    AsprovaHigh Speed Scheduling

    Melissa Brankamp [email protected]

    Erin Johnson [email protected]

    Gerald Eheduru [email protected] Cestari [email protected]

    Suprena Isaac [email protected]

  • 8/11/2019 Asprova Threejjjjjj

    2/28

    Basics from Asprova Corporation

    Production scheduling is the central mechanism for controlling production in a factory and making

    decisions about what to produce, when to produce it, and what resources to use in its production. It

    is also the key to knowing and understanding what is going on in your factory - not just now, buthours, days, and weeks into the future.

    Enormous improvements have been made in production scheduling in the past years through the

    development of high-speed automated production scheduling software. Most noted among these is

    the scheduling system Asprova, which has its roots in the artificial intelligence boom and Japanese

    just-in-time manufacturing practices, and which has long been accepted as the de-facto standard forproduction scheduling among Japanese manufacturers.

    Asprova is a production scheduling system developed and distributed by Asprova Corporation.

  • 8/11/2019 Asprova Threejjjjjj

    3/28

    How Does Asprova Work? It manipulates input and output data by default via the operating system's file system, so

    that it is not dependent upon any particular database format. The data is comprised offiles containing Project Settings and Guide Settings, as well as multiple table files. As allthis data is read into memory when the project is loaded, file access during scheduling

    is unnecessary, allowing computation to be performed at extremely high speeds. A single schedule along with all related data is called a Project. Asprova is capable of

    having multiple projects open at the same time. Each project includes multiple tables(databases) which contain the data upon which the schedule is based.

    Asprova's scheduling engine is extremely rich in features. But when viewed from adifferent angle, the activity of the scheduling engine is quite simple.

    The fundamental function of Asprova's Guide is to display information from the project'stables visually from every possible angle. An example is changing assigned resourcesand times by dragging a job on the Gantt chart. The core of Asprova's GUI is the Ganttchart and the other graph windows. These windows display the table contents along atime line or display the aggregate results in a histogram.

  • 8/11/2019 Asprova Threejjjjjj

    4/28

    Asprova's Main Window(1) Menu Bar

    Used in executing various Asprova functions. The menu itemsavailable for execution will vary depending on the type ofwindow in the foreground.

    (2)Toolbar

    Allows execution of Asprova commands with a single button click.(3)Windows

    Multiple windows can be open at the same time, including projectwindows, Gantt charts, evaluation graphs, table views, andcustom HTML views.

    (4)Tab

    Click on a tab to bring a different window into the foreground.

    (5)Output Window

    Currently consists of a single message window tab.(6)Output Window Close Button

    Click this to close the output window.

    (7)Status Bar

    Displays short messages describing the object at the currentlocation of the mouse pointer.

    (8)Number of Unassigned Jobs

    Displays the current number of unassigned jobs. Note that this

    number will be zero if job generation has not yet beenperformed, or if all jobs have been successfully assigned.

  • 8/11/2019 Asprova Threejjjjjj

    5/28

    Asprova's Project window

  • 8/11/2019 Asprova Threejjjjjj

    6/28

    Environment Settings

    The data specified in the environment settings

    dialog affects the whole of Asprova.

    Environment Settings has the followingpages:

    General Settings

    Display Color

    Messages

    User Registration

    Sound

    Log

    Toolbars

    Commands

    Options

    Advance Settings

  • 8/11/2019 Asprova Threejjjjjj

    7/28

    Project SettingsThe data specified in the project settings dialog

    affects the currently active project.

    Project name

    You can specify here a name for the current

    project, which will be displayed in the titlebar of all related windows to distinguish

    them from windows of other projects. The

    project name does not affect the actual

    functionality of Asprova.

    Table holding results data

    You can specify here whether results data

    will be entered and maintained in the results

    table or in the job table. This choice shouldgenerally be made before introduction of

    Asprova into the factory, as it will affect the

    way in which Asprova is integrated with

    other data management systems.

    Comments

    You can enter here comments regarding the

    current project. These comments do notaffect the actual functionality of Asprova.

  • 8/11/2019 Asprova Threejjjjjj

    8/28

    Scheduling basis time

    The scheduling basis time generally refers to the

    "present time.

    Scheduling period

    You can specify here the start and end times of the

    scheduling period via the time setting dialog.Scheduling freeze time

    Defines the end of the scheduling freeze period. The

    meaning of the scheduling freeze period is that

    whenever the project is loaded, Asprova will

    automatically mark all jobs within the scheduling

    freeze period as "frozen", which will prevent the

    assignment status of those jobs from being changed

    when rescheduling is performed.isplay period start time

    You can specify here the start time of Asprova's

    display period. The end time of the display period is

    always the scheduling end time.

    ay demarcation time

    The time at which one day is considered to end and

    the next to start -- as a time of day between 0:00:00and 23:59:59.

    Project Settings (contd.)

  • 8/11/2019 Asprova Threejjjjjj

    9/28

    You can choose here the method for

    handling inventory data in Asprova.

    Project Settings (contd.)

  • 8/11/2019 Asprova Threejjjjjj

    10/28

    Reflect reported quantities onto scheduled quantities

    Suppose that a certain job was scheduled to produce 100 of

    its output item, but results data was reported saying

    that the job was completed after producing only 90

    items. If this option is checked, then the fact that thisjob completed only 90 percent of its scheduled output

    will be reflected onto the schedule of the entire lot by

    decreasing the scheduled production quantity of the

    finished item by 10 percent. It this option is not

    checked, then the schedule will remain unchanged,

    regardless of the possibility of an item shortage in later

    jobs.

    Automatically delete result records not bound to jobs

    You can specify here whether or not to automatically delete

    result records which have fallen out of use because of

    the deletion of the corresponding job or because of the

    existence of a more recent result record for that job.

    Don't calculate setup time for results jobs

    Skip calculation of setup time for jobs with results.

    Project Settings (contd.)

  • 8/11/2019 Asprova Threejjjjjj

    11/28

    Scheduling Parameter SettingsDispatching

    A dispatching rule in Asprova is defined by up to 5 different

    sort keys, with the first sort key having highest precedence.

    You should first specify the number of sort keysyou will

    use, and then for each one specify the type of sort key and

    whether it will sort the jobs/lots in ascending or descendingorder.

    Weights

    You can specify here the weights to be applied to the

    various criteria for evaluating the tentative assignment of a

    task to a candidate resource during scheduling.

    Options

    You can specify the methods you will be using to

    determining the resource to which a task will be assigned.

    Target Lots

    On this property page you can specify various conditions

    for filtering the target lots to be assigned with the current

    scheduling parameter.

    Target Period

    You have the option here of explicitly defining the start

    and/or end time of the assignment period, in which jobs willbe assigned.

  • 8/11/2019 Asprova Threejjjjjj

    12/28

    Calendar Settings

    The calendar settings dialog allows

    you to set the available time and the

    shift of each resource for each day.

  • 8/11/2019 Asprova Threejjjjjj

    13/28

    The tool settings dialog

    allows you to register

    external tools in Asprova.

    Tools Settings

  • 8/11/2019 Asprova Threejjjjjj

    14/28

  • 8/11/2019 Asprova Threejjjjjj

    15/28

    Asprova's Graph window

  • 8/11/2019 Asprova Threejjjjjj

    16/28

    Asprova's Graph window (contd.)

  • 8/11/2019 Asprova Threejjjjjj

    17/28

    Asprova's Graph window (contd.)

  • 8/11/2019 Asprova Threejjjjjj

    18/28

    Asprova's Graph window (contd.)

  • 8/11/2019 Asprova Threejjjjjj

    19/28

    Asprova's Graph window (contd.)

  • 8/11/2019 Asprova Threejjjjjj

    20/28

    Asprova's Graph window (contd.)

  • 8/11/2019 Asprova Threejjjjjj

    21/28

    Asprova's Graph window (contd.)

  • 8/11/2019 Asprova Threejjjjjj

    22/28

    Asprova's Basic Samples

  • 8/11/2019 Asprova Threejjjjjj

    23/28

    One way to express these on the database is by

    grouping. For example, designate the group of

    items which can be produced with K1 as group A1,

    and the group of items which can be produced

    with K2 and K3 as group A2 in the Item Table.Then in the resource capacity table, set the output

    item of resource K1 to group A1, and the output

    item of resources K2, K3 to A2. Note that this

    example is a simple one and you can perform the

    same designation job without grouping. Just set

    the output item of each resource in the resource

    capacity table one by one.

    In this sample, two resources are used in one

    production process. In this case, the molding

    machine is called the main resource and the metal

    mold is called the secondary resource. When the

    secondary resource is used, it is necessary to

    define the required data in the resource table.

    Asprova's Basic Samples (contd.)

  • 8/11/2019 Asprova Threejjjjjj

    24/28

  • 8/11/2019 Asprova Threejjjjjj

    25/28

    Asprovas Benefits

    Helps to reduce on-hand inventory.

    Dramatically reduces schedule generation time

    from several hours to seconds. Cuts order turnaround time.

    Promotes consistency in production schedules

    and delivery schedules across the plant. Greatly

    improves shop-floor discipline by following theschedules generated.

  • 8/11/2019 Asprova Threejjjjjj

    26/28

  • 8/11/2019 Asprova Threejjjjjj

    27/28

    Asprovas Benefits (contd.)

    What-if analysis capabilities are able to

    determine the possibility of eliminating a shiftwithout negatively affecting throughput.

    Increases clients on-time delivery rate to the

    warehouse.