Why Do Six Sigma?
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 2
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
What is Six Sigma
• Sigma is Greek letter used to indicate standard deviation
–A sigma level provides a statistical estimate of the Defect (Error) Rate
• Six Sigma relates to 3.4 Defects Per Million Opportunities
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 3
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
Graphical View of Six Sigma
USL = 6σLSL = - 6σ Target +3σ
Measured Process
– Customer Requirements (USL, LSL) defined at ± Six Sigma from the measured Process Mean
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 4
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
Why 3.4 PPM Defect Rate?
USL = 6σLSL = - 6σ Target +3σ
Measured Process
– Measured process may shift by as much as 1.5 sigma (shown in pink), resulting in a max defect rate of 3.4 ppm
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 5
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
Does Six Sigma Apply to…
• Low volume production:
–How can you measure Defects per Million Opportunities
• Service Companies:
–What’s a Defect? We don’t produce anything?
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 6
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
Six Sigma Applications
• Manufacturing, Service, Chemical, Financial…
• High or low volume
• Millions or Billions in Revenue
• Even Non-profits
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 7
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
Errors Happen
• Wherever errors occur, can measure a Defect Level
• Need to define
–Customers• Internal or External
–Critical Customer Requirements• needs, specifications
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 8
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
How DPMO Relates to Sigma Level
Examples of Sigma Levels
0.1
10
1000
100000
10000000
1 2 3 4 5 6 7
Sigma Level
DPM
O
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 9
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
Service Example• IRS tax form advice• Survey of responses indicates predicted
error rate• If 40% then:
–DPO = .40
–DPMO = .40 defects/opportunity * 1,000,000 opportunities/million opportunities
–400,000 DPMO = 1.75 Sigma
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 10
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
What Sigma Level Are Your Key Processes?
• Product-based:
–Scrap / Yield Reports
–Best to include Reworks (Hidden Factory)
• Service:
–Error rate of information exchanged
–Cycle time
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 11
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
Order Processing Example
• Requirements:
–Name exactly as appears on credit card
–Billing Address exactly as on credit card statement
–Credit card number
–Credit card expiration date
–Product ID being ordered
–Quantity Ordered
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 12
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
Example (cont.)
• Find 600 errors on 200 orders in random sample of 4,000 orders
• 6 critical characteristics
• DPMO = (600 defects / (4000 orders * 6 opportunities / order)) * 1,000,000
• DPMO = 25,000
• Sigma Level approx. 3.5
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 13
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
Processes in Series
• Final Yield = Yield1 * Yield2 * Yield3 * … Yieldn
• Example: Order is processed through six departments, each with defect rates calculated as 0.3%, 0.5%, 5%, 7.5%, 11.1%, 7.9%
• Final Yield = .997 * .995 * .95 * .925 * .899 *.921 * 100% = 71.4 %
DPMO = 286,000
Sigma Level approx. 2
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 14
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
Why DPMO?• 1% error rate (10,000 DPMO) = 3.8
Sigma• 4 Sigma = 0.6 %• 5 Sigma = 0.02 %• 6 Sigma = 0.00034 %
• Inconvenient to use % beyond 3 or 4 Sigma
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 15
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
Example Sigma Levels(ref: Six Sigma Deployment by Paul Keller, Quality Publishing, Inc. 2001)
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 16
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
3 Sigma vs. 6 Sigma Processes(source: Six Sigma Handbook by Thomas Pyzdek, Quality Publishing, Inc. 2001)
Defect 3 Sigma 6 Sigma
Mishandled Healthcare Claim
10,800,000 550
US Savings Bonds Lost / Month
18,900 1
Checks Lost / Night by Single US Bank
54,000 3
Erroneous Credit Card Transactions / Year
270,000,000 13,741
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 17
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
The DPMO Game
• How to classify an “Opportunity”?
–Ex: Define opportunity for earlier IRS Tax advice example:• each customer contact, OR
• each question from each customer contact
–The latter choice provides more opportunities
• More opportunities = less DPMO for same number of errors
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 18
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
Using DPMO Appropriately
• Classify opportunities in customer terms
–An opportunity should be related to a transaction that results in customer appraisal
• Consider only what is critical to customer
–Countless non-critical criteria can be excluded
• Limit DPMO / Sigma Level use
–Comparisons between companies often meaningless
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 19
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
Six Sigma in Terms of CostCost of Quality as % of Revenue
• As Sigma Level increases, defect costs can be shifted to revenue-generating activities – (Numerator decreases AND denominator increases)
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 20
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
Hidden Factory
• Most companies operate in 3 to 4 Sigma Levels
–For-profit companies cannot afford 2 Sigma
–Many costs go unreported as Quality costs
–Failure costs include warranty, rework, sorting, fine-tuning, management approvals, next day deliveries, invoicing errors,….
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 21
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
How are Cost Savings Achieved?
• Failure Costs moved to Prevention Costs
–As improvement occurs, wasted dollars go to bottom line
–Go from ‘fire-fighting’ to sales & profit generation
• Design for Six Sigma
–Particularly useful for companies at ≥ 4 Sigma
–Incorporates prevention activities at early stages of product / service development
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 22
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
Key Differences: SS & typical TQM
1. Project Focus & Duration
2. Organizational Support & Infrastructure
3. Clear & Consistent Methodology
4. Top-down Training
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 23
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
Key Difference 1: Project Focus & Duration
• Projects focus on one or more key areas:
–Cost, Schedule, Quality
• Directly linked to strategic goals
• Project scope ‘small’
–designed to conclude in 3 or 4 month or less
• Project Charter defines scope, objective and deliverables
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 24
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
Key Difference 2: Organizational Support & Infrastructure
• Executive Staff
• Champions
• Sponsors
• Master Black Belts
• Black Belts
• Green Belts
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 25
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
Key Difference 3: Clear & Consistent Methodology
• DMAIC
–Define
–Measure
–Analyze
–Improve
–Control
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 26
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
DMAIC Approach
• Structured approach leads to success
–Check sheet applied to each stage
• Projects clearly defined and implemented
• Results standardized into operational practices
• Financial results certified by Accounting dept.
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 27
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
Key Difference 4: Top Down Training
• Starts at top:
–Executive Level
–Champion
–Black Belt
–Green Belt
• Goal: Data driven decision making
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 28
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
Key Differences: SS & typical TQM 1. Project Focus & Duration
2. Organizational Support & Infrastructure
3. Clear & Consistent Methodology
4. Top-down Training
RESULT: Data-driven decision making at all levels of organization, geared towards satisfying critical needs of key stakeholders.
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 29
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
Success Stories
• Motorola
• Allied Signal / Honeywell
• GE
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 30
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
Six Sigma Origins• Motorola developed Six Sigma
Methodology in 80’s• In 1981, Motorola set out to improve the
quality of their products and services tenfold
• In 1988, accepted Malcolm Baldrige National Quality Award, and began the Six Sigma Quality movement
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 31
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
Motorola Experience(ref: http:/mu.Motorola.com/Six Sigma/SixSigma.html)
• Between 1983-87: spent $70 Million on quality-related education
• Productivity increased average of 12.3% /yr• Cost of Quality reduced by more than 84%• 99.7% of in-process defects eliminated• $11 Billion in manufacturing costs saved• Average annual compounded growth rate of
17% in earnings, revenues, and stock prices
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 32
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
Allied Signal Experience• Larry Bossidy, CEO of Allied Signal,
began their Six Sigma program in 1994.
• In 1998, achieved cost savings of $500 million directly attributable to their Six Sigma program
• In 1999, the cost savings grew to $600 million.
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 33
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
Allied Delights Customersref.: 1999 Annual Report
“…cost savings are only part of the story. Delighting customers and accelerating growth completes the picture. When we are more efficient and improve work flow throughout every function in the company, we provide tremendous added value to our customers - through higher quality solutions that are more competitively priced, delivered on time and invoiced correctly. That makes us a more desirable business partner.“
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 34
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
Allied Cycle Time Reductions
• Two plants operating at full capacity could not satisfy customer demand
–Six Sigma methodology increased production rate by 30%, with little to no additional costs.
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 35
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
GE Six Sigma Deployment (ref: 1998 Annual Report)
• Capacity improvements of 12-18%
• Rise in operating margin to 16.7%
• $750 million in savings.
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 36
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
GE Plastics • Reduced color variation in plastic
products. - Raised quality from 2 sigma to 4.9 sigma
over 4 months
- Saved $400,000 a year for one plant. (ref GE Way)
• In 1996, first year of Six Sigma deployment, GE Plastics achieved benefits of $20M
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 37
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
GE Capital Mortgage Insurance
• Cut defects 96%.
• Claim payments were reduced by $8M, while borrowers were offered alternatives to foreclosure. (ref: 1997 GE Annual Report)
• Reported a 160% increase in new transactions.
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 38
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
GE Aircraft Engines
• Reduced custom charges and cut delays at the border by 50%
- Reduced defects in the paperwork needed when parts are imported into Canada. (ref: 1997 GE Annual Report)
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 39
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
GE Medical Systems
• Developed a new ultrasound technology which allows medical personnel to more clearly diagnose risk factors contributing to stroke.
• Technology became available two years earlier than otherwise possible, due to GE’s Design for Six Sigma deployment.
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 40
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
Other SS Industry Leaders
• Boeing, IBM, Bombadier, Asea Brown Boveri, DuPont, Kodak, Compaq and Texas Instruments.
• GMAC Mortgage, Citibank, JP Morgan and Cendant Mortgage.
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 41
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
Six Sigma Doesn’t Cost, It Pays
• Cost of training low relative to resulting savings
–Each project $100,000 or more in savings
• Reap rewards as you go
–Train as needed
–More projects = More savings
• Bottom line impact grows with program maturity
ASC Asia Six Sigma Consultants
HAMID REZA REZAIEWhy Do Six Sigma 42
Six
Sig
ma
Six
Sig
ma
Overv
iew
Overv
iew
Still Wondering?
• What would the impact be if your closest competitor implemented a Six Sigma program and you didn’t ?