11
Assembly Manual „Leon“ USB powered Nixie Clocks Congratulations for purchasing this Nixie clock kit “Leon”. For successful assembly of this kit please read the following helpful hints. • This kit is designed for someone who has advanced experience with assembling electronics. • If you believe that the kit is too complicated for your skill level please do not try to assemble it - this generally ends up with a device that is not repairable and results in you being very frustrated. Please contact the provider and they can offer you other options that will end in a more fulfilling result! • Take your time - this kit should take 2 hours to complete if uninterrupted. Assembling the kit in a hurry will lead to frustration and troubleshooting takes three times as long. • Ensure your work area is well lit (daylight preferred) and clean. • Electronic tools, such as pliers, small side-cutters or tweezers will be handy. You will also need a T10 (Torx) Allen screwdriver for the housing assembly. • A soldering iron station with a 1 mm round tip (maximum) and a 0.5 mm (maximum) fine electronic solder (lead-free) is required. For lead-free solder we’ve had good experience with type Iso-Core EL Sn95,5 Ag3,8 Cu0,7 with 0,5 mm Ø and 3,5% Flux from Felder Löttechnik and a 400°C soldering tip temperature. • For the intermediary function test you need a multimeter with at least 200 VDC range. • A loupe (magnifying glass) to read the small device markings is often helpful. • Assemble the board in the order as stated in the instructions - this has been proven and will minimise mistakes. • It is assumed that you understand that semiconductors (diodes, ICs, transistors) or electrolytic capacitors are polarized components. Appropriate markings are silk-screened on the PCB and shown on the board schematic. Together with this construction guide there are some other usefull documents for download • The owners manual for this “Leon” Nixie clock kit • Schematic and Parts List Safety precautions: During assembly, operation, measurements and maintenance extra precautions must be taken. The generated high voltage of 160 V is dangerous. Assemble the circuit at your own risk. The clock’s functionality cannot be guaranteed when assembled by the customer. No responsibility can be taken for any personal claims and damages during assembly and commission, especially for damages based on insufficient technical knowledge. The Nixie clock may only be operated in a solid and moisture-proof enclosure. The person who completes the kit and assembles this board into an enclosure for operation is considered by the German directive VDE 0869 as a manufacturer and is required to indicate their name and address including all documents when selling the clock. Ready-to-go devices, which are assembled from kits, are counted as a safety-related industrial made product. Okay, and now, Ladies and Gentlemen – start your soldering iron... Following fit and solder the 28-pol. IC socket, the crystal, the potentiometer and the buzzer. The polarity marking on the buzzer is negligable. Start with soldering the 32-pol. female header, fitted from the solder side As you might notice, most of the electrical parts are just pre-assembled and soldered. However, we recommend to check these SMT assembly for assembly faults and cold solder pads before assembling the through hole components. You’ll find at the end of the manual a detailed assembly silk screen for reference. Next cut and remove the tape from the 2.200μF capacitor. Please do not simple cut the wires at the top of the tape as the remaining lenght will be too short. Pin 1 Pin 14 Pin 15 Pin 28 Solder these two outer pins also from this (solder) side !

Assembly Manual „Leon“ USB powered Nixie Clocks · parts runs hot. If everything is allright we will do follwing some voltage checkings: Please check the voltages on the PIC’s

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Assembly Manual „Leon“ USB powered Nixie Clocks · parts runs hot. If everything is allright we will do follwing some voltage checkings: Please check the voltages on the PIC’s

Assembly Manual „Leon“ USB powered Nixie Clocks

Congratulations for purchasing this Nixie clock kit “Leon”.For successful assembly of this kit please read the following helpful hints.

• This kit is designed for someone who has advanced experience with assemblingelectronics.• If you believe that the kit is too complicated for your skill level please do not try toassemble it - this generally ends up with a device that is not repairable and results in youbeing very frustrated. Please contact the provider and they can offer you other options thatwill end in a more fulfilling result!• Take your time - this kit should take 2 hours to complete if uninterrupted. Assemblingthe kit in a hurry will lead to frustration and troubleshooting takes three times as long.• Ensure your work area is well lit (daylight preferred) and clean.• Electronic tools, such as pliers, small side-cutters or tweezers will be handy. You willalso need a T10 (Torx) Allen screwdriver for the housing assembly.• A soldering iron station with a 1 mm round tip (maximum) and a 0.5 mm (maximum)fine electronic solder (lead-free) is required. For lead-free solder we’ve had goodexperience with type Iso-Core EL Sn95,5 Ag3,8 Cu0,7 with 0,5 mm Ø and 3,5% Flux fromFelder Löttechnik and a 400°C soldering tip temperature.• For the intermediary function test you need a multimeter with at least 200 VDC range.• A loupe (magnifying glass) to read the small device markings is often helpful.• Assemble the board in the order as stated in the instructions - this has been proven andwill minimise mistakes.• It is assumed that you understand that semiconductors (diodes, ICs, transistors) orelectrolytic capacitors are polarized components. Appropriate markings are silk-screenedon the PCB and shown on the board schematic.

Together with this construction guide there are some other usefull documents fordownload

• The owners manual for this “Leon” Nixie clock kit• Schematic and Parts List

Safety precautions:During assembly, operation, measurements and maintenance extra precautions mustbe taken. The generated high voltage of 160 V is dangerous. Assemble the circuit at yourown risk.The clock’s functionality cannot be guaranteed when assembled by the customer.No responsibility can be taken for any personal claims and damages during assemblyand commission, especially for damages based on insufficient technical knowledge.The Nixie clock may only be operated in a solid and moisture-proof enclosure.The person who completes the kit and assembles this board into an enclosure foroperation is considered by the German directive VDE 0869 as a manufacturer and isrequired to indicate their name and address including all documents when selling theclock.Ready-to-go devices, which are assembled from kits, are counted as a safety-relatedindustrial made product.

Okay, and now, Ladies and Gentlemen – start your soldering iron...

Following fit and solder the 28-pol. IC socket, the crystal, the potentiometer and the buzzer. Thepolarity marking on the buzzer is negligable.

Start with soldering the 32-pol. female header, fitted from the solder side

As you might notice, most of the electrical parts are just pre-assembled and soldered.However, we recommend to check these SMT assembly for assembly faults and cold solder padsbefore assembling the through hole components.You’ll find at the end of the manual a detailed assembly silk screen for reference.

Next cut and remove the tape from the 2.200μFcapacitor. Please do not simple cut the wires atthe top of the tape as the remaining lenght willbe too short.

Pin 1

Pin 14

Pin 15

Pin 28

Solder these two outer pins also from this (solder) side !

Page 2: Assembly Manual „Leon“ USB powered Nixie Clocks · parts runs hot. If everything is allright we will do follwing some voltage checkings: Please check the voltages on the PIC’s

Assembly Manual „Leon“ USB powered Nixie Clocks

Now connect the PCB to an USB power supply and check if something strange will happen; e.g. aparts runs hot. If everything is allright we will do follwing some voltage checkings:

Please check the voltages on the PIC’s socket pins with a multimeter. Put the negative probe (black)on TP3; left hand from the buzzer. Put the positive probe (red) on the socket pins.

Measured Voltagesred = ca. 5 V • blue = 0...3 V • amber = 0,3 V • green = ca. 0...-2 V • black = 0 V

Pin 1 • Pin 2 • Pin 3 • Pin 4 • Pin 5 • Pin 6 • Pin 7 • Pin 8 • Pin 9 • Pin 10 • Pin 11 • Pin 12 • Pin 13Pin 14 • Pin 15 • Pin 16 • Pin 17 • Pin 18 • Pin 19 • Pin 20 • Pin 21 • Pin 22 • Pin 23 • Pin 24Pin 25 • Pin 26 • Pin 27 • Pin 28

Check following the voltages on the other testpoints: TP1 (around 4.5 V) • TP2 (around 3 V)Please do not proceed until all voltages are within their range and check for the fault.

If everything is ok, unplug the clock from the power supply.

Solder now jumper „ENABLE HIGH V. CONVERTER“ X1/X2, direct above the inductorand insert the PIC. Keep care for correct orientation. Turn on the clock again.

Caution! Now the HV converter is working. Therefore 170 V is present on the board.

Please check again, if something strange happens; e.g. if a part will run hot.Pick up now a screwdriver and do again a measurement of the voltage on TP1It should be in the range of 40 V.

Adjust now this voltage with potentiometer „HIGH V. ADJUST“ to 41.5 V

Do following a voltage check on TP2. It should be in the range of 170 V.Push now button SET. The clock must make a short bleep.Unplug the clock again from power and wait 10 secs. until the capacitors are discharged.

Stop here and flip the page. You need now assemble and fit the tube board. Whenfinished come back for a quick test of the tube board.

Turn the clock on again.The tubes should start with a „digit test routine“; which counts all digits. Also the (RGB) LEDs arechecked within this routine with the following scheme:

Digit 1 = red • digit 2 = green • digit 3 = blue • digit 4 = none • digit 5 = green/orangedigit 6 = none • digit 7 = violett • digit 8 = none • digit 9 = cyan • digit 0 = none

The column Neons should continuously light up and slightly flicker.

If everything is ok, unplug the clock again from power.

Solder now jumper „ENABLE POWER BACKUP“ X3/X4 direct below the dual LEDs.

Solder jumper A/B direct below the ASK module.

Now flip the page again and assemble the enclosure to finish your clock.

Pick up the mounting bracket, the 2,9 x 9,5metall tapping screw and two rosettes.

Mount the bracket as shown in the picture.

Assemble now the 2.200μFcapacitor as shown in thepicture.Tip: Solder from componentside.Assemble following theremaining 2,2μF capacitor.Take care for correctorientation.

Assemble following both dual LEDs (pay attention for correct colour), the Super Capacitor(pay attention for the polarity / arrow marking) and both dual switches.

On the white mainboard (Rev.10/2012) these 10μF are SMT type and just pre-assembled

Page 3: Assembly Manual „Leon“ USB powered Nixie Clocks · parts runs hot. If everything is allright we will do follwing some voltage checkings: Please check the voltages on the PIC’s

Assembly Manual „Leon“ USB powered Nixie Clocks

Assembling the Leon Tube Board

1.: Start with assembling the tubesocket pins and both 510k resistors.

2.: When finished fix the pins and resistorswith a piece of self-adhesive tape.

3.: Flip the board and solder all pins and both resistors

7.: Pick up the RGB-LEDs and bend them asshown in the picture. Keep special careabout the location of the Anode wire (longestwire)

4.: Pick up the neons, bend the leads straight and add two 8 mm spacers.

5.: Bend the neon’s wires as shown in thepicture. Do not make any short ciruit.

6.: Add carefully all tubes and neons to theboard and solder the neons.

8.: Fit the LEDs to the board and solderthem. Use as less solder tin as possible asthe spacing between the LED pins is verysmall.

9.: Fit the 32-pin header and the resistorarrays (the „polarity“ is negligable) fromsolder side and solder them.

10.: Attach the tube board to the main board. Now solder with a piece of (cutted) wire aconnection between pin „HV“ of the tube board to „TP2“ on the main board. This will feedthe 170V, which are necessary to power the neons, to the tube board.

Stop here: Turn back to the assembly of the main board for a quick functioncheck of the tube board.

Assembling the Leon Enclosure

Pick up the front cover, remove both protective films and attach the cover on thealuminium profiles. Now fix the cover only with 3 screws GF M3 x 14 and tighten loosethe right hand screw.

Page 4: Assembly Manual „Leon“ USB powered Nixie Clocks · parts runs hot. If everything is allright we will do follwing some voltage checkings: Please check the voltages on the PIC’s

Assembly Manual „Leon“ USB powered Nixie Clocks

Next pick up both reinforcement profiles and attach them to the enclosure. To enable thisyou need to bend the (only with one screw fixed) right hand profile a little bit.

Remove all protective films from bothtransparent covers and from the silverycover. Keep special care to remove only the„inner“ film on the self-adhesive side fromthe silvery cover.

Attach next the transparent coverson the self-adhesive side. Check forproper alignment befor this task as iiis very difficult to remove this coverswhen fixed.

Pick up next the rubber grommet and insertit into the hole of the buttom cover.

Attach now the 5/8“ to 3/8“ adaptertogether with the nut.

!

Attach both covers to the enclosure. Add the remaining screw on the front cover andtighten them.

Attach now two red „ears“ and fixthem with the GF M3 x 20 screws.

Remove from the rear cover the protectivefilm from the self-adhesive side (theengraved outer side has no film) and fix it onthe main board with the M3 x 6 screw

Page 5: Assembly Manual „Leon“ USB powered Nixie Clocks · parts runs hot. If everything is allright we will do follwing some voltage checkings: Please check the voltages on the PIC’s

Assembly Manual „Leon“ USB powered Nixie Clocks

Next remove the buttom cover from the enclosure and add the electronics plus areinforcment profile as shown in the photo.

Add four rods to the aluminium profiles.Keep care about the correct orientation ofthe nut.Next add to the assembled top cover theremaining reinforement aluminium profile.

Slide carefully the electronics together withthe buttom cover into the enclosure. Checkif the neons will fit into their holes on front.Next fix the rear with the remaining 4 x GFM3 x 14 screws

Finally fit the remaining two „ears“ and fix them.Congratulations. Your clock is now ready assembled. Have a lot of fun.

Adding the ASK Receiver Module from the„Wireless GPS Connection“

Simply fit the module onto the mainboard and solder the 8 pins.Pay attention for correct orientation (see pictures).

The clock has a build in antenna. However, due to the RF shielding of the aluminium profiles thereception range is very limited. If the reception is too poor you can connect the supplied external

antenna to the TIME DATA connector.

Don’t forget to set option #12 to value 4 (for GPS reception) and option #14...16 to correct the timeoffset according to your location; this offset is based on standard time (not day saving).

The green LED below the module will show the received data as well as the DATA LED on rear.

Please note that it is not possible to connect an extra external receiver to the TIME DATAconnector when an ASK module is fitted, only the supplied antenna can be fitted.Please check also, if the solder jumper A/B (direct below the module) is soldered.

For setting up the „Wireless GPS Connection“ system proceed as stated in the appropriateowners manual.

Anbieterkennzeichung • VendorJürgen Grau • Feiningerweg 28/1 • 72622 Nürtingen • Germany • Fon: 07022 / 789 6886 • Fax: 07022 / 90 44 03

E-Mail: [email protected] • www.Nixiekits.eu

Subject change without notice – Issue 1.0 – Version from 03.10.2014

DateMarch, 10th. 2013

Issue1.0

DescriptionInitial Release

Revision History

Page 6: Assembly Manual „Leon“ USB powered Nixie Clocks · parts runs hot. If everything is allright we will do follwing some voltage checkings: Please check the voltages on the PIC’s

5

5

4

4

3

3

2

2

1

1

D D

C C

B B

A A

K10K9K8K7K6K5K4K3K2K1

KK10KK9KK8KK7KK6KK5KK4KK3KK2KK1

KK8KK7KK6KK5KK4KK3KK2KK1

KK10KK9

A1

A2

A3

A4

A5

A6

A3

A5K2K3K4K5K6

K8K7

K9

KK1KK2KK3KK4

KK6

KK7KK8KK9KK10

AM

VC

PM

LR

LG

LB

LB

LG

LRA1

LB

A4

K10K9K8K7K6K5K4K3K2K1

K10K9K8K7K6K5K4K3K2K1

LG

LR

LR

LG

LB

A2

A6

VC

LR

LG

LBVC

LR

LG

LB

LR

LG

LB

VC

VC

AM

AM

VCPM

PM KK8KK7KK6KK5KK4KK3KK2KK1

KK10KK9

VC

K1K10

KK5

DCF

DCF

DCF

VCC

VCC

VCC

VCC

VCC

Title

Size Document Number Rev

Date: Sheet of

Main Board with IN-2 Laura Tube Board 10/2012

USB powered Nixie Clock

A4

1 1Tuesday, October 09, 2012

Title

Size Document Number Rev

Date: Sheet of

Main Board with IN-2 Laura Tube Board 10/2012

USB powered Nixie Clock

A4

1 1Tuesday, October 09, 2012

Title

Size Document Number Rev

Date: Sheet of

Main Board with IN-2 Laura Tube Board 10/2012

USB powered Nixie Clock

A4

1 1Tuesday, October 09, 2012

POLARITY

HV ENABLE

BACKUPENABLE

HV ADJUST

63V 63V

6V3

Track 17,4 cm

22 x 560R 0603

IN-2 Laura Tube Board

- +

TR122k

- +

TR122k

H1H1

A

0987654321

N13N13

T101DT101D

R2R2

R23

12k

R23

12k

LED8LED8

NPMNPM

R20R20

L2L2

M3M3

MA4MA4

TP1TP1

R19R19

C91uC91u

N14N14

IC2HV5812IC2HV5812

VHV1

DOUT2

HV20 3

HV19 4

HV18 5

HV17 6

HV16 7

HV15 8

HV14 9

HV13 10

HV12 11

BLANK13

GND14

CLK15

STROBE16 HV11 12

HV10 17

HV9 18

HV8 19

HV7 20

HV6 21

HV5 22

HV4 23

HV3 24

HV2 25

HV1 26

VDD28

DATA27

BU1

DCF/GPS

BU1

DCF/GPS

L7L7

R12R12

LED3LED3RGB

A

R2612kR2612k

T61DT61D

R27470RR27470R

NLGNLG

Q132kQ132k

S1S1

MAMMAM

R32680kR32680k

M20M20

M12M12

M8M8

R50

12k

R50

12k

NAMNAM

T122DT122D

R46

470R

R46

470R

N15N15

T81DT81D

C1

33p

C1

33p

NA4NA4

C162u2C162u2

R22R22

D8

SS16L

D8

SS16L

M11M11

D5

SS16L

D5

SS16L

CC

T132DT132D

R572k7R572k7

M6M6

C2710uC2710u

R4R4

R41470RR41470R

LED5LED5RGB

A

R14R14

R10R10

T151DT151D

TP3TP3

N16N16

C12

1u

C12

1u

R3812kR3812k

N5N5

X4X4

C1310uC1310u

X1X1

C20

1u

C20

1u

LED13LED13

M15M15

R62

12k

R62

12k

N20N20

L4L4

C2510uC2510u

N18N18

LED7LED7

M2M2

R52

680k

R52

680k

D2

SS16L

D2

SS16L

R3R3

M18M18

OP

TIO

NA

L1

AS

K-R

XB

2O

PT

ION

AL

1A

SK

-RX

B2

GNDSHTDAT5V

5VGNDGNDANT

R53

680k

R53

680k

LED6LED6RGB

A

R6R6

NA1NA1

R18R18

R49

12k

R49

12k

X3X3

BB

R25

12k

R25

12k

NA2NA2

C51uC51u

T41DT41D

T112DT112D

NA5NA5

R44

12k

R44

12k

LED4LED4RGB

A

R8R8

R48

12k

R48

12k

M9M9

R582k7R582k7

NLBNLB

IC1

PIC16F1938_IN-2

IC1

PIC16F1938_IN-2

MCLR1

HV SENSE2

A1 28

LED B 27LED G 26LED R 25

A3 7

VS

S8

LED AM 9

LED PM 10

XTAL1/TCXO11

XTAL212

HV PWM13LED DST 14

LED ALARM 15

LED DCF/GPS 16

SOUNDER17

DCF/GPS18

VS

S1

9V

DD

20

SET21

ADJ22

ALARM23

DST24

DTA 3

CLK 4

STR 5

A2 6

R45

470R

R45

470R

N6N6

R42470RR42470R

NVCNVC

R16R16

LED9LED9

M5M5

NA6NA6

C101uC101u

MA5MA5

T21DT21D

R21R21

MA3MA3

M13M13

R37n.c.R37n.c.

MVCMVC

C8

10u

C8

10u

SND1SounderSND1Sounder

N7N7

LED2LED2RGB

A

R13R13

T11DT11D

R7R7

C151uC151u

M1M1

R30680kR30680k

R34680kR34680k

L6L6

N8N8

M16M16

N19N19

AA

C171FC171F

R29680kR29680k

C42200uC42200u

R47

470R

R47

470R

R3912kR3912k

L1L1

R592k7R592k7

R15R15

MLGMLG

R5R5

C18

1u

C18

1u

R36

12k

R36

12k

N9N9

X2X2

N1N1

BU2BU212345

T71DT71D

M19M19LED12LED12

T31DT31D

D6

SS16L

D6

SS16L

MA2MA2

T14NDT3055LT14NDT3055L

MA1MA1

C2610uC2610u

R552k7R552k7

H5H5

A

0987654321

R1R1

NA3NA3

M4M4

N10N10

R33

680k

R33

680k

N2N2

R51

680k

R51

680k

R9R9

D7SS16LD7SS16L

S2S2

LED10LED10

H4H4

A

0987654321

R24

12k

R24

12k

R562k7R562k7

M14M14

MLRMLR

C24

1u

C24

1u

L847uHL847uH

T51DT51D

R542k7R542k7

D3

SS16L

D3

SS16L

MA6MA6

R43

12k

R43

12k

C733pC733p

ZD175VZD175V

LED11LED11

C2233pC2233p

D1

SS16L

D1

SS16L

N11N11

N3N3

D4

SS16L

D4

SS16L

R35

12k

R35

12k

M10M10

M7M7

H3H3

A

0987654321

TP2TP2

C2133pC2133p

C19

10u

C19

10u

L5L5

H6H6

A

0987654321

MLBMLB

Z1Z1

NLRNLR

R17R17

R11R11

H2H2

A

0987654321

C141uC141u

N12N12

C2333pC2333p

R40470RR40470R

R60470RR60470R N4N4

MPMMPM

R63470RR63470R

R3112kR3112k

R61

12k

R61

12k

R28680kR28680k

LED1LED1RGB

A

M17M17

T91DT91D

N17N17

L3L3

C6

10u

C6

10u

C310uC310u

C111uC111u

Page 7: Assembly Manual „Leon“ USB powered Nixie Clocks · parts runs hot. If everything is allright we will do follwing some voltage checkings: Please check the voltages on the PIC’s

5

5

4

4

3

3

2

2

1

1

D D

C C

B B

A A

A3

KK8KK7KK6KK5KK4KK3KK2KK1

KK9

A4A5

A1

KK9KK8KK7

K9

AM

KK6

K8

KK5

VC

K7

KK8KK7KK6KK5KK4KK3KK2KK1

KK9

KK4

PM

K6

KK3

K5

KK2

K4

KK1

R

K3

K9K8K7K6K5K4K3K2K1

K2

G

BK1

K9K8K7K6K5K4K3K2K1

B

G

R

A1A2

VC

K0

K0

B

G

RA2

VC

G

BVC

K0

A3R

HVAM

A4R

G

BVC

KK0

PM HV

A5R

G

BVC

KK0

A6R

G

BVC

KK0

A6K0K1K2K3K4K5K6KK7KK8KK9KK0KK1KK2KK3KK4KK5KK6K7K8K9

HV

Title

Size Document Number Rev

Date: Sheet of

For USB Nixie Clock Main Board 0

Leon Tube Board

1 1Saturday, February 23, 2013

Title

Size Document Number Rev

Date: Sheet of

For USB Nixie Clock Main Board 0

Leon Tube Board

1 1Saturday, February 23, 2013

Title

Size Document Number Rev

Date: Sheet of

For USB Nixie Clock Main Board 0

Leon Tube Board

1 1Saturday, February 23, 2013

RN1...6 = 3 x 1k Array

H4ST12CH4ST12C

A

0987654321

HVHV

NPMNPM

RN2ARN2A

LED6LED6RGB

A

RN1ARN1A

R2

510k

R2

510k

N2N2

NA2NA2

RN6BRN6B

N7N7

N20N20

RN4ARN4A

N10N10

N6N6

NLGNLG

H7H7

LED2LED2RGB

A

R1

510k

R1

510k

N17N17

N16N16

RN2BRN2B

NVCNVC

NLBNLB

N3N3

H8H8

H3ST12CH3ST12C

A

0987654321

N13N13

H5ST12CH5ST12C

A

0987654321

RN1BRN1B

RN2CRN2C

NA3NA3

NLRNLR

N1N1

NA6NA6

NAMNAM

NA1NA1

H1ST12CH1ST12C

A

0987654321

N14N14

N8N8

RN3ARN3A

H6ST12CH6ST12C

A

0987654321

RN4CRN4C

RN5BRN5B

RN1CRN1C

NA4NA4

N19N19

LED5LED5RGB

A

LED1LED1RGB

A

RN6CRN6C

RN5ARN5A

H2ST12CH2ST12C

A

0987654321

N11N11

N4N4

RN3BRN3B

N5N5

RN5CRN5C

N9N9

N15N15

N18N18

RN3CRN3C

LED4LED4RGB

ARN4BRN4B

N12N12

RN6ARN6A

NA5NA5

LED3LED3RGB

A

Page 8: Assembly Manual „Leon“ USB powered Nixie Clocks · parts runs hot. If everything is allright we will do follwing some voltage checkings: Please check the voltages on the PIC’s
Page 9: Assembly Manual „Leon“ USB powered Nixie Clocks · parts runs hot. If everything is allright we will do follwing some voltage checkings: Please check the voltages on the PIC’s
Page 10: Assembly Manual „Leon“ USB powered Nixie Clocks · parts runs hot. If everything is allright we will do follwing some voltage checkings: Please check the voltages on the PIC’s
Page 11: Assembly Manual „Leon“ USB powered Nixie Clocks · parts runs hot. If everything is allright we will do follwing some voltage checkings: Please check the voltages on the PIC’s

Part List Leon USB powered Nixie Clock

Through hole components Main PCB for Leon Qty Part description Value Position / Code 1 Duo-LED Green / green LED11 1 Duo-LED Red / Yellow LED12 4 LED spacer 8 mm Tube Board 2 Dual push button switch S1, S2 1 Buzzer 42 ohms voice coil imp. SND1 1 Super Capacitor 1F 5V5 C17 1 Electrolytic capacitor 2200uF 6V3 C4 1 Electrolytic capacitor 2u2 250V C16 1 Potentiometer 22k TR1 1 Crystal 32.756 kHz Q1 1 IC-Socket 28-pol. IC1 1 Processor 16F1938 IC1 1 Female Connector 90° 32-pol. 32-pol. 1 Male Connector 180° 32-pol. 32-pol. 1 Mounting Bracket M3 / 3.2 1 Allan flat hat screw M3 x 6 1 Sheet metal screw 2.9 x 9.5 1 Rosettes Plastic black 1 Main Board Board preassembled Electrical and Mechanical Parts for Leon Nixie Clock Tube Board Ca. 70 Tube socket pins H1…H6 8 Alan flat hat screw self tapping M3 x 14 4 Alan flat hat screw self tapping M3 x 20 4 Roads Red plastic 6 RGB-LEDs 5mm diffus LED1…LED6 2 Neons H7,H8 2 Resistors 510k R1,R2 6 Resistor Arrays 1k RN1…RN6 2 Aluminium side profiles 1 Rubber grommet 1 5/8” to 3/8” adapter 1 Nut for adapter 4 “Ears” Red plastic 4 Aluminium rainforcement frames 1 Leon Tube Board 1 Front cover 1,6 mm silvery 1 Rear cover 1,6 mm silvery engraved 1 Top cover 1,6 mm silvery 1 Bottom cover 1,6 mm silvery with drill hole for adapter 2 Reinforcement frames 3 mm transparent with drill hole