ASBESTOS INSPECTION REPORT Conducted at: FITERMAN HALL 30 WEST BROADWAY NEW YORK, NEW YORK 10007 Conducted for: DORMITORY AUTHORITY OF THE STATE OF NEW YORK CITY UNIVERSITY OF NEW YORK Prepared By: PEI COBB FREED TEAM AIRTEK ENVIRONMENTAL CORP. 39 WEST 38 TH STREET – 12 TH FLOOR NEW YORK, NY 10018 AIRTEK PROJECT NUMBER 05-0867 Revised - 09/15/06

ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed

  • Upload
    lyque

  • View
    217

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed

ASBESTOS INSPECTION REPORT

Conducted at:

FITERMAN HALL 30 WEST BROADWAY

NEW YORK, NEW YORK 10007

Conducted for:

DORMITORY AUTHORITY OF THE STATE OF NEW YORK CITY UNIVERSITY OF NEW YORK

Prepared By:

PEI COBB FREED TEAM AIRTEK ENVIRONMENTAL CORP.

39 WEST 38TH STREET – 12TH FLOOR NEW YORK, NY 10018

AIRTEK PROJECT NUMBER 05-0867

Revised - 09/15/06

Page 2: ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed

TABLE OF CONTENTS

Page No.

1.0 BACKGROUND..............................................................................................1 2.0 SCOPE OF WORK.........................................................................................2 3.0 SUMMARY OF FILE RESEARCH..................................................................2 4.0 SUMMARY OF AIRTEK’S INSPECTION RESULTS......................................3 5.0 CONCLUSIONS AND RECOMMENDATIONS...............................................3 6.0 ASBESTOS QUANTITY SCHEDULE.............................................................5 7.0 AREAS NOT ACCESSIBLE ...........................................................................8 8.0 REPORT CERTIFICATIONS..........................................................................8

APPENDICES

9.0 APPENDIX A: Analytical Results and Chain of Custody 10.0 APPENDIX B: File Search Data 11.0 APPENDIX C: Personnel Licenses 12.0 APPENDIX D: Laboratory Accreditations 13.0 APPENDIX E: ACM Location Drawings

Page 3: ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed

1.0 BACKGROUND: Airtek Environmental Corp. has conducted an asbestos survey for the presence of Asbestos-Containing Materials (ACM) at the following building:

Site: Fiterman Hall Borough: Manhattan Address: 30 West Broadway, New York, NY, 10007 The Investigator and inspector responsible for this project were: Damien Gordon Toylor NYS Asbestos Inspector CERT #95-12324 Expires: 11/30/06 Hilton Sue NYS Asbestos Inspector CERT #91-02355 Expires: 05/31/06 Moyna Ali NYS Asbestos Inspector CERT #89-01641 Expires: 03/31/07 Enayat Nassry NYC Asbestos Investigator CERT#99570 Expires: 07/04/07 Michael Porter NYS Asbestos Inspector CERT #91-06440 Expires: 10/31/06 Site Visit(s): 10/21/05 through 4/4/06 Report Date: 12/20/05 Revision Date: 9/15/06 Field Procedures and Analysis Methodology: Guidelines used for the inspection were established by the Environmental Protection Agency (EPA) in the Guidance for Controlling Asbestos Containing Materials in Buildings, Office of Pesticides and Toxic Substances, DOC #560/5-85-024 and 40 CFR Part 763, Asbestos Hazard Emergency Response Act (AHERA). Field information was organized as per the AHERA concept of Homogeneous Area (HA). A HA is defined as a suspect material of similar age, appearance, function and texture. Each material was grouped together as a specific HA, sampled and then assessed for condition. Bulk samples of suspect ACM were analyzed by Polarized Light Microscopy (PLM) with dispersion staining, as described in 40 CFR Part 763 and the National Emissions Standard for Hazardous Air Pollutants (NESHAPS). The New York State Department of Health has recently revised the PLM Stratified Point Counting Method. The new method, “Polarized Light Microscopy Methods for Identifying and Quantitating Asbestos in Bulk Samples” can be found as item 198.1 in the ELAP Certification manual. The State of New York ELAP has determined that analysis of Non-friable, Organically Bound Materials (NOB) are not reliably performed by PLM. Therefore, if PLM analysis of a NOB yields a negative result, it must be further confirmed by Transmission Electron Microscopy (TEM). All samples were initially analyzed by PLM. Samples which produced a negative PLM result and which are classified as a NOB were then re-analyzed utilizing the TEM methodology.

1

Page 4: ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed

2.0 SCOPE OF WORK: The whole building including interior and exterior, which may be affected by the decontamination and deconstruction, was inspected for ACM: The inspection was characterized by a close visual inspection of all accessible areas. Selective demolition was also conducted to access interstitial spaces suspected of containing ACM. Suspect materials were sampled and inventoried for quantity, condition and friability. Airtek used previous survey results, which had been provided by the Applied Technology Services Inc., in our determination of areas and materials to sample. Materials examined included:

1. Tar materials on interior perimeter walls 2. Spandrel/Lintel/Relieving angle flashing and mastic 3. Paper materials on perimeter walls 4. Fiber glass materials on perimeter walls 5. Felt materials on perimeter walls 6. Flashing mastic on beams 7. Black cloth materials on beams 8. Roof materials/flashing 9. Roof tar/paper 10. Roof brick 11. Roof cloth 12. Roof insulation 13. Roof shingles 14. Coping caulk 15. Cap flashing 16. Window caulking 17. Window glazing 18. Roof screed 19. Brick wall mortar 20. Expansion joint caulking 21. Marble mortar & sealant 22. Window frame caulking 23. Column caulking 24. Floor covering materials 25. Cloth/rubber materials on beams 26. Black tar on concrete ceiling 27. Pipe insulation 28. Glue daub

3.0 SUMMARY OF FILE SEARCH: All available Dormitory Authority of the State of New York (DASNY) files have been reviewed. The following is a listing of our findings:

• Previous files – Applied Technology Services Inc. initiated an asbestos investigation at Fiterman Hall on July 12th, 1996 and found the following ACMs throughout the building:

Pipe Insulation Mudded Joint Fitting Floor Tile & Mastic Exhaust Duct Insulation Window Glazing Metal Fire Doors Vapor Barrier

2

Page 5: ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed

• Abatement Records –According to abatement records subsequent to the above-referenced 1996 Survey Report, extensive abatement was conducted in support of the gut rehabilitation.

Based on the currently recommended sampling and analytical procedures for ACM materials, Airtek determined that additional sampling was necessary in order to determine the asbestos content of additional suspect materials. 4.0 SUMMARY OF AIRTEK ENVIRONMENTAL’S INSPECTION RESULTS: The asbestos inspection was conducted in several phases from October 21st, 2005 to April 4th, 2006 and involved a thorough visual examination of all areas and sampling of suspect materials that would be impacted during the proposed work schedule. Airtek Laboratory analysis confirmed the presence of asbestos in the amount greater than 1% within the samples collected from the following material:

1. Tar and paper materials on interior of perimeter walls 2. Flashing mastic on exterior of spandrel beams 3. Roof membrane – 15th floor set back north roof 4. Window caulking (Bulkhead Windows) 5. Window frame caulking (Elevator Room Windows) 6. All flooring materials are assumed ACM 7. Roof shingles and tar (Parapet Wall – Chiller)

Airtek laboratory analysis determined the samples collected from the following materials to contain less then one percent (<1%) asbestos.

1. Felt and fiber glass backing materials on perimeter walls (Contaminated by ACM) 2. Cloth materials on spandrel beams (Contaminated by ACM) 3. Screed 4. Brick wall mortar 5. Expansion joint caulking 6. Marble mortar, sealant and caulking 7. Column caulking and mortar 8. Interior spandrel flashing mastic

5.0 CONCLUSIONS AND RECOMMENDATIONS: Asbestos-containing materials, which may be affected by the scope of work, have been positively identified at various locations throughout the building. As the identified ACM is to be disturbed by the proposed renovation work, proper asbestos abatement procedures shall be implemented prior to the commencement of such work. All asbestos abatement work shall be performed in accordance with all applicable Federal, State and Local rules and regulations. The abatement project shall be filed with all agencies having jurisdiction over this project, such as USEPA, NYSDOL and NYCDEP. A licensed abatement contractor must perform the removal of all friable and non-friable ACM. Airtek believes that the implementation of these recommendations will serve to best protect human health and the environment. To assure that the removal of the aforementioned ACM is properly and effectively carried out, the following recommendations are proposed by Airtek:

3

Page 6: ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed

A. Develop and implement a schedule that outlines the time frame for removal of ACM. B. Develop complete and concise specifications to effectively deal with removal of the ACM.

These specifications should be developed to comply with all applicable Federal, State and Local regulations.

C. Retain the service of an independent testing laboratory to monitor the air for possible

asbestos contamination before, during and after the removal work. Retain all documentation and correspondence from the removal contractor, the testing laboratory and related items in a permanent record.

4

Page 7: ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed

5

6.0 ASBESTOS QUANTITY SCHEDULE: Approximate asbestos quantity schedules are presented on the following table:

TABLE 1 SUMMARY OF INSPECTION RESULTS FOR ASBESTOS

FITERMAN HALL 30 WEST BROADWAY, NEW YORK, NY 10007 PROPOSED

WORK SUSPECT ACM THAT MAY BE AFFECTED

LAB RESULTS

APPROXIMATE ACM

QUANTITY NOTES/SPECIFIC LOCATION

Elbow drain insulation of water tower

Non ACM 0 SF Confirmed by Applied Technology Services Inc. Aug. 1996

Roof shingle of water tower Non ACM 0 SF Confirmed by Applied Technology Services Inc. Aug. 1996

Louvers of cooling tower Non ACM 0 SF Confirmed by Applied Technology Services Inc. Aug. 1996

Silicone caulk Non ACM 0 SF Confirmed by Applied Technology Services Inc. Aug. 1996

Glazing Non ACM 0 SF Confirmed by Applied Technology Services Inc. Aug. 1996

Gypsum wallboard Non ACM 0 SF Confirmed by Applied Technology Services Inc. Aug. 1996

Condenser gasket Non ACM 0 SF Confirmed by Applied Technology Services Inc. Aug. 1996

Radiator backing Non ACM 0 SF Confirmed by Applied Technology Services Inc. Aug. 1996

Hard wall plaster Non ACM 0 SF Confirmed by Applied Technology Services Inc. Aug. 1996

Pyrobar building block Non ACM 0 SF Confirmed by Applied Technology Services Inc. Aug. 1996

Deck patch on I-beam above women’s bathroom

Non ACM 0 SF Confirmed by Applied Technology Services Inc. Aug. 1996

Cove moulding with glue Non ACM 0 SF Confirmed by Applied Technology Services Inc. Aug. 1996

Wall joint compound Non ACM 0 SF Confirmed by Applied Technology Services Inc. Aug. 1996

Adhesive on duct-fiberglass Non ACM 0 SF Confirmed by Applied Technology Services Inc. Aug. 1996

Patch on duct insulation Non ACM 0 SF Confirmed by Applied Technology Services Inc. Aug. 1996

Trowelled on cement on duct

Non ACM 0 SF Confirmed by Applied Technology Services Inc. Aug. 1996

Mastic/Glue paper Non ACM 0 SF Confirmed by Applied Technology Services Inc. Aug. 1996

White speckled 9×9 VFT Non ACM 0 SF Confirmed by Applied Technology Services Inc. Aug. 1996

Grey speckled 9×9 VFT Non ACM 0 SF Confirmed by Applied Technology Services Inc. Aug. 1996

Blue speckled 9×9 VFT Non ACM 0 SF Confirmed by Applied Technology Services Inc. Aug. 1996

Pipe wrapping in cage Non ACM 0 SF Confirmed by Applied Technology Services Inc. Aug. 1996

Mudded joint fitting elbow Non ACM 0 SF Confirmed by Applied Technology Services Inc. Aug. 1996

White 12×12 VFT/mastic Non ACM 0 SF Confirmed by Applied Technology Services Inc. Aug. 1996

Beige 12×12 VFT/mastic Non ACM 0 SF Confirmed by Applied Technology Services Inc. Aug. 1996

Page 8: ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed

6

TABLE 1 SUMMARY OF INSPECTION RESULTS FOR ASBESTOS

FITERMAN HALL 30 WEST BROADWAY, NEW YORK, NY 10007 PROPOSED

WORK SUSPECT ACM THAT MAY BE AFFECTED

LAB RESULTS

APPROXIMATE ACM

QUANTITY NOTES/SPECIFIC LOCATION

Acoustical ceiling tile 4×2 and 2×2

Non ACM 0 SF Confirmed by Applied Technology Services Inc. Aug. 1996

Spray-on fireproofing Non ACM 0 SF Confirmed by Applied Technology Services Inc. Aug. 1996

Blue 12×12 VFT/mastic Non ACM 0 SF Confirmed by Applied Technology Services Inc. Aug. 1996

Light grey 12×12 VFT/mastic

Non ACM 0 SF Confirmed by Applied Technology Services Inc. Aug. 1996

Tar materials on interior perimeter walls

ACM 28,755 SF 1st-15th Floor. Fair condition

Spandrel/Lintel/Relieving Angle flashing mastic (Exterior Side)

ACM 28,755 SF 1st-15th Floor. Fair condition

Paper materials on perimeter walls

ACM 26,793 SF 2nd -15th Floor. Fair condition

Fiber glass materials on perimeter walls

ACM contaminated

26,793 SF 2nd -15th Floor. Fair condition

Felt materials on perimeter walls

ACM contaminated

1,962 SF Only exists on the 1st Floor. Fair condition

Flashing mastic on beams ACM 25 SF Loading dock entrance. Fair condition

Black cloth material on beams

ACM contaminated 25 SF Loading dock entrance. Fair

condition Roof materials Non ACM 0 SF Elevator machine room roof Flashing Non ACM 0 SF Elevator machine room roof Coping caulk Non ACM 0 LF Elevator machine room roof Cap flashing Non ACM 0 SF Elevator machine room roof Screed Non ACM 0 SF Elevator machine room roof Flashing Non ACM 0 SF Fan room roof Roof materials Non ACM 0 SF Bulkhead roof Flashing Non ACM 0 SF Bulkhead roof Side window caulking ACM 8 LF Bulkhead. Fair condition Top window caulking ACM 4 LF Bulkhead. Fair condition Window glazing Non ACM 0 LF Bulkhead Screed Non ACM 0 SF Bulkhead roof Roof materials Non ACM 0 SF New elevator mechanical room roof Flashing Non ACM 0 SF New elevator mechanical room roof Coping stone caulk Non ACM 0 LF New elevator mechanical room roof Side window caulking ACM 8 LF New elevator mechanical room roof.

Fair condition Top window caulking ACM 4 LF New elevator mechanical room roof.

Fair condition Screed Non ACM 0 SF New elevator mechanical room roof Roof materials Non ACM 0 SF 15th Floor roof Flashing Non ACM 0 SF 15th Floor roof Flashing Non ACM 0 SF 14th Floor roof Roof membrane ACM 6,950 SF 14th Floor roof. Fair condition Screed Non ACM 0 SF 14th Floor roof Roof membrane under

screed Non ACM 0 SF 14th Floor roof

Flashing Non ACM 0 SF 5th Floor roof Roof membrane Non ACM 0 SF 5th Floor roof

Page 9: ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed

7

TABLE 1 SUMMARY OF INSPECTION RESULTS FOR ASBESTOS

FITERMAN HALL 30 WEST BROADWAY, NEW YORK, NY 10007 PROPOSED

WORK SUSPECT ACM THAT MAY BE AFFECTED

LAB RESULTS

APPROXIMATE ACM

QUANTITY NOTES/SPECIFIC LOCATION

Screed Non ACM 0 SF 5th Floor roof Brick wall mortar Non ACM 0 SF 6th & 15th Floor Expansion joint caulking Non ACM 0 SF 6th & 15th Floor Marble mortar & sealant Non ACM 0 SF 1st Floor exterior of the building Marble caulking Non ACM 0 SF 1st Floor exterior of the building Window frame caulking ACM 600 LF 1st Floor exterior of the building. Fair

condition Column caulking Non ACM 0 SF 1st Floor exterior of the building Column mortar Non ACM 0 SF 1st Floor exterior of the building Floor Covering Materials

including Adhesives/Mastics

Assumed ACM

288,000 SF Throughout the building. Slightly Damaged

Glue daub Non ACM 0 SF NW entrance exterior ceiling Interior spandrel flashing Non ACM 0 SF 1st – 15th Floor Black tar on concrete Non ACM 0 SF 3rd floor south side ceiling Black tar Non ACM 0 SF 3rd floor south side ceiling Black roof tar/paper ACM 6,950 SF 14th floor setback roof N. side. Fair

condition Brown roof insulation Non ACM 0 SF 14th floor setback roof N. side Black roof membrane Non ACM 0 SF 14th floor setback roof N. side Brown roof paper Non ACM 0 SF 14th floor setback roof N. side Red brick material Non ACM 0 SF 14th floor setback roof N. side Brown roof cloth Non ACM 0 SF 14th floor setback roof N. side Black roof insulation Non ACM 0 SF 14th floor setback roof N. side Brown roof insulation Non ACM 0 SF 14th floor setback roof N. side Black roof paper Non ACM 0 SF 16th floor water tank White pipe insulation ACM 12 LF 5th floor column S. side (Riser Only).

Fair condition Black roof shingle ACM 80 SF Cooler roof walls. Fair condition Black roof tar ACM 80 SF Cooler roof walls. Fair condition

Total Approximate Quantity of ACM 415,168 SF 636 LF

Page 10: ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed

8

7.0 AREAS NOT ACCESSIBLE: Airtek inspected and sampled materials, which were observable and accessible to the survey team. Any suspect ACM that have not been tested and/or found positive for asbestos, if any, must be assumed ACM until and unless they are tested. 8.0 REPORT CERTIFICATIONS: Airtek certifies that the information contained herein is based on the physical and visual inspections conducted by Airtek and data collected during the inspection survey and file review. Enayat Nassry Michael Porter, Efren Martinez, NYC Investigator QA/QC Lab Manager

.

Page 11: ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed

9

APPENDIX A

9.0 Analytical Results and Chain of Custody Certificates of Analysis

Page 12: ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed

10

LABORATORY RESULTS

HA # Sample # Location Material PLM Results PLM-NOB TEM-NOB

1 DT01-04 West side 15th floor Black tar material 5.1% Chrysotile

2 DT05-07 South side 14th floor Black tar material 3.6% Chrysotile

3 DT08-10 East side 13th floor Black tar material 3.5% Chrysotile

4 DT11-13 North side 12th floor Black tar material 4.8% Chrysotile

5 DT14-20 West side 11th floor Black tar material 3.9% Chrysotile

6 DT21-23 South side 10th floor Black tar material 3.6% Chrysotile

7 DT24-26 East side 9th floor Black tar material 4.3% Chrysotile

8 DT27-29 North side 8th floor Black tar material 3.2% Chrysotile

9 DT30-36 West side 7th floor Black tar material 3.6% Chrysotile

10 DT37-39 South side 6th floor Black tar material 3.6% Chrysotile

11 DT40-42 East side 5th floor Black tar material 4.2% Chrysotile

12 DT43-45 North side 4th floor Black tar material 5.1% Chrysotile

13 DT46-52 West side 3rd floor Black tar material 3.1% Chrysotile

14 DT53-55 Southeast corner 2nd floor Black tar material 4.6%

Chrysotile

15 DT56-58 Northeast corner 1st floor Black tar material 2.8% Chrysotile

16 DT59 Northeast corner 1st floor Black felt material Inconclusive NAD*

16 DT60 Northeast corner 1st floor Black felt material Inconclusive Trace Chrysotile

17 DT61-64 West side 15th floor Black paper material Inconclusive NAD

18 DT65-67 South side 14th floor Black paper material Inconclusive 1.9%

Chrysotile

19 DT68-69 North side 13th floor Black paper material Inconclusive NAD

20 DT70-73 North side 12th floor Black paper material Inconclusive 1.8%

Chrysotile

21 DT74-80 South side 11th floor Black paper material Inconclusive Trace

Chrysotile

22 DT81-83 South side 10th floor Black paper material Inconclusive NAD

23 DT84-86 East side 9th floor Black paper material 1.9%

Chrysotile

24 DT87-89 North side 8th floor Black paper material Inconclusive NAD

25 DT90-96 West side 7th floor Black paper material Inconclusive NAD

26 DT97-99 South side 6th floor Black paper material Inconclusive NAD

27 DT100-102 East side 5th floor Black paper

material Inconclusive NAD

Page 13: ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed

11

HA # Sample # Location Material PLM Results PLM-NOB TEM-NOB

28 DT103-105 North side 4th floor Black paper

material 1.5% Chrysotile

29 DT106-112 West side 3rd floor Black paper

material Inconclusive NAD

30 DT113-115

Southeast corner 2nd floor Black tar material Inconclusive NAD

31 DT116-120 West side 15th floor Black fiber glass

backing Inconclusive NAD

32 DT121-123 South side 14th floor Black fiber glass

backing Inconclusive NAD

33 DT124-125 North side 13th floor Black fiber glass

backing Inconclusive NAD

34 DT126-129 North side 12th floor Black fiber glass

backing Inconclusive NAD

35 DT130-136 West side 11th floor Black fiber glass

backing Inconclusive NAD

36 DT137-139 South side 10th floor Black fiber glass

backing Inconclusive NAD

37 DT140-142 East side 9th floor Black fiber glass

backing Inconclusive NAD

38 DT143-145 North side 8th floor Black fiber glass

backing Inconclusive NAD

39 DT146-152 West side 7th floor Black fiber glass

backing Inconclusive NAD

40 DT153-155 South side 6th floor Black fiber glass

backing Inconclusive NAD

41 DT156-158 East side 5th floor Black fiber glass

backing Inconclusive NAD

42 DT159-161 North side 4th floor Black fiber glass

backing Inconclusive NAD

43 DT162-168 West side 3rd floor Black fiber glass

backing Inconclusive NAD

44 DT169-171

Southeast corner 2nd floor

Black fiber glass backing Inconclusive NAD

45 HS01 On beam at loading dock entrance

Black cloth material Inconclusive NAD

45 HS02 On beam at loading dock entrance

Black cloth material Inconclusive Trace

Chrysotile

45 HS03 On beam at loading dock entrance

Black cloth material Inconclusive NAD

46 HS04 On beam at loading dock entrance

Black cloth material 3.6%

Chrysotile

46 HS05 On beam at loading dock entrance

Black cloth material NA

46 HS06 On beam at loading dock entrance

Black cloth material NA

47 MA01-03 Elevator machine room roof Roof material Inconclusive NAD

48 MA04-06 Elevator machine room roof Flashing Inconclusive NAD

49 MA07-09 Elevator machine room roof Coping caulk Inconclusive NAD

50 MA10-12 Elevator machine room roof Cap flashing Inconclusive NAD

51 MA13-15 Elevator machine room roof Screed NAD

52 MA16-18 Fan room roof Flashing Inconclusive NAD

Page 14: ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed

12

HA # Sample # Location Material PLM Results PLM-NOB TEM-NOB

53 MA19-21 Stair roof Roof material Inconclusive NAD 54 MA22-24 Stair roof Flashing Inconclusive NAD

55 MA25 Stair roof Side window caulking

2.6% Anthophyllite

and 1.6% Chrysotile

55 MA26 Stair roof Side window caulking NA**

55 MA27 Stair roof Side window caulking NA

56 MA28 Stair roof Top window caulking

2.6% Anthophyllite

and 1.1% Chrysotile

56 MA29 Stair roof Top window caulking NA

56 MA30 Stair roof Top window caulking NA

57 MA31-33 Stair roof Window glazing Inconclusive NAD 58 MA34-36 Stair roof Screed NAD

59 MA37-39 New mechanical equipment room roof Roof material Inconclusive NAD

60 MA40-42 New mechanical equipment room roof Flashing Inconclusive NAD

61 MA43-45 New mechanical equipment room roof

Coping stone caulk (Alumina covers)

Inconclusive NAD

62 MA46 New mechanical equipment room roof

Side window caulking

3.5% Anthophyllite

and 1.6% Chrysotile

62 MA47 New mechanical equipment room roof

Side window caulking NA

62 MA48 New mechanical equipment room roof

Side window caulking NA

63 MA49 New mechanical equipment room roof

Top window caulking

3.4% Anthophyllite

and 2.2% Chrysotile

63 MA50 New mechanical equipment room roof

Top window caulking NA

63 MA51 New mechanical equipment room roof

Top window caulking NA

64 MA52-54 New mechanical equipment room roof Screed NAD

65 MA55-57 15th floor roof Roof material Inconclusive NAD 66 MA58-60 15th floor roof Flashing Inconclusive NAD 67 EN01 14th-floor roof west side Flashing Inconclusive NAD

67 EN02 14th-floor roof adjacent to entrance Flashing Inconclusive NAD

67 EN03 14th-floor roof park place side Flashing Inconclusive NAD

68 EN04 14th-floor roof west side Roof membrane Inconclusive

68 EN05 14th-floor roof adjacent to entrance Roof membrane Inconclusive

68 EN06 14th-floor roof park place side Roof membrane 2.8%

Chrysotile

Page 15: ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed

13

HA # Sample # Location Material PLM Results PLM-NOB TEM-NOB

69 EN07 14th-floor roof park place side Screed Inconclusive NAD

69 EN08 14th-floor roof park place side Screed NAD

69 EN09 14th-floor roof park place side Screed Inconclusive NAD

70 EN10-12 14th-floor roof W Broadway side

Roof membrane under screed Inconclusive NAD

71 EN13 5th floor roof east side adjacent to entrance Flashing Inconclusive NAD

71 EN14 5th floor roof southwest corner Flashing Inconclusive NAD

71 EN15 5th floor roof north side Flashing Inconclusive NAD 72 EN16 5th floor roof east side Roof membrane Inconclusive NAD

72 EN17 5th floor roof adjacent to AC exhaust system Roof membrane Inconclusive NAD

72 EN18 5th floor roof north side Roof membrane Inconclusive NAD 73 EN19 5th floor roof east side Screed Inconclusive NAD

73 EN20 5th floor roof adjacent to AC exhaust system Screed Inconclusive NAD

73 EN21 5th floor roof north side Screed Inconclusive NAD 74 EN22 15th Floor north side wall Brick wall mortar NAD

74 EN23 15th Floor north side wall adjacent to the Exit Brick wall mortar NAD

74 EN24 15th Floor west side wall Brick wall mortar NAD

74 EN25 15th Floor southwest Section Brick wall mortar NAD

74 EN26 15th Floor southeast section Brick wall mortar NAD

74 EN27 15th Floor East Side Wall Brick wall mortar NAD

74 EN28 15th Floor Northeast Section Brick wall mortar NAD

75 EN29 15th Floor North Side Expansion joint caulking Inconclusive NAD

75 EN30 15th Floor Northwest Side

Expansion joint caulking Inconclusive NAD

75 EN31 15th Floor West Side Expansion joint caulking Inconclusive NAD

74 EN32 6th Floor North Side Set-Back Roof Brick wall mortar NAD

74 EN33 6th Floor Northwest Side Set-Back Roof Brick wall mortar NAD

74 EN34 6th Floor Southwest Side Set-Back Roof Brick wall mortar NAD

74 EN35 6th Floor Southeast Side Roof Brick wall mortar NAD

74 EN36 6th Floor East Side Brick wall mortar NAD

74 EN37 6th Floor Northeast Roof Brick wall mortar NAD

74 EN38 6th Floor Northeast Section Park Place Side Brick wall mortar NAD

75 EN39 6th Floor North Side Above the Window

Expansion joint caulking Inconclusive NAD

75 EN40 6th Floor Northwest Side Expansion joint caulking Inconclusive NAD

75 EN41 6th Floor West Side Expansion joint caulking Inconclusive NAD

Page 16: ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed

14

HA # Sample # Location Material PLM Results PLM-NOB TEM-NOB

76 EN42-44 1st Floor Exterior of the building Greenwich Side

Marble mortar/sealant Inconclusive NAD

77 EN45 1st Floor exterior Greenwich side adjacent to the steps

Marble mortar gray NAD

77 EN46-48

1st Floor exterior adjacent to the main entrance W Broadway side

Marble mortar gray NAD

78 EN49-51 1st Floor exterior left side of Main entrance W. Broadway side

Marble caulking gray Inconclusive NAD

79 EN52-54

1st Floor exterior adjacent to the main entrance btwn. Wall & sidewalk W Broadway side

Marble caulking black Inconclusive NAD

80 EN55 1st Floor exterior window frame & marble wall

Window frame caulking gray

3.5% Anthophyllite

and 1.3% Chrysotile

80 EN56 1st Floor exterior window frame & marble wall

Window frame caulking gray NA

81 EN57-59 1st Floor exterior building column

Column caulking dark gray Inconclusive NAD

82 EN60-62 1st Floor exterior building column W. Broadway side

Column mortar dark black NAD

83 MP1-3 6th Floor Exterior North Spandrel Flashing Inconclusive NAD 84 MP4 6th Floor Exterior North Spandrel Mastic 6.4% Chrys. 84 MP5 6th Floor Exterior West Spandrel Mastic 7% Chrys. 84 MP6 6th Floor Exterior West Spandrel Mastic 6.1% Chrys. 85 MP7-10 15th Floor Exterior North Spandrel Flashing Inconclusive NAD 86 MP11 15th Floor Exterior North Spandrel Mastic 5.5% Chrys. 86 MP12 15th Floor Exterior East Spandrel Mastic 6.2% Chrys. 86 MP13 15th Floor Exterior South Spandrel Mastic 6.7% Chrys. 86 MP14 15th Floor Exterior West Spandrel Mastic 6.1% Chrys.

87 MP15-17 Exterior Ceiling – NW Entrance Glue Daub Inconclusive NAD

88 MP01-03 3rd Floor Interior Spandrel Flashing Inconclusive NAD

89 MP04-06 6th Floor Interior Spandrel Flashing Inconclusive NAD

90 MP07-09 14th Floor Interior Spandrel Flashing Inconclusive NAD

91 DT01-03 3rd Floor South Side Ceiling

Black tar on concrete NAD

92 DT04-06 3rd Floor South Side Ceiling Black tar Inconclusive NAD

93 DT01 14th Floor Setback Roof N. Side

Black roof tar/paper 6.4% Chrys.

93 DT02-03 14th Floor Setback Roof N. Side

Black roof tar/paper NA

94 DT04-06 14th Floor Setback Roof N. Side

Brown roof insulation NAD

Page 17: ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed

15

HA # Sample # Location Material PLM Results PLM-NOB TEM-NOB

95 DT07-09 14th Floor Setback Roof N. Side

Black roof membrane Inconclusive NAD

96 DT11-13 14th Floor Setback Roof N. Side Brown roof paper NAD

97 DT14-16 14th Floor Setback Roof N. Side Red brick material NAD

98 DT17-19 14th Floor Setback Roof N. Side Brown roof cloth NAD

99 DT20-22 14th Floor Setback Roof N. Side

Black roof insulation NAD

100 DT23-25 14th Floor Setback Roof N. Side

Brown roof insulation NAD

101 DT01-03 16th Floor Water Tank Black roof paper Inconclusive NAD

102 DT04 5th Floor Column South Side

White Pipe Insulation

31% Chrys.

102 DT05-06 5th Floor Column South Side

White Pipe Insulation NA

103 DT01 Cooler Roof Walls Black roof shingle 2.7% Chrys. 103 DT02-03 Cooler Roof Walls Black roof shingle NA 104 DT04 Cooler Roof Walls Black roof tar 5.8% Chrys. 105 DT05-06 Cooler Roof Walls Black roof tar NA

NAD*=No Asbestos Detected NA**=Not Analyzed

Page 18: ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed

APPENDIX B

10.0 File Search Data

(Previous report reviewed: ATS, Inc. 06/97)

Page 19: ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed

APPENDIX C

11.0 Personnel Licenses

Page 20: ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed
Page 21: ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed
Page 22: ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed
Page 23: ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed
Page 24: ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed
Page 25: ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed

APPENDIX D

12.0 Laboratory Accreditations

Page 26: ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed
Page 27: ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed
Page 28: ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed
Page 29: ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed
Page 30: ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed
Page 31: ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed
Page 32: ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed
Page 33: ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed
Page 34: ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed
Page 35: ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed
Page 36: ASBESTOS INSPECTION · PDF fileASBESTOS INSPECTION REPORT Conducted at: ... Pyrobar building block Non ACM 0 SF Confirmed by Applied ... Cove moulding with glue Non ACM 0 SF Confirmed

APPENDIX E

13.0 ACM Location Drawings