Sohail Hasnie Principal Energy Specialist, Asian Development Bank November 2015

Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -

Sohail Hasnie Principal Energy Specialist, Asian Development Bank November 2015

Page 2: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -
Page 3: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -
Page 4: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -
Page 5: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -
Page 6: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -

#1 Solar Power 570 kW (ADB) - 100 MW Samarkand, Uzbekistan

Page 7: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -

#2 Wangan Aji 50 kW – Indonesia

Page 8: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -

#3 Rehabilitation of 1200 MW Toktogul Hydropower Plant

Page 9: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -

1,000,000

CFLs

13 Watt each

13,000,000 watts

13 MW

60,000,000 watts

60 MW

Savings of about

50 MW of equivalent

generation

1,000,000

incandescent

60 Watt each

#4: 1 million CFL is a 50 MW power

station

1 million CFLs cost

$1.5 million

A 50 MW Power Station costs

$50 million

Page 10: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -

Replacement of

1,000,000 incandescent bulbs

with 1,000,000 CFLs

is same as building a new

50 MW virtual power station

1 million CFLs cost

$1.0 million a 50 MW power station costs**

$50 million

** Plus cost of maintenance, land acquisition, fuel, and emissions

Page 11: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -

100,000 electric tricycles

Cost $504 million

Savings: $185 million per year

(500,000 liters/ day $500,000 / day)

Avoided CO2 emissions

260,000 tons per year

Electricity Demand

Demand: 6-60 MW peak

Energy: 600,000 MWh

#5

Page 12: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -

12 #6

Page 13: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -

3 c/kWh

10 c/kWh

30+ c/kWh

#5

Page 14: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -

300 MW, 220 kV, 500 km

Cost around $100m Estimated Savings: vs self diesel

generation per year - 2014

1500 GWh

$323 million

#7 Uzbekistan–Afghanistan (completed 2009)

Page 15: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -

600 MW, 220kV, 175 km (in AFG)

Cost around: $57.43 million

($20.93 million for Tajikistan and

$36.5 million for Afghanistan)

•Estimated Savings against vs self diesel generation per year - 2014

•650 GWh

•$170 million

Tajikistan to Afghanistan (Oct 2011)

#8

Page 16: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -

Disruption

is coming to the power sector

Page 17: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -

Source: http://www.kotzendes-einhorn.de/blog/2011-06/the-hard-disk-youve-been-waiting-for-na-endlich/

1986 10,000 KB

$340 /MB

Page 20: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -

3.87 cents per kWh or $38.7 per MWh

100 MW July 2015

Page 21: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -

Solar PPA prices trending down

Page 23: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -

Source:

Page 24: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -

Prices are falling …

Page 25: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -

Battery Life

Page 26: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -
Page 27: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -
Page 28: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -

By 2015,

1,000,000 Electric Vehicle on road By 2022 battery price reduced

from $500/kWh

to $125/ kWh

http://energy.gov/sites/prod/files/2014/02/f8/eveverywhere_road_to_success.pdf

Page 29: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -
Page 30: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -

$500 per kWh in 2015

$175 per kWh by 2020!

$50 per kWh by 2025??

Source:

http://www.bloomberg.com/news/articles/2015-03-24/cheap-batteries-under-the-hood-add-power-to-cut-fuel-consumption

March 2015

$833 per kWh in 2010 Batteries

Page 31: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -

• Question?

• How will your world will look like with

$50 / kWh

1000 Wh / kg

Page 32: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -

Battery: 3 kWh

Motor: 3 kW

Battery: 16 kWh

Motor: 47 kW

Battery: 24 kWh

Motor: 80 kW

Battery: 85 kWh

Motor: 310 kW

Mitsubishi

iMiEV

Nissan

LEAF

Tesla

Model S

E-Trike

Page 33: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -

Battery: 16 kWh

Battery: 24 kWh

Battery: 85 kWh

Mitsubishi

iMiEV

Nissan

LEAF

Tesla

Model S Battery Price

$500 / kWh

to

$50 /kWh

$38,000

$11,000

$7,000

Battery: 3 kWh

Motor: 3 kW

E-Trike

$1,350

Page 34: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -
Page 35: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -

New Technology Training

Tokyo, July 2015 • Solar power generation • Energy efficiency • Electric vehicles • Clean coal technology

Page 36: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -
Page 37: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -

SH: CONTEXT / LANDSCAPE Project

No. AFG AZE KAZ KGZ MON PAK TAJ TKM UZB

A. Supply Side

1 Solar powered micro-grid for remote areas P P P

2 Adoption of clean coal technologies in power

generation P P P

3 Improve efficiency of solar industry / establish new

industry P P

4 Solar off-grid to reduce demand from diesel P P P P P

5 Recycling of municipal waste for power generation P P P P P

B. Electric Vehicle and Storage

6 Battery based grid storage for reliability

improvement of renewable energy P P P P

7 Electric vehicles (bus, cars, motorcycles and

scooters) pilot for government fleet and public

transport P P P P P P P

C. Demand Side and Distribution Efficiency

8 Demand responses through smart meters and

diversified tariffs P

9 LEDs for public lighting and offices P P P P

10 Efficiency in distribution efficiency and loss

reduction P P P P P

11 Improve load dispatch systems and distribution

control with SCADA P P P P P

12 Reduce heat losses in office buildings by

retrofitting P P

Proposed Investment Projects by Each Country

(Based on brainstorming session on 29 July in Tokyo and updated on 9 September in KL)

P Proposed in Tokyo on 29 July 2015 and confirmed in KL on 9 September 2015 (AZE and TKM did not participate)

P Proposed on 9 September 2015 in KL; For AZE and TKM, proposed in Tokyo on 29 July 2015

Page 38: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -

SH: CONTEXT / LANDSCAPE Project

No. AFG AZE KAZ KGZ MON PAK TAJ TKM UZB

B. Electric Vehicle and Storage

7

Electric vehicles (bus, cars, motorcycles and

scooters) pilot for government fleet and public

transport P P P P P P P

Electric bus P P P P P

Electric cars P P P P P

Electric motorcycles P

Electric scooters P

Proposed Investment Projects by Each Country

(Based on brainstorming session on 29 July in Tokyo and updated on 9 September in KL)

P Proposed in Tokyo on 29 July 2015 and confirmed in KL on 9 September 2015 (AZE and TKM did not participate in KL)

P Additional information provided on 9 September 2015 in KL; For AZE and TKM, proposed in Tokyo on 29 July 2015

Page 39: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -

14 Oct 2010

Page 40: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -

Solution Space: Electric Vehicles

Range: 35-50 km Speed: 45 km/h NO Air-conditioners: Min. Safety Standards

Price: $4,000 to $6,000 as

$4 per day

5-years Standard Warranty

24 kWh battery

160 km range

3 kWh battery

40 km range

Range: 160 km Speed: 200 km/h Air-conditioners Best Possible Safety Standards

Price: $35,000 3-years or 100,000 km Standard Warranty

Top of the Pyramid

Bottom of the Pyramid

Page 41: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -

Range results (“Continuous" running)

A1: 72.53 km

A2: 90.33 km

B4: 62.21 km

B7: 41.89 km

22 May 2011

Page 42: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -

25 Mar 2011

Page 43: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -
Page 44: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -

Which one? side by side comparison (5-years of operation)

Cost: $5,000 Cost: $2,000

Electricity: $3,000 Gasoline: $7,000

Drivers save about $2,000over 5 years!!* * In addition e-trike may increase income by $9,000 over the 5-years

Other maintenance: $2,000 Other maintenance: $1,000

Total cost: $11,000 Total cost: $9,000

Page 46: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -

Off-grid light in the courtyard

Page 47: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -

PROTOTYPE

PV Solar

Panels LED Bulb

DC

Refrigerator DC LED

TV

DC Fan

Lithium Ion

Battery

KIT Components

250 watt solar panel $150

2 kWh Lithium-ion battery $700

10 LED light bulbs with cables $100

1 DC LED 19” TV $200

1 DC refrigerator $200

2 DC fans $50

Contingency $100

Total: $1,500

•47

Page 48: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -

Proof of Concept of

an off-grid kit

April 2016 – Nov 2016 Dec 2016

Estimated

50,000

off-grid kits in

Afghanistan

and/or Pakistan

Multi-country demonstration with

estimated

1,500-2,000 off-grid kits

Sept 2015 – March 2016

Proof of Concep

t Scale-up Pilot

Page 49: Asian Development Bank - University of Tasmania€¦ · Asian Development Bank November 2015 #1 Solar Power 570 kW (ADB) -

Megatrends!!

Electricity: new small business.