ASPERA-3
May 25, 01
Monthly Status Report
ASPERA Monthly Status Report Monthly 5_25/ Page 1
Monthly Status ReportReport due 5/25/01
Schedule statused as of May 11, 2001
ASPERA-3
May 25, 01
Monthly Status Report
ASPERA Monthly Status Report Monthly 5_25/ Page 2
Project Status Summary
Technical
Mar Apr May
Detailed Description: (for items identified as yellow or red)
Programmatic
Mar Apr May
Schedule
Mar Apr May
Resources
Mar Apr May
•ELS flight unit was successfully re-certified and delivered to MSSL/ IRF on May 15. Calibration has started. We are supporting via telcon and email.
•Software activities continue to be on track.
•Latest project photos and videos are available on Aspera-3 web site.
ASPERA-3
May 25, 01
Monthly Status Report
ASPERA Monthly Status Report Monthly 5_25/ Page 3
Problem and Concern Summary
P=Problem C=Concern R=Resolved
Description Item Month ID'D Feb Mar Apr MayFunding for ELS board fix Mar C C C
ASPERA-3
May 25, 01
Monthly Status Report
ASPERA Monthly Status Report Monthly 5_25/ Page 4
Accomplishments of the Last Month -ELS
•Finished characterization testing of flight unit.
•Completed re-vibration test of flight unit.
•Completed post-vibe aliveness test of flight unit.
•Delivered flight unit to MSSL / IRF on May 15.
•Have been supporting calibration of flight unit via telcon.
•Completed assembly of flight spare.
ASPERA-3
May 25, 01
Monthly Status Report
ASPERA Monthly Status Report Monthly 5_25/ Page 5
Accomplishments of the Last Month - IMA
• Supported IRF assembly and test of IMA and IMA detector subassembly via telcon.
ASPERA-3
May 25, 01
Monthly Status Report
ASPERA Monthly Status Report Monthly 5_25/ Page 6
Accomplishments of the Last Month - Data Reduction Software
• APAF Software Requirements Specification (SRS), Version 1.0– Delivered Electronically April 30, 2001– Hardcopies Sent to NASA and IRF May 1, 2001
• Began Updates to APAF Software Development Plan (SDP)– Version 1.3 to be Released June 7, 2001
• Began Packet Definitions for NPI– Waiting for Input from IRF
• Continued Dialog with ESTEC Staff for ASPERA-3 Data Archiving Plans
• Continued Providing Technical Assistance for EPO Web Information
• Continued Defining and Implementing IDFS Web Tools• Held monthly ASPERA-3 Software Status Meeting (May 24,
2001)
ASPERA-3
May 25, 01
Monthly Status Report
ASPERA Monthly Status Report Monthly 5_25/ Page 7
Planned Activities for the Next Month - ELS
• Support IRF/ MSSL in the completion of the flight model calibration via telcon.
ASPERA-3
May 25, 01
Monthly Status Report
ASPERA Monthly Status Report Monthly 5_25/ Page 8
Planned Activities for the Next Month - IMA
• Support IRF in the assembly and test of the IMA flight model via telcon.
ASPERA-3
May 25, 01
Monthly Status Report
ASPERA Monthly Status Report Monthly 5_25/ Page 9
Planned Activities for the Next Month - Data Reduction
Software Tasks
•Release APAF Software Development Plan (SDP), V1.3 by June 7, 2001
•Continue Packet Definitions for NPI
•Begin Packet Definition Review for IMA
•Continue Dialog with Staff of PDS PPI Node and ESTEC Staff for ASPERA-3 Data Archiving Plans
•Attend Mars Express (MEX) Data Archiving Working Group (DAWG)
•Meeting to be Held June 20-22, 2001 at ESTEC
Splinter Meeting Scheduled for Discussing ASPERA-3 Archiving Issues
•Continue Providing Technical Assistance for EPO Web Information
•Continue Defining and Implementing IDFS Web Tools
ASPERA-3
May 25, 01
Monthly Status Report
ASPERA Monthly Status Report Monthly 5_25/ Page 10
Problem and Concern Status
Funding for ELS board fix: We have implemented the fix to the ELS amp board and have completed re-certification and delivery. The funding is only listed as a concern because we have not yet received the final cost sheets documenting the cost of the repair. All indications are that we under-ran our estimate. Cost sheets are scheduled to be out May 30.
ASPERA-3
May 25, 01
Monthly Status Report
ASPERA Monthly Status Report Monthly 5_25/ Page 11
Schedule Summary
ELS: ELS was delivered on time to MSSL / IRF on May 15.
Software: Software activities continue to be on schedule.
• The full-up schedule is available on the ASPERA-3 Web site.
ASPERA-3
May 25, 01
Monthly Status Report
ASPERA Monthly Status Report Monthly 5_25/ Page 12
ASPERA-3 PHASE B/C/D MASTER SCHEDULEJ J A S O N D2003
J J A S O N D J F M A M2002
J J A S O N D J F M A M2001
J J A S O N D J F M A M2000
J J A S O N D J F M A M
MAJOR MILESTONES / REVIEWS
Southwest Research Institute Approval: John Scherrer, Project Mgr.
Orig Approval: 6/25/99 Last Change: 12/15/00
MA1999
INSTRUMENT DEVELOPMENTELS
ESA MEXLAUNCH
- Electron Spectrometer Imager
MCPs Avail
ELSPDR
Denotes a Change/Slip
MechanicalDesignDetail DesignMechanical FabricationMicrochannel Plates (MCP’s)
MCP ProcurementMCP Characterization
Structural Thermal Model (STM) FabricationSTM Test & Delivery
IRF ELS & IMADelivery to ESA
CDRKEY
MAJOR MILESTONE
SCHEDULED START
SCHEDULED COMPLETION
EARLY START/COMPLETIONLATE START/COMPLETION
RESERVES
CRITICAL PATH
SUMMARY
STM
STM DeliveryElectrical
HVPS DesignHVPS LayoutHVPS FabricationHVPS Testing
HV Power Supply (HVPS)
Anode Board Design ModificationsAnode PWA LayoutAnode FabricationAnode Testing
Anode Assemby
Sensor Integration & TestSensor AssemblySensor Bench TestSensor Testing & Characterization (@ SwRI)
ELS FM/Flt. SpareDelivery to IRF
ELS Calibration (@ IRF) & Delivery to ESA
IMA- Ion Mass Analyzer ImagerIMAPDR
Prototype Development
IMA Definition
CDR
ELS FM/FSDeliv
Prototype DesignPrototype LayoutPrototype Fabrication & Testing
Flt. Model / Flt. Spare DevelopmentFM/FS Design ModificationFM/FS LayoutFM/FS Fabrication & AssemblyMCP Need Date MCP’s
Req’dIMA FM/FS Deliveryto ASPERA / ESA
IMA FM/FSDelivery
FM Sensor Characterization (@ SwRI)IMA Calibration (@ IRF) & Delivery to ESA
Processing SoftwareSoftware Concept & RequirementsVirtual Instrument DesignVirtual Instrument S/W CodingVirtual Instrument S/W TestingS/W Integration w/Sensor Calibration
SwRI IMA &ELS Deliv
to IRF
Instrument SupportEngineering SupportScience Planning & SupportSoftware Development & Support
IMA FM/FS I&T
FP
F
FP
P
P
FP
FP
FSP
FSP
FP
FP
FP
P
F
F
P PROTOTYPE
F FLIGHT
P
Deliver IMA Prototype
F
ASPERAICDR
ASPERAPDR
ELS FM/FS Deliveryto ASPERA / ESA
IMA FM/Flt. SpareDelivery to IRF less MCP’s
9/30/07
P
P
F
MCP’s Returned to IRF for Rework
R
R
R
Rework
Redelivery
4/10/01 D - ELS Anode PWA Rework, FU ReTest/ReQual Work
R REWORK