&C) has intimated that the settings suggested by the WRLDC for load trimming scheme in Gwalior

area of MP cannot be adopted because Zone-II tripping time of 220 KV feeder is 300 ms. To avoid mal

operation of load trimming scheme, it is necessary that Stage-I should be operated with delay of 500 ms,

so that necessary time discrimination of 200 ms with Zone-II can be provided. Similarly the time delay of

800 ms for Stage-II operation selected.

The same has been intimated to WRLDC and CE(T&C) was requested to implement the Load

Trimming Scheme in Gwalior area. MPPTCL representative confirmed the committee in the meeting that

the scheme has been commissioned at 220 KV sub-station Malanpur successfully on dated 18.11.2016.

6.8 Charging of 3rd 220 KV Interconnector between 765 KV PGCIL and 220 KV S/s Satna (MP):-

Member Secretary, OCC informed the committee that there are 2 Nos. 220 KV Interconnectors between

765KV S/s Satna (PGCIL) and 220 KV S/s, Satna. The load on these 220 KV Interconnectors sometimes

increases up to 240-250 MW during peak load hours due to increased irrigational demand of MP. Such

high loading of these lines may lead to interruption in the area if any of the line trips.

He informed to overcome the issue of high loading of these 220 KV Interconnectors, the Testing

Wing of MPPTCL has proposed that a part of the 220 KV Satna(PG)-Katni line may be utilized as 220 KV

IIIrd Interconnector between 765 KV S/s Satna (PGCIL) and 220 KV S/s, Satna by opening jumper at

Location No.5. The proposed arrangement shall be as given below:

OPENED LINE JUMPER SATNA PGCIL x---- I/C-III

I/C-II I/C-I 400KV S/S KATNI 220KV S/S SATNA MPPTCL

The proposal of Testing Wing of MPPTCL has been examined and necessary concurrence for this interim measure was given by WRLDC on 08.12.2016. MPPTCL and Power Grid WRTS-II shall coordinate for revised protection settings and confirm to SLDC and WRLDC before charging the 3rd

Minutes of 55th OCCM of MP 10

Page 14: As per distribution list

interconnector between Satna (PG) – Satna 220 KV (MP). Progress in this regard may be conveyed to SLDC during the meeting. Member secretary requested MPPTCL to coordinate with PGCIL the above matter and expedite the work. 6.9 Ten Daily Reservoir operation table of MPPGCL HPS:- Member Secretary, OCC informed the committee that in the meeting held in Regional Office of MPPMCL at Bhopal on 24.09.2016 to discuss availability from Sardar Sarovar Project, ISP & OPS and State Hydel Plants for Rabi season, MPPGCL had agreed to obtain ten daily reservoir operation table from WRD and NVDA for their operation of their hydro generators. In last 54th OCCM, request has been made to MPPGCL for furnishing the same to

SLDC by 29th October 2016, but the same is not received by SLDC.

SLDC has requested MPPGCL to pursue the matter with WRD and submit the Ten Daily

reservoir operation table in the OCCM.

MPPGCL representative submitted the ten daily reservoir operation table of Bargi HPS in the

meeting. Member Secretary requested MPPGCL to submit the ten daily reservoir operation table of remaining HPS to SLDC at the earliest. 6.10 Charging of new 50 MVA, 132/33 KV transformer at 220 KV Anuppur S/s without obtaining real time code from SLDC and taking load by S/s officials :- Member Secretary, OCC informed the

committee that on dtd. 10.12.2016 at around 17.47 hrs. the 50 MVA X’mer at Anuppur S/s was taken on

load without submitting documents required for confirmation of compliance of regulatory requirement and

without obtaining the code/clearance from SLDC. He pointed out that the switching operation of

transmission elements without obtaining code and intimation to SLDC is not desirable for safe, secure

and smooth operation of integrated grid and also violation of IEGC section 1.5, 5.6.2(b) and MPEGC

clause 1.14. Such violation was also noticed in past also i.e on dtd 10.04.2016 and 15.04.2016 when the

transmission elements in Satna and Rewa were charged without obtaining real time code from SLDC.

The same was also informed vide this office letter no. 07-05/RPC-51/164 dtd 16.04.2016.

The matter was discussed in the meeting and Member secretary requested MPPTCL & other

entities to circulate invariably the formats of documents required to submit to SLDC prior to charging of

new transmission elements to all related field officers/offices of MPPTCL and also instructed all field

officials to strictly adhere to the compliance of regulations.

6.11 Hand tripping of Transmission elements without obtaining real time code from SLDC by S/s officials: - Member Secretary, OCC informed the committee that on dtd. 14.12.2016 at around 11.30

Hrs. the 40 MVA 132/33 kV X’mer was hand-tripped at 132 KV sub-station Banda without intimating the

reason and obtaining the code from SLDC. Such unilaterally switching operation of transmission

elements without obtaining code and intimation to SLDC is not desirable for safe, secure and smooth

operation of integrated grid and also violation of IEGC section 5.2 (b), 5.6.2(b) and MPEGC clause 6.1.3. Member Secretary, OCC requested MPPTCL to avoid such occurrences in future and instruct the

substation officials/incharge to comply to the Grid Code to ensure safety of the integrated system.

Minutes of 55th OCCM of MP 11

Page 15: As per distribution list

6.12 : FRC computation for Generators of MP for dated 30.11.2016.:- Member Secretary, OCC

informed the committee that WRLDC has requested all the states to compute the Frequency Response

Characteristics (FRC) for dated 30.11.2016 for the generators under the control area of each state at the

time of 2300 MW generation loss at Anapara due to tripping of 400 KV Anapara-Sarnath Double Ckt. and

resulting in frequency dip from 50.16 Hz to 49.89 Hz (0.27 Hz). Accordingly MP SLDC has computed the

FRC of the generators under the control area of MP SLDC. The observation of the computation of FRC

are given below:

Sr.No.

Unit No. Actual net interchange before the

event (MW)

Actual net interchange

after the event (MW)

Change in net interchange

(MW)

Response of the unit

(%age)

1. STP-10 252.54 251.67 -1 -3.2 2. STP-11 248.78 253.39 4.61 17.2 3. SGTPS-1 152.26 152.93 1 4.1 4. SGTPS-4 154.26 154.26 0 0 5. SGTPS-5 497.55 497.55 0 0 6. ATPS 215.93 211.97 -4 -17.0

7. SSTPS-1 349.65 349.65 0 0 8. SSTPS-2 353.58 353.58 0 0

The Chairman, OCC pointed out that, from the results it can be seen that frequency response

has been observed only from STP-11 and SGTPS-1 units and no response has been observed from

other units of MPPGCL. Moreover STPS-10 and ATPS-5 have contributed their negative response which

is not at all desirable. Thus from above it appears that either the RGMO of the above units are not in

service or the working of RGMO is not proper.

SLDC vide letter no. 07-05/RPC-55/3313 dtd. 08.12.2016 requested MPPGCL to look into the matter for

investigating the reasons for not contributing the desired response by MPPGCL units / negative response

and submit the same to SLDC latest by 15.12.2016. The Information has not been received from

MPPGCL till now. It is therefore requested MPPGCL shall submit the same in the meeting.

Member Secretary requested MPPGCL to submit the FRC data to SLDC for further submission

to WRLDC?WRPC and ensure the implementation and proper working of RGMO.

6.13 Integration of New Transmission Elements into the Grid:- Member Secretary, OCC informed the

committee that the transmission system in Madhya Pradesh is growing at a rapid pace. The process of

integration/charging of new transmission elements belonging to each entity requires compliance of

certain regulatory requirements and sharing of information/submission of documents to SLDC/RLDC.

Therefore mandatory documents and not limited to, to be submitted to SLDC/RLDC prior to issue of

charging code for new transmission element are as follows:-

1. Copy of approval by Electrical Inspector.

2. Intimation by Transmission Licensee Regarding anticipated charging of new elements

(Annexure6.13-A)

Minutes of 55th OCCM of MP 12

Page 16: As per distribution list

3. List Of Elements to be charged and Element Rating details. (Annexure- 6.13-B). 4. Undertaking by Transmission Licensee in respect of Telemetry and communication (Annexure- 6.13-C).

All the intra-state entities are requested to provide the above data in prescribed formats (enclosed) to

SLDC/RLDC prior to charging of new transmission elements. He stated that the matter was discussed and brought to the notice of all entities during 54th

OCCM. However, the desired information is still not being furnished for all the new transmission elements. He requested the intra-state entities to furnish the required information for integration of all new transmission elements into the grid, to SLDC/RLDC prior to applying for charging.

Member secretary OCC requested MPPTCL to circulate the formats of documents (as mentioned

above) required to be submitted to SLDC prior to charging of new transmission elements to all the field

officers/offices of MPPTCL, and adhere to compliance of regulations. ITEM NO. 7: BLACK-START MOCK DRILL OF HYDEL POWER STATIONS : 7.1 Black Start mock drill of Hydel stations of MPPGCL :- Member Secretary, OCC informed the committee that the last black start mock drill of Gandhisagar HPS was completed successfully on 04.04.2016 with extending supply to 132 KV S/s, Bherugarh Ratadiya & Ujjain for Simhastha 2016. The Black Start Mock Drill at Bargi, Pench, Indira Sagar Power Station (ISP), Omkareshwar Power Station (OSP) and Tons HPS were successfully completed on 28.09.16, 06.10.16, 14.10.16, 15.10.16 & 20.10.16 respectively. As per IEGC Black Start Mock Drill need to be conducted once in every 6 months duration.

In compliance to IEGC, SLDC has proposed that the black start mock drill of Birsinghpur Hydel Power station in MP shall be conducted on 28.12.2016. Member Secretary requested the MPPGCL to take up necessary measures for conducting the Black Start Mock Drill. The black start mock drill of at Rajghat & Madikheda HPS in MP is proposed in the first week of Jan-2017.

Chairman OCC stated that the the Black Start Mock Drill of Birsinghpur HPS shall invariably be

done in presence of Mock Drill team (.i.e, officials from SLDC, MPPTCL & GCC,MPPGCL) on 28.12.2016. ITEM NO 8: SOME IMPORTANT MATTERS REQUIRED IMMEDIATE ATTENTION: 8.1 Quarterly Review of Crisis Management Plan: Member Secretary, OCC informed the committee

that as discussed and intimated in various OCCMs, quarterly review of crisis management report is to be

furnished to Chief Engineer (GM), CEA New Delhi under intimation to SLDC Jabalpur and WRPC

Mumbai. Further the NHDC & SLDC are submitting the quarterly crisis management report to CE (GM)

CEA, New Delhi under intimation to WRPC, Mumbai.

However despite continuous persuasion by SLDC other state utilities i.e. MPPTCL, MPPGCL and

IPPs are not submitting the report to CEA. Member Secretary requested the entities to submit the CMP

report in prescribed format for the second quarter of 2016-17 (July-Sept 2016) to CEA under intimation to

SLDC and WRPC, Mumbai.

Minutes of 55th OCCM of MP 13

Page 17: As per distribution list

8.2 Status of Physical & Cyber Security in Power Sector regarding: Member Secretary, OCC informed the committee that the Status of physical & cyber security in Power Sector for the first quarter (April to June 2016) has not been received from any of the state utilities. In the past also this report is not being furnished by any of the state utilities despite constantly pursuing the same by SLDC in OCC meetings and also through correspondence.

The state entities are requested to furnish the Status of physical & cyber security in Power Sector for First quarter and second quarter of 2016-17 (April-June & July-Sept 2016) directly to the Chief Engineer (GM), CEA New Delhi under intimation to SLDC Jabalpur and WRPC Mumbai. ITEM NO. 9: AVAILABILITY BASED TARIFF (ABT) RELATED ISSUES: 9.1 Status of AMR system installed at SLDC:

SLDC representative informed the Committee about the status of AMR data received through AMR

system in the month of Nov 2016. He informed that the complete data of 534 meters was received

through AMR system and data of 89 Nos meters (Monthly-67 & Partial – 22) was not received through

AMR system. The incomplete data is received due to site related issues such as network problem,

modem burnt, Non ABT meter installed, meter defective, Elster meter installed and time drift in meters or

due to some other problems. The status of data received through AMR system is invariably sent to all

concerned offices including SE(T&C) offices through email latest by 4th of every month for furnishing the

missing data alongwith monthly JMR data. Further following points are discussed and resolved as

under:-

1. SLDC requested the CE(T&C) office to take up the matter with M/s Secure Meters Ltd for resolving

the site related issues such as time drift in meters, meter defective, Non ABT meter & elster meters installed, network problem and modem burnt, list of interface points is available at website as Annexure-I. CE(T&C) office have assured to resolve the site related issues with M/s Secure Meters Ltd shortly.

2. SLDC representative informed that integration of ABT meters installed at the interface points of newly commissioned substation / Xmers / HT consumers / OACs / REGs – 85 Nos. He also informed that SLDC vide email dated 13.12.2016 forwarded the list of interface points to CE(T&C) office for furnishing the details of meters, modem and SIMs for integrating the ABT meters with AMR system of SLDC. He requested the (T&C) office to arrange to furnish the same on priority basis so that integration of the ABT meters with AMR system could be done by SLDC. (T&C) office representative have assured to furnish the details shortly.

3. SLDC representative requested the CE(T&C) office to issue instructions to M/s Secure Meters Ltd for deputing their engineer at SLDC in the beginning of every month for attending the problems and ensuring the readability of meters installed at the interface points. Chairman OCC also advised the T&C office representative to write letter to M/s Secure Meters Ltd. (T&C) office representative have assured to issue instructions to M/s Secure Meters Ltd.

9.2 Providing AMR facility for the ABT meters installed at MPPGCL :

SLDC representative informed that ABT meters installed at the interface points of the power stations

have been integrated with AMR system of SLDC except Tons HPS, Pench HPS and Bargi HPS. He also

informed that list of interface points whose ABT meter data not received through AMR system of SLDC

for the month of Nov’2016 has been emailed to GCC, MPPGCL on 14th Dec 2016 and requested

Minutes of 55th OCCM of MP 14

Page 18: As per distribution list

MPPGCL to take up the matter with M/s Secure Meters Ltd. for integrating the balance meters with AMR

system of SLDC and resolve the problems related with non-readability of meters integrated earlier

successfully. MPPGCL representative informed that Idea SIMs with GPRS + GSM facility have been

provided to M/s Secure Meters Ltd for Bargi HPS and integration will be done in 1 or 2 days, he also

informed that , Idea SIMs are being arranged to resolve the network issue to Tons HPS and Pench HPS

meters will be integrated after establishment of optical link.

Further, SLDC representative also requested MPPGCL to intimate the plan for integrating the ABT

meters installed at SSTPS. MPPGCL representative informed that replacement of meters with AMR

facility is in progress and shall be done shortly.

9.3 Energy Accounting and settlement of DSM charges of Discom embedded Open Access Customers connected at 33KV level.

SLDC representative informed that in accordance with Madhya Pradesh Electricity Balancing and

Settlement Code (BSC) 2015 and as decided in the 48th OCC meeting that energy accounting of Discom

Embedded Open Access Customers (DEOACs) shall be done by the Discom Energy Accounting Group

(DEAG) of Discoms. Accordingly, SLDC has provided the training and necessary inputs to Discom

officials on 11th Dec 2015 and requested the Commercial Sections of Discons to issue necessary

instructions to Discom Energy Accounting Group (DEAG) to take over the energy accounting of DEOACs

from the month of April 2016.

SLDC representative further apprise the Committee that East Discom & West Discom are doing the

energy accounting and issuing the DSM charges Bill of embedded customers from the month of April

2016, but, no feedback regarding issuance of DSM Bill / energy accounting of the embedded customers

from the month of April 2016 is received from Central Discom. The Central Discom representative

informed that DEAG of Central Discoms is doing the energy accounting of Discom embedded open

access customers w.e.f. April 2016.

9.4 Requirement of Centralized agency of Discoms for providing the energy injection data of Renewable Energy Generators:

SLDC representative informed that State Energy Account (SEA) is prepared and issued on 7th of

every month as per Balancing and Settlement Code 2015 of MPERC. SLDC considers the monthly

energy injection data of Renewable Energy Generators (REGs) connected at 33KV level and below

furnished by the respective SE(O&M) of the Discoms, however, Discom officials are not furnishing the

data by 3rd of every month despite repeated request made by SLDC. Sometimes the complete data is

not furnished by the Discoms by 7th of month, due to this the SLDC does not include the complete data

of REGs which later on get included in the revised SEA issued by SLDC. He further informed that

collection of REG data is a cumbersome process for which SLDC has to talk to various Discom officials

every month. He proposed that Discoms may appoint a centralized agency preferably Discom Energy

Accounting Group (DEAG) of DCC and made them responsible for furnishing the energy injection data of

REGs to SLDC in required format. This will help the SLDC to deal with only one agency of Discoms. The

Minutes of 55th OCCM of MP 15

Page 19: As per distribution list

Chairman OCC advise the SLDC to take up the matter with commercial sections / Managing Directors of

Discoms. 9.5 Energy Accounting of Renewable Energy Generators (REGs) connected at 33KV as per the data recorded in ABT meter installed at the pooling station:

SLDC representative informed that it was discussed and decided in the 45th OCC meeting that

energy accounting of Renewable Energy Generators (REGs) shall be done as per the actual data

recorded in ABT meters installed at the pooling station, SLDC has requested the commercial sections of

Discoms to furnish the details of meter, modem & SIM of the pooling station, but, Central & West Discom has mainly furnished the generator wise details whereas pooling station wise details are required for the purpose of energy accounting at pooling station. He further

apprise the Committee that Discom officials has informed that in case of solar generators ABT meters are

installed at the generators end only and standby meter is installed at the grid substation. In such cases

where there is no separate pooling station and standby meter is installed at the grid substation, the grid

substation shall be considered as a pooling substation as per MPERC draft REG regulations.

Accordingly, SLDC vide letter no. 2117 dated 02.09.2016 and 3344 dated 14.12.2016 has requested the

SE(T&C), Nagda, Bhopal, Ujjain of MPPTCL to furnish the details of ABT meters installed at the grid

substations, but, details have not been received so far. He requested CE(T&C) office to provide the

details of ABT meter installed at the grid substation and instruct the site officials to coordinate with Wind

& Solar Generators for providing AMR facility. CE(T&C) office have assured to do the same.

ITEM NO 10: SCADA/EMS RELATED ISSUES: 10.1 ARRANGENEMENT OF TELEMETRY OF IMPORTANT 220KV SUB STATIONS & 132KV S/S HAVING INJECTION FROM RENEWABLES/CAPTIVE POWER PLANTS OR HAVING INTERDISCOM FEEDERS & HAVING TRACTION FEEDERS- SLDC informed that a list of 50 S/s were identified for commissioning of telemetry Out of which around

fifteen RTUs (220KV Sirmore, 132KV Rewa, 132KV Satna, 132KV Biora,132KV Sironj, 132KV

Chanderi, 132KV Bercha, 132KV Arniakala, 132KV Sonkach,132KV Kannod, 132KV Poliakala, 132KV

Momin Barodia,132KV Pachore, 132KV Jeerapur, 132KV Petlabad,132KV Jaora,132KV Shankargarh,

132 Khacrod) are pending. MPPTCL agreed to arrange the commissioning of balance stations at the

earliest.

SLDC further informed that the telemetry of fourteen number of RTUs having railway traction feeder

i.e.132KV Betul S/s, 132KV Bahadurpur S/s, 132KV Banmore S/s, 132KV Chegoan S/s, 132KV

Morena S/s, 132KV Datia S/s, 132KV Mullapura S/s, 132KV Mulatai S/s, 132KV Berasiya S/s, 132KV

Mungaoli S/s, 132KV Sehore S/s, 132KV Shujalpur S/s, 132KV Meghnagar S/s, 132KV Ayodhya S/s)

is also pending to be commissioned for monitoring of railway drawal. MPPTCL informed that the

arrangement of PLCC panels and outdoor equipments required for commissioning of these RTUs is

under progress and commissioning shall be taken up in phased manner.

The matter regarding intermittent functioning of newly commissioned RTUs specifically at 132KV Kushi,

132KV Khilchipur, 132KV Vijaypur,132KV Alot, 132KV Icchawar,132KV Gudgaon,132KV Mandideep is

Minutes of 55th OCCM of MP 16

Page 20: As per distribution list

also discussed and MPPTCL assured to look into it and rectify the problems to ensure round the clock

functioning of these newly commissioned RTUs.

10.2 UPGRADATION OF EXISTING RTUS & DISCREPANCY IN TELEMETRERED VALUES RECEIVED FROM DIFFERENT EHV S/S & POWER STATIONS The present status of telemetry discrepancy including upgradation requirement is discussed in

detail. The list of following important locations where RTU upgradation is required to accommodate

renewable feeders/other feeders/transformers was discussed in detail:-

Sl No. Name of Substation

whose RTU is required to be upgraded

Name of feeders/transformers required to be included in telemetry

01 220KV Sidhi S/s

220KV Sidhi –Hindalco and 220KV Sidhi- Rewa feeder is not functioning since last three months.

02 132KV Gudgaon S/s

RTU is to be upgraded to provide telemetry of important renewable feeders i.e. 132KV Gudgaon-Kukru Windfarms. 132KV Gudgaon- 33kV Inox -1, 132KV Gudgaon- 33KV Inox-2.

03 220KV Birsingpur S/s

The telemetry of 220KV IC-1 & 132KV Shahdol feeder is not available since last six month

04

220 KV Dewas S/s

33 KV MP Windfarm feeder is not available 33 KV Jamgodarani feeder 1,2 is not available

05 132 KV Jaora S/s

33 KV Ratlam Wind 1,2 is not available

06 132 KV Alot S/s

33 KV Narbheram is not available

07 220 KV Badnagar S/s

33 KV Kshema Power is not available

08 220KV Pipariya S/S 220/132KV Transformer, 220KV Pipariya- 220KV Chichli feeder not available,132KV Gadarwara feeer telemetry wrong.

09 220KV Anuppur S/s 132KV Shahdol,132KV Kotma 2, 132KV TRF 2 telemetry not available.

10 132KV Kotma S/s 132KV Anuppur feeder telemetry not available 11 220KV Shivpuri S/s 220/132KV Transformer telemetry is not available 12 220KV Pandurna 220KV Pandurna-Chindwara telemetry is not available 13 220KV Kotar Telemetry of newly commissioned 132/33KV

Transformer not available 14 220KV Chatarpur S/s Telemetry of 132/33KV Transformer-2 not available 15 Satpura TPS Telemetred value of ICT and STP-ISP feeder is wrong

from Power Station end. SLDC informed that lot of inconvenience in grid management is observed and hence upgradation of

above mentioned RTU is to be taken up on top most priority for which MPPTCL agreed.

10.3 PRESENT STATUS OF PROCUREMENT OF RTUs BY MPPGCL:- The matter of procurement of RTU for Rajghat HPS and Bansagar III HPS was discussed in detail.

The Telemetry of Rajghat HPS is out since last two & half years. In response MPPGCL informed that the Minutes of 55th OCCM of MP 17

Page 21: As per distribution list

order has already been placed and approval of drawings is under progress. The RTU is expected to be

delivered in next three months.

10.4 COMMISSIONING OF COMMUNICATION CHANNELS FOR DUAL REPORTIG OF RTUS AS

PER BACKUP SLDC REQUIREMENT:- The commissioning of SCADA/EMS system at SLDC Jabalpur and backup SLDC Bhopal is

already completed and the additional communication channel is required to be extended to respective

control centers for testing with new SCADA/EMS system. SLDC requested MPPTCL & MPPGCL to

provide RTU wise progress.

SLDC further informed that a separate meeting with Communication officers has also been

arranged in SLDC on 19-12-2016 and modified communication plan submitted to MPPTCL was

discussed in detail. To commission communication channels as per backup SLDC requirement,

strengthening of existing wideband communication node is also required to be arranged. The

requirement of new wideband nodes and OPGW has already been submitted to MPPTCL and MPPGCL.

It was informed by MPPGCL that work shall be taken up shortly.

10.5 Arrangement of space, Power Supply for installation of PMUs panels & wideband node

equipments:- SLDC informed that the PMUs at MPPTCL 400KV Sub stations namely Bhopal, Bina, Indore, Katni,

Nagda has already been delivered and installation & commissioning is under progress. The necessary

arrangement for space and power supply at these sub stations is required to be ensured by MPPTCL.

MPPTCL confirmed to arrange the same before installation activities.

SLDC further informed that wideband node equipments at 220Kv Chindwara, 220KV Seoni,

220KV Ratlam,220KV Shivpuri, 220KV Indore SZ, 220KV Shujalpur, 220KV Neemuch,132KV Waidhan,

220KV Rajgarh, 220KV Malanpur,400KV Pithampur, 220KV Pithampur, 132KV Indore Chambal, Pench

& Gandhisagar HPS is expected to be commissioned within next four months. MPPTCL & MPPGCL

officials confirmed to look into the matter for necessary provisions of space, DCPS, Air conditions. 10.6 LONG OUTAGE OF RTUS, PROBLEM IN DATA AND VOICE CHANNELS- The long outage of telemetry of following S/s is discussed in detail:-

Sl. No. Name of Sub Station Out from /Remark

01 Rajghat HPS Out from last two & half years 02

132KV Morwa S/s

More then one and half Year

03 132KV Waidhan Out from six month. Channel problem between Anuppur to Jabalpur

04 132KV Beohari Out from more then six month

05 132KV Umariya Out due to problem in power supply module in PLCC panel at Birsingpur Sub station

Minutes of 55th OCCM of MP 18

Page 22: As per distribution list

06 132KV Balaghat Frequent Outage at least three four time in a day is observed.

07 220KV Sidhi Communication channel problem MPPTCL, MPPGCL officials confirmed to look into the matter to sort out/ rectification of above RTU/data

channel.

10.7 Telemetry of railway TSS Sub Stations:-

It was informed by SLDC that the telemetry of 36 Nos railway Traction Sub Stations is required to

be provided by railway for monitoring of drawal by each TSS and also monitoring of demand of railway in

MP. To finalise the telemetry scheme, a series of meetings of various filed offices from railway & SLDC

were held at SLDC Jabalpur on various occasions. In response railway officials informed that the work

regarding telemetry of TSS is under progress and telemetry is expected to be commissioned by June

2017.

ITEM No 11 : DATE AND VENUE OF NEXT OCC MEETING :

It is proposed to hold 56th OCC meeting of Operation and Coordination Committee of MP on

27.02.2017 at Conference Hall of State Load Despatch Centre, MPPTCL, Nayagaon, Jabalpur.

Minutes of 55th OCCM of MP 19

Page 23: As per distribution list

Minutes of 55th OCCM of MP 20

Page 24: As per distribution list

Minutes of 55th OCCM of MP 21

Page 25: As per distribution list

Minutes of 55th OCCM of MP 22

Page 26: As per distribution list

FREQUENCY PARTICULARS Annexure-2.1

S. No.

Particulars

Oct-16

Nov-16

1

INTEGRATED OVER AN-HOUR

1.1

Maximum Frequency

50.11 Hz

Between 13.00 hrs & 14.00 Hrs on 02.10.16

50.09 Hz

Between 13.00 hrs & 14.00 Hrs on 06.11.16

1.2

Minimum Frequency

49.89 Hz

Between 14.00 hrs & 15.00 Hrs on 20.10.16

49.78 Hz

Between 17.00 hrs & 18.00 Hrs on 30.11.16

1.3 Average Frequency 50 Hz 49.99 Hz

2 INSTANTANEOUS FREQUENCY

2.1

Maximum Frequency

50.25 Hz AT 13.02 HRS ON 08.10.16

50.27 Hz AT 22.07 HRS ON 17.11.16

2.2

Minimum Frequency

49.74 Hz AT 17.53 HRS

ON 20.10.16

49.54 Hz AT 17.43. HRS ON

30.11.16 3 Percentage of time when frequency was :-

%age of time when frequency was

Oct-16

Nov-16

3.1

Below 48.5 Hz

0.00

0

3.2

Between 48.50 Hz and 48.8 Hz

0.00

0

3.3

Between 48.80 Hz and 49.2 Hz

0.00

0

3.4

Between 49.20 Hz and 49.5 Hz

0.00

0

3.5

Between 49.50 Hz and 49.7 Hz

0.00

0

3.6

Between 49.70 Hz and 49.9 Hz

5.43

9.02

3.7

Between 49.9 Hz and 50.05 Hz

74.78

71.94

3.8

Between 50.05 Hz AND 51.5 Hz

19.80

19.04

3.9

Above 51.5 Hz

0.00

0.00

4

No. of times frquency touched 48.80 Hz

0

0

4.1

No. of times frquency touched 48.60 Hz

0

0

4.2

No. of times frquency touched 51.0 Hz

0

0

Minutes of 55th OCCM of MP 23

Page 27: As per distribution list

Date Indore Itarsi Bina Gwalior Nagda Birsingpur ISP

Max Min Max Min Max Min Max Max Max Min Max Min Max Min 1 422 409 418 407 412 395 421 408 2 422 410 419 409 414 393 423 410 3 420 403 417 402 409 393 421 407 4 418 405 415 403 411 393 420 407 5 420 406 418 404 411 393 423 407 6 420 402 417 399 408 384 423 404 7 421 406 416 403 409 393 423 407 8 421 407 416 404 410 392 422 408 9 420 407 417 403 412 392 423 409

10 422 408 417 407 409 396 424 410 11 420 411 417 409 414 399 422 414 12 425 405 419 403 412 394 427 407 13 422 406 419 403 410 397 424 406 14 420 401 415 398 408 391 423 403 15 415 400 413 400 407 391 418 403 16 417 401 416 401 409 391 420 406 17 415 399 414 399 407 390 419 403 18 413 398 413 400 408 396 418 403 19 414 395 414 396 411 394 418 400 20 413 397 412 398 413 397 416 399 21 416 395 414 395 413 393 419 397 22 414 396 411 398 405 392 419 398 23 414 401 411 400 413 397 418 403 24 417 398 414 395 410 392 418 398 25 417 395 413 394 408 393 417 397 26 419 398 414 395 409 393 419 399 27 417 397 413 395 408 395 417 397 28 416 401 414 397 407 392 416 400 29 418 399 413 397 409 394 419 400 30 423 404 415 400 411 397 423 402 31 423 408 416 403 411 397 420 404

Max /Min 425 395 419 394 0 0 414 384 427 397 0 0 0 0

Voltage Profile During the Month of October- 2016

Voltage Profile During the Month of November - 2016

Date Indore Itarsi Bina Gwalior Nagda Birsingpur ISP

Max Min Max Min Max Min Max Min Max Min Max Min Max Min 1 423 407 416 402 410 399 422 404 2 421 403 415 397 407 395 420 401 3 420 402 415 398 413 393 419 400 4 420 398 414 394 409 393 421 399 5 417 400 409 394 412 393 418 399 6 418 396 412 391 410 394 421 393 7 420 397 413 391 409 391 423 395 8 420 396 414 392 409 392 421 393 9 419 396 412 392 408 390 422 395

10 419 396 413 393 410 391 423 396 11 418 394 413 388 410 392 424 395 12 419 402 413 397 412 391 422 402 13 419 403 414 398 410 395 422 404 14 419 399 415 394 414 391 421 400 15 420 399 414 395 411 392 422 401 16 422 401 416 397 414 392 425 402 17 422 397 416 395 415 388 424 399 18 419 398 414 393 414 389 424 399 19 419 397 414 394 417 387 421 398 20 420 397 414 394 416 397 423 396 21 416 398 413 394 419 394 423 400 22 417 398 413 393 419 393 421 399 23 418 395 414 392 415 391 422 396 24 419 398 413 393 413 390 422 401 25 418 400 413 395 418 398 424 400 26 417 398 411 392 416 394 421 399 27 419 398 414 393 415 395 424 401 28 418 401 413 398 414 390 421 402 29 419 398 413 394 413 392 420 400 30 417 396 412 390 411 393 421 395 31

Max /Min 423 394 416 388 0 0 419 387 425 393 0 0 0 0

Minutes of 55th OCCM of MP 24

Page 28: As per distribution list

ANNEXURE - 2.3.4(i)

M.P POWER TRANSMISSION COMPANY LIMITED TRANSMISSION WORKS COMPLETED DURING 2016-17 (UP TO 30.11.2016)

I EHV TRANSMISSION LINES S.

No.

NAME OF THE TRANSMISSION LINE / (FINANCED BY)

TYPE OF CIR CUITS

ROUTE LENGTH

CIRCUIT KMS.

DATE OF COMPL- ETION

DATE OF COMMI- SSIONING

A. 400 KV TRANSMISSION LINES NIL 0 0

B. 220 KV TRANSMISSION LINES

1 LILO of 220 KV Katni - Satna line at PGCIL, Satna DCDS 0.7 1.40 April'16 09.04.2016

2

LILO of one Ckt of 220kv DCDS Bhopal - Ashta line at 220kv S/S Mugaliya chhap. (DCDS) (2x26.459) (JICA)

DCDS 26.46 52.92 June'16 18.06.2016

3 LILO of 220KV line Indore 400 -Pithampur at Pithampur-II 220Kv S/s in Indore (2x6.898) (PFCIIi)

DCDS 6.90 13.80 June'16 10.06.2016

4

220Kv DCDS line from 400Kv S/s Bina to plant of M/s Bharat Oman Refinaries Ltd. Agasod, Bina (2x18.197) (Contr.Works)

DCDS 18.197 36.394 Aug'16 01.08.2016

C. 132 KV TRANSMISSION LINES

1 2nd Circuit of 132 Kv Gudgaon - Kukru Wind Power Ltd. Betul (Contributory work)

2nd ckt 22.5 22.50 Aprilo'16 07.04.2016

2 LILO of one circuit of Mandideep - Hoshangabad for 132 KV Sub-Station Tamot(2x1.686) (REC-I)

DCDS 1.686 3.37 Aprilo'16 30.04.2016

3 2nd Ckt. Of 132 Kv DCSS Gairatganj- Vidisha line (48.30) ADB-III 2nd ckt 48.27 48.27 May'16 10.05.2016

4 132Kv 2phase 2wire S/c line from 132Kv s/s Amla to GSS Bordehi of RVNL(1x23.5) Contrib

DCSS 23.29 23.29 May'16 06.05.2016

5

132Kv DCSS line from 132Kv S/s Madhotal to 11.5 MW Processing Plant of M/s Essel Jabalpur MSW Pvt.Ltd. at Kathonda Dist- Jabalpur Contrib.

DCSS 2.52 2.515 May'16 02.05.2016

6

2nd Ckt.of 132 KV Rewa - Mangawan line (Dist. Rewa) (JICA) approch section of mangawan end (4x2.079+1x6.75) (JICA) (Balance work)

2nd Ckt 8.829 15.066 June'16 27.06.2016

7 132 kv DCSS Datiya- Bhander line (1x34.038)ADB-III DCSS 34.04 34.04 June'16 27.06.2016

Minutes of 55th OCCM of MP 25

Page 29: As per distribution list

8 132 kv DCSS Ashoknagar - Kothiya line (1x27.5+4x2.5) ADB-III DCSS 37.50 37.50 June'16 09.06.2016

9 132 kv DCSS line from 132Kv S/s Lahar - 132Kv S/s Seondha (1x15.5) PFC-III

DCSS 16.70 16.70 June'16 24.06.2016

10 2nd ckt of Betul - Gudgaon line (1X57) ADB-III 2nd ckt 57.00 57.00 June'16 24.06.2016

11 132 kv DCDS line Panagar - Katangi (2x29.471) PFC-II DCDS 29.47 58.94 JULY'16 04.07.2016

12 132 kv DCSS line from 132Kv S/s Porsa - 132Kv S/s Ambah (1x22.524) PFC-III

DCDS 22.52 22.52 Aug'16 11.08.2016

13

2nd Ckt.of 132Kv DCSS Katangi tap line tapped to one ckt. Of 132Kv Balaghat-Seoni line (1x0.5+35.67) ADB-III

DCDS 35.67 35.67 Aug'16 29.08.2016

14 132 kv DCSS line Mehgaon - Pratappura (1x29.74) ADB-III DCDS 29.74 29.74 Aug'16 31.08.2016

15 132kv Jeerapur -Susner DCSS line (1x30.236) (JICA) DCSS 30.24 30.236 Sept'16 21.09.2016

16 2nd ckt of 132kv Bairagarh - Shyampur line (1x0.5+4x1.9+19) (ADB-III)

2nd ckt 19.04 19.04 Sept'16 28.09.2016

17

132 kv Ashoknagar - Eshagarh DCSS line (1x37) (Transco) (Est.Sanc.-0281dtd. 17.03.2015 for Rs.1895.67)

DCSS 38.50 38.50 Sept'16 30.09.2016

18

132KV DCDS line from 132KV S/s Pithampur (to be upgrated) for Pithampur SEZ Phase-II of AKVN(2x0.54) (contr. work)

DCDS 0.54 1.08 Sept'16 10.09.2016

19 132 kv DCSS line Datiya - Dabra (1x23.091) PFC-III DCSS 23.09 23.09 Oct'16 comm. On

10.10.2016

20 2nd ckt of 132kv RTS Mangliyagaon line (Contr. Work) 2nd ckt. 8.82 8.82 Oct'16 comm. On

19.10.2016

21 2nd ckt of 132Kv Chhatarpur- Khajuraho line (1x0.5+33.2) ADB-III 2nd ckt. 32.00 32 Oct'16 comm on

19.10.2016

22 2nd ckt of 132kv Kukshi - Alirajpur line (1x1+35.82) ADB-III 2nd ckt. 35.82 35.82 Oct'16 comm. On

22.10.2016

23 2nd Ckt. Of 132 Kv DCSS Tikamgarh- Budhera line (32.138) ADB-III 2nd ckt. 32.14 32.14 Oct'16 comm. On

26.10.2016

24 LILO of 132 kv Manawar - Kukshi Line at 132Kv S/s Singhana(2x3.1) ADB-III

DCDS 3.10 6.2 Oct'16 comm on 27.10.2016

25

132Kv DCDS line for LILO of both circuit of 132Kv Banmore -Morena/Hetampur DCDS line for 220Kv S/s Morena(2x0.781+4x2.974) (PFC-III)

DCDS 3.755 13.46 Nov'16 comm. On 06.11.2016

Minutes of 55th OCCM of MP 26

Page 30: As per distribution list

26 LILO of 132 kv Chhegaon - Nepanagar Line at 132Kv S/s Pandhana(2x1.895) ADB-III

DCDS 1.895 3.79 Nov'16 comm. On 04.11.2016

27 LILO of Khargone - Julwaniya DP line(132Kv) at Talakpura (2x1.1+1x0.8) ADB-III

DCDS 1.900 3.80 Nov'16 comm. On 20.11.2016

II. EHV SUB - STATIONS

S. No.

NAME OF SUBSTATION / (DISTRICT) / (FINANCED BY)

VOLTAGE RATIO

(KV)

No.OF X-mer & Cap. (MVA)

EFFECTIVE CAPACITY

MVA

DATE OF COMPL- ETION

DATE OF COMMI-

SSIONING

A. 400 KV SUBSTATIONS

1 1x125 MVAR 400 Kv Bus Reactor at existing 400Kv S/s Nagda ADB-III 400Kv Aug'16 09.08.2016

Nil 0.00 B. 220 KV SUBSTATIONS

a. 220 KV NEW SUBSTATIONS

1 220kv switching S/s at Nagra Dist- Ratlam Contrib.

220/132 KV 0.00 0 May'16 30.05.2016

2 Mugaliachhap(Bhopal) 220kv (New S/s)(1x160+40) (JICA)

220/132 KV 1x160 160 June'16 20.06.2016

C. 132 KV SUBSTATIONS

a. 132KV NEW SUBSTATIONS

1 Pratappura 132 KV New S/s (1x40) ADB-III (Dist- Bhind) 132/33KV 1x40 40 April'16

12.04.2016(33KV side)

&31.08.2016 (132KV side)

2 Tamot 132kv s/s (Distt. Raisen ) 1x50MVA (Transco) 132/33KV 1x40 40 May'16 05.05.2016

3 Bhander 132kv s/s (Distt. Datia) 1x63 (ADB-II) 132/33KV 1x63 63 June'16 28.06.2016

4 Kothiya 132kv s/s (Distt. Guna ) 1x40 MVA (ADB-III) 132/33KV 1x40 40 June'16 09.06.2016

5 Katangi 132kv s/s with 1 no. 132 kv feeder bay & 1x40 MVA (Distt. - Jabalpur) (PFC-III)

132/33KV 1x40 40 June'16

28.06.2016 from 33kV

& 05.07.2016 from 132Kv

6 Pithampur SEZ- II 132kv s/s 1x63 MVA (Distt.Dhar) (contr.work) 132/33KV 1x63 63 Sept'16 19.09.2016

7 Singhana 132kv s/s (Distt. Dhar) 1x40 MVA (ADB-III) 132/33KV 1x40 40 Oct'16 comm on

27.10.2016

8 Pandhana 132kv s/s (Distt. Khandwa) 1x63 MVA (ADB-III) 132/33KV 1x63 63 Nov'16 comm. On

04.11.2016

Minutes of 55th OCCM of MP 27

Page 31: As per distribution list

9 Talakpura 132kv s/s (Distt. Barwani) 1x40 MVA (ADB-III) 132/33KV 1x40 40 Nov'16 comm. On

23.11.2016

Minutes of 55th OCCM of MP 28

Page 32: As per distribution list

EHV TRANSMISSION WORKS UNDER PROGRESS AS ON 30.11.2016 Annexure-2.3.4(ii)

S.

No.

NAME OF THE TRANSMISSION LINE

CKT. KMS.

PROGRESS

IN %

Target for commis- sioning

A. 400 KV TRANSMISSION LINES 1 NIL 0 0% -

Sub Total (A) 0 B. 220 KV TRANSMISSION LINES 1 2nd Ckt of 220kv Satna - Chhatarpur line (152) 160 8% 2016-17

2

Upgradation of 132KV D/C Indore-II (Jaitpura) - Indore(N/Z) line on composite multi circuit monopole & LILO of one Ckt of 220kv Indore-II (Jaitpura) - Indore(400KV) line at 220kv S/S Indore(N/Z) (2x0.5+2x4+4x6.7)

35.8

44%

2018-19

3 220Kv DCDS line from Gwalior(Malanpur)- Morena (2X29.25) 58.5 60% 2016-17

4 LILO of one Ckt of 220kv DCDS Ashta - Dewas line at 220kv S/S Chapda (DCDS) (2x32.782)

66

3%

2017-18

5 220Kv DCDS line from Pithampur-Depalpur line (2X31) 62 37% 2017-18

6 220Kv FCFS line for LILO of both Ckt. Of Badnagar -Ratlam D/C line at 400Kv S/s Badnawar (2x1+4x8)

34

4%

2017-18

7 220Kv DCDS Julwaniya- Kukshi (2X58) 116 16% 2017-18 8 220Kv DCSS Shujalpur- Narsinghgarh line (1X43.6) 44 15% 2017-18

9

220Kv DCDS Morena(400KV S/s CWRTL Adani Group) - Sabalgarh DCDS line (2X57.339)

114.678

4%

10

LILO of 2nd ckt. Of Bansagar - Satna 220Kv line at Kotar 220 KV S/s. (2X5.693)

11.386

8%

C. 132 KV TRANSMISSION LINES 1 132kv Ichhawar -Sehore DCSS line (1x35.298) 35.298 66% 2017-18 2 132 kv DCDS Ujjain(220 kv) -Chandrawatiganj line (2x35.42) 70.84 79% 2016-17 3 132 kv DCSS Dewas-Barotha line (1x23) 23 60% 2016-17 4 132 kv DCSS Ghatabillod-Betama line (1x18) 18 29% 2016-17 5 132kv DCSS Gautampur -Depalpur line (1x19) 19 20% 2016-17 6 132kv Nagda(220kv)- Kachrod-Jaora DCSS line (1x64) 64 18% 2016-17 7 132kv DCSS Shujalpur( 220kv) -Pachhore DCSS line (1x35.5) 35.5 81% 2017-18 8 132kv Mugaliya Chaap - Sehore DCSS line (1x24) 24 14% 2016-17

9

132 kv DCSS line between 132Kv S/s Nasrullaganj & 220KV Itarsi s/s(1x53.209)

53.209

38%

2017-18

10

LILO of S/C ckt of 132 KV Seoni-Lakhnadon line at 220kv S/S Seoni (2x20)

40

5%

2017-18

11 132 kv DCSS Guna-Eshagarh line (1x72) 72 32% 2017-18 12 132 kv DCSS Line from 220Kv S/s Shivpuri-132Kv Bairad (1x32.859) 32.859 32% 2017-18 13 132 kv DCSS from 220Kv S/s Datiya-132kv S/s Indergarh (1x27.1) 27.1 49% 2017-18 14 132 kv DCSS line from 132Kv S/s Kymore-132Kv S/s Barhi (1x35) 35 5% 2017-18 15 132 kv Sirmour - Katra DCDS line (2x37.67) 75.34 18% 2017-18

16

132 kv DCSS line from220Kv S/s Chichli - 132Kv Karapgaon (1x31.059)

31.059

3%

2017-18

17 132 kv Sagar-Rahatgarh DCSS line (1x55) 55 13% 2016-17 18 132Kv DCSS line from 220Kv S/s Rajgarh to 132Kv S/s Jhabua (1x50) 50 33% 2016-17

19

LILO of Both circuit of 132 kv DCDS Gwalior(Mahalgaon) - Dabra/Karera line at 220 KV S/s Gwalior II) (2x2x7.87)

55.09

36%

2016-17

21 132 kv DCSS Dewas-Agrod line (1x20.76) 20.76 24% 2017-18

22 132 kv DCSS Khurai- Khimlasa line (1x20.937) 20.937 20% 2017-18

Minutes of 55th OCCM of MP 29

Page 33: As per distribution list

23

LILO of 132Kv Mungaoli Traction feeder at 132Kv S/s Mungaoli (4x7.8+2x0.7) Note: (4x7.8ckt.km line charged on 30.12.2015 by tapping )

32.6

96%

2017-18

24 LILO of 132Kv Vidisha- Bairasiya line at salamatpurr (2x0.162) 0.324 46% 2016-17 25 132 kv DCDS Line Chichli - Udaypura (2x47) (On 220Kv Tower) 94 28% 2018-19 26 132 kv DCSS Panagar - Patan line (1x22.749) 22.749 7% 2017-18 27 132 kv DCSS Badnagar - Chhayan Line (1x31) 31 33% 2016-17 28 132 kv DCSS Dhar - Teesgaon line (1x15.35) 15.35 16% 2017-18

31

LILO of 132 kv Ratlam - Meghnagar line at 132Kv S/s Petlawad (2x7.4)

14.8

5%

32 132 kv DCDS Beragarh - Intkhedi (2x8.7+4x1.5) 23.4 55% 2017-18 33 132 kv DCSS Udaipura - Silvani line (1x25.8) 25.8 38% 2017-18 34 132 kv DCSS Narsinghpur - Devnagar (1x23) 23 13% 2017-18 35 132 kv DCSS Karakbel - Belkheda (1x24.445) 24.445 11% 2017-18 36 132 kv DCDS Narsinghpur - Karakbel line (2x23) 46 15% 2017-18 37 132KV DCSS Sabalgarh - Kelaras line (1x25) 25 7% 2016-17 38 132kv DCDS line from Guna - Bhonra (2x25) 50 5% 38 132kv DCSS line from Kolaras - Mada line (1x18.366) 18.366 2%

39

132kv Birsinghpur -Shahdol DCSS line (1x45) (Revised Estt. Sanc.no.0187dtd.05.09.2016)

45

5%

2018-19

40

132 kv DCSS Line from 220Kv S/s Barwaha - 132Kv S/s Kishangarh (1x57.139)

57.139

92%

2016-17

41

132Kv 2 phase 2wire line from 132Kv s/s Semri-Harchan for PS to RTS Bagra Tawa(1x4.3)

4.3

98%

42

132Kv DCSS 2 phase 2wire line from 132Kv s/s Majhgawan for PS to TSS Majhgawan(1x0.19)

0.19

89%

43

132Kv DCSS 2 phase 2wire line from 132Kv s/s Rewa for PS to TSS Rewa(1x0.4)

0.4

73%

44

132Kv DCSS line from proposed 132Kv s/s Tamot to Sagar Yarn plant of M/s Sagar Manufacturer (P) Ltd.(1x3.1)

3.1

30%

S.

No.

NAME OF THE SUBSTATION

EFFECTIVE CAPACITY

MVA

PROGRESS

IN %

Target for commis- sioning

A. 400 KV SUBSTATIONS

1 400 KV sub-station Balaghat/Kirnapur with 2x100MVA 400/220 kv x-MER+ 1X40 MVA X-mer (Distt.Balaghat)

200

9%

2017-18

2

400 KV sub-station Badnawar with 2x315MVA 400/220 KV X-mer (Distt.Balaghat)

630

8%

2017-18

3

Bhopal (Sukhi Sewaniya) 400/220 kv s/s Addl. 315 MVA X-mer (Distt.Bhopal)

315

19%

2016-17

4 Chhegaon 400/220 kv s/s Addl. 315 MVA X-mer (Distt.Khandwa) 315 31% 2016-17

B. a

220 KV SUBSTATIONS

1

Julwaniya 220/132kv S/s at 400kv s/s (Distt. Badwani) (2x160+40 MVA) (1No. 160MVA Charged on 21.08.2015)

320

79%

2016-17

2

Gwalior-II 220kv (New S/s)(2x160+40) (1x160 charged on31.3.2015)

160

95%

2016-17

3

Upgradation of Chapda 132Kv S/s to 220kv with 1x160MVA (Distt. )

160

2%

2017-18

4

Upgradation of Depalpur 132Kv S/s to 220kv with 1x160MVA(Distt. )

160

9%

2017-18

5 Adampur 220/33kv S/s 2x50MVA 100 6% 2017-18

Minutes of 55th OCCM of MP 30

Page 34: As per distribution list

6

Upgradation of Kukshi 132Kv S/s to 220kv with 1x160MVA (Distt. )

160

11%

2017-18

7

Morena 220/132kv S/s 1x160 +1x63 MVA +2No.220Kv FB +4No.132Kv FB+6No.33Kv FB+BC +Capacitor Bank

160

70%

2016-17

C. 132 KV SUBSTATIONS (a) NEW SUBSTATIONS 1 Rahatgarh132kv s/s (Distt.Sagar) 40 60% 2016-17

2 Bairad 132kv s/s(Dist.-Shivpuri ) 40 16% 2017-18

3 Barahi 132kv s/s (Distt.Katni) 40 11% 2017-18

4 Karapgaon 132kv s/s (Distt-Narsinghpur) 40 14% 2017-18

5 Indergarh 132kv s/s (Distt.Datia) 40 25% 2017-18

6 Biston 132kv s/s (Distt. ) 1x40 MVA 40 24% 2017-18

7 Agrod 132kv s/s (Distt. ) 1x40 MVA 40 56% 2017-18

8 Chhayan 132kv s/s (Distt. ) 1x40 MVA 40 76% 2016-17

9 Teesgaon 132kv s/s (Distt. ) 1x40MVA 40 20% 2016-17

12 Waraseoni 132kv s/s (Distt.Balaghat ) 1x40 MVA 40 2% 2017-18

13 Devnagar 132kv s/s (Distt. Narsighpur) ) 1x40 MVA 40 35% 2017-18

14 Belkheda 132kv s/s (Distt. Jabalpur) ) 1x40 MVA 40 4% 2017-18

15 Khimlasa 132kv s/s (Distt. ) 1x40 MVA 40 3% 2017-18

16 Karakbel 132kv s/s (Distt. Narsinghpur) 1x40 MVA 40 17% 2017-18

17 Chinaur 132kv s/s (Distt. ) 1x40 MVA 40 45% 2016-17

18 Kelaras 132kv s/s with 1x63 MVA (Distt. ) 63 23% 2016-17

19 Narsinghgarh 132kv s/s with 1x40 MVA (Distt. ) 40 7% 2016-17

20 Salamatpur 132kv s/s with 1x40 MVA (Distt. ) 40 51% 2016-17

21 Intkhedi 132kv s/s (Distt. ) 1x63 MVA 63 69% 2017-18

22 Silvani 132kv s/s with 1x40 MVA (Distt. ) 40 12% 2017-18

23 Udaipura 132kv s/s with 1x40 MVA (Distt. ) 40 20% 24 Bilkishganj 132kv s/s with 1x50 MVA (Distt. ) 50 16%

25

Kishangarh 132kv s/s with 1 no. 132 kv feeder bay & 1x40 MVA (Distt. Dewash)

40

95%

2016-17

25 Jobat 132kv s/s with 1x40 MVA (Distt. ) 40 17% 2017-18

Minutes of 55th OCCM of MP 31

Page 35: As per distribution list

ANNEXURE-2.4(ii)

LIST OF 33KV FEEDERS UNDER MPPKVVCL, INDORE (For which group to be allocated)

INDORE REGION

Name of EHV Substation

Name of 33KV feeder

Date of commissioning of feeder bay

Date of commissioning

of feeder 220KV

220KV Indore (Jetpura)-II

33KV PGCIL-II feeder 24.08.2014

132KV

132KV Raukhedi

33KV DLF-I 33KV DLF-II

01.03.2014 01.03.2014

132KV Badgaon

33KV Discom Bay

29.11.2014

25.09.2015

UJJAIN REGION

Name of EHV Substation

Name of 33KV feeder Date of commissioning of feeder bay

Date of Charging of feeder

220KV

220KV Barod 33KV M&B-I&II

132KV

132KV Susner 33KV Evershine 21.05.2014 132KV Agar 33KV Enercon-I

33KV Enercon-II 33KV M&B-I 33KV M&B-II

132KV Nalkheda 33KV Kachnariya 33KV Lasuldiya Kelwa

132KV Sonkatch 33KV Industrial (MPAKVN)

Minutes of 55th OCCM of MP 32

Page 36: As per distribution list

ANNEXURE-2.4(ii)

LIST OF 33KV FEEDERS UNDER MPPKVVCL,BHOPAL (For which group to be allocated)

BHOPAL REGION

Name of EHV Substation

Name of 33KV feeder Date of charging of feeder

220 KV 220 KV Betul 33 KV Industrial 13.06.2014

220 KV Vidisha 33 KV ISanchi 30.01.2015

132 KV 132 KV Bareli 33 KV Barna

33 KV Boras 19.02.2014 19.02.2014

132 KV Biora 33 KV Nagar Palika 33 KV Water Works

09.03.2014 09.03.2014

132 KV Shyampur 33 KV Jatkheda-I 33 KV Jatkheda-II

07.05.2014 07.05.2014

132 KV Runaha 33 KV Runaha 33 KV Nazirabad 33 KV Ramgarh 33 KV Nayasamand

15.04.2015 18.09.2015 19.09.2015 19.12.2015

132 KV MACT Bhopal 33 KV Bairagarh chichli-2 15.11.2014

132 KV Gopalpur 33 KV AE, PHE 27.02.2015

132 KV Amrawad Khurd 33 KV AIIMS Hospital 33 KV AIIMS Residence 33 KV C-21 Mall 33 KV Katara Hills-II

29.02.2016 29.02.2016 01.06.2016 01.06.2016

GWALIOR REGION

Name of EHV Substation

Name of 33KV feeder Date of charging of feeder

220 KV 220 KV Sagalgarh 33 KV Mangrol 30.05.2014

132 KV 132 KV Datia 33 KV Karapura 17.05.2014 132 KV Ron 33 KV Mangarh 21.11.2013 132 KV Morar 33 KV Readymade

Garment 22.08.2014

132 KV Motizheel 33 KV Transport Nagar 30.05.2015

Minutes of 55th OCCM of MP 33

Page 37: As per distribution list

Annexure-2.4(ii)

LIST OF 33KV FEEDERS UNDER MPPKVVCL, JABALPUR (For which group to be allocated)

JABALPUR REGION

Name of EHV

Substation

Name of 33KV feeder

Date of commission- ing of feeder

bay

Date of commission- ing of feeder

220KV

NIL

132KV

132KV Borgaon 33KV FS-II 26.02.2013 12.04.2016

Minutes of 55th OCCM of MP 34

Page 38: As per distribution list

Discoms wise Average Supply Hours Annexure 2.4(i)

PARTICULARS

East Zone

Central Zone

Oct-16

Nov-16

Oct-16

Nov-16

Commissinary HQ

23:51

23:55

23:40

23:40

District HQ

23:55

23:55

23:45

23:44

Tehsil HQ

23:49

23:51

23:34

23:34

Rural -Mixed

23:31

23:34

22:57

22:59

Rural -DLF

23:31

23:34

23:11

23:17

Rural -Irrigation

9:58

9:58

9:34

9:41

PARTICULARS

West Zone

MP

Oct-16

Nov-16

Oct-16

Nov-16

Commissinary HQ

23:53

23:56

23:47

23:49

District HQ

23:48

23:55

23:50

23:52

Tehsil HQ

23:40

23:51

23:42

23:45

Rural -3Phase

22:53

23:02

23:14

23:17

Rural -1Phase

23:28

23:37

23:23

23:29

Total Rural

9:44

9:52

9:45

9:50

Minutes of 55th OCCM of MP 35

Page 39: As per distribution list

PROPOSED SHUT DOWN PROGRAMME OF TANSMISSION ELEMENTS OF 400 KV EQUIPMENTS/FEEDER FOR THE DURATION 01-01-2017 TO 28-02-2017

Annexure-3.2

S- NO-

NAME OF 400KV SUBSTATION

NAME OF 400KV EQUIPMENT/FEED

ER/LINE

CIRC UIT NO-

DATE

PERIOD OF

DURATION IN HRS-

MAINTENANCE WORK PROPOSED

REMARKS

FROM

TO

1 Bina 400 220KV Gwalior - 13-Feb-17 09:00 17:00 8:00 For Bay Maintenance Work.

2 Bina 400 220KV Datiya - 20-Feb-17 09:00 17:00 8:00 For Bay Maintenance Work.

3 Mahalgaon 220 220KV PGCIL 1 17-Jan-17 09:00 17:00 8:00 Erection of 220KV CVT

4 Mahalgaon 220 220KV PGCIL 2 18-Jan-17 09:00 17:00 8:00 Erection of 220KV CVT

5 Mahalgaon 220 220KV Datia - 2-Feb-17 09:00 17:00 8:00 Erection of 220KV CVT

6 Mahalgaon 220 220KV Bina - 4-Feb-17 09:00 17:00 8:00 Erection of 220KV CVT

7 Mehgaon 220 220KV Auraiya - 7-Jan-17 09:00 17:00 8:00 For Post monsson Maintanence

8 Malanpur 220 220KV Auraiya - 6-Jan-17 09:00 17:00 8:00 For Post monsson Maintanence

9 Malanpur 220 220KV PGCIL 1 12-Jan-17 09:00 17:00 8:00 For Post monsson Maintanence

10 Malanpur 220 220KV PGCIL 2 13-Jan-17 09:00 17:00 8:00 For Post monsson Maintanence

11 Indore 400 400KV Nagda - 2-Jan-17 08:00 17:00 9:00 For Maintenance & relay testing work

12 Sukha 220 220KV ICT - 1 1 9-Jan-17 09:00 17:00 8:00 For Bay Maintenance Work.

13 Sukha 220 220KV ICT - 1 1 10-Jan-17 09:00 17:00 8:00 For Bay Maintenance Work.

14 Sukha 220 220KV ICT - 2 2 11-Jan-17 09:00 17:00 8:00 For Bay Maintenance Work.

15 Sukha 220 220KV ICT - 2 2 12-Jul-17 09:00 17:00 8:00 For Bay Maintenance Work.

Minutes of 55th OCCM of MP 36

Page 40: As per distribution list

Unitwise / Stationwise Genration in MU A. Thermal Annexure 4.1 Stn. Name UNIT No. Capacity

MW Oct-16 Nov-16

AM

AR

KA

NTA

K 3 120 0.00 0.00

4 120 0.00 0.00 PH II 240 0.00 0.00

5 210 150.27 124.09 PH III 210 150.27 124.09 TOT 210 150.27 124.09

SA

TPU

RA

6 200 91.93 35.30 7 210 29.66 74.33

PH II 410 121.59 109.62 8 210 5.97 0.00 9 210 25.21 0.00

PH III 420 31.18 0.00 10 250 115.94 159.71 11 250 156.81 175.40

PH IV 500 272.75 335.11 TOT 1330 425.51 444.73

SA

NJA

Y G

AN

DH

I

1 210 63.32 6.20 2 210 31.09 76.93

PH I 420 94.40 83.13 3 210 34.42 0.00 4 210 68.33 97.14

PH II 420 102.75 97.14 5 500 340.52 249.48

PH III 500 340.52 249.48 TOT 1340 537.68 429.75

SSTP

S

1 600 135.54 223.17 2 600 82.68 304.53

PH1 1200 218.22 527.70

MPPGCL THERMAL 4080 1331.68 1526.27 Note : 1. Amarkantak Thermal Power Station-II Unit # 4 De-commissioned wef 01-May-2014.

2. Amarkantak Thermal Power Station-II Unit # 3 De-commissioned wef 13-Jan-2015.

B. Hydel Station Name Capacity

MW Oct-16 Nov-16 GANDHISAGAR 115.0 9.55 16.85 R.P.SAGAR 172.0 41.26 76.58 J.SAGAR 99.0 28.32 47.05 CHAMBAL 386.0 79.13 140.48 M.P.CHAMBAL 193.0 39.56 70.24 PENCH 160.0 78.20 36.15 M.P.PENCH 107.0 52.13 24.10 BARGI 90.0 64.55 45.35 TONS 315.0 174.34 134.82 BIRSINGHPUR 20.0 6.96 0.67 B.SGR(DEOLONDH) 60.0 16.63 0.00 B.SGR(SILPARA) 30.0 9.79 14.02 RAJGHAT 45.0 0.01 8.90 M.P.RAJGHAT 22.5 0.01 4.45 B.SGR(JINHA) 20.0 10.63 14.86 MADIKHEDA 60.0 21.92 10.24 TOTAL HYDEL 1186.0 462.17 405.48 MPPGCL Hydel 915.0 392.59 281.85 MPSEB HYDEL Share 917.5 396.53 318.74 C. NHDC (Ex-Bus)

Station Name Capacity MW Oct-16 Nov-16

Indira Sagar Hydel Project 1000 335.190 233.380 Omkareshwar Hydel Project 520 143.582 95.498

Minutes of 55th OCCM of MP 37

Page 41: As per distribution list

S No. Source Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Total

A. M.P. Availability 1 Thermal 1534.26 1058.71 641.73 332.22 352.62 928.27 1206.18 1404.48 0.00 0.00 0.00 0.00 7458.46 2 Hydel 71.27 73.63 49.50 146.54 372.19 392.84 393.36 315.61 0.00 0.00 0.00 0.00 1814.95 3 Total 1605.53 1132.35 691.22 478.76 724.82 1321.11 1599.54 1720.09 0.00 0.00 0.00 0.00 9273.42

B. Exchange with other States / Systems 1 Indira Sagar 120.81 146.45 52.97 496.81 731.60 304.97 330.31 229.04 0.00 0.00 0.00 0.00 2412.96 2 Omkareshwar 65.89 75.81 31.09 215.83 290.23 131.97 143.58 95.50 0.00 0.00 0.00 0.00 1049.89 3 MPPMCL Schedule from Central Sector of WR 1753.12 1394.10 1634.96 1127.74 933.38 1494.56 1394.87 1744.29 0.00 0.00 0.00 0.00 11477.02 4 MPPMCL Schedule from Central Sector ER 47.17 31.17 15.19 4.98 11.58 14.23 14.21 12.01 0.00 0.00 0.00 0.00 150.55 5 Total MPPMCL Schedule from Central Sector (WR+ER) 1800.29 1425.27 1650.15 1132.72 944.96 1508.79 1409.08 1756.30 0.00 0.00 0.00 0.00 11627.57 6 Deviation Energy of (WR+ER) -47.47 -70.17 -59.80 -88.60 -92.98 -83.76 -97.98 -84.59 0.00 0.00 0.00 0.00 -625.35 7 Schedule From DVC ER 232.92 202.40 229.04 111.04 8.12 57.86 134.56 201.32 0.00 0.00 0.00 0.00 1177.27 8 Schedule From Sugen 0.00 0.00 0.00 4.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.80 9 LANCO Amk 195.30 186.44 187.18 144.74 54.50 140.13 149.39 148.45 0.00 0.00 0.00 0.00 1206.12

10 SASAN 988.04 886.52 921.35 834.99 589.41 616.28 784.87 988.66 0.00 0.00 0.00 0.00 6610.12 11 ESSAR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12 J P Nigri 278.92 323.20 295.64 250.95 308.17 318.10 326.63 309.14 0.00 0.00 0.00 0.00 2410.75 13 MB Power 63.53 131.56 84.34 18.07 14.29 43.26 51.57 139.47 0.00 0.00 0.00 0.00 546.10 14 JHABUA Power 0.00 20.41 3.30 0.00 0.00 0.00 0.00 0.21 0.00 0.00 0.00 0.00 23.92 15 STOA Schedule other than MPPMCL 0.00 0.00 64.44 75.76 80.19 19.73 49.39 -82.36 0.00 0.00 0.00 0.00 207.15 16 Himachal Pradesh HYDAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17 BARH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18 Schedule from Sardar Sarovar 8.89 19.97 78.71 257.09 527.28 268.86 313.48 77.27 0.00 0.00 0.00 0.00 1551.55 19 SCH to Railway from RGPPL_ebid 144.00 148.02 143.44 158.36 161.40 161.67 155.33 146.77 0.00 0.00 0.00 0.00 1218.99 20 Schedule from SEZ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21 Schedule from Rihand+Matatila 2.37 3.07 3.26 5.02 11.49 19.42 19.06 11.87 0.00 0.00 0.00 0.00 75.56

22 Medium Term Power Purchase from CSPDCL through PTC agaisnt PPA CSPDCCL dtd. 18.09.2012 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

23 Medium Term Power Purchase from Balco through PTC agaisnt PPA Balco dtd. 18.09.2012 Including Short term purchase against MTOA

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

24 Additional Power Purchase 6.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.53 25 Energy Exchange 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 26 Banking of Energy -145.84 -11.74 -77.54 -210.04 -297.14 -149.27 -1.48 527.43 0.00 0.00 0.00 0.00 -365.62 27 Sale of Power -321.72 -171.39 -105.78 -155.59 -512.51 -399.33 -472.36 -97.70 0.00 0.00 0.00 0.00 -2236.37 28 Total MP Schedule (Including Railway) 3253.22 3163.74 3477.52 2627.92 1890.17 2605.51 2919.52 4126.83 0.00 0.00 0.00 0.00 24064.44 29 Total MP Drawal (Including Railway) 3205.75 3093.57 3417.72 2539.32 1797.19 2521.75 2821.54 4042.24 0.00 0.00 0.00 0.00 23439.09 30 Wheeled Energy of Tawa HEG 0.00 0.00 0.00 6.87 11.38 8.33 5.95 10.89 0.00 0.00 0.00 0.00 43.41 31 Wheeled Energy of Wind Farm 18.13 9.25 25.91 19.94 12.96 6.17 6.30 2.33 0.00 0.00 0.00 0.00 100.99 32 Wheeled Energy of Solar Plant 16.07 15.81 13.19 8.67 8.05 12.82 14.09 14.40 0.00 0.00 0.00 0.00 103.11 33 Wheeled Energy of Ascent Hydro 1.39 1.16 0.67 0.05 0.13 0.98 0.62 0.54 0.00 0.00 0.00 0.00 5.54 34 POW ER PURCHASE by MPPMCL from BLA Power + JP BINA (Intra State STOA) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 35 Deviation Energy of MPPGCL Thermal 11.36 0.36 -7.88 -10.24 -10.91 2.46 9.39 0.31 0.00 0.00 0.00 0.00 -5.16 36 Energy Purchased by MP from Wind Farm 227.92 447.95 437.76 435.03 496.33 279.71 158.80 75.47 0.00 0.00 0.00 0.00 2558.97 37 Energy Purchased by MP from Solar Plant 87.17 87.65 75.92 76.23 48.36 77.74 85.50 86.28 0.00 0.00 0.00 0.00 624.87

38 Firm / Infirm Energy of HEG Mandideep+Hindalco+HEG Tawa +Trimula Ind. purchase by MP +Wheeled enrgy of CPP / IPP 20.37 8.23 8.07 21.17 23.00 50.10 -6.51 -25.86 0.00 0.00 0.00 0.00 98.55

39

Purchased from ASN Biomass Katni + RDM Care Ind. Biogas Pariyat + Pragya Energy Pvt. Ltd. Biogas Richhai+ Arya Energy Kotma + Orient Green Power Limited, Gadarawara Bio-Mass+Shaliwahna (CHH+Umariya) + JBP MSW

10.35

8.46

9.39

6.14

8.23

8.82

7.29

11.11

0.00

0.00

0.00

0.00

69.80

40 Deviation Energy of ISP 1.99 2.22 2.15 6.76 9.00 5.66 4.88 4.34 0.00 0.00 0.00 0.00 37.00 41 Schedule Energy of BLA Power against LTOA 7.85 1.92 2.76 1.09 0.16 1.69 0.00 0.00 0.00 0.00 0.00 0.00 15.45 42 Schedule Energy of JP BINA Power against LTOA 0.00 3.86 0.00 0.00 0.00 17.27 6.51 25.86 0.00 0.00 0.00 0.00 53.51 43 Import from bargi Left Bank Canal Power House + ISP NVDA 0.01 0.01 0.01 0.01 0.01 0.55 0.93 2.01 0.00 0.00 0.00 0.00 3.53 44 Chambal Complex Excess / less Overshare by MP -3.19 3.46 6.91 -6.51 -41.40 -14.62 -35.68 -59.26 0.00 0.00 0.00 0.00 -150.28 45 Rajghat Hydel Power Station Excess / Less Overshare by MP -0.03 0.01 -0.02 3.50 2.62 -0.02 -0.03 2.47 0.00 0.00 0.00 0.00 8.50

46 State Supply (Ex-Power st. Bus) 5397.37 5038.53 4767.84 4299.45 4111.75 4737.46 5153.00 6237.76 0.00 0.00 0.00 0.00 39743.15 47 AVERAGE DAILY (Ex-Bus) 179.91 162.53 158.93 138.69 132.64 157.92 166.23 207.93 #DIV/0! #DIV/0! #DIV/0! #DIV/0! 162.88 48 MINIMUM DAILY (MP Periphery) 167.37 137.08 134.68 107.18 92.82 135.71 143.39 189.11 0.00 0.00 0.00 0.00 92.82 49 MAXIMUM DAILY (MP Periphery) 177.75 174.97 166.73 144.25 142.69 177.30 194.93 214.77 0.00 0.00 0.00 0.00 214.77 50 State Supply (Ex-Power st. Bus):- YEAR : 2015-16 4281.50 4822.95 4090.97 4214.27 4371.53 5133.25 6395.72 6376.15 6847.93 6256.30 5773.75 5310.94 39686.35 51 Year ((16-17)-(15-16))*100/Year (15-16) 26.06 4.47 16.55 2.02 -5.94 -7.71 -19.43 -2.17 -100.00 -100.00 -100.00 -100.00 0.14 52 Unshedule L/S : Year-2016-17 0.00 5.37 0.00 0.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.64 53 Frequency Correction 3.92 1.95 2.34 1.38 1.52 1.86 1.89 3.34 0.00 0.00 0.00 0.00 18.20 54 Restricted Requirement : Year-2016-17 5401.30 5045.84 4770.18 4301.10 4113.27 4739.32 5154.89 6241.10 0.00 0.00 0.00 0.00 39767.00 55 Shedule L/S : Year-2016-17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56 Un-Restricted Requirement : Year-2016-17 5401.30 5045.84 4770.18 4301.10 4113.27 4739.32 5154.89 6241.10 0.00 0.00 0.00 0.00 39767.00

ENERGY BALANCE SHEET Year : 2016 - 17 Annexure 4.2

All figures in Million Unit

30

Minutes of 55th OCCM of MP 38

Page 42: As per distribution list

ENERGY BALANCE SHEET : Demand & Sypply Hours Year : 2016 - 17 Annexure 4.2

S.NO. Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Yr 16-17

C. MORNING PEAK (MAX) 1 DEMAND MET 7984 7347 7019 6147 6146 7909 8790 10816 0 0 0 0 10816 2 LOAD RELIEF 0 0 0 0 0 0 0 0 0 0 0 0 0

3 LOAD SHEDDING 0 0 0 0 0 0 0 0 0 0 0 0 0

D. EVENING PEAK (MAX) 1 DEMAND MET 8011 7902 7501 6903 6964 7963 8656 9487 0 0 0 0 9487 2 LOAD RELIEF 0 0 0 0 0 0 0 0 0 0 0 0 0

3 LOAD SHEDDING 0 0 0 0 0 0 0 0 0 0 0 0 0

F. REGISTERED MAXIMUM 8119 8045 7501 6903 6964 7963 8790 10816 0 0 0 0 10816 G. COMPUTED MAXIMUM DEMAND 8153 8050 7517 6913 6964 7978 8790 10839 0 0 0 0 10839

H. UNRESTRICTED MAXIMUM DEMAND 8153 8050 7517 6913 6964 7978 8790 10839 0 0 0 0 10839

I. Average Power Supply per day to 1. Div. Head Quarters 23:47 23:37 23:42 23:42 23:45 23:47 23:47 0:00 0:00 0:00 0:00 0:00 20:49 2. District Head Quarters 23:52 23:44 23:45 23:48 23:49 23:50 23:50 0:00 0:00 0:00 0:00 0:00 20:53 3. Tahsil Head Quarters 23:44 23:31 23:34 23:36 23:40 23:38 23:42 0:00 0:00 0:00 0:00 0:00 20:43 4. Rural -Mixed 23:25 22:52 22:54 22:56 23:05 23:10 23:14 0:00 0:00 0:00 0:00 0:00 20:15 5. Rural -DLF 23:32 23:09 23:06 23:12 23:18 23:17 23:23 0:00 0:00 0:00 0:00 0:00 20:25

6. Rural -Irrigation 9:51 9:37 9:37 9:39 9:42 9:43 9:45 0:00 0:00 0:00 0:00 0:00 8:30 J LOAD FACTOR % 92.33 79.51 82.87 78.80 74.42 78.71 74.88 77.48 #DIV/0! #DIV/0! #DIV/0! #DIV/0! 79.88

FREQUENCY ANALYSIS YEAR 2016-17

S.N PARTICULARS Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Yr 16-17

A. INTGRATED FREQUENCY 1 MAXIMUM 50.11 50.20 50.11 50.16 50.14 50.09 50.11 50.09 0.00 0.00 0.00 0.00 50.20

2 MINIMUM 49.80 49.78 49.82 49.82 49.67 49.85 49.89 49.78 0.00 0.00 0.00 0.00 49.67

B. INSTANTANEOUS FREQUENCY 1 MAXIMUM 50.32 50.44 50.37 50.35 50.35 50.24 50.25 50.27 0.00 0.00 0.00 0.00 50.44

2 MINIMUM 49.64 49.56 49.65 49.69 49.65 49.67 49.74 49.54 0.00 0.00 0.00 0.00 49.54 C. AVG FREQUENCY 49.98 50.00 50.00 50.01 50.00 50.00 50.00 49.99 0.00 0.00 0.00 0.00 50.00 D. % TIME WHEN FREQUENCY WAS

1 ABOVE 51.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 50.05 TO 51.5 Hz 16.98 23.12 18.28 23.65 20.32 19.00 19.80 19.04 0.00 0.00 0.00 0.00 20.05 3 49.9 TO 50.05 Hz 69.94 69.78 74.09 72.35 73.73 75.15 74.78 71.94 0.00 0.00 0.00 0.00 72.72 4 49.7 TO 49.9 Hz 12.92 6.96 7.50 3.90 5.83 5.75 5.42 9.02 0.00 0.00 0.00 0.00 7.14 5 49.5 TO 49.7 Hz 0.16 0.14 0.13 0.10 0.12 0.10 0.00 0.00 0.00 0.00 0.00 0.00 0.09 6 49.2 TO 49.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7 48.8 TO 49.2 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8 48.5 TO 48.8 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

9 BELOW 48.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Minutes of 55th OCCM of MP 39

Page 43: As per distribution list

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- October 2016

FIGURES IN MW

Hrs.

FREQ.

Own Generation Schedule from

Tot Avl.

Act. Drl

Deviation

Intra State STO

A

DEMAN D MET

Load Shedding REST.

DEMAN D

UNRES

T. DEMA

ND

THER.

Incl Aux

THER.

Excl Aux

HYD.

ISP

OSP

Total IPPs

Injecti on

Total CPPs Injecti

on

Total

CSS

DVC ER

Sugen

Lanco

Sasan

Essar

JP

Nigri

MB

Power

Jhabu

a Power

SSP

SCH

to Railw

ay

SE Z

Banking

Sale

Pur

Total MTO

A at

MP

STO

A

Riha nd+ Mata tila- Rajg hat

Total

SCH

UN

SCH

TOTAL

1:00

50.00

1752

1594

469

378

174

46

305

2967

1821

167

0

182

996

0

426

60

0

387

209

0

-108

-331

0

0

9

25

3843

6810

3745

-98

0

6712

0

0

0

6714

6714

2:00

50.01

1735

1579

456

321

150

46

303

2856

1675

142

0

172

983

0

422

62

0

391

208

0

-96

-219

0

0

11

25

3775

6631

3676

-99

0

6532

0

0

0

6534

6534

3:00

50.02

1730

1575

447

324

137

46

295

2825

1650

142

0

168

959

0

422

63

0

395

210

0

-92

-179

0

0

11

25

3774

6599

3722

-52

0

6547

0

0

0

6547

6547

4:00

50.02

1730

1574

459

334

143

47

293

2850

1688

142

0

165

950

0

422

64

0

389

207

0

-93

-239

0

0

11

25

3731

6581

3674

-57

0

6524

0

0

0

6525

6525

5:00

49.99

1727

1571

463

377

152

46

268

2878

1724

155

0

168

957

0

422

62

0

419

206

0

-114

-332

0

0

13

25

3707

6585

3687

-20

0

6565

0

0

0

6569

6569

6:00

49.97

1763

1604

503

442

187

47

242

3025

1810

167

0

189

993

0

414

62

0

412

206

0

-122

-460

0

0

11

25

3707

6732

3713

7

0

6738

0

0

0

6745

6745

7:00

50.00

1783

1622

521

506

217

47

250

3164

1810

184

0

192

987

0

406

64

0

453

212

0

-132

-563

0

0

63

25

3702

6866

3848

146

0

7012

0

0

0

7015

7015

8:00

50.02

1800

1638

491

466

201

48

347

3190

1762

175

0

196

988

0

406

64

0

486

211

0

135

-462

0

0

59

25

4044

7234

3888

-156

0

7078

0

0

0

7079

7079

9:00

50.00

1802

1640

500

470

209

47

442

3309

1810

188

0

199

997

0

408

64

0

481

211

0

132

-658

0

0

33

25

3889

7198

3769

-121

0

7078

0

0

0

7080

7080

10:00

50.02

1809

1646

492

437

202

47

550

3375

1890

188

0

206

1020

0

411

64

0

366

214

0

138

-839

0

0

9

25

3693

7068

3567

-126

0

6942

0

0

0

6943

6943

11:00

50.00

1810

1647

492

430

202

47

607

3424

1884

185

0

199

1017

0

415

64

0

346

211

0

138

-892

0

0

-11

25

3581

7005

3432

-149

0

6856

0

0

0

6858

6858

12:00

50.00

1789

1628

440

403

178

46

625

3320

1833

175

0

196

995

0

418

63

0

326

203

0

136

-923

0

0

-34

25

3414

6734

3201

-213

0

6521

0

0

0

6523

6523

13:00

50.01

1760

1602

446

403

177

46

594

3268

1763

170

0

192

1000

0

418

65

0

338

201

0

150

-974

0

0

-28

25

3321

6589

3318

-2

0

6586

0

0

0

6588

6588

14:00

50.00

1754

1596

477

418

191

46

549

3277

1748

171

0

196

990

0

418

65

0

331

199

0

146

-929

0

0

-17

25

3341

6618

3298

-43

0

6576

0

0

0

6579

6579

15:00

49.98

1747

1590

496

462

202

41

464

3255

1766

170

0

192

993

0

418

59

0

321

203

0

144

-973

0

0

-5

25

3313

6568

3302

-11

0

6557

0

0

0

6563

6563

16:00

49.98

1752

1594

494

459

204

41

353

3145

1759

156

0

182

1000

0

418

60

0

336

206

0

147

-895

0

0

13

25

3407

6553

3342

-65

0

6488

0

0

0

6494

6494

17:00

49.97

1784

1623

481

542

227

41

228

3143

1804

173

0

185

1021

0

420

61

0

405

207

0

154

-937

0

0

40

25

3557

6700

3453

-104

0

6596

0

0

0

6603

6603

18:00

49.98

1859

1692

555

624

259

42

183

3356

1932

201

0

206

1068

0

433

69

0

527

210

0

-123

-965

0

0

70

25

3654

7009

3614

-40

0

6970

0

0

0

6975

6975

19:00

50.02

1923

1750

554

626

279

43

240

3491

2115

280

0

237

1075

0

445

82

0

514

213

0

-117

-698

0

0

58

25

4229

7720

4089

-139

0

7581

0

0

0

7582

7582

20:00

50.02

1883

1713

553

523

231

48

277

3346

2106

236

0

230

1086

0

446

92

0

522

215

0

-113

-718

0

0

54

25

4180

7526

4066

-114

0

7412

0

0

0

7413

7413

21:00

50.02

1835

1670

540

488

221

48

298

3266

2046

191

0

210

1086

0

445

74

0

549

214

0

-88

-790

0

0

56

25

4017

7283

3918

-100

0

7184

0

0

0

7184

7184

22:00

50.06

1775

1615

523

460

200

47

319

3164

1959

159

0

202

1090

0

445

73

0

483

213

0

-82

-760

0

0

65

25

3871

7035

3775

-96

0

6939

0

0

0

6939

6939

23:00

50.02

1761

1603

530

424

193

47

325

3122

1849

166

0

196

1075

0

444

73

0

392

212

0

-72

-440

0

0

8

25

3928

7050

3974

46

0

7096

0

0

0

7096

7096

24:00

50.04

1746

1589

494

430

196

45

334

3088

1828

162

0

189

1034

0

439

67

0

335

208

0

-112

-269

0

0

6

25

3911

6999

3826

-85

0

6914

0

0

0

6914

6914

Avg. 50.01 1784 1623 495 448 197 46 362 3171 1835 177 0 194 1015 0 424 67 0 413 209 0 -2 -644 0 0 21 25 3733 6904 3662 -70 0 6833 0 0 0 6836 6836

00 TO 06 HRS.

50.00 1740 1583 466 363 157 46 284 2900 1728 153 0 174 973 0 421 62 0 399 208 0 -104 -293 0 0 11 25 3756 6656 3703 -53 0 6603 0 0 0 6606 6606

06 TO 12 HRS.

50.01

1799

1637

489

452

202

47

470

3297

1832

183

0

198

1001

0

411

64

0

410

210

0

91

-723

0

0

20

25

3720

7017

3617

-103

0

6914

0

0

0

6916

6916

12 TO 18 HRS.

49.99

1776

1616

492

485

210

43

395

3241

1795

174

0

192

1012

0

421

63

0

376

204

0

103

-945

0

0

12

25

3432

6673

3388

-44

0

6629

0

0

0

6634

6634

06TO 18 HRS.

50.00

1787

1627

490

468

206

45

433

3269

1813

178

0

195

1007

0

416

64

0

393

207

0

97

-834

0

0

16

25

3576

6845

3503

-74

0

6772

0

0

0

6775

6775

18 TO 24 HRS.

50.03

1820

1657

532

492

220

46

299

3246

1984

199

0

211

1074

0

444

77

0

466

213

0

-98

-612

0

0

41

25

4023

7269

3941

-81

0

7188

0

0

0

7188

7188

Minutes of 55th OCCM of MP 40

Page 44: As per distribution list

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- November 2016

FIGURES IN MW

Hrs.

FREQ.

Own Generation Schedule from

Tot Avl.

Act. Drl

Deviation

Intra State STO

A

DEMAN D MET

Load Shedding REST.

DEMAN D

UNRES

T. DEMA

ND

THER.

Incl Aux

THER.

Excl Aux

HYD.

ISP

OSP

Total IPPs

Injecti on

Total CPPs Injecti

on

Total

CSS

DVC ER

Sugen

Lanco

Sasan

Essar

JP

Nigri

MB

Power

Jhabu

a Power

SSP

SCH

to Railw

ay

SE Z

Banking

Sale

Pur

Total MTO

A at

MP

STO

A

Riha nd+ Mata tila- Rajg hat

Total

SCH

UN

SCH

TOTAL

1:00

50.01

2001

1821

297

188

92

245

163

2805

2337

228

0

179

1325

0

407

188

0

70

211

0

345

-6

0

0

-156

14

5143

7948

4974

-169

0

7779

0

0

0

7781

7781

2:00

50.02

1974

1797

272

142

69

245

151

2676

2236

228

0

179

1344

0

407

181

0

70

208

0

345

0

0

0

-145

14

5067

7743

4931

-136

0

7607

0

0

0

7607

7607

3:00

50.01

1982

1803

289

113

52

245

137

2639

2211

222

0

181

1374

0

407

182

0

70

209

0

345

0

0

0

-139

14

5076

7715

5068

-8

0

7707

0

0

0

7708

7708

4:00

50.00

1994

1814

301

142

61

245

127

2690

2250

223

0

181

1364

0

407

182

0

76

205

0

345

0

0

0

-138

14

5108

7798

5093

-15

0

7783

0

0

0

7785

7785

5:00

50.01

2012

1831

296

199

81

245

116

2767

2324

228

0

183

1324

0

407

182

0

91

204

0

345

-16

0

0

-153

14

5131

7898

5058

-73

0

7826

0

0

0

7829

7829

6:00

49.97

2081

1894

334

280

121

246

117

2991

2397

286

0

197

1324

0

407

187

0

127

205

0

345

-14

0

0

-157

14

5316

8308

5193

-123

0

8184

0

0

0

8192

8192

7:00

49.96

2234

2033

498

469

185

246

123

3554

2447

358

0

221

1328

0

410

186

0

152

210

0

345

-175

0

0

-67

14

5428

8982

5723

295

0

9277

0

0

0

9289

9289

8:00

49.98

2291

2085

467

413

173

246

274

3658

2437

319

0

239

1317

0

412

183

0

175

208

0

1280

-217

0

0

-91

14

6275

9932

6129

-146

0

9787

0

0

0

9794

9794

9:00

49.99

2307

2099

482

405

178

248

430

3843

2455

342

0

242

1322

0

414

187

0

165

208

0

1280

-262

0

0

-115

14

6251

10094

6154

-97

0

9997

0

0

0

10003

10003

10:00

50.01

2284

2078

442

389

172

251

528

3860

2458

340

0

235

1326

0

416

182

0

142

207

0

1280

-209

0

0

-166

14

6227

10087

6072

-155

0

9932

0

0

0

9935

9935

11:00

50.01

2224

2024

386

388

161

251

604

3814

2446

298

0

214

1326

0

418

182

0

116

203

0

1280

-201

0

0

-178

14

6120

9934

5857

-262

0

9672

0

0

0

9674

9674

12:00

50.02

2118

1928

324

310

132

250

628

3571

2365

265

0

197

1317

0

418

188

0

102

193

0

1280

-235

0

0

-185

14

5917

9488

5580

-337

0

9151

0

0

0

9153

9153

13:00

50.00

2111

1921

293

275

115

248

613

3465

2354

271

0

193

1318

0

416

188

0

95

186

0

1281

-251

0

0

-242

14

5823

9288

5907

84

0

9372

0

0

0

9375

9375

14:00

50.00

2093

1904

320

331

132

247

559

3494

2369

262

0

190

1308

0

417

189

0

89

187

0

1281

-161

0

0

-231

14

5912

9406

5859

-53

0

9353

0

0

0

9358

9358

15:00

49.97

2101

1912

316

310

136

247

453

3374

2371

263

0

190

1309

0

417

189

0

83

191

0

1281

-200

0

0

-215

14

5891

9265

5875

-17

0

9249

0

0

0

9258

9258

16:00

49.94

2113

1923

345

337

137

251

296

3289

2336

260

0

190

1310

0

418

189

0

83

194

0

1281

-128

0

0

-188

14

5957

9246

5858

-98

0

9147

0

0

0

9165

9165

17:00

49.97

2192

1994

493

541

213

251

113

3606

2420

294

0

207

1311

0

418

189

0

101

198

0

1231

-332

0

0

-162

14

5888

9494

5526

-362

0

9131

0

0

0

9141

9141

18:00

49.96

2287

2081

563

614

229

254

91

3832

2501

356

0

249

1311

0

423

189

0

110

211

0

346

-163

0

0

-89

14

5458

9290

5272

-186

0

9104

0

0

0

9116

9116

19:00

50.02

2252

2050

472

452

195

255

127

3550

2467

307

0

214

1310

0

427

189

3

90

211

0

346

-250

0

0

-32

14

5296

8847

5144

-153

0

8694

0

0

0

8695

8695

20:00

50.01

2131

1939

428

333

149

252

148

3249

2375

276

0

193

1310

0

427

189

3

99

209

0

346

-214

0

0

-49

14

5177

8426

5081

-95

0

8330

0

0

0

8332

8332

21:00

50.03

2046

1862

396

286

122

255

162

3083

2297

245

0

172

1312

0

424

189

3

125

210

0

346

-175

0

0

-85

14

5078

8161

4860

-218

0

7943

0

0

0

7943

7943

22:00

50.09

2014

1833

335

244

109

255

166

2943

2226

240

0

172

1312

0

421

187

0

110

213

0

346

-143

0

0

-137

14

4959

7902

4701

-258

0

7644

0

0

0

7644

7644

23:00

50.01

2017

1835

342

342

142

256

168

3085

2340

251

0

179

1312

0

417

188

0

113

210

0

346

-21

0

0

-165

14

5182

8267

5203

21

0

8288

0

0

0

8289

8289

24:00

50.05

2009

1829

348

349

139

247

162

3074

2335

257

0

179

1314

0

411

188

0

90

204

0

346

-4

0

0

-168

14

5165

8239

5049

-116

0

8123

0

0

0

8124

8124

Avg. 50.00 2119 1929 377 327 137 249 269 3288 2365 276 0 199 1322 0 415 186 0 106 204 0 733 -141 0 0 -144 14 5535 8823 5424 -112 0 8712 0 0 0 8716 8716

00 TO 06 HRS.

50.00 2007 1827 298 177 79 245 135 2761 2292 236 0 183 1343 0 407 184 0 84 207 0 345 -6 0 0 -148 14 5140 7902 5053 -87 0 7814 0 0 0 7817 7817

06 TO 12 HRS.

50.00

2243

2041

433

396

167

249

431

3717

2435

320

0

225

1323

0

415

185

0

142

205

0

1124

-217

0

0

-134

14

6036

9753

5919

-117

0

9636

0

0

0

9641

9641

12 TO 18 HRS.

49.97

2149

1956

388

401

160

250

354

3510

2392

284

0

203

1311

0

418

189

0

93

194

0

1117

-206

0

0

-188

14

5821

9331

5716

-105

0

9226

0

0

0

9236

9236

06TO 18 HRS.

49.98

2196

1999

411

398

164

249

393

3613

2413

302

0

214

1317

0

416

187

0

118

200

0

1120

-211

0

0

-161

14

5929

9542

5818

-111

0

9431

0

0

0

9438

9438

18 TO 24 HRS.

50.03

2078

1891

387

334

143

254

156

3164

2340

263

0

185

1311

0

421

188

1

104

209

0

346

-134

0

0

-106

14

5143

8307

5006

-137

0

8170

0

0

0

8171

8171

Minutes of 55th OCCM of MP 41

Page 45: As per distribution list

Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) Drawal Month :- October 2016

FIGURES IN MW

Hrs.

FREQ.

EZONE CZONE WZONE Railway

SCH

Demand

Met

O/U DRL

SCH LS

Unsch

LS

Restricte d

Demand

Unrestrict ed

Demand

SCH

Demand

Met

O/U DRL

SCH LS

Unsch

LS

Restricte d

Demand

Unrestrict ed

Demand

SCH

Demand

Met

O/U DRL

SCH LS

Unsch

LS

Restricte d

Demand

Unrestrict ed

Demand

Total Sch

Total

Drawal

1:00 50.00 2120 2091 -28 0 0 2092 2092 2295 2273 -21 0 0 2274 2274 2229 2137 -92 0 0 2138 2138 209 210

2:00 50.01 2064 2029 -35 0 0 2030 2030 2237 2216 -22 0 0 2217 2217 2197 2080 -117 0 0 2080 2080 208 207

3:00 50.02 2038 2018 -20 0 0 2018 2018 2177 2168 -9 0 0 2168 2168 2228 2147 -80 0 0 2148 2148 210 213

4:00 50.02 2021 1996 -24 0 0 1996 1996 2160 2130 -30 0 0 2131 2131 2257 2190 -67 0 0 2191 2191 207 208

5:00 49.99 2002 1996 -6 0 0 1997 1997 2136 2133 -3 0 0 2134 2134 2281 2233 -48 0 0 2234 2234 206 203

6:00 49.97 1974 2011 37 0 0 2013 2013 2114 2167 53 0 0 2169 2169 2341 2353 12 0 0 2356 2356 206 207

7:00 50.00 2000 2043 43 0 0 2044 2044 2110 2173 63 0 0 2174 2174 2518 2572 54 0 0 2573 2573 212 224

8:00 50.02 2081 2022 -59 0 0 2022 2022 2215 2170 -45 0 0 2170 2170 2683 2670 -13 0 0 2670 2670 211 216

9:00 50.00 2025 1977 -48 0 0 1978 1978 2196 2203 7 0 0 2204 2204 2707 2677 -30 0 0 2678 2678 211 220

10:00 50.02 1995 1939 -56 0 0 1939 1939 2175 2168 -7 0 0 2168 2168 2629 2614 -15 0 0 2615 2615 214 221

11:00 50.00 1972 1898 -74 0 0 1899 1899 2170 2144 -26 0 0 2145 2145 2606 2599 -8 0 0 2599 2599 211 215

12:00 50.00 1925 1814 -111 0 0 1814 1814 2145 2049 -96 0 0 2050 2050 2501 2464 -37 0 0 2465 2465 203 194

13:00 50.01 1892 1839 -53 0 0 1840 1840 2064 2050 -14 0 0 2051 2051 2507 2509 1 0 0 2509 2509 201 188

14:00 50.00 1859 1788 -71 0 0 1789 1789 2074 2008 -66 0 0 2009 2009 2549 2593 44 0 0 2595 2595 199 187

15:00 49.98 1841 1760 -81 0 0 1761 1761 2038 1977 -61 0 0 1978 1978 2568 2625 56 0 0 2627 2627 203 196

16:00 49.98 1812 1748 -64 0 0 1750 1750 1984 1929 -55 0 0 1931 1931 2551 2608 57 0 0 2611 2611 206 203

17:00 49.97 1823 1779 -44 0 0 1781 1781 1983 1958 -25 0 0 1960 1960 2595 2652 57 0 0 2655 2655 207 206

18:00 49.98 1955 2066 111 0 0 2068 2068 2078 2137 60 0 0 2139 2139 2558 2549 -9 0 0 2551 2551 210 217

19:00 50.02 2376 2403 27 0 0 2404 2404 2372 2381 9 0 0 2381 2381 2627 2573 -54 0 0 2573 2573 213 224

20:00 50.02 2380 2379 -1 0 0 2379 2379 2446 2379 -67 0 0 2379 2379 2473 2429 -44 0 0 2430 2430 215 225

21:00 50.02 2362 2317 -45 0 0 2317 2317 2426 2332 -94 0 0 2333 2333 2356 2308 -48 0 0 2309 2309 214 226

22:00 50.06 2276 2203 -73 0 0 2203 2203 2361 2246 -115 0 0 2246 2246 2320 2262 -58 0 0 2262 2262 213 227

23:00 50.02 2216 2201 -15 0 0 2201 2201 2389 2413 24 0 0 2413 2413 2365 2265 -99 0 0 2265 2265 212 217

24:00 50.04 2175 2132 -43 0 0 2132 2132 2379 2340 -38 0 0 2340 2340 2373 2234 -139 0 0 2234 2234 208 208

Avg. 50.01 2049 2019 -30 0 0 2020 2020 2197 2173 -24 0 0 2174 2174 2459 2431 -28 0 0 2432 2432 209 211

00 TO 06 HRS. 50.00 2036 2024 -13 0 0 2024 2024 2187 2181 -5 0 0 2182 2182 2256 2190 -65 0 0 2191 2191 208 208

06 TO 12 HRS. 50.01 2000 1949 -51 0 0 1949 1949 2169 2151 -17 0 0 2152 2152 2607 2599 -8 0 0 2600 2600 210 215

12 TO 18 HRS. 49.99 1864 1830 -34 0 0 1832 1832 2037 2010 -27 0 0 2011 2011 2555 2589 34 0 0 2591 2591 204 200

06TO 18 HRS. 50.00 1932 1890 -42 0 0 1890 1890 2103 2081 -22 0 0 2082 2082 2581 2594 13 0 0 2596 2596 207 207

18 TO 24 HRS. 50.03 2298 2273 -25 0 0 2273 2273 2396 2349 -47 0 0 2349 2349 2419 2345 -74 0 0 2345 2345 213 221

Minutes of 55th OCCM of MP 42

Page 46: As per distribution list

Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) Drawal Month :- November 2016

FIGURES IN MW

Hrs.

FREQ.

EZONE CZONE WZONE Railway

SCH

Demand

Met

O/U DRL

SCH LS

Unsch

LS

Restricte d

Demand

Unrestrict ed

Demand

SCH

Demand

Met

O/U DRL

SCH LS

Unsch

LS

Restricte d

Demand

Unrestrict ed

Demand

SCH

Demand

Met

O/U DRL

SCH LS

Unsch

LS

Restricte d

Demand

Unrestrict ed

Demand

Total Sch

Total

Drawal

1:00 50.01 2283 2221 -62 0 0 2222 2222 2741 2770 28 0 0 2770 2770 2705 2574 -132 0 0 2575 2575 211 214

2:00 50.02 2179 2114 -65 0 0 2114 2114 2633 2648 15 0 0 2648 2648 2677 2631 -46 0 0 2631 2631 208 214

3:00 50.01 2117 2088 -29 0 0 2088 2088 2500 2587 87 0 0 2587 2587 2800 2818 18 0 0 2818 2818 209 215

4:00 50.00 2090 2043 -47 0 0 2044 2044 2528 2569 41 0 0 2569 2569 2893 2958 65 0 0 2959 2959 205 213

5:00 50.01 2104 2049 -55 0 0 2050 2050 2537 2579 42 0 0 2580 2580 2930 2990 60 0 0 2991 2991 204 207

6:00 49.97 2182 2135 -47 0 0 2137 2137 2612 2656 43 0 0 2658 2658 3107 3182 75 0 0 3185 3185 205 212

7:00 49.96 2339 2429 91 0 0 2432 2432 2690 2923 233 0 0 2927 2927 3549 3704 155 0 0 3708 3708 210 221

8:00 49.98 2564 2454 -109 0 0 2456 2456 2991 2979 -12 0 0 2981 2981 3970 4140 170 0 0 4143 4143 208 213

9:00 49.99 2607 2451 -156 0 0 2453 2453 3051 3052 1 0 0 3054 3054 4104 4280 176 0 0 4282 4282 208 214

10:00 50.01 2624 2434 -190 0 0 2435 2435 3079 3041 -38 0 0 3042 3042 4099 4244 144 0 0 4245 4245 207 213

11:00 50.01 2645 2381 -263 0 0 2382 2382 3110 2986 -124 0 0 2987 2987 4049 4095 46 0 0 4096 4096 203 210

12:00 50.02 2549 2246 -304 0 0 2246 2246 2995 2772 -223 0 0 2773 2773 3851 3937 86 0 0 3938 3938 193 196

13:00 50.00 2458 2300 -158 0 0 2301 2301 2832 2866 35 0 0 2867 2867 3872 4020 148 0 0 4022 4022 186 186

14:00 50.00 2411 2157 -254 0 0 2158 2158 2894 2805 -89 0 0 2806 2806 4012 4203 191 0 0 4205 4205 187 188

15:00 49.97 2341 2129 -212 0 0 2131 2131 2821 2742 -79 0 0 2745 2745 3954 4183 228 0 0 4187 4187 191 195

16:00 49.94 2346 2131 -215 0 0 2135 2135 2789 2702 -87 0 0 2708 2708 3946 4117 171 0 0 4125 4125 194 197

17:00 49.97 2355 2172 -183 0 0 2174 2174 2814 2743 -72 0 0 2746 2746 3915 4011 97 0 0 4016 4016 198 205

18:00 49.96 2510 2513 3 0 0 2516 2516 2900 2876 -24 0 0 2880 2880 3559 3496 -63 0 0 3500 3500 211 219

19:00 50.02 2656 2659 2 0 0 2659 2659 2793 2762 -31 0 0 2762 2762 3225 3053 -172 0 0 3054 3054 211 220

20:00 50.01 2583 2599 16 0 0 2600 2600 2730 2701 -29 0 0 2701 2701 2940 2811 -129 0 0 2811 2811 209 220

21:00 50.03 2486 2474 -12 0 0 2474 2474 2646 2615 -31 0 0 2615 2615 2786 2631 -156 0 0 2631 2631 210 223

22:00 50.09 2371 2293 -78 0 0 2293 2293 2567 2492 -75 0 0 2492 2492 2767 2636 -131 0 0 2636 2636 213 223

23:00 50.01 2409 2419 9 0 0 2419 2419 2757 2931 174 0 0 2931 2931 2856 2720 -136 0 0 2720 2720 210 219

24:00 50.05 2352 2314 -38 0 0 2314 2314 2811 2861 50 0 0 2861 2861 2877 2740 -137 0 0 2740 2740 204 208

Avg. 50.00 2398 2300 -98 0 0 2301 2301 2784 2777 -7 0 0 2779 2779 3394 3424 30 0 0 3426 3426 204 210

00 TO 06 HRS. 50.00 2159 2108 -51 0 0 2109 2109 2592 2635 43 0 0 2636 2636 2852 2859 7 0 0 2860 2860 207 213

06 TO 12 HRS. 50.00 2555 2399 -155 0 0 2401 2401 2986 2959 -27 0 0 2961 2961 3937 4067 130 0 0 4069 4069 205 211

12 TO 18 HRS. 49.97 2404 2234 -170 0 0 2236 2236 2842 2789 -53 0 0 2792 2792 3876 4005 129 0 0 4009 4009 194 198

06TO 18 HRS. 49.98 2479 2316 -163 0 0 2318 2318 2914 2874 -40 0 0 2876 2876 3907 4036 129 0 0 4039 4039 200 205

18 TO 24 HRS. 50.03 2476 2460 -17 0 0 2460 2460 2717 2727 10 0 0 2727 2727 2909 2765 -144 0 0 2765 2765 209 219

Minutes of 55th OCCM of MP 43

Page 47: As per distribution list

ANNEXURE-5.0

System Disturbance / System Incidence

1. System Disturbance on 01.10.2016 at 220 KV S/s Shivpuri: On dated 01.10.2016 at around 16:15 Hrs. M.P system was normal and frequency of National Grid was 50.06 Hz. Prior to fault there was heavy rain & storm in Shivpuri & Bina area. At around 16:21 Hrs. 220 KV Shivpuri – Bina (MPPTCL) Ckt & 220 KV Shivpuri – Bina (PGCIL) Ckt tripped due to transient fault. Simultaneously 132 KV Shivpuri – Pichhore Ckt tripped due to overloading. Due to the tripping of above feeders interruption occurred at 220 KV S/s Sabalgarh, 220 KV S/s Shivpuri, 132 KV S/s Shivpuri, Kolaras, Mohna, Vijaypur, Sheopur Kalan, Baroda & Jora and there was load loss of about 299MW. There was no generation loss and System was normalized in due course of time.

2. System Disturbance on 02.10.2016 at 220 KV S/s Chhindwara: On dated 02.10.2016 at around 15:10 Hrs. M.P system was normal and frequency of National Grid was 50.10Hz. At around 15:15 Grs. 220 KV R-Phase PT of 220 KV Main Bus – II failed at 220 KV S/s Chhindwara resunting in 220 KV Main Bus – II bus fault and 220 KV Main Bus – II Bus Bar Protection operated. Consequently tripping of following connected feeders and transformers:- 220 KV Chhindwara – Betul Ckt, 220 KV Chhindwara – Seoni Ckt, 220/132 KV, 160 MVA X’mer – II & 220 KV Bus Tie at 220 KV S/s Chhindwara. Due to the above tripping there was no interruption in any area and hence no load loss. There was no generation loss and System was normalized in due course of time.

3. System Disturbance on 06.10.2016 at 220 KV S/s Maihar : On dated 06.10.2016 at around 13:10 Hrs. M.P system was normal and frequency of National Grid was 50.07 Hz. Prior to fault 132 KV Maihar – Satna Ckt and 132 KV Amarpatan – Zinna Ckt was kept open for load management. At around 13:16 Hrs. due to transient fault 132 KV Maihar – Kymore Ckt tripped from 132 KV S/s Kymore end only. The 132 KV Maihar – Kymore Ckt did not trip from 132 KV S/s Maihar end due to problem in its Master trip relaya, consequently fault persisted and resulted in tripping of 220/132 KV, 160 MVA X’mer at 220 KV S/s Maihars. Due to the above tripping 132 KV supply failed at 220 KV S/s Maihar & 132 KV S/s Amarpatan and there was load loss of 62 MW. There was no generation loss and System was normalized in due course of time.

4. System Disturbance on 08.10.2016 at 220 KV S/s Anuppur: On dated 08.10.2016 at around 11:40 Hrs. M.P system was normal and frequency of National Grid was 50.01 Hz. Prior to fault 132 KV Rajmilan – Morwa Ckt & 132 KV Rajmilan – Waidhan Ckt was kept open for load management. At around 11:46 Hrs. transient fault occurred on 132 KV Shahdol – Anuppur Ckt but the Ckt did not trip from either end due to relay problem at 220 KV S/s Anuppur end. The fault was fed through 132 KV Main Bus at 220 KV S/s Anuppur resulting in tripping of all the elements connected to 132 KV Main Bus as follows:- 220/132 KV, 160 MVA X’mer – I & II, 132 KV Anuppur – Kotma Ckt – I & II. Due to this tripping 132 KV supply failed at 220 KV S/s Anuppur, 132 KV S/s Shahdol, 132 KV S/s Dindori, 132 KV S/s Dongrital & 132 KV S/s Rajmilan and there was load loss of about 62 MW occurred. There was no generation loss and System was normalized in due course of time.

5. System Disturbance on 15.10.2016 at 132 KV S/s Damoh: On dated 15.10.2016 at around 20:25 Hrs. M.P system was normal and frequency of National Grid was 50.00 Hz. At around 20:26 Hrs. ‘R’-Phase CT of 132 KV Interconnector – II burst at 132 KV S/s Damoh resulting

Minutes of 55th OCCM of MP 44

Page 48: As per distribution list

in tripping of 132 KV Interconnector-I and 132 KV Damoh – Hatta Ckt. Simultaneously 220/132 KV, 160 MVA X’mer – I & II at 220 KV S/s Damoh tripped due to jerk. Due to the above tripping interruption occurred at 132 KV S/s Damoh and there was load loss of about 12.2MW. There was no generation loss and System was normalized in due course of time.

6. System Disturbance on 16.10.2016 at STPS: On dated 16.10.2016 at around 11:20 Hrs. M.P system was normal and frequency of National Grid was 50.04 Hz. At 11:27 Hrs. tree fault fault occurred on 400 KV STPS – ISP Ckt and the feeder tripped from ISP end only. As the circuit breaker at STPS did not operate, resulting in operation of LBB Protection of 400 KV STPS – ISP Ckt at STPS end which initiated the operation of 400 KV Bus Bar Protection of 400 KV Main Bus – I at STPS. Consequently 400 KV STPS – ISP Ckt, 400 KV STPS – Seoni Ckt, 400 KV STPS – Astha Ckt – I, 400 KV Bus Coupler, 400/220 KV,500 MVA ICT, 62 MVAR Bus Reactor and Unit # 11 at STPS tripped. Due to the above tripping there was no load loss. There was generation loss of about 167 MW and System was normalized in due course of time.

7. System Disturbance on 17.10.2016 at 400 KV S/s Chhegaon: On dated 17.10.2016 at around 01:10 Hrs. M.P system was normal and frequency of National Grid was 49.97 Hz. At around 01:14 Hrs. ‘R’-phase PT of 220 KV Main Bus – II burst at 400 KV S/s Chhegaon resulting in 220 KV Bus fault and 220 KV Main Bus –II Bus Bar Protection operated at 400 KV S/s Chhegaon. Consequently 220 KV Chhegaon – Nimrani Ckt – II, 220 KV Chhegaon – Nepanagar Ckt, 220 KV Chhegaon – SSTPS Ckt – I & II, 220 KV Chhegaon – Khandwa Ckt – II, 220/132 KV and 160 MVA X’mer – II tripped at 400 KV S/s Chhegaon. Due to the above tripping there was no interruption in any area and hence no load loss. There was no generation loss and System was normalized in due course of time.

8. System Disturbance on 17.10.2016 at 400 KV S/s Chhegaon: On dated 17.10.2016 at around 01:10 Hrs. M.P system was normal and frequency of National Grid was 49.97 Hz. At around 01:14 Hrs. ‘R’-phase PT of 220 KV Main Bus – II burst at 400 KV S/s Chhegaon resulting in 220 KV Bus fault and 220 KV Main Bus – II Bus Bar Protection operated at 400 KV S/s Chhegaon. Consequently 220 KV Chhegaon – Nimrani Ckt – II, 220 KV Chhegaon – Nepanagar Ckt, 220 KV Chhegaon – SSTPS Ckt – I & II, 220 KV Chhegaon – Khandwa Ckt –II, 220/132 KV and 160 MVA X’mer – II tripped at 400 KV S/s Chhegaon. Due to the above tripping there was no interruption in any area and hence no load loss. There was no generation loss and System was normalized in due course of time.

9. System Disturbance on 23.10.2016 at 220 KV yard of 400 KV S/s Sukha: On dated 23.10.2016 at around 21:50 Hrs. M.P system was normal and frequency of National Grid was 50.12 Hz. At around 21:57 Hrs. 220 KV side LBB Protection of 400//220 KV, 315 MVA X’mer – I operated at 400 KV S/s Sukha (PGCIL) due to cable fault. Consequently Bus Bar Protection of 220 KV Main Bus – I operated and resulted in tripping of 220 KV Sukha – Panagar – I, 220 KV Sukha – Jabalpur – I, 220 KV Sukha – Narsinghpur and 220 KV Bus Tie. Due to the above tripping there was no interruption in any area and hence no load loss. There was no generation loss and System was normalized in due course of time.

10. System Disturbance on 09.11.2016 at 220 KV Tons HPS :On dated 09.11.16 at 07:35 Hrs. 220 KV Tons-Rewa Ckt I and Ckt II tripped from Tons end.These both ckt got tripped with no indication at Tons end along with 220 KV Bus coupler and because of problem in Unit no.2 .The 220 KV Tons-Rewa Ckt I,Ckt II and 220 KV Bus Coupler were normalized at 09:06 Hrs,09:07 Hrs and 12:17 Hrs respectively on 09.11.2016.

Minutes of 55th OCCM of MP 45

Page 49: As per distribution list

11. System Disturbance on 10.11.2016 at 220 KV S/s Pipariya : On dated 10.11.2016 from 09:32 Hrs shutdown was taken on 160 MVA Areva make Xmer for PMM work. After completion of the work at 16:41 Hrs. Xmer was charged but did’nt hold and its incoming CB’s LBB operated resulting in tripping of all 220 KV feeders connected on Main Bus-I (220 KV Narsingpur ,220 KV Itarsi II and bus tie got tripped .The system was normalized at 18:16 Hrs on 10.11.2016 after necessary measures.

12. System Disturbance on 14.11.2016 at 220 KV yard STPS Sarni : On 14.11.2016 at 05:14 Hrs. 220 KV Sarni(PH)-Sarni-IC-I tripped at STPS end along with 220 KV STPS-Itarsi Ckt III, 500 MVA ICT at STPS .Further 220 KV Sarni –STPS IC I tripped at 10:01 Hrs due to B-Phase CT burst at STPS yard along with STPS-Sarni IC II.500 MVA ICT at STPS, 220 KV STPS-Sarni IC II and 220 KV STPS-Itarsi III were normalized at 07:21 Hrs, 11:20 Hrs and 19:20 Hrs respectively. Later on after replacement of 220 KV B-phase CT , 220 KV Sarni-STPS IC-I was normalized at 00:07 Hrs on 16.11.2016.

13. System Disturbance on 19.11.2016 at OSP HPS : On dated 19.11.2016 220 KV OSP-

Barwaha tap Nimrani feeder tripped at 01:20 Hrs with operation of 220 KV Bus bar protection of Bus-A along with 220 KV Bus coupler ,220 KV OSP-Khandwa and 220 KV OSP-Julwania Ckt .Thereafter Unit no.III desyncronised and SF6 Gas pressure low alarm noticed on OSP-Barwaha feeder.220 KV Bus Coupler , OSP-Barwaha Ckt, OSP-Julwania feeder and OSP-khandwa feeder were normalized at 02:20 Hrs,02:31 Hrs.02:32 Hrs, and 02:45 Hrs.respectively.

14. System Disturbance on 21.11.2016 at 220 KV Satna : On dated 21.11.2016 at 04:22 Hrs 220 KV Satna-Chhatarpur Ckt tripped on Zone I,R-phase to ground,at both end.The ckt was charged at 04:27 Hrs but the line didn’t hold and declared faulty.It was intimated that at location no.239 of 220 KV Satna-Chhatarpur top and middle phase disc flashover tripping occured.Alternate supply was resumed by charging 132 KV Chhatarpur-bijawar line at 04:45 Hrs.

15. System Disturbance on 22.11.2016 at 220 KV S/s Shujalpur : On dated 22.11.2016 at 12:14 Hrs,220 Kv Bhopal-Shujalpur Ckt I tripped from Shujalpur end on Zone-I R-Phase indication with LBB operation,resulting in tripping of 160 MVA Xmer –I,Xmer-II and Xmer-III and 220 KV PGCIL-I ckt at Shujalpur .The 160 MVA Xmer –I,Xmer-III and Xmer-II and 220 KV PGCIL-I ckt were normalized at 12:21 Hrs,12:22 Hrs,13:10 Hrs and 12:34 Hrs respectively.

Minutes of 55th OCCM of MP 46

Page 50: As per distribution list

Minutes of 55th OCCM of MP 47

Page 51: As per distribution list

Minutes of 55th OCCM of MP 48

Page 52: As per distribution list

Minutes of 55th OCCM of MP 49

Page 53: As per distribution list

Minutes of 55th OCCM of MP 50

Page 54: As per distribution list

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER ANNEXURE 10.2

1 400 KV BUS 2 VOLTAGE/FREQ N/C2 400/220 Kv Xmer-2 CB faulty.

1 132/33 KV TR CB FAULTY CLOSE2 132 KVBUSCOUPLER CB FAULTY CLOSE3 220 KV BUS COUPLER CB FAULTY CLOSE

1 132 KV BUS COUPLER CB FAULTY2 220/132 TR 3(160MVA 2) OLTC MW/MVAR INCORRECT VALUES.

1 BPL400-BDTL 765 1 & 2 TIE CB FAULTY2 80 MVAR REACTOR CB FAULTY3 400/220 ICT 1 & 3 CB FAULTY

1 132 KV TRACTION-2 CB FAULTY

1 220 KV BUS FREQUENCY N/A2 160 MVA XMER-1&2 OLTC Non-current3 160 MVA -1(132 KV SIDE) CB FAULTY4 132 KV BUS VOLTAGE,FREQUENCY INCORRECT/NON CURRENT 10

1 132 KV DATIA CB FAULTY CLOSE2 132 KV RAJGHAT CB FAULTY CLOSE3 132/33 KV TR NGEF CB FAULTY CLOSE

1 220 KV BUS-COUPLER CB FAULTY2 220 KV BUS-2 VOLTAGE,FREQUENCY Non-current

220 KV BUS-2 VOLTAGE,FREQUENCY INCORRECT/NON CURRENT1 132/33 TR 4 CB FAULTY CLOSE

1 132 KV GADARWARA CB MW/MVAR TRANSIT/NON CURRENT CLOSE2 220/132 TR 2 CB MW/MVAR N/A3 220 KV CHICHLI MW/MVAR N/A 40/05

1 220/132 KV TR 2 MW/MVAR/CB N/APROCESSES CONNECTION REQUIRED

2 220 KV BUS-COUPLER CB FAULTY3 220 KV BUS-2 VOLTAGE,FREQUENCY Non-current4 132 KC XMER-1 CB FAULTY

220 KV BINA MW/MVAR/CB Non-current/FAULTY

40 MVA XMER CB Non-current

132 KV BUS COUPLER CB FAULTY Open

132 KV TRACTION-1 MW/MVAR Non-currentALL 220KV &132KV CB NON CURRENT CLOSE

MANDIDEEP 220 KV S/S

HARDA 132 KV S/S

ASHTA 400 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDGUNA 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDGWALIOR 220 KV S/S

BHOPAL 400 KV S/S

SARNI 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDMALANPUR 220 KV S/S

PICHORE 132 KV S/S

ALL CB FAULTY EXCEPT HANDIA1

DATIA 220 KV S/S

GANJBASODA 220 KV S/S

ITARSI 220 KV S/S

PIPARIA 220 KV S/S

SHIVPURI 220 KV S/S

ASHOKNAGAR 220 KV S/S

VIJAYPUR 132 KV S/S

Minutes of 55th OCCM of MP 51

Page 55: As per distribution list

Minutes of 55th OCCM of MP 52

Page 56: As per distribution list

1132 KV JULWANIA-NIMRANI CKT I CB/SOE N/C

2132 KV JULWANIA-NIMRANI CKT II CB/SOE N/C

3 132 KV JULWANIA-ANJAD CKT CB/SOE N/C4 132 KV JULWANIA- I/C I CB/SOE N/C5 132 KV JULWANIA- I/C II CB/SOE N/C6 400KV BUS 2 KV N/C7 400KV BUS 2 HZ N/C8 132/33 KV 40 MVA TR CB FAULTY

1 220/132 KV TR OLTC N/A2 132/33 KV TR I CB/OLTC FAULTY3 132/33 KV TR II OLTC N/A4 132 KV NIMRANI CB FAULTY CLOSE

1 220/132 TR2 160MVA OLTC N/A2 220/132 TR 1 4*40 MVA OLTC N/A3 220/132 TR2 160MVA MW Direction wrong4 220/132 TR 1 4*40 MVA MW Direction wrong Need to be reverse from field

1 220 KV BUS COUPLER CB FAULTY CLOSE

2220/132 KV TR 160 MVA (PRIMARY) CB FAULTY CLOSE

2 220/132 TR 3 P CB FAULTY3 400 KV REACTOR CB FAULTY4 400 KV BUS COUPLER CB FAULTY OPEN5 63 MVA TR CB FAULTY CLOSE6 220 kV BUS I & II FREQ NOT SHOWING IN DECIMAL POINT

1 132 KV I/C 2 MW N/C 2 220 KV B/C CB FAULTY3 132 KV RATANGARH II MW/MVAR/CB N/C

1 220KV BUS COUPLER CB FAULTY CLOSE2 132 KV BUS COUPLER CB FAULTY OPEN3 132 KV SARANGPUR II CB FAULTY CLOSE4 132 KV CAPECITOR BANK CB FAULTY CLOSE5 132 KV KURAWAR CB FAULTY CLOSE6 132 IC-1 MW,MVAR N/A PROCESSES CONNECTION REQUIRED

7132 IC-2 MW,MVAR N/A PROCESSES CONNECTION REQUIRED

1220/132 KV TR (160 MVA) 2 SECONDARY CB FAULTY CLOSE

2 132 KV BUS COUPLER CB FAULTY CLOSE3 220/132 KV TR (160 MVA) 2 SECCB N/A CLOSE

1 132 KV BUS COUPLER CB FAULTY CLOSE2 132 KV GRASIM CB FAULTY CLOSE

JULWANIA 400 KV S/S

PROCESSES CONNECTION REQUIRED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDNEPANAGAR 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SHUJALPUR 220 KV S/S

BADOD 220 KV S/S

JULWANIA 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDBARWAHA 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

NEEMUCH 220 KV S/S

CHEGAON 400 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDNAGDA 220 KV S/S

Minutes of 55th OCCM of MP 53

Page 57: As per distribution list

3 132 KV MAHIDPUR -2 MW,MVAR N/A4 132 KV CAP BANK MVAR N/C

1 400KV BUS TIE CB FAULTY CLOSE2 400 KV RAJGRAH 1 CB FAULTY CLOSE3 400 KV DEHGAON LINE REACTOMVAR N/A4 400 KV ISP LINE REACTOR MVAR FUTURE FUTURE5 400 KV SHUJALPUR I MVAR N/A6 220 KV BUS II KV/FREQ N/A

1 132 KV SIDTUBE CB /MW/MVAR N/A2 132 KV INOX CKT (RE) CB /MW/MVAR N/A8

1 220 KV BUSCOUPLER CB FAULTY CLOSE2 220 KV INDORE CB FAULTY CLOSE

2 220/132 TR 1 & 2 OLTC N/A3 132/33 TR CB/OLTC N/A

1 220 KV MAHESHWAR 2 CB FAULTY OPEN2 220/132 TR1 OLTC N/C

3 132/33 TR3 MW/MVAR/CB/OLTC N/C

1 220 KV NAGDA I CB OPEN CLOSE2 132 KV MAXI MW/ MVAR N/C3 220/132 TR1 & TR2 OLTC N/C

1 220/132 TR1 & TR2 OLTC N/C2 220/132 TR2(SECONDARY SIDE) CB FAULTY2 132KV BUS COUPLER CB FAULTY CLOSE

1 132/33 KV TR-1 40 MVA MVAR NOT COMING2 132 KV MAIN BUS KV,HZ NOT COMING

1 CAP BANK MVAR N/C 10.66SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

DEPALPUR 132 KV S/S

UJJAIN 220 KV S/S

INDORE SZ 220KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

INDORE NZ (JETPURA) 220KV S/S

GHOSLA 132 KV S/S

DEWAS BNP 132 KV S/SSOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDINDORE EAST 220 KV S/S

NIMRANI 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

PITAMPUR 220 KV S/S

SHAJAPUR 220 KV S/S

ALL BREAKERS OF 132 SIDE ARE FAULTY EXCEPT 220/132 KV X-MAR II (HV DIDE)

NAGDA 400 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

Minutes of 55th OCCM of MP 54

Page 58: As per distribution list

DATA OUT FROM LONG TIME1 WAIDHAN 132KV S/S2 MORWA 132 KV S/S3 BEOHARI 132 KV S/S

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETERSr.no. DESCRIPTION Status telemetry value at SLDC actual value at site

1 220 KV INTERCONNECTOR 1 & 4 MW/MVAR N/C 115/15

1 220 KV KOTOR CB FAULTY CLOSE2 220 KV CHATARPUR CB FAULTY CLOSE1 220 KV B/C CB FAULTY CLOSE

1 400/200/33 KV TERTIARY REACTOR 1 & MVAR N/A

2 220 KV PGCIL 2 CB FAULTY CLOSE

1 220 KV BUS TIE CB FAULTY CLOSE

2 220 KV REWA MW/MVAR N/C3 220 KV HINDALCO MW/MVAR N/C

1 132 KV JP NIGRI CB/MW/MVAR N/C PROCESSES CONNECTION REQUIRED

2 220/132 TR 2 SEC CB N/C PROCESSES CONNECTION REQUIRED

1 220 KV TONS PH MW /MVAR 0 45/52 132 /33 KV TR 2 CB ,MW,MVAR N/A PROCESSES CONNECTION REQUIRED3 220 KV SATNA MW /MVAR 0 15/5

1 132 KV KOTMA CB N/A

2220/132 KV TR 2 (160 MVA) PRI & SEC CB N/A CLOSE

3 132 KV SHAHDOL CB ,MW,MVAR N/A4 132 KV KOTMA 2 CB ,MW,MVAR N/A

5 132 /33 KV TR 2 CB ,MW,MVAR N/A

1 220 KV SATPURA T P S CB /MW/MVAR N/C PROCESSES CONNECTION REQUIRED

1 132 KV ASHOK NAGAR CB /MW/MVAR N/C PROCESSES CONNECTION REQUIRED

1 220/132 KV TR 1 (160 MVA) SEC CB FAULTY CLOSE

2220/132 KV TR 2 (160 MVA) PRI & SEC CB N/A CLOSE

1 132 KV ANUPPUR 2 CB /MW/MVAR FAULTY PROCESSES CONNECTION REQUIRED

1 220 KV PGCIL SATNA MW 0 MFM PROBLUM

1 132 /33 KV TR 2 CB ,MW,MVAR N/A PROCESSES CONNECTION REQUIRED

KOTMA 132 KV S/S

MAIHAR 220 KV S/S

PANDURNA 220 KV S/S

BINA 220 KV S/S

CHATARPUR 220 KV S/S

BIRSINGHPUR 220 KV S/S

SATNA220 KV S/S

BINA 400 KV S/S

DAMOH 220 KV S/S

TIKAMGRAH 220 KV S/S

SIDHI 220 KV S/S

CHINDWARA 220 KV S/S

REWA 220 KV S/S

KOTAR 220 KV S/S

ANUPPUR 220 KV S/S

PROCESSES CONNECTION REQUIRED

Minutes of 55th OCCM of MP 55

Page 59: As per distribution list

Name at SLDC end at site end

1 GEN 6 GT MW/MVAR 76/4 02 GEN 7 GT MW/MVAR 152/4 03 GEN 6 GT CB FAULTY OPEN4 GEN 7 GT CB FAULTY OPEN5 220 KV TRB CB FAULTY CLOSE6 ITC 400/220 MW 280 2607 400 KV STP- ISP MW 220 200

1 220 KV SGTPS 3 CB TRANSIT CLOSE2 220 KV SGTPS 3 MW 456 503 TRACTION 1 & 2 MW/MVAR -7 7

STN TR FOR UNIT 5 CB/MW/MVAR NA

1 400/220 KV TR 1 & 2 (315MVA ) OLTC N/C

1 400/220 KV ICT CB FAULTY CLOSE2 400 KV DAMOH 1 CB FAULTY CLOSE

3 4004 KV DAMOH 2 CB FAULTY CLOSE4 220 KV GEN 4 CB FAULTY OPEN5 STN TR 1 ,2 3 CB/MW/MVAR NA

1 220 KV SIRMORE MVAR 494 52 221 KV SIRMORE MVAR 685 5

RAJGHAT H P S RTU OUT

TONS H P S

SATPURA T P S

A T P S T P S

SINGHA JI S T P S

S G T P S

Minutes of 55th OCCM of MP 56

Page 60: As per distribution list

TELEMETRY DISCRIPIENCY

Sr.no. DESCRIPTION Status telemetry value at SLDC actual value at site1 GEN 7 MVAR 125 52 GEN 3 MVAR 125 53 400 KV INDORE 2 MVAR 256 25

Sr.no. DESCRIPTION Status telemetry value at SLDC actual value at site

I SP H P S

O S P H P S

FOR 220 KV BUS VOLTAGE & FREQUENCY , LINE PT IS USED BUT ACTUALLY BUS PT IS REQUIRED

Minutes of 55th OCCM of MP 57