Assessment Reportfor
The Tributary Grid, Part of the Faint Hope Property.
4 ft
Northern Shield Resources
lan Bliss October, 2001
42H11SE2001 2.22346 IRELAND 010
2. 2234
Location and Access
The Tributary Grid is part of the Faint Hope Property and is located in the center of Ireland Township in the Porcupine Mining Division, District of Cochrane, 50 km and 120 km north of Cochrane and Timmins respectively. A railway passes within 7 km of the property and a surfaced road exists within 18 km. Access is best gained by helicopter from Timmins or Cochrane though winter skidoo travel is possible through a network of trails and creeks. Forestry roads exist within about 12 km to the south and east and are reported to be extended to the centre of Ireland Township in 2001.
Previous Work
No claims have been previously staked in Ireland Township and there is no indication of any work having been performed in the immediate area by industry or government organizations.
Ground Magnetic Survey
In early May, 2000 a flagged grid was constructed in NE Ireland township over a possible kimberlite target. The origin of the grid is located at approximately 489,160W 5,487,450N (UTM WGS 84 Zone 17). A 400 meter base-line was run E-W (0900) with cross-lines every 100 meters. Readings were taken at 25 m intervals with a GEM GSM 19 Magnetometer.
The results show a tear-drop shaped magnetic high sitting in what appears to be an E-W trending dyke. Since no outcrop exists in the area the cause of the anomaly is uncertain. While it could be a separate intrusive phase, including kimberlite it is also possibly the result of two intersecting dykes.
2.22346
l
Ireland NMag survey " Tributary Grid
w ^
(^ Kilometers i Vo/ v
c \T" A 'I ' ^9^ 1 4 \ i a i
•( Marven * \ i ^^-^ 1 TU*
2. 2
w
FAINT HOPE PROJECT Tributary GridTotal Magnetic Intensity
Scale 1:5000
2. 2
FAINT HOPE PROJECT Tributary Grid
J Total Magnetic Intensityw^Hs
+58.059.33
4-58, 107.24
458,187.97
4-58,419.42
4-58,521.8
4-58,413.44
-L58.957.63
—58,308.81
458,468.93
4-58,639.86
[ co ion r)————————— pOO , ̂ CX7- o ———
4-58,025.53
4-57,956.83
^57,930.27
^57,922.52
+57.931.81
4-57,927.25
4-57,929.32
4-57,943. 1
r- wS
+58.039.1
4-58,077.25
4-58,107.18
4-58,380.66
—58,309.41
—58,312.43
4-58,507.78
4-58,331.69
4-58,518.57
4-58,449.64
—— 1-58,165.03 —
^-58,01 8.22
^-57,963.57
+57.935.01
4-57.942.95
+57.934.21
4-57,957.94
4-57,947.16
^57,941.81
—57,947.29
r57,886.13
|— ro O O
4-58,013.44
+58.050.56
4-58,089.66
^58,135.4
4-58,319.5
4-58,302.05
4-58,545.12
4-58,715.52
+58,834.29
—58,949.32
^58,459.8
—— (-58,063.22 —
4-57,978.22
4-57,958.91
4-57,933.48
+57,932.25
-^57,909.62
4-57,922.06
4-57,933.29
4-57,937.24
4-57,957.72
l—
S
4-58,225.05
458,440.08
-f 58,478.25
458,683.32
458,503.78
4-58,918.69
459,271.79
459,090.45
459,044.76
458,873.19
458,277.72
—— (-57,990.62 —
457,951.5
457,930.09
457,949.23
457,923.97
457,940.14
457,986.84
457,997.37
458,021.07
4-58,015.2
5 S
458,054.47
458,062.83
458,117.24
458,224.74
4-58,448.89
^58,808.88
458,697.82
4-58,794.44
4-58,696.84
-f 58,581 .81
—58,214.4
—58,052.22
,, l PI _____
457,988.69
4-57,973.24
4-57,948.43
4-57,902.2
4-57,837.18
457,883.16
+57.880.61
457,850.05
4-57,857.11
r~
o om
Scale 1:5000 readings in nanaTesla
10/29/2881 21:44 7853607733 VISIONPAGE 81
GEM GSM-19
INSTRUMENT SPECIFICATIONS
MAGNETOMETER l GRADIOMEVER
2.8
Resolution:Accuracy:Range:Gradient ToleranceOperating interval:.
Input/Output: Power Requirements:
Power Source-
Battery Charger:
Operating Ranges:
Storage Temperature: Display:
Onneusions:
YL.FFrequency Range: Parameters Measured:
Resolution: Number of Stations:
Terrain Slope Range: Sensor Dimensions: SensDf Weight.
0.01 nT (gamma), magnetic Add and gradient. O JL nT over operating range. 20,000 to 120,000 nt Over 10,000 nT/m3 seconds minimum, fester optional Readings initiated from keyboard. edbemaTtrigget or carriage nawn via R5-232-C. 6 pin weatherproof Gonnecft. RS-232C and (optional) analog output 12 V, 200 mA peak (during polarization), 36 mA standby. 300mA peak in gradiometer mode- Internal 12 V, 2.6 Ah sealed Jcadsidd battery standard, others op- tionaL An External 12V power source can also be used fnpofc 110 VAC. 60 Hz. Optional 110/220 VAC, 50/50 Hz. Output: dual levef charging. Temperature:-40 *C to+60-CBattery Vbhage: 104) V mfnmtinn to 15V maximum. Humidify: op to 9096 relative, non condensing.
LCD: 240 x 64 pixels, or 8x30 characters. Built in heater fer opera tion bdow -20-CConsole: 223 x 69 x 240mm.Sensor statfrV 4 x 450mm sedkms.Sensor 1 70 X 71 mm dia.Weight Console 2.1kg, Staff 0.9kg, Sensors 1.1 kg each.
15-30.0 kHz.Vertical Itvphase and Out-ofyhase components as percentage of totalfield.2 component of horizontal field.Absolute ampftude of total flett0.1*.Up to 3 at a time.AtftxiiatfcyAh^tirn^coonfaatE^fnagn^field, frequency m-andout-o^phase vertical, andcomponents fer ead ' J '
i horizontal
-. 14 x 15 x 9 cm. (5-5x6x3 inched.
ONTARIO MINISTRY OF NORTHERN DEVELOPMENT AND MINESTransaction No:
Recording Date:
Approval Date:
Client(s):
392612
Survey Type(s):
W0160.31018
2001-OCT-31
2001-DEC-11
Work Report Summary
Status: APPROVED
Work Done from: 2000-MAY-05
to: 2000-MAY-05
NORTHERN SHIELD RESOURCES INC.
MAG
Work Report Details:
Claim*
P 1239820
Perform
33,840
33,840
Perform Approve
53,840
S3, 840
Applied
31,600
31,600
Applied Approve
31,600
31,600
Assign
so30
Assign Approve
0
so
Reserve
32,240
S2.240
Reserve Approve
S2.240
S2.240
Due Date
2002-NOV-02
Status of claim is based on information currently on record.
42H11SE2001 2.22346 IRELAND 900
2001-Dec-19 23:09 Armstrong-d Page 1 of 1
Ministry ofNorthern Developmentand Mines
Date: 2001-DEC-12
Ministers du Developpement du Nord et des Mines Ontario
GEOSCIENCE ASSESSMENT OFFICE 933 RAMSEY LAKE ROAD, 6th FLOOR SUDBURY, ONTARIO P3E6B5
NORTHERN SHIELD RESOURCES INC. 44 FARNHAM CRES. OTTAWA, ONTARIO K1K OG2 CANADA
Tel: (888) 415-9845 Fax:(877)670-1555
Dear Sir or Madam
Submission Number: 2.22346 Transaction Number(s): W0160.31018
Subject: Approval of Assessment Work
We have approved your Assessment Work Submission with the above noted Transaction Number(s). The attached Work Report Summary indicates the results of the approval.
At the discretion of the Ministry, the assessment work performed on the mining lands noted in this work report may be subject to inspection and/or investigation at any time.
If you have any question regarding this correspondence, please contact LUCILLE JEROME by email at [email protected] or by phone at (705) 670-5858.
Yours Sincerely,
Roy SpoonerActing Supervisor, Geoscience Assessment Office
Gc: Resident Geologist
Northern Shield Resources Inc. (Claim Holder)
Assessment File Library
Northern Shield Resources Inc. (Assessment Office)
Visit our website at http://www.gov.on.ca/MNDM/LANDS/mlsmnpge.htm Page: 1 Correspondence 10:16655
MINING LAND TENURE
MAP
Date /Time of Issue Dec 11 2001
TOWNSHIP r ARE A
IRELAND
16:45h Eastern
PLAN
G-109B
ADMINISTRATIVE DISTRICTS l DIVISIONS Mining Division Porcupine Land Titles/Registry Division COCHRANE Ministry of Natural Resources Dlitrkt COCHRANE
'.i -- iita'?
LAND TENURE WITHDRAWALS
IMPORTANT NOTICES
LAND TENURE WITHDRAWAL DESCRIPTIONS