    ASME CERTIFICATIONASME CERTIFICATION

    REQUIREMENTSREQUIREMENTS

    By : Samy A. FattouhAuthorized Inspector

  • 8/6/2019 Asme Certification

    2/13

    11/9/2005

    2

    Program GoalsProgram Goals

    l How To obtain an ASME Certificate ofauthorization.

    l To compete with other boilers and pressurevessels manufacturers

  • 8/6/2019 Asme Certification

    3/13

    11/9/2005

    3

    Type of CertificatesType of Certificatesl U Certificate

    - Fabrication of pressure vessels.

    l S Certificate

    - Fabrication of boilers.

    l A Certificate

    - Assembly of boilers.l PP Certificate

    - Fabrication piping.

  • 8/6/2019 Asme Certification

    4/13

    11/9/2005

    4

    DescriptionDescriptionl A certificate of authorization from ASME

    allow the manufacturer to fabricate code

    stamped vessels as required by many clients.l The certificate of authorization will be valid

    for three years.

  • 8/6/2019 Asme Certification

    5/13

    11/9/2005

    5

    ResourcesResourcesl Resources required for this project:

    - Qualified Work force.

    - Calibrated Equipments.

    - Defined Location.

    - Manufacturing Techniques.

    - Document & Records control.

  • 8/6/2019 Asme Certification

    6/13

    11/9/2005

    6

    Competitive AnalysisCompetitive Analysisl Competitors

    - Currently there are 5 Certificate holders inQatar.

    l Strengths

    - The manufacturer are proposed to be the

    leader.l Weaknesses

    - The delay to get the certificate till now.

  • 8/6/2019 Asme Certification

    7/13

    11/9/2005

    7

    RequirementsRequirementsl Have an agreement with an Authorized

    Inspection Agency.

    l Have the applicable ASME code.

    l Fill an application form & send to ASME

  • 8/6/2019 Asme Certification

    8/13

    11/9/2005

    8

    ProcedureProcedurel Company has to prepare a quality manual

    according to ASME code requirements.

    l Pre-survey to be carried out by the authorizedInspection Agency (AIA).

    l Joint Review to be conducted by both theASME designee & the AIA.

    l Certificate will be issued by ASME.

  • 8/6/2019 Asme Certification

    9/13

    11/9/2005

    9

    ScheduleSchedule

    l Time Span for the program

    approximately one year

    Preparation of Quality Manual

    Pre-survey & Joint Review

    Issue of Certificate

  • 8/6/2019 Asme Certification

    10/13

    11/9/2005

    10

    Current StatusCurrent Statusl An inspection agreement need to be signed

    with the (AIA).

    l A consultancy service for preparation of themanual is optional and can be provided by the( AIA).

    l Fees will be discussed with GermanischerLloyd.

  • 8/6/2019 Asme Certification

    11/13

    11/9/2005

    11

    Inspection AgreementInspection Agreementl ASME Rules

    - The manufacturer shall maintain an inspection

    agreement with an Authorized Inspection Agency.- A joint Review to be conducted by the ASME

    designee and the AIA.

    - Annual audit may be carried out by the AIA.

    l The AIA

    - Germanischer Lloyd agreement with Royal &Sunalliance will be cancelled at the the end ofNovember 2005 and an agreement will be signedwith an other AIA .

  • 8/6/2019 Asme Certification

    12/13

    11/9/2005

    12

    Inspection Agreement (cont.)Inspection Agreement (cont.)l The Agreement

    - The AIA will provide the Authorized Inspector (AI)

    on an intermittent basis to provide ASME codeInspection .

    - The AIA will provide the Authorized (AIS)

    for pre-survey , joint review & consultation.

    l The Annual Audits

    - Annual audits may be carried out by AIA to verify thecompliance with the ASME requirements.

  • 8/6/2019 Asme Certification

    13/13

    11/9/2005

    13